Loading...
HomeMy WebLinkAbout8.2 Dublin Blvd Eastern Extension 00; 't CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 28, 1989 SUBJECT Easterly Extension of Dublin Boulevard - Dougherty Road to Southern Pacific Railroad Corridor (Report by City Manager Richard Ambrose) EXHIBITS ATTACHED 1 ) Proposal to Prepare Preliminary Redevelopment Feasibility Study from Economic and Planning Systems dated August, 1989 2) Adopted Plan Lines for Dublin Boulevard Extension and Connector Street to Scarlett Court RECOMMENDATION 1 ) Authorize City Manager to execute an agreement with Economic Planning and Systems to undertake a Preliminary Redevelopment Feasibility Study not to exceed $8, 750 2 ) Authorize a budget transfer from the Contingent Reserve to the City Managers Budget in the amount of $8, 750 . FINANCIAL STATEMENT: Estimated Study cost $8, 750 . A Budget transfer will be necessary. DESCRIPTION On February 22, 1988, the City Council considered a request from John P. Moore of J. Patrick Land Company to investigate the possibility of using an assessment district to extend Dublin Boulevard from Dougherty Road to the Southern Pacific Railroad corridor. The City Council approved the request and authorized Staff to proceed with preliminary assessment district engineering. On April 25, 1988, the City Council adopted Ordinance No. 12-88 which established right-of-way lines for the extension of Dublin Boulevard between Dougherty Road and the Southern Pacific Railroad Right-of-Way and for a street connecting the Dublin Boulevard Extension with Scarlett Court. As part of that meeting, the City Engineer presented a preliminary estimated cost of $8, 200, 000 for acquiring property, relocating businesses, designing and constructing roadway improvements. Since April, 1988, the Public Works Director and City Attorney have worked with Mr. Moore in developing some assessment district alternative concepts. As a result of those discussions, a concept was developed which included the following elements : 1 . An assessment district should be formed which includes approximately 50 + acres . Properties included within the district would be those properties which would directly benefit from the new roadway improvements . 2 . The improvements as proposed, are oversized beyond those circulation improvements needed by the property owners within the Dougherty Road/ Scarlett Court area. 3 . An integrated financing district would be formed which would require eastern Dublin property owners to contribute their proportionate share of the Dublin Boulevard extension improvement costs. These contributions would be paid only at such time that property owners had received a land use approval from the City. 4 . The property owners within the Dougherty Road/Scarlett Court assessment district would initially carry 100% of the improvement costs and would be reimbursed when east Dublin property owners received land use approvals . -------------------------------------------------------------------------- �. COPIES TO: John Moore ITEM NO. t AGENDA STATEMENT: Easterly Extension of Dublin Boulevard Page 2 Mr. Moore agreed to discuss this concept with those affected property owners to determine if a majority of the property owners would be willing to participate in an assessment district as described above. As a result of Mr. Moore' s discussions with these property owners, he concluded that an insufficient number of property owners would be willing to participate in an assessment district as proposed for the following reasons: 1 . Property owners were concerned that they might be required to pay a disproportionate share of the roadway improvement costs. 2 . Property owners did not feel they could afford to front the entire cost of the district for an undetermined period of time. 3 . What guarantee did property owners within the proposed assessment district have that east Dublin property owners would receive land use approvals and reimburse local property owner for the oversized portion of the improvements. Since it is unlikely that a local assessment district could be formed to initially fund 100% of the costs of the easterly extension of Dublin Boulevard, it is apparent that the : City must pursue other financing alternatives, if the extension of Dublin Boulevard is to be accomplished in the near future. Staff has met with representatives from the City Attorney' s Office to review financing alternatives and concluded that the City should consider exploring Redevelopment as a means of financing the oversized share of the cost of improvements . Attached to this report is a proposal by Economic and Planning Systems to undertake a Preliminary Redevelopment Feasibility Study for the City. The Consultant' s proposal would define redevelopment area boundaries, forecast tax increment revenues, and evaluate financing alternatives to accomplish