Loading...
HomeMy WebLinkAboutItem 4.02 MCE Amend Agreement CITY C LER'K File # I I Oil ,~ll~- ~L-~[-~ . AGENDA STATEMENT CITY COUNCIL MEETING DATE: July 7, 1998 SUBJECT: Amendment to Agreement With MCE Corporation for Public Works Maintenance Services Report Prepared by: Lee S. Thompson, Public Works Director EXlrlIBITS A TTA CI~,D: 1) :) Resolution and Proposed Amendmem Letter and Detailed Budget Information fi.om MCE RECOMMENDATION: ~ ,I JV'Ad°pt resolution approving amendment to agreemem and authorize ~,/,/m~ Mayor to execute amendment FINANCIAL STATEMENT: See Description. DESCRIPTION: MCE has provided maintenance services to the City of Dublin since 1984. Those services which are provided by MCE are as follows: Bike Path Maintenance Building Management and Maintenance Curb, Gutter, and Sidewalk (emergency or temporary repair) Drainage Maintenance Guardrail Repair Park Maintenance Si~.Lm Installation, Repair & Maintenance Spill Cleanup Storm Patrol/Cleanup Street Landscaping Maintenance Street Repair (emergency or temporary repair) Street Tree Maintenance Striping and Marking (emergency replacement) Weed Abatement The current three-year contract v, dth MCE Corporation for maintenance services expires in June of 1999. As with previous years, MCE has submitted a budget proposal for FY 1998-99. This proposal has been reviewed by Staffin conjunction with the budget process. COPIES TO: MCE Corporation ITEM NO. ~ g:\cont ractsXm ce\agstrev The proposed amendment makes no changes to the agreement except that rates are proposed to increase as noted below. Proposed Changes for 1998-99 MCE is proposing an average 3% cost of living increase in labor rates for the Dublin crew and a 7% increase in equipment rates due to increased fuel costs and other operating expenses. Most rates for work performed by subcontractors are also proposed to increase by an average of 3%. The rates for tree pruning are proposed to increase by 4% for 4" to 8" trees and 15% for the other two sizes. This is due to an increased number of trees in those size ranges. Chemical weed control is proposed to increase 5.1%. No other rate changes are proposed. Total expenditures under MCE's contract for FY 1997-98 are anticipated to exceed budget primarily in the areas of street repair and storm patrol. Staff requested that MCE perform more pavement repair than budgeted because the heavy rains caused unexpected street damage. The additional costs associated with storm patrol are expected to be offset by reimbursement from FEMA_ The overall budget for 1998-99 is projected to be a total of $1,068,038, wh/ch represents an increase of $49,678 (4.9%) over the 1997-98 budget, or an increase of $21,918 (2%) over projected 1997-98 expenditures (including "extra work"). Table I of MCE's submittal (Exhibit 2) identifies work activities and details actual expenditures for the prior two fiscal years, the adopted 1997-98 budget, anticipated expenditures for 1997-98, and the proposed budget for Fiscal Year 1998-99. Table 1~ identifies actual work hours expended by category compared to budget. Table 1II identifies the percentage of rate change for various work categories. Table 15/provides a staffing comparison. Their staffing level is proposed to increase for 1998-99 by approximately 1/3 of a person in the Landscape Laborer Ill category. This is primarily recommended due to additional areas proposed to be maintained in new developments. Recommendation MCE Corporation has shown a consistent standard of excellence in performance and safety, as well as concern for the