HomeMy WebLinkAboutItem 4.3 Accept Improve Village Pkwy Wall CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 24, 1985 SUBJECT Acceptance of Contract 84-7 , Village Parkway Wall EXHIBITS ATTACHED None RECOMMENDATION 1 ) Accept improvements as being complete pursuant to the specifications of Contract 84-7 2 ) Authorize final payment to Printex/Sierra Precast , Inc . , in the amount of $26,707 .80 3 ) Authorize a budget change from the Street Improvement Reserve in the amount of $3 ,$$0. 00 to provide final funding for the project FINANCIAL STATEMENT: Construction Budget $250,258.00 Actual 254,438 . 50 (Less Penalty ) 2 , 250.00 $252 ,188 - 50 Engineering Budget Actual 83/84 Design Costs $17 , 000 .00 $149 . 00 84-85 Design/Inspection 3 , 000.00 4 ,949. 50 $20,000.00 19,11 . 50 Budget Changes Required Engineering 1 ,949. 50 Construction 1 ,930. 50 $3 , 880.7 Total Project Cost $271 ,307 DESCRIPTION In October of 1984, the City Council awarded Contract 84-7 to Printex Sierra Precast , Inc . , for the construction of a soundwall along the west side of Village Parkway. The project provided for a precast concrete wall to be installed along 72 properties between Amador Valley Boulevard and Kimball Avenue . The City. had obtained an easement from each of the property owners to construct the wall . The construction on this project began in late November of 1984. The contractor was unable to meet the number of working days alloted by the contract and did not complete the project until April , 1984. The work was completed 9 days after the contract expired . As a result of the contractor not meeting the terms of the contract , a penalty fee of $250 for each day beyond the contract period has been levied . The total, project cost including design and inspection fees is anticipated to exceed the intial budgeted amount by $3 ,880.00. During the construction process , DSRSD required tree relocation of a fire hydrant . The Services District shared the cost with the City. The City ' s share .of this change was $1 , 868 - 50 . Also , the actual field measurements were slightly longer than those estimated in the original bid package . The engineering costs were also escalated due to the fact that this contract was originally bid in September and the City Council rejected the only bid received . The design was then altered and advertised for bids a second time . It is estimated that the engineering costs were approximately $1 ,949. 50 more than was budgeted in the 1984-85 budget . However , the total design and inspection costs did not exceed the original anticipated total of $20,000.00. The City Engineer and his Staff have completed an inspection of 'the improvements and noted that they are in acc,6rdance with the approved plans , specifications and modifications . Staf: recommends acceptance of the improvements and payment in full to the contractor . ------------------------- ---------------------------------------------- ----- COPIES TO : Printex/Sierra precast , Inc . ITEM NO . 40