the City' s objectives. It is Staff' s recommendation that the City Council authorize the City Manager to execute an agreement with Economic Planning Systems to undertake a Preliminary Redevelopment Feasibility Study at a cost not to exceed $8, 750 . f WORK SCOPE UNDERSTANDING OF THE STUDY The area of primary interest in this study(the study area)is comprised of about 80 acres located east of the Dougherty Road/Dublin Boulevard intersection. The area is developed in a variety of light industrial, retail and automotive uses,including some low intensity and marginal uses. About 15 acres of the area is vacant,but the vacant land currently has very poor accessibility. One of the property owners in the study area has been seeking to establish an assessment district to finance the extension of Dublin Boulevard eastward through the area. Extending the arterial would open up the vacant property and allow for fuller utilization or redevelop- ment of some parcels that are already developed. The extension of Dublin Boulevard would also provide substantial benefits for properties east of the study area. Through a land swap involving Alameda County,the U.S.Army and the East Bay Regional Parks District,the County acquired a developable property with freeway frontage which would be accessed by the extension. As part of the swap,the City of Dublin received a 12-acre right-of-way for the further easterly extension of Dublin Boule- vard. The extension of Dublin Boulevard would provide arterial access to the substantial development planned for the East Dublin area,and would meet the requirement for a paral- lel route that is a condition for construction of the Hacienda interchange. Because the East Dublin area would benefit from the extension,it is appropriate the study area shoulder only a portion of the cost of extending the road.The City has not been success- ful in establishing the assessment district to date. The purpose of this study is to provide a preliminary indication as to whether redevelop- ment is feasible and if it is a potentially viable solution to funding the needed improvements. Once tax increment potential has been forecasted,it will be possible to evaluate financing alternatives that incorporate tax increment funds in combination with other funding sources. Ultimately,the financing plan may incorporate tax increments assessments,land dedica- tions,and short term financing from public and/or private parties. l r� WORK PROGRAM Our work program will consist of three principal tasks: l)define the prospective redevelop- ment area,2) forecast tax increments;and 3) evaluate financing alternatives. Each of the op- i tasks is described in more detail below. TASK 1: DEFINE AREA BOUNDARIES The legal basis for establishing a redevelopment area,as well as,the configuration of the mun area,depend on the blight findings that are required by California Comity Redevelo ment Law. p- The State Legislature has declared that: (...)A blighted area is one which is characterized by one or more of those con- ditions set forth in Sections 33031 or 33032,causing a reduction of,or lack of, _ proper utilization of the area to such an extent that it constitutes a serious physical,social, or economic burden on the community which cannot rea- sonably be expected to be reversed or alleviated by private enterprise acting L alone(California Community Redevelopment Law,Section 33030). Using these blight definitions as a guide,we will work closely with City staff and interested property owners,as appropriate, to identify a prospective redevelopment area that appears likely to meet the tests for blight as well as other statutory requirements. At this point in the process,we do not propose to document blighting conditions in detail If the City elects to pursue adoption of a redevelopment plan,it will be necessary to compile such documentation as part of the adoption process. TASK 2: FORECAST TAX INCREMENT REVENUES _ Economic and Planning Systems will modify its tax increment model to develop forecasts for the prospective redevelopment area. The tax increment model simulates three different com- ponents of assessed value (AV) growth in the project area: • the maximum two percent annual AV increase permitted by the State Constitution since the passage of"Proposition 13'; • AV added by reassessments at the time properties are resold or upgraded;and, • AV added by new development which can reasonably be expected to occur in the project area during the project implementation period. Li � f 2 We will collect assessed value information on the area to estimate base year assessed value by parcel. In order to meet the short time frame of this study,we will need assistance from the City in compiling the assessed value of parcels in the area. We also will collect from the City and property owners information on any new development projects