HomeMy WebLinkAbout8.1 West Dublin GP Amendment AGENDA STATEMENT
CITY COUNCIL MEETING DATE: December 12, 1988
SUBJECT: PA 88-144 West Dublin General Plan Amendment
Study and Specific Plan Study Requests
EXHIBITS ATTACHED:
Attachment 1: Letter from Michael S. McKissick, Eden Development Group dated
November 28, 1988, requesting General Plan Amendment/Specific
Plan Studies
Attachment 2: Location Map - Eden Development Group
Attachment 3: Letter from Robert Yohai, Schaefer Heights, Incorporated dated
received November 29, 1988, requesting General Plan
Amendment/Specific Plan Studies
Attachment 4: Location Map - Schaefer Heights, Incorporated
Attachment 5: Dublin General Plan - Extended Planning Area Map
RECOMMENDATION:
1) Determine whether or not to authorize a General Plan Amendment Study and
Specific Plan Study, including a determination of study area boundaries.
2) If studies are authorized, direct Staff to hire Contract Planner,
initiate discussions with other agencies having jurisdiction, determine
appropriate consultant team, bring consultant team contract to City
Council for authorization, and bring any other associated agreements or
documents to City Council for action.
FINANCIAL STATEMENT: Undetermined. Applicant to pay for studies,
Contract Planner costs, and Consultant costs
related to the request.
DESCRIPTION:
Mr. Michael S. McKissick, representing Eden Development Group, and Mr.
Robert Yohai, representing Schaefer Heights, Incorporated, have separately
requested the City Council to authorize a General Plan Amendment Study and
Specific Plan Study for the Western Extended Planning Area.
The Eden Development Group request involves approximately 3600 acres
under 11 separate ownerships. • The area is generally bounded by I-580 on the
south, Eden Canyon Road on the west, the Alameda County/Contra Costa County
boundary on the north, and the Dublin City boundary and Schaefer Ranch Road on
the east (see Attachment 2) .
------------------------------------------------------------------------------
COPIES TO: Applicant
Owner
ITEM NO. PA 88-144
-1-
The Applicant intends to extend the Dublin General Plan Primary Planning
Area to include the property and have a Specific Plan prepared in order to
develop an exclusive Country Club Community with high end homes, substantial
amenities, such as an 18-hole championship golf course, and-some support
retail/commercial areas (See Attachment 1) .The request contains property owner authorization from the following 10
property owners: Davilla/Fields; Manuel Machado; Butch Schaefer; Robert
Nielsen; Jeffrey Wiederman; John Machado; Scott Machado; Dennis Gibbs; Domino
Cattle Co. ; and LeMoyne/Eastwood/Bartling. Authorization from Marie Cronin
has not been submitted.
The Schaefer Heights, Incorporated request involves approximately 335
acres owned by Barbara Schaefer. The area is generally bounded by I-580 on
the south, Schaefer Ranch Road on the west, and Donlan Canyon on the north and
east. The site includes Donlon Point (see Attachment 4) .
The Applicant intends to extend the Dublin General Plan Primary Planning
Area to include the property and have a Specific Plan prepared in order to
develop an upscale single family Planned Development Community with support
facilities (see Attachment 3) .
State law limits General Plan Amendments to a maximum of four (4) per
calendar year. The City Council has previously authorized the following four
(4) General Plan Amendment Studies:
1. Hansen Hill Ranch
2. Blaylock, GLeason, Fletcher (Donlan Canyon)
3. Dublin Boulevard Extension - Southern Pacific Railroad
Right-of-Way to Tassajara Road
. 4. East Dublin
It would be appropriate to combine the Eden Development Group request
with the Schaefer Heights, Inc. request to form a single "West Dublin" General
Plan Amendment Study and Specific Plan Study. Such a West Dublin Study would
be the fifth General Plan Amendment Study. Staff anticipates that the first
three listed amendments will take place in 1989, and the fourth occurring
after 1989.
State law does not limit the number of Specific Plans that can be
prepared. It does, however, call out the contents of a Specific Plan. A
Specific Plan must include:
1. Land Use Designations
2. Infrastructure and Facilities
3. Development and Environmental Management
4. Implementation and Financing Measures
Since a Specific Plan typically requires more planning, architectural
and engineering detail and expertise than a General Plan Amendment, it is
usually more costly to prepare.
The initial step in processing the requests is for the City Council to
determine whether or not to authorize a General Plan Amendment Study. If the
City Council decides to not authorize an amendment study, the existing
policies remain in effect. In essence, residential development on the site
would be subject to future study when the City Council finds it appropriate.
If the City Council decides to authorize a General Plan Amendment Study,
the City Council should also determine whether or not to authorize a Specific
Plan Study. The City Council should also determine the boundaries of the
study areas. Staff will have a large scale map available at the City Council
meeting to help determine study area boundaries.
