Loading...
HomeMy WebLinkAbout7.5 MCE AmendExtendAgrmnt CITY OF DUBLIN AGENDA STATEMENT SUBJECT: City Council Meeting Date: June 27, 1989 Public Works Maintenance Contract Review (MCE) Report prepared by Public Works Director Lee Thompson EXHIBITS ATTACHED: 6) 1) Table of Workload Measures 2) Comparison of Equipment Rental Rates 3) Proposed ~endment Extending Agreement 4) Current Maintenance Agreement with MCE 5) Service Request Form, Final Service Request Summary for Fiscal Year 1987-88 and Summary for ~f 1988-89 through May MCE Self-Evaluation Discuss maintenance issues as part of evaluation process. Approve amendment to current agreement extending Agreement for one year and authorize Ma]for to execute. FINANCIAL STATEMENT: See below. DESCRIPTION: PiCE has provided maintenance services to the City of Dublin since July 1, 1984. Those services which are provided by MCE are as follows: Spill Cleanup Street Repair Drainage Maintenance Storm Patrol/Cleanup Curb, Gutter, and Sidewalk (temporary or emergency repair) Sign Installation, Repair, and Maintenance Striping and Marking Guardrai! Repair Weed Abatement Bike Path Maintenance Street /tee Haintenance Stree5 Landscaping Maintenance Park Maintenance On July 1, 1987, the City entered into a one-year agreement with MCE Corporation, which provided for extensions for two successive one-year terms, subject to the satisfactory performance by the Contractor as determined by the City. July 1, 1989, will begin the final year provided for in the current agreement. Shown below is a comparison of the contract costs authorized by the City for Fiscal Year 1988-89 with the estimated costs which will be incurred for Fiscal Year 1988- 89 by activity. TABLE I Activity Spills Street Repair Drainage Haintenance Storm Patrol Curb, Gutter, & Sidewalk Sign Repair/Installation Striping & Harking Cuardrail Repair Weed Abatement Bike Path Maintenance Street Tree Maintenance Landscape Haintenance Park Haintenance Maintenance Supervisor Miscellaneous Work Budget* Estimated Over/Under 1988-89 1989-90 1988-89 BudgeI 5,300 76 700 10 !00 8 600 15 900 21 200 45 000 1 300 5 800 6 200 90 900 184 300 319 500 73 800 10 000 $ 3 300 45 000 17 000 6 600 15 900 21 000 44 255 1 300 5,800 2,000 71,900 173,900 308,360 73,800 6,000 (2,ooo) (Sl,7OO) 6,900 (2,000) 0 (200) (745) 0 0 (4,200) (19,ooo) (~0,400) (ll,i40) 0 (4,000) $ 874,600 $ 746,115 $ (78,485) * As adopted by City Council in June 1988. ITEM NO. / t: .' COPIES TO' Maynard Crowther, MCE Stat Smalley, MCE As indicated above, it is anticipated that MCE will spend $78,485 less than the7 were authorized to spend in Fiscal Year 1988-89. This is primarily attributable to the following factors: 1) Much of the street repair was done under the overlay/street repair contract because of the much lower cost of using a pavement grinder for production street repair work ($~1,700). 2) Because of the size of many of the street trees, the frequency of maintenance pruning was reduced ($19,000). 3) The San Ramon Road Phase III landscape maintenance and Villages assessment district came on line much later than estimated ($10,400). 4) Park maintenance is lower due primarily to taking over Alamo Creek Park later than anticipated ($11,140). The computerized reporting methods that MCE uses allows cost review and control on a monthly basis so that the various maintenance activities to be monitored may be easily revised when necessary. Work Performed MCE staff has developed a performance based budget in which a very detailed inventory of improvements is monitored. Exhibit 1 lists a sample of the workload measures which helps City Staff to keep up on changes in maintenance needs. These workload measures include a full time maintenance supervisor who oversees the budget categories of park maintenance, street tree maintenance, street maintenance, and street landscape maintenance. The listed workload measures are definable tasks which make up these budget categories. Labor is measured in manhours; materials are quantified by weight, measurement, or item. ~uality of Service Provided Attached (Exhibit 5) are the Final Se~ice Request Summary for street maintenance (including sweeping, landscaping, signs, and so forth) for Fiscal Year 1987-88 and the summary for the first 11 monnhs of Fiscal Year 1988-89. As indicated in the s~mnary, the City handled a total of 46 street maintenance service requests for the first 11 months of this fiscal year. Of those service requests that were handled, the City received 13 responses to the Se~;ice Request questionnaire. The job evaluation score increased from 4.30 in Fiscal Year 1987-88 to 4.50 in 1988-89 (the ratings being defined as ~4 "somewhat pleased" and #5 "very pleased). For the most part, those residents that responded had very favorable comments regarding the quality of service provided by MCE. Fl' 1988-89 is the first year that MCE has handled park maintenance se~ices for the City. The Service Request Summary for park maintenance is computed separately from the street maintenance report and is also attached. Through biay of 1989, a total of 70 requests for park maintenance were received, including service to the Senior Center and Shannon Center buildings. The City received 16 responses to the questionnaire, with an average evaluation score of 4.3. (It should be noted that approximately half of the park se~ice requests were Staff- generated and that the response rate from residents is actually about 50%.) Again, most co~nents were favorable regarding the quality of service. ~iCE's emergency response has been very good. In general, they have responded within 20 to 30 minutes. Several of MCE's staff live in close proximity to the City of Dublin, enabling a quick response time during non-working hours. In addition to the normal contract work, MCE has provided personnel and equipment for special events such as the St. Patrick's Day parade and the Shamrock Festival and for miscellaneous banner installations. The traffic control planning and execution has been professional and timely for these events. Contract Comoliance As was indicated in last year's report, MCE's performance has continued to improve. MCE has strived to find different ways to reduce costs to the City and has exercised consistent initiative in identifying problem areas as well as keeping the Public Works Director's office informed of the status of public works maintenance activities. MCE has also gone to great lengths to doc~tment and inventory all of the various public works items throughout the City in order to more accurately project maintenance costs and identify service levels. This information has been invaluable in preparing the P'i$cal Year ].989-90 maintenance budgets in that Staff was able to easily pinpoint areas where cost savings might be realized. Additionally, the Maintenance Superintendent participates in both the Traffic Safety Committee and regular Public Works staff meetings. These activities have proven invaluable from the standpoint of communication within and among departments and have hastened the resolution of real and potential problems that come to light. Cost Effectiveness In past years, it has appeared that the only viable alternative to providing . public works maintenance services at this time would be to provide the service in a combination of contract and City employees or with solely City employees. As noted in prior reviews, the City's existing Corporation Yard facility would be inadequate for the equipment and personnel that would be necessary if this function was provided in-house. The cost of relocating and constructing a ne~ facility would far outweigh any difference between the contract and in-house provision of public works services at this time. Proposed Services for Fiscal Year 1989-90 The proposed schedule of work for Fiscal Year 1989-90 is sho,~n in Attachment 1 of the Addendum to Public Works Maintenance Agreement. As always, the scheduled work is tentative and will not be finalized until the City Council approves the Budget. As indicated in Attachment 1, Schedule of Work, the estimated contract costs for maintenance services provided by MCE for Fiscal Year 1989-90 total $993,050. This exceeds by $193,690 the estimated maintenance costs of $799,360 for Fiscal Year 1988-89. This increase is primarily attributable to the following factors' I) The assumption of the Villages landscape maintenance assessment district for a full year ($75,400). 2) Increase in the first few years' costs of using thermoplastic striping instead of paint which will see long-term cost savings ($20,500). This was implemented in May of 1989 with the annual overlay program. 3) Landscape maintenance, including the addition of 2.89 acres of new landscaping in the San Ramon Road Phase III project ($25,600). 4) The ass~ption of Alamo Creek Park for a full year ($42,590). 5) ~[aintenance of the new landscaping on the Civic Center grounds ($37,000). Proposed Contract Amendment Exhibit 2 provides a table of proposed labor and equipment rental rate revisions. Note that while labor rates are generally increasing in the 5 to 7 percent range, there are substantial decreases (up to 50%) for equipment charges. These decreases are possible because of the high hourly usage for much of the equipment. The labor charges are in line with Staff's knowledge of the rise in labor market. It is to MCE's credit that they are volunteering to substantially reduce most of their equipment rates based on their analysis of the usage of this equipment. Re commendat ion It is Staff's recommendation that the City Council approve the Addendum to the Agreement for Fiscal Year 1989-90 as shown in Attachment 1, Schedule of Work, including the revisions to the labor and equipment rates. - 3 (SAMPLE) COMPARISON OF WORKLOAD MEASURES ACTIVITY SPILLS TEMPORARY PATCHING POTHOLE PATCHING REMOVE AND REPLACE ASPHALT DRAINAGE INSPECTION CATCH BASINS CLEANED DITCH CLEANING STORM PATROL INSPECTION/ REMOVAL REPLACE SIDEWALK CURB & GUTTER REPLACEMENT INSTALL NEW SIGNS SIGNS REPAIRED STRIPING-LANE LINES STRIPING-LETTERS/SYMBOLS STRIPING-CROSSWALKS CURB PAINTING INSTALL PAVEMENT MARKERS ROADSIDE SPRAYING BIKE PATH MAINTENANCE TREE/BUSH CUTTING TREE TRIMMING SUBCONTRACTOR TREE REMOVAL TREE WATERING TREE REPLACEMENT LITTER PICKUP PRUNE/TRIM BEDDINGS MOW MEDIAN TURF EDGE MEDIAN TURF (ANNUAL TTL IRRIGATION INSPECTION/ PROGRAM IRRIGATION REPAIRS (HEADS ONLY) REPAIR PAVER STONES MAINTENANCE SUPERVISION PARK TURF (ACRES) OPEN SPACE (ACRES) BUDGET ACTUAL ACTUAL 1988-89 1986-87 1987-88 REVISED PROPOSED 1989-90 204 HRS 182 HRS 133 HRS 179 HR 70 HRS 46 HRS 64 HRS 64 HR 0 TON 6 TONS 0 TON 0 TN 20592 SF 15645 SF 7000 SF 6390 SF 792 EA 718 EA 883 EA 934 EA 546 EA 374 EA 353 EA 373 EA 4210 LF 3030 LF 5850 LF 5850 LF 44 HRS 157 HRS 200 HRS 3407,SF 2503 SF 1532 SF 265, LF 221 LF 178 LF 180 EA 71 EA 71 EA 191 EA 271 LF 300 EA 79159 LF 47924 EA 114712 LF 1425 EA 1549 LF 1700 EA 17219 LF 14993 LF 13510 LF 3514 LF 6337 LF 21490 LF 956 EA 773 EA 911 EA 16 AC 15 AC 15 AC 155 HRS 112 HRS 120 HRS 665 HRS 1223 h-RS 1015 HRS 263 EA 92 EA 225 EA 0 EA 0 EA 2 EA 8174 EA 7021 EA 6408 EA 50 EA 66 EA 83 EA 842 HRS 1787 HRS 2700 HRS 1176 HRS 500 HRS 400 HRS 315 HRS 896 HRS 700 HRS 27610 LF 211614 LF 280000 LF 185 EA 7176 EA 8000 EA 162 HRS 291 HRS 190 HRS 248 HRS 242 HRS 160 HRS 1869 HRS 1908 HRS 1864 HRS N/A N/A 32.44AC 91.84AC 91.84AC 91~84AC 468 HR 1590 SF 187 LF 75 EA 300 EA 127512 LF 2536 EA 21030 LF 21540 LF 911 EA 43 AC 160 HR 1052 HR 250 EA 5 EA 6408 EA 114 EA 2944 HR 408 HR 790 HR 280350 LF 12760 EA 190 HR 160 HR 1856 HR 40.17AC 91.84AC PROPOSED LA_ ~R AND EQUIPMENT RENTAL RA%_S 1989-90 1988-89 