HomeMy WebLinkAboutAttach 7 Apndx8.7 Sec I-IVAppendix 8.7
Traffic Impact Analysis
IKEA Draft Supplemental EIR
City of Dublin
PA 02-034
Page 99
November 2003
.-2.
prepared for:
City of Dublin
1021-1837
FFHR & PIERS
TABLE OF CONTENTS
Paqe
EXECUTIVE SUMMARY .............................................................................................................. i
INTRODUCTION ............................................................................................................ 1
Study Purpose and Evaluation of Intersections .............................................................
Scenarios ........................................................................................................................ 3
Report Organization ...................................................................................................... 3
II.
EXISTING CONDITIONS .............................................................................................. 4
Roadway Network .......................................................................................................... 4
Existing Transit Service .................................................................................................. 4
Existing Traffic Volumes and Intersection Lane Geometries ........................................ 5
Level of Service Methodology ...................................................................................... 10
Existing Conditions Levels of Service ......................................................................... 10
III.
BASELINE TRAFFIC CONDITIONS .......................................................................... 13
Baseline Traffic Estimates ............................................................................................ 13
Baseline Roadway Changes ....................................................................................... 16
Baseline Conditions Intersections Levels of Service ................................................... 16
IV.
VI.
VII.
PROJECT CHARACTERISTICS ................................................................................. 20
Project Traffic Estimates .............................................................................................. 20
PROJECT IMPACTS AND RECOMMENDATIONS ................................................... 27
Significance Criteria ..................................................................................................... 27
Traffic Estimates With Project ..................................................................................... 27
Planned Roadway Improvements ............................................................................... 27
Project-Related Roadway Changes ............................................................................ 32
Project Conditions Intersection Levels of Service ....................................................... 33
Project Impacts and Recommendations ...................................................................... 33
BUILD-OUT CONDITIONS ......................................................................................... 37
Build-out Traffic Estimates ........................................................................................... 37
Build-out Related Roadway Changes ......................................................................... 40
Build-out Intersection Levels of Service ...................................................................... 43
Build-out Impacts and Recommendations ................................................................... 43
Congestion Management Agency Thresholds ............................................................. 48
Average Daily Traffic Conditions ................................................................................. 48
Freeway Mainline Weekday Traffic ............................................................................. 49
SITE ACCESS, CIRCULATION, AND PARKING ....................................................... 52
Site Access and Circulation ......................................................................................... 52
Parking ........................................................................................................................ 52
VIII.
OFF-SITE RECOMMENDATION SUMMARY ............................................................. 54
Martinelli Way Extension ............................................................................................. 54
Arnold Road Extension ................................................................................................ 54
LIST OF APENDICES
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
APPENDIX E
APPENDIX F
Intersection Traffic Counts
Existing Conditions LOS Calculation Worksheets
Land Use Assumptions and Trip Generation
Baseline Conditions LOS Calculation Worksheets
Baseline Plus Project Conditions LOS Calculation Worksheets
Build-out Conditions LOS Calculation Worksheets
LIST OF FIGURES
1
2A
2B
3A
3B
4A
4B
5A
5B
6
7A
7B
8A
8B
9A
9B
10A
10B
11A
11B
Project Site and Study Intersections ...................................................................................... 2
Existing January 2003 Peak Hour Traffic Volumes ............................................................... 6
Existing January 2003 Peak Hour Traffic Volumes ................................................................ 7
Existing January 2003 Lane Configurations and Traffic Control ............................................ 8
Existing January 2003 Lane Configurations and Traffic Control ............................................ 9
Baseline Peak Hour Traffic Volumes .................................................................................... 14
Baseline Peak Hour Traffic Volumes .................................................................................... 15
Baseline Conditions Lane Configurations and Traffic Control .............................................. 17
Baseline Conditions Lane Configurations and Traffic Control .............................................. 18
IKEA Regional Trip Distribution ........................................................................................... 24
Proposed Project Trip Assignment ......................................... 25
Proposed Project Trip Assignment ....................................................................................... 26
Baseline Plus Project Peak Hour Traffic Volumes ...............................................................28
Baseline Plus Project Peak Hour Traffic Volumes ...............................................................29
Baseline Plus Project Conditions Lane Configurations and Traffic Control ......................... 30
Baseline Plus Project Conditions Lane Configurations and Traffic Control ......................... 31
Build-out Peak Hour Traffic Volumes ................................................................................... 38
Build-out Peak Hour Traffic Volumes ................................................................................... 39
Build-out Lane Configurations and Traffic Control ............................................................... 41
Build-out Lane Configurations and Traffic Control ............................................................... 42
LIST OF TABLES
1
2
3
4
5
6
7A
7B
7C
8A
8B
8C
9
10
11
12
Signalized Intersection Level of Service Definitions Using VIC Ratio ..................................... 11
Unsignalized Intersection Level of Service Definitions Using Average Delay ......................... 11
Existing Peak Hour Intersection Level of Service ................................................................... 12
Baseline Peak Hour Intersection Level of Service .................................................................. 19
Vehicle Trip Generation - IKEA Store Surveys ...................................................................... 20
IKEA Shopping Center Trip Generation ................................................................................. 22
Existing, Baseline, and Baseline Plus Project AM Peak Hour Intersection Level of Service.. 34
Existing, Baseline, and Baseline Plus Project PM Peak Hour Intersection Level of Service.. 35
Existing, Baseline, and Baseline Plus Project Saturday Peak Hour Intersection Level of
Service ..................................................................................................................................... 36
Build-out With Project and With Commerce One AM Peak Hour intersection Level of
Service ..................................................................................................................................... 44
Build-out With Project and With Commerce One PM Peak Hour Intersection Level of
Service ..................................................................................................................................... 45
Build-out With Project and With Commerce One Saturday Peak Hour Intersection Level
of Service ................................................................................................................................. 46
Congestion Management Agency Trip Generation Assessment ........................................... 48
Weekday Average Daily Traffic Forecasts ............................................................................. 48
Year 2025 Mainline Freeway Operation AM Peak Hour Level of Service ............................. 50
Year 2025 Mainline Freeway Operation PM Peak Hour Level of Service ............................. 51
Final Report
IKEA Development Traffic Impact Study
August 2003
EXECUTIVE SUMMARY
This report presents the findings of a traffic impact analysis conducted for the proposed IKEA
development to be located on the south side of Martinelli Way between Hacienda Drive and Arnold
Road and north of Interstate 580 (I-580) in Dublin, California. The site was previously designated the
Commerce One site, which was approved with 780,000 square feet of office space. The current
proposal would replace the Commerce One approved development with a 317,000 square-foot IKEA
store and a 135,215 square-foot shopping center with approximately 25,855 square feet (20 percent)
of restaurant space. Figure 1 illustrates the site location, the surrounding roadway network, and the
study intersections.
