Loading...
HomeMy WebLinkAbout4.06 Annual Street Overlay CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: February 9, 1987 SUBJECT: Contract 87-2 Annual Street Overlay and Repair Program EXHIBITS ATTACHED: Specifications will be available at the City Council meeting. RECOMMENDATION: /04//Authorize Staff to advertise for bids. FINANCIAL STATEMENT: Budgeted costs are as follows: Design and Inspection $ 18,000 Overlay 112,000 Repair (overlay and slurry streets) 200,000 330,000 • DESCRIPTION: As with previous annual overlay programs, this project consists of placing at least a 1 1/2" asphalt overlay on streets that are in a deteriorated condition. A special pavement fabric will also be placed over the travelway prior to the asphalt overlay. This fabric helps bridge the existing pavement cracks and prevent the reflection of cracks through the new asphalt. The streets proposed to be overlaid are Davona Drive and Sierra Court. The following list identifies those streets in the greatest need of repair which are proposed to be included in the overlay, slurry, and repair contract. Ashford Way Firethorn Way Carlow Way Sharon Court Longford Way Sharon Street Edenberry Street Beverly Court Edenberry Place Beverly Lane Bonniewood Lane Sovereign Court Bonniewood Court Glenoaks Way Wicklow Lane Briarwood Lane Wicklow Court Bandon Drive Ardmore Place Newry Place Kilrush Avenue Estrella Court Bluebell Way Shamrock Place Elgin Lane Sierra Court Davona Drive // ITEM NO. COPIES TO: