HomeMy WebLinkAboutItem 8.1 Five Year Capital Improvement Program s
CITY OF DUBLIN
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: June 26, 1990
SUBJECT: Public Hearing: 1990-95 Five-Year Capital Improvement
Program
(Prepared by: City Manager)
EXHIBITS ATTACHED: 1 . Resolution
2. Memorandum from Recreation Director to City Manager
dated May 8, 1990
3. 1990-95 Five-Year Capital Improvement Program
provided under separate cover.
RECOMMENDATION: _ ) Open Public Hearing; 2) Receive Staff presentation; 3)
Receive public comment; 4) Close Public Hearing and
deliberate; 5) Adopt Resolution.
FINANCIAL STATEMENT: Project costs for Fiscal Year 1990-91 through
Fiscal Year 1994-95 are estimated at $22, 210, 21.3:
The recommended project costs for Fiscal Year
1990-91 are $6,916,913.
DESCRIPTION: Staff has prepared a proposed Five-Year Capital
Improvement Program for the period covering 1990 through 1995. The total
proposed Capital Improvement Program costs for the next five years are
$22, 210, 213. This cost is broken down by program area as follows:
General Improvements $ 215, 000
Community Improvements 1 ,347, 165
Parks 4,838,844
Streets 15,809, 204
Total $22,210, 213
The new Five-Year Capital Improvement Program includes not only those
projects which were identified in the 1988-93 CIP, but also a number of new
projects. A total of 14 new projects are proposed for the Fiscal Year 1990-
95 Capital Improvement Program.
On June 18, 1990, the Dublin Planning Commission reviewed the Five-Year
Capital Improvement Program and determined that it was in performance with
the City's adopted General Plan.
The Park and Recreation Commission reviewed those Park and Recreation
facility projects included in the Parks Program of the City's CIP. The
proposed projects in the Parks portion of the CIP are approximately in
accordance with the Parks and Recreation Commission's recommended priorities.
Staff has modified the priorities slightly to balance available funding for
some projects in any given year.
The City Manager's Capital Improvement Program message, which is included in
the Capital Improvement Program document, explains changes, additions, and
deletions in the CIP, as well as, funding for projects in more depth.
It is recommended that the City Council conduct a public hearing, deliberate,
and adopt the attached resolution approving the 1990-95 Capital Improvement
Program.
----------------------------------------------------------------------
COPIES TO:
ITEM N0. 8,%1
y
RESOLUTION NO. - 90
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
***************************
ADOPTING THE 1990-95 FIVE-YEAR
CAPITAL IMPROVEMENT PROGRAM
WHEREAS, the City Council is desirous of establishing a Five-Year
Capital Improvement Program to address the City' s future public
infrastructure needs; and
WHEREAS, the City Council is desirous of reviewing the recommended
1990-95 Capital Improvement Program to assure that the City' s capital needs
are addressed; and
WHEREAS, the 1990-95 Capital Improvement Program has been reviewed by
the Planning Commission, which found the document to be in conformance with
the City' s adopted General Plan; and
WHEREAS, the 1990-95 proposed park improvements have been reviewed by
the Park and Recreation Commission.
NOW, THEREFORE, BE IT RESOLVED that 1 ) the City Council of the City of
Dublin does hereby adopt the 1990-95 Five-Year Capital Improvement Program,
which is attached to and made a part hereof. 2) the items scheduled for
implementation in Fiscal Year 1990-91 shall be included in the Capital
Budget of the annual City Budget and Financial Plan for Fiscal Year 1990-
91 .
PASSED, APPROVED AND ADOPTED this th day of June, 1990 .
AYES :
NOES :
ABSENT:
Mayor
ATTEST:
City Clerk
TO City Manager
Public Works Director
FROM Recreation Director
SUBJECT 1990-95 Capital Improvement Program
DATE May 8 , 1990
Below you will find the priority listing that was developed by the
Park and Recreation Commission for the park projects to be considered
for the 1990-95 Capital Improvement Program.
1. Shannon Park Renovation
2 . Alamo Creek Park, Phase II
3 . Park & Pool Signs
4 . DHS Stadium Renovation
5. Frederiksen School Kindergarten Tot Lot
6 . Senior Center Upgrade
7. Masterplan Study - East & West Dublin
8 . DHS Baseball Fields Renovation
9. DHS Girls Athletic Fields Renovation
10 . DHS Tennis Courts Renovation (add lights)
11 . DHS Outdoor Lighting
12 . Dublin Sports Grounds, Phase I
13 . Dublin Sports Grounds, Phase II
14 . Dublin Sports Grounds, Phase III
15. Murray School Athletic Field Renovation
16 . Mape Park Renovation
17. Nielsen School Athletic Field Renovation
18 . Dublin Swim Center Bathhouse Renovation
19 . Wells-Cronin Athletic Field Renovation
20 . Frederiksen Athletic Field Renovation
21 . Dublin Elementary School Athletic Field Renovation
22 . Dougherty Hills Open Space
Should you have any questions, please give me a call.
•
ct'O ty ® Dublin
L
x
.,v
`';; ��4'����� i�. as .?•� ti
I�
n
. ;� a `�„"•,''. _ <�Ty.�'+; ��"F�y�R� �a�r'U
.� Cyr t•$& ��4�.y\��1.;�?y R `.. ` @.i
L � s
`Y ass
'�.K .�` .fin 4�'`^ � •o-'� t� � �� `�2"R�,�t'"tr,a`9.K�� '�.Fr� >�aL '4 �-S1,Cam,,"...a�-y Aa
[__ i st �+ R�� '� �` � �'�•.c a � -,w'z.,, -�� �' ,�R- a�. ���. � RHr-L°��r � _
t,.?' •,.3 _F�.9:"^.V.. �,.�'" � �..h.�4 HT>r c`f+., f.4. +��� ,Y:.<t � ;�;h � j�.. � i .
DUBLIN CIVIC CENTER
Five Year Capital Improvement Program
1990 - 1995
C I T Y O F D U B L I N
PROPOSED
FIVE-YEAR
CAPITAL IMPROVEMENT PROGRAM
1990 - 95
JUNE 1990
Paul C. Moffatt, Mayor
Georgean M. Vonheeder, Vice Mayor
Peter J. Hegarty, Councilmember SUBMITTED BY
Linda J. Jeffery, Councilmember Richard C. Ambrose
Peter W. Snyder, Councilmember City Manager
1990-95 CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
PAGE
CITY MANAGER'S LETTER OF TRANSMITTAL
CAPITAL IMPROVEMENT PROGRAM SUMMARIES
AllPrograms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Community Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii . .
Parks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv
Streets . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v
GENERAL IMPROVEMENTS
Data Processing System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
COMMUNITY IMPROVEMENTS
Sidewalk Safety Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
CityEntrance Signs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Catch Basin Grate Replacement . . . 4
Pedestrian Signal Handicap Modifications . . . . . . . . . . . . . . . . . . . . 5
Downtown Identity Theme Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Widen Village Parkway Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Street Name Identification Sign Replacement Program . . . . . . . . . 8
Downtown Restaurant Row Improvements . . . . . . . . . . . . . . . . . . . . . . . . 9
Downtown Street Furniture Program . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
PARKS
Park & Pool Signs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Shannon Park Renovation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Alamo Creek Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Dublin High School Football Field Renovation . . . . . . . . . . . . . . . . 14
Frederiksen Kindergarten Tot Lot . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Senior Center Kitchen Upgrade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Park & Recreation Facilities Masterplan . 17
Dublin High School Baseball Field Renovation . . . . . . . . . . . . . . . 18
Dublin High School Girls Athletic Field Renovation . . . . . . . . . . 19
Dublin High School Tennis Courts . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Dublin High School Outdoor Lighting . ... . . . . . . . . . . . . . . . . . . . . . . 21
Dublin Sports Grounds Renovation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Murray School Field Renovation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Mape Park Renovation . . . . 24
Nielsen School Athletic Field & Play Area Renovation . . . . . . . . 25
Dublin Swim Center Bathhouse Renovation . . . . . . . . . . . . . . . . . . . . . 26
Wells-Cronin Athletic Field Renovation . . 27
Frederiksen School Athletic Field Renovation . . . . . . . . . . . . . . . . 28
Dublin School Athletic Field & Play Area Renovation . . . . . . . . . 29
STREETS
Annual Street Overlay Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Dougherty Road Bike Path . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
San Ramon Road Phase IV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
I-580/I-680 Ramp Widening . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Dublin Boulevard Improvements-Donlon Way to Village Parkway . 34
Dublin Boulevard Extension-Dougherty Road East to Tract 5900 35
Dougherty Road Improvements South of SPRR . . . . . . . . . . . . . . . . . . 36
Dublin Boulevard Bridge Over Alamo Creek Bridge Repair . . . . . . 37
Street Subdrains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Landscape Silvergate Drive Medians — . 39
Traffic Signals - Village Parkway @ Brighton & @ Tamarack . . . 40
Downtown Street Light Additions . . . . . . . . . . . . . . . . . . . 41
New Street Parallel to and South of Dublin Boulevard . . . . . . . . 42
I-580 Offramp Improvements @ San Ramon Road . . . . . . . . . . . . . . . . . 43
Road Parallel to SPRR - Dougherty Rd to Dublin Blvd Extension 44
011 1)
IC) ®'®,�9 62 CITY OF DUBLIN
P.O. Box 2340, Dublin, California 94568 City Offices, 100 Civic Plaza, Dublin, California 94568
June 12, 1990
Honorable Mayor and City Councilmembers:
Transmitted herewith is the Proposed Five-Year Capital Improvement
Program for Fiscal Years 1990-95.
The Five-Year Capital Improvement Program serves as a planning
document for the City's current and short term public facility needs.
A new Five-Year Program is proposed this year in order that the City
may begin planning and financing those projects, which will be 'needed
during the next five years.
The Capital Improvement Program (CIP) must be submitted to the
Planning Commission, whose responsibility is to make a `determination
i regarding the CIP's conformance with the General Plan. The Park &
Recreation Commission has reviewed those park facility projects
included in the CIP. The recommended park and recreation facility
projects closely approximate the Commission's recommended priorities.
Those projects which are recommended for Fiscal Year 1990-91 are
included and funded in the Fiscal Year 1990-91 Preliminary Budget..
Both documents are proposed for consideration by the City Council
during the City's annual budget hearings.
The total estimated cost for the Capital Improvement Program between
1990-91 and 1994-95 is estimated at $22,210,213 (1990 dollars) . This
amount does not include $2,123,402 expended on projects which will not
be completed by June 30, 1990. Of the total projects proposed,
. $215,000 is identified for General Improvements; $1,347,165 is
identified for Community Improvements; $4,838,844 is identified for
i Parks; and $15,809,204 is identified for Streets.
! Fiscal Year 1990-91
For this upcoming year, $6,916,913 is proposed for Capital Projects.
As shown, in the "All Program Summary", these costs will be funded by
a variety of sources. The primary funding sources are the General
Fund with $2,893, 075, or 42%; the Dublin Boulevard Extension Fund with
$2,218,000, or 32%; Federal and State Grants with $1,262,273, or 18%;
Reimbursements with $418,565, or 6%; and Measure B with $125, 000, or
2%. Of the $2,893,075 from the General Fund, $1,570,009 comes from
General Fund Reserves, with the balance coming from the difference
between 1990-91 General Fund Revenues and 1990-91 General Fund
Operating Expenditures. The $2,218,000 . identified in the Dublin
i Boulevard Extension Fund will be funded from BART loans which resulted
from litigation between the City and BART.
i
Administration (415) 833-6650 • City Council (415) 833-6605 • Finance (415) 833-6640 • Building Inspection (415)833-6620
Code Enforcement (415) 833-6620 • Engineering (415)833-6630 • Planning (415) 833-6610
Police (415)833-6670 • Public Works (415)833-6630 • Recreation (415) 833.6645 ,
i
i
I
It is important to note that the City may choose to participate in
funding a Tri-Valley Animal Shelter in Fiscal Year 1990-91, which
could cost the City an estimated $813,750. No funding has been
included in the CIP or Preliminary Budget, because neither the amount
required of the City for 1990-91, nor the most advantageous method of
financing the Shelter are certain at this time.
1990-95 CIP
Described below are the highlights and proposed changes in each
program area:
General ($215,000)
The only project included in the CIP in this program area is the
completion of the City's Data Processing System. For Fiscal Year
1990-91, additional equipment is provided for Police, Finance, and
Economic Development to accommodate increases in staffing; and land
permit software and hardware, and word processing for Community
Development. In 1991-92, an Autocad Software System is proposed so
that the City can computerize its base maps.
Community Improvements ($1, 347, 165)
The projects included in the Community Improvement CIP either improve
safety or enhance community promotion and economic development in the
Downtown. For the 1990-95 CIP, it is proposed that the additional
Library Access Improvement Project be deleted from the CIP. Staff is
recommending the deletion of this project because Target has no plans
to implement its approved plan to expand its garden area, which would
trigger the requirement for an access easement.
New projects included in the 1990-91 Community Improvement CIP are the
Downtown Street Furniture Program, which was approved as part of the
Downtown Specific Plan; and the Pedestrian Signal Handicap
Modifications.
The timing for those projects which are proposed to be carried over
from the previous CIP are approximately the same, with the exception
of the Downtown Identity Theme Program. It is proposed that this
project be delayed one year until 1991-92 in order that a survey might
be done during 1990-91 to solicit input from downtown businesses.
Parks ($4,838,844)
The Parks Program for 1990-95 represents a continued effort to expand
the quantity and quality of the City's park and recreational
facilities, which the City has actively pursued since incorporation.
Between 1987 and 1990, the City added 4 active parks, 1 open space
park, and a senior citizen's center to the City's park system. The
City also assumed responsibility for those recreational facilities
owned by the Dublin San Ramon Services District and renovated the
Dublin Swim Center and Shannon Community Center.
2 -
In 1989-90, the City and Dublin Unified School District entered into
an historic agreement which will facilitate the improvement of nearly
every school recreational facility in the City during the next five
years. This agreement will not only result in improved recreational
usage by students and residents, but also improve the appearance and
image of school facilities and the community.
In addition to the improvement of school facilities, the renovation of
Shannon Park will be completed during 1990-91.
Those new projects which have been included in the Parks 1990-95 CIP
include the following projects.
Proposed
Project Time Frame
1. Senior Center Kitchen Upgrade 1990-91
2. Park & Recreation Facilities Masterplan 1990-91
3. Dublin Sports Grounds Renovation 1991-93
4. Murray School Field Renovation 1991-93
5. Dublin Swim Center Bathhouse Renovation 1992-93
6. Wells-Cronin Athletic Field Renovation 1992-93
7. Frederiksen School Athletic Field Renovation 1993-94
8. Dublin School Athletic Field & Play Area Renovation 1994-95
The Park & Recreation Commission reviewed the Park CIP in May 1990.
The CIP proposed project funding varies from the Commission's
recommendations where construction phasing would better accommodate
users of the facilities. It's important to note that the Commission
is recommending a number of changes to last year's CIP project
priority. These changes are as follows:
1. Dublin High School Tennis Courts moved from 1990-91 to 1991-92.
2. Mape Park moved from 1990-91 to 1992-93.
3. Nielsen Athletic Field Renovation moved from 1991-92 to 1993-94.
The delay in the above projects is due to the inclusion of a Park &
Recreation Facility Masterplan in 1990-91, the renovation of the
Dublin Sports Grounds in 1991-93, and the advancement of the Murray
School Field Renovation to 1991-93.
Streets ($15,809,204)
The 1990-95 Street CIP provides a blueprint to improve the circulation
system in the City. However, the blueprint cannot be fulfilled due to
the lack of available funding. As indicated in the Street CIP
Summary, a total of $7, 107, 000 in Reimbursements from the development
community will be required to complete certain projects in the latter
year of this CIP. To date, the City has collected approximately
$214, 193 in reimbursements.
3 -
New projects for the 1990-95 Street CIP include:
1. Dublin Boulevard Extension - Dougherty Road East to
Tract 5900 1990-91
2 . Dublin Boulevard Bridge over Alamo Creek Repair 1991-92 & 1993-94
3. Street Subdrains 1991-92
4. Road Parallel to SPRR - Dougherty Road to
Dublin Boulevard Extension 1994-95
The Dublin Boulevard Extension Project can be undertaken in 1990-91,
if the City is able to successfully complete current negotiations with
the City of Pleasanton and the County of Alameda.
The Dublin Boulevard Bridge Repair Project and the Street Subdrain
Project are major maintenance projects which will help avoid greater
future capital costs.
The road parallel to the SPRR will improve circulation in the vicinity
of the BART East Station.
The 1990-95 CIP also revises project timing for several projects.