The study purpose is to identify potential impacts of the proposed development on the transportation
system in the project vicinity. Project impacts were analyzed in accordance with methodologies
requested by the City of Dublin staff. The key intersections shown on Figure 1 were evaluated during
the weekday morning (AM), evening (PM), and mid-day Saturday peak periods for the following four
scenarios:
· Scenario 1: Existing Conditions - Existing traffic volumes obtained from counts.
· Scenario 2: Baseline Conditions - Existing traffic volumes plus traffic from "approved"
developments that are either under construction, built but not fully occupied, or unbuilt but
have final site development review approval.
· Scenario 3: Baseline Plus Project Conditions - Traffic volumes from Scenario 2 plus
traffic generated by the proposed IKEA store and retail center.
· Scenario 4: Build-out Conditions - Traffic volumes from Scenario 3 plus traffic from
"pending and build-out" projects (proposed future developments not yet approved, as
provided by the City).
Project Trip Making Characteristics
The AM and PM peak hour traffic added to the roadway system by the proposed IKEA store was
estimated based on traffic volume data collected at existing IKEA stores in Emeryville, California in
December 2001, and in Woodbridge, Virginia in November 2002. In addition, the tdp generation
estimation process considered the relationship between multiple IKEA stores in a given metropolitan
area. Stores of this type attract customers from a broad regional area; therefore, the first store in a
region will generate more new trips than will subsequent stores in the same region. The proposed
Dublin IKEA will be the third store in the Bay Area (after the existing location in Emeryville and the
approved store in East Palo Alto that is expected to open in late 2003), so the trip generation rate of
the Dublin IKEA is expected to be lower than that measured at the Emeryville store. The amount of
traffic generated by the proposed shopping center adjacent to the IKEA store was derived from the
Institute of Transportation Engineer's Tdp Generation (6~ Edition) for a Shopping Center (Land Use
Code 820) and Restaurant (Land Use Code 832).
In total, the site is projected to generate approximately 16,100 daily trips during a typical weekday.
The proposed IKENretail center project is expected to generate about 460 net new trips (250 inbound
and 210 outbound) in the AM peak hour. Net new PM peak hour traffic generated by the site is
anticipated to be about 880 trips (440 inbound and 440 outbound). Net new Saturday peak hour
traffic is estimated to be approximately 2,510 trips (1,310 inbound and 1,200 outbound). As a point of
comparison, the previously approved development for the site would generate about 980, 920, and
150 trips during the AM, PM, and Saturday peak hours, respectively.
Fehr & Peers i
Final Report
IKEA Development Traffic Impact Study
August 2003
Roadway Improvement Assumptions
Off-site road improvements assumed in this study incorporate project-related improvements
necessary to provide access to the project site, improvements currently under construction, and build-
out roadway improvements anticipated to occur with the future development assumed in this study.
Roadway Improvements Under Construction
· Tassajara Road/Santa Rita Road / 1-580 Intemhanqe Reconstruction - This project includes
interchange improvements such as: (1) one westbound right-turn lane and an exclusive
overpass lane leading to the northbound free right-turn lane at the 1-580 westbound off-ramp/
Tassajara Road intersection; and (2) adding one eastbound left-turn lane, one westbound
left-turn lane, and one northbound overpass through lane at the 1-580 off-ramp/P/mi/co Drive/
Santa Rita Road intersection. Expected to be implemented prior to construction of the IKEA
Shopping Center.
Baseline Roadway Improvements
· Dublin Boulevard~ouqherty Road Capacity Improvements - This project includes inter-
section widening to incorporate additional turn lanes at the intersection, such as: (1) adding a
southbound right turn lane; (2) adding a westbound left turn lane; (3) adding a northbound left
turn lane, through lane, and right turn lane; and (4) adding an eastbound through lane and
right turn lane. Expected to be implemented at full occupancy of the IKEA Shopping Center.
Project-Related Roadway Improvements
· Mart/nell/ Way Extension - This project includes: (1) constructing Mart/nell/ Way between
Hacienda Drive and Arnold Road; (2) modifying the traffic signal at the Mart/nell/ Way/
Hacienda Drive/Hacienda Crossings intersection to accommodate the Mart/nell/ Way
extension; (3) designing Mart/nell/Way to accommodate the triple northbound to westbound
left-turn lanes from Hacienda Drive onto Mart/nell/Way; (4) constructing two left-turn lanes on
Mart/nell/Way at the project site main entrance; (5) signalizing the project main entrance at
Mart/nell/Way; and (6) constructing a secondary site access right-turn out only driveway on
Mart/nell/Way east of Arnold Road.
· Arnold Road Extension - This project includes: (1) constructing the Arnold Road extension
south from Dublin Boulevard to the Altamirano Avenue intersection with the southernmost
project site access; (2) modifying the traffic signal at the Arnold Road/Dublin Boulevard inter-
section to accommodate the Arnold Road extension; (3) signalizing the newly constructed
intersection of Arnold Road/Mart/nell/Way; and (4) signalizing the project access on Arnold
Road (midway between Mart/nell/Way and Altamirano Avenue).
Buildout-Related Roadway Improvements
· Dublin Boulevard/Tassaiara Road Capacity Improvements - Addition of two westbound left-
turn lanes, one through lane and one right-turn lane; one northbound left-turn lane and two
through lanes; one eastbound left-turn lane and one through lane; and one southbound left-
turn lane. Some of these improvements have been constructed, but are not open to traffic.
(Eastern Dublin TIF improvement)
Fehr & Peers ii
Final Report
/KEA Development Traffic/rnpact Study
August 2003
· Dub/in Transit Center Roadways - Incorporation of new and improved roadway connections
at the Dublin Transit Center due to development of the Transit Center. Reduction from two to
one northbound exclusive left-turn lanes on Iron Horse Parkway at Dublin Boulevard. The
ultimate lane configurations for this approach would consist of one left-turn lane and one
shared right/left turn lane.
· Scaflett Drive Extension - Extension of Scarlett Drive from Dublin Boulevard north to
Dougherty Road and associated intersection improvements at Dublin Boulevard/Scarlett
Drive and Dougherty Road/Scarlett Drive, as identified in the Transit Center EIR.
(Eastern Dublin TIF improvement)
· Dublin Boulevard/Hacienda Drive Capacity Improvements - Addition of one westbound
through lane and conversion of a northbound right-turn lane to a third through lane.
(Eastern Dub/in T/F improvement)
· Hacienda Drive/I-580 Westbound Off-ramp Capacity Improvements - Widening of the
northbound Hacienda overpass to four lanes to accommodate an exclusive lane leading to
the 1-580 westbound loop on-ramp. Addition of one shared right/left-turn lane on the off-ramp
approach. These improvements are identified in the Transit Center and East Dublin
Properties EIRs.