To help process the studies, Staff would need to hire a Contract
Planner, or perhaps contract with a Planning Firm, as well as assemble a
Consultant Team with expertise in such areas as hillside development,
transportation planning, environmental review, geology, fiscal analysis, and
infrastructure planning. The Staff should also be authorized to initiate
discussions with other agencies having jurisdiction in the project area.
-2-
Y
Staff recommends that the City Council take the following actions:
1. Determine whether or not to authorize a General Plan Amendment
Study and Specific Plan Study, including a determination of:study ,area, _
boundaries. If the study is not authorized, no other action would be needed. °~
2. Based upon the current Planning Department workload, sufficient
Staff resources to process this General Plan Amendment and Specific Plan Study
are not available. In order to be able to coordinate these requests, the
Applicants have agreed to incur the costs of the City hiring another Planner.
It is the City Manager's recommendation that the Council not hire another full
time permanent Planner until the Management Audit of Development Services is
undertaken and completed. The City Manager does recommend that the Council
authorize Staff to secure the services of a Contract Planner to handle the
processing of this study, if the City Council authorizes the study. In
addition, it is recommended that Council authorize Staff to initiate
discussions with other agencies having jurisdiction, determine the appropriate
Consultant Team, bring a Consultant Team Contract to the City Council for
authorization and bring any other associated documents, agreements, or
resolutions to the City Council for action.
r
EDEN DEVELOPMENT GROUP
1400 Fashion Island Blvd., #1000 • San Mateo, CA 94404
415-571-8100 • FAX 415-349-7338
I
November 28, 1988
i
' City Council
City of Dublin
P.O. Box 2340
Dublin, CA 94568
Dear City Council Members:
Eden Development Group is ,.,the optionee of approximately
3 , 600 acres of land referred to as the "Western Extended Planning
Area" in the City of Dublin's General Plan. We are requesting
that the City Council authorize preparation of (i) a General Plan
Amendment Study, (ii) a Specific Plan Study, and (iii) associated
Environmental, Fiscal, Traffic, Geologic, and other related
studies. It will also be necessary to initiate discussions with
all other agencies having jurisdiction over the infrastructure
improvements required for the project's development. It is our
understanding that, in addition to financing all of the required
studies, it will be necessary for us to fund the costs of a City-
hired Contract Planner to help process the request.
It is our intention to develop the property as an exclusive
Country Club Community including an 18-hole championship golf
course, full service club facility, tennis courts, swimming
pools, and equestrian center. We also envision some
retail/commercial areas to support the community. Given the
amenity levels proposed, the homes will be "high-end" . Our
design philosophy will be predicated upon producing the "most
exclusive" project in the East Bay.
In consideration of comprehensive planning, we are prepared
to have our property processed with others in the area. However,
if future events not related to our request create unreasonable
delays, then we feel the project is substantial enough to be
considered for separate processing.
We appreciate your consideration and look forward to working
with the City of Dublin to produce an exceptional project.
Very truly yours, .
B 1
M chael S . rlcFissick -
Partner NON ^ � 1 10
MSM:krm
Au"n M 1i
�A�-I�{4 Ltd P.� �t,�hl,�►t �P�15�
}}
�Ott ( 1
7�1
jfO
_-' '• _ 1 118 1
(/' GYjB ,` SBO tics
CANYON 'Pa
� Icy ICINITY MAP
of the floe n .,
C 11 9 1,
WESTERN AUQUOT
a EXTENDED nUa- pi MAN va _ , o.....__. . ,... . ....
`
PLAN .
y ,
SCHAEFER HEIGHTS, INCORPORATED
155 Filbert Street, Suite 200
Oakland, California 94607
November 22 , 1988 �,(L'
CEJV. ED
Honorable Linda J. Jeffery, Mayor NOV 291938
City of Dublin
P.O. Box 2340
Dublin, California 94568UBUJ!� PLANNING
Re: Schaefer Heights
Western Extended Planning Area (Barbara Schaefer Property)
Dear Mayor Jeffery, .
We are contacting you concerning our property that covers plus or
minus 335 acres located north of and adjacent to Interstate 580
approximately 900 feet west of the current end of Dublin Boulevard
in the unincorporated part of Alameda County. It is immediately
adjacent to the west of the Blaylock Gleason, Fletcher property--
which property has recently requested a General Plan Amendment
Study with annexation and approval of development plans.
