HomeMy WebLinkAbout7.1 Design Dev Civic Center 30 CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 8, 1987 SUBJECT Civic .Center Complex - Design Development EXHIBITS ATTACHED o Minutes of November 18, 1986 Council Meeting o Minutes of January 28, 1987 Council Meeting 0 Preliminary Schedule of Cost Reductions RECOMMENDATION 1) Receive presentation from Design Team 2) Discuss Project ; 3) Direct Staff and Architects to pursue Option 1 FINANCIAL STATEMENT: See Below DESCRIPTION Background On November 18, 1986, the City Council held a special meeting to review the proposed program for the Civic Center Complex. The schematic design based on the approved program was approved at a meeting on January 28, 1987. A schematic design normally consists of "Bubble Diagrams" of the interior space and general layouts of the buildings and site improvements. The program reviewed and approved by the City Council included a 26, 667 square foot facility containing: City Offices, Community/Regional Meeting Room and a 150 seat City Council Chamber. Also, an 18, 710 square foot Police Facility was proposed for the site. This element included a holding facility, evidence storage room, space for a future dispatch area, Emergency Operating Center and Administrative Offices . The exterior improvements included 214 parking spaces, a Community Plaza, a public courtyard/garden, and a large fountain. It was also recognized that in the future, the site could accommodate additional uses. The City Council directed Staff, in conjunction with the Civic Center Advisory Committee (CCAC) and the Architects, to proceed with the Design Development Phase. This phase involves a further refinement of the schematic design. The approved program estimated the work area required and applied a percentage factor in order to determine circulation space. During the Design Development Phase, the Architects worked with each of the Departments to develop floor plans for the facilities . Also, the Landscape Architect developed detailed plans of the exterior spaces . Space to Accommodate Future Growth In addition to continuing with the design process, Staff identified current anticipated funding for the project. In November, the City Council was presented with the opportunity to reduce the size of the building. However, even this approach would have required additional appropriations. The City Council concurred that it was prudent to proceed with the construction of sufficient office space to accommodate a variety of municipal services into the future. This will result in avoiding escalated costs and disruptions which would be likely in a future expansion or addition. In recent months, the need for adequate City Office space is being considered by all of our neighboring cities . Livermore, Pleasanton, and San Ramon are currently evaluating needs or taking steps to purchase additional office space. The design approach undertaken by the City of Dublin is to construct a facility which can serve the City' s needs upon occupancy today and in the future. The planned interior improvements would accommodate the near term needs of the City. Expansion space would remain unimproved and could be leased to a compatible tenant. This allows the City to only incur the initial shell cost at this time. As indicated above, this provides an investment in the future ability of the City to adequately provide services. ---------------------------------------------------------------------------- COPIES T0: ITEM NO. AGENDA STATEMENT: Civic Center Complex - Design Development Page 2 Change in Building Program The Civic Center Advisory Committee has been providing input to the Architects throughout the design phase. The Architects modified the approved program based on discussions with the City Council in March, 1987. The program was modified to provide additional space which could accommodate a cable television studio. The additional space modified the overall shape of the Administrative wing. In discussions with the Building Official, it was also determined that an allowable exiting scheme would require an additional stairway. The Design Team has made several modifications to the size of the building based on input during the development phase. The changes are outlined below: Lobby: The total size was increased by 900 square feet. However, they feel that 500 square feet can be eliminated without affecting the functioning of the space. This will result in a net increase of 400 square feet. City Hall Lease Space: The preliminary estimate of the space required to accommodate the cable television function was 2, 680 square feet. The actual increase in the radius of the City Hall wing was 3, 200 square feet. Approximately 300-400 square feet of this figure is attributed to the connection space between the City Hall and Police Facility. City Council Chamber/Audio Visual Room: The