· Hacienda Drive/I-580 EB Off-ramp Capacity Improvement- Addition of one shared right/left-
turn lane on the off-ramp approach, as identified in the East Dublin Properties EIR.
· Dub/in Boulevard/Dougherty Road Capacity Improvement - Addition of ultimate improve-
ments as identified on pages 158, 159, and 167 of the Transit Center DEIR and page 3.6-17
of the East Dublin Properties Draft SEIR. These improvements are expected to occur with
the development of the Transit Center project. (Eastern Dublin TIF improvement)
· Dougherty Road/I-580 WB Off. ramp Capacity Improvement- Addition of one southbound
free right-turn lane and one shared right/through lane by re-striping an existing shoulder area,
and widening of the westbound diagonal on-ramp to two single-occupancy vehicle lanes as
specified in the Transit Center EIR.
· Fa/ton Road Extension - Extension of Fallon Road north to Tassajara Road to include four
lanes of traffic. (Eastern Dublin TIF improvement)
· Dub/in Boulevard/Amold Road Capacity Improvement - Addition of a second eastbound left-
turn lane (Eastern Dublin TIF improvement) plus ultimate improvements as identified in the
Transit Center EIR.
· Dubfin Boulevard Extension - Extension of Dublin Boulevard east to Fallon Road to include
six lanes of traffic. (Eastern Dublin TIF improvement)
Off-Site Intersection, Roadway and Freeway Findings
The IKEA Shopping Center will have incremental impacts to the study intersections as compared to
the Commerce One project. During the weekday AM peak hour, the incremental impacts are
generally beneficial as compared to the Commerce One project. Weekday PM peak hour incremental
impacts are mixed; the IKEA Shopping Center causes increased V/C ratios at some locations but
decreases the V/C ratio in other areas. While the IKEA Shopping Center and Commerce One
projects generate similar levels of traffic during the weekday PM peak hour, the trip distribution and
assignment characteristics differ due to differences in land uses. Saturday peak hour incremental
impacts are more substantial with the IKEA Shopping Center increasing the V/C ratios at most study
intersections. Analysis findings for intersections, roadway segments, and freeway segments are
summarized below.
Fehr & Peers iii
Final Report
IKEA Development Traffic Impact Study
August 2003
Intersections
The study intersections operate at acceptable LOS C or better during the AM, PM, and Saturday peak
hours under the existing conditions evaluated in this study. With Baseline traffic forecasts, all of the
study intersections will continue to operate at acceptable levels of LOS D or better during the AM,
PM, and Saturday peak hours.
Based on the Significance Criteria stipulated in the City of Dublin General Plan, there are no
significant project-related impacts under the Baseline Plus Project conditions. All intersections
continue to operate at LOS D or better.
Several intersections are projected to operate below the LOS D threshold under build-out conditions,
regardless of the IKEA Shopping Center development. These intersections include:
· Dublin Boulevard / Hacienda Drive - PM peak hour
· Dublin Boulevard / Arnold Road - PM peak hour
· Dublin Boulevard / Dougherty Road - PM peak hour
Roadway and Freeway Segments
Under all analysis scenarios, roadway segments analyzed within the study area are expected to
operate within standards set by the City of Dublin General Plan policies. Freeway segment analyses
conducted on 1-580 and 1-680 for the build-out scenario indicate similar service levels with or without
the IKEA Shopping Center. Several freeway segments are expected to operate at unacceptable
service levels on 1-580 and 1-680 during the weekday AM and PM peak hours regardless of IKEA
Shopping Center traffic. The IKEA Shopping Center development would be adding to an already
deficient condition on these freeway segments. The addition of trips from this development to build-
out peak hour traffic on adjacent freeways would be considered a significant unavoidable cumulative
impact.
Parking Code Findings
The IKEA store will include the following uses:
· Furniture/retail (217,000 square feet)
· Restaurant (21,000 square feet)
· Warehouse (62,000 square feet)
· Office (17,000 square feet)
Additionally, there will be a 135,215 square-foot retail center comprised of a restaurant (25,855
square feet) and retail facility (109,360 square feet) on the site.
Based on City parking standards, a total of 877 spaces are required to accommodate the IKEA
component of the site and 623 spaces are necessary to accommodate the retail/restaurant
component. These requirements are calculated from the following parking code standards:
· 1 stall per 400 square feet of retail (furniture/large appliance/floor)
· 1 stall per 100 square feet of restaurant
· 1 stall per 1000 square feet of warehouse
· 1 stall per 250 square feet of office (0 to 7,500 square feet)
· 1 stall per 300 square feet of office (greater than 7,500 square feet)
· 1 stall per 300 square feet of retail (general, neighborhood)
Fehr & Peers iv
Final Report
IKEA Development Traffic Impact Study
August 2003
Based on the site plan from the City of Dublin that was provided to Fehr & Peers, a total of 1,165
spaces are proposed for the IKEA component and 751 spaces are proposed for the retail/restaurant
component. Parking supplies for both sites exceed the parking code requirements.
Study Recommendations
The development site proposed for the IKEA Shopping Center is known as the Commerce One site.
The site currently has approval for 780,000 square-feet of office use. The IKEA project's incremental
impact as compared to the Commerce One office development provides a basis from which to
determine what additional measures would be necessary to improve traffic operations to an
equivalent level as with current approvals (i.e., with the Commerce One development).
Measures to improve off-site intersection operations have been considered to minimize the effects of
traffic generated by the IKEA Shopping Center on the surrounding road system for the Build-out
conditions scenario. As stated previously, the three impacted intersections include Dublin Boulevard/
Hacienda Drive (PM peak hour), Dublin Boulevard/Arnold Road (PM peak hour), and Dublin
Boulevard/Dougherty Road (PM peak hour).
The recommendation for the Dublin Boulevard/Arnold Road intersection includes installing one
southbound-to-westbound right-turn lane. With this improvement, the intersection operations during
the PM peak hour under the Build-out conditions improve to LOS D whether the IKEA Shopping
Center or Commerce One is constructed. Both the AM and Saturday peak hour operations are
acceptable whether or not the recommended measure is provided.
No recommendations beyond those assumed in this study are identified for the Dublin
Boulevard/Hacienda Drive and the Dublin Boulevard/Dougherty Road intersections. The East Dublin
Properties EIR shows the Dublin Boulevard/Hacienda Drive intersection operating at LOS E during
the PM peak hour under build-out conditions. Similarly, the Transit Center and East Dublin Properties
EIRs show the Dublin Boulevard/ Dougherty Road intersection operating at LOS F during the PM
peak hour under build-out conditions. No additional improvements are feasible at these two
intersections as described in the above EIRs.