Project delays are primarily due to lack of funding in the year the
project was originally scheduled. Those projects with revised time
frames include:
1. Dougherty Road Improvements South of SPRR 1990-91 to 1991-93
2. Landscape Silvergate Drive Medians 1990-91 to 1992-93
3 . Downtown Street Light Additions - Phase I 1992-93 to 1991-92
4. New Street Parallel to and South of Dublin
Boulevard 1992-93 to 1993-95
5. I-580 Offramp Improvements @ San Ramon Road 1992-93 to 1993-95
Conclusion
The 1990-95 CIP is an aggressive program to increase the City's
economic vitality in the Downtown, enhance our residents leisure time
and improve the City's transportation system for the future. .
I would like to thank all Commission members and Staff who have been
involved in the preparation of this plan and in assisting the City
Council in its implementation.
Respectfully submitted,
Richard C. Ambrose
City Manager
4 -
SUMMARY 1990-95 CAPITAL IMPROVEMENT PROGRAM
ALL PROGRAMS
TOTAL PRIOR
PROJECT COST YEARS 1990-91 1991-92 1992-93 1993-94 1994-95
General $ 391,135 $ 176,135 $ 155,000 $ 60,000 $ 0 $ 0 $ 0
Community Improvements 1,431,056 83,891 190,165 334,000 350,500 272,500 200,000
Parks 6,343,602 1,504,758 1,266,444 852,580 1,146,635 720,090 853,095
Streets 16,167,822 358,618 5,305,304 2,515,000 1,425,400 2,690,500 3,873,000
Total Cost $24,333,615 $ 2,123,402 $ 6,916,913 $ 3,761,580 $ 2,922,535 $ 3,683,090 $ 4,926,095
FINANCING *
General Fund $ 9,351,445 $ 711,916 $ 2,893,075 $ 1,691,134 $ 1,881,135 $ 1,038,990 $ 1,135,195
Community Development Block
Grant Fund 19,800 0 19,800 0 0 0 0
Federal Aid Urban Fund 1,080,325 0 721,325 359,000 0 0 0
Transportation Development
Act (Article 3) Grant Fund 290,999 71,491 144,508 75,000 0 0 0
State Park Bond Act Fund 72,017 64,815 7,202 0 0 0 0
Park Dedication In-Lieu Fund 1,740,657 501,053 293,558 803,875 142,171 0 0
Measure B Fund 583,100 0 125,000 111,200 113,400 115,600 117,900
Measure AA Fund 631,316 473,487 0 0 157,829 0 0
SAFCO Grant Fund 100,000 90,000 10,000 0 0 0 0
Capital Project Fund (Reim-
bursements) ** 7,672,076 210,640 418,565 213,371 628,000 2,528,500 3,673,000
SB 140 Fund 65,880 0 65,880 0 0 0 0
Dublin Blvd Extension Fund 2,726,000 0 2,218,000 508,000 0 0 0
Total $24,333,615 $ 2,123,402 $ 6,916,913 $ 3,761,580 $ 2,922,535 $ 3,683,090 $ 4,926,095
Less Capital Improvements (24,333,615) (2,123,402) (6,916,913) (3,761,580) (2,922,535) (3,683,090) (4,926,095)
Surplus (Deficit) $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0
* Does not include the use of General Fund Reserves beyond Fiscal Year 1990-91.
** Of the total $7,672,076 in Reimbursements identified, the City has received or has obligated to it $556,769. If the City is
unable to collect the remaining Reimbursements identified, those affected projects would require General Fund support, if
available, or would have to be deferred.
SUMMARY 1990-95 CAPITAL IMPROVEMENT PROGRAM
GENERAL
TOTAL PRIOR
PROJECT COST YEARS 1990-91 1991-92 1992-93 1993-94 1994-95
1) Data Processing System $ 391,135 $ 176,135 $ 155,000 $ 60,000 $ 0 $ 0 $ 0
Total Cost $ 391,135 $ 176,135 $ 155,000 $ 60,000 $ 0 $ 0 $ 0
FINANCING
General Fund $ 391,135 $ 176,135 $ 155,000 $ 60,000 $ 0 $ 0 $ 0
Total $ 391,135 $ 176,135 $ 155,000 $ 60,000 $ 0 $ 0 $ 0
Less Capital Improvements (391,135) (176,135) (155,000) (60,000)
Surplus (Deficit) $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0
* Does not include the use of Reserves beyond Fiscal Year 1990-91.
- ii -
SUMMARY 1990-95 CAPITAL IMPROVEMENT PROGRAM
COMMUNITY IMPROVEMENTS
TOTAL PRIOR
PROJECT COST YEARS 1990-91 1991-92 1992-93 1993-94 1994-95
1) Sidewalk Safety Repair $ 250,000 $ Annual $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
2) City Entrance Signs 64,311 12,400 51,911
3) Catch Basin Grate
Replacement 143,745 71,491 72,254
4) Pedestrian Signal Handicap
Modifications 16,000 16,000
5) Downtown Identity Theme
Program 150,000 150,000
6) Widen Village Parkway
Sidewalk 130,000 130,000
7) Street Name Identification
Sign Replacement Program 82,000 4,000 78,000
8) Downtown Restaurant Row
Improvements 445,000 222,500 222,500
9) Downtown Street Furniture
Program 150,000 150,000
Total Cost $ 1,431,056 $ 83,891 $ 190,165 $ 334,000 $ 350,500 $ 272,500 $ 200,000
FINANCING
General Fund $ 1,055,811 $ 12,400 $ 108,911 $ 334,000 $ 350,500 $ 50,000 $ 200,000
Transportation Development
Act (Article 3) Grant 143,745 71,491 72,254 0 0 0 0
Capital Projects Fund (Reim-
bursements) ** 231,500 0 9,000 0 0 222,500 0
Total $ 1,431,056 $ 83,891 $ 190,165 $ 334,000 $ 350,500 $ 272,500 $ 200,000
Less Capital Improvements (1,431,056) (83,891) (190,165) (334,000) (350,500) (272,500) (200,000)
Surplus (Deficit) $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0
* Does not include the use of General Fund Reserves beyond Fiscal Year 1990-91.
** Of the total $231,500 in Reimbursements identified, the City has received or has obligated to it $9,000. If the City is
unable to collect the remaining Reimbursements identified, those affected projects would require General Fund support, if
available, or would have to be deferred.
SUMMARY 1990-95 CAPITAL IMPROVEMENT PROGRAM
PARKS
TOTAL PRIOR
PROJECT COST YEARS 1990-91 1991-92 1992-93 1993-94 1994-95
1)Park & Pool Signs $ 35,525 $ 5,050 $ 30,475 $ 0 $ 0 $ 0 $ 0
2)Shannon Park Renovation 1,077,979 877,228 200,751
3)Alamo Creek Park 364,897 346,497 18,400
4)Dublin High School Football
Field Renovation 914,231 271,583 642,648
5)Frederiksen Kindergarten
Tot Lot 39,305 4,400 34,905
6)Senior Center Kitchen
Upgrade 19,800 19,800
7)Park & Recreation Facilities
Masterplan 75,000 75,000
8)Dublin High School Baseball
Field Renovation 332,060 27,025 305,035
9)Dublin High School Girls
Athletic Field Renovation 217,440 217,440
10)Dublin High School Tennis
Courts 196,000 196,000
11)Dublin High School Outdoor
Lighting 21,600 21,600
12)Dublin Snorts Grounds
Renovation 681,090 302,840 378,250
13)Murray School Field
Renovation 347,310 27,105 320,205
14)Mape Park Renovation 370,855 370,855
15)Nielsen School Athletic
Field & Play Area Renovatn 346,115 27,325 318,790
16)Dublin Swim Center Bath-
house Renovation 50,000 50,000
17)Wells-Cronin Athletic Field
Renovation 324,700 324,700
18)Frederiksen School Athletic
Field Renovation 76,600 76,600
19)Dublin School Athletic Field
& Play Area Renovation 853,095 853,095
Total Cost $ 6,343,602 $ 1,504,758 $ 1,266,444 $ 852,580 $ 1,146,635 $ 720,090 $ 853,095
FINANCING
General Fund $ 3,446,236 $ 219,763 $ 757,948 $ 48,705 $ 846,635 $ 720,090 $ 853,095
Community Development Block
Grant Fund 19,800 0 19,800 0 0 0 0
State Park Bond Act Fund 72,017 64,815 7,202 0 0 0 0
Park Dedication In-Lieu Fund 1,740,657 501,053 293,558 803,875 142,171 0 0
Measure AA Fund 631,316 473,487 0 0 157,829 0 0
SAFCO Grant Fund 100,000 90,000 10,000 0 0 0 0
Capital Project Funds (Reim-
bursements) ** 333,576 155,640 177,936 0 0 0 0
Total $ 6,343,602 $ 1,504,758 $ 1,266,444 $ 852,580 $ 1,146,635 $ 720,090 $ 853,095
Less Capital Improvements (6,343,602) (1,504,758) (1,266,444) (852,580) (1,146,635) (720,090) (853,095)
surplus (Deficit) $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0
* Does not include the use of General Fund Reserves beyond Fiscal Year 1990-91.