arrangement of the A.V. /Conference Room, including a toilet facility required an additional 500 square feet. Additional Exit from 2nd Floor : An additional stairway was added to meet code requirements for exiting. This resulted in an additional 350 square feet. Waiting Area: A waiting area in front of the Council Chambers was added. In order to provide a balance at the entry point, a similar feature was provided in the police lobby. The combined change resulted in an additional 400 square feet. Administrative Offices : The layout of the Administrative Offices required additional space to accommodate the various functions in a manner which was consistent with the rest of the building. This resulted in an additional 300 square feet. The Architects also made small modifications in circulation throughout the facility. All of the changes result in a complex consisting of approximately 52, 000 square feet. The Design Team is continuing to evaluate these changes and their desirability, given budget considerations . For example, a reduction in the lobby size or elimination of the waiting areas would have a minimal impact on the functioning of the building and will be pursued. Budget Considerations The initial base cost of the building identified by the Architect' s Independent Estimator was approximately $6. 2 million. This was prepared in January and closely approximated the preliminary estimate of $6.106 million issued to the City Council in November. The estimate did not include contingency factors for changes in the economic conditions between the time of the estimate and the actual construction date. Also, no contingency is shown for change orders which may occur. The City' s Construction Manager feels it is prudent to include these items in order to adequately fund the project. The estimate also excluded the addition of the cable television space. ---------------------------------------------------------------------------- AGENDA STATEMENT: Civic Center Complex - Design Development Page 3 During the past 4 months, Staff has been able to more closely identify potential costs associated with the project. Included in these costs are: Flood Control Fees, Testing Services, Architectural Services, Construction Management Services and Geotechnical Services . In most cases, the actual costs are higher than originally estimated. The estimated development costs excluding building construction are as follows : Financing Cost $483, 670 Design 733, 710 Construction Mgmt 255, 046 Testing 21, 500 Soils 10, 845 Zone 7/Utilities 37, 276 Furnishings & Equip. 500, 000 Land 6, 514, 377 Prepaid DSRSD Fees 200, 000 Total 8, 765, 424 In December, 1985, the City issued Certificates of Participation to fund a Civic Center. The issue was sized based on a 25, 000 square foot building, parking and landscaping. It was also predicated on only using approximately 2 . 87 acres of a 10 acre site. Subsequent to that, the space needs were more clearly defined and the City purchased an additional 1. 6 acres from Amador Valley Joint Union High School District. The costs shown above excluded the extension of Sierra Court. The total design and construction cost of that project was $566, 071. This project was also funded with proceeds from the Certificates of Participation. The current building construction estimate was based on the facility at the conclusion of De gn Development. The cost estimate is as follows : Base Construction Cost $7,164, 200 (Estimator includes 12% Contractor Overhead/Profit) Contingency-Design & Inflation 788, 062 (Estimator uses 11% to represent cost increases from the time of the estimate to construction) Contingency - Construction 397, 738 (Harris & Associates recommend 5%) TOTAL ESTIMATE $8, 350, 000 Contingencies It is important to note that 16 percent of the total is in the form of contingencies. If economic conditions are favorable and the extent of construction changes are less, the total construction cost could be less . The intent is to provide the best possible estimate and attempt to anticipate some changes . The Construction Management Firm will conduct an in-depth review of the Bid Documents in order to avoid unnecessary change orders. Harris & Associates have indicated that it is not uncommon for change orders to be in thQ range of 2%. The City has already expended some General Fund monies on the project. These include: Funding Escrow Deposit for 10 acre project site: $115, 000 . Purchase of Valley High School site: 841, 700 $956, 700 It is estimated that the project will require an additional $3. 