PROPOSED RATES RATES CHANGE PERCENT CHANGE LABOR RATES DUBLIN CREW MAINTENANCE SUPERINTENDENT LANDSCAPE FOREMAN LANDSCAPE LABORER I LANDSCAPE LABORER II LANDSCAPE LABORER III $26.00 HR $28.00 HR $ 2.00 HR 18.80 HR 20.20 HR 1.40 HR 16.00 HR 17.00 HR 1.00 HR 13.60 HR 14.40 HR 0.80 HR 10.80 HR 11.40 HR 0.60 HR 7.7% 7.4% 6.2% 5.8% 5.6% MCE CREW SUPERINTENDENT LOADER/BACKHOE OPERATOR ASPHALT PAVER OPERATOR ROLLER OPERATOR TRACTOR OPERATOR TRUCK DRIVER 8-12 C.Y. TRUCK DRIVER 4-5 C.Y. TRUCK DRIVER 3 C.T. TRANSIT CEMENT FINISHER LABOR FOREMAN LABORER I LABORER II LABORER III $42.50 HR $44.75 HR $ 2.25 HR 41.50 HR 43.75 HR 2.25 HR 40.25 HR 42.30 HR 2.05 HR 40.25 HR 42.30 HR 2.05 HR 37.75 HR 40.15 HR 2.40 HR 34.50 HR 36.75 HR 2.25 HR 34.00 HR 36.25 HR 2.25 HR 34.00 HR 36.25 HR 2.25 HR 33.00 HR 35.10 HR 2.10 HR 31.75 HR 33.65 HR 1.90 HR 30.75 HR 32.65 HR 1.90 HR 30.60 HR 32.45 HR 1.80 HR 30.50 HR 32.30 HR 1.80 HR 5.3% 5.4% 5.1% 5.1% 6.4% 6.5% 6.6% 6.6% 6.4% 6.0% 6.2% 6.O% 5.9% EQUIPMENT RATES ASPHALT PAVER LOADER/BACKHOE TRACTOR ROLLER-VIBRATORY 3-5 TON ROLLER-VIBRATORY 1-3 TON DUMPTRUCK 8-12 C.Y. DUMPTRUCK 4-6 C.Y. TRANSIT TRUCK 3 C.Y. FLATBED DUMP W/R & HT PICKUP CREW CAB PICKUP W/R & HT CONCRETE SAW-SELF PROP. CONCRETE SAW-SMALL AIR COMPRESSOR $37.50 HR $37.50 HR N/C 27.50 HR 27.50 HR N/C 22.50 HR 22.50 HR N/C 15.00 HR 15.00 HR N/C 12.00 HR 12.00 HR N/C 20.00 HR 22.50 HR 2.50 HR 18.00 HR 20.00 HR 2.00 HR 18.00 HR 20.00 HR 2.00 HR 9.00 HR 7.00 HR -2.00 HR 7.00 HR 7.00 HR N/C 7.00 HR 5.00 HR -2.00 HR 12.50 HR 12.50 HR N/C 8.00 HR 8.00 HR N/C 10.00 HR 10.00 HR N/C 12.5% 11.1% 11.1% -22.2% -28.5% 1988-89 RATES 1989-9~ PROPOSED RATES CHANGE EQUIPMENT RATES (CONTINUED) BITUMAL POT VIBRA PLATE WACKER POWER BERM MACHINE MOWER (21") MOWER (36") MOWER (72") CHAIN SAW BRUSH CUTTER POWER BLOWER POWER EDGER SPRAY TANK W/TRAILER POWER HEDGE TRIMMER POWER VACUUM (30") TRAILER LARGE (18') TRAILER SMALL (8') HAND TOOLS (PER TRUCK) TWO-WAY RADIO $ 6.00 HR $ 6.00 HR N/C 5.00 HR 6.00 HR $ 1.00 HR 6.00 HR 6.00 HR N/C 10.00 HR 10.00 HR N/C 2.00 HR 3.00 HR 1.00 HR 5.00 HR 4.00 HR -1.00 HR 14.00 HR 10.00 HR -4.00 HR 5.00 HR 4.00 HR -1.00 HR 4.00 HR 3.00 HR -1o00 HR 3.00 HR 2.00 HR -1.00 HR 1.50 HR 2.00 HR .50 HR 2.50 HR N/A N/A 2.50 HR 2.00 HR - .50 HR 5.00 HR 7.00 HR 2.00 HR 5.00 HR 4.00 HR -1.00 HR 3.00 HR 2.00 HR -1.00 HR 1.00 HR .50 HR - .50 HR 1.00 HR .50 HR - .50 HR PERCENT CHA~GE 20.0% 5O.O% -2O.O% -28.5% -2O.O% -25.O% -33.3% 33.3% -20. O% 4O.0% -20.O% -33.3% -5O.O% -5O. O% UNIT PRICES REMOVE/REPLACE ASPHALT REMOVE/REPLACE ADD. DEPTH ASPHALT LEVELING/OVERLAY REPLACE SIDEWALK REPLACE DRIVEWAY REPLACE CURB & GUTTER 3.30 SF 3.90 SF .60 SF .4O SF .40 SF N/C 90.00 T 95.00 T 5.00 T 6.60 SF 6~90 SF .30 SF 7.60 SF 8.00 SF .40 SF 18.00 LF 18.90 LF .90 LF SAW CUTTING 1.75 LF 1.85 LF .10 LF CHEMICAL WEED CONTROL MEDIANS 143.00 AC 111.10 AC -31.90 AC CHEMICAL WEED CONTROL R.O.W. 115.50 AC 114.70 AC -.80 AC TREE TRIMMING UNDER 30' TREE TRIMMING OVER 30' TREE WATERING FERTILIZE TURF AERATION TURF PRUNE PARK TREES OVER 20' FUNGUS SPRAYING-TREES 4" SKIP CENTERLINE 4" SOLID EDGELINE 4" SOLID CENTERLINE 6" SOLID BIKE LANE 8" SOLID TURN LANE 12" CONTINUOUS TURN LANE (ONE SIDE) 49.50 EA 40.70 EA -8.80 EA 82.50 EA 74.80 EA -7.70 EA .83 EA .83 EA N/C 110.00 AC 105.00 AC -5.00 AC 200.00 AC 333.30 AC 133.30 AC 53.35 EA 52.80 EA 4.40 EA 4.12 EA .037 LF .039 LF .055 LF .057 LF .061 LF .064 LF .128 LF .133 LF .157 LF .165 LF .169 LF .178 LF -.55 EA -.28 EA 18.2% 5.6% 4.5% 5.3% 5.0% 5.7% -22.3% -O.7% -17.8% -9.3% -4.5% 66.6% -1.0% -6.4% 5.O% 5.0% 5.0% 5.O% 5.O% 5.0% 1989-~.~ 1988-89 PROPOSED RATES RATES CHANGE PERCENT CHANGE UNIT PRICES (CONTINUED) 12" DOUBLE CENTERLINE 8' LETTER 12" CROSSWALK 12" LIMIT BAR 8' DIRECTIONAL ARROW 24' DIRECTIONAL ARROW 20' DIAGONAL PARKING LINE PARKING "T" HANDICAP LEGEND (W/BACKGROUND) CURB PAINTING BIKE LANE ARROW BIKE LANE LEGEND 4' PAINT REMOVAL RAISED PAVEMENT MARKERS (REFLECTIVE) RAISED PAVEMENT MARKERS (NON-REFLECTIVE) $ .182 LF $ .190 LF 3.930 LF 4.125 LF .424 LF .444 LF .484 LF .508 LF 9.680 LF 10.164 LF 22.330 LF 23.441 LF 3.630 EA 3.812 EA 2.420 EA 2.541 EA 22.180 LF 22.233 LF .484 LF .508 LF 3.630 EA 3.812 EA 2.420 EA 2.541 EA 3.630 SF 3.812 SF 4.240 EA 4.446 EA 2.420 EA 2.541 EA 5.0% 5.O% 5.0% 5.O% 5.O% 5.0% 5.0% 5.O% 5.O% 5.0% 5.O% 5.O% 5.O% 5.O% 5.0% AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND MCE CORPORATION FOR ANNUAL PUBLIC WORKS/MAINTENANCE SERVICES WHEREAS, on September 14, 1987 the City of Dublin (hereinafter referred to as "CITY") , MCE Corporation (hereinafter referred to as "CONTRACTOR") , entered into an Agreement to provide Public Works/Maintenance Services to the City of Dubl in; and WHEREAS, that Agreement provided for the extension of the term of the Agreement for two consecutive one-year terms subject to the satisfactory performance by the CONTRACTOR as determined by the CITY; and WHEREAS, the CITY has reviewed the performance of the CONTRACTOR and has determined that the CONTRACTOR has performed satisfactorily; and WHEREAS, an adjustment of fees for services is desired by both the CITY and the CONTRACTOR. NOW, THEREFORE, the parties hereto agree as follows: Section !: Extension of Contract The City of Dublin extends the Annual Public Works/Maintenance Contract with CONTRACTOR for a period of one year commencing on July 1, 1989 and ending on June 30, 1990. Section 2: Schedule o_~fWorkandAdjustment of Rates The CONTRACTOR will perform the Schedule of Work as identified in Attachment 1 and as modified by the CITY for Fiscal Year 1989-90. The CITY also authorizes a change in the rates charged by CONTRACTOR to the CITY as indicated in Attachment 1. CITY OF DUBLIN ATTEST: Mayor City Clerk MCE CORPORATION ATTEST: President Secretary AT' ~HMENT i - SCHEDULE OF ~ PRELIMINARY CITY BUDGET FISCAL YEAR 1989-90 K A. SCOPE OF WORK The following breakdown identifies tasks which are anticipated to be conducted as part of the Annual Public Works Maintenance Agreement for the Fiscal Year 1989-90. Annual estimated costs include management fees as provided in Section C. Contractor shall schedule work to adhere to these expenditure levels as provided for in this Agreement. 1989-90 ESTIMATED ACTIVITY/SUB-ACTIVITY ANNUAL EXPENDITURE SPILL CLEAN UP $ 4,500-- STREET MAINTENANCE o Street Repair o Drainage Maintenance o Storm Patrol/Clean Up o Curb & Gutter/Sidewalks o sign Repair Maintenance o Striping/Marking o Guardrail Repair o Chemical Weed Abatement o Bike Path Maintenance 29,000 21,100 12,900 17,200 16,700 35,000 1,200 13,800 6,300 Activity Total $ 153,200 MAINTENANCE SUPERVISION STREET TREE MAIt~TENANCE o In-House Tree Maintenance o Contract Tree Watering o Contract Tree Trimming o Contract Tree Removal o Stagecoach Assessment District o Dougherty Assessment District $ 73,500 $56,700 5,300 15,600 2,200 7,200 10,600 Activity Total NEIGHBORHOOD WATCH SIGNS STREET LANDSCAPE MAINTENANCE (BEAUTIFICATION) o Existing Streets Including San Ramon Road Phase III o Stagecoach Assessment District o Dougherty Assessment District $ $ 97,600 1,600 171,500 21,700 76,900 Activity Total 270,100 MISCELLANEOUS WORK $ 10,000 PARKS MAINTENANCE o Stagecoach Park o Kolb Park o Dolan Park o Alamo Creek Park o Dougherty Hills o Mape Park o Shannon Park (6 Months) o Dublin Sports Ground o Valley Swim Center o civic Center (9 Months) 14,800 38,500 41,900 39,300 10,600 15,600 26,700 106,400 20,150 37,000 Activity Total $ 350,950 Total 1989-90 Estimated Annual Expenditure $ 961,4-50 B. UNIT PRICES The following activities shall be completed at the Unit Prices indicated. The unit prices are inclusive of all labor, materials, equipment, overhead and management fees. ACTIVITY STREET REPAIR o Remove/Replace Asphalt (4" Depth) 0 - 30 S.F. per patch 30 - 150 S.F. per patch 150 - 300 S.F. per patch Over 300 S.F. per patch o Remove/Replace Additional Depths o Asphalt Leveling/Overlay CURB~ GUTTER AND SIDEWALK o Replace Sidewalk o Replace Driveway o Replace Curb & Gutter o Saw Cutting 1989-90 UNIT PRICE $ 6.10 per S.F. 5.00 per S.F. 3.90 per S.F. 2.80 per S.F. .40 per S.F. per inch 95.00 per ton $ 6.90 per S.F. 8.00 per S.F. 18.90 per S.F. 1.85 per L.F. RESTRIPING AND REM' KING o o o o o 4" Skip Centerline 4" Solid Edgeline 4" Solid Centerline 6" Solid Bike Lane 8" Solid Turn Lane .039 per L.F. .057 per L.F. · 064 per L.F. · 133 per L.F. · 165 per L.F. o o o o o o o o o o o o o o o o 12" Continuous Turn Lane (One Side) 12" Double Centerline 8' Letter 12" Crosswalk 12" Limit Bar 8' Directional Arrow 24' Directional Arrow 20' Diagonal Parking Line Parking "T" Handicap Legend (w/Background) Curb Paining Bike Lane Arrow Bike Lane Legend 4' Paint Removal Raised Pavement Markers (Reflective) .178 per L.F. .190 per L.F. 4.125 Each .444 per L.F. .508 per L.F. 10.164 Each 23.441 Each 3.812 Each 2.541 Each 22.233 Each .508 per L.F. 3.812 Each 2.541 Each 3.812 per S.F. 4.446 Each Raised Pavement Markers (Non-Reflective) 2.541 Each Note: (1) Restriping unit prices require a minimum of $ 1,000 of work. Less than the above will require a $ 250.00 move-in charge. (2) For small jobs, priority striping or new striping, unit prices may be determined by local subcontractor rates. RIGHT OF WAY MAINTENANCE o Chemical Weed Control 114.70 per Acre TURF MAINTENANCE o Fertilize/Weed Control o Aeration 105.00 per Acre 333.30 per Acre BEDDING MAINTENANCE o Fertilization o Chemical Weed Control 109.50 per Acre 111.10 per Acre TREE MAINTENANCE Street Trees o Trim for Clearance Only (Under 30') o Trim for Clearance & Balance (Under 30') o Trim for Clearance Only (Over 30') o Trim for Clearance & Balance (Over 30') o Fungus Spraying o Tree Watering 20.35 per Tree 40.70 per Tree 37.40 per Tree 74.80 per Tree 4.12 per Tree 0.83 per Tree Park Trees o Prune and Shape (Over 20') o Fungus Spraying 52.80 per Tree 4.12 per Tree Ce TIME AND MATEI IL RATES The following rates shall be applied to work performed by the Contractor which is not specified in Section B (Unit Prices). At all times the Contractor shall strive to utilize the most cost effective elements possible to complete a project. Appropriate overhead and management fees will be applied as indicated. DESCRIPTION (8 HOURS) OVERTIME HOLIDAY HOURLY HOURLY HOURLY HOURLY RATES RATES RATES RATES LABOR RATES Dublin Crew Maintenance Superintendent 28.00 224.00 42.00 56.00 Landscape Foreman 20.20 161.60 30.30 40.40 Landscape Laborer I 17.00 136.00 25.50 34.00 Landscape Laborer II 14.40 115.20 21.60 28.80 Landscape Laborer III 11.40 91.20 17.10 22.80 MCE Crew Superintendent 44.75 Loader/Backhoe Operator 43.75 Asphalt Paver Operator 42.30 Roller Operator 42.30 Tractor Operator 40.15 Truck Driver 8-12 C.Y. 36.75 Truck Driver 4-6 C.Y. 36.25 Truck Driver 3 C.Y. Transit 36.25 Cement Finisher 35.10 Laborer Foreman 33.65 Laborer 1 32.65 Laborer 2 32.45 Laborer 3 32.30 358.00 67.12 89.50 350.00 65.62 87.50 338.40 63.45 84.60 338.40 63.45 84.60 321.20 60.22 80.30 294.00 55.12 73.50 290.00 54.38 72.50 290.00 54.38 72.50 280.80 52.65 70.20 269.20 50.48 67.30 261120 48.98 65.30 259.60 48.68 64.90 258.40 48.45 64.60 DESCRIPTION EQUIP. COST HOURLY RATE WAGES TOTAL OPERATED INC. COST FRINGE PER PER BENEFITS HOUR DAY EQUIPMENT RATES Dublin Crew * Flatbed Dump * Pickup Mower (21") Mower (36") Mower (72") Chain Saw Brush Cutter 7.00 5.00 3.00 4.00 10.00 4.00 3.00 56.00 40.00 24.00 32.00 80.00 32.00 24.00 Power Blower Power Edger Spray Tank w/Trailer Power Hedge Trimmer Power Vacuum (30") Trailer - Large (18') Trailer - Small (8') Hand Tools (per truck) Two Way Radio 2.00 2.00 2.50 2.00 7.00 4.00 2.00 .50 .50 16.00 16.00 20.00 16.00 56.00 32.00 16.00 4.00 4.00 MCE Crew Asphalt Paver 37.50 Loader/Backhoe 27.50 Tractor 22.50 Roller - Vibratory 3-5 Tons 15.00 Roller - Vibratory 1-3 Tons 12.00 Dump Truck 8-12 Yd. Dump 4-6 Yd. Transit Truck 3 Yd. Flatbed Dump Pickup Crew Cab Pickup 22.50 20.00 20.00. 