** Of the $333,576 in Reimbursements, the City has received or has obligated to it, the entire amount.
iv
SUMMARY 1990-95 CAPITAL IMPROVEMENT PROGRAM
STREETS
TOTAL PRIOR
PROJECT COST YEARS 1990-91 1991-92 1992-93 1993-94 1994-95
1)Annual Street Overlay
Program $ 1,000,000 $ Annual $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000
2)Dougherty Road Bike Path 147,254 72,254 75,000
3)San Ramon Road Phase IV 2,557,000 180,413 2,376,587
4)I-580/I-680 Ramp Widening 121,668 55,834 65,834
5)Dublin Blvd Improvements-
Donlon Way to Village
Parkway 1,410,500 90,371 372,629 947,500
6)Dublin Blvd Extension-
Dougherty Rd East to
Tract 5900 2,726,000 2,218,000 508,000
7)Dougherty Rd Improvements
South of SPRR 1,083,000 22,000 433,000 628,000
8)Dublin Blvd Bridge over
Alamo Creek Repair 223,000 38,500 184,500
9)Street Subdrains 260,000 260,000
10)Landscape Silvergate Drive
Medians 145,000 145,000
11)Traffic Signals-Village
Parkway @ Brighton Drive
& @ Tamarack Drive 280,400 10,000 270,400
12)Downtown Street Light
Additions 235,000. 53,000 182,000
13)New Street Parallel to and
South of Dublin Blvd 3,516,000 2,241,000 1,275,000
14)1-580 O£framp Improvements
@ San Ramon Road 725,000 65,000 660,000
15)Road Parallel to SPRR -
Dougherty Rd to Dublin Blvd
Extension 1,738,000 1,738,000
Total Cost $16,167,822 $ 358,618 $ 5,305,304 $ 2,515,000 $ 1,425,400 $ 2,690,500 $ 3,873,000
FINANCING
General Fund $ 4,458,263 $ 303,618 $ 1,871,216 $ 1,248,429 $ 684,000
$ 268,900 $ 82,100
Federal Aid Urban Fund 1,080,325 0 721,325 359,000 0 0 0
Transportation Development
Act (Article B) Grant Fund 147,254 0 72,254 75,000 0 0 0
Measure B Fund 583,100 0 125,000 111,200 113,400 115,600 117,900
Capital Project Fund (Reim-
bursements) ** 7,107,000 55,000 231,629 213,371 628,000 2,306,000 3,673,000
SB 140 Fund 65,880 0 65,880 0 0 0 0
Dublin Blvd Extension Fund 2,726,000 0 2,218,000 508,000 0 0 0
Total $16,167,822 $ 358,618 $ 5,305,304 $ 2,515 000
$ 1,425,400 $ 2,690,500 $ 3,873,000
Less Capital Improvements (16,167,822) (358,618) (5,305,304) (2,515,000) (1,425,400) (2,690,500) (3,873,000)
Surplus (Deficit) $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0
* Does not include the use of Reserves beyond Fiscal Year 1990-91.
** Of the $7,107,000 in Reimbursements the City has received or has obligated to it $214,193. It is important to note that BART
is required by the Dublin BART Extension EIR to contribute $1,000,000 toward certain roadway improvements, if the West Dublin
BART station is built. If the City is unable to collect the remaining reimbursements identified, those affected projects would
require General Fund support, if available, or would have to be deferred.
V
G
N
R
A
L
I
M
P
R
O
V
M
N
T
s
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9315 Data Processing GENERAL
DESCRIPTION-LOCATION
This item provides for the selection and
installation of a comprehensive data
processing system. The system components
would address financial applications, as
well as, a speicalized computer packages
for use by all departments
COMMENTS
In prior years, the expenses for this item
have financed the purchase of hardware to
support Administration, Finance, Police,
and Recreation. The software systems
installed in prior years, included:
accounting, payroll, word processing,
legislative history/indexing, and
Recreation Facility scheduling. In 1990-
91 , the Alameda County Sheriff's
Department is installing a computer aided
dispatch and police records management
system. Therefore, this project only
provides hardware and word processing
software for this department. In 1990-91
this item includes the purchase of
hardware to support Development Services
(Building & Safety, Planning, Public
Works), plus additional workstations to
support activities in Finance, Economic
Development, and Police. The planned
software to be implemented in 1990-91
includes: Business Registration, Land Use
Permit System, and Word Processing. 1991-
92 provides for the second phase of
Development Services implementation. This
will include both hardware and software to
operate a geographically based mapping
system.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Machinery &
Equipment $391,135 001 (GF) $176,135 $155,000 $60,000 $391,135
TOTAL --> $391,135 TOTALS --> $176,135 $155,000 $60,000 $391,135
1 - CITY OF DUBLIN, CALIFORNIA
C
O
M
M
U
N
I
T
Y
I
M
P
R
O
V
M
N
T
s
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9425 Sidewalk Safety Repair COMMUNITY IMPROVEMENTS
DESCRIPTION-LOCATION
This project would provide for the
replacement of damaged curb, gutter, and
sidewalks at various locations.
COMMENTS
State Law provides that sidewalk repair is
the responsibility of the property owner,
yet cities are typically held liable for
hazards associated with sidewalks in need
of repair. This program reduces the
City's liability exposure. The policy for
the City's funding of this program is
reviewed each year and may be terminated
at any time.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 10,000 001 annual $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Survey 10,000
Inspection 10,000
Improvements 220,000
TOTAL --> $250,000 TOTALS --> annual $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
- 2 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9422 City Entrance Signs COMMUNITY IMPROVEMENTS
DESCRIPTION-LOCATION
This project provides for the construction
of City entrance signs at the following
locations: (1 ) San Ramon Road at I-580
Offramp, (2) San Ramon Road at Alcosta " �m
Blvd. , (3) Dougherty Road at I-580
Offramp, (4) Village Parkway at Kimball e C �1
Ave. , and (5) Dougherty Road at the
N
northerly City limit line. All of these o o y
signs are proposed to be lighted except pJE LAMA o
nncK oP
the sign at Dougherty Road at I-580, which SNANNO� p0 p�p0
will be lighted when the street °qq
improvements are completed in this area.
09
u
COMMENTS sao
Ground signs will be placed in City right-
of-way so as not to obstruct traffic sight
lines. This contract was awarded in the
1989-90 Fiscal Year. The cost of the
north Dougherty Road sign is being
reimbursed by the adjacent developer.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 7200 001 $12,400 $42,911 $55,311
Inspection 800 300 9,000 9,000
Improvements 56,311
TOTAL --> $64,311 TOTALS --> $12,400 $51,911 $64,311
3 — CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9426 Catch Basin Grate Replacement COMMUNITY IMPROVEMENTS
DESCRIPTION-LOCATION
This project would provide for the phased
replacement of 550 existing catch basin
grates with new standard bicycle grates.
COMMENTS
Prior to incorporation, Alameda County had
modified existing catch basin grates by
adding steel bars in order to make them
safer for bicyclists. Over the years,
many of these bars have broken loose.
These grates present an ongoing
maintenance and liability problem.
This project is entirely funded by
Transportation Development Act Article 3
Grant Funds.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 8,080 (TDA)211 $71,491 $72,254 $143,745
Inspection 4,629
Improvements 131,036
TOTAL --> $143,745 TOTALS --> $71,491 $72,254 $143,745
- 4 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Pedestrian Signal Handicap Modifications COMMUNITY IMPROVEMENTS
DESCRIPTION-LOCATION
This project would remove curb barriers or
relocate pedestrian push buttons at 20
locations within the City's existing
traffic signal system. These improvements
would provide handicap access to all the
City's traffic signal system push buttons. �1
N �
JY
Z
i BR�ONtON I
0
0 Fy O
z p�E rAMA HACK P4P�' o
SHANNO"O �QO
P
90 P y n
a" qq
a
OP
90 v
9
O
W
J
HO y�f 099
OUO�,N o mmy
COMMENTS
�590
In Fiscal Year 1989-90, a survey of the
location of pedestrian signal push buttons
was undertaken at Council direction.