6 million appropriation, if the current estimates and project scope are maintained. This figure is derived by subtracting the -COP proceeds interest earned, on the COP proceeds,and General Funds already expended on the project, from the estimated cost. AGENDA STATEMENT: Civic Center Complex- Design Development Page 4 At the last CCAC meeting, the Architects presented various changes which would reduce the cost of the project. The areas of the largest savings involve program modifications or changes which would impact the image of the project. A copy of one listing is provided for your reference. Since that meeting, the Architects have continued to look for additional savings . Again, many of the proposals result in changes to the program, or substantial changes to the public amentities . Due to the large deviations, Staff felt that it was appropriate to obtain City Council input on the desire to maintain the approved program. In any case, the Design Team is continuing to evaluate cost savings which will not impact the functioning of the complex. Options The City Council has three basic options : 1. Direct the Architects to proceed with the complex as proposed. Staff would be directed to evaluate funding options including, refinancing of the COP issue, use of reserves, or a combination of funding sources. The Architects will continue to evaluate cost saving measures which do not affect the program. 2 . Direct the CCAC to develop recommended program cuts within the existing design scheme, which will reduce the building cost. If this approach is taken, it may be appropriate for the City Council to conduct a special meeting in which it could prioritize various elements of the program. For example, are the Council Chambers more desirable than the public/regional meeting room? The Architect estimates that these efforts would not eliminate the need for additional appropriations. 3 . The Architect can be directed to redesign the entire complex. This would start the design process over and the form of the building may take a different form. This would result in an additional delay. Recommendation Staff recommends that the City Council receive a brief presentation on the Civic Center Complex Design and the proposed public amenities, discuss the project and pursue Option 1. ADJOURNED REGULAR MEETING - November 18, 1986 An adjourned regular meeting of the City Council of the City of Dublin was held on Tuesday, November 18, 1986 in the east room of .the Shannon Community Center. The meeting was called to order at 7:17 p.m. , by Mayor Peter Snyder. ROLL CALL PRESENT: Councilmembers Hegarty, Jeffery, Moffatt, Vonheeder and Mayor Snyder. DUBLIN CIVIC CENTER City Manager Ambrose gave a brief review of the events that had transpired thus far with regard to the development of Dublin's Civic Center project. Mr. Ambrose introduced Mr.. George Miers, who then introduced his design team. A member of the audience had questions regarding the ratio of the police facility to the City hall size. Zev Kahn questioned the percentage of those cities survey which have a County police facility within their city limits. He stated that he found it obsurd that Dublin is considering 4 holding cells when we have a facility so close. Staff explained that currently male and female police officers are using the same locker room facilities and in addition, officers are not always able to immediately take a suspect to Santa Rita. Mr. Ambrose clarified that the City is the lead agency to provide emergency services. A question was asked with regard to the square footage per :employee as 462 sounded extremely high. Mr. Miers explained that this includes halls, restrooms, Council Chambers, lobbys, etc. A chart indicating the net square foot requirement per employee was displayed. Some unresolved issues exist with regard to space; .for instance, the issue of contract employees vs. City employees. Also, currently the.majority of employees who handle water and sewer (DSRSD) , are located at the sewer treatment plant or at the fire stations. __ The fire services proposal discussed in the past would involve a JPA which would basically keep the existing fire department in tact, but which would provide some office space at the Civic Center for fire inspectors. A number of .personnel would need to be added if the City takes over the water and sewer functions. The Council needed to determine whether or not to plan a facility to meet today's needs or to design for the future. Staff felt .