that may occur within the area. These data,together with assumptions on property turnover,rents,appreciati on,inflation and other data,will be input into the model,which will then be used to produce year-by- year forecasts of tax increment revenues. The resulting forecasts and the underlying data and assumptions will be summarized in a technical memorandum to the City. TASK 3: EVALUATE FINANCING ALTERNATIVES Utilizing the forecasts of tax increment revenues,together with any information on assess- ments that has already been developed,we will work with staff and interested property owners to evaluate financing alternatives that incorporate tax increment financing. We will look to the City Attorney to provide input on the legal aspects of financing alternatives. This task will assess the need for short term interim financing,evaluate ways to utilize tax increments in combination with an Integrated Financing District or other reimbursement arrangements,and identify any other financing arrangements that may be workable. r-. I ' 3 SCHEDULE AND BUDGET We recognize that time is of the essence in the completion of this study. We will make every effort to complete the tax increment forecasts within three weeks of receiving authorization to proceed. We then will work with the City and interested property owners to evaluate financing alternatives in a timely fashion. A frequent source of delay in completing the tax increment forecasts is acquiring the assessed value data for parcels in the subarea. We ask that the City assist us by providing the assessed value data or, at the least, giving us a complete listing of the parcels in the area. The cost of EPS staff time is based on the amount of time actually spent on the study,billed at standard hourly rates. Expenses,such as for copying,delivery,and mileage,are billed to you at their cost to us;invoices are submitted monthly and are payable upon receipt. The estimated costs of the study effort,by task,are summarized below. TASK COSTS TASK 1: DEFINE AREA BOUNDAIU-ES $1,500 TASK 2: FORECAST TAX INCREMENT REVENUES 3,750 TASK 3: EVALUATE FINANCING ALTERNATIVES 3,500 TOTAL $8,750 i i i i 4 r^� I i ECONOMIC AND PLANNING SYSTEMS it i 1 . I STATEMENT OF QUALIFICATIONS 'd A I i I z .1 t t 1 t ABOUT ECONOMIC AND PLANNING SYSTEMS Economic and Planning Systems is a land economics consulting firm experienced in the full spectrum of services related to land use planning,real estate feasibility analysis,fiscal impact analysis, public finance, and government organization. The firm was founded in 1983 and currently employs a diverse group of professional staff members including specialists in land use planning,real estate,public finance,survey research,and computer applications. During the past five years EPS has served over 100 public and private-sector clients in Cali- _ forma and other western states. Clients have included cities,counties,special districts,prop- erty owners,developers,asset managers,and land-use attorneys. Specific areas of consulting expertise and experience include: • Real Estate Market and Financial Feasibility Analysis • Fiscal and Economic Impact Analysis • Public Finance • Land Use Planning • Government Organization • Financial Negotiations • Revitalization and Redevelopment • Survey Research The firm excels in its ability to synthesize its areas of expertise into concise analyses that dis- close risks and impacts, support decision-making, and provide solutions to problems associ- ated with land use planning and development. The firm's expertise in advanced computer data bases and modeling supports its ability to analyze complex problems and clearly ` identify alternative solutions. The professional staff of Economic and Planning Systems possess a broad range of experi- ence in all aspects of land economics,public finance and planning. Each of the firm's princi- pals has over ten years of professional experience providing consulting services to public and private-sector clients. The firm is organized to allow strategic application of each mem- ber's specific areas of expertise to meet clients'needs in a timely and cost-effective manner. AREAS OF EXPERTISE The creative combination of skills drawn from its areas of expertise allows Economic and - Planning Systems to effectively support decision-making and problem-solving for both pub- lic and private sector clients. The capabilities of Economic and Planning Systems in each of these areas of expertise is described briefly below. Real Estate Market and Financial Feasibility Analysis Economic and Planning Systems utilizes real estate market and financial feasibility analysis in a wide variety of applications, including development project programming, project feasibility analysis, formulation of strategies,for property disposition,downtown revitaliza- tion and redevelopment, specific and general