Those able to be rectified by simply
moving the button lower on the signal
polls were retrofitted through the City's
maintenance contract with Alameda County.
The remainder, which includes new or
relocated stand alone push buttons or the
removal of curbs, are included in this
project.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 2,500 001 $16,000 $16,000
Inspection 1,000
Improvements 12,500
TOTAL --> $16,000 TOTALS --> $16,000 $16,000
5 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Downtown Identity Theme Program COMMUNITY IMPROVEMENTS
Assigned
DESCRIPTION-LOCATION
This project would 1 ) establish and carry
out a public sign support and framing
program; 2) prepare a design for private
shopping center identification pylons °,t+ 10
consistent with other theme elements in
the downtown area; and 3) design and F 8 �1
construct district identification
improvements at the four major
intersections in the downtown area. pJE O LA MA iqA P�Pyye
SNRNN°N A°
o y
a' Rq
9 a
9
w
- `O Am y°lQ Q�1
1.580
COMMENTS
These improvements were identified in the
Dublin Downtown Improvement Plan approved
by the City Council in 1987. This project
would implement some of the larger
improvements from that study.
1 ) Public Signing Program $ 56,000
2 Study for design of center
entry pylons 5,000
3) Downtown entries identification 89,000
Total $150,000
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Study $ 15,000 001 $150,000 $150,000
Design 11,000
Inspection 5,000
Improvements 119,000
TOTAL --> $150,000 TOTALS --> $150,000 $150,000
6 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Widen Village Parkway Sidewalks COMMUNITY IMPROVEMENTS
Assigned Dublin Boulevard to
Amador Valley Boulevard
DESCRIPTION-LOCATION
This project would widen the sidewalk on
both sides of Village Parkway between
Dublin Boulevard and Amador Valley
Boulevard from its present 4-1/2 feet to 8
feet. °�, g
N
f O
e
s 9qCN1Ory
x
i HEAP
pJE LAMA HACK
SHANNON O t1P00
O P y n
a Nq
9 i
OP
�O Y
9
V
W
COMMENTS A q
p13 0`,110� O TTZ
Most of the sidewalks in the downtown area SE°
are presently 8 feet wide. The 4-1/2 foot
sidewalk is a residential standard for
areas where a high volume of pedestrian
use is not expected. This segment of
Village Parkway allows parking directly in
front of a large number of small retail
businesses. Pedestrian use of this
sidewalk is made more difficult because of
obstructions typically found in a downtown
area such as bus benches, sign posts, and
fire hydrants. The City presently has 8
feet of right-of-way from the curb face on
both sides of the street.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Engineering $ 11,000 001 $130,000 $130,000
Construction 114,000
Inspection 5,000
TOTAL --> $130,000 TOTALS --> $130,000 $130,000
- 7 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Street Name Identification COMMUNITY IMPROVEMENTS
Assigned Sign Replacement Program
DESCRIPTION-LOCATION
This project would replace the existing
black lettering on white background street
name identification signs at approximately
400 intersections throughout the City with
distinctive reflectorized green-and-white
name signs with the City's logo, as well
as, block numbers, as adopted by the City
Council during Fiscal Year 1985-86.
COMMENTS
The new signs will be easier to read
because the faces are reflectorized.
These signs are presently being installed
on all new subdivision streets.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Sign & address
Survey $ 4,000 001 $4,000 $78,000 $82,000
Improvements 71,000
Design 4,500
Inspection 2,500
TOTAL --> $82,000 TOTALS --> $4,000 $78,000 $82,000
- $ - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Assigned Downtown Restaurant Row COMMUNITY IMPROVEMENTS
Improvements
DESCRIPTION-LOCATION
This project would landscape and modify
parking and median configuration along
Amador Plaza Road between Dublin Boulevard
and Amador Valley Boulevard.
9 T
c o
m
x
o N
f °
o
a �
z
Z BR'CN,O
V
s cq N `O <
Z V AO O
AVE LAMA HACK p`p c
SHANNON pO
O P y n
COMMENTS
9 D
This improvement was recommended as a part . 9
of Central Business District
intensification by the City's Downtown NP�V° '^0 °m�
Study. The existing street is wide and p°0�
somewhat sterile. Protrusions of 5B°
landscaping into the parking lanes and/or
the addition of landscaped medians would
give this street a more inviting look and
encourage people to stop rather than using
it simply as a connector street between
Dublin Boulevard and Amador Valley
Boulevard. The City hopes to develop
enough interest from adjacent property
owners to encourage contributions to this
project.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Preliminary engr/owner
coordination $15,000 001 $222,500 $222,500
Design 34,000 300 $222,500 $222,500
Inspection 18,000
Improvements 378,000
TOTAL --> $445,000 TOTALS -> $222,500 $222,500 $445,000
9 — CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Downtown Street Furniture Program COMMUNITY IMPROVEMENTS
DESCRIPTION-LOCATION
This project would establish a street
furniture theme design and carry out this
theme by installing such items as
planters, bike racks, benches and waste
m I{�
receptacles. s
E
o
o N
N �
Z
s '� BRION'ON O
o RO 6AP
Z pE YAW MCN P,Py u
SHANNON
o P w n
09
u
a
N g�y0 9C 9O�Q Q'T
OVg�`N O mm
1,5g0
COMMENTS
The need for an integrated street
furniture program was identified in the
Downtown Study. It is intended that this
street furniture tie into the other
downtown theme improvements to enhance the
pedestrian, worker, and shopper
experiences in the downtown area.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Study $ 5,000 001 $150,000 $150,000
Design 11,000
Inspection 4,000
Improvements 130,000
TOTAL --> $150,000 TOTALS --> $150,000 $150,000
- 10 - CITY OF DUBLIN, CALIFORNIA
P
A
R
K
s
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9590 Park & Pool Signs PARKS
DESCRIPTION-LOCATION
This project provides for the resigning of
the parks and pool that were transferred
from DSRSD to the City of Dublin on July
1 , 1988. Signs will be provided for Mape
Park, the Dublin Sports Grounds, and the o
�1
Dublin Swim Center.
BR,C�rON J�
m v p
i yy8 O
JE �A
TAMA p
P CN P, a
SHANNON O lEp�
♦� p N n
a 9'D
v a
O �9
u
a 4
�, 'r
o�e�N � Tm2
1
0
COMMENTS .58
The existing park signs have been removed
because of the need to change the sponsor
wording from Dublin San Ramon Services
District to City of Dublin. The Shannon
Park sign is being changed with the
refurbishing of that park. The contract
to replace these signs was amended in May
1990.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 2,000 001 $5,050 $30,475 $35,525
Inspection 3,000
Improvements 30,525
TOTAL --> $35,525 TOTALS --> $5,050 $30,475 $35,525
- 11 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9593 Shannon Park Renovation PARKS
DESCRIPTION-LOCATION
This project provides for the renovation
of Shannon Park, which is located on the
northwest corner of San Ramon Road and
Shannon Avenue.
9
9 mn T
°F o
xx o
E N
o
N °
Z
BR/C MI°ry O
•o mO by° O
COMMENTS : ,e iAMA EACH � o
SHANNON o
Title to Shannon Park was transferred from p
a" NR
the Dublin San Ramon Services District to °
the City of Dublin on July 1 , 1988. The 0 9
design of the park was undertaken in 1988- W
89 while the Community Center was being
renovated. The actual improvements were °° 1
begun in 1989-90 and will extend into 5
1990-91 . These improvements include the
following elements:
Older Children's Play Area
Plaza Area Fountain
Stream Bank Planting & Irrigation
Parking Lot & Drop-Off Improvements
Spray Pool/Water Element
Preparation for Hillside Landscaping
Southwest Garden Renovation
Bridge at Creek
Outdoor Plaza at Building
Tot Lot
Lighting
Annual maintenance and utility costs are
estimated at $70,000.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 59,451 001 $ 38,730 $ 80,356 $ 119,086
Topography 6,744 213 64,815 7,202 72,017
Inspection 29,000 215 255,196 108,193 363,389
Printing 3,900 218 473,487 473,487
Improvements 975,626 219 45,000 5,000 50,000
Test 2,830
Legal 428
TOTAL --> $1,077,979 TOTALS --> $877,228 $200,751 $1,077,979
12 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9575 Alamo Creek Park PARKS
DESCRIPTION-LOCATION
This project funds the plan checking and
inspection of Phase I construction and all
aspects of the second phase of park
improvements at Alamo Creek Park. This
park is located on Dougherty Road north of
Amador Valley Boulevard between Wildwood x o
E
Road and Willow Creek Drive. a
Z o A
0.
pVE TAMA fiACK P,P 0
SHANN�H O ,lP�
O P
COMMENTS
90 v
9
0
The developer of the Villages at Willow W
Creek development dedicated 8 acres of —
parkland to the City and completed o Z
construction of the first phase of park 5s°
improvements. First phase improvements
included basic park improvements such as
turf area, lighting, parking lot, park
furniture, fencing, and a bridge
connecting those portions of the park
which are divided by Alamo Creek.