fiscal interests of the City. Staff recommends that the City Council adopt the resolution (Exhibit 1) approving the amendment to their agreement. Page 2 RESOLUTION NO. - 98 A RESOLUTION OF ~ CITY COUNCIL OF ~ CITY OF DUBLIN APPROVING AMENDMENT TO AGREEMENT WlTIt MCE CORPORATION FOR PUBLIC WORKS MAINTENANCE SERVICES WHEKEAS, on June 25, 1996, the City Council approved an agreement with MCE Corporation for Public Works Maintenance Services; and WHEREAS, said agreement provided a detailed scope of work and labor rates for Fiscal Year 1996-97; and and WHEREAS, said agreement was amended to provided for rate changes for Fiscal Year 1997-98; WHEREAS, MCE Corporation is requesting a cost of living increase in labor, vehicle, and subcontract rates for Fiscal Year 1998-99; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the amendment to the agreement with MCE Corporation attached hereto as "Exhibit A," with an effective date of July 1, 1998. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendmem. PASSED, APPROVED AND ADOPTED this 7th day of July, 1998. AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk C:\contrazt'unamt~resoarnnd EXI~IBIT "A" OF RESOLUTION -98 AMEN-DMENT TO AGREEMENT BETWEEN CITY OF DUBLI~I AND MCE CORPORATION FOR PUBLIC WORKS MAINTENANCE SERVICES WHEREAS, on June 25, 1996, the City of Dublin (hereinafter referred to as "CITY" and MCE Corporation (hereinafter referred to as "CONTRACTOR") entered into an agreement to provide Public Works Maintenance Services to CITY (hereinafter referred to as "AGREEMENT); and WHEREAS, the rate schedule of said agreement were amended effective July 1, 1997; and WHEREAS, MCE Corporation has requested a cost of living increase in labor, vehicle, and subcontract rates for Fiscal Year 1998-99; NOW, THEREFORE, the parties hereto agree as follows: Section 1. Exhibit B, "Payment Schedule," of the Agreement shall be amended by replacing Attachment 1 in the current Agreement with Attachment ] of this Amendment, said Attachment 1 being identified as "Exhibit B Payment Schedule 1998-99." 1998. Section 2. Said revision in Exhibit B "Payment Schedule" shall be effective as of July 1, CITY OF DUBLIN MCE CORPORATION Mayor President ATTEST: ATTEST: Cid' Clerk Secretary g: ~contrn£tim£e~mndmt2 *TTACHMENT 1 OF AMENDMENT Al I ACHMENT 1 - SCHEDULE OF WORK CITY OF DUBLIN PROPOSED CITY BUDGET FISCAL YEAR 1998-99 JUNE 10, 1998 A. SCOPE OF WORK The following breakdown identifies tasks which are anticipated to be conducted as part of the Annual Public Works Maintenance Agreement for the Fiscal Year 1998-99. Annual estimated costs include management fees as provided in Section C. Contractor shall schedule work to adhere to these expenditure levels as provided for in this Agreement. ACTIVITY / SUB-ACTIVITY 1998-99 ESTIMATED ANNUAL EXPENDITURE STREET MAINTENANCE · Street Repair · Drainage Maintenance · NPDES Drainage Maintenance · Storm Patrol/Clean Up · Curb & Gutter/Sidewalks · Sign Repair/Maintenance · Neighborhood Watch Signs · Striping/Marking · Guardrail Repair · Weed Abatement · Bike Path Maintenance · Spill Clean Up Activity Total 16,350 4,130 5,100 16,940 730 16,740 72O 6,680 210 26,400 4,990 4,280 103,270 MAINTENANCE SUPERVISION 91,520 STREET TREE MAINTENANCE MCE/Contract Tree Maint- General Fund MCE/Contract Tree Maint- Stagecoach A.D. MCE/Contract Tree Maint - Dougherty A.D. MCE/Contract Tree Maint - Santa Rita A.D. Activity Total 44,990 2,160 5,520 1,920 54,59O STREET LANDSCAPE MAINTENANCE (BEAUTIFICATION) Existing Streets Stagecoach Assessment Distdct Dougherty