AGENDA STATEMENT
CITY COUNCIL MEETING DATE: August 28, 1989
REPORT PREPARED BY: Brenda Gillarde, Project Coordinator
SUBJECT: PA 88-144 West Dublin Studies: First Amendment
to the Agreement between the City of Dublin and
WPM Planning Team, Inc.
EXHIBITS ATTACHED: Attachment 1: Draft Resolution approving the
first amendment to the agreement between the
City and WPM Planning Team, Inc.
Attachment 2: Agreement Amendment from WPM
Planning Team, Inc.
At 3: Letter from Marie Cronin
Attachment 4: Property location map showing
site and major ridgeline
Attachment S: Preliminary site plan
RECOMMENDATION" 1) Consider the agreement amendment allowing
, for more detailed studies of the Cronin property
for the purpose of determining residential
development potential.
2) If Council decides in favor of the agreement
amendment:
a) Adopt resolution approving the first
amendment to the agreement between the City
of Dublin and WPM Planning Team, Inc.
b) Authorize the City Manager to sign the
agreement between the City and WPM Planning
Team, Inc. after funds have been received
from the Applicant.
3) If Council decides to not study the
potential for residential development at
this time, no additional action is required
by Council and the West Dublin Studies will
proceed as outlined in the original
agreement.
FINANCIAL STATEMENT: The Applicant is responsible for all processing
costs associated with the agreement amendment,
including but not limited to, planning
consultant costs, contract planner costs and
Staff processing costs. A payment method and
schedule will be developed with the Applicant
and the City' s Finance Department.
DESCRIPTION:
On May 8, 1989, the City Council authorized the City Manager to sign an
agreement with WPM Planning Team, Inc. (Consultants) to undertake the West
Dublin Studies which include a General Plan Amendment, a Specific Plan and an
Environmental Impact Report ("Studies") . The Cronin property was included in
the study area boundary but was to remain undeveloped; therefore, the
Consultant' s workscope did not include detailed studies of the property for
purposes of determining development options.
------------------------------------------------------------------------------
COPIES TO: Applicant/Owner
Eden Development
ITEM NO. (,./ �„t,,. PA 88-144
-1-
Subsequently, Marie Cronin, property owner and Applicant, has indicated
_ she intends to sell the property and the potential buyers wish to develop the
site for residential use. The Applicant has requested the City to include the
Cronin property in the Studies and to evaluate the site for residential
development. A preliminary site plan and soils report have been prepared by
Bissell and Karn engineering firm. The preliminary site plan indicates 143
single-family homes on the 176+ acre site, yielding one unit per 1.23 acres.
Approximately 64% of the site would remain in open space, although 24 lots
have been located on the ridge, the most sensitive area of the site.
Development of the Cronin property raises several key issues that will
need to be examined by the Consultants in the course of the Studies:
- circulation, traffic and access
- visual impacts
- geotechnical constraints
- biological impacts
- ridgeline/open space preservation
As mentioned above, the original workscope prepared by the Consultant
did not include analysis of the Cronin property for potential residential
development. The cost for undertaking this additional work is estimated at
$40,000:
$29,385 - WPM Planning Team costs
$10,615 - City of Dublin Staff and Planning Consultant deposit.
Applicant responsible for cost of processing project.
Examination of the Cronin property for residential development will add
approximately two months to the West Dublin processing schedule. The time is
needed to assess the proposed site plan, alternative development plans for the
site and resultant environmental impacts.
If the Council decides to study the potential for residential
development on the Cronin property, there would be several advantages to
amending the West Dublin Studies agreement, rather than conducting a separate
General Plan Amendment study:
- it would result in a fully integrated development plan for the West
Dublin area
- it would avoid re-analyzing certain issues and minimize delays in the
West Dublin processing schedule
- it would be more cost effective and time efficient
If the Council decides to not study the potential for residential
development on the Cronin property at this time, no further Council action
would be required.
-2-
RESOLUTION NO. - 89
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
-------------------------------------------------------------------=----------
A RESOLUTION APPROVING FIRST AMENDMENT TO THE AGREEMENT
FOR THE WEST DUBLIN STUDIES
WHEREAS, the City Manager has presented an Agreement entitled "FIRST
AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES FOR PREPARATION OF THE WEST
DUBLIN GENERAL PLAN AMENDMENT, SPECIFIC PLAN AND ENVIRONMENTAL IMPACT REPORT
STUDIES; and
WHEREAS, the City Council is familiar with the provisions of said
Agreement.