land use planning, and economic analysis of impact fees and other public finance options. The firm's market analysis efforts range from simple evaluation of existing market informa- tion to detailed market forecasts that utilize consumer surveys and other primary research. Its proprietary computer cash flow models are capable of estimating financial returns and project feasibility under a broad range of project,financing,and disposition alternatives. Fiscal and Economic Impact Analysis Economic and Planning Systems' fiscal impact studies forecast local government costs and revenues that result from development projects or local government actions. Its economic impact studies forecast broader socio-economic variables such as employment,income,retail sales,property values,regional dollar-flow,and industry sales. The firm's fiscal and economic impact studies are designed to quantify and disclose potential impacts and identify practical mitigation measures that address these potential impacts. Fis- cal and economic impact studies are typically completed within the context of land use plan evaluations,financing studies,financial negotiations,and environmental impact reports. Public Finance Economic and Planning Systems provides a range of services related to the financing of infrastructure and capital improvements associated with land development. These services include: forecasting demand to assist in project design,sizing and timing, forecasting poten- tial revenues; allocating capital costs among participating properties; analyzing the distribu- tion of financial burden; assessing the impacts of capital financing alternatives on project feasibility and public agency budgets; participating in public finance negotiations and draft- ing of development agreements; formulating fee ordinances; and preparing financing plans that make creative use of applicable finance mechanisms. Government Organization Economic and Planning Systems combines its expertise in fiscal analysis,public finance,and land use planning with a thorough knowledge of local government operations to evaluate the feasibility and impacts associated with changes in government organization, such as annexations,municipal incorporations,and special district formation. Economic and Planning Systems typically prepares detailed budgets for the jurisdiction in question to test alternative organizational options and growth projections. The firm's princi- pals actively participate in the inter-governmental negotiations to assist in the creation of new jurisdictions. Land Use Planning Economic and Planning Systems combines a thorough working knowledge of land use plan- ning and regulation practices with its economic analysis expertise in its contribution to Gen- eral and Specific Plan programs. The firm's roles in land use planning programs typically include economic and demographic forecasts; market inputs to plan formulation; develop- went of land use information systems for analyzing project alternatives; land use policy development; fiscal and financial evaluation of plan alternatives; development and evalua- lion of open space and agricultural preservation strategies; and formulation of implementa- tion programs. The firm stresses rigorous quantitative analysis and the development of policies and pro- grams that assure economically and fiscally sound land use plans. Financial Negotiations Balancing the public fiscal and environmental benefits of a real estate project with its private financial feasibility often requires negotiations between agencies providing public services and the proponents of the real estate project Economic and Planning Systems provides strategic planning and technical support for such negotiations, utilizing its expertise in development economics, fiscal analysis, and capital improvement financing to facilitate agreements such as CEQA mitigation measures,development agreements,tax-sharing agree- ments and financing plans. The firm's reputation for objective analysis and its understanding and working experience with public and private-sector clients allows the firm to be successful in representing either the public or private side during such negotiations. Urban Revitalization and Redevelopment The revitalization of declining downtown areas requires the strategic combination of market- ing,business development,and the amelioration of physical and market constraints to create a vital mix of business, civic, and pedestrian activity. Utilizing market research, real estate feasibility analysis and organizational evaluation techniques, Economic and Planning Sys- tems takes a lead role in working with urban designers, transportation planners, and other professionals to assist local agencies in formulating effective revitalization strategies. The firm also serves as a financial consultant to redevelopment agencies, assisting