Assessment District Santa Rita Assessment District Activity Total $ * $ 161,500 29,200 38,980 10,200 239,880 Includes $ 8,000 for St. Patrick's Day Parade & Festivities (Community Promotions) PARKS MAINTENANCE · Stagecoach Park · Kolb Park · Dolan Park · Alamo Creek Park · Dougherty Hills · Dublin Sports Ground · Mape Park · Shannon Park · Dublin Swim Center · Civic Center · Senior Center · Martin Canyon Creek BUILDING MANAGEMENT HERITAGE CENTER MAINTENANCE CEMETERY / GROUNDS FIRE STATION BUILDING FIRE STATION GROUNDS Activity Total $ $ $ $ $ $ 10,678 43,398 26,467 44.783 26,942 134 217 22 949 55,341 20,024 49 089 956 8,095 442,939 94,293 8,080 16,744 11,778 4,944 Total 1998-99 Estimated Annual Expenditure 1,068,038 2 UNIT PRICES The following activities shall be completed at the Unit Prices indicated. The unit prices are inclusive of all labor, materials, equipment, overhead and management fees. ACTIVITY / SUB-ACTIVITY 1998-99 UNIT PRICE BEDDING WEED CONTROL · Streets & Parks $ 94.3'2 per Acre per Mo. TURF MAINTENANCE · · · · · · Fertilize Parks Fertilize Streets & Assessment Districts Broadleaf Spraying Aeration Mowing Turf Edging 86.98 117.55 47.12 45.90 48.32 12.08 ~er Acre ~er Acre 3er Acre ~er Acre ~er Acre ~er 1,000 L.F. TREE MAINTENANCE Tree Pruning o 0"- 4" Class 1 o 4"- 8" Class 1 o 8" - 16" Class 2 o Over 16" · Fungus Spraying 39.67 per Tree · 53.76 per Tree 99.18 per Tree By Bid 5.04 per Tree ~BLIN, CITY' OF - EXHIBIT B, PG %3 - 1998-99 - 6-4-98 (CONT MGMT - X) 3 C. TIME AND MATERIALS RATES The following rates shall be applied to work performed by the Contractor which is not specified in Section B (Unit Prices). At all times the Contractor shall strive to utilize the most cost effective elements possible to complete a project. Appropriate overhead and management fees are included in the labor and equipment rates listed below. OVERTIME HOURLY HOURLY · ' RATES RATES DESCRIPTION LABOR RATES Dublin Crew Maintenance Superintendent Landscape Foreperson Landscape Leadperson Landscape Laborer'l Landscape Laborer II Landscape Laborer III Landscape Laborer IV $ 43.20 $ 64.80 $ 33.10 49.65 29.60 44.40 27.9O 41.85 23.60 35.4O 18.90 28.35 14.20 21.30 HOLIDAY HOURLY RATES 86.40 66.20 59.20 55.80 47.20 37.80 28.40 MCE Crew Superintendent Loader/Backhoe Operator Asphalt Paver Operator Roller Operator Truck Driver 8-12 C.Y. Truck Driver 4-6 C.Y. Truck Driver 3 C.Y. Transit Cement Finisher Laborer Foreman Laborer I Laborer II Laborer III DESCRIPTION EQUIPMENT RATES Dublin Crew * Flatbed Dump * Pickup Chain Saw Brush Cutter $ 64.00 $ 96.00 $ 62.80 94.20 60.65 90.98 60.65 90.98 51.7O 77.55 50.85 76.28 51.35 77.03 49.70 74.55 45.90 68.85 44.60 66.90 44.35 66.53 44.20 66.30 4 EQUIP. COST HOURLY RATE 7.85 6.60 5.05 4.40 128.00 125.60 121.30 121.30 103.40 101.70 102.70 99.40 91.80 89.20 88.70 88.40 DESCRIPTION EQUIPMENT RATES (CONTINUED) Power Blower Power Hedge Tdmmer Trailer- Small (8') Power Washer Electric Welder Portable Generator Water Trailer EQUIP. COST HOURLY RATE 1.85 3.10 2.25 11.25 6.25 5.05 8.75 MCE Crew Large Asphalt Paver Asphalt Paver Backhoe Loader Roller-Vibratory 5-8 Tons Roller-Vibratory 3-5 Tons Dump Truck 8-12 C.Y. Dump Truck 4-6 C.Y. Transit Truck 3 C.Y. Saw Truck Pickup Crew Cab Pickup Concrete Saw-Self Propelled Concrete Saw- Small Air Compressor Bitumal Pot Vibra Plate Wacker Power Berm Machine 62.50 46.90 40.65 37.50 34.40 31.25 37.50 34.40 34.40 18.75 12.50 11.25 25.00 6.25 18.75 11.25 10.00 10.00 18.75 OVERHEAD AND MANAGEMENT FEES Applied to Subcontract Work and Material Costs 10 percent NOTE: Dublin Flatbed and Pickup rates include cost of two way radios and hand tools. DUBLIN, Ci ,-FY OF - EXHIBIT B, PG 4-5 ~ 1998-99 (6.