-it made more sense to design for the future rather than have to look at additions in 3 or 4 years. CM-5-239 Adjourned Regular Meeting 'November 18, 1986 • Mr. Ambrose stated that another option that could be discussed would be the potential to lease part of the facility to other tenants. The set-up in the City of Brea was discussed. They lease space to a school district, chamber of commerce, library and other civic-related uses. Mayor Snyder indicated that the project is already financed and the money has been on deposit since December, 1985. He also commented on the fact that the City is presently spending approximately $90, 000 a year on rental space. Cm. Moffatt questioned tax dollars which would be generated by new building over the next year. An unidentified member of the audience questioned the basis of the contract with George Miers & Associates. Paul Rankin, Assistant to the City Manager, indicated that as we move into the schematic design phase, we will have several options which will obviously affect the budget. Zev Kahn questioned what happened when we spend the COP dollars, and also questioned the cost overruns. Mr. Ambrose advised that the interest earned on the proceeds do not have to be used to repay the COP. Mr. Ambrose reported that the City will be hiring a construction management firm and this will be another way of assisting us in managing the project. The major advantage of this site is its size. It offers great potential for expansion to add facilities that have yet to be determined. It was hoped that there would be a lot of response from residents as well as service groups and organizations with regard to what they would like to see in their Civic Center.. Mr. Rankin explained that the Committee has discussed the fact that the site presents opportunities. for outdoor activities. Cm. Moffatt indicated that the building can be designed to accommodate multiple uses . Zev Kahn felt that citizens who were not present at this meeting should be polled for ideas. j John Collins felt the City should forget the whole idea and try to back out as gracefully as possible. He felt that the larger space you give government to fill, the larger -space they will fill. Seth Goldman, representing the YMCA reported that they had conducted a feasibility study to determine the need for a facility in the Valley. They '. have met with some developers and with the City of Pleasanton and felt it was worthwhile to present this concept to the City Council of Dublin. There is a need for a gymnasium due to the Camp Parks facility recently closing. They would propose a family center and health club facility. CM-5-241 Adjourned Regular Meeting November 18, 1986 i ,An unidentified member of the audience questioned the promised facilities to replace the lost soccer fields . Mr. Ambrose indicated that it was his understanding that there will be one additional soccer field, in addition to improved fields when construction is completed. A member of the audience felt that there is a need for a place for teens to congregate other than in the streets. If we, as a City, are to continue to grow, we need to supervise, as well as build a facility. The City should also oversee the project. ; A member of the audience urged the City Council to keep costs of this project down and in addition, keep the streets 'well-kept and repaired and swept. Recreation Director Lowart reported that a teen program is being developed at the present time. There is a sub-committee of the Park & Recreation Commission studying the establishment of a teen center. Dr. Harvey Scudder felt that .no appropriate weight had been given to services which would come to the City as far as programs by residents. He liked the idea of a single stop for services for the community. He suggested consideration of a childcare center. George Miers displayed various charts dealing with such issues as parking, wind and sun factors . The Council indicated that Staff should pursue additional funding options rather than cutting the size of the project, and that the architect should proceed with the schematic design phase including the water and sewer function space with the space program requirements identified in the architect's report. ADJOURNMENT There being no further business to come before the Council, the meeting was adjourned at 10 :30 p.m. � y r ATTEST: City C ekk f CM-5-242 Adjourned Regular Meeting November 18, 1986 r u l t v ' ADJOURNED REGULAR MEETING - January 28, 1987 i An adjourned regular meeting of the City Council of the City of Dublin was held on Wednesday, January 28, 1987 in the east room of the Shannon Community Center. The meeting was called to order at 7 :10 p.m. by Mayor Linda Jeffery. ROLL CALL PRESENT: Councilmembers Hegarty, Moffatt, Snyder, Vonheeder and Mayor Jeffery. PROPOSED CIVIC CENTER SCHEMATIC DESIGN Paul Rankin, Assistant to the City Manager gave an overview of the Civic Center project and explained that at a special meeting on November 18, 1986, the City Council reviewed and approved a program for the Dublin Civic Center. The approved program provides sufficient space to accommodate the City through the year 2005. The total building size required to meet these projections is 45, 377 square feet. This provides space for a police facility, administrative offices, City Council Chambers, and a regional meeting room. Of this total 18, 710 square feet is devoted to the police facility. The 26, 667 square feet within the City Hall facility provides sufficient building flexibility to accommodate the provision