8.50~ 7.00 6.50 Concrete Saw-Self Propelled 12.50 Concrete Saw - Small Compressor Bitumal Pot Vibra Plate Wacker Power Berm Machine Hand Tools (per Truck) Two Way Radio 8.00 10.00 6.00 6.00 6.00 10.00 .50 .50 42.34 79.80 43.75 71.25 40.15 62.65 42.30 57.30 42.30 54.30 36.75 59.25 36.25 56.25 36.25 56.25 638.40 570.00 501.20 458.40 434.40 474.00 450.00 450.00 68.00 56.00 52.00 100.00 64.00 80.00 48.00 48.00 48.00 80.00 4.00 4.00 OVERHEAD AND MANAGEMENT FEES Applied to MCE Operations Applied to Subcontract Work * NOTE: 20 percent to Street Maintenance 15 percent to all Park Maintenance 10 percent Dublin Flatbed and Pickup rates include cost of two way radios and hand tools. ANNUAL PUBLIC WORKS MAINTENANCE AGREEMENT Between CITY DF DUBLI~ and MCE CORPORATION TITLE 1 2 3 4 5 6 7 8 9 10. 11. 12. 13 14. 15. 16. 17. 18 19 2O 21 22 23 TABLE OF CONTENTS ANNUAL PUBLIC WORKS MAINTENANCE AGREEMENT PAGE Scope of Work 1 Duration of Contract and Date of Commencement 1 Adjustments to Contract Prices and Work Quantity 2 Scheduled Work 2 Additional Work 2 Emergency Work 2 Contract Amount and Prices 3 Maintenance Supervision 3 Work Scheduling Procedures 3 Work Reporting Procedures 3 Additional Contractor Responsibilities 4 Protection of Work and Public 4 Compensation and Billing Public Works Headquarters Insurance and Indemnify Independent Contractor Licenses and Permits Assignment Maintenance of Records Equal Employment Opportunity Attorney Fees Miscellaneous Notices 4 4 4-6 6 6 6 6 6 6 7 7 AGREEMENT ANNUAL PUBLIC WORKS HAINTENANCE This Agreement is made this~PT-~.~_ ./~_, 1987 between THE CITY OF DUBLIN, a municipal corpo-rat~05 ("City"), and HCE CORPORATION, a California corporation, ("Contractor"). The City has elected to perform its public works maintenance and related activities as set forth in Attachment 1 of this document, using private contractors. The Contractor has agreed to arrange for and supervise the performance of the work and the City has agreed to retain the Contractor for such purposes, in accordance with the terms and provisions of this Agreement. The City and the Contractor agree as follows: 1. Scope of Work: The City retains Contractor to arrange for, supervise and-manage the performance of the work described in the Schedule for Work (Attachment 1) (q,nd as otherwise specified in this Agreement; and for additional work, Additional Work") as is called for in this Agreement. Notwithstanding the foregoing, the City may at any time revise the schedule of work identified in Attachment I for budgeting or other reasons as deemed necessary by the City and the estimated annual expenditure for Fiscal Year 1987-88 shall be revised accordingly. The Contractor specifically agrees to (a) undertake the direct responsibility for the performance of the work in accordance with this Agreement; (b) provide directly, or through subcontractors or as otherwise permitted by this Agreement all labor, materials and supervision necessary for the proper performance of the work in accordance with this Agreement; (c) furnish a Haintenance Superintendent to provide the necessary liaison with the City staff and the required coordination of workmen and materials in the performance of the Work; {d) comply with all laws, ordinances, rules, regulations, and requirements of governmental authorities, pertaining to the performance of the work; (e) perform the work, contract for its performance and supervise its performance in a good and workmanlike manner and in the most expeditious cost effective manner consistent with first-class quality; (f) perform all activities necessary and incidental to the orderly performance of the work. 2. Duration of Contract and Date of Commencement: The term of the Agreement ~'~a~l be one (1) year commencing July 1, 1~87, with provision for an extension of term for two successive one-year terms, subject to satisfactory performance during the prior year, as determined by and in the sole discretion of the City. The City has the option to renew the Agreement, subject to the price modifications that may be agreed upon by City and Contractor. 1 Notwithstanding the foregoing paragraph, the services of the Contractor may be terminated by the City by giving ninety (90) days written notice with or without cause. If the City terminates the Agreement the Contractor shall be compensated for such services up to the point of termination. Compensation for work in progress will be prorated as to the percentage of progress completed at the date of termination. Contractor may also terminate its services to the City, but must first provide the City with written notice at least ninety (90) days in advance of termination. 3. Adjustments to Contract Prices and Work Quantit)~.' No later than Harch lst,-~h'e Contractor w~l~ submit to the City for the coming contract year a proposed revised Schedule of Work which will set forth a Work Plan in terms of types and quantities of work to be performed as well as unit prices and/or estimated annual expenditure amounts as appropriate. Upon written approval of both parties, the Contract shall be extended for one (1) year effective July I as provided above. 4. Scheduled Work: All of the work set forth in Attachment i is considered scheduled work, except as provided in Section 1. Contractor shall perform no work in addition to scheduled work, unless (a) additional work is approved in advance by the City Hanager or (b) an emergency situation exists. An emergency situation is one which endangers the public safety or public or private property and occurs under circumstances making it either impossible or impractical to obtain City approval before proceeding with the work. In such cases, the Contractor will proceed with the work to the extent necessary to relieve said danger and shall specifically inform the City Manager of all emergency work accomplished. All scheduled work shall be provided according to a monthly schedule prepared by the Maintenance Superintendent and approved by the City Hanager. 5. Additional Work: City may require Contractor to provide additional Lwo~k 'no~sp~~ally described herein at rates and quantities negotiated by the City and Contractor. The City Hanager at his discretion may recommend that projects of a large scope be approved by the City Council for competitive bid. Contractor shall be entitled to participate in the bid process. No additional work will be undertaken by the Contractor without the approval of the City Manager. The Contractor will bill the City for additional work in the manner as provided in Attachment 1. 6. Emergency Work: Emergency call-out procedures wilt be maintained to provi-~--~6r emergency response on nights, weekends and holidays. The procedure will be reviewed and updated periodically to ensure its effectiveness. In the event emergency work dictates that work be accomplished outside the normal working hours, such as night time, week- ends, and holidays, appropriate overtime rates shall be used as set forth in Attachment 1. 2 7. Contract Amount and Prices: Except as provided in Section 1, the total annua~t-lm'at'e'd ~'dget shall be the sum of the planned expenditure amounts listed in Attachment 1. The actual amount paid to the Contractor shall be based on the amount of work performed according to the costs outlined in Attachment 1 and any subsequent "Additional Work" approved by the City. Work items listed in Attachment 1 shall be billed on a unit price basis or otherwise as set forth in the schedule. Unit Pricing is expressed in terms of Dollars per Work Heasurement Unit for each item of work. For work listed as "Time and Materials" (T&M), Contractor shall bill the City on the basis of actual costs to the Contractor plus a percentage as stated on Attachment 1, Section C, to cover management costs. Contractor shall bill Additional Work on the basis mutually agreed to by the Contractor and the City at the time the work is incorporated into the annual maintenance program. 8. Haintenance.~.upervision: The Contractor shall furnish a Maintenance Superint6ndent to assume full'responsibility for day-to-day maintenance operations, insuring that resources required to successfully complete the project are applied in a timely manner. In addition to providing the necessary liaison with the City, the Haintenance Superintendent is responsible for: (a) making recommendations to the City Manager of work that should be performed but which is not set forth on the Schedule of Work, (b) identifying work programs, (c) scheduling (d) assisting and supervising work crews, (e) responding to citizen calls, (f) assisting in contract administration, (g) maintaining activity reports, and (h) generally administering public works maintenance functions. 9. Work Schedul~pg Procedures: To the extent possible, it is the intent of {~is Agreement that the Work be performed on a scheduled, orderly basis. The Contractor will prepare monthly work schedules and review them with the City Manager. These schedules will represent specific work needs identified as the result of the Contractor's recommendations and requests from the City Manager or his designee. Emphasis will be placed on identifying needs to insure proper timing of work (for example, ditches should be scheduled for cleaning before winter rains). The Contractor will comply with reasonable requests of the City Hanager as to preferred locations for various types of work. The Contractor will use, a service request form to insure that complete information is obtained on work needs and requests for service. 10. Work Repo[~ing Procedures: The Contractor shall submit a Monthly Work Summary Report to the City Manager on or before the lOth day of the month summarizing work completed in the previous month. These reports shall include a listing of work activities and work units completed, including any additional or emergency work performed; status of current and completed service requests; and, comparisons of annual work quantities and expenditures planned versus actual. 3 11. Additional Contractor Responsibilities: HCE workers will be alert for observable maintenance deficiencies in public facilities as they travel within the City's boundaries in the course of their maintenance activities. They will report maintenance deficiencies to designated HCE, City staff members, or appropriate agency. 12. Protection of Work and Public: The Contractor shall take all necessary measures to protect the work and prevent accidents during any and all phases of work. He shall provide and maintain all necessary barriers, flagmen, and/or signs during maintenance procedures. The Contractor will provide at his own expense, alt the advance signing and barricading and also signs, barricades, flashers, and other necessary facilities for the protection of the public within the limits of the maintenance area while maintenance activities are proceeding. 13. Compensation and Billing: For work performed and services rendered, Contractor shall submit monthly bills to the City by the lOth day of the month following the month in which the work was performed. The Contractor shall be compensated by the city as follows: A monthly payment for time and materials or unit price work will be provided, with payment to be made within twenty (20) days of receipt of invoice bx City. For additional work for which no unit prices have been agreed upon, compensation shall be agreed upon between the City Hanager and Contractor in writing before work is performed. For emergency work when prior approval is not possible and when unit prices have not been agreed upon, the City and Contractor shall agree as soon as possible after the work is performed on the amount of compensation based on costs, for related jobs. 14. Public Works Headquarters: City shall provide an office for the Haintenance Superintendent. City shall provide a corporation yard facility from which routine maintenance may be dispatched. Work days shall begin at such time of dispatch from a Dublin corporation yard or as mutually agreed upon by City and Contractor. 