-4-98) (CONT MGMT - X) 5 II MCE CORPORATION Maintenance -- Construction -- Engineering June 10,1998 Mr. Lee Thompson Public Works Director City of Dublin P.'O. Box 2340 Dublin, California 94568 RE: 1998-99 MAINTENANCE SERVICES Dear Mr. Thompson: Attached are the revised tables and Exhibit B for Fiscal Year 1998-99. Following is a brief description of each table or exhibit. We propose no changes to the language in the contract. EXHIBIT B Exhibit B lists the proposed city budget for 1998-99, subcontract unit prices, labor and equipment rates for personnel permanently assigned to Dublin and for the construction personnel. TABLE I Table I lists the actual 1995-96 expenditures, actual 1996-97 expenditures, final budget for 1997-98, 1997-98 estimated expenditures based on eight months of actual reporting plus a detailed projection of each activity in every location, and proposed 1998-99 expenditures based on current service levels and rates listed in Exhibit B, for general activity groupings. Also included are the activities that were over or under the adopted budget by 10% or more for 1996-97. Another listing shows the activities that are expected to be over or under by 10% for fiscal year 1997-98. Reasons for the overage or underage are listed for each activity. At this time, it is estimated that expenditures will exceed the budget by $14,740 or 1.4%. TABLE II Table II lists the accomplishments for several activities for actuat 1995-96, actual ! ~9u-97, final budgeted 1997-98, estimated 1997-98 based on eight months of actual reporting plus anticipated amounts of work for the last four months in the fiscal year, and proposed 1998-99 based on current service levels. 6515 Trinity Court, Dublin, California 9456[ TABLE III Table III lists all labor rates, equipment rates and unit prices for 1997-98 and proposed for 1998-99 and the change, if any, in dollars and percent. It is proposed that MCE crews that work permanently in Dublin be granted a cost of living wage increase that averages 3 %.The rates to the City of Dublin have been increased for 1998-99 to reflect the cost of living increase. Labor rates for other MCE crews remain.the same as the current year rates. All rental rates for equipment have been increased an average of 7% due to higher fuel costs and other operating expenses. Subcontract rates average 3% for landscape maintenance activities such as mowing, edging, fertilization, aerating, broadleaf spraying, and contract bedding maintenance. Tree spraying for disease and pests has gone up 3% also. Tree pruning has gone up by 15% in two categories ( 0-4' & 8-16" caliper size ) and approximately 4 % in the 4-8" caliper size tree. This is due, primarily, to the continued growth of the trees and the fact that the inventory is getting larger and taller. Chemical weed control applications have increased by 5.1%. TABLE IV Table IV shows staffing comparisons of actual 1996-97, 1997-98 budgeted, 1997-98 estimated and 1998-99 proposed. The staff comparison table was prepared using 1950 hours per employee. Please review and advise any questions. As always, thank you for the opportunity to work with you. Sincerely, MCE CORPORATION Vice President, Contract Management cc: Steve Loweree, MCE Dean McDoanld, MCE file Enclosures TABLE I CITY OF DUBLIN JUNE 10, 1998 ACTIVITY STREET REPAIR DRAINAGE MAINT. NPDES DRAIN MAINT. STORM 'PATROL CURB & GU-I-/'ER / SIDEWALK SIGN REPAIRS/INSTALL. NEIGHBORHOOD