It is recommended that the City monitor the intersections of Dublin Boulevard/Dougherty Road and
Dublin Boulevard/Hacienda Ddve for peak hour volumes on a periodic basis and continue to obtain
updated volume forecasts for future horizon years. Such monitoring will be performed to assist the
City and development projects to comply with policies of the General Plan that require implementation
of transportation measures to improve levels of service. In addition, current and future phases of the
1-580 Smart Corridor project are expected to relieve some congestion at the Dublin Boulevard/
Dougherty Road and Dublin Boulevard/Hacienda Drive intersections (i.e., through implementation of
ITS measuresl and discourage traffic from diverting off the freeway due to congestion or incidents.
The applicant for the IKEA Shopping Center should be responsible for implementing the project-
related roadway improvements along the Martinelli Way and Arnold Road corridors as previously
mentioned. In addition, the applicant for the IKEA Shopping Center should contribute a pro-rata share
toward funding the following improvements, which are anticipated to be impacted at the Build-out
condition:
· Widening the southbound Arnold Road approach at Dublin Boulevard to include one left-turn
lane, one through lane, and one right-turn lane.
Fehr & Peers v
/:ina/Report
/KEA Development Traffic/rnpact Study
August 2.003
Improving the intersection of Dublin Boulevard/Dougherty Road as evaluated in this study to
ultimate improvements. The applicant should advance to the City applicable monies for
acquisition of right-of-way and construction of improvements assumed in this study. The
amount of money advanced to the City should be based on the developer's fair share of the
deficit (spread over those projects which are required to make up the deficit) between funds
available to the City from Category 2 Eastern Dub/in Traffic Impact Fee funds and the
estimated cost of acquiring the right-of-way and constructing the improvements. The City
should provide credit for Category 2 Eastern Dublin Traffic Impact Fees to the developer for
any advance of monies for the improvements planned for the Dublin Boulevard/Dougherty
Road intersection.
Adding a shared right/left turn lane on the 1-580 eastbound off-ramp at Hacienda Drive as
identified in the East Dublin Properties EIR.
Development projects in the Tri-Valley area are required to pay the Tri-Valley Transportation
Development (TVTD) Fees toward constructing planned freeway improvements, including HO¥ lanes,
auxiliary lanes, and interchange improvements on 1-580 and 1-680. Development projects also pay
TVTD Fees toward public transportation improvements to help reduce traffic on the freeways and
other roadways in the Tri-Valley area. Two of the improvements to be funded by the TVTD Fees are
the West Dublin BART Station and the Express Bus Service from Livermore to the East Dublin BART
Station. The IKEA Shopping Center development will be required to pay the appropriate TV'rD Fees.
Fehr & Peers vi
Final Report
IKEA Development Traffic Impact Study
August 2003
I. INTRODUCTION
This report presents traffic impact analysis findings conducted for the proposed IKEA development to
be located on the south side of Marlinelli Way between Hacienda Drive and Arnold Road and north of
Interstate 580 (I-580) in Dublin, California. The site was previously designated the Commerce One
site, which was approved with 780,000 square feet of office space. The current proposal would
replace the Commerce One approved development with a 317,000 square-foot IKEA store and a
135,215 square-foot shopping center with approximately 25,855 square-feet (20 percent) of
restaurant space. Figure 1 illustrates the site location and surrounding roadway network.
Study Purpose and Evaluation of Intersections
The study purpose is to identity potential traffic impacts of the proposed development on the
transportation system in the project vicinity. Project impacts were analyzed in accordance with
methodologies requested by the City of Dublin staff. Traffic operations for the following 18 key
intersections were evaluated for this study:
1. Dublin Boulevard / Tassajara Road
2. 1-580 westbound off-ramp / Tassajara Road
3. 1-580 eastbound off-ramp / Pimlico Drive / Santa Rita Road
4. Dublin Boulevard / Hacienda Drive
5. Martinelli Way / Hacienda Drive
6. 1-580 westbound off-ramp / Hacienda Drive
7. 1-580 eastbound off-ramp / Hacienda Drive
8. Martinelli Way / IKEA main driveway (future intersection)
9. Dublin Boulevard / Arnold Road
10. Martinelli Way / Arnold Road (future intersection)
11. IKEA minor driveway ~ / Arnold Road (future intersection)
12. IKEA minor driveway #2 / Arnold Road (future intersection)
13. Dublin Boulevard / Iron Horse Parkway
14. Dublin Boulevard / Scarlett Drive
15. Scarlett Drive / Dougherty Road
16. Dublin Boulevard / Dougherty Road
17. 1-580 westbound off-ramp / Dougherty Road
18. 1-580 eastbound off-ramp / Hopyard Road
Fehr & Peers I
'UO ¥1N~81H
II II II
~ ,
!
!
!
Final Report
/KEA DeYe/oprnent Traffic Impact Study
August 2003
Scenarios
All existing study intersections are controlled by traffic signals. The key intersections were evaluated
during the weekday morning (AM), evening (PM), and mid-day Saturday peak periods for the
following four scenarios:
Scenario 1: Existing - Existing traffic volumes obtained from counts.
Scenario 2: Baseline Conditions - Existing traffic volumes plus traffic from "approved"
project developments that are eithe~ under construction, built but not fully occupied, or unbuilt
but have final site development review approval.
· Scenario 3: Baseline Plus Project Conditions- Traffic volumes from Scenario 2 plus
traffic generated by the proposed IKEA store and retail center.
Scenario 4: Build-out Conditions- Traffic volumes from Scenario 3 plus traffic from
"pending and build-out" projects (proposed future developments not yet approved, as
provided by the City).
Report Organization
This report is divided into eight chapters as described below:
· Chapter I. Introduction discusses the purpose and organization of this report.
· Chapter II - Existing Conditions describes transportation facilities and traffic operations in
the project vicinity including the surrounding roadway network, AM, PM, and Saturday peak-
hour traffic volumes, and intersection levels of service.
· Chapter III - Baseline Traffic Conditions provides AM, PM, and Saturday intersection
levels of service after the addition of applicable transportation improvements and traffic from
approved developments as defined above.
· Chapter IV- Project Characteristics presents relevant project information such as the
description of the project components and project tdp generation, distribution, and
assignment.
· Chapter V- Project Impacts and Recommendations provides AM, PM, and Saturday
intersection level of service for baseline conditions (Chapter III) plus proposed project traffic
as developed in Chapter IV.
· Chapter VI- Build-out Conditions provides an assessment of traffic operations with City of
Dublin build-out and all planned roadway improvements. City staff provided a list of potential
build-out developments and planned roadway improvements.
