HomeMy WebLinkAbout4.6 Accept Work Contract 88-4 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: October 24, 1988 SUBJECT: Acceptance of Work - Contract No. 88-4 Annual Street Overlay and Repair; Dougherty Road Bike Path EXHIBITS ATTACHED: ; 1) Memorandum from Public Works Inspector dated 10/3/88 2) Change Orders RECOMMENDATION: Approve Change Orders 1 and 2 2) Accept improvements under Contract 88-4. cl �/J 2) Authorize final progress payment and retention in the amount of $96,336.97 to Les McDonald Construction. 4) Authorize additional appropriation in the amount of $154,146.99 from General Fund and Gas Tax reserves to cover those project costs which carried over 'into Fiscal Year 1988-89. FINANCIAL STATEMENT: See Below - DESCRIPTION: In April, 1988, the City Council awarded Contract 88-4 to Les McDonald Construction Company. This contract combined the Annual Street Overlay and Repair Program and the Dougherty Road Bike Path. The street repair which was undertaken as part of this contract included those streets which are overlaid and slurry sealed. In the development of the Fiscal Year 1988-89 Annual Budget, Staff anticipated that the work included in this contract would be completed prior to the end of Fiscal Year 1987-88, and therefore, no funds were budgeted in Fiscal Year 1988-89 to complete the project. As indicated in the memorandum from the Public Works Inspector to the City Manager dated October 3, 1988 (see attached) , numerous problems were encountered during the course of construction which caused the project to overlap into Fiscal Year 1988-89. These problems also necessitated two change orders (see attached) totaling $20,477.87 and $33,256.10 respectively. These change orders involved additional street repair associated with more extensive street failures than anticipated on Bedford Way, Canterbury Lane, and Brighton Drive. These streets had serious subgrade problems which had last been skin-patched and slurry sealed before incorporation. The Public Works Director authorized additional repair in these areas in the field. In addition to time required to complete this additional work, the contractor took more time than was allowed under the contract and the change orders and was, therefore, assessed liquidated damages totaling $4,500. Despite the problems encountered with this contract, the actual project costs were well under the total budget established for these projects in Fiscal Year 1987-88 as shown below. ;r ITEM NO. ; .y 4: COPIES TO: McDonald Construction TOTAL PROJECT COST 1987-88 APPROVED CHANGE TOTAL ITEM PROJECT BUDGET CONTRACT ORDERS ACTUAL COST IMPROVEMENTS • Street Overlay & Repair: Annual Overlay $170,000.00 $107,496.60 $ (8,864.60) $ 98,632.00 Street Repair 250,000.00 