WHEREAS, Marie Cronin, owner of the property shown on Exhibit A, is
hereby requesting the City to amend the West Dublin Studies Agreement to
include consideration of residential .development for said property.
NOW, THEREFORE, the City Council does resolve as follows:
The City Council approves said Agreement and authorizes the City Manager
to execute said Agreement.
PASSED, APPROVED AND ADOPTED this 28th day of August, 1989.
AYES:
NOES:
ABSENT:
Mayor
City Clerk
Ai. iA F�
CtAajA I�x ',7,1'NX_11�z
WEST DUBLIN STUDY AREA
Major Ridgeline
:l.
M,
N.
IN)
5t
0
Cronin Property
=r \� t: ;rr",i• •.•y-� ,fl.i y.� '�,�—a:•1. �Il.�� .dya •:, �!,!\,,•. •• ai,:.� :c..' `v;
7. 71, Ar
A 7T�
I—R.V
Alt;
<*
-Nrl
u4,i •
At
W I k
Tx
N,
Oil—
-V
L '%1_1 _% 11,
7 •`
%tyi tip`
'N.
"'V$O m
Worth
ip.
FIRST AMENDMENT TO AGREEMENT FOR CONSULTANT
SERVICES FOR PREPARATION OF THE WEST DUBLIN
GENERAL PLAN AMENDMENT STUDY,SPECIFIC PLAN STUDY
AND ENVIRONMENTAL IMPACT REPORT
WHEREAS, the CITY OF DUBLIN("The City")and WPM PLANNING TEAM,INC. ("The
Consultant")are parties to an agreement entitled "AGREEMENT FOR CONSULTANT
SERVICES FOR PREPARATION OF THE WEST DUBLIN GENERAL.PLAN AMENDMENT
STUDY, SPECIFIC PLAN STUDY AND ENVIRONMENTAL IMPACT REPORT(The West
Dublin Study), dated June 20, 1989 (the "AGREEMENT"); and
WHEREAS,the owner of that piece of property currently known as the Cronin
17 to:
an ownership of JS-eacres,has made application to The City to include
such property as a candidate for development in The West Dublin Study; and
WHEREAS, The City and The Consultant desire to amend the AGREEMENT to provide
for additional planning and environmental services necessary to consider the
Cronin property as a development candidate in The West Dublin Study;
NOW, THEREFORE, The City and The Consultant agree to amend as follows:
A. Exhibit "A" is amended by adding thereto the work set forth on Exhibit A-1
attached hereto and incorporated herein, to be included within the Paragraph 11
Scope of Work.
B. Paragraph III is amended by deleting the sum of$559,032 and adding in its
place the sum of$588,417.
Except as expressly set forth herein, the AGREEMENT shall remain in full force
and effect.
Map
I A A C pi. ter
OF•
� '� bT :TT G,a: 27 ElnH
IN VTITNFSS WHEREOF,the parties hereto have caused this Fast Amendment to the
AGREEMENT to be executed the day and year first written below.
THE CITY OF DUBLIN
(a Municipal corporation)
By:
Richard C.Ambrose City Manager
Date:
WPM PLANNING TEAM, INC.
By Ru o___"P k, PreAdent
p R.