· Chapter VII - Site Access, Circulation, and Parking provides a project site description
relating to general vehicle and pedestrian flows accessing and circulating through the site.
· Chapter VIII - Off-site Recommendation Summary provides study results and
recommendations for further improvements.
Fehr & Peers 3
Final Report
IKEA Development Traffic Impact Study
August 2003
II. EXISTING CONDITIONS
This chapter describes the transportation facilities project vicinity including the existing roadway
network and operating conditions at the study intersections.
Roadway Network
Interstate 680 (I-680) provides regional access to the project site from the north and south, and 1-580
from the east and west. Dublin Boulevard, Hacienda Drive, Arnold Road, and Martinelli Way provide
local access. Each of these roadways is described below.
1-580 is an east-west freeway that extends from U.S. 101 in San Rafael to Interstate 5 (I-5) south of
Tracy. Through Dublin, 1-580 carries approximately 183,000 vehicles per day (vpd) across six travel
lanes~. Local interchanges are located at Dougherty Road, Hacienda Drive, and Tassajara Road.
1-680 is a north-south freeway that extends from Interstate 80 (I-80) in Solano County south to
San Jose. Through Dublin, 1-680 carries approximately 147,000 vpd across eight travel lanes.~ Local
access to 1-680 is provided at an interchange located north of 1-580.
Dublin Boulevard is a major east-west arterial that extends from just west of Brigadoon Way at the
western city limit, through Dublin parallel to 1-580, to Keegan Street in eastern Dublin. Dublin
Boulevard has six travel lanes between San Ramon Road and Village Parkway and between
Dougherty Road and Tassajara Road. This roadway (east of San Ramon Road) is classified as a
Metropolitan Transportation System (MTS) roadway under the county's Congestion Management
Program. Pedestrian and bicycle facilities are provided on this roadway within the project vicinity.
Hacienda Drive, bordering the project site on the east, is a major north-south arterial that extends
from Gleason Drive in Dublin to West Las Positas Boulevard in Pleasanton. Hacienda Drive has six
travel lanes between 1-580 and Dublin Boulevard. Pedestrian and bicycle facilities are provided on
this roadway within the project vicinity.
Arnold Road is a two lane, north-south roadway that extends from Gleason Drive to Dublin
Boulevard. In the future, this roadway will extend south past the future Martinelli Way intersection
and along the western boundary of the project site. This roadway will provide access between the
project site and Dublin Boulevard
Martinelli Way will be a future east-west roadway extending from Hacienda Drive to Arnold Road and
eventually through the transit center area. The main entrance to the IKEA Shopping Center will be on
Martinelli Way. Pedestrian and bicycle facilities will be provided throughout the roadway
Existing Transit Service
Fixed-route transit, DART (Direct Access Responsive Transit), and paratransit are available in Dublin.
"Wheels" is the transit service provided by the Livermore Amador Valley Transit Authority (LAVTA) for
the Tri-Valley communities of Dublin, Livermore, and Pleasanton. The "Wheels" routes that provide
service near the project site include Routes 1, 3, and 54. Each mute is described below.
Freeway volumes from Traffic Volumes on California State Highways (Caltrans, 2001)
Fehr & Peers 4
Final Report
IKEA Development Traffic Impact Study
August 2003
Route 1: Route 1 is separated into Routes lA and lB. Route lA operates clockwise and RoutelB
operates counter-clockwise. These routes connect the Dublin Bay Area Rapid Transit (BART) station
with the Santa Rita jail, Hacienda Crossing, and the Rose Pavilion. Service is provided from 6:00 AM
to 7:30 PM on weekdays with 30-minute headways.
Route 3: Route 3 is separated into Routes 3A and 3B. Route 3A operates clockwise and Route 3B
operates counter-clockwise. These routes connect the Dublin BART station and Stoneridge Mall
along Dublin Boulevard and Foothill Road. They also connect these sites to downtown Dublin and
Alcosta Boulevard in San Ramon. The routes cover most of Dougherty Road within the city limits of
Dublin. Service is provided during peak weekday pedods from 6:00 to 9:30 AM and 2:00 to 7:00 PM
with 1-hour headways.
Route 54: This Altamont Commuter Express (ACE) shuttle provides service between the Dublin
BART station, Pleasanton Fairgrounds, and ACE train. Service is provided along Dublin Boulevard
and Hacienda Drive near the project site. This route operates on weekdays during peak periods from
5:30 to 8:30 AM and 4:00 to 8:00 PM with headways of more than 1-hour. The ACE train provides
service between Stockton and San Jose, including stations in Livermore and Pleasanton.
DART provides service during off-peak hours when most fixed-route buses are not in operation.
Weekday service runs between 9:00 AM and 2:00 PM and 7:30 to 9:30 PM. Saturday service runs
from 8:30 AM to 6:30 PM. With a reservation, a DART van will provide passengers with the most
direct transportation service possible. Dial-a-Ride paratransit is also available seven days a week for
passengers with disabilities.
BART provides regional rail transit access from the Dublin/Pleasanton station. BART runs at 15- to
20-minute headways between 4:00 and 12:00 AM on weekdays. Saturday service is available every
20 minutes between 6:00 and 12:45 AM. Service is also available on Sunday from 8:00 to 12:45 AM
with 20-minute headways.
Existing Traffic Volumes and Intersection Lane Geometries
The study intersection traffic operations were analyzed under weekday AM and PM peak hour
conditions and Saturday mid-day peak hour conditions. Peak hour conditions were determined from
peak period intersection turning movement counts. Weekday AM and PM turning movement counts
were conducted on February 11, 19, and 20, 2003, from 7:00 to 9:00 AM and from 4:00 to 6:00 PM.
Saturday turning movement counts were conducted on July 13, 20, and August 24, 2002 from 3:30 to
5:30 PM. The raw traffic count data for the AM, PM, and Saturday peak periods is provided in
Appendix A.
The peak hour represents the highest 1-hour during the peak period traffic counts. From the data
collection effort, weekday peak hours were determined to be 7:30 to 8:30 AM and 5:00 to 6:00 PM,
and the Saturday peak hour was 3:30 to 4:30 PM. Figures 2A and 2B present the existing peak hour
turning movement counts, and the existing lane configurations and traffic control for the study
intersections are shown on Figures 3A and 3B.
Fehr & Peers 5
J Dublin Blvd.