The Second Phase improvements began in
Fiscal Year 1989-90 and include restroom
facilities, a children's play area, picnic
areas, and a basketball court.
Annual maintenance and utilities for the
completed park is estimated at $68,200.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Inspection Phase I $ 55,640 215 $245,857 $13,400 $259,257
Topography 2,800 219 45,000 5,000 50,000
Design 19,900 300 55,640 55,640
Inspection Phase II 6,540
Permits 3,800
Improvements 276,217
TOTAL --> $364,897 TOTALS --> $346,497 $18,400 $364,897
13 — CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9582 Dublin High School PARKS
Football Field Renovation
DESCRIPTION-LOCATION
This project provides for the renovation
of the Dublin High School football field
and stadium which is located on the Dublin
High School Campus at 8151 Village
ac o T
o
Parkway.
a
° N
N O O
Z
s � BAi�NTON �° y
o �
pJE LAMA BACK P,p °
SHANNON A° tpOO
i qN
9 D
O 90 i
Op
t7
W
> G Q9
COMMENTS .40
ONN�`N
SBo
This project is the first Joint Facility
Improvement Project undertaken by the City
and the School District. This project will
include the following improvements:
Turf and Irrigation Renovation
New Railing for Bleachers
New Snack Bar and Restroom
Landscape Screening Along the East Side
Installation of School District-Supplied Scoreboard
New Aluminum Bleacher Seating
Replacement of Existing Stadium Lights
New Pressbox
Relocation & renovation of Track & Field
Event areas
The turf areas will be maintained by the
City upon completion of the project at an
annual estimated cost of $20,000.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Engr 5,300
Design 47,230 001 171,583 469,712 641,295
Insp 24,160 300 100,000 172,936 272,936
Improvements 832,711
Permits 3,630
Staking 1,200
TOTAL --> $914,231 TOTALS --> $271,583 $642,648 $914,231
- 14 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9597 Frederiksen School Kindergarten Tot Lot PARKS
DESCRIPTION-LOCATION
This project provides for the renovation
of the Kindergarten Tot Lot at C. H.
Frederiksen School, which is located on
Tamarack Drive. clip `MIt � °o A
qq o
b
x o N
4 C
N �
i BRICNrQ m
a ,�9 N
Z O • Ey6 O
pJE TAMA BACK
$IfANNON p POO
O y n
am qq
9 y
O 90 v
Op
U'
W
j G+ Q9
y� 9
A�J0
COMMENTS 5Eo
C. H. Frederiksen School is an elementary
school in the Dublin Unified School
District. This project, proposed by the
Principal and Parent Faculty Club of the
school, provides for demolition of the
present tot lot and installation of new
play equipment, sand, and curbs.
Adjustments to fencing and bicycle parking
are also provided for in this project.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design 5,500
Insp 1,610 001 4,400 29,905 34,305
Improvements 32,195 300 5,000 5,000
TOTAL --> $39,305 TOTALS --> $4,400 $34,905 $39,305
- 15 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Senior Center Kitchen Upgrade PARKS
DESCRIPTION-LOCATION
This project provides for the upgrade of
the kitchen at the Dublin Senior Center,
located at 7437 Larkdale Avenue.
9 n
o� o
x
°
E °
a c
N �
x
Z BH'CN°N y
CA • `O
;O ° V�yO O +
p1@ LAMA nACN P.1 o
SHANNON O
O y n
a' 9q
9 a
Op �
O v
op
u
w
0`qo pC 900 Q'1
N
1.580
COMMENTS
This project, funded through a Community
Development Block Grant, provides for the
renovation of the kitchen at the Senior
Center to include replacement of floor,
range, and dishwasher heater pump, as well
as, painting and repair of walk-in
refrigerator/freezer. Additional improve-
ments include replacement of social hall
floor.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $17,400 209 $19,800 $19,800
Design/Inspection 2,400
TOTAL --> $19,800 TOTALS --> $19,800 $19,800
16 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
NEW Park & Recreation Facilities Masterplan PARKS
DESCRIPTION-LOCATION
This project provides for the services of
a landscape architect/planner to develop
an overall park and recreation facilities
masterplan for East and West Dublin.
COMMENTS
In order to provide an adequate system of
park and receational facilities to
accommodate the anticipated growth to the
East and West, it is necessary to develop
a comprehensive master plan to use as a
planning document.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Consultant Svcs. $75,000 001 $75,000 $75,000
TOTAL --> $75,000 TOTALS --> $75,000 $75,000
- 17 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Dublin High School PARKS
Assigned Baseball Field Renovation
DESCRIPTION-LOCATION
This project provides for the renovation
and upgrade of the Jr. Varsity and Varsity
Baseball fields at Dublin High School
which is located at 8151 Village Parkway.
v m
� o
F
s
E C N
e
N t• i
zm BAiCHpH o i
o �
0
pJE 'AMA UCK µJ*y
SHANNON
O P y n
a qA
9 D
OP i
O Y
P
R
oNO�N O�JN vo '"mz
COMMENTS ® 5ao
This project was conceived by the Dublin
School Facilities Improvement Task Force.
Field renovation includes regrading and
reseeding of turf areas, irrigation system
repair and replacement, and infield
repairs. Additionally, the project
provides for installation of bleachers and
limited landscaping.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $287,770 215 $27,025 $305,035 $332,060
Design/cost ??? 25,900
Survey 4,000
Inspection 14,390
TOTAL --> $332,060 TOTALS --> $27,025 $305,035 $332,060
18 — CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Dublin High School PARKS
Assigned Girls Athletic Field Renovation
DESCRIPTION-LOCATION
This project would provide for the
renovation of the girls, athletic field,
as well as, the undeveloped area adjacent
to the field. These fields are located at s,
Dublin High School, 8151 Village Parkway. 'gym o
n
x o N
o
z
v ,T BAi�h ON JO
m
Z a �yP O
TAMA NACN PJp
SHANNON pO `npOO
O p
y n
a q9
9 d
'O v
9
W
J
0 40 ymC 900 ';
oJ0���
59U
COMMENTS
This is one of the projects proposed by
the Dublin School Facilities Improvement
Task Force. Improvements included are as
follows:
1 ) Clearing, filling, and partial
regrading; 2) Reseeding of turf area; 3)
Repair and partial replacement of
irrigation; 4) New backstops; and 5) Paved
access with security lighting
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $187,230 001 $ 72,500 $ 72,500
Design/Cost ??? 16,850 215 144,940 144,940
Survey 4,000
Improvements 9,360
TOTAL --> $217,440 TOTALS --> $217,440 $217,440
- 19 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Dublin High School PARKS
Assigned Tennis Court Renovation
DESCRIPTION-LOCATION
This project would provide for
improvements to the tennis courts at
Dublin High School which is located at
8151 Village Parkway.
e
° N
N • S
2 BRiOH ON n I
A �
O
se0 A a
i O +
P
pJE LAMA HACN OPJ v
SHANNON A0 �p0
P
O N SA
a q9
9 d
OP 90 Y
9
O
w
- `JO 9m y0l� Q91
OJ9`06 o mmi
590
COMMENTS
The Dublin School Facilities Improvement
Task Force recommended that the tennis
courts at Dublin High School be renovated.