15. Insurance and Indemnity: a. HCE warrants that Scheduled Work, Additional Work and Emergency Work as defined in paragraphs 4, 5 and 6 will be performed and completed in a safe manner without causing personal injury or property damage. HCE will indemnify, hold City harmless and defend City from claims involving HCE Scheduled, Additional and Emergency Work. City will indemnify and hold HCE harmless and defend HCE from claims other than Scheduled, Additional and Emergency Work. 4 b. Insurance. Contractor shall obtain and maintain insurance and shall require each subcontractor to obtain and maintain insurance as provided in this paragraph. (1) Compensation Insurance. Contractor shall maintain during the life of this Agreement, workers' compensation insurance for all Contractor's employees employed at the site of the work, and in case any work is sublet, Contractor shall require any subcontractor similarly to provide workers' compensation insurance for all subcontractor's employees, unless such employees are covered by the protection afforded by Contractor. In case a class of employees engaged in work under this Agreement is not protected under the workers' compensation law, Contractor shall provide and shall cause each subcontractor to provide adequate insurance for the protection of employees not otherwise protected. Contractor indemnifies City for any damage resulting to it from failure of either Contractor or any subcontractor to take out or maintain such insurance. (2) Public Liability and Property Damage Insurance. Contractor shall take out and maintain during the life of this Agreement such public liability and property damage insurance as shall insure City, its elective and appointive officers, agents and employees, Contractor and any subcontractor performing work covered by this Agreement from claims for damages for personal injury, including death, as well as from claims for property damage which may arise from Contractor's or any subcontractor's operations hereunder, whether such operations by Contractors operations hereunder, whether such operations by Contractor or a subcontractor or be anyone directly or indirectly employed by either Contractor or subcontractor. The amounts of insurance shall be as follows: a. Automobile Insurance. Vehicular public liability insurance with minimum coverages of $500,000.00 for property damage $t,000,000.00 for injury to one person/any one occurrence and $1,000,000.00 for injury to more than one person/any one occurrence. b. Public Liability Insurance. In an amount not less than $1,000,000.00 for injuries, including, but not limited to death, to any one person and, subject to the same limits for each person, in an amount not less than $1,000,000 on account of any one occurrence. c. Property Damage Insurance. In an amount of not less than $500,000.00 for damage to the property of each person on account of any one occurrence. (3) Contractual Liability Insurance. Contractor shall take out and maintain during the life of this Agreement, a policy of Contractual Liability Insurance in the amount of at least $500,000.00 each occurrence, $500,000.00 aggregate insuring City, its elective and appointive officers, agents and employees, Contractor and any subcontractor performing work covered by this Agreement against damages sustained by reason of any action or demand by reason of breach or alleged breach of any contract, or by reason of any contractual liability or alleged contractual liability on any contract for the performance of work covered by this Agreement entered into by Contractor or a subcontractor, agent or employee. (4) Evidence of Insurance. Contractor shall furnish City with satisfactory evidence of the insurance required and evidence that each carrier is required to give City at least 3 days prior notice of the cancellation or reduction in coverage of the policy during the effective period of this Agreement. All Certificates of Insurance which are a part of this Agreement shall be approved by the City Hanager and Citx Attorney as to form and content. 16. Independent Contractor: Contractor is an independent Contractor and shall not be considered an employee of the City. It is understood that in the performance of services under this ^greement, Contractor is operating independent of the control of the City (other than normal contract monitoring) and possesses no authority to act as an agent or representative of the City. As such, Contractor is not a public official as defined in the California Fair Political Practices Act and is not subject to the city's local conflict of interest code. 17. Licenses and Permits: Contractor represents and warrants to City that it shall maintain in effect all licenses, permits, qualifications and approvals that are legallx required for Contractor to perform under this Agreement. 18. Assignment: This Agreement max not be assigned or subcontracted unless C~ty consents in advance in writing. An assignment or subcontracting in violation of this provision is void. 19. Maintenance of Records Contractor shall maintain all books, documents, papers, employee timesheets, accounting records and such other evidence pertaining to costs incurred and shall make these materials available at reasonable times during the contract period and for one year from the date of final payment under this Agreement for inspection by City. 20. Equal Employment Opportunity: Contractor is an equal opportunitx employer and agrees to comply with applicable regulations governing equal employment opportunity. 6 21. Attorney Fees: If either party brings an action against the other party arising out of or in connection with this Agreement entered into between City and Contractor, the prevailing party is entitled to have and recover from the losing party reasonable attorneys fees and costs of suit. 22. Miscellaneous: Ao Contractor shall inform City of private clients within the corporate boundaries or sphere of influence of the City during the term of this Agreement. Contractor agrees not to accept other employment which is or may be in conflict with its duties under this Agreement or which may adversely affect the interests of the City. B o Contractor will endeavor to secure mat'erials from the lowest cost source reasonably available. 23. Notices: Any notice given under this Agreement shall be served by depositing it in the mail, postage prepaid, to the addresses set forth below: A. Notices to the Contractor shall be addressed to: HCE Corporation 7 Crow Canyon Court, Suite 200 San Ramon, California 94583 B. Notices to the City shall be addressed to: City of Dublin P.O. Box 2340 Dublin, California 94568 7 IN WITNESS WHEREOF, the parties have e×ecuted this Agreement on the day and year first above written. CITY OF DUBLIN ATTEST: Cler'k L, _] HCE CORPORA~I~C' ~ / By: '"~,,~ ~'.~/~'pr e s.i'"i' 'e n~t ATTE ST: AI-FACHMENT i SCHEDULE OF WORK FINAL APPROVED CITY BUDGET FISCAL YEAR 1987/88 Au SCOPE OF WORK The following breakdown identifies tasks which are anticipated to be conducted as part of the Annual Public Works Haintenance Agreement for the Fiscal Year 1987-88. Annual estimated costs include management fees as provided in Section C. Contractor shall schedule work to adhere to these expenditure levels as provided for in this Agreement. 1987-88 ESTIMATED AClIVITY/SUB ACTIVITY ANNUAL EXPENDITURE SPILL CLEAN-UP $ 3,500. STREET MAINTENANCE Street Repair Drainage Haintenance Storm Patrol/Clean-up Curb & Gutter/Sidewalks Sign Repair Haintenance Striping/Harking Guardrail Repair Chemical Weed Abatement Bike Path Haintenance 85,100. 18,500. 13,200. 22,800. 21,400. 38,700. 1,200. 5,300. 6,200. Activity Total $ 212,400. MAINTENANCE SUPERVISION $ 66,000. STREET TREE MAINTENANCE o Tree/Brush Cutting o Tree Watering o Tree Trimming o Tree Removal 48,750. 5,320. 11,230. 2,200. Activity Total $ 67,500. NEIGHBORHOOD WATCH SIGNS $ 1,000. STREET LANDSCAPE MAINTENANCE (BEAUTIFICATION) $ 208,400. ASSESSMENT DISTRICT LANDSCAPE HAINTENANCE $ 22,500. MISCELLANEOUS WORK $ 3,300. PARKS HAINTENANCE o Stagecoach Park $ 6,4G0. o Kolb Park 16,200. o Dolan Park - 16,100. o East Dougherty Hills 23,500. o Dougherty Hills 4,000. Activity Total $ 66,200. Total 1987-88 Estimated Annual Expenditure $ 650,800. UNIT PRICES The following activities shall be completed at the Unit Prices indicated. The unit prices are inclusive of all labor, materials, equipment, overhead and. management fees. ACTIVITY 1987-88 UNIT-PRICE STREET REPAIR o Pothole Patching o Remove/Replace Asphalt (4" depth) o Remove/Replace Additional Depths o Asphalt Leveling/Overlay 300.00 per Ton 3.00 per S.F. .40 per S.F.per In. 90.00 per Ton CURB, GUTTER, AND SIDEWALK o Replace Sidewalk o Replace Driveway o Replace Curb & Gutter o Saw Cutting 6.00 per S.F. 7.00 per S.F. 18.00 per L.F. 2.00 per L.F. DRAINAGE MAINTENANCE o Mechanical Culvert Flushing - Regular Time (2 1/2 hour Minimum) - Overtime - Overtime - Sundays/Holidays o Mechanical Catchbasin Cleaning 137.50 per Hour 154.50 per Hour 170.50 per Hour 44.00 per C.B. STRIPING AND MARKING 4" Skip Centerline 4" Solid Edgeline 4" Solid Centerline 6" Solid Bike Lane 8" Solid Turn Lane 12" Continuous Turn Lane (One Side) 12" Double Centerline Pre-line Layout/Survey 8' Letter 12" Crosswalk 12" Limit Bar 8' Directional Arrow 24' Directional Arrow 20' Diagonal Parking Line Parking "T" Handicap Legend (w/background) Curb Painting Bike Lane Arrow/Legend Paint Removal Raised Pavement Markers (Reflective) Raised Pavement Markers (Non-Reflective) R/R Crossing (Two directions) .033 per L.F. .050 per L.F. .055 per L.F. .116 per L.F. .143 per L.F. .154 per L.F. .165 per L.F. .055 per L.F. 3.575 EA. .385 per L.F. .440 per L.F. 8.80 EA. 20.30 EA. 3.30 EA. 2.20 EA. 19.25 EA. .44 per L.F. 13.20 EA. 3.30 per S.F. 3.85 EA. 2.20 EA. 77.00 EA. Note: (1) Striping unit prices require a minimum of $1,000. of work. Less than the above will require a $250.00 move-in charge. (2) For small jobs or priority striping, unit prices may be determined by local subcontractor rates. 