Date: G I
PA G& of
EXHIBIT A-1
SCOPE OF WORK AND COSTS FOR
ADDITIONAL PLANNING AND ENVIRONMENTAL SERVICES
FOR CONSIDERATION OF THE CRONIN PROPERTY
AS A DEVELOPMENT CANDIDATE IN THE WEST DUBLIN STUDY
Stage I: Opportunities and Constraints Costs
Task 1: Proiect Initiation
Prepare First Amendment work scope,cost and contract amendment $1440
Task 2: Prepare Base Maps
Prepare additional base map setups 90
Task 3: Data Collection
Conduct additional site visit 480
Task 4: Conduct Intensive Environmental Analyses
Conduct additional slope analysis, constraints and opportunities
analysis, edits,mapping and printing 1630
Task 5: Stage I Meetings
Additional meeting preparation and attendance 340
Task 6: Stage I Project 11-Mana cement and Consultation Process
A d dztional team coordination,consultation and contract
administration 1040
Task 8: Prepare and Evaluate Sketch Plan Alternatives
Ubtaxn and distribute Cronin initial development plan
Review Cronin initial development plan
Prepare alternative development plans
Evaluate alternative development plans
Additional write ups and graphics 4150
Task 10: Stage II Meetings
Additional meeting preparation and attendance 280
Task 11: Stage II Project Management and Consultation Process
Additional team coordination,consultation and contract administra-
tion 1910
Task 13: Prepare Preliminary Draft SP Introduction and Summary
Additional work on text and graphics for project description,eg,
site features, slope analysis,plant communities, development summary,
etc. 645
3 PAM Q�q:-OF.�,
CT •T T C.Q
Y
Task 15: Prepare Preliminary Draft SP Land Use Plan Element
Additional work on text and graphics for development concept,develop-
ment components, implementation, land use plan and illustrative develop-
ment plan 1450
Task 16• Prepare Preliminary Draft SP Circulation Plan Element
Additional work on text and graphics for circulation concept and policy 570
Task 17• Prepare Preliminary Draft SP Community Services and Facilities
Element
Additional work on text and graphics for sewer,water and drainage 670
Task 1.8: Pre are Preliminary Draft SP Q en Space and Landscape Element
Additional text and graphics on open space concept and planning,land-
scape features, and illustrative landscape concept 2270
Task 19• Prepare Preliminary Draft SP Environmental Management Element
Additional work on text for biologic resources,fire protection and
police protection 510
Task 20: Prepare the Preliminary Draft Design Element
Additional.work on design criteria for site planning and landscape
design 180
Task 21• Prepare the Preliminary Draft SP Development Standards
Additional work on residential use standards,performance standards and
word processing 590
Task 24• Stage III Document Preparation and Printing
Additional work for edits and integration,report graphics, word proces-
sing and printing 1015
Task 25: Stage III Meetings
Additional meeting preparation and attendance 140
Task 26• Stage III Proiect Management and Consultation Process
Additional team coordination,consultations, and contract administra-
tion 1735
Task 27: Prepare the Administrative Draft EIR
Additional work to prepare the protect description, summary and EIR
sections on land use and planning, project design, open space and
recreation, impact overview and site redesign alternative 3910
Task 28: Prepare and Print Draft EIR
Additional work in responding to comments and revising the ADEIR 210
Task 29: Prepare Draft GPA and SP
Additional work in responding to comments and revising to Draft SP 640
Task 32: Prepare and Print Final_EIR
Additional work in responding to DEIR comments, word processing and
printing the FOR 1530
• Task 33: Stage IV Meetings
Additional meeting preparation and attendance 490
Task 34: Stage IV Project Management and Consultation Process
Additional team coordination,consultations imd contract admuustra-
tion 350
Task 35: Stage IV Meetings
Additional meeting preparation and attendance 210
Task 36: Prepare Res once to Planning Commission Comments on Draft
Gx A and SP
Additional rk in responding to Draft SP comments 280
Task 37: Prepare Additional GPA and SP Refinements
Additional work in making SP refinements 70
Task 40: Prepare and Print__CEQA Findings and Overriding Considerations
Additional work in preparing findings on significant impacts,mitigation
feasibility and overriding statements 280
Task 41: Stage V Pro.iect Management and Consultation Process
Additional team coordination,consultations and contract administra-
tion 280
TOTAL ADDITIONAL COSTS $29,385
5 PW OF
9T :TT 68, AU
JOHN and MARIE CRONIN
P.O. Box 2001, Dublin, CA 94566
8989 Dublin Canyon Road, Hayward, CA 94546
cronin ramb 415/582-2254 or 415/828-6183
dublin August 13, 1989
REtElVED
City of Dublin , Planning Dept. AUG 141989
% Brenda Gillarde , Froj . Coordinator
6500 Dublin Flvd . Suite D DUBLIN PLANNING
Dublin Ca . 94568
Re : Application to participate in the West Dublin GPA/SP Study
Dear Nis . Gilla.rde ,
On 8/5/89 I received your pack for application to "the study" .
To gather all the information requested in one week was
difficult , but I believe the enclosed is sufficient for 8/28/89
City Council Agenda .
This is a. formal request to the City of Dublin to includ6 the
Cronin property in the West Dublin GFA/SP Study. The property
Is 179 Ac .t , Assissor' s Farrel #941-10-5, located North-West of
"Hansen Hill Development", see map attached . Development inten-
tio;, is for residential.
As requested , enclosed is :
1 . Planning application form
2 . Processing Fee agreement form
3 . Initial processing cost plan from FCA, Livermore
4 . Preliminary Study Flan, from Bissell & Earn by 5 P.N. 8/14/89
5. Mailing list of persons to be kept informed
6. Aerial photographs to be submitted this week.
7 . Preliminary Title Report and location maps
If you have any questions, please contact me at ( 415) 828-6183
or message phone 582-2254.