Improvements include court resurfacing,
access from court area to the football
field, and the lighting of the tennis
courts for night play. These courts would
be available for public play when not in
use for teaching.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 14,000 215 $196,000 $196,000
Inspection 7,000
Improvements 175,000
TOTAL --> $196,000 TOTALS --> $196,000 $196,000
20 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Dublin High School Outdoor Lighting PARKS
Assigned
DESCRIPTION-LOCATION
This project provides for installation of
outdoor lighting in the parking lots and
along walkways at Dublin High School.
n
�m o
x
o �
m
x •
pit
ON i
m� AO
pJE TAMA HACH pJ4 O
SHANNON
O PtT
y q
Am q�
O v0 v
Op
O
W /
o p m y
'Bo
COMMENTS
Installation of outdoor lighting in the
parking lots and along walkways at Dublin
High School would make the facility more
accessible to the community in the
evening. This project was suggested by
the Dublin School Facilities Improvement
Task Force.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $21,600 001 $21,600 $21,600
TOTAL --> $21,600 TOTALS --> $21,600 $21,600
- 21 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9583 Dublin Sports Grounds Renovation PARKS
DESCRIPTION-LOCATION
The project provides for the renovation of
the Dublin Sports Grounds which is located
at Dublin Boulevard and Civic Plaza. The
renovation is proposed for three phases M0 sA
and will include the following major �1t '� 9c0
improvements: Phase 1 : Softball field g
renovation, the addition of a 601 baseball B" N
diamond, and drainage improvements; Phase
2: Drainage and sprinkler repair for
baseball and soccer fields and SMRNNON O
PEE TAMA nACK
reorientation of baseball field No. 3;
Phase 3: Snack bar upgrade, score booths,
and a jogging trail. a
u
OUe�NO o mmy
COMMENTS
These improvements were included in the
Dublin Sports Grounds Master Plan which
was adopted by the City Council in May
1990.
The improvement costs are shown by phases
below.
Phase I Phase II Phase III
$ 37,190 $ 34,985 $ 11 ,465
265,650 249,900 81 ,900
$302,840 $284,885 $ 93,365
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Inspection $ 29,870 001 $ 0 $ 78,250 $ 78,250
Design 53,770 215 302,840 142,171 445,011
Improvements 597,450 218 157,829 157,829
TOTAL --> $681,090 TOTALS --> $302,840 $378,250 $681,090
- 22 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Murray School Athletic Field Renovation PARKS
DESCRIPTION-LOCATION
This project provides for the renovation
of the athletic fields at Murray
Elementary School located at 8435 Davona
Drive.
Al
9 mn T
® v n
I
E
a
N
N m
= 9AONrON ` I
T
_ ^vE iAMA WK
O
SHANNON p0 APO
T
N
9 �
Op
w
� 0`v0
o�o�`H o mmZ
5g0
COMMENTS
This project was conceived by the Dublin
Schools Facilities Improvement Task Force.
Field renovation includes extensive
grading and reseeding, the addition of an
irrigation system and paved walk and
renovation of playfield backstops.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $301,150 001 $27,105 $320,205 $347,310
Design 27,105
Survey 4,000
Inspection 15,055
TOTAL --> $347,310 TOTALS --> $27,105 $320,205 $347,310
- 23 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Mape Park Renovation PARKS
Assigned
DESCRIPTION-LOCATION
This project provides for the renovation
of Mape Park which is located on Prata
Way.
`1M,t L Sr
b n
o
n
x C N
f °
o
a °
x
a BR/C�rON o
i o yye
pJ6 "MA SACK
O
SNANNON 90 �Po
so P y n
a q'P
9 w
Op
O
N `'1O 9m yO�o Q99
OVn�",N O mmZ
,.500
COMMENTS
Major improvements at this park would
include play area reconstruction for tots
and older children, a par course,
lighting, additional trees, and
rehabilitation of turf and irrigation
system.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $321,805 001 $370,855 $370,855
Design 28,960
Survey 4,000
Inspection 16,090
TOTAL --> $370,855 TOTALS --> $370,855 $370,855
- 24 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Nielsen School Athletic Field PARKS
Assigned and Play Area Renovation
DESCRIPTION-LOCATION
This project provides for the renovation
of Athletic Fields and the play area at
Nielsen School, located at 7500 Amarillo
Road. `,M,,
cnr << c
9 n
A
E
o
N
r •P 9qON'ON JQ
e .
� yy6 O
pJE LAMA IIACM PyP
SHANNON .y POO
O pa
F
a 9q
9� A
O Y
O
9
O
W
J S S CO Q�j
N g��0 C 9ff0 1
OVg�`N O TmZ
1 5g0
COMMENTS
This project was identified by the Dublin
Schools Facilities Improvement Task Force.
Recommended improvements include
connecting school yard to Mape Park by
removing drainage swale. Additional
improvements include regrading and
reseeding of turf, irrigation
installation, play area reconstruction and
capping of an abandoned well.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $303,610 001 $27,325 $318,790 $346,115
Design 27,325
Inspection 15,180
TOTAL --> $346,115 TOTALS --> $27,325 $318,790 $346,115
- 25 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Dublin Swim Center Bathhouse Renovation PARKS
DESCRIPTION-LOCATION
This project provides for the renovation
of the bathhouse at the Dublin Swim
Center, located at 8157 Village Parkway. s
9c �
x
N
N m
i BRCNrON `
F C JO p
� mp fA0 O
= P�
ASE fAMA nACN P, o
OO
SHANNON
G P a sAk
9
9 �
O 9A i
09
u
a
j S 9Of Q7'
1 N OVg�N 6�0 TO 1
COMMENTS
® •sBo
Renovation of the bathhouse is necessary
to complete the overall renovation of the
Dublin Swim Center. Included in the
renovation is roof repair, replacement of
toilets and countertops, heater repair,
lighting upgrade, enclosure of office
areas and installation of lockers. This
project also provides for installation of
benches, picnic tables and trash
recepticles around the pool.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $47,600 001 $50,000 $50,000
Design 2,400
TOTAL --> $50,000 TOTALS --> $50,000 $50,000
- 26 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Wells-Cronin Athletic Field Renovation PARKS
DESCRIPTION-LOCATION
This project provides for the renovation
of the athletic fields between Cronin and
Wells Schools located between Penn and
York Drives.
9c m
m o
z o
° N
N �
2
i
fro
I
p iP ry O
y �J
o �EAO
z pE TAMA RACK P-A
SHANNON 9O tp00
O F y n
a qH
9 �
a �9
t7
a
i c+ Av
N OLID
OVg�H 0 mm2
,.5B0
COMMENTS
This project was recommended by the Dublin
School Facilities Improvement Task Force.
It provides for regrading and reseeding of
turf areas; replacement of approximately
one-third of the irrigation system,
backstop repair; and renovation of the
play area (formerly Cronin Park) .
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $281,315 001 $324,700 $324,700
Design 25,320
Survey 4,000
Inspection 14,065
TOTAL --> $324,700 TOTALS --> $324,700 $324,700
- 27 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Frederiksen School PARKS
Athletic Field Renovation
DESCRIPTION-LOCATION
This project provides for the renovation
of the athletic fields at Frederiksen
School, located at 7243 Tamarack Drive.
*� n
, o
C N
E O
o
N 2
i BaiOhroN ~
9
SAO y0`�0
2 JpV c ,
pV0
TAM A nACN OP
SHANNON
�O p y S4
� qA
9 a
9
u
w
N `JO pig 9Of� T'
`.500
COMMENTS
This project was identified by the Dublin
Schools Facilities Improvement Task Force
and includes filling and reseeding of low
spots in the athletic fields and
irrigation system repair.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $67,190 001 $76,600 $76,600
Design 6,050
Inspection 3,360
TOTAL --> $76,600 TOTALS --> $76,600 $76,600
- 28 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Dublin School Athletic Field and PARKS
Play Area Renovation
DESCRIPTION-LOCATION
This project provides for the renovation
of the athletic fields at Dublin
Elementary School and development of a
mini-park on the former pool site. The
project is located at 7997 Vomac Road. 9c"
° JV
E a o
o �
N �
T
i • ,� eRONrON �0
n �
o
z P
PEE iAA,A RACK PJ o
SHANNON �p00
O P y n
am 9q
9 a
� X90 Y
9
0
6 ,Q
COMMENTS
`,yeo
This project was developed by the Dublin
Schools Facilities Improvement Task Force
and will be undertaken in two phases.
Phase I: Renovation of athletic fields
includes complete regrading, reseeding,
and new irrigation of fields; and
replacement of back stops. Phase II
entails converting a former pool which has
been filled into a mini-park.
Phase I Phase II
$ 69,545 $ 38,730
468, 170 276,650
$537,715 $315,380
I
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Improvements $744,820 001 $853,095 $853,095
Design 67,035
Survey 4,000
Inspection 37,240
TOTAL --> $853,095 TOTALS --> $853,095 $853,095
- 29 - CITY OF DUBLIN, CALIFORNIA
s
T
R
T
s
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9657 Annual Street Overlay Program STREETS
DESCRIPTION-LOCATION
This project provides for the placement of
a 1-1/2 inch asphalt overlay on streets
that are presently in a deteriorated
condition at various locations.