10 CHEMICAL WEED CONTROL o Weed Spraying Hedians o Weed Spraxing Right of Ways 100,00 per Acre 105,00 per Acre STREET TREE MAINTENANCE o Tree Trimming Under 30' o Tree Trimming Over 30' o Tree Watering 34,10 EA. 45.10 EA. 0,83 EA, PARK MAINTENANCE o Thatching - Turf o Aerate - Turf o Fertilize - Turf/Bedding o Pre-Emergent Spraying-Bedding o Prune Trees (over 20') o Fungus Spraying - Trees 330,00 per Acre 198,00 per Acre 88,00 per Acre 220,00 per Acre 53,35 per Tree 4.40 per Tree C. TIME AND MATERIAL RATES The following rates shall be applied to work performed by the Contractor which is not specified in section B (Unit Prices), At all times the Contractor shall strive to utilize the most cost effective elements possible to complete a project. Appropriate overhead and management fees will be applied as indicated, (8 HOURS) OVERTIME HOLIDAY HOURLY DAILY HOURLY HOURLY DESCRIPTION RATES RATES RATES RATES LABOR RATES Dublin Crew Maintenance Superintendent Landscape Foreman Landscape Laborer I Landscape Laborer II Landscape Laborer III Landscape Laborer (Temp) MCE Crew Superintendent Backhoe Operator Roller Operator Truck Driver 8-12 C.Y, Truck Driver 4-6 C,Y. Truck Driver 3 C,Y, Transit Cement Finisher Labor Foreman Laborer 1 Laborer 2 Laborer 3 23,50 188,00 34,50 45,40 17,60 140.80 24.75 31.90 15.20 121,60 21,38 27,55 12,80 102,40 18,00 23.20 10.40 83,20 14,63 18,85 8,10 64,80 12,15 16.20 40,00 39,00 38,00 32.50 32,00 32.00 31,00 30,00 29,00 28.75 28,50 320,00 312.00 304.00 260.00 256,00 256,00 248 O0 240 O0 232 O0 230.00 228,00 60.00 80,00 58,50 78,00 57,00 76,00 48.75 65,00 48.00 64,00 48,00 64,00 46,50 62.00 45,00 60,00 43,50 58,00 43,12 57,50 42.75 57,00 DESCRIPTION EQUIP. COST HOURLY RATE WAGES TOTAL OPERATED INC. COST FRINGE PER PER BENEFITS HOUR DAY EQUIPMENT RATES Asphalt Paver 35.00 Loader/Backhoe 30.00 Tractor 20.00 Roller - Walk Behind 8.00 Roller - Vibratory 12.00 lO-wheel Dump Truck 8-12 YD 18.00 Bobtail Dump 5-6 YD 16.00 Ready Mix Truck 3 YD 16.00 Flatbed Dump 7.00 Pick-up Crew Cab 6.00 Pick-up 5'00~ Concrete Saw 8.00 Compressor 8.00 Bitumal Pot 5.00 Vibra Plate 4.00 Wacker 5.00 Berm Machine 5.00 Mower Large 13' 15.00 Mower - Large 8' 10.00 Trailer - Large (18') 5.00 Trailer - Small (8') 3..00 Tractor Attachments 8.00 Brush Chipper 8.00 Chain Saw 6.00 Portable Generator 5.00 Brush Cutter 4.00 Power Blower 3.00 Power Mower (21") 2.00 Power Edger 1.50 Hand Tools (per crew) 1.50 Two-way Radio 1.00 OVERHEAD AND MANAGEMENT FEES Applied to MCE Operations Applied to Subcontract Work 20 per cent 10 per cent 38.00 73.00 39.00 69.00 35.50 55.50 29.00 37.00 38.00 50.00 32.50 50.50 32.00 48.00 32.00 48.00 584.00 552.00 444.00 296.00 400.00 404.00 384.00 384.00 56.00 48.00 40.00 64.00 64.00 40.00 32.00 40.00 40.00 120.00 80.00 40.00 24.00 64.00 64.00 48.00 40.00 32.00 24.00 16.00 12.00 12.00 8.00 Note: Hourly rates for equipment used which are not listed above shall be charged at rates listed in the most current edition of the Labor Surcharge and Equipment Rental Rates as published by the State of California Department of Transportation. If not listed in the aforementioned publication, equipment rates shall be agreed upon between the City Manager and Contractor in writing. 12 · AMENDMENT TO AGREEMENT BETWEEN ~{. CITY OF DUBLIN AND MCE CORPORATION ' ~ FOR ANNUAL PUBLIC WORKS/MAINTENANCE SERVICES ~9,(6~ ~ z,p~& WHEREAS, on September 14, 1987 the City of Dublin (hereinafter referred to as "CITY"), MCE Corporation (hereinafter referred to as "CONTRACTOR"), entered into an Agreement to provide Public Works/Maintenance Services to the City of Dublin; and WHEREAS, that Agreement provided for the extension of the term of the Agreement for two consecutive one-year terms subject to the satisfactory performance by the CONTRACTOR as determined by the CITY; and WHEREAS, the CITY has reviewed the performance of the CONTRACTOR and has determined that the CONTRACTOR has performed satisfactorily; and WHEREAS, an adjustment of fees for services is desired by both the CITY and the CONTRACTOR. NOW, THEREFORE, the parties hereto agree as follows: Section 1: Extension of Contract The City of Dublin extends the Annual Public Works/Maintenance Contract with CONTRACTOR for a period of one year commencing on July 1, 1988 and ending on June 30, 1989, with the provision of an extension of term for one year, subject to satisfactory performance during that year, as determined by and to the sole discretion of the CITY. Section 2: Schedule of Work and Adjustment of Rates The CONTRACTOR will perform the Schedule of Work as identified in Attachment 1 and as modified by the CITY for Fiscal Year 1988-89. The CITY also authorizes a change in the rates charged by CONTRACTOR to the CITY as indicated in Attachment 1. CITY OF DUBLIN ATTEST; [ ./ . _ City Clef'k) ACTIVITY/SUB-ACIIVITY SPILL CLEAN UP FINAL APPROVED CITY BUDGET FISCAL YEAR 1988/89 SCOPE OF WORK The following breakdown identifies tasks which are anticipated to be conducted as part of the Annual Public Works Maintenance Agreement for the Fiscal Year 1988-89. Annual estimated costs include management fees as provided in Section C. Contractor shall schedule work to adhere to these expenditure levels as provided for in this Agreement. 1988-89 ESTIMATED ANNUAL EXPENDITURE $ 5,300 STREET MAINTENANCE $ 76,700 o Street Repair 22,100 o Drainage Maintenance 12,600 o Storn Patrol/Clean Up 15,900 o Curb & Gutter/Sidewalks 19,600 o Sign Repair Maintenance 45,000 o Striping/Marking 1,300 o Guardrail Repair o Chemical Weed Abatement 5,800 o Bike Path Maintenance 6,200 Activity Total $ 205,200 MAINTENANCE SUPERVISION $ 73,800 STREET TREE MAINTENANCE o Tree/Bush Cutting o Tree Watering o Tree Trimming o Tree Removal Activity Total NEIGHBORHOOD WATCH SIGNS STREET LANDSCAPE HAINTENANCE (BEAUTIFICATION) o Existing Streets o San Ramon Road Phase III (3 months) o Stagecoach Assessment District o Dougherty Assessment District Activity Total $ $ $ $ $ 67,700 5,300 15,700 2,200 90,900 1,600 127,700 9,700 19,300 27,600 184,300 MISCELLANEOUS WORK $ 10,000 PARKS MAINTENANCE o Stagecoach Park o Kolb Park (11Honths) o Dolan Park (11Honths) o Alamo Creek Park (10 Honths) o Dougherty Hills o Hape Park o Shannon Park o Dublin Sports Ground o Valley Swim Center o Civic Center (3 Months) o Senior Center Activity Total Total 1988-89 Estimated Annual Expenditure 11,400 31,500 36,600 31,500 4,000 16,000 40,200 119,300 20,000 7,500 1,500 319,500 890,600 UNIT PRICES The following activities shall be completed at the Unit Proces indicated. The unit prices are inclusive of all labor, materials, equipment, overhead and management fees. ACTIVITY 1988-89 UNIT PRICE STREET REPAIR o Pothole Patching o Remove/Replace Asphalt (4" depth) o Remove/Replace Additional Depths o Asphalt Leveling/Overlay $ 300.00 per ton 3.30 per S.F. .40 per S.F. per inch 90.00 per ton CURB, GUTTER AND SIDEWALK o Replace Sidewalk o Replace Driveway o Replace Curb & Gutter o Saw Cutting 6.60 per S.F. 7.60 per S.F. 18.00 per S.F. 1.75 per L.F. STRIPING AND MARKING o 4' Skip Centerline 0 0 0 0 0 0 0 0 0 0 0 0 4" Solid Edgeline 4" Solid Centerline 6" Solid Bike Lane 8" Solid Turn Lane 12" Continuous Turn Lane (One Side) 12" Double Centerline 8' letter 12" Crosswalk 12" Limit Bar 8' Directional Arrow 24' Directional Arrow 20' Diagonal Parking Line .037 per L.F. .055 per L.F. .061 per L.F. .128 per L.F. .157 per L.F. .169 per L.F. .182 per L.F. 3.93 Each .424 per L.F. .484 per L.F. 9.68 Each 22.33 Each 3.63 Each 0 0 0 0 0 0 0 0 Note: Parking "T" Handicap Legend (w/background) Curb Painting Bike Lane Arrow Bike Lane Legend 4' Paint Removal Raised Pavemnet Markers (Reflective) Raised Pavement Markers (Non-Reflective) 2.42 Each 21.18 Each .484 per L.F. 3.63 Each 2.42 Each 3.63 Per S.F. 4.24 Each 2.42 Each (1) Striping unit prices require a minimum of $1,000 of work. Less than the above will require a $250.00 move-in charge. (2) For small jobs or priority striping, unit prices may be determined by local subcontractor rates. CHEMICAL WEED CONTROL o Weed Spraying Medians o Weed Spraying Right of Ways 143.00 per Acre 115.50 per Acre STREET TREE MAINTENANCE o Tree Trimming Under 30' o Tree Trimming Over 30' o Tree Watering o Fungus Spraying PARK MAINTENANCE o Fertilizing - Turf/Bedding o Pre-Emergent Spraying-Bedding o Prune Trees (Over 20') o Fungus Spraying - Trees DESCRIPTION 49.50 Ea. 82.50 Ea. .83 Ea. 4.40 Ea. 110.00 per Acre 220.00 per Acre 53.35 per Tree 4.40 per Tree TIME AND MATERIAL RATES The following rates shall be applied to work performed by the Contractor which is not specified in Section B (Unit Prices). At all times the Contractor shall strive to utilize the most cost effective elements possible to complete a project. Appropriate overhead and management fees will be applied as indicated. (8 HOURS) OVERTIME HOLIDAY HOURLY HOURLY HOURLY HOURLY RATES RATES RATES RATES LABOR RATES Dublin Crew Maintenance Superintendent 26.00 Landscape Foreman 18.80 Landscape Laborer I 16.00 Landscape Laborer II 13.60 Landscape Laborer III 10.80 208.00 39.00 52.00 150.40 28.20 37.60 128.00 24.00 32.00 108.80 20.40 27.20 86.40 16.20 21.60 MCE Crew Superintendent Loader/Backhoe Operator Asphalt Paver Operator Roller Operator Tractor Operator Truck Driver 8-12 C.Y. Truck Driver 4-6 C.Y. Truck Driver 3 C.Y. Transit Cement Finisher Labor Foreman Laborer 1 Laborer 2 Laborer 3 DESCRIPTION 42.50 41.50 40.25 40.25 37.75 34.5O 34.00 34.00 33.00 31.75 30.75 30.60 30.50 EQUIP. COST HOURLY RATE 340.00 332.00 322.00 322.00 302.00 276.00 272.00 272.00 264.00 254.O0 246.00 244.80 244.00 63.75 62.25 60.38 60.38 56.62 51.75 51.00 51.00 49.50 47.62 46.12 45.90 45.75 85.00 83.00 80.50 80.50 75.50 69.00 68.00 68.00 66.00 63.50 61.50 61.20 61.00 EQUIPMENT RATES Asphalt Paver Loader/Backhoe Tractor Roller - Vibratory 3-5 Tons Roller - Vibratory 1-3 Tons Dump Truck 8-12 Yd. Dump 4-6 Yd. Transit Truck 3 Yd. *Flatbed Dump w/Radio & Hand Tools *Pickup Crew Cab w/Radio & Hand Tools *Pickup w/Radio or Hand Tools Propelled - Self - Small Concrete Saw Concrete Saw Compressor Bitumal Pot Vibra Plate Wacker Power Berm Machine Mower (21") Mower (36") Mower (72") Chain Saw Brush Cutter Power Blower Power Edger Spray Tank w/Trailer Power Hedge Trimmer Power Vacuum (30") WAGES TOTAL OPERATED INC. COST FRINGE PER PER BENEFITS HOUR DAY 37.50 40.25 77.75 622.00 27.50 41.50 69.00 552.00 22.50 37.75 60.25 482.00 15.00 40.25 55.25 442.00 12.00 40.25 52.25 418.00 20.00 34.50 54.50 436.00 18.00 34.00 52.00 416.00 18.00 34.00 52.00 416.00 10.00 80.00 9.00 72.00 7.00 12.50 8.00 10.00 6.00 5.00 6.00 10.00 2.00 5.00 14.00 5.00 4.00 3.00 1.50 2.50 2.50 5.00 56.00 100.00 64.00 80.00 48.00 40.00 48.00 80. O0 16.00 40.00 112.08 40.00 32.00 24.00 12.00 20.00 20.00 40.00 Trailer - Large (18') Trailer - Small (8') Hand Tools (per Truck) Two Way Radio 5.00 3.00 1.00 1.00 40.00 24.00 8.00 8.00 OVERHEAD AND MANAGEMENT FEES Applied to MCE Operations 20 per cent to Street Maintenance 15 per cent to all Park Maintenance Applied to Subcontract Work 10 per cent * Note: 1. Flatbed rate and Pickup Crew Cab includes cost of two way radio and hand tools. Pick up rate includes cost of two-way radio o__[r hand tools. SAMPLE SERVICE REQUEST FORM USE BALL POINT PEN PRESS FIRMLY -- YOU ARE MAKING 4 COPIES CITY OF DUBLIN Service Request No. 2158 Received from: Dublin, CA 94568 Daylime Phone # Location: Same as above __ 1. Storm Drain __ 2. Slreet S;gn __ 3. S/reef Sweeping __ 4. PotholelStreet Repa!r __ __ 5. S/feet Light __ 6. Traffic Signal __ 7. Sidewalk Recei,~ed By Ctrler Date Time __ 8. CurblGutter Repair __ t4. Building & Safety __ g. Striping/Marking Complaint __ 10. Landscape -- 15. information Reques,' 11. T~ee Trimming __ I6. Other __ 12. Rodentl[nsect ProbLem __ 13. ,7.chin9 Complaint Description of problem: Action: Employee: Date: Job Assignment: 2158 SERVICE REQUEST SU~9,Z4RY MAY 51, 1989 TOTAL NO. OF SERVICE REQUESTS: TOTAL NO. OF RESPONSES RECD.: 13 TOTAL NO. OF IN-HOUSE SERVICE REQUESTS: 4 TOTAL NO. TOTAL NO. NOT RESPONDING AFTER 2 MONTHS: 18 R~INING OPEN: 11 RESPONSE BREAKDOWN: Job Evaluation: 1 2 $ 4 Total response 0 I 1 1 10 Average score 4.54 Previous average 4.50 City Evaluation: I 2 3 4 Total response 0 0 0 5 5 Average score 4.50 Previous average 4.56 Note: Three residents did not give a response in the City evaluation section; number of responses shown is 10 instead of 13. BREAKDOWN BY TYPE OF PROBLEM: Ttl. SR's Ttl. Resp. Job Eval. City Eval. (Avg.) (Aug. Type: #1 Storm drain 3 2 5.00 5.00 #2 Sign 11 4 5.00 4.75 #3 Sweeping 9 I 4.00 4.00 #4 St. Repair 7 0 0.00 0.00 #5 St. Light 0 0 0.00 0.00 #7 Sidewalk I I 2.00 4.00 #8 Curb & Gutter 0 0 0.00 0.00 #9 striping/Marking I 1 3.00 0.00 #10 Landscape 5 3 5.00 4.00 #11 Tree Trim 4 0 0.00 0.00 #16 Other 5 I 5.00 0.00 total SERVICE REQUEST COMMENTS FY 1988-89 Month of May [[o new co,~n, ents received. Month of April 7542 2~arillo Road: Very distressed at the mess and dangerous c~itions left on Amador Valley Boulevard this past weekend 4/14 thru present. ~ne cuts in pavement were not marked and hitting them at posted s~eed was so,rye Very worried about front end alignment and.tire distress. Some were patche4 - some still not 4/22/89. Month of March No new comments received. Month of February 7500 L~arilio Road: Never complained ~out flare burns, it was gr~ffiVi. ~t really looked into properly first time but was eventu~l!u taken c~re of. Month of January 87~8 Davona Drive: The last street swee=er A-! was on i?