193,308.00 63,343.57 256,651.57 Striping 5,000.00 8,335.90 (745.50) 7,590.40 Subtotal: $425,000.00 $309,140.50 $53,733.47 $362,873.97 Bike Path: $60,000.00 $60,289.00 0.00 60,289.00 TOTAL IMPROVEMENTS $485,000.00 $369,429.50 $53,733.47 $423,162.97 Less Liquidated Damages (4,500.00) TOTAL NET CONTRACT COST $418,662.97 ENGINEERING/INSPECTION Street Overlay & Repair $34,000.00 $29,809.34 Bike Path 15,000.00 12,234.09 TOTAL ENGINEERING/INSP. $49,000.00 $42,043.43 TOTAL PROJECT COST: $534,000.00 $460,706.40 The costs incurred during Fiscal Years 1987-88 and 1988-89 are illustrated below: ACTUAL COSTS ACTUAL COSTS TOTAL ITEM 1987-88 1988-89 - ACTUAL COSTS Street Overlay and Repair: Annual Overlay $ 83,025.90 $ 15,606.10 $ 98,632.00 Street Repair 181,663.20 70,488.37 252,151.57 Striping 3,852.90 3,737.50 7,590.40 Engineering/Inspection 26,241.22 3,568.12 29,809.34 Subtotal: $294,783.22 $ 93,400.09 $388,183.31 Bike Path: Improvements $ 0.00 $ 60,289.00 $ 60,289.00 Engineering/Inspection 11,776.19 457.90 12,234.09 Subtotal: $ 11,776.19 $ 60,746.90 $72,523.09 TOTAL COSTS: $306,559.41 $154,146.99 $460,706.40 The City Engineer has inspected the work performed on the project and determined that it is complete and in accordance with the plans and specifications. CITY OF DUBLIN M E M O R A N D U M Date: October 3, 1988 To: City Manager From: Public Works Inspector Subject: Attached Change Orders for Contract 88-4 The annual street overlay project includes digging out and repairing the failed areas in both the streets to be overlaid with asphalt concrete and those which receive a slurry seal coat. Identification of failed areas is often made difficult by previous attempts to cover the failures with slurry seals or asphalt skin patches, a common practice of Alameda County maintenance. During the recent overlay project, it became evident, as the marked out areas were exposed, that the failures were more extensive than originally surveyed. The streets which required almost total rehabilitation were Canterbury, Bedford, and Brighton. Brighton Drive also collapsed in five locations in the parking lanes during the paving operation. The cost to repair these areas required an additional $33,295.10. This amount covers extended bid item amounts to make the extra repairs. Bid item quantities also had to be adjusted because Regional Street was pulled off the overlay at the last minute due to a time conflict for the installation of El Pollo Asado's gas line. The overlay was extended on Tamarack to Elgin Lane, thereby changing quantities in striping and monuments in particular. An extra cost was also incurred when the grinder hit a buried monument on Brighton Drive and had to be repaired. DS/gr Project Hare: - . Annual Street