65 (255)
~,- 2 C012l
~, ~4 (s3)['/]
U
' j~J %z~ (42)F1
~ ~ e- 757 {1~8) J583~
~' ~ D~v~. I
m
Blvd. J
~,' 644 (239) [137j
I I'd- 751(1248)r~51
I
I 'r~ ('u3~lso73-~.j~l
I17 (37)[12J' ~
la(S)~Jf
1 (~)1oI,-~..
s6(24)pq.~
~',-4 (1) R
0('3)10t
~,- 17 (8)~
I .s~d~.. I
31 (88)[la1~-,~'
J DuUin B~d, I
LEGEND:
O = .Study .
Intersections
xxlw]jzz) = AM [PM] (Saturday)
Peak Hour
Traffic Volumes
.... = Future Roadway
FEHR & PEERS
TRANSPORTATION CONSULTANTS
IKEA Dublin Traffic Impact Analysis
EXISTING (JANUARY 2003)
PEAK HOUR TRAFFIC VOLUMES
August 2003
~w-12~ FIGURE 2A
1-580 WB
On-Ramp
LEGEND:
O =
intersections
xx(YY)LZZ] = AM (PM) [Saturday]
Peak Hour
Traffic Volumes
.... = Future Roadway
FEHR & PEERS
TRANSPORTATION CONSULTANTS
IKEA Dublin Traffic Impact Analysis
EXISTING (JANUARY 2003)
PEAK HOUR TRAFFIC VOLUMES
2003 FIGURE 2B
1837-12~
Dublin Blvd.
J~-.580 v'~
On. Ramp
Dublin ~ i
~
~ ~ Duban BAa. I
Jm~ m
m
, ~-
!
(~k, ~ D~ BAa. t
Jw
~ · P,mlico Dr. J
tttr
-
{~] ScmtettDr. I
/
LEGEND:
I~J = Study
Imersections
{~ : Signalized Intersection
~' = Free Right Turn
OL = Right Turn Ovedap
..... Future Roadway
* = Lane Constructed
But Not Open
** = U-Turn Lane
FEHR & PEERS
TRANSPORTATION CONSULTANTS
IKEA Dublin Traffic Impact Analysis
EXISTING (JANUARY 2003)
LANE CONFIGURATIONS AND TRAFFIC CONTROL
August 2003
~-~ FIGURE 3A
FEHR & PEERS
TRANSPORTATION CONSULTANTS
LEGEND:
Study
Intersections
Signalized Intersection
'~' = Free Right Turn
OL = Right Turn Ovedap
..... Future Roadway
* = Lane Constructed
But Not Open
** =U-TumLane
IKEA Dublin Traffic Impact Analysis
EXISTING (JANUARY 2003)
LANE CONFIGURATIONS AND TRAFFIC CONTROL
A.gu,, 2o~3 FIGURE 3B
1837-13t~
Final Report
IKEA Development Traffic Impact Study
August 2003
Level of Service Methodology
The concept of level of service (LOS) is commonly used to determine the operating conditions of an
intersection or roadway. The LOS grading system is a rating scale ranging from LOS A to LOS F,
where LOS A represents free-flow conditions and LOS F represents jammed conditions. A unit of
measure, such as the volume-to-capacity (V/C) ratio or average delay, generally accompanies a LOS
designation. The City of Dublin General Plan states that a service level of LOS D or better is
considered acceptable; LOS E or LOS F standards are considered undesirable.
The City of Dublin uses the intersection LOS methodology outlined in Technical Procedures (Contra
Costa County Transportation Authority [CCTA], 1997), which relates service level grade to a V/C
ratio. The V/C ratio relates the total traffic volumes for critical opposing movements to the theoretical
capacity for those movements. This methodology is only applied to signalized intersections. For
unsignalized intersections, methods are based on the Highway Capacity Manual (HCM)
(Transportation Research Board, 2000). This method determines the service level for each
movement based on the average control delay per vehicle. Control delay includes deceleration
delay, queue move-up time, stopped delay, and acceleration delay.
Table 1 summarizes the LOS criteria for the CCTA (signalized) methodology, and Table 2
summarizes the LOS criteria for the HCM (unsignalized) methodology.
Existing Conditions Levels of Service
The existing lane configurations and peak hour turning movement volumes were used to determine
service levels for the study intersections. These results are shown in Table 3. The measure of
effectiveness (V/C ratio) for signalized intersections and LOS are presented. As indicated in the
table, all study intersections operate at acceptable LOS C or better during the AM, PM, and Saturday
peak hours. LOS calculation worksheets are provided in Appendix B.
Fehr & Peers 10
Final Report
IKEA Development Traffic Impact Study
August 2003
TABLE 1
Signalized Intersection Level of Service Definitions Using ViC Ratio
Level of Description of Traffic Conditions VIC Ratio
Service
Stable flow - slight or no delay. Conditions are such that no approach phase is 0.00 - 0.60
A fully utilized by traffic and no vehicle waits longer than one red indication.
B Stable flow - Slight delay. An occasional approach phase is fully utilized. 0.61 - 0.70
C Stable flow- Acceptable delay. A few drivers arriving at the end of a queue may 0.71 - 0.80
have to wait through one signal cycle.
D Approaching unstable flow - Tolerable delay. Delay may be substantial during 0.81 -0.90
short pedods, but excessive back ups do not occur.
E Unstable flow - Intolerable delay. Delay may be great - up to several signal 0.91 -1.00
cycles. Long queues form upstream of intemection.
F Forced flow - Excessive delay. Volumes vary widely, depending on downstream > 1.00
queue conditions. ,,,,
Source: Technical Procedures (Contra Costa Transportation Authority, 1997).
TABLE 2
Unsignalized Intersection Level of Service Definitions Using Average Delay
Level of Service Average Control Delay Description
{seconds/vehicle)
A 0 - 10 Little or no delay
B · 10 - 15 Minor delays
C > 15 - 25 Average delays
D > 25 - 35 Moderate delays
E > 35 - 50 Lengthy delays
F · 50 Excessive delayslgfidlock
Source: H~hway Capacity Manual 0'ransportation Research Board, 2000).
Fehr & Peers 11
Final Report
IKEA Development Traffic Impact Study
August 2003
III. BASELINE TRAFFIC CONDITIONS
This chapter describes the study intersection operations under baseline traffic conditions including
existing traffic plus traffic generated by approved projects. The methodology for determining baseline
traffic volumes is described and levels of service are also presented.
Baseline Traffic Estimates
As requested by City staff, baseline conditions were developed by adding existing traffic with traffic
generated by approved projects. A list of approved but not yet constructed or fully occupied
developments was provided by the City of Dublin. The City also provided traffic studies that were
completed for many of the approved projects. The amount of traffic generated by these devel-
opments during weekday AM and PM and Saturday peak hours was estimated from the Institute of
Transportation Engineers (ITE) Trip Generation (6~ Edition) and the respective project traffic studies.
A complete list of approved projects, including trip generation information, is provided in Appendix C.