Sincerely ,
iarie .,ron n , Applicant
WEST DUBLIN STUDY AREA
';•s•Ir �;1,,;,;' '.� :`lid°.-
Major Ridgeline
-` ,�nrru�'.' .1 � LLS).�"4• �irwl:i,.. '�I �� c.
Cronin Property
,1�' •�Iu 1 11 1.. ? 2jl;'r vpf c�n,::'•;� � `,, t: 1
C/`'f 11111\d1G%•��Jv+"1•\�. ` r \�_:. �d='Z'•,� i 7 �'°:��-. .'/ 41�:.:,Q.� ii l _ �-�` _ .,i�- �\ r` ,2
is/t��w,r � .:CO__Lj � r �•r 'f�S' y� .7: .'CIj t, {. a.� ,'O .o�',rui)% �2•, ,'0��. �y�1��•,�ri••:�-�- __
+jQ - `, s •VC = jam
A3.L.�_ r.,5'_ • -.f >~� ;� O- a .,:•.•;.i. �.
' - i/r __3!!,11=-!rt_- .�a. �,�;`+{C'�:� ,,.•-.'7 ;;1 1°•'' .r `'\ .J�'�: � ,.Ir,•p`�.._ :,ldo.,•.:••' �,L:.yt y�f'
/,� )i:'.!.f 1, ♦ • ,°'♦, j' 1:` I.:�' '} ,•^ i1:o , J°r vu•, , o �O o- i��.
/ °(ZNr ,1r rid oo. ii'�.��-`�N/-��' �.� � � ��^� ♦ ...i;__ 1 ... � , ��//r- '.�.0_ III\:of c�
• (r1�U: n 11,1j. ') .1:7w. •!�[�Fy'J�"'r. l! t �, rd i:..(�; _
!r �'��. {f`+.Iy�^•�\I' ji ��..i ri 11\: •r�,91q�\„v r.%�1/a ��i�+l,'?�' "�t �';o
.(/�—.`_I.-�8;.:�1.E:5,fi' "�� ,(� �:a'✓ -•-r•. , ... �. 1:.� � x,11 '�L.
'V%"°=�:;�y5c\� �:J' C �ly ( r:. i•{ O.:` ��. � ',�:.��iry���•'�,`�� O: -\ultij!r., -�n
�=:��j •• .v '! z• ?;.i ,{ l,l •r.'• ,1,. "<�,� •l' -o :.�::'.,w, o :•. •.;� �l l '''o. '��'';\1�'.• _ �.�
-'�1: +: _ y- d'.r�y .•fir,:Y n •,,•. �/..�' ." �' n.;�. ,✓ ,�� ♦ �J� G= '� r' - . �,•.:� � -_ _
J?lt _� \ ,.. t`(,,lt� ,���,;n�•iY` � �E' L• ,.� ...:.i:iL%'•-d .1`'``\. •;` �,:. 1',r :•ll \:_�_..� -
moon
.y! -'u:'.•:..yia7:':4�' /'''� {TM, r I,• .�•>r,..
,j�-'���t,.. .�.�':�(-7 r .••!�9?'1':� / 5!';:.n{'G. ,'�St. •J�.} '+ M \\��I � o- ,1,': ��•iiil:::.'' \n��N\��• �~`'
�'�/m 11• ��C+'l�i�• ��', (:1' •�. ••�.. SR:i Y'�_�r::,,;1 Vhf.• ,1 \\I/\`OI� �' - ,.'1 1!° .G�� ,`.���' i.
•!11 it Y '✓�'..•wY,9ih .� _1•^r=•�!�`'��, iY r, •� .. ��1,� •I ir�� ,...j.•1' \�.';�'c .,/S \
kRV
�..���a✓;: y�,!'t�q�{.'` i;.`. '°f or'�z" ';ir:' .` 4:L` � V,� �r�` _ _ ,.11\ �\�� ,�\� � _ :�i �.