~/89. Was hopeful for more frequent sweeping. During the ~asv few years i~ w~s don~ weekly, it appears they swepv tod~y 1/25/89. Looks like you are on a 21-~ay schedule, is that correct ? (Resident was contacted and advised about the twice-a~.,,onth schedule, which h~s been in effect for a n~ber of ye=rs.) ~nth of December ~o new cements received in December. Month of ~W~ember $~49 Lon~ford Way: I feel it is so im-_ortant for person~-i convict and i a?preciated Vhe phon~ c~ii. ~!onth of October new co;:',~-.,ents received in October. 693~~ S'~e?_~-~ Court: Veru helpful w'l:;: bu'l!d'lng permivs c. nd infc?!ation. 75~1 Z.~'::a~_~ack Dri~,e: ! j:~st mot, eS. ;:ere 2 :.,',onths a~to s: Z c~:ntt answer #2 e,~,aI~uat[o?:.! u~:t. HowevJr i xn v~_'[,' :~'.e~:sef. with t;t~ ;:~:7 i For fz?m t',:e Civy w::t.;: p?,ob['c:.'~ i /:ad. - Month of August 11721 Bloomington Way (graffiti removal request .from r~altor selling the house): Don't like your sign ordinance. 7676 Burnham Way: Driver has slowed down; appears to ~e some water being used (albeit very little), and speaking of water . doesn't it se~m very odd that in a time of drought, Dublin is planting gr~ss down the middle of the streets in the center dividers? Carmel by the Sea? Month of July 7835 Canterbury Lane: ~e City needs to be more firm about old junk autos and also unattended lawns. The City needs to crack down on the rental owners. All they c~re about is their rent money. They don~t have to live around these d~nps like us homeowners do. It shouldn't be left u~ to the people to c~ll in about slummy property. ~e slumlords are ruining the City af Dublin. Very soon we can rename Dublin Slw~ City, CA or City Dump, CA. ~origin~i red, est was for sidewalk repair). REPORT DATED: May 3I, 1989 DEPT. SRN PR DESC CD NO CITY Ol; I)UBI, IN SI';Ii'VICI'; h'l','(]Ul','S'J' LOG I,'Y 1968-8<2 FROBLBTI DESCRiPI'.tON PI~,I 2083 3 I0 Feels im,~gat~on w~suf]~.~-~ent on Stgco 7992 Agate Way F~/DSR 2097 3 4 t~othol, o~ (1 wad water oa~o~) Amado~ VaLLeU ~ Stamoard DSRSD 2099 1 16 Ice hagard from ~m,~iU. ~ I)SRSL~ p~np sra. A,ladof VaLLey at Stgco. Fh~ 209~ 3 9 GeofJ'~it~: on st~,cet ~t cvossw~k 7500 Amaeitto Road Ph~ 2~47 3 ~ Catch b~is~in 9~,ato ~u~Ua~, 7542 Amm,~:tto P~f 2147 3 2 Speed ttngt sign m~ss~;ng bolt 7542 /ltuar~t~o Road Fh~l 2145 3 2 l~cpl.(w(~/rcpa~e NWb' 07~7 Uandon F~t 2097 ,~ ~ I',',t Ahc,~d s/:m l.(',ln[~l~l ltt,[~iJtbul~ (ti; P~3t 2070 3 7 S/W has been e~npcd bt~t ~eve~, re~aircd 7~J6 6~nterbue~ Lane 'WP 2088 3 3 G~,auet Left J'~,om sttem,y not swept .up 7685 Candigan Court .'851 2074 3 16 Ne[.ghbor's bushes growing DUet s/w 7607 Ca~tow Way Fh~l 2156 3 10 Im'[gdttlon bPa~ik 7638 Coral ~9t 2162 3 2 lnstot~ NWS (5) 80U4 t'~'ou~;Pidfle Road SWP 2095 3 d ,%~,ct)e~, hosn't been by ~;n months 8748 lla~ona Ph31 2097 ,~ 4 l~ot;ho~t?s Uotq/hauty Ifil. W DSRSD 2099 ] 16 Leak ~n backJ'tow/[ce ~n pkU ~ot on~!/ Dot~tjhc?t'by h'd. at b'[erra SRHX 2i00 3 4 PothoLe (wds Sau l?~,wn's) l)ou~lhertU h'd. Ph3I 2082 3 i0 Tree stake needs ~,eptaced 7499 Uublin Btud. PiOI 2096 3 4 Forbore D~btin Bt. at Eeg~onal SWP 2143 3 3 chatter not swept 11897 Dabtin Green Pk?4 2144 3 4 PothoLe 8652 l,'enwSck Way Fhg~ 2057 ,; 11 Ne[~?hbo~,'s teac needs trDumguj 8J/fl l;'ernutiJ'J' SWP 209i 5 5 Sweepea, Left pgLe Dj' Leaves 8378 l;'ernctgJ'J' Ct. LOOITION DA TE STAT DA TE Ol" DA TE REC 'D CODE INIT R£',FP # DA YS COMPLTD 8/9/88 4 8/9/88 I 8/9/88 216/89 2/7/89 2 2/7/89 4 2/7/89 I 2/13/89 4/I]/~W 4 4/20/SU 9 4/11/80 4 4/11/80 1 4/11/89 Z/]4/~U 4 3/16/~9 2 Z/1G/~U 5/11/BU 4 5/15/HU 4 l,/Ib/H9 U/~/H8 4 8/H/88 J 2/6/0S 011/68 4 7/11~8 4 71510~ 4 71~1~ 10/18/~8 2 10/18/88 1 7/19/88 4 7/27/88 8 7/27/88 4/.19/89 ] 4/19/89 ] 5130189 11/~0/~8 4 12/1/88 ] 12/l/88 2161~ 2/7/U2 2 2/7/82 ] 2/7/H2 3/2~/80 819188 4 819188 I 819/99 1/20/89 4 1/20/89 1 1/20/89 3/2/8~ 4 3/6/~ 4 $/10/89 ;~/8/89 8/7/88 I 9/8/88 ] 11/21/88 11/8/88 # DAYS 1 1 6 1 2 4 I 1 4 1 1 1 8 73 JOB CITY EVAL EVAL + ~ + 5 5 5 4 4 4 5 4 4- + PRIORITY CODE STATUS CODE Db'PT. CODE - 1 L~.::¢rgency C,~LLout - i in£~a[-E¢st)onse Nade--Work Fending PWM - PubLic Works - 2 b:rned[at~ E~,sVonsa - 2 Ecquast Raj'sm,cd to Or:hen Rest)ohs[bLs t'a~,by I)WI - PubLic Wo~,ks Inspection -3 Routine Eo~?,,use - 5 A'o Act:iota Nccc;;sa~,y dWI) -Street Uwaw;inw ConbPactoP - 4 On Hol. d 4 kbek Comutcted b'(;l~' - t-'acij'~e (las & O2'IIR- Other Agency fn-hous~ toque, st ~ Xo n:~:ber circled on response caud - or - no ~,esponsa 2 mo. aJ'ten cavd was mailed. DEFT. 5i{N t'1¢ DE, SC I'I?Ol;LEM DU6CI;I l'2'1 ON LOCA TJ UN DA TI2 I;:I'A T DA T/t,' 01" I)A'/'L' ,/OL' ,'.'l 7'7 CD NO I?EC'I) CODE INiT Ilk',';l' 2 DAY,'; COMPL']'D 2 DA;".3' EVAL L'VAL SWP 2089 $ 3 Sw'eepep left pile of leaves 7625 Ironwood Or£ve Ph~,! 2060 $ 4 Fothol. es 6421 K~n~] Way P~I 1727 3 2 Jnstatt NW$ 7072 Lancastel' Road t~tOf 2090 5 2 8'top sign tean~ug/at n~vue sign od'd' 8449 LonuJ'o~'d Way p~ 2073 S I0 Cttt:y im'[~? teaks b~to hep yd. G7,12 OnU:c I'tacc ~,M 2080 3 10 C~ity ~:m'~9 j'l. oodiu9 he~' yd. 6763 Onyx FL.de SWP 2077 3 3 Sw,~epop not do[u9 adequate job 7853 acbot,, SWP 2076 3 3 Wwccpe~' doesn't come 11697 l;otL/u~l ID~LLu OTHR 2099 ] 16 .lc~? h,~mu,d o,I b~ke path al. ~k)wn/CounL~'u &in I~'anlot~ h'oad b~l(e uaLh OTHR 2072 3 1 Sl:l'on9 dlno~l. J'l,OUl dl,al]n t;g;iH Phil 2154 3 .l ~k~tllote oll I)uh, BI,. /','/0 Ildn:3ml 1~470 b'l]Lor~'tlctte Fk~] 209~ 3 11 2'1'~'~' tl'i~rnt:n9 not sat~sJ'actol'U 11503 Uitodl'flat~ Dr,Joe SWP 2146 3 & Jnfo~,nat~onat calf re sweep~ng 7779 Sunwood Drive ~7,I 2086 3 2 Doesn't want SI'. Ct1,. sign i,~ Uq~]d. 7841 T~napaak D~ive ~4 2079 3 11 Tree next dooi. needs tPimming 7933 T~narack Dr~ve ph~f 2094 3 11 Tl,ee tPDnm[ng not adequate 7933 Tama~.ack Dpive SWP 2092 3 3 Adjust swc'~'Utb19 t[ut~ to aool~d cam; 7U5~1 Ut~aa C'oul,t FhS~ 2071 5 2 Fed Ahcdd Sl'9~1 blew off uotc 8285 Woutau h'oad 10/25/88 2 10/26/88 1 10/26/88 ~/Z0/89 11129/88 4 12/5/88 6 12/5/88 6 11/1/88 4 11/2/88 I 11/2/88 71181~8 4 711~1~ I ~1A1/88 44 81~188 4 813188 l ~/~188 813/88 2 8/3188 I 8/4/88 2 ?/2G/88 ~ 7/27/8~ I 8/U/89 12 217183 4 217/83 I 217183 ~/24/88 4 #/24/l~n I #/24/88 1 7/12/q8 q 7/I.1/8fl 2 7/14/88 2 h/17/8~ 11/28/88 4 ll/2~/#U I 11/2~/88 4/14/89 ~ ~/1~/8~ 4 4/1~/89 4 ~114/89 4 ~/14189 I ~123183 9/1/88 4 9/1/88 1 9/1/88 8/8/88 4 8/15/~8 7 8/15/88 7 11/30/88 4 12/2/88 2 12/2/88 2 I1/1#/H~ 4 12/1/~U I I/2~/B3 ;57 7/6/88 ,1 7/13/88 7 ?/l,5/UU 7 5 5 + 5 4 4- + + + + + -2- .+ No response c~rcied on card -or- no res?onse received 2 tnonths after card wau mailed. CITY OF DUBLIN MEMORANDUM Date: To: From: Subject: July 7, 1988 City Manager Public Works Department Service Request Summary Three Year Statistics Attached is the final service request report for FY 1987-88. Following is & summary of the number of requests by category and evaluation percentag&s for the past three fiscal years: ~ 1987-88 1986-87 1985-86 ~1 Storm Drain 11 13 26 #2 Street Sign 6 21 24 #3 Sweeping 24 12 25 #4 Street Repair 2 8 15 #5 Street Light 5 6 27 #7 Sidewalk 4 8 9 #8 Curb & Gutter 0 1 1 #9 Striping 0 2 3 #10 Landscape 4 5 3 #11 Tree Trimming 7 9 29 #12 Rodent/Insect 0 0 2* #13 Zoning 0 0 3* #14 Building 0 0 1' #16 Other 5 6 13 TOTALS: 68 91 181 (*These items have been referred to outside agencies or other departments for the past two years.) Mailback Responses Rec'd 37 % Responding 54.4% 23 64 25.3% 35.4% Evaluation Ratings: Job 4.51 4.43 4.20 City 4.03 3.63 3.78 All categories of request showed a lower number this year than last year with the exception of street sweeping. The largest number of sweeping requests occurred during the month of December, which is anticipated due to falling leaves, and the month of June, during which the sweeper experienced a personnel problem which has since been corrected. Steadily decreasing Service Request Summary Three Year Statistics July 7, 1988 Page 2 numbers of service requests in other categories are attributable to (1) the annual repair programs and CiP projects and (2) ongoing and/or preventive maintenance programs. It should be noted that the evaluation rating percentage has also increased. '~ Service requests for park maintenance items are being taken by the Recreation Department and will be reported separately from the Public Works Maintenance items, at least for the time being. The Recreation Department will be developing a report which addresse~ slightly different statistics than the Public Works report. Please advise if you have any questions. SERVICE REQUEST SUMMARY FY 1987-88 FINAL REPORT JUNE 30~ 1988 TOTAL NO. OF SERVICE REQUESTS: 68 TOTAL NO. OF RESPONSES RECD.: 37 TOTAL NO. OF IN-HOUSE SERVICE REQUESTS: 4. TOTAL NO. NOT RESPONDING AFTER 2 MONTHS: 16 TO%AL NO. REMAINING OPEN: RESPONSE BREAKDOWN: Job Evaluation: 1 2 3 ~ 4 5 Total response 1 2 4 0 30 Average score 4.51 Previous average 4.44 City Evaluation: 1 2 3 4 5 Total response~ 1 1 10 3 16 Average score 4.03 Previous average 3.96 ~Six responses in the City Evaluation section did not give a rating. was 31 rather than 37). Total response BREAKDOWN BY TYPE OF PROBLEM: Type: Ttl. SR's Ttl. Resp. Job Eval. City Evai. (Avz.) (Avz.) #1 Storm drain 11 4 $ 4-5 #2 Sign 6 4 4.3 4.3 #3 Sweeping 24 10 4.3 3.2 #4 St. Repair 2 1 3 3 #5 St. Light 5 3 5 4-7 #7 Sidewalk 4 0 0 0 #$ Curb & Gutter 0 0 0 #9 Striping/biarking 0 0 O 0 #10 Landscape 4 4 4.5 3-3 #11 Tree Trim 7 6 4.3 4-4 #16 Other 5 4 5 4.3 SERVICE REQUEST COMMENTS FY 1987-88 Month of June 11543 Circle Way: A very professional tree trim. 8745 Davona Drive: Thanks for your quick response to cutting my neighbor's shrubs. Next to him at 8701Davona, the shrubs are growing over the sidewalk also. Does this need a phone call from me to request this service? Or is this post card sufficient? Spruce Lane: No more snitch laws. Please try to find another way to enforce the laws. (Original request was for replacement of a street name sign.) Month of May ..... 7890 Bristol Road: Does not look like the tree has been touched. 7412 Limerick Ave.: We got a quick response when we called about the pothole~ but when they came out the second time (4/27) to permanent patch it~ they failed to clean up when they were finished) the street was a mess: the gutter needed to be swept: and they even left their trash (drink cups) in front of our house. We were very displeased with the actual work done. 8362 Ferncliff Ct.: The street sweeper never did return. The cleaning previous to 4/26/88 was not satisfactory either. Did the sweeper need repair? 7741Woodren Court: My response to the second question (rating of "2" under "City Evaluation") is based on the City's evaluation and handling of the fence issue brought about by the widening of San Ranen Road. Month of A~ril 7521 Brighton Dr.: So far so good! And I was very pleased also when HUD remodeled my house that the City Inspector kept insisting thin~s were brought up to code. Thanks again! 