HomeMy WebLinkAbout4.05 Stagecoach Park Construction Bids CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: March 23, 1987 SUBJECT Stagecoach Park Construction Bids EXHIBITS ATTACHED Bid Summary; Budget Change Form; Park Plans will be available at the City Council Meeting RECOMMENDATION 1 uthorize an additional appropriation of $26, 095 from the Capital Projects Reserve Fund 2) Authorize City Manager to develop and execute a contract with Developer for the performance and payment for construction FINANCIAL STATEMENT: Total 1986-87 Project Budget-$46, 500; City' s share of total estimated remaining cost-$72, 595; Additional funds required-$26, 095 DESCRIPTION In January of 1987, the 3/4 acre Stagecoach Park was put out to bid by Real Estate Developer Rafanelli & Nahas . Four bids were received by the February 9, 1987 deadline. The bid amounts range from a low of $145, 476 to a high of $229, 245 (including alternates) . The apparent low bidder is C & C Landscape of Tracy, California (Exhibit A) . The City of Dublin budgeted $46, 500 in Fiscal Year 1986-87 for design and construction of Stagecoach Park. To date, $2, 300 has been spent leaving an available balance of $44, 200 . Rafanelli & Nahas were required to spend $88, 000 for design and construction of Stagecoach Park. To date, $7, 000 has been spent leaving an available balance of $81, 000. Therefore, $125, 200 is currently available for construction and inspection of Stagecoach Park. As the bids received are in excess of the funds available, Staff has outlined the following five options for Council consideration : Option I Pare down the basic park design in order to bring the park within the budget allocated. This includes deleting the entry wall, drinking fountain and seating wall/planter, as well as cutting back on plant materials, removing some of the picnic tables, altering the fence design and reducing the depth of the sand in the play area from 12" to 9" Option II Basic park design without entry wall or drinking fountain. Construction/Inspection $ 141, 075 Available Balance 125, 200 Additional Cost to City $ 15, 875 Option III Basic park design including entry wall but no drinking fountain. Construction/Inspection $ 145, 675 Available Balance 125, 200 Additional Cost to City $ 20, 475 ---------------------------------------------------------------------------- COPIES TO: ITEM NO. *� �/� AGENDA STATEMENT: Stagecoach Park Page 2 Option IV Basic park design including drinking fountain but no entry wall . Construction/Inspection $ 146; 695 Available Balance 125, 200 Additional Cost to City $ 21, 495 Option V Basic park design including entry wall and drinking fountain. Construction/Inspection $ 151, 295 Available Balance 125, 200 Additional Cost to City 26, 095 As Stagecoach Park will be the first City owned developed park, it is important that the park be constructed to reflect the design approved by the City Council and the community. Staff is therefore requesting that the City Council authorize an additional appropriation of $26, 095 from the Capital Projects Reserve Fund. The total cost that the City would incur for Stagecoach Park would be as follows : Design Fiscal Year 1985-86 $ 5, 882 Fiscal Year 1986-87 2, 300 Construction/Inspection 1986-87 70, 295 Total $ 78, 477 Total Fiscal Year 1986-87 Cost $ 72, 595 Total Fiscal Year 1986-87 Budget 46, 500 Shortfall $ 26, 095 BID SUMMARY (JOB= Stagecoach Park IIC&C Landscape IlDevengenz❑ 11White Oak LandscapellGateway II 1 11209-835-4809 11930-7186 11449-4500 it Il I-------------------------------IlCraig Cowden IlRobert Devengenzo IIJim Lewellen II- Il IBID DATE: 2/9/87 IlTracy, CA IlLafayette, CA IlLivermore II II ------------------------------------------------------------------------------------------------------------------------ I I II II II II II IITEMI DESCRIPTION II TOTAL II TOTAL II TOTAL II TOTAL II 1 1 iEarthwork/Site Preparation II 5,389 II 11,250 II 13,001 II 22,600 II 1 2 (Concrete Paving & Walkways II 14,445 II 17,684 II 171314 II 9,17 II 1 3 (Concrete Structural Elementsll 17,876 . II 20,119 II 33,959 II 30,000 II 1 4 (Electrical Conduit II 3,056 II 9,703 II 3,699 II 3,000 II 1 5 IDrainage II 2,759 II 6,748 II 1,550 II 4,000 II 1 6 ISand 11 5,216 II 10,917 II 4,573 II 5,000 II 1 7 (Play apparatus II 23,460 II 33,025 II 26,084 .11 25,000 II ------------------------------------- -- ------------ ---__-__-�_-�__--------_--__ ---__ �- 1 8 ISite Amenities 11 9,813 II 17,458 II 11,926 II 10,000 11 1 9 (Fencing II 9,629 II 18,304 II 13,943 II 12,000 II 1 10 ISoil Preparation II 9,751 II 9,867 II 5,661 II 3,0r'- II 1 11 ( Irrigation II 15,166 II 26,789 II 14,359 II 15,000 II 1 12 (Planting II 19,085 II 28,507 II 16,537 II 11,000 II I II II II II II I SUB-TOTAL II $135,647 II $210,371 II $162,606 II $149,600 II 1 13 (Entry Wall II 4,424 II 7,291 II 11,175 II 9,000 II 1 14 (Drinking Fountain II 5,405 11 11,583 II 7,759 11 7,800 II I TOTAL (W/ALTERNATES) 11 $145,476 11 $229,245 11 $181,540 11 $1661400 11 C 12 OF DUB IN BUDGET CHANGE FORM FROM TO DAPPROPRIATION ACCOUNT AMOUNT ACCOUNT AMOUNT M TRANSFER AMENDMENT r3-65' 416 26,095 3-65 26,095 JUSTIFICATION TO APPROPRIATE RESERVES IN THE CAPITAL IMPROVEMENT PROJECT FUND EQUAL TO THE ESTIMATED SHORT FALL FOR COMPLETING THE -STAGECOACH PARK. ITEMITIZED COST CAPITAL IMPROVEMENT PROJEC STAGE<'OACH P IRK 26,095-00 TO AL 26,095.00 CITY DATE MANAGER APPROVAL CITY DATE 'JOUNCIL APPROVAL