+�' .` `-L�.^!:: �;...�.. .'T'�'fiwxw •1 s 't O I,�1., � '��1� r/11�\.��- ,'11••�: ra7
�� O �A •••-i' • :111
•. ♦ .++-`a`�ry;:J !a�./ �:1 1: �5� .•NUJ' r• 1 .�V ~�i,••�.wt,sl � �1 "��:'��1111j°\Itl,/> �`�,�'� :.�/�`�� I i.:
r � ;trf-%,1 :.-..'.�"' •,1'.11111..�;m "'oi;:. � -.'rli:,�•� : � .�': ♦ O ,r'.F� �1.�, � v((i"n - 1 !:111 �/l'-P.y%��
3ci �::. 1(• �'�-� ��.!+fi,tl�� "�•�.' V ,�..'l••lI�•' :'+.1,\,.• ;f• ld•..1:4`U':. _\ i� \.•.- y; ^• ,^
v .• °� �. :a=- /' ��illlll.,u'pit � �:•i,i>,I,u:a�:;7j�.::; r, X01 ..�:6.� ii •� �= 1
ti � o %iai., /rd, •\Ilr,(d't;'il'd1' .(p,•: \ J=I .:4.. y`.\. _ n';� �� �„�".'=.,��\
`l`
id:. "a'ri.':. •i�.::•rl,.. ..0. :%.f'.�• ,1,1 .Ilr: h ��
'IC .dr.., ililr�. ;4,�i1. .1•" ilu ,•�S,:ylrll r... f 1 r4
• t^ •F,r•ry.iiu li :;}..! �.I 111 ".L• I ,L- .r_�- r.r..l.l1,,:}. t
'�. 1 tlru'('T`fw,.; - �'r• ! � ,C�•' _ _
`0°` ,•plGr '3' �I�•7.d:, 111,E /ham:. IC•. "` .-' .♦J4R,
'!11'�I! .d 11 '�,i�,"•.,nn:'' a. ,� rd.,....�, i -. \IIII',,,4:JRo. 'ate_:.--_'�.<:v. :�r."�..� �,`�• �e.
'+(!I/1�•.:�I ,.. _•�u ,./„�pr, ♦, jn[ �.:1',::Y111�•�:..y. -:1°�'rr ,,. � �� ?-- a ::!•.. ..,(,�`,r �:!`'-' .ce-7=
-r, '/1• r�(\.�•"•”-'r"T' '�rZ"i'=' Trn. 11.•x:.! �, � ,� ♦�1� -�Ilyf,;�/ /i?^;`. .�.i�. __:�_::= - •�� ,, , �' .
`I � r111\ ,�.;.,-•yrr � \ .; }�a
:
�� .. 0=$: � ... '•,q��: .��'•9�•i/: ,�/��rf(r'/l0 r li iir ��`\\ �=�
/
✓4r..I '!�°C'J��Jdd�,,�I�u' 'u„u'.� _':a;^` 'y 1 r �•�'4 r11U'i :�� J'lu'•�(M•;'�W'uC�,;;.. \ �� q}
i1� 1 o w n•..��, b°''I• .-nc,`��'fir%L+qulU}�.a ,ll• ��_ i_ .,ua,.
-`•.��L;,.�C �JJ�,y-r�~ "ri,::..•u�:: ,' 1 '_:I�n,: ,.�. �,,;�.-_ -•,-a-t,,,'11u„t,,.
Aorth
��� � V� .`-- �'•' �•it �� �• ��;�
ti: Nq
ZN% IR
RECEIVED
�""s:: �i� `!. �~. `�� t.�� psi. �/ �:. t, w x. �t �t�•�
�' •7 � e,1••� � �'•i ':7r�� '�u�����..TfIT�•�i� l+i� I -, �d�I� �,11j
d; •4.IY,A• •�- '� 'w I.�..3' '�I�� ♦.rr1• J .�f-���� � •,i.;'-•'•.;rlt;?9�1g i3�1
��' ,.t •.• '�:=� ;ate l
AUG 231989 ��:• 1� ,:`:..�� :
DUBLIN PLANNING
LAND USE SUMMARY
LAND USE ACRES X UMTS Ar .��\ �` _:�>�•�'i �. �: �'� .
RESIDENTIAL 55.9 31
SPhase.m,rlb•nnl 22.7 a'•�`Nit-
Phase 0 77.2 _� 4 _ � >\���� •ni:�..
OPEN SPACE 115.1 64 •��g1 \ \:-• 2.
ROADS ROADS P 4 e,r ,' :�. \' \• ty'�°�''• V ._1.F'1
TOTAL SrrE 179 100 107 _ �/ _ J1.J' •�- -''-: -• -
Y` `5;7�;�',�
e^t1C��4 t]MDL�tI r1�1., CQ ••` '{,�.;';t4
Blesen�l 8 Kem,Inc, ,; ��