WATCH STRIPING & MARKING GUARD RAIL REPAIR WEED ABATEMENT BIKE PATH MAINT. SPILL CLEANUP MAINTENANCE SUPERVISION STREET TREE MAINT. STAGECOACH A. D. TREES DOUGHERTY A. D. TREES SANTA R1TA A.D. TREES LANDSCAPE MAINT. STAGECOACH A. D. LANDSCAPE DOUGHERTY A. D. LANDSCAPE SANTA RiTA A.D. LANDSCAPE PARK MAINTENANCE BUILDING MANAGEMENT HERITAGE CENTER DUBLIN CEMETERY FIRE STATION BUILDING FIRE STATION GROUNDS ADDITIONAL WORK TOTAL MCE CONTRACT COST = W/O ADDITIONAL WORK = ACTUAL 1995-96 $13,765 1,205 5,925 15,841 3,059 20,000 23 2,599 200 18,300 4,792 5,378 83,813 48,192 1,885 6,982 0 150,604 29,547 34,096 401,815 107,038 5,190 12,997 0 0 23,174 $996,420 $973,246 ACTUAL 1996-97 $14,610 1,450 4,730 11,315 2,430 15,630 250 3,140 0 26,310 3,320 6,330 83,250 48,550 850 4,850 0 150,790 29,120 36,240 347,590 92,740 7,470 11,650 0 0 43,900 $946,515 $902,615 BUDGET 1997-98 (FINAL) $15,950 2,270 4,910 13,740 2,940 17,450 27O 5,500 20O 21,000 4,140 6,260 88,450 47,700 2,080 5,980 3,350 145,630 29,220 39,840 18,340 419,280 92,450 7,140 13,170 6,300 4,800 0 $1,018,360 91,018,360 ESTIMATED 1997-98 $23,820 5,160 4,640 24,270 83O 16,460 350 3,250 0 24,430 4,510 4,460 88,410 42,310 3,010 5,660 0 149,050 28,320 41,850 427,460 93,92O 7,68O 16,780 12,270 4,200 13,020 $1,046,120 $1,033,100 PROPOSED BUDGET 1998-99 $16,350 4,130 5,100 16,940 730 16,740 720 6,680 210 26,40O 4,990 4,280 91,520 44,990 2,16 5,520 1,920 161,500 29,200 38,980 10,200 442,939 94,293 8,080 16,744 11,778 4,944 0 $1,068,038 $1.068,038 DUBLIN, CiTY OF -TABLE 1 - 6--4-98 -1998-99 (CONT MGMT - X) TABLE I CITY OF DUBLIN JUNE 10, 1998 (CONTINUED...) THE ACTUAL EXPENDITURES FOR 1996-97 WERE UNDER THE FINAL APPROVED BUDGET (EXCLUDING ADDITIONAL WORK) BY $ 43,935 OR 4.7%. ADDITIONAL WORK TOTALED $ 43,900. THE 1996-97 ACTUAL MCE COSTS EXCEEDED THE FINAL ADOPTED BUDGET BY 10% OR MORE IN THE FOLLOWING AREAS: AMOUNT ACTIVITY OVER BUDGET WEED ABATEMENT $8,720 50% REASONS FOR OVEREXPENDITURE DUE TO HIGHER THAN USUAL GROWTH IN SPRING DUE TO LATE RAINS & CHANGE OF APPROACH TO DOUGHERTY ROAD AS DIRECTED BY COUNCIL. SPILL CLEAN UP $1,270 28% DUE MOSTLY TO SINGLE LARGE SPILL OF DIESEL INTO CANAL AT DUBLIN COURT. LANDSCAPE MAINTENANCE $16,330 12% DUE TO NEED FOR INCREASED SHRUB PRUNING ON VILLAGE PARKVVAY. PRUNING INVOLVED SEVERE THINNING AND TOPPING. HERITAGE CENTER $1,720 30% DUE TO MORE UTILIZATION OF BUILDING BY PUBLIC AND PRESENCE OF FACILITY MANAGER, GENERATING MORE REQUESTS FOR SERVICE. ACTIVITY DRAINAGE MAINTENANCE NPDES DRAINAGE AMOUNT UNDER BUDGET 54O 27% $880 16% REASONS FOR UNDEREXPENDITURE DUE TO LACK OF RAIN AFTER JANUARY 1997 STORMS. EARLY STORM MAY HAVE WASHED DEBRIS FROM DRAINS PRIOR TO PLANNED CLEANING. LESS DEBRIS REMOVED THAN YEAR BEFORE. STORM PATROL $2,455 18% NO SIGNIFICANT RAIN AFTER JANUARY, RESULTING IN LESS HOURS NEEDED. CURB, GtJq-FER & SIDEWALK $63O 2O% LESS REPARtS THAN ANTICIPATED BASED ON HISTORICAL NEEDS. 2 AMOUNT ACTIVITY UNDER BUDGET NEIGHBORHOOD WATCH SIGNS $150 37% REASONS FOR UNDEREXPENDITURE LESS SIGNS REPAIRED AND INSTALLED DUE TO LESS WORK GENERATED BY COMMUNITY SAFETY OFFICER. STRIPING & MARKING $1,970 38% LESS CURB PAINTING NEEDED DUE TO ACTUAL CONDITION OF TARGETED CURBS. GUARD RAIL REPAIR BIKE PATH MAINTENANCE $200 100% $2,940 47% NO GUARD RAILS WERE DAMAGED IN FISCAL YEAR 96-97. LESS MAINTENANCE REQUIRED DUE TO LESS STORM RELATED PROBLEMS, PARTICULARLY ON DOUGHERTY ROAD. STAGECOACH A.D. TREES $1,370 62% DUE TO NO PEST CONTROL SPRAYING NEEDED AND LESS THAN PLANNED IN-HOUSE WORK. DOUGHERTYA. D. TREES PARK MAINTENANCE DUBLIN CEMETARY $1,400 