in the creation of new agencies, formulation of redevelopment plans and financing programs, and negotiation of tax increment sharing agreements. Survey Research EPS conducts survey research as a component of market studies and other applications, including public finance studies, land use policy analysis and litigation support. Survey efforts range from simple structured interviews designed to provide cost-effective, system- atic collection of information to formal random sample surveys designed to support expert witness testimony and to withstand rigorous legal scrutiny. I ! ECONOMIC AND PLANNING SYSTEMS PROJECT EXPERIENCE i REVITALIZATION AND REDEVELOPMENT Downtown Revitalization Strategy City of Pleasanton,California Conducted a comprehensive economic and marketing analysis of downtown Pleasanton and formulated strategies to revitalize downtown commercial activity. Analyzed trends in downtown commercial activity based on a detailed inventory and historical analysis of busi- ness mix; explored consumer motivations toward downtown through shopper and household surveys; evaluated business prospects through interviews with merchants and property owners;projected market potential of various types of goods and services;analyzed the real estate financial feasibility of private redevelopment; and formulated a program of improvements and marketing strategies to improve the downtown market conditions. i � Downtown Revitalization Study Walnut Creek,California Led joint economic and urban design study to identify revitalization strategies for Downtown Walnut Creek. Surveyed merchants, property owners,shoppers and households to determine perceptions of and attitudes towards the Downtown area. Compiled a compre- hensive inventory of Downtown business activity and market conditions. Evaluated retail market support and tenant mix of Downtown retail in context of surrounding commercial activities, including a major regional shopping facilities. Conducted series of town meetings to obtain input from citizens and other constituent groups in formulation of plan. Recom- mended a strategy to enhance the image and identity of Downtown and to forge a stronger link to the regional market while enhancing the role of the Downtown as a center of com- munity activity. Recommended specific steps to establish organizational framework and program activities including retail management, aesthetic improvements and key retail development. Belmont Downtown Revitalization Study Belmont,California Addressed the need to invigorate the commercial activities of downtown Belmont. The anal- ysis included the identification of community objectives, an assessment of retail conditions in the trade area for the Downtown, analysis of opportunities and constraints for retail and office uses,and recommendation of alternative revitalization strategies. i f " Redevelopment Financial Negotiations Novato, California Working for the Novato Redevelopment Agency, EPS conducted a variety of financial analyses and assisted in negotiations with the project developer and taxing agencies as part of the adoption process for the Hamilton Air Base project. EPS developed a real estate finan- cial feasibility model of the Hamilton project to simulate the financial returns of the project EPS also analyzed the ability of the project to support assessments and other financing mechanisms. These analyses were used to identify the level of tax increment subsidy needed and to negotiate a corresponding tax sharing agreement with the County and an Owner Par- ticipation Agreement with the developer. Redevelopment Feasibility Analysis Roseville,CA Prepared a feasibility analysis and Report''to Council for a proposed redevelopment plan which included an auto mall, a regional shopping center and downtown revitalization efforts. Analyzed auto mall feasibility issues in relation to the economic conditions and blighting influences in the proposed redevelopment area. Evaluated the financial require- ments of preparing the regional mall site for development. Incorporated these analyses along with strategies to revitalize downtown into a formal report documenting the rationale for redevelopment, strategies to accomplish the purposes of the plan and the financial feasibility of the plan. r ° i . REAL ESTATE MARKET ANALYSIS AND FEASIBILITY ANALYSIS Comparative Demographic and Market Analysis Tri-Valley Area of Alameda and Contra Costa Counties Analyzed the demographic, labor force and housing trends underlying the demand for office and commercial space in the City of Pleasanton, and in eastern Contra Costa and Alameda Counties. Constructed comparative assessment of the locational advantages of these areas for office users for presentation to prospective tenants and land purchasers in Hacienda Busi- ness Park Central Contra Costa County Office Market Analysis Pleasant