Overlay/Repair and Dougherty'Road Bike Path Project CIPt: -Project Finance Control 1 9629 Engineer Contract t 88-4 PERCENT COMPLETED: 100 Z COUNCIL APPROVED CONTRACTOR: Les McDonald Construction APPROVED BUDGET AMOUNT S 531,500.00 COUNCIL APPROVED CONTRACT INUIT: f 369,429.50 CHAISE AXOOXT C3XRSE ORDER XUrnER I_ ;t_. f 33,256.10 CHAISE ORDER XUXBE2 2 #1- f-70,477.37-- CHAISE ORDER RUDER 3 #1- S - C3;RSE ORDER XUXBE2 4 +1- f _ CHAISE ORDER XUXBE2 5 #1- CHAISE ORDER IUXBER 6 #1- f CHAISE ORDER IUI3ER 7 #1- f CHAISE ORDER IUIBE2 8 II- $ CHAISE ORDER I013ER 9 H- S CHAISE ORDER RFX3ER 10 #1- f- IOTAL OF ALL CDRRE3T AID PRIOR CHAISE ORDERS $ 53X7 __47 ADJUSTED CONTRACT ROUE.: f 423,162.97 PROSRESS PATIENTS XAE: PATIENT XFX3ER 1 $ 254,871.00 PAYXEXT XU1d:•1 2 S _67,455.00 PAYXEXT NUXBER 3 f=- PATIENT XUXBE2. I fr PATIENI 50XbER 5 f PATIENT IUIBE! b PATIENT NUX3ER 7 f_ PAYIExT 10I8E2 PATIENT IUIME2 9 $PATIENT IJI3E1 • 14 f PATIENT RUIBER 11 $ PATIENT NUR 12 PATIENT RUI3ER 13 f_ PATIENT IUIBER 11 5 PATIENT ROX3ER 15 !_ TOTAL PROSRESS PAYIEITS - 5_ 322 326200__ RELIINIRS BALANCE ON COITRSCT: f 96,336.97 IUUHi RECOMMENDATION:- . ICXXt APPROVED t * APPROVED * t APPROVED *Hit ttttt Hitt 111H ttttt Hatt t . t DENIED - t t DENIED t t DENIED Hitt ttttt ttttt LST SuperYising- City Na1ager City Mayor Deaartient Head . CQ RACT CHAN ORDift No. stns 't6..,.... ,�,1.• tA_.• °r KN'K • • . .� ' Various 1<0�0 = 88-4 NSA a l+o rccEfuc >10.l31 . . . Box 4076 Hayward CA 94540 Les McDonald Construction, P. Ct w LI.IrM/tw fS 0,-;,„ 7i .t HIM th* * 1&4rlass «k t~w hli•+•tss t/.wlb/tfa s< Yav N. M.r.ty s{r! Kris/ p Alsha ttls ltH•� tjrnlilN� .iarM :• �,� as4 $ 5s *atiss.l. M Ns soot: d. Nobs this (hang* ortifr is sari sflsstiva until/ srt/ Mites s+i» f s Cf*. In 10.41. sifJtt•fal r.sril N w 1/ia• w {rers a, tl$4.1 wash fs N 4 am.sftif.ai. 0 M slrtM 1Nns es ywlpsssr Is"a"�1 tqs/sr/N atlsrM ,*.w tsaf�ht►Ma tirr+. •rnvM. Unlsu s+h�'#N 1tst./.ata br aMSI sF srs+�Ff*+s*f�"r�- Chow es sste/by „so r s .rn IS sr Mt 014V masted 1041110111 M NrN rfA M rMs srwie M os .;"=1.'"...."'''. "" ""' CHANU6S ENCOUNTERED IN FIELD IN ADDITION TO DCOrE OF ii0RX IN FROCR&SS I o 1) Delay and down time during paving- operation caused con. Drive $ 5,603.00 = 1 by subgrade failure on.Brigh 3,i7o.0o - - 1g 2) Additional trucking to dump site !; `' cinder caused by hitting 3) Repair of damage to AC g $ 529f44 - �- buried survey monument c• 4) Repair to failed areas on Brighton and Regional .; �`� after completion of overlay (2 days - time and $ 12,174.93 materials) • • ptrtraml CAW ()Warn s - -f«uw.••.s 20.47 1. 7 _ • Sy MEW,sf the silo tt■s tarn.of pm.kf144 will bib ailvileti s+isltsr si SitistIsItissi by: -4 -- Jlryfswl R...stn..