Approved projects in Dublin are estimated to generate between 2,000 and 2,500 net new peak hour
trips, as follows:
· 2,070 (820 inbound and 1,250 outbound) for the AM peak hour
· 2,410 (1,320 inbound and 1,090 outbound) for the PM peak hour
· 2,080 (1,100 inbound and 980 outbound) for Saturday peak hour
Fehr & Peers contacted the City of Pleasanton and Contra Costa County in July 2002 to investigate
probable projects, both north and south of the City of Dublin that potentially could impact the study
intersections. The City of Pleasanton provided both land use forecasts and expected build-out traffic
forecasts from their traffic model. Contra Costa County provided information related to Dougherty
Valley development. Appendix C contains a summary of the baseline traffic estimates for Pleasanton
and Dougherty Valley including land use type, size and resulting trip generation. Combined,
development in Dougherty Valley and the City of Pleasanton is likely to generate about 2,550 AM
peak hour trips, 2,950 PM peak hour trips, and 1,720 Saturday peak hour trips.
The directional distribution of the trips generated by the developments in Dublin, Pleasanton, and
Dougherty Valley were developed using a combination of distribution characteristics from the
Tri-Valley traffic model, previously completed traffic studies, and knowledge of local travel patterns.
Traffic generated by the developments in Dublin, Pteasanton, and Dougherty Valley was assigned to
the roadway system using the software TRAFFIX. The assigned traffic was added to the existing
turning movement volumes (as shown on Figures 2A and 2B) to obtain the Baseline conditions traffic
forecasts. Figures 4A and 4B present the resulting turning movement volumes at the study
intersections under Baseline conditions.
Fehr & Peers 13
...L~.~ , ~.~.,,,w.~ ~+ ~ *+ ~ ......
+~ +~ +/ .
~; - -~~ -.
I I I
I I
~U~S)~l/mm m m
~ (n,~4) ~1i~ m m
i i I
~5~)~
~ 1.~(1~)~ ~ ~818(1~)~l ,~o~)~ .
~ ~ ~ ~)~1]~
~GEND:
~ = ~udy
Inteme~ions
~ = AM (PM) [Saturday]
Peak Hour
Tra~c Volumes
.... = Future Roadway
_p IKEA Dublin Traffic Impact Analysis
BASELINE PEAK HOUR
F E H K & P E E KS TRAFFIC VOLUMES
TRANSPORTATION CONSULTANTS
^~,, zooz FIGURE 4A
1837-14a
On-Ramp
1-580 EB
Ramps
6'12 ('514) [3CT'~ ~
LEGEND:
O = .Study .
intersections
xxcn31zzl = AM (PM) [Saturday]
Peak Hour
Traffic Volumes
.... = Future Roadway
FEHR & PEERS
TNANSPORTATION CONSULTANTS
IKEA Dublin Traffic Impact Analysis
BASELINE PEAK HOUR
TRAFFIC VOLUMES
August 2003 FIGURE 4B
1837-14b
Final Report
IKEA Development Traffic Impact Study
August 2003
Baseline Roadway Changes
There is a planned roadway improvement currently under construction within the study area that was
included in the Baseline conditions analysis:
· Tassaiara Road/Santa Rita Road/1-580 Interchange Reconstruction - This project includes
interchange improvements such as: (1) one westbound right-turn lane and an exclusive
overpass lane leading to the northbound free right-turn lane at the 1-580 westbound off-ramp/
Tassajara Road intersection; and (2) adding one eastbound left-turn lane, one westbound
left-turn lane, and one northbound overpass through lane at the 1-580 off-ramp/Pimlico Drive/
Santa Rita Road intersection.
This improvement, including the study intersection lane configurations and traffic control under
Baseline conditions, is shown on Figures 5A and 5B.
Baseline Conditions Intersection Levels of Service
Levels of service were calculated for the study intersections using the baseline traffic volumes from
Figures 4A and 4B, and lane configurations and traffic controls shown on Figures 5A and 5B. Table 4
presents the LOS results for Baseline conditions. LOS calculation worksheets are included in
Appendix D.
As shown in Table 4, all intersections operate at an acceptable LOS D or better during the AM, PM,
and Saturday peak hours.
Notable differences between the Existing and Baseline conditions include:
· The change from LOS A to LOS B at the 1-580 eastbound off-ramp/Pimlico Drive/Santa Rita
Road intersection during the weekday PM peak hour. LOS degradation occurs despite the
roadway improvements assumed at this study intersection.
· The 1-580 eastbound off-ramp/Hopyard Road intersection is anticipated to deteriorate from
LOS B to LOS D during the weekday AM peak hour and from LOS A to LOS B during the PM
peak hour.
· The Dublin Boulevard/Dougherty Road intersection is expected to deteriorate from LOS C
with Existing conditions to LOS D with Baseline conditions during the weekday PM peak
hour.
Fehr & Peers 16
Dublin BIv0. I m m m ~
~
ttt~
~J ScadettDr. I
/
+ ,~ttn
J ~J Dublin ~lvd.
_.-. l, tt-
OL -.~
LEGEND:
= Study
Intersections
= Intersection
Signalized
= Free Right Turn
OL = Right Turn Overlap
..... Future Roadway
* = Lane Constructed
But Not Open
** = U-Turn Lane
F I~HI~ &
TRANSPORTATION CONSULTANTS
IKEA Dublin Traffic Impact Analysis
BASELINE CONDITIONS
LANE CONFIGURATIONS AND TRAFFIC CONTROL
^~9u~ 2oo-~ FIGURE 5A
1837-15a
Jttt
LEGEND:
O = Study
Intersections
Signalized Intersection
'F.EE' = Free Right Turn
OL = Right Turn Ovedap
.... = Future Roadway
* = Lane Constructed
But Not Open
** = U-Tum Lane
F[HR. &. PE~RS
TRANSPORTATION CONSULTANTS
IKEA Dublin Traffic Impact Analysis
BASELINE CONDITIONS
LANE CONFIGURATIONS AND TRAFFIC CONTROL
^.g.~, 2oo3 FIGURE 5B
1837-1
Final Report
IKEA Development Traffic Impact Study
August 2003
IV. PROJECT CHARACTERISTICS
The proposed project consists of a 317,000 square foot IKEA store and a 135,215 square-foot
shopping center, including approximately 25,855 square feet (20 percent) of restaurant space. The
methodology used to estimate the amount of traffic generated by these uses is presented in this
chapter.
Project Traffic Estimates
The amount of traffic associated with a project is estimated using a three-step process:
1) Trip Generation - the amount of traffic entering and exiting a project site is estimated on a
daily and peak-hour basis.
2) Trip Distribution - the directions of trips to approach and depart the site are estimated.