Hill,California Forecasted the market for office uses in the Central Contra Costa County area,and analyzed the competitive position of an office site in the Pleasant Hill BART station area. The report was used as part of a package to secure a joint venture partner for developing the site. Industrial Property Disposition Study Concord,California Evaluated disposition options for a large industrial site in eastern Contra Costa County and recommended a strategy that optimized the objectives of the property owner. Evaluated regulatory and site constraints and identified candidate uses; projected the demand for alternative industrial uses; analyzed existing and future competitive supply; evaluated alternative entitlement options and marketing strategies; projected rents, absorption and residual land value under alternative development/disposition plans; and recommended a disposition program. Residential Market Analysis Tri-Valley Area of Alameda and Contra Costa Counties Authored an in-depth study of the markets for and rental housing in the southern portion of the I-680 corridor, including Pleasanton and San Ramon. The study forecasted the demand for housing generated by economic growth in the Tri-Valley and in employment centers else- where in the region. Market segmentation, consumer preferences and competitive supply were analyzed, under-served market niches were identified and the absorption of specific housing types in particular price ranges was estimated. i ! FISCAL IMPACT ANALYSIS ' Albany Waterfront Plan Albany,California Prepared a fiscal and economic impact analysis of a development plan for the.Albany Water- front area. The proposed project included 2,000,000 square feet of office space, 165,000 square feet of retail uses, 980 residential units, and 1,000 rooms in three hotels. Project Alternatives included 4 lower densities of development with park uses and one higher density alternative. The analysis examines existing market conditions and presents findings regarding market absorption for the various proposed uses. Fiscal and economic analyses were used to determine the impacts of the project and alternatives upon the City of Albany. Oakhurst Country Club Clayton, California Evaluated the fiscal impacts of a proposed residential/commercial/golf course project as part of the project EIR. The impact analysis included evaluation of fiscal impacts on land- owners, future residents, and existing public agencies serving the area. Detailed mitigation measures were developed that provided a means by which the project could finance major onsite and offsite capital improvements. Hillsdale-Meadows Specific Plan EIR San Mateo,California 1 - Estimated the fiscal impact on the City of three potential development alternatives for the Specific Plan area, which includes Bay Meadows racetrack and Hillsdale Shopping Center property. Identified the development alternative that generated the most surplus operating revenue and recommended a financing strategy to fund over$20 million in required trans- portation improvements. Mission Bay Project San Francisco,California Preparing a comprehensive fiscal impact analysis for a large mixed use development. The proposed project includes 4.2 million square feet of office space, 2.8 million square feet of research and development space and nearly 8,000 residential units to be built over a 25 year period. The analysis included preparation of a 25 year forecast of City costs and public revenues. This information served the negotiation of a Development Agreement as well as providing public disclosure of the fiscal costs and benefits of the Mission Bay Project. I . PUBLIC FINANCE Contra Costa County General Plan Review Contra Costa County,California Participating on the team that is revising the Contra Costa County General Plan. Specific responsibilities include development of a computerized land use data base being used to drive a County-wide transportation model, fiscal and financial evaluation of land use alternatives, preparation of a Community Facilities Element which includes recommenda- tions regarding how required improvements should be financed. The financing analysis includes consideration of how funds from a 1/2 cent sales tax override would contribute to overall transportation system improvement financing. Transportation Impact Fee Ordinance Orinda,California Prepared a study that led to the creation of a Transportation Impact Fee ordinance. The Study included evaluation of needed transportation and parking improvements,a forecast of commercial and residential development, estimation of potential fee revenues,an evaluation of potential economic impacts of fees,and preparation of a draft ordinance. Transportation Improvement Financing Plan Danville,California Prepared an evaluation of financing strategies for major transportation improvements in downtown