7627 Turquoise St.: Weeds were killed and more gazanias planted. However many gazanias on the left half have died leaving a large unplanted area next to our la~m area. Your quickness and service were very much appreciated, Month of March 7619 Carlow Way: Your service was prompt and efficient and I appreciate it. Sorry it took so long to respond - this card was misplaced. Your men were very courteous and competent. Thank you. I would really like to see several small parks w/trees: benches~ etc.~ for kids and senior citizens to enjoy. The ball park offers little for the elderly. Dublin needs a tree cutting "permit" code like Danville has. 7602 Coral Way: Sprinkler head is full circle; Should be half circle. Please have changed (water sprays on fence). }ionth of February 6522 biansfield Ave.: The street sweeper has very rarely managed to get into the curved area at street corners (right er left). My only complaint. - 1 - Month of January 8577 Bandon Drive: I called and complained because I hadn't seen the sweeper because the leaves never were picked up. WRen they showed up I had already cleaned my area and he sweep the neighbors and did a good job but when he come on the other side he left a big pile of trash. Anyway somehow or-other it got cleaned up so its alright now. 8471 Briarwood Lane: I think somehow all cars should be made to be off.the streets on street cleaning day. If it were snow we would be in trouble. Plows ~ould not get through. 7642 Topaz Circle: Landscaping on interior slopes of Topaz still not completed. Lived there 1 1/2 years. When is this going to be completed? (Response letter sent.) Month of December (From Murray School District re trimming tre~s on Amarillo Road): I am very pleased with your quick response and cooperation. It's good to have a'working relationship between public agencies. 7462 Stagecoach Road: The repair trucks were out at the site of the break (irrigation) within minutes. I was very pleased with their quick response. The one thing that could be improved would be a phone # where I could reach you in an instant. I was given 4 phone #'s before I found one that would help me. (Response letter sent to resident on 1/5/88). Month of November 11354 Dillon Way: It took a long time to get action - I called re missing street intersection sign Di]_lon & Bet!on in late August. No action so called again in November - was told it was on back order. Perhaps you need a better supplier. Intersection signs are important in case of fire and police dept. I appreciate that it is corrected. (Response letter sent by City Manager.) 11640 Luna Court: Dublin Blvd. above Silvergate needs more work but I have seen an improvement since I called. 7364 Tamarack Drive: Only been here since June but I have had a few questions~ etc.~ & everyone I've talked to in the "city" has been great. They were out within 2-3 hours. That's what I call service! Thanks! 8366 Vomac Road: You could be more thorough on our corners - Vomac - (North/South side San Ramon Road). Sometimes I feel that the west side gets more attention. Month of October 7S38 Diana Lane: The problem was taken care of very fast. 7264 Brighton Drive: Suggest sweepers empty more often to prevent future complaints. blonth of September $37S Fernclif{-Court: Thank you very much for getting those trees trimmed. It certainly makes a big difference on our court. - 2- Month of August 7302 quartz Circle: I still require some assistance to kill the gophers underneath and adjacent to my backyard. Your help would be greatly appreciated. ?059 Utica Court: Should still ban fireworks; (No comments received for month of July.) -3- REPORT DATED; DERT. SRN ' PWM ,-, 2055 SWW!~ 2043 ~..SWP,i'., 2065 2124 ?PW~I~" : 2039 ]SWP:~, 2109 .SWP', ' 2049 p .... ., 2o44 ~: 2069 2126 2052 2128 '~WP) 2006 ~ PWH ~' 2050 '~SWP 2116 SWP 211S P~l 213S L PW}i ~ 2141 ::PWH 2123 ~PWH 2047 '~:Pi~! ~i 2133 !~Pmff 7 2048 PRIORITY CODE June 30, 1988 PR 'DESC PROBLEH DESCRIPTION CD NO 3 I Drain backed tip during rain 3 3 3 3 3 3 3 3 : 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 CITY O1" DUBLIN SERVICE REt~UEST LOG LOCATION 7078 Allegheny l)rive 6825 Amador Va]3ey B~vd. 6825 Amador Va]]ey Blvd. Amarillo at AI.egre Ardmore Pi.acc 8577 ~andon Drive llet] en Drive Devec]y & GJenoaks 8384 lk~vorJ y 0700 Jljrch Cour~ 7701 Uomli awood 8471 Briarwood Lane 8471 Driarwood Lane 8471 Briarwood Lane 7264 ~righton Drive 7521 Brighton Drive 7890 Ul.lstaJ. Road 7670 llur:fimm Way 8164 Card]iT Drive 7619 GarJow Way 11794 GasCJe Court 11543 CircJ.e Way 11579 Circ]~ Way 7602 Coral Way 8382 Cypress Ct. 8745 Davona Drive 7838 Diaua Lane -;1,E2nergency Callout i'f2 ~Immedia te Response · Routine Respause - 0n' Hold 3 Sweeper doesn't clean gutter 3 Sweeper not using water/leaves debris 11 Trees scraping top of school bus 3 Sweeper ]eft glass & debris 3 'Sweeper didn't come 3 Sweeper sweeping at 2:30 a.m. I Storm drain emitting odor 3 Sweeper didnJt pick up Jeaves 3 Sweeper doesn't c]ean gutter 2 St. name sign fell off 3 Sweeper not cleaning her ~ide of street 3 ' Sweeper didn't come 3 Sweeper not cleaning her side of street 3 Sweeper left trash in front of house 5 St. l~ght out 11 Tree needs trimming 3 Sweeper not using water ? sidcwaJk ]Sftcd by trees 3 Sweeper did not pick up ]cow's I Catch basin backed up 11 Tree needs trimming 16 Weed abatement - Dub]in Blvd. 10 Leaking/missing /trig. head/slope repair 1 Storm drain full of trash 16 Neighbor's bushes growing over s/w 16 Pampas grass growing over s/w DATE STAT BATE OF DATE JOB CiTY REC'D CODE iNiT I(ESI' J/ DAYS COHI'LTD Jl BAYS EVAL EVAL 10/28/87 4 1o/28/87 I 10/28/87 I 5 8/27/87 I 8/27/87 I 12/30/87 216 + + 6/30/88 2 6/30/88 I 6/30/88 1 12/1/87 4 12/1/87 I 12/14/87 14 5 5 ,. 3/17/88 4 3/17/88 ! 3/17/88 1 12/17/87 2 12/18/87 I 12/18/87 I 2 3 6/27/88 2 6/27/88 I 6/27/88 1 8/12/87 4 8/13/87 I 8/13/87 I + + 11/25/87 2 tl/25/87 I 12/8/87 13 + 1o/2/87 2 1o16/87 4 1o/6/87 4 + + 9/1/87 4 9/1/87 I 9/2/87 I 5 5 6/30/88 2 12/17/87 2 12/18/87 I 12/18/87 I 5 5 3/30/88 4 3/31/88 1 3/31/88 ! + lO/14/87 2 10/14/87 I 10/14/87 1 5 3 4/18/88 z 4/18/88 I 4125/88 8 5 5 4/21/88 4 4/26/88 5 4/26/88 5 1 6/30/88 2 6/30/88 I 6/30/88 1o/5/87 4 1o/9/~7 4 6/23/88 259 12/18/87 2 12/18/87 I 12/18/87 I 5 3 1/14/88 4 1/14/88 I 1/14/88 I 5 5 5/26/88 4 5/27/88 I 5/27/88 I 5 3 6/17/g~ 4 0/24/88 7 6/24/88 7 2/8/88 4 2/9/88 I 2/9/88 I 5 4 9/21/87 4 9/22/87 1 9/22/87 I + + 5/11/88 4 6/lO/88 30 6/1o/88 30 5 5 9/29/87 4 9/30/87 I 9/30/87 I 5 3 STATUS CODE DI';PT. CODE - 1 initial Response Hade--Work Pending I'WH - Pub].ic Works Haintenance - 2 Request Referred to Other Responsible Party I'WI - l'ub]ic Works Inspection - 3 No Action Necessary SWi' - Street Sweeping Contractor - 4 Work Completed PGE - Pacific Gas & Electric OTBR- Other Agency ~7 InMmuse request number circled on response card - or - no response 2 mo. after card was mailed. LOCATION DATI'] STAT DATg OF DATg REC'D CODE INIT I{ESP DAYS COHPLTD DAYS SRN I'R DESC CD NO PRODLEH DESCRIPTION 2053 3 2 2122 3 2037 3 1 2068 3 3 2131 3 3 2041 3 5 2o41 3 11 2106 3 3 2111 3 3 2108 3 3 2142 3 7 2136 1 2119 3 1 2054 3 3 2121 3 2107 3, 1' 1726 3 2 1728 3 2 2i4o 3 7 2132 3 5 2057 3 2035 3 3 203S 3 16 2046 3 5 2067 : 3 4 2112 3 3 2045 3 2042 3 1 2137 3 3 2102 3 2 2117 3 10 2120 3 5 2103 3 2 St. name signs missing Pothole in front of driveway Storm drain emitting odor, Sweeper hi t mai ] box Sweeper ]eft debris ou street Street light out Neighbor's tree blocking st. & s/w Sweeper didn't p/u trash in gutter Sweeper not cleaning up/moving too fast Sweeper doesn't get ].eaves in gutter S/W lifted by treel gutter lifted Lg. tree limb fei] into street Gatcb basin backed up Sweeper missed com't Sweeper did not clean gutter Drain blocked l flooding Install NWS Install NWS S/W needs repJacemcnt/construction Street light keeps going out Drain backed up during rain Sweeper missed street' Debris needs to be cleaned up from s/w Street light out Street bmnpy in front of business Sweeper not getting gutter c]ean Storm drain emitting odor Storm draiu emitting odor Sweeper doesu't clean in front of house Street sign misspelled Broken sprinkler head in median Street light is out frequently School ped sign loose/leaning 11354 Di].loll Way 7614 Donohue Drive 7240 Dover Lane 7701 Dublin Grccl, Ct. 8362 l"c r,mJ 8378 Fer,m] iff Ct. 8638 ga]indo Drive 8638 galindo Drive 7538 Garde]Ia Drive 7546 Langmui r 7,112 bi,lerjelt Ave. Locust Court 11640 Luna Court 6822 Mansfield Ave. 8128 Mulberry Place 8i05 North Lake Drive 6753 Onyx Place 1i042 Padre Way 6914 Post l{oatJ 7302 tluartz Clrc]e 11377 Rampart l)rive 6355 Scar]crt Court 7274 Sheffield Lane 7274 Slmffield Lane 0591 Sierra Lane 11619 Si]vergate Spruce Lane 7462 Stagecoach l~oad 7884 Starward Drive 7364 Tamarack grige -2- *=in-house request was mai] ed. ',+7~o response circled on card -or- no response received Z months after card ;~<: <!.', 10/20/87 1 2/2/88 1 8/11/87 4 6/3o/88 2 ~/26/8s 2 8118187 z " 4 11/10/87 2 12/8/87 2 11/19/87 3 6/17/88 5/23/~ 4 ~/~4/Ss 4 IO/27/87 z 1/28/88 2 11/17/87 4 lO/26/87 i 11/4/87 4 o/v/ss 5/3/~8 2 io/zS/87 4 ~/12/87 2 " 4 v/~/~7 4 0/3o/88 12/~/87 z ~/~/~7 4 ~/25/87 4 5/24/88 2 5/23/88 4 12/18/87 4 1/27/88 2 ii/5/87 4 11/10187 2/2/88 8/13/87 4/27/88 8118187 8/18/87 12/8/87 11/2o187 10/27/g7 1/28/a8 11/17/~7 10/27/87 1o/28/~7 8/14/87 12/IO/~7 8/26/~7 ~/2~/~ 5/26/88 12/21/87 1/27/88 21 1 2 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 2 2 1 1 1 1 3 3 1 1 ~1/m/87 4/27/88 84 8/13/87 1 4/27/88 1 8/18/87 9/3/87 16 11/10/87 1 i2/8/87 11/20/87 1 5/23/a8 ~/~4/S~ iO/27/87 1128/88 1 11/17/87 1 11/20/87 11/5/87 1 5/20/88 17 ~ol28/87 1 8/14/87 2 " 2 ~1~/~7 1 12/21/87 12 9/8/87 5 8/26/87 1 5/25/88 1 5/26/88 12/21/87 3 1/27/88 1 11/5/87 JOB CITY EVAL EVAL 2 3 3 5 4 5 4 + + + + 5 + SRN PR DESC CD NO PROBLEH DESCIIlPTION LOCATION DATI'2 STAI' DAI'E O1" REC' 11 COllk; IN£T liESI' IJATI:: DAYS COHI'LTI) D^ Y$ JOB CiTY EVAL EVAL 2059 3 I0 Broken sprinkler head - Jade Cir.. 7642 Topaz Circ]e 2125 3 10 Ck. irrigation/weeds 7627 Turquoise Street 2036 3 11 Neighbor's tree' blocking sight dist. 7059 Utica Ct. 2058 3 16 Clean up pile of trash O cot. S. Il. Rd. 8366 Vumac Hoad 2129 3 I Ck DI on Sail Iiamon Rd. O Vomac/l'looding 8351 Von,ac Hoad 2134 3 11 Requested that palm tree be trim,ed 8449 Wick]ow Lane 2139 3 7 Ck. crack in sidewalk in front of house 8696 Wick]ow Lane 2127 3 3 Sweeper doesn't use water or p/u dirt 7741 Woodren Court In-house request ~i +'lqo response circled on card -or- ilo response received 2 months after card was mailed. 