+i4d1 af:�— . AArw•dl C*1•F Int;e.a SY �rrlf•as! Is•rsfr�N,tASt rf �fi{I Ms•sdr _ ��r�IV M t t�s s sad rVI. i! 14 w ,..r.Ltri• IA lIw .,, _ IM •�.l• .tNw fWfFVt r0 !1 ..111 br rN11 [files M 1JNfWW* .�• w•, .r., .-�_..I f 'ah rll mpl•na 4 .f.•Ot.! II.rY en l%a iMyl, Fes# *wawa. stt•s• s. fvl! s►yls'wl tMnfsr th. ekes • Gars . , 1 .....a-.41......4....+ if tlla eytr itlot ion aa) dqn' *memo isl this *am 141. stuffings is dirsctwi is 11• totitrimashts +i Ow ! '64611614 u N rrrc.siles with 1 1 N•.rte wpfk Pwd Intitiol • writtsit 'sough witAia ties tuns district stadia. • . i <; x �. CONTRACT CHA ORDER N4. - 2 Sul N4 _ r Les McDonald Construction P. 0. • 4 6 Ha ward CA e' .0 - ry,► ,--1-7—„ „,,,,,, th• re a M.u' 4P•rjN ►t a OA pt.ne .r1 >)•t16c.tt.ee ee M tlr • Iawii.1.wort n+r k.sh•d.d is ON s1+µ Tw 1 is .nU4t. i NWT:►: Thl11sn4 ,v ►t+ VI, Clltsf In lw•.+. NOTi��l,.ay. Hd•• h n.' sA•.tiv. reweSt avowing 1Y y rem Rrts• � �... Q.wifli•w of w•til t•ire 1•n. •sanert∎•I rp,s.tfi•1, .tit p•+�$ b. s•i4, 3.944$ t 1s.vw.+ ssfut..s1 r.«t ,e 46.0.0 ,,k+, rs•vra.Unity►•ett.+Wi•.*NW,DIN fN r•.t•t **qv; Ow eon/ l'e" WwM el ttph+»*+Ic+df real,e,„16„,.tt•,.e•s...tA r••d.►.I Ti.rG•., atieflf e t0e00011 hr a et )Mct,M.1.1}rswe is Ow Mt •uWWt•ted or4NO• w *Wow/ ING4 tP. w:yiM1.a..mry M OW btin M`I •t•. CHANGES IN FIELD MEASURED QUANTITIES FROM BID ITEM AMOUNTS 1) Plane AC pavement . - • b,�t • BID 17,910 LF' - FIELD 17 8 LF - --- 062 0 .52 ($ 437.84) - 2) Install overlay • ' • a,�� BID 364,525 SF - • FIELD 326,212 SF • . 38,313 — ' R .22 ($8,428.86) 3) pavement fabric -. (�it ✓� OIL. BID 24,597 SY �� . FIELD 21.78-4:840—BY v.3Yoc - 0.37.it) <: 0 .70 (32,017f}a) /, 197 L 4) Adjust monuments 11 EA r • BID FIELD 23 EA • 12 0 70.00 $ 840.00 5) Pavement markings A$4 �� . 0/ 1,- � • BID � EA �}I�1 FIELD 201 EA . \ 1. t `' �,� 1'�" r1 9.75 0 63 ttnt-.. r...r 0av1.4s.S fw leg BMW t • SY te.>.•91 tAis.rsl.+ ue Hlw•It1 .sw.ol.tl•.w+it 1• dlwt.d•1 t.l.wu ..._____„^, Deft. AM,ov.11 t'bisi 1noln.ar by We. the vMle„ipnrd so.usslor, bow. ptvV1 u,•tvt c•n.t�.,•tN.h*Ao cl.o'9' p,op.N4 •ad > Ws*.11 *ix rwfss.l n . ,,..sd, t.3 • w.11 *n.:1. ell p p..t,tit,iv„,hh .it ,t.i.ri•1►. eN,.pt •r ,r•y .rh.r•vhe I c ;Wad.-d •lrevo. •"d ►s.lann sll ver•ldH w'.a....Y f•r+A.w.k"v.v.sM<.6.d. .n. will fame .e Nil p y .* r tl...st.+ M. p,la.s .6..1% ab .w A.c.Mt.at. 0•3*-- -.- - Tit1.—_. IV I! tA• Contractor 10+e test 11I0 •cc.pt•rtc• of thh •ratty, ka .tt.nlion h 44444 to ON Nivirorr.r.h v( lA. 1p•ciRceH•,rs µ H prwe•diNg wl/A ON r+'d•?ed work •n4 Bli,.s • voltNn protect wit#L. I . limo Ih.roin opoelAed. - ' 'd :2-.. --.---''L': -L. -. canwei 16tr•L' LL•—• - - ' ' ;�.,' ,w AfAIMM M M ^*"'' we*MM betuded N *. i.e. . ' iiram01.6;4- 7; 57111r1"7:211 Ne m►r.Agt 'N lim /!e"s.'