Danville. The evaluation included a ten-year projection of commercial floor- space, identification and quantification of available financing mechanisms, and recom- mendation of a financing plan. The recommended financing plan included creation of a transportation improvement fee to be levied upon new commercial development. Mission Bay Financing Plan San Francisco,California Preparing a financing plan for the Mission Bay project,a large mixed use project. The project requires over $200 million of improvements including alterations to an interstate freeway, basic infrastructure improvements, transit facilities, new open space and parks, and com- munity facilities. The project also includes a program to provide a large number of affor- dable housing units. The financing plan includes an assessment of the project's ability to pay for needed improvements, selection and prioritization of improvements and the recom- mendation of specific funding and financing mechanisms. . i LAND USE PLANNING ' Danville General Plan Danville,California Prepared a new General Plan for Danville, a recently incorporated town in the San Ramon Valley of Contra Costa County. The effort included land use research,policy development creation of an implementation program,and production of a General Plan document. _ Sonoma County General Plan Update Sonoma County,California Provided an evaluation of population and employment trends in Sonoma County as part of an update of the county's General Plan originally adopted in 1977. The effort included a 1972 to 1982 population and employment trends analysis and projections through the year 2000. The impact of emerging high technology industries was specifically addressed along with commuting trends both within the county and to jobs in adjacent counties. Old Blackhawk Road Specific Plan Danville,California Prepared a Specific Plan for a small residential area within the Sycamore Valley area of Dan- ville. The Specific Plan involved establishing development standards and design guidelines for an area that is expected to be converted from a rural residential area to a more densely developed residential neighborhood in keeping with surrounding development. North Natomas Agricultural Land Preservation Strategy Sacramento, California As part of planning for a large new urban area north of Sacramento,prepared a strategy for preserving agricultural land on the periphery of the developing area. The strategy recom- mended adoption of preservation policies in the General Plan,creation of special zoning dis- tricts, and the establishment of a fee benefit area to purchase of development rights from surrounding farmland. Jobs/Housing Forecasts Walnut Creek,California At the subregional level, prepared comparative forecasts of the relationship between future employment growth, housing supply and labor force availability in the commute sheds serv- ing Walnut Creek and five other major Bay Area employment centers. At the local level, projected the occupational make-up, income distribution and housing demand of Walnut Creek's future labor force, and compared housing demand to projected supply by price category. Both forecasts were used to evaluate alternative land use policies as part of the City's General Plan update. GOVERNMENT ORGANIZATION Windsor Incorporation Feasibility Study Sonoma County,California As part of an evaluation of incorporating a growing urban community,a financial feasibility analysis was conducted. The analysis began with a report that identified possible "fatal -- flaws" that would make incorporation infeasible. No such flaws were identified,and hence, a complete feasibility study was conducted. The incorporation effort is proceeding. Templeton Incorporation Study San Luis Obispo County Prepared a feasibility analysis of incorporating a small rural community. The analysis evaluated the feasibility of incorporation under several boundary alternatives and growth rates. A detailed public services and financing plan was prepared for all municipal services and capital improvements required. The feasibility analysis included the creation of a five year municipal budget projection for the new town. The initial feasibility analysis served in the negotiations between the incorporation proponents and the County. Danville Sphere of Influence Study Danville,California The study addressed public service issues within the Town of Danville and in a large adjacent unincorporated area to the east where substantial development is expected to occur over the next twenty years. Aptos Incorporation Feasibility Study Santa Cruz,California _ Prepared an incorporation feasibility analysis for an existing, stable residential community. A detailed public services and financing plan was prepared for the limited municipal ser- vices required by the new city. The feasibility analysis included the creation