12/28/87 4 12/29/87 7/27/87 3 11/2/87 4 11/3/87 4/21/88 4 4/21/88 5111188 4 5/|2/~ 013188 4 0/7/~ 4/12/88 2 4/12/88 12/29/87 1 4/2/88 11/3/87 1 4/zt/88 5/23/88 12 6/7/88 4 4/12/88 1 1 5 5 5 PARKS SERVICE REQUEST SUMMARY May 31, 1989 TOTAL NO. OF SERVICE REQUESTS: TOTAL NO. OF RESPONSES RECEIVED: TOTAL NO. OF IN-HOUSE SERVICE REQUESTS: TOTAL NO. NOT RESPONDING AFTER 2 MONTHS~ TOTAL NO~ REMAINING OPEN: 70 16 33 15 6 RESPONSE BREAKDOWn: Job Evaluation: 0 1 2 3 A 5 Total Response 1 Average Sccre ~.3 Previous Average &.l 0 1 1 2 1t City Eva!uaticn' 0 t 2 3 ~' 5 Total Respcnse 0 Average Score 4.1 Previous Average 4.1 BREAKDOWN BY TYPE OF PROBLE>!: Type: Tt! SR's 0 0 6 2 8 ~ Resm Job Eva! (AVG.) City Eva! (Arc.) #1 Storm Drain #2 Sign 1 #3 Sweeping #4 St. Repair #5 St. Light #7 Sidewalk #8 Curb & Gutter #9 Striping/Marking #]0 Landscape #]] Tree Trim #16 Other 69 16 4.3 4.I S~RVICE REQUEST COMMENTS FY 1988-89 MONTH OF JULY 1988 7564 Kilrush Avenue: There is new graffiti on pavement on Kilrush Avenue just off of Luciana. Don't know if you can do anything about it or not. I don'.t know if teenagers on my street did it or not. Please advise results if any. Thank you. 11507 Treeline Place: I was impressed with the return call. Thank you. MONTH OF AUGUST 1988 11518 Soleado Court: Dolan Park is a wonderful park. The City has kept it up wonderfully, each day it's as clean as the.first day. Thanks to all your employee-s who work to help maintain our park. MONTH OF SEPTEMBER 1988 11708 Hartan Road: I haven't had time to get back to you. Thanks for taking care of the problems as you always do. Hope your feeling better. Is there a more direct way I can contact you or just call through Public Wo '--~ MONTH OF OCTOBER 1988 7604 San Sabana: ! was going to write a letter, but this will save me even that trouble! Diane Lowart and Steve Loweree both followed through with timely phone calls to me. The next game found the field in exce!len~ condizion and myself very impressed with the City of Dublin. Keep up the great work! MONTH OF NOVEMBER 1988 None MONTH OF DECEMBER 1988 None MONTH OF JANUARY 1989 7635 San Sabana Road: Except for the appearance of the N.W. corner of Amador Valley & San Ramon Road, I'm tired of looking at the weeds all year long, year after year. I would like to see the voters elect the Mayor ins~o=d of rotating the office amon Councilmembers. MONTH OF FEBRUARY 1989 6753 Onyx Place: It's very nice tc MONTH OF MARCH 1989 7524 Silvertree Lane: they finished trimming. have our park back? Your crew cleaned up beautifully after Thank you. SERVICE REQUEST COMp~=NTS Page Two MONTH OF APRIL 1989 7729 Castilian Road: We were very happy with your promptness and responsiveness to our call. MONTH OF MAY 1989 11672 Harlan Road: Thanks very much for your quick response to this matter. .i RI~CRI.;^TfON DEI~ARTHI';NT S ERe 1Cl'.; IH';QUEST REIT)RT I'IONTII: HAY 1989 DEPT. SRN PR DESC CD NO 1889 3 16 I'WM 1878 3 PWM 1881 3 16 PWH 1882 3 P~I 1829 1 16 PWH 1821 3 16 PI~I 1801 3 16 "k%t 1811 3 16 ~1 1820 4 16 PI&I 1826 3 16 Pk&l 1823 3 16 PWH 1807 3 16 P~I 1835 3 16 I'~1 1837 3 16 PWH 1838 3 16 Pl~l 1839 3 16 P%%1 1843 3 16 PWH 1844 3 16 P~I 1845 3 16 P~%I 1847 3 16 PWH 1840 3 16 PROBL~I DESCRIPTION LOCATION I)ATE STAT I)ATE OF NI). I{F.C ' I) C(11)1¢ INIT RESP DAYS When will the temporary £ence be tnkea dowa? '['e.l~i.s court gules locked VomiL oil swings '['elH~is cotlrL Rates loci<ed Play bridge has loose boaFds. Fitness staLl, on (Kolb) adjacenk Lo backyard is creating problems - people looking into yard by climbing structure. Water pressure on spickets off Tree vandalized (limbs broken-kite) Dust from Sports Grounds dr~fts into Toyota office and sales lot. Sports field ~1 flooded: Water on fields -West side. Willow Creek Dr/^lamo Creek l'nrk Ih-:lghton Ih'ive/lG)ll) l'ark Brighton l}riv,:/Kolb Park I~rtghto. I)rlv,,/K,)ll) I'u~k Brlghto. I)rive/Koll) l'nrk 7936 Bristol I~,ad Dol)ltn BIwl,/I)S(; Dub.Lin I)1 wi ./liS/; 6450 Dublin Blwl. Dui)lin BIvd./DSG Dublin BIwl./I)SG Faucet men's & ladies res~lroom leaks 7437 Larkdale/S,'. Ce,,ter Vent of mens restroom is located 7437 Lr, rl<(lale/Sr. Cc.ter os office wnll. Noise from vent can be heard in the office. Toilet overflowing in men's bath- room. Exit light out. Paper towel dispenser needs to be installed. Faucet in m~lls room Exit light a mens bathroom light needs to be replaced, Panel dividers need to be moved from City Office to Senior Center. Leak in roof (hallway leading to stage). Exit light in main hall is out. 7437 l,utl(dalc/S~. Ce. Ler 7437 l~arkllal e/Sr. Ccnler 7437 La~kdale/Sr. Center 7437 I.arl<dnl(./S~. Ce.ter 7437 Larkdale/Sr. Center 7437 Larkdale/Sr. Center 7437 Larkdale/Sr. Ce.~er 7~37 Larkdale/Sr. Center O5/O2/89 I O5/O4/89 2 O1/19/88 3 O?/21/aH 2 O7/21/88 a [17121 &22/8,~ I (17/25/8~1 3 07/25/88 I IO/20/H8 4 I O/2~)/~8 0 O9/13/88 I 01/03/8q 93 O7/06/88 4 O7/O7/48 I O8/12/88 4 O8/10/88 4 O9/~2/88 5 09/20/88 4 09/23/88 3 09/20/88 4 09/26/88 O 0?/O6/88 5 11/16/88 4 12/o7/88 21 11/10/88 4 12/{16/88 12/16/88 4 12/2()Ia8 01/30/89 4 O2/01/89 U1124/89 01/09/89 a (11/12/89 01/09/89 3 01/13/89 12/14/88 1 12/16/88 04/11/89 I)ATE NO. CHPLI'I} I)AYS E\'AL O51051119 3 5 07/07/88 I + 08/10188 4 3 o9123/88 3 5 o9/26/88 o 4 12/07/88 2t !~* CtIY EVAL I 02/01 (12/02/H9 (11/12/89 01/13/89 02/08/89 04/25/89 PRIORITY CODE 1 - F~nergency Cailout 2 - I~m~diate Response 3 - Routine Response 4 - On llold ST^TtIS COI)E I - Initial Response Made - Work l'euding 2 - Request Referred to Other Responsible Party 3 - No Action Necessary 4 - Work Co,.p[eted 5 - Form not returned by t~/H I}l';Iq'. CODF, IMH - Public Works Maiatena.ce l~/I - Public Works Inspection ,qWI) - Street Sweepi.g Co.lrnctor I~E - I)oci[ic Gas & Electric OTIIR- Other Agency EVAL COI)I'; ~ - 1N IIOUSE + - NO CARl} REqlJRNED, OR CARl) RI"J;EIVEI)WITH NO I.',VAL iND ICA'H:I) REI'ORT HONl'll: HAY 1989 FAGE TWO DEPT. SRN PR DESC CD NO PROBLEH DESCRIPTION LOCATI UN I)A'I'E I(EC' l) S'I'^T I)A'I'I~ OF CODE INIT RI:,SI' NO. I)ATE N(). .lOB DAYS CHI'L'I I0 I)AY5 EVAt, ('I'I'Y EVAL 1%%1 1809 3 16 PWH 1884 3 16 l'i&l 1813 3 16 I'WH 1859 3 16 P~&l 1886 3 16 I'WH 1887 3 16 I%%1 1826 3 16 PWH 1856 3 16 PWH 2101 3 16 PI,~I 1810 3 16 P~7I 1880 3 16 PWH 1883 3 16 PIGI 1802 3 16 PWM 1814 3 16 t%71 1812 3 16 I'~01 1818 3 16 Pi~}l 1822 2 16 PWH 1817 3 16 1",~,'1'1 1832 3 16 PWI'I 1834 3 2 PI~}I 1848 3 lO P~&I 1858 3 16 I%}1 1860 3 16 PI&I 1861 3 16 Pl,}l 1862 3 16 P~71 1803 3 16 I'WM 1864 3 16 ])ark lights not on at night Sand area being used as litter box Sand from sandpit all over sidewalk Several lights not on ot night. Ilt'okcn glass in III~Q nrta. Swing lmlts ate loose. Water [rom park sprinklers is running Into her backyt~rd and flooding it. Broken boards in park. Park shrubbery growing over re.ce - I)[ocks ].igbt and may be pushi.g [elite over, Tire swing is .loose Door hardware is broken Drinking fountaln won't turn off Padre Way/I).lau Park l'adre Way/I)olau I'atk I'adre Way/I)oln. Park l'adre Way/Il. la. ]'ark Padre Wny/I).ln. I'a~k 11667 Padre l'lata Way/Maim I'nrk 7524 SLlvertrce Lane 11600 Shn.uou/Pr eschool l160U Slmuuon/A&ll 11600 Slmn.on/l'ark Graffiti on glass door 11600 Sham'mn/A&B R,, Graffiti on downstairs entrance door 1160(} Shan.on/Dwnstrs Courtyard needs weeding a.d 11600 Shamw)u/lheschool cleaaup. Sandbox needs more sand. Hens room toilet won't ['lush. Exit door downstairs has fealty hardware aad will not close. Lights i., ladies room go off and bazz loudly. Exit sign blinking o~f a on. Plastic cover to message sign ak Shannon Park Double doors oi Social Hall (South side o~ Mdg) crash/panic hard,are on boEEom does not secure. Outside rear lights are no~ ~o~king. 11600 Sha,aou/l'ark Drinking Fountain ~n ha.ll~ay is 11600 Shanmm/Cencer plugged up. gale in courtyard cnnnot be secured ILO00 Shanaoa/Preschool (bo.It does ~ot work). Light pa,el loose and about to fall. 11600 Shnnnon/Center Bolt felt off o~ preschool wagou llO00 Shannon/Preschool Lights over counter bar are out. 11600 Shannon/Ceuter ll600 Shanuol,/Centor 11600 Shanl,ou/Ce.ter llO00 Sh;.m.n/Centcr 11600 Shalmon/(;enter 11600 Shalmon/Fark 11600 S.hanuon/Center (}7/l 1188 08/24/88 (18124188 Ol/23/89 04 / 2 I I o/10188 0 l / 17/8q 02/27/89 o7/~5/88 07/20/88 O8103188 08/25/88 08/15188 09/06/88 09/16/88 o9/ol/88 10/3[/88 11/09/88 ll/25/88 01118189 01126/89 01/3u/89 02/03/89 02/07/89 (12/08/89 4 0 1 / 19189 4 03107/89 4 07/20188 4 ()7/27/8~ 4 07/26/88 4 (18119/88 1 4 09/16/88 09/16/88 4 o9/13/a~ 4 1 1102/88 4 11/~4/88 4 11/28/88 4 01/19/89 4 01/30/89 4 02/01/89 4 02/03/89 4 02/08/89 4 02/10/89 2 01/19/R9 2 8 U3/07/89 8 5 ()7/20/~1~ 5 7 07/20/8,~ 7 I 07/26/8g I 16 08/19/88 16 5 5 5 3 4 3 4 t. + + 3 11/28/88 I 01/19/89 1 4 01/30/89 4 2 02/01/89 2 *** ~ f) 02/03/89 0 e:'= :H~ I 02/08/89 1 ~'[ :"' r~', 2 02/10/89 2 :~::' o.** 3 09/09/88 3 0 09/10/88 0 "'~ :~ 09/16/88 RF, I'ORT HONTII: HAY 1989 I'At;E 't'IIREE DEPT. SRN I'R DESC CD NO I'ROBLI~I I)ESCRI PTION LOCAT ION DATE RI,;C' l) -- oz/15189 STAT PATI:, ()1: CODE INIT RI.;SI' 4 I12/I 7/~9 DAYS 2 DA'If: NO. JOI; CHI'I,'I'I) DAYS I.',VAI, CITY kVAI, I'WH 1874 3 16 PWH 1875 3 16 PI&I 1876 3 16 PWH 1877 3 16 I'WM 1885 3 lO t'WH 1888 3 1 O I~4M 1890 3 lO pWM 2075 3 16 PWH 1815 3 16 WH 1825 3 16 PX&I 1827 4 16 PWH 1831 4 16 PWH 1849 4 16 I'/01 1833 4 16 PWH 1857 4 16 t'~,~1 1855 3 lO PX~I 1806 3 16 P~I 1866 3 16 Pg}l 1869 3 16 P~l 1851 3 16 Pk,3l 1852 3 16 1854 3 16 Sink pipes in kitchen arc leaki, ug. I'lastic knob Lo heater timer switch .ts broken. Door womens bathroom broken - will Batter] for eme~'genCy lights needs distilled water. Fluoresceut tube needs to be re- placed iu back of room. Sink is leaking. Brokea glass in preschool courtyard Irrigation from park flooding yard Benches removed from park Childrens play area flooded with Sandbox flooded with water. Barricades around sand areamd~y? Flooding in park. Water drainage thoblem. Reported wet sm'.d 6 wks ago - why has iL not bec:: replaced? Standing water - child could drowu. Ladies restroom floor is slick Low board needs safety railings Iligh dive needs third rail Cage on filter pit room needs repair. Pipiag above soda ash tanks ueed to be secured. Filter room door needs new lock. Remove diving boards, guard stand 11000 Slnnmon/(ieuter ILO00 Shaumm/Ccutcr llOO0 Shaunon/Ceuter 11600 8hmmo,I/Ccuter 11000 Slmnnon/l'reschool 11600 Shannon/l'reschoo[ 11600 Shnanoa/l'reschool 7532 Sitvertrce Lane Stagecoach/l';~r k Stagecoach/l'atk Stagecoach/Pat k Stagecoach/l'ark St ap, econch/l'a~ k Stage(:oach/l'a ~ k Stagecoach/Park Stagec.ach/l'a~ k 815l Vi llm;e l'kwy/l'ool 8151 Village Pkwy/l'ool 8151 Village Pkwy/l'ool 8151 Village Pkwy/Pool 815l Village l'kwy/Pool 8151 Village l'kwy/l'ool 02/16/89 o~/t 5189 03/21/89 03123189 04/25/B9 05/08/89 07/21/88 08/30/88 09/28/88 IU/lT/B8 10/21/88 I I/28/88 I I/0 I 01/17/89 01/09/89 07/15/88 101o5188 10/07/88 02/23/tq9 03/16/89 U3/27/89 04/27/89 051O8/89 07/22/88 o~/3 I lO/26/8a lO/17/88 11/29/R8 I I Ol/18/89 07/o5/88 08/26/88 10/25/88 4 10/07/88 4 1 O/14/88 7 (12/23/89 7 I 03/16/89 1 4 (1't/27/89 4 2 04/27/89 2 0 05/08/89 0 I 07/22/88 I 5 ; I ~19/31/88 I 5 29 ~)2/(}9/89 106 + 9 02/08/89 105 6 02/08/89 104 + 1 02/08/89 71 5 [ 02/(P~/89 ¢)~ I 02/U9/89 21 + 2 (12/(/8/89 2~ lO 07/15/88 10 + 37 08/26/88 37 ~'~ 20 10/25/88 20 2 10/07/88 7 1 U/14/88 5 + + + 5 + + + + HDE C[]RR]RA~ SF1 F-EVALUATI(]I~ QUALITY OF SERVICES HCE BELIEVES IT HAS PROVIDED A HIGH LEVEL OF SERVICE TO ~ CITY OF DUBLIN AND IN A RESPONSIVE HAhB~R. THE FINAL SERVICE REQLEST SU~bt~kRY FOR FY 1986-87, )~CE RESPONDED TO 68 SERVICE REQUESTS. ON llE AVERAFF, CITIZENS GAVE YCE A SCORE OF 4.51 UP FROH PREVIOUS RATINGS OF 4.43 IN 1986-87 AND 4.20 IN 1985-86. PERFORHANCE BASED WORK PROGRAH AND BUDGET MCE FULLY IMPLEMENTED A PERFORMANCE BASED WORK PROGRAH AND BUDGET FOR THE PARKS ON J]LY 1, 1988. THIS FOLLOkED BY A YEAR ~ INPLE~NTATION ON ~ STREET SYSTE~I. AN ELEMENT OF THIS HAINTENANCE MANAGEMENT SYSTEM IS A COMPREHENSIVE REPORTING SYSTEM WHICH IS USED TO UPDATE FUTURE PLANNING VALUES. REPORTED DATA FROM JULY 1988 THROUGH FEBRUARY 1989 WAS USED TO ADJUST PLANNING VALUES FOR ~ FY 1989-90 BUDGET. INVENTORY ITEMS HAVE BEEN UPDATED TO REFLECT CONSTRUCTION OqANGES TO THE STREET SYSTEM AND ll-E ADDITION OF hE~W SUBDIVISION STREETS. ALL OF THE FY 1989-90 STREET AND PARK BUDGETS HAVE BEEN PREPARED USING THE SAHE MAINTENANCE HANAGEMENT SYSTEM. AS ADDITIONAL PARKS, STREETS OR AS.SESS~ENT DISTRICTS ARE PROPOSED FOR ~ CITY, ANNUAL MAINTENANCE COSTS CAN BE EASILY PROJECTED BASED ON THE TYPES AND QUANTITY OF PHYSICAL FEATURES THAT ARE BEING PROPOSED FOR THE FACILITY. WORK ALTERNATIVE PROGRAM DURING THE CURRENT FISCAL YEAR, MCE HAS ASSISTED THE CITY IN CONTINUING THE WORK ALTERNATIVE PROGRAH USING INMATES SUPPLIED BY THE ALAMEDA COUNTY SHERIFF'S OFFICE. THESE INMATES ARE USED PRIMARILY FOR ROADSIDE LITTER PICKUP AND l~EEDING BOTH ON TH~ CITY'S STREET ~EDIANS AND IN THE STAGECOACH ASSESS~NT DISTRICT.