of engineering and public works with City employees as opposed to contract employees . Also, space is provided to allow for the assumption of the management of sewer and water functions . Based on a review of the program needs, the design team developed a scheme which will accomplish the various functions which are requirements of a civic center. If the City) Council approves the CCAC recommended schematic design, the architect has indicated a willingness to immediately begin the Design Development phase. Staff prepared an amendment to the existing agreement with the project architect, which will allow initial design work to proceed. A comprehensive agreement covering the remainder of the project will be presented at the regular City Council meeting on February 9, 1987:. i Mr . Rankin explained the interim agreement which would cover work between now and February 9, 1987 . 3 c A model of the proposed Civic Center project was displayed. 3 Mary Comerio gave a brief presentation. a David Gates presented landscaping ideas and concepts which were incorporated into the design . ....+++++- ..................t+++t+++++++....++•1-....++++++......... -+++++++++ CM-5-34 Adjourned Regular Meeting : .January „28, 1987 George Miers gave a brief presentation, displayed and discussed potential exterior and window materials and answered questions . Mayor Jeffery expressed concern that certain outside materials have a tendency to fade . The use of copper was discussed and George Miers indicated he liked to use copper as it gets better as it ages . The key to .evaluate costs is how you accomplish a particular look. Structural costs are generally the highest costs . Cm. Moffatt questioned the loss or gain of heat in the center of the building with all the glass being proposed. Cm. Moffatt also expressed seizmic and structural concerns . Cm. Hegarty questioned the possibility of adding another 2, 000 square feet for a possible television studio for use by Community Television Corporation. Mr. Rankin indicated that it will be necessary to come back before the Council in the future for direction in several areas, for instance, do we build out the space; as the current program includes about 1, 700 square feet for water and sewer services . George Miers felt that it would make a lot more sense from a financial standpoint to add the space in the beginning. Mayor Jeffery felt it would be wise to talk with Community Television Corporation to understand exactly how serious they are with regard to a facility. City Manager Ambrose indicated that Staff will make a formal proposal to the Community Television Corporation. Lt. Severini suggested that some kind of a simple alarm system is needed from the administrative area to the police department. By a consensus, the Council indicated agreement with regard to the design of the building. Cm. Snyder questioned slippage in the time schedule. George Miers indicated the project design was about 6 weeks behind. In addition, one month has been added to the construction time because of the increase in size of the building. Brian Danley with Harris & Associates has been working very closely with George Miers & Associates in developing .a time schedule . on motion of Cm. Hegarty, seconded by. Cm. Moffatt, and by unanimous vote, the Council approved the interim agreement for architectural services,, with the total fee not to exceed $22, 400. This provides for $11, 700 in design services by George Miers & Associates and $10, 700 of work provided by other members of the design team. Reimburseables shall not exceed $750 . The Council authorized the Mayor to execute the Addendum to the Agreement. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ CM-5-35 , Adjourned Regular 'Meeting January 28, 1987 E� DUBLIN CIVIC CENTER i SCHEDULE OF COST REDUCTIONS Category A (miscellaneous items) 1. Delete large fountain Save $224,000 2. Delete gasoline pump 28,000 3. Delete one toilet room at police lobby. 11,200 Let remaining toilet room serve both sexes. I 4. Delete other toilet room at police lobby. 11,200 Let public walk across courtyard to use City Hall toilets. 5. Delete toilet room adjacent to Police 11,200 Department conference room. 6. Delete toilet room at council chambers. 11,200 Change to storage. 7. Delete police carport. 35, 840 8. Delete the major landscape wall that extends 47,040 axially from the building to the Dublin Blvd./ Sierra Court intersection. 9. Replace concealed spline ceiling with lay in 60,480 T-bar ceiling (not recommended) . I 10. Delete special roadway lighting at Sierra 17, 920 Court extension. 11. Delete sloped seating in council chambers. 11,200 12 . Delete terrazzo at entrance lobby and 24,222 elevator. I Category A Subtotal $493,502* ConJc%^�e^cj- —_�e5Zara �..���Ia �oA) 5y, 285 ToT� L b � ���C77 5}51 rN, *All numbers include 12% for Contractor profit and overhead. I,