22% $54,500 14% $2,650 19% DUE TO NO PEST CONTROL SPRAYING NEEDED AND LESS THAN PLANNED IN-HOUSE WORK. LESS STORM RELATED WORK IN DOUGHERTY HILLS OPEN SPACE AND LESS UNIT PRICE WORK (MOWING, EDGING) DUE TO RAINS THROUGH JANUARY. LESS CONTRACT TREE WORK REQUIRED DUE TO EXTENSIVE WORK IN FY 95-96. DUBLIN, CITY OF - TABLE 1 CONT'D -6-4-98 (CONT MGMT - X) 3 TABLE I CITY OF DUBLIN JUNE 10, 1998 (CONTINUED...) THE PROJECTED EXPENDITURES FOR 1997-98 ARE ANTICIPATED TO BE OVER THE FINAL APPROVED BUDGET (EXCLUDING ADDITIONAL WORK) BY $14,470 OR 1.4%. THE 1997-98 PROJECTED MCE COSTS EXCEED THE FINAL ADOPTED BUDGET BY 10% OR MORE IN THE FOLLOWING AREAS: ACTIVITY AMOUNT OVER BUDGET STREET REPAIR $7,870 49% REASONS FOR OVER-EXPENDITURE EMERGENCY REMOVE & REPLACE AS DIRECTED BY PUBLIC WORKS DIRECTOR. DRAINAGE MAINTENANCE $2,890 127% DUE LARGELY TO AN EMERGENCY BANK STABILIZATION (SAND BAGGING) ON MARTIN CANYON CREEK. STORM PATROL $10,530 76% DUE TO RECORD WET WINTER GENERATING MORE HOURS THAN PLANNED. _.'IGHBORHOOD WATCH $80 30% MORE WORK GENERATED BY COMMUNITY SERVICE OFFICER. WEED ABATEMENT $3,150 16% LONGER, WETTER WINTER PROMOTED MORE WEED GROWTH, PARTICULARLY IN HARDSCAPE AREAS. STAGECOACH A.D. TREES DUBLIN CEMETERY $930 45% $3,610 27% MORE TREE PLANTING THAN PLANNED. MAJORITY OF OVER-EXPENDITURE DUE TO GROWTH OF HERITAGE DAYS CELEBRATION AND ADDITIONAL UNPLANNED TREE WORK. FIRE STATION BUILDING $5,970 95% LARGELY DUE TO UNPLANNED ROOF REPAIRS. 4 THE 1997-98 PROJECTED UNDER-R~,4S (10% OR MORE) ARE ANTICIPATED ,~ THE FOLLOWING AREAS: ACTIVITY CURB, GUTi-ER, SIDEWALK AMOUNT UNDER BUDGET $2,110 72% REASONS FOR UNDER-EXPENDITURE FEWER REPAIRS GENERATED BY CITIZENS AND CITY STAFF. STRIPING & MARKING $2,25O 59% LESS DONE THAN PLANNED DUE TO POOR WEATHER & OVERAGES IN OTHER AREAS. GUARD RAILREPAIR $200 100% SPILL CLEAN UP $1,800 29% NO REPAIRS NEEDED. LESS THAN PLANNED DUE TO FEWER SPILLS & SIZE OF SPILLS. STREET TREE MAINT. $5,390 11% FEWER REMOVALS NEEDED DUE TO LESS ACCIDENTS AND VANDALISM AND REDUCED LEVEL OF SERVICE TO TREE FERTILIZATION WHILE A MORE COST EFFECIVE METHOD IS FOUND. SANTA RITA A.D. TREES SANTA RITA A.D. LANDSCAPE FIRE STATION GROUNDS $3,350 100% $18,340 100% $600 12% DID NOT ASSUME MAINTENANCE IN FY 1997-98. DID NOT ASSUME MAINTENANCE IN FY 1997-98. LESS CONTRACT MAINTENANCE DUE TO EXCESSIVE RAINS. DUBLIN, CFT"Y OF - TABLE lA - 6-4-98 (CONT MGIVIT - X) TABLE II CiTY OF DUBLIN JUNE 10, 1998 ACTIVITY MAINTENANCE A8-01 (D1) SUPERVISION SPILLS A1-01,02 (D1, D5, D7) TEMPORARY PATCHING A7-01 (D1, D7) DRAINAGE INSPECTION D1-01 (D1, D7) CATCH BASINS CLEANED D1-02 (D1, D7) DITCH CLEANING D1-04 (D1, D7) STORM PATROL D2-01, 02 INSPECTION / REMOVAL (D1, DS, DT) INSTALL NEW SIGNS D4-01, A5-01 rnl, D5, D7) ,. ,S REPAIRED D4-02, 03, A5-02 (D1, D5, D7) CURB PAINTING D5-01 (D1) INSTALL PAVEMENT MARKERS D5-02 ROADSIDE SPRAYING D7-01 (D1, DS, BIKE PATH MAINTENANCE D8-01 (D1) TREE/BRUSH CUTTING A3-01 (D1, D7) TREE STAKING A3-02 (D1, D2, D3, D4, D9) TREE PRUNING A3-03,08,09, A4-03 (D1, D2, D3, D4, D9) TREE PLANTING A3-04 (D1, D2, D3, D4, D9) TREE FERTILIZING A3-05 (D1, D2, D3, D4, D9) TREE WATERING A3-06 (D1) 'E REMOVAL A3-07, A4-04 ~.