Our request is that the Dublin City Council authorize and direct
staff to prepare (1) a General Plan Amendment Study, (2) a Specific
Plan Study with associated environmental, fiscal, traffic, geologic
and other related studies and that (3) the City initiate
discussions with other agencies having jurisdiction for this
property. (Which includes Assessor's Parcel Numbers 941-18-5; 941-
18-6 ; 85A-1000-1-16; 85A-1000-1-14 ; 85A-1000-1-17; 941-18-2-2; and
941-18-2-3) . Further, we would expect to request rezoning, a
vesting tentative map, and concurrent annexation to the City of
Dublin subject to an acceptable pre-annexation agreement.
Currently, the primary access to our property is through the City
of Pleasanton and Alameda County, traveling west on Dublin Canyon
.Road to the Schaefer Ranch Road underpass, at which time one turns
north under Interstate 580, approximately 2.85 miles west of the
intersection with Foothill Boulevard. We understand Dublin will
prefer western properties to access via internal Dublin roads --
perhaps through Donlan Canyon -- rather than through the City of
Pleasanton.
Our property is currently zoned A, Agricultural District and is
under contract as part of the Williamson act Lands under Land
Conservation Contract 10677 , Agricultural Preserve 1973-2 . Notice
of Nonrenewal was given to Alameda County in 1986 and the
nonrenewal was effective January 1, 1987.
Our project is closely related to the assemblage currently under
way for most of the properties in the Western Extended Planninq
MM [to
A T�1 An C H'Mlm E'Ran T 3
Honorable Linda J. Jeffery
October 13 , 1938
Page 2
Area--which we hear may include 3, 000 or 4, 000 acres. Their
application and ours should be processed on a parallel track since
we believe, as we understand does yours,.aff, that from a land
planning and approval process point of view that concerted effort
makes very good sense given the importance of this area's sensitive
planning. Toward that end we would encourage the City to hire a
contract planner to help process these projects.
A comprehensive planning approach of this kind will identify a
large number of issues and we expect many, although not all, to
impact our property. We wish to proceed concurrently as far as
possible and unless some issue arises which involves the other
parcels but which does not involve our own and which creates any
real delay--in which case we would wish to be able to continue
processing our application.
We have engaged professionals who are assisting us in the legal and
technical resolution of the various issues here. The General Plan
Amendment Study requested should be directed at including
this property in the Primary Planning Area and to allow for
consideration of an upscale master planned residential community
of single family homes with support facilities.
Enclosed, please find our signed application form and required $100
deposit. We are available to you or your staff to answer any
questions you may have.
We look forward to your. positive response and would be happy to
answer any questions you have. We are working with Jim Parsons of
the engineering and planning firm Parsons Rourke & Walker of
Pleasant Hill (686-6300) if you have any questions about this.
Sincerely,
SCHAEFER HEIGHTS, INC.
Robert Yohai
7 ident
Ac nowledge
Barbara Schaefer, Legal Owner
15-18082
880051tr. 009/enc.
i .
1 .
a
AVI \� Y
`7
\� ♦ \
2A
'RE C � IY. ED
UM
A-f I ACHM Pf}SS- l4�( West t)ubllaj 6PAII
LOCATION MAP
Dublin General Plan
�O
9
B<
GUIDING POLICY
Consider residential development
'Pin J+,o9 •,��:.
proposals(including supportlecihties)
on moderate slopes,with multi•lamily
densities typically considered on flatter
-S :':.\ land and nest to business perk areas.
?.Tassalare Creek`1 IMPLEMENTATION POLICY
:;.Regional Park;-11 t The location.extent and density
:: ^.: ;;; of residential development will be
;•Ptirlcs•Heserve:•, determined when municipal services
•Forces Training:ti•i(:.ti:; ':N=t=, < can be provided and through General
GUIDING POLICY N .Area :t- .1: �:� Plan refinement studies.
:Y'.•: .•.:�::•.':•: :�i cn
Considor residential development yZ a '•r: •.;.;.;.;�.;.;.};.;
o:........... ...Santa Rita.
proposals(includingsuppon facilities) '�, y w oC.• 'Rohobililalion Canter
on moderate slopes,with multi-lams ••
densities typically considered on flatter YO 0�2'. :'�•'•'•••••••'•'' '•'••,
land. { Z �y w''•''''•''
IMPLEMENTATION POLICY
The location,extent and density �`� P p• •;�
of residential development will be �, p.MP p ;;;;;•,
determined when municipal services •�,-ri.;ti;ti•-
can be provided and through General
FREEWAY 580 Plan refinement studies. �•--L— N 8 V0 —
( D JeL�
O I
74 STONERIDGE DR'
C �T 9a
G
, ,e Extended Planning Area
Residential/Open Space(see note)
Ism
t
® Business Park/Industrial:tow Coverage
S ® Business Park/Industrial
S
Public(_ands
�. Blayney-Dyell,Urban and Regional Planners
v FIGURE 2
' t