Loading...
HomeMy WebLinkAboutItem 8.1 E Dublin Land Use Joint CC/PC Meeting 4, -o-� AGENDA STATEMENT CITY COUNCIL MEETING DATE: February 26, 1989 SUBJECT: Schedule for Joint Planning Commission/City Council Study Session on East Dublin Land Use. Alternatives REPORT PREPARED BY: A� Brenda Gillarde, Project Coordinator EXHIBITS ATTACHED: Attachment 1 : September 25, 1989 Staff report on West Dublin meeting dates . ( �v RECOMMENDATIONS : Jar Select a meeting date in the second or third d"[ week of April FINANCIAL STATEMENT: Undetermined DESCRIPTION I . BACKGROUND On September 25, 1989 , the City Council approved a set of special meeting dates for the West Dublin project (see Attachment 1) . A similar set of meetings will be held for East Dublin. II . ISSUES A date needs to be selected for the first in a series of joint Planning Commission/City Council (PC/CC) study sessions on East Dublin. Ordinarily, the meeting would be held on a regular Planning Commission meeting day, however the two Planning Commission meetings in April have been set aside for joint PC/CC meetings on West Dublin. Based on the East Dublin time schedule, Staff suggests a meeting date in the second or third week of April on a non-Planning Commission meeting day. The April meeting is intended as a study session on the three land use alternatives for the East Dublin Study Area; it is not a public hearing. The alternatives will be presented by the East Dublin consultants - Wallace, Roberts and Todd. An Alternative Report describing the alternatives, their relative impacts on the local transportation network and the preliminary costs for infrastructure will be available approximately two weeks before the meeting. The meeting will be noticed in the same manner as all Council and Commission meetings . In addition, written notice will be mailed to all persons on the East Dublin mailing list. This list includes property owners, agencies and interested citizens . The Mayor will chair the meeting and coordinate input from both the Planning Commission and City Council . All persons wishing to address the Council/Commission on the alternatives will be allowed to speak. No formal decisions or action on the project will be made by either the Planning Commission or Council at this meeting. The Planning Commission and City Council will hold public hearings before making any formal decisions on land uses for East Dublin. III . CONCLUSION Select a meeting date in the second or third week of April for the study session on the East Dublin land use alternatives . ---------_------------------------------------------------------------- ITEM NO. s COPIES TO: File PA 87-031 [PLNG-08 :CC87031] General File Planning Commission i a �V AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 25, 1989 REPORT PREPARED BY: Brenda Gillarde, Project Coordinator SUBJECT: PA 88-144 West Dublin Studies - Dates for Joint Planning Commission/City Council meetings EXHIBITS ATTACHED: Attachment 1: West Dublin Processing Schedule RECOMMENDATION: 1) Review dates for joint Planning Commission/City Council meetings. 2) Approve or amend dates as necessary. FINANCIAL STATEMENT: The meetings described below are included in the contract with WPM Planning Team that was approved by-the City Council on May 8, 1989. DESCRIPTION: As part of the West Dublin Studies, several Public Study Sessions are scheduled jointly with the Planning Commission and City Council. The meetings will be chaired by the Mayor, with both the Planning Commission and City Council providing input, and the City Council providing the final directions and decisions. The dates and topics of these meetings are outlined below: Date Topic December 13, 1989 Presentation of Study Report #1: Opportunities and Constraints. This report will describe the environmental assets and liabilities associated with development of the West Dublin Area. WPM Planning Team will present the findings of their 5 month analysis of the site. This meeting is for information only; no decision is required of the Planning Commission or City Council. April 2 & 16, 1990 Discussion of Study Reports 2/3: Sketch Plan Alternatives. This report will describe up to three alternatives to the proposed development plans for West Dublin. The purpose of the meeting is to achieve Planning Commission/City Council consensus on a preferred alternative. November 5, 1990 Discussion of Study Report #4: Administrative Draft General Plan Amendment/Specific Plan. WPM Planning Team will present the key features of the amendment and specific plan. The Planning Commission and City Council will have the opportunity to review and comment. Once the Draft General Plan Amendment/Specific Plan/EIR are completed, the Planning Commission and City Council will hold separate public hearings on these documents (refer to Stage V of the attached processing schedule) . ------------------------------------------------------------------------------ j/ "Mvmf& OT ITEM NO. � t, I t WRS1' 1) 1) 111. IN P R O C E S S I N G S C if E 1) U 1. R TASK Starr is OiL)orlulsitirs/(.1WIlrn{Ilts enusplel.e 1.1 Staff/WI71 cundUCL Pro.ject. OrlenLOL'ion complete ] 1.2 SLnff/WPM conduct tech Session 1 (orirnLOLion) complete 9 weeks [s 1.3 WPAI completes Initinl SLudy/Notice of I'repnraLion for I:LI1 8/31 1 week 1.4 Staff reviews Initial SLudy/Notice of Preparation 8/31 1 week 1.5 Status report/staff meeting 9/8 10 weeks 1.6 Eden Development completes model of existing site 9/8 1.7 Staff distributes Initial Study and letter regarding scoping session to key agencies/persons 10/20 5 weeks 1.S Staff receives Notice of Preparation responses 10/19 1.9 Staff/wrfl conduct Notice of PrepnroLion scoping session (Tech Session 2) 10/26 1 week 1.10 SLOf IM"I conduct Tech Session 3 on issues LhaL should be nddressed In Lhe CIA/SP/1`111 Studies 10/27 1 week 1.11 SLnLus reporL/atnff mocLine 11/3 7 weeks 1.12 WPH delivers Administrotive Draft SLudy Re purC 1 (OpporCUn.IC1.es and ConatrninL's) 11/17 2 weeks 1.13 Stnff reviews Study Report 1/submits coimnenL's Lo WPM 12/1 2 weeks 1.14 WPfI delivers/stnff distributes Study Report 1 12/13 2 weeks A 1.15 Staff/WPM conduct Public Session 1 (public conmsenL on Study Iteporl 1) 12/22 1 week 1.16 Status report/staff meeting Stnec li: Sl:elch Plans 1/26/9( G weeks 9 2.1 WPI•I submits AdminisLrnLive Draft of SLudy Reports 2/3 (Sketch Plan AlCCrnnC.l.ves) •' 2 CtnfC/WI'1l conduct' Tech Sessions 4 and 5 (SLnff/Developer cunnnenL.v on SLudy Reports 2/3) 2/8. 2/22 4 weeks _ 3/2 1 week 2.3 Stntus rvporl/stnff mcellnl; 3/16 3 weeks 2.4 W111 submit:/Staff dIsLrlbuLes Study Rapurls 2/:l 4/2. 4/16 4 weeks 66 2.5 WPPI/Staff conducts Public Sessions 2 and 3 (Joint PC/CC meeLings on SLudy Reports 2/3 - Sketch Plan Alternatives) 4/27 1 week 0 2.6 Stntus report/staff meeting �ttCr III Prrlimnr� Draft CPA/SP 5/18 3 weeks s7 3.1 ltr�l submits SLudy Report 4 (Pre].lint naiy General Plan Amendment) (,/1 2 weeks 3.2 Stnff reviews SLudy ReporL 4/submiLs conuucnLs to WPM 6/7 1 week 0 3.3 Stntus report/staff marling 7/6 5 weeks ® 3.4 WP11 submits Preliminary Specif.lc flan ('Tech Memos 12-17) 7/19 2 weeks ❑ 3.5 Staff/WPIM conducts Tech .5'e&91011 6 (Developer/SLaTf cunnnenls un TO-Ch Manu''s) 7/27 1 week 0 3.6 Status report/staff meeting 8/10 5 weeks 0 3.7 WPM submits Preliminary Specific Plan (1'ecil Memos 18-22) 8/23 2 weeks ❑ 3.8 Staff/WPM conducts Tech Session 7 (Developer/Staff comments on Tech Memos) 8/31 1 week 0 3.9 Status report/staff meeting 9/21 4 weeks 0 3.10 WPM submits AdministrnLive Draft Cenernl Pion Amendmonl/SpeciEle Pl.nn IU/5 2 weeks 3.11 StnfC reviews AdminIsLrnLive Draft/sulnn.its eosmncnLa Lo Wl'M 10/12 1 week 0 3.12 SUILtis report/sLnfl' mrrt.lst). !0/l9 2 weeks sly 3.13 l:Pfi delivers/SLnff disLribuLcs AdmintsLraLlve DrnfL Cenernl 1'.lnn Amendment/Specific I'.Inn) 0 3.14 Staff/W111 conduct Public Session 4 (Joine PC/CC meeting on AdminisLra Live DrsfL Ceneral Plan Amenchnent/Spoci[ic Plan 11/9 1 weeks 0 3.15 Status report/staff meeting 0 Stnff fleeting ❑ Tech Session A Public SLudy Session A Public Hearing QIDocument from WPM e l _ W E S T D U B L I N ' P R O C E S S I N G S C 11 I: D U L E TASK Stare IV: Drnft SP/EIR 4.1 WPM submits Administrntive Drnft IsIR, Draft CPA/SP 1/18/91 13/weeks 4.2 Staff reviews Administrative Draft EIR and Draft GPA/SP; submits comments to WI'M (check against NOP) 2/01 2 weeks 4.3 Status report/staff meeting 2/08 1 week 4.4 WPM delivers/Staff distributes Draft EIR, CPA/SP and Notice of Completion; 30-day EIR review period begins 2/22 3 weeks Stacie V: Adopt EIR/GPA/SP IL 5.1 Planning Commission public hearings on Draft EIR/GPA/SP (30-day EIR review period ends 4/12/91) 3/18 3 weeks 4/1 2 weeks 4/15 2 weeks 4/29 2 weeks (opt.) D 5.2 Status report/staff meeting 5/1 1 week 5.3 Staff/WPM conduct Tech Session 8 (discuss revisions to CPA/SP based on PC and public comments) 5/9 2 weeks 0 5.4 WPM submits Final EIR and Study Report 5 (recommended refinements to CPA/SP) 5/31 5 weeks 5.5 Staff reviews Final EIR and Study Report 5; submits comments to WPM 6/14 2 weeks 9 5.6 WPM submits/Staff distributes Final EIR rind Study Report 5 6/28 2 weeks ► 5.7 City Council public hearings on Flnnl EIR and Draft GPA/SP 7/8 2 weeks 7/22 2 weeks 8/12 2 weeks 5.8 SLnrf/LTM conduct Tech Session 9 (41HcUss revisions to CI'A/SI' based On CC and public comunents) 8/1 (opt.) 5.9 WPM submits Study Rcport 6 (CEQA Findings and Overriding ConsideraLions) 8/9 1 week 5.10 Staff reviews Study Report 6/submits comments 'to WPM 8/16 1 week 31 5.11 WPM submits/Staff distributes Study Report 6 8/23 1 week 4 5.12 City Council certifies and adopts CPA/SP 8/26 3 days 31 5.13 WPM submits/Staff distributes Notice of Determination 9/7 1 week ® 5.14 WPM submits final GPA/SP 9/27 5 weeks Note: These dates care subject to change Q Staff Meeting ❑Tech Session A Public Study Session A Public Clearing 9 Document from WPM 9/1/89 5