~,1, D2, D3, D4, D9) TREE TRIMMING A4-01 (D1) SUBCONTRACTOR ACTUAL 1995-96 1,801 HRS 146 HRS 188 HRS 9O7 EA 561 EA 1,213 LF 535 HRS 62 EA 462 EA 3,676 LF 0 EA 28 AC 139 HRS 258 HRS 333 EA 1,665 EA 68 EA 376 EA 663 EA 20 EA 0 EA ACTUAL 1996-97 1,777 186 91 770 246 10 356 55 222 9,297 0 49 112 2O7 171 1,063 39 378 326 3O 15 BUDGET 1997-98 (FINAL) 179 113 1,033 248 1,363 417 49 255 6,306 40 49 132 152 5O4 1,253 59 537 287 30 3O ESTIMATED 1997-98 1,840 117 7O 911 243 1,363 7O7 58 169 3,018 0 73 145 151 219 1,284 59 1 56 33O 27 3O PROPOSED BUDGET 1998-99 1,840 117 95 1,033 243 1,363 456 72 172 6,306 40 61 160 152 300 1,227 59 156 376 27 3O ACTIVITY LITTER PICKUP A6-01, A6-02 (D1, D2, D3, D4, D5, DT, Dg) LEAF CLEANUP A6-03 (D1, D2, D3, D4, Dg) PRUNE BEDDING PLANTS A6-10 (D1, D2, D3, D4, D9) PRUNE SHRUBS A6-16 (D1, D2, D3, D9) MOW MEDIAN TURF A6-21 (D1, D2) EDGE MEDIAN TURF A6-22 (D1, D2) IRRIGATION INSPECTION/ PROGRAM (STREETS) A6-30,31 (D1, D2, D3, D4, Dg) IRRIGATION HEAD REPAIR A6-32 (D1, D2, D3, D4, D9) OTHER IRRIGATION SYSTEM REPAIRS (VALVES, BACKFLOWS, CONTROLLERS, LINES) A6-33,34,35,36 (D1, D2, D3, D4, Dg) ILLEGAL SIGNS/HAZARDS A6-80 (D1, D2, D5, DT, Dg) PARKS (BUDGET 8020) PARK TREE PRUNING A3-03,08,09 A4-01,03 LITTER PICKUP A6-01 PARK SHRUB PRUNING A6-16 MOW PARK TURF A6-21 EDGE PARK TURF A6-22 IRRIGATION INSPECTION/ PROGRAM (PARKS) A6-30,31 IRRIGATION HEAD REPAIR A6-32 OTHER IRRIGATION SYSTEM REPAIRS (VALVES, BACKFLOWS, CONTROLLERS, LINES) A6-33,34,35,36 RESTROOM MAINTENANCE A9-03 PLAYCOURT MAINTENANCE A9-06 PLAYGROUND MAINTENANCE A9-09 FOUNTAIN MAINTENANCE A9-10 BALLFIELD PREP - GAMES A9-22 BALLFIELD MAINT. A9-23,24 STORM PATROL & CLEANUP D2-01,02 ACTUAL 1995-96 400 HRS 238 HRS 466 HRS .5,440 EA 117 AC 249 MLF 13,005 STA 1,148 EA 352 HRS 365 HRS 610 EA 752 HRS 2,790 EA 1,459 AC 367 MLF 15,251 STA 1,001 EA 198 HRS 1,054 HRS 115 HRS 796 HRS 341 HRS 0 HRS 389 HRS 360 HRS 2 ACTUAL 1996-97 55O 399 433 6,256 109 94 12,101 1,529 421 338 491 901 2,919 1,342 236 16,948 1,041 284 962 98 756 245 255 347 261 BUDGET 1997-98 (FINAL) 587 464 455 ~,583 125 271 15,414 1,550 474 356 592 778 3,126 1,481 337 16,253 944 291 1,240 222 816 242 564 392 351 ESTIMATED 1997-98 456 399 614 10,258 125 2O8 14,584 366 312 59O 97O 3,169 1,450 267 16,922 1,037 318 1,t42 153 739 263 498 436 486 /~ -~'; .¢/ PROPOSED BUDGET 1998-99 434 496 10,770 125 271 15,023 1,250 374 336 598 1,005 3,108 1,481 337 16,871 991 248 1,142 15~ 263 49~ 550 52O TABLE !11 CITY OF DUBLIN COUNCIL APPROVED JUNE 10, 1998 LABOR RATES DUBLIN CREW MAINTENANCE SUPERINTENDENT LANDSCAPE FOREPERSON LANDSCAPE LEADPER~;ON LANDSCAPE LABORER I LANDSCAPE LABORER II LANDSCAPE LABORER III LANDSCAPE LABORER IV DUBLIN EQUIPMENT RATES PICKUP WIR & HT FLATBED W/R & HT CHAIN SAW BRUSH CUTTER POWER BLOWER POWER HEDGE TRIMMER '.AILER SMALL (8') POWER WASHER ELECTRIC WELDER PORTABLE GENERATOR WATER TRAILER MCE CREW SUPERINTENDENT LOADER/BACKHOE OPERATOR ASPHALT PAVER OPERATOR ROLLER OPERATOR TRUCK DRIVER 8-12 C.Y, TRUCK DRIVER 4-6 C.Y. TRUCK DRIVER 3 C.Y. TRANSIT CEMENT FINISHER LABORER FOREMAN LABORER I LABORER tl LABOR-_R 1997-98 RATES $41.90 32.10 28.70 27.10 22.90 18.40 13.80 $6.15 7.35 4.70 4.10 1.75 2.90 2.10 10.50 5.85 4.70 8.20 $64.00 62.80 60.65 60.65 51.70 50.85 51.35 49.70 45.90 44.60 44.35 44.20 1998-99 PROPOSED RATES HR HR HR HR HR HR HR $43.20 33.10 29.60 27.90 23.60 18.90 14.20 HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR $6.60 7.85 5.05 4.40 1.85 3.10 2.25 11.25 6.25 5.05 8.75 HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR $64.00 62.80 60.65 60.65 51.70 50.85 51.35 49.70 45.90 44.60 44.35 44.20 HR HR HR HR HR HR HR HR HR HR HR HR CHANGE $1.30 1.00 0.90 0.80 0.70 0.50 0.40 $0.45 0.50 0.35 0.30 0.10 0.20 0.15 0.75 0.40 0.35 0.55 N/C N/C N/C N/C N/C N/C N/C N/C N/C N/C N/C N/C PERCENT CHANGE 3.1% 3.1% 3.1% 3.0% 3.1% 2.7% 2.9% 7.3% 6.8% 7.4% 7.3% 5.7% 6.9% 7.1% 7.1% 6.8% 7.4% 6.7% LABOR RATES MCE EQUIPMENT RATES LARGE ASPHALT PAVER ASPHALT