3) Trip Assignment- the assigned traffic to specific roadway segments and intersection-
turning movements is determined.
The results of this process are described in the following sections.
Trip Generation
The AM and PM peak hour traffic added to this roadway system by the proposed IKEA store was
estimated on traffic volumes collected at existing IKEA stores in Emeryville, California in December
2001, and in Woodbridge, Virginia in November 2002. The survey findings are presented in Table 5.
Other factors considered in the trip generation development process included the relative locations of
the approved East Palo Alto store (to be opened in 2003) in Santa Clara County and the existing
IKEA store in Emeryville. The regional attraction of these stores creates a situation where a third
similar-type establishment is not expected to generate new trips at the same rate as the initial
establishment. According to the market projections conducted by IKEA Property, Inc., when fully
operational, IKEA Dublin will generate about 61 percent of the current sales at IKEA Emeryville.
TABLE 5
Vehicle Trip Generation - IKEA Store Surveys
AM Peak Hour PM Peak Hour Saturday Peak Hour
Survey Location ~ Vehicle Trips Vehicle Trips Vehicle Trips
In Out In Out In Out
Emeryville; 29 32 266 298 630 549
Woodbddge 3 19 9 119 148 733 795
Notes:
1. These survey sites are similar in size, visitor activity, and are the only IKEA stores in their respective markets.
2. Vehicle trips obtained from driveway volumes counted at the existing IKEA location in Emeryville, California during
December 2001.
3. Vehicle trips obtained from driveway volumes counted at the existing IKEA location in Woodbridge, Virginia
dudng November 2002.
Source: Fehr & Peers, June 2003
Fehr & Peers 20
Final Report
/KEA Development Traffic Impact Study
August 2003
Considering the survey data from Table 5 and sales projections discussed above, Fehr & Peers, in
consultation with City staff, determined the Dublin IKEA would likely generate about 25 percent fewer
weekday trips than was generated at the existing Emeryville IKEA. Appropriate adjustments were
made for pass-by IKEA traffic during the weekday PM peak hour. For Saturday data, trip estimates
were based solely on the Woodbridge IKEA store trip generation survey results as this facility is
located at a shopping destination similar to the Dublin site.
The amount of traffic generated by the proposed shopping center adjacent to the IKEA store was
derived from ITE's Trip Generation (6th Edition) for a Shopping Center (Land Use Code 820) and
Restaurant (Land Use Code 832) with appropriate adjustments made for pass-by traffic. Trip rates
for the shopping center were based on the regression equation (and not average value) from Trip
Generation, according to the guiding principles stated in the Trip Generation Handbook (October
1998). The same publication indicates that restaurant rates should be based on average values.
Table 6 shows the projected trip generation for the Dublin IKEA Shopping Center.
As shown in Table 6, the site is projected to generate approximately 16,100 daily trips during a typical
weekday4 During the AM peak hour, about 460 net new trips (250 inbound and 210 outbound)
would be generated. Net new PM peak hour traffic generated by the site is anticipated to be about
880 trips (440 inbound and 440 outbound). Net new Saturday peak hour traffic is estimated to be
approximately 2,510 trips (1,310 inbound and 1,200 outbound).
Table 6 also shows the trip generation for Commerce One as approved by the city of Dublin. The
IKEA Shopping Center site (previously known as Commerce One) has approvals for a 780,000
square-foot office use. Trip generation shown in Table 6 was obtained from the traffic impact study
prepared for the Commerce One office development. As shown, net new PM peak hour trips
generated by the Commerce One and IKEA Shopping Center developments are similar (i.e., within
5 percent). During the AM peak hour, Commerce One would generate substantially more traffic than
the IKEA Shopping Center, while the reverse is true for the Saturday peak hour.
Trip Distribution and Assignment
Traffic distribution for the Dublin IKEA Shopping Center was derived from the primary trade areas
(PTAs) established by IKEA Property, Inc. PTAs were established using zip code sales surveys at
the existing Emeryville IKEA, 2006 population projections, and the relative locations of the three
stores (i.e., existing store in Emeryville, store opening in East Palo Alto, and proposed Dublin store)
within the Bay Area.
Using information provided by IKEA, Fehr & Peers derived the following regional trip distribution for
IKEA Shopping Center trips:
· 35 percent of trips to/from the south along 1-680
· 30 percent of trips to/from the north along 1-680
· 10 percent of trips to/from the west along 1-580
· 11 percent of trips to/from the east along 1-580
· 14 percent of trips to/from the Dublin, Pleasanton, and San Ramon areas
21
Fehr & Peers
Final Report
IKEA Development Traffic Impact Study
August 2003
These trip distribution percentages are illustrated on Figure 6. The distribution percentages shown
and listed above were applied to the trip generation estimates shown in Table 6. The resulting trips
were then assigned to the roadway system through the study intersections. The assignment process
was completed using the assignment software TRAFFIX. The traffic assignments used the closest
proximity interchange (i.e., Hacienda Drive) to access the freeway. Pass-by traffic assignments were
applied according to the inter-relationship between traffic levels on Dublin Boulevard and Hacienda
Drive. The resulting project traffic assignments are illustrated on Figures 7A and 7B.
23
Fehr & Peen~
30%
?
14% TRIPS
WITHIN
TRI-VALLEY
AREA
?DUBI21N-=
11%
N
Not to scale
LEGEND:
...... City Limits
11% = Percentage of Trip Dis~ibulJon
FEHR 1~ PEERS
TRANSPORTATION COSSULTANTS
35%
IKEA Dublin Traffic Impact Analysis
IKEA REGIONAL TRIP DISTRIBUTIOI"
FIGURE 6
~- 29(61),168] i .,a._ 29(61)[1681 [ ~ ~ ~..3~[181
,,e...6 (13)[36j
35 {62) [2231'"'~ GE 35 (63) [2231'"e' ,'~ 8 (13) [39~ .~,
LEGEND:
I~ = Study
Intemeetions
~xcenm = ^M (eM) [Smurday]
~eak Hour
Traffic Volumes
NOTE: Volumes
include diverted trips.
F£HR & PliERS
TRANSPORTATZON CONSULTANTS
IKEA Dublin Traffic Impact Analysis
PROPOSED PROJECT
TRIP ASSIGNMENT
'~g~'~' ~ FIGURE 7A
1837-16a
19 (33)[~37]
LEGEND:
O = .Study
~ ntersections
xx(~31zzi = AM (PM) [Saturday]
Peak Hour
Traffic Volumes
FEHR & PEERS
TRANSPORTAT[O~ CONSULTANTS
IKEA Dublin Traffic Impact Analysis
PROPOSED PROJECT
TRIP ASSIGNMENT
August 2003
1837-16b FIGURE 7B