•'+/. ,. rttl rt► tits. talfsl�`.11lt)Ir1ee�. !P' NOTES 1111* thetscd ortfer fe we dW. ussf1! 4 .�.�,,. ... o�� ..-- a.sPtfttmw tl lrerk Is II.dm'M t+tt,..t.of ttu.Mllhmf. end PAO M be be_i/. 0NN foresee siA+iMl wwrk et tmwttesf mite, epee/ tl+lt. ow/ iva ' +i;�WM•4wiwl Mhwwk*54514 me./N/Miff of*outmost Meet M� rose uN.TI�M.f fieon* M1.d r./pe alLw . .will sis /N H1t+pk.s. ' �.tmtu.s � t MI txwww• ' N M *5'a'"•MM tl.5MMr ION .MOt MI+Re1.• r• CHANGE. ORDER N0, T CONTID. , . • • .) , 6) Caltraaa Detail 23. •BID .� , 450 LF 4 � FIELD . 100 LIP. . - jl t�1 • 350 0 , 1.60 • - (S - 56o.00). . • . 7) 2-way reflectors (Yellow) . BID . 30 EA � ' - FIELD ' ' . 0 EA . . • 30 EA -6 5.00 ' . 04 ($ 150.00) . - 1 8) 2-way•reflectors (blue) - . BID . 18 -EA _ . FIELD 22 EA / •-7 8 • 10.00 ��� • (s 70.00) • ,.r- 9) Single yellow broken .. _ ' BID 7730.1g . FIELD 7091'17 -. X39- 0 25 \1�� ($ 159.75) • ice, AU Ka.A ti this.+rl.+the the*.J_ . . . .te+ton will re•itwr.•d vs l.11sn.I na_ .4m.wl tt.+aw.�., .-J4�, T. 0.1. AaMrov.ii 414.1 111110~411 Vi .4. W.;0. .t...4...l . tr.,w.Any.t.."s.retul-e. sh/aed..M M.tlw.m. �r.1.sod ■.. tads •Ire+•k t4S}...wt b .or..d. that 1. will f t. • on..1.Tpa+5nt,tvre4h fsu mois ms.*mem es .+.p M s•sr A.Nd.ee.s. M+rf Nrr.r�••w tsr•t+.s•ea..+.n t.r Mw .ts.....>r . w. ...1 .�u....•. .s Nit �MM."t tha.i.t th. rise" 'besot •he.- . 1Mterted.0.f- ■ Cswlre•+•' _ _ is �— -- if Shy eo.ir.siet doll Mt sip wag,ttess .1 this erlsr, 1b ettiett.n h dit.tl.J N the svolite.seets .T th. ipesiketsaes .s I. prvt.rdiay with the .Nete4 writ sin+) Shay r whims pretest *bite the Sim. Ih.+mt5 specified- • . .... ..•...1 _ M.I ri3d ,t:a�•ti 8E5j 6i;B•5tir:t�r!'E �'�Ih� ,�0 :QI CS:OT fiHl SB+–w-dam ...'...•:' t• �;:,: . • ' • 7sllpid} vii.rg1 •.op •j} w,' * pol•+d .)I1 • 614111 TAM VOA pimp* •9 ¶ bv(ra•so+d o+ }a .ve'toaJ!Nds .40 1• '+'••°•••"'ba, #3 04 prowl') 11 vµvsp• i;+l 'opt* rpp to •wyd.}t• 414 lO' w•p 14`0641002 •41 11 sou --.,■o •J_•"}r y„•.* .melt navel •Vt.•t...41 +e•r+M•i 1141 •• WWII. rr. • 1 .i. ...t•9,•s m}..i 4s f+a.w+ H. 'v.m N 6w h'4 • w• *9.4000 A.w' }• .r►>'m •4111+.0•" 11■ '.1W ) 1/4"10"en • 1■*19..914 in.. am imp .1.8.6.114* ry («.■ ,+914 W04 N t"t "■ !".• .r vw} •+c +h wlei■ v }IM•..}„m'4(! **DI '.a.r+sr•}phvkurp4rf rig '1M Alt N.vl•v] etc; Ip *u,dur • 'p.pwa'•+.+11 tr..e.eer ' 'A1 p•utwVI ,tr.mll•) u pn«up•81 II!'"v101041N )•"ill Skit'.p.•4!'1.1•w.1/4 kg ., MUM a ;d"""9 +s$)P+tt`g+R • • oS'Ig6 SG��j' 0E'1 Ski • Cf*t zT.J • ,01 k , 3i IIzt 3I$ au-cn Mottax (bI --yy i- ��" i - x1.YSxYnb NI FOxnu0 ON t • --......... N. . _ �� C� - . C ' it PI t I Q73Ia� J/ 3'I 028 r,o�Ta�4 a�4rlO (Z1 .%� • • (00'Srt $) 9' S2' 0 0 c QT3I3 . n 08S CIE( ezTW{M ■wOu;g (11 >5 (00'661 $) S2' a 6t • •. 