PAVER BACKHOE LOADER ROLLER-VIBRATORY 5-8 TON ROLLER-VIBRATORY 3-5 TON DUMP TRUCK 8-12 C.Y. DUMP TRUCK 4-6 C.Y. TRANSIT TRUCK 3 C.Y. SAW TRUCK PICKUP CREW CAB PICKUP CONCRETE SAW-SELF PROP. CONCRETE SAW-SMALL AIR COMPRESSOR BITUMAL POT VIBRA PLATE WACKER POWER BERM MACHINE UNIT PRICES CHEMICAL WEED CONTROL R.O.W. TREE PRUNING 0- 4" CLASS 1 4- 8" CLASS 1 8 - 16" CLASS 2 OVER 16" BY BID FUNGUS SPRAYING - TREES (50 TREE MINIMUM) FERTILIZE ONLY TURF (PARKS) FERTILIZE / BROADLEAF (STREETS) BROADLEAF SPRAYING TURF (PARKS) AERATION TURF (ALL AREAS) TABLE III (CONTINUED...) CITY OF DUBLIN JUNE 10, 1998 1997-98 RATES 1998-99 PROPOSED RATES $58.50 HR 43.85 HR 38.00 HR 35.10 HR 32.20 HR 29.25 HR 36.85 HR 33.80 HR 33.80 HR 18.40 HR 12.30 HR 11.00 HR 23.40 HR 5.85 HR 17.55 HR 10.50 HR 9.35 HR _ 9.35 HR 17.55 HR $62.50 HR 46.90 HR 40.65 HR 37.50 HR 34.40 HR 31.25 HR 37.50 HR 34.40 HR 34.40 HR 18.75 HR 12.50 HR 11.25 HR 25.00 HR 6.25 HR 18.75 HR 11.25 HR 10.00 HR 10.00 HR 18.75 HR $109.25 AC 34.50 EA 51.75 EA 86.25 EA BY BID 4.90 EA 84.46 AC N/A 45.75 AC 44.57 AC $114.78 AC 39.67 EA 53.76 EA 99.18 EA BY BID 5.04 EA 86.98 AC 117.55 AC 47.12 AC 45.90 AC CHANGE $4.00 3.05 2.65 2.40 2.20 2.00 0.65 0.60 0.60 0.35 0.20 0.25 1.60 0.40 1.20 0.75 0.65 0.65 1.20 $5.53 5.17 2.01 12.93 0.14 2.52 N/A 1.37 1.33 PERCENT CHANGE 6.8% 7.0% 7.0% 6.8% 6.8% 6.8% 1.8% 1.8% 1.8% 1.9% 1.6% 2.3% 6.8% 6.8% 6.8% 7.1% 7.0% 7.0% 6.8% 5.1% 15.0% 3.9% 15.0% 2.9% 3.0% N/A 3.0% 3.0% TABLE Iii (CONTINUED-.-) CITY OF DUBLIN JUNE 10, 1998 -/ UNIT PRICES MOW TURF (ALL AREAS) EDGING TURF CONTRACT BEDDING (ALL AREAS) 1997-98 RATES $46.92 AC 11.73 MLF 91.58 MO 1998-99 PROPOSED RATES $48.32 AC 12.08 MLF 94.32 MO CHANGE $1.4O 0.35 2.'74 PERCENT CHANGE 3.0% 3.0% 3.0% DUBLIN, CITY OF - TABLE 3 - 1998-99 - 6-4-98 (CONT MGMT - X) TABLE IV CITY OF DUBLIN STAFFING COMPARISONS JUNE 10, 1998 AREA / POSITION PUBLIC WORKS ADMIN. SUPERINTENDENT BUILDING MANAGEMENT LLI LLII STREET MAINTENANCE LLF LLL LLII LLlll STREET TREE LLF LLL LLII LLIII 1996-97 1997-98 1997-98 1998-99 ACTUAL FINAL ESTIMATED PROPOSED 1.00 1.00 1.0q 1.00 1.00 0.98 0.94 0.94 0.13 0.20 0.15 0.14 .13 1.18 1.09 1.08 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.20 0.20 0.20 0.20 0.51 0.78 0.85 0.88 1.01 1.28 1.35 1.38 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.30 0.30 0.30 0.30 0.15 0.19 0.10 0.21 0.57 0.61 0.52 0.63 STREET LANDSCAPE MAINT. LLF 0.28 0.28 0.28 0.28 LLL 0.28 0.28 0.28 0.28 LLI 0.40 0.40 0.40 0.40 LLII 0.68 0.68 0.68 0.69 LLIII 1.64 1.34 1.26 1.33 PARK MAINTENANCE LLF LLL LLI LLII LLIII 3.28 2.98 2.90 2.98 0.49 0.49 0.49 0.49 0.49 0.48 0.48 0.48 0.60 0.60 0.60 0.60 1.51 1.41 1.40 1.41 0.68 1.61 1.70 1.80 3.77 4.59 4.67 4.78 TABLE IV CITY OF DUBLIN STAFFING COMPARISONS JUNE 10, 1998 (CONTINUED ...) AREA / POSITION 1996-97 1997-98 1997-98 1998-99 ACTUAL FINAL ESTIMATED PROPOSED HERITAGE CENTER 'LLII 0.11 0.10 0.08 0.09 CEMETERY LLF 0.02 0.02 0.02 0.02 LLL 0.02 0.02 0.02 0.02 LLII 0.07 0.07 0.10 0.09 LLIII 0.09 0.09 0.11 0.09 0.20 0.20 0.25 0.22 FIRE STATION BLDG. MAINT. LLI 0.02 0.06 LLII 0.04 0.09 0.06 0.08 0.06 0.15 0.14 FIRE STATION LANDSCAPE LLL 0.01 0.01 LLIII 0.01 0.01 0.01 0.01 0.02 0.02 0.02 MCE GRAND TOTAL Supt. 1.00 1.00 1.00 1.00 LLF 1.00 1.00 1.00 1.00 LLL 1.00 1.00 1.00 1.00 LLI 2.00 2.00 2.00 2.00 LLII 3.00 3.00 3.00 3.00 LLIII 3.07 4.02 4.03 4.32 11.07 12.02 12.03 12.32 Staff calculations based on the assumption that each hourly employee will work a total of 1,950 hours of reguiar and overtime per year. DUBLIN, CITY OF - 'FABLE 4 -1998-99 - 6-4-98 (CONT MGMT - X) 2