of a ten year municipal budget projection for the new city. The feasibility analysis served in public rela- tions efforts of the incorporation proponents and in negotiations with the County. FINANCIAL NEGOTIATIONS r' Mission Bay Project - San Francisco,California Preparing a comprehensive economic analysis of a large mixed use development project as a part of the City's Development Agreement negotiating team. The project includes 4.2 million square feet of office space, 2.8 million square feet of research and development space and nearly 8,000 residential units and will be built over a 25 year period. The economic analysis _ includes assessment of the project's economic impacts, fiscal impacts, and creation of a capital improvement financing plan. The Development Agreement will incorporate a specific financing plan which will assure the required infrastructure and community facilities without creating an undue financial burden upon the project or the City. Tassajara Area Annexations Danville,California Prepared a comprehensive fiscal analysis of several large projects. This information aided preparation of annexation application. The annexation involved the negotiation of a Master Property Tax Sharing Agreement with the County. Working directly with the County, the fiscal model was used to evaluate tax sharing alternatives leading to an equitable agreement. The model was also used during negotiation of a Development Agreement between the Town and the project proponents and the creation of a joint Powers Agreement between affected jurisdictions enabling the sharing of project exactions,assessments,and fees. School Finance Analysis Pleasanton,California Authored two reports analyzing the facility needs of the Amador-Pleasanton joint School district and proposing alternative capital financing programs. The proposed programs involved an innovative "endowment fund" approach that utilized revenues from surplus property disposition, Proposition 4 override funds and other sources in addition to fees to meet school funding needs. Participated in subsequent negotiations with the district on school impact fees,which resulted in a modified fee schedule acceptable to both parties. i i s. �• SURVEY RESEARCH i Danville Parks Users Survey Danville, California I - Designed, tabulated,and analyzed a survey of Danville citizens concerning park use,desired park improvements, and financing mechanisms. The survey results indicated resident's preference for specific proposed park and recreation improvements and also resident's will- ingness to pay for these improvements with bond payments and/or new taxes. Danville Downtown Survey Danville,California Tabulated and analyzed a survey of Danville citizens concerning the revitalization of the downtown area. The results assisted the Town in establishing land use policies and priorities for its downtown area, identifying target businesses,and determining the potential role of the downtown given the regional retail and commercial service competition through- out the San Ramon Valley. Lake Comanche Recreation Market Study Sierra Nevada Foothills, California Conducted an on-site user survey of visitors to Lake Comanche. The survey results sup- ported demand analysis for the existing and proposed recreational facilities and services pro- posed at the Lake. The survey identified user characteristics,recreational patterns,and pref- erences for facilities provided at the Lake. Survey of Thrift Depositors Salt Lake City,Utah - A survey was conducted to support expert witness testimony in a class action suit. Questionnaire design was done to the specifications of litigators. Random samples were i taken from a specially designed data base of the target population. Telephone interviewers were trained specifically for the job and surveyed households throughout the United States. Survey results were analyzed to exacting specifications to withstand legal scrutiny. i i a O ETON P �O PROP055ooD �■ ure ` ` OUBLIN BOULBVAFiD HX7ENSION •.q DOUONURTY ROAD TO UCXTHARN PAZ t R/W ea se, • le U\ 111164 IH ■IRRRA lNr ZO - — n 4 MAP SHOWING RIGHT—OF—WAY LINES FOR 1 rn�cr 4978 1 EXTENSION OF DUBLIN BOULEVARD BETWEEN •• ••••• •• DOUGHERTY ROAD AND SOUTHERN PACIFIC t s s • .. .;r. .-.•.ti •'=:;-:-r.•t-:-r�-�-: RIGHT-Or-WAY �n eRR e•Re • • ReR ' O►Oe=t=� �•4; E Q� ss RR1 wool 1....1 Rose 23 b — O T• � esv 00" Q Roo■ � ry a O ETON PI,. �O i •tb ' 0,1 O•• ^- •... AqO,� ELOOc> CONTROL. CN•AW N ■1[RRA LN, 20 G �j E�'�-�'Y• i �a n to �a TRACT 497e MAP SHOWING RIGHT—OF—WAY LINE FOR STREET CONNECTING DUBLIN t i s ♦ a a 7 e Y BOULEVARD EXTENSION WITH Q ----- SCAltLLTT COURT ••• • ■• O ••r• ►noro•.o •o� Is tt, ------ a �d OUOUN OOULLTVARO QXTUNENON •;: _ A • 11304LJOHNIFTTY ROAO TO ■OUTN.RN PACU"O R/W •tt■ c� �1 7 / / 32.'1(. \ . 1. Its� 1.0 so. . OJO��• O L • �A °r, *oil E •e•■ ❑ Islas - comNscnReq 3 I,