0 - 31 0$t'I cue . • . MoptaA 0I2uTS (01i-S ' 'a 11,x00 i 'OH H3a o 3otvHO '&,near'' ...w+w� ....w Ar.wf• lwA..• •'p wry .S.snmp.. .soon+�++•two"' too •4t u m.,.w •Mw•}wi y r. doiroo*lore ••u+tl ,114 01 Ira,tuff,." P1tw w P HA�•as omptiob+se wyl OM 404_w•�t^4 M !MW N) wtrr WOO.4!° *44. •*Ik3 '1 •a.■1 tw "t'° t.a.6. 'r,y,i wrv•• P i"ak t+Nffl.P fammoti etaA•+6°f •fsbd mi •}, poo 'Nmwod► N "MPH" .6944.41 " 444'4'1*r,3+! 4M61 I PPP •414 Ai MAW • loan toolPott• I. r1 np.a *twig) NO %OK . 4h qwr�` me 11•4.+ *rang vo op.,.... )4446 w■ rs r,Owmis' ! wtN,K • a 0•11441 Mj■rmy •ri l ►!1lnNj 'w 0 C?'01! 7YYt01! . • --.„" ins -'4-'4'`'0'6 nave ItK� Jay i1N�� "'} ' • . - �.. r • ...�_..�s..o...,'. ......�a_ ...._,,•1".....•.___.. �-. _,_, .-,r. r+-, J7f± .• • , 5tr G. -m • ,.w•J.f l_w I'lk.L..0w,nV�;�Zvw��"M�••LIN - xAttilbli -D. -, , .\mid ~ a. . " •!': ., • r CONTRACT CH f$ QR�tIER MO,.:..1. ,..�� of ,- itRTS >tOAp -- - --�.. 710111,41e f+o,(s)— • sNsAN T rai►y 4i +� .,. . eh. jl OIS dotal s . k M ttt. OW M. ..'.."t,.et.at M M tA. i.wibatt,..rf, sit im d» stem este ,p.dit..+t«. .o thh await. 'rh. Chief in in.+.. NOT!'Thu sheltie *titer is nit effective yeti! ,,rr. ,4 by Dts.11pKs...•irk N be dew.. WNW*.1 srs.11144.4m4 fltiO4 to 4 /ed. S.fr.,.f. Yatvnn .ilFri.41 ....k .Wi weed pets., i.. w.i Sena S4swel•Woof slhtw.ise thft4,,.'N f«roofs, Of fN•sst..'M.� Wth sites.t.gvly+,i<•altAly Mod wti M.its...ars wR is Mere for i&Sm.. alloy rgr•alesi by tt pwt.s+.f. .e roe as M fat 414voow I t$ttssw M .sito ism Ow sews.' wows M Its • r• . . CHANGE ORDER NO I CONT'D. , 15) Install detector loops BID. 41 EA _ FIELD 1.2— A ' . • 12 6 264-.00 ($3,120.00) _ . . . (a)) 16) Pavement failure 3" . BID 70,800 SF FIELD 109,227 SF } 38,427 9 1:00 $38,427.00 'RCP 17) Pavement failure 4" ' BID 101',680 SF YIELD 10.,$$2 SF 6,872 A 1.10 - $ 7,559.20 • (NO CHANGES IN QUANTITIES FOR REMAINING $ID ITEMS) . • 3325i261 t,1h...+V4 4 4$I a.1...ta .r Iwtlw.s. "iZ 1• S.1'9 hp new.a Shit attar rho Hiss sl - a..sId.as still b.adt.)f d_ d t+�t•y*-. ......_ )_„.•444 i / • //2 lig/ wiw.in.d by, /1 Aotkaysi R.t.n••ta+Jrdt ■ tl.1s.- -DelPe • *pprev.dt Weal ir'.ia...lY. Wa.the Witralen4J tanfr.Oso,Nays fives t.wtvl amith..t:+.N fh. .h.Nf. pteset.J •.d bt.bx■ti. if this pr.sfsd i1■ppravt.l. f.,t ..a *sal pfavida .11 ,.,.w1w..M.fw.•1.h.tl ....atf.t., , ..r1 II ww•y ..*.•fit+'t•••.•.1.►w., a•/pt•ler.e .f a.n+..s..tv•a.r,f..Ma whsle N..v. 101.644, and will Ktapr we Iv+l y..Y...nt tt....i.. As sott o. thav±A Stove. ' , . a Ciwowiet e7 -40.../---_ 1(--"' Po.....-4:6 Att.pNi. Rs sir",e,le.9_ . TT1 fy tier if ii, c r t../ is.a Mt $390 d"f0.nc. .1 thil .fiat, hu .titstisn.la itt.t* I,. th. r.ril,ugnt. alt tp«tReef:.n. ., M, p,..+.8 • wtth A. otier.J wart. ...J AM., 4 spilt.% proles wilhis the sirs Aglaia 1pni1W,