COMMENTS
As streets begin showing major structural
failures, it is important to reinforce
these streets with repairs and overlay to
reduce the need for more costly
reconstruction at a later date. The
City's Pavement Management System Program
has given the City funding guidelines, as
well as, priorities for maintaining the
City streets.
The Street Maintenance Account in the
Operating Budget includes funding for
preparatory patching for this project, for
the slurry seal project, and for the
restriping of those streets to be
overlaid. Design and inspection is
budgeted in this project for both the
overlay and patching contract.
This program will protect the substantial
investment the City has in its streets.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Survey $ 25,000 001 annual $ 9,120 $ 88,800 $ 86,600 $ 84,400 $ 82,100 $ 351,020
Design 10,000 217 125,000 111,200 113,400 115,600 117,900 583,100
Inspection 100,000 SB140 65,880 65,880
Construction 865,000
TOTAL --> $1,000,000 TOTALS --> $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000
30 — CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9678 Dougherty Road Bike Path STREETS
Amador Valley Blvd. to North City Limit
DESCRIPTION-LOCATION
This project provides for the two-phase
construction of an asphalt bike path along
the east side of Dougherty Road between
the northerly City Limit and Amador Valley
9 n
Boulevard.
°n
s o
° N
m
Z �
y C Bp'OhON 0 i
A V
T ° y0 y
i F 0
pVE
TAM A nACN p.4 °
SHANNON p0 �P00
G P
N q
a" qA
9 a
'O y
9
l7
a
J `V0 Tm v�lQ Q99
N
ONO�`N
1.580
COMMENTS
This bikeway was initially established by
the County as part of the county Bikeway
Master Plan. The City adhered to this
bikeway master plan.
In Fiscal Year 1988-89, the City received
a TDA bicycle/pedestrian grant and
constructed a separated bikeway on
Dougherty Road between the Southern
Pacific right-of-way and Amador Valley
Boulevard. The City has received another
$75,000 TDA Article 3 Grant to continue
this pathway from Amador Valley Boulevard
to Alamo Creek Park. Phase II of this
project will complete the bike path to the
northerly City Limit line.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Engineer $ 10,000 211(TDA) $72,254 $75,000 $147,254
Design 10,000
Inspection 5,000
Improvements 122,254
TOTAL --> $147,254 TOTALS --> $72,254 $75,000 $147,254
31 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9659 San Ramon Road Improvements Phase IV STREETS
DESCRIPTION-LOCATION
This project will provide for the widening
of San Ramon Road to four through lanes
between Silvergate Drive and Vomac Road.
The project would also include roadway and
median landscaping, street lighting, low
c1jr ( c
soundwalls at the edge of the road, o 0 �1
reconstruction of the Shannon Avenue
v ON
traffic signal, and a soil study to ,m�Q p
i
determine if landscaping of the western z �E 'AMA NA°N a
hillside of San Ramon Road within the SHANNON p0 pip°O
public right-of-way is feasible.
C. 9
Op
0
W
N0`v0 9mC 90o Q79
COMMENTS 5eo
This project is the fourth and final phase
for the ultimate improvement of San Ramon
Road. In 1987-88, $500,000 of Federal Aid
Urban (FAU) funds were obtained for this
project. In 1988-89, the City was
authorized to carry over $80,325 in unused
FAU funds from Phase III to this project.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Survey $ 50,000 001 $180,413 $1,796,262 $1,976,675
Engineering 5,000 210 580,325 580,325
Soils Report/Test 15,000
Design 175,000
Inspection 40,000
Improvements 2,225,000
Res Engineer 40,000
Permits & Fees 7,000
TOTAL --> $2,557,000 TOTALS --> $180,413 $2,376,587 $2,557,000
32 — CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9694 I-580/I-680 Ramp Widening STREETS
DESCRIPTION-LOCATION
This project would widen and modify the
I-580 westbound off-ramp onto northbound
I-680 from one to two lanes. It would
also eliminate the existing merge between r,T
I-580 east to northbound and I-580 west to 9`F
northbound traffic. f C N
N I
vBR�hroN o �
x p�
pJE LAMA nACN
9HA NNON �p
9 a
Op
O
COMMENTS
The costs to Dublin reflected here are a
portion of the monies needed to match the '.SBo
County's Measure B funding for this
improvement. The other matching money for
construction would come equally from
Livermore and Pleasanton with a smaller
portion from Alameda County. In addition,
Danville and San Ramon have committed to
aid in the engineering costs. Measure B
funding (1/2 cent sales tax) was approved
in 1987 by the voters for a number of
major projects. Caltrans will be designing
and administering this work.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Contribution to 001(GF) $55,834 $65,834 $121,668
County Transport
Authority $121,668
TOTAL --> $121,668 TOTALS --> $55,834 $65,834 $121,668
33 — CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9696 Dublin Boulevard Improvements STREETS
Donlon Way to Village Parkway
DESCRIPTION-LOCATION
This project will implement those
improvements identified in the Dublin
Boulevard Traffic Study, which was
approved by the City Council in 1983-84
and as amended in 1987-88 in the plan line 9c" o
update. These improvements include the E N
development of Dublin Boulevard to a six P e"'° N t
lane street between San Ramon Road and
Village Parkway. It will provide pJE r4Mn n4CK P,*
additional right-turn lanes where needed SNANN°N 9
and extra turning lanes at San Ramon Road. a "q
vy
9
t
COMMENTS
po 'r
Right-of-Way acquisition will be required
at the northeast corner of Dublin
Boulevard and Village Parkway, at the
Crown Chevrolet site, and from midblock
between Golden Gate Drive and Regional
Street, westward to Donlon Way during
Fiscal Year 1990-91 . To date the City has
received $179,593 in developer
contributions. In addition to these
contributions, the BART Dublin Extension
EIR requires BART to contribute funds
toward this project. The balance of the
project costs will have to be funded by
additional developer contributions from
new development and/or outside grants.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Engineering$ 12,000 001 $35,371 $375,129 $ 410,500
Environment Report 13,000 300 55,000 $231,629 213,371 500,000
Right-of-way Survey 309000 210 141,000 359,000 500,000
Design 729000
Inspection 359000
Right of Way 3369000
Improvements 861,000
Staking 139000
Res Engineer 30,000
Testing 2,000
Permits 6,500
TOTAL --> $19410,500 TOTALS --> $90,371 $372,629 $947,500 $1,410,500
34 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Dublin Boulevard Extension STREETS
Dougherty Rd east to Tract 5900
DESCRIPTION-LOCATION
This project would purchase right-of-way
for six lanes and construct two lanes of
improvements on the extension of Dublin
Boulevard to the east of Dougherty Road to
Tract 5900 (approximately 400 ft. )
i o
E °
o C
N m
P i� krOry Jp
0 o E
LAMA SA p
z PEE CK
SHANN°N 90
�pP
COMMENTS p °9q
v a
Dublin Boulevard is proposed to extend •'•
from Dougherty Road east parallel to I-580
to Tassajara Road and beyond. As a first
phase, this project will provide access to mm
Tract 5900. Funding for this phase is
made possible through $2,285,000 in loans
from BART and sale of excess right-of-way.
Tract 5900 is responsible for extending
one half of the ultimate improvements from
the ending point of this project east to
the Southern Pacific Railroad Right-of
Way. The remainder of the extension will
be done in incremental stages as funds
become available from the extended eastern
planning area.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Engineering$ 10,000 Dublin Blvd Ext $2,218,000 $508,000 $2,726,000
Design 38,000
Inspection 19,000
Survey 15,000
Right-of-Way 2,164,000
Improvements 480,000
TOTAL --> $2,726,000 TOTALS --> $2,218,000 $508,000 $2,726,000
35 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9C88 Dougherty Road Improvements STREETS
South of Southern Pacific Railroad
DESCRIPTION-LOCATION
This project provides for the acquisition
of right-of-way and the widening of
Dougherty Road, primarily on the east side
of the street, between Dublin Boulevard,
>� n
and the Southern Pacific right-of-way. x S
This widening would provide six travel N
lanes, landscaped medians, street trees,
and street lights. E° o
A.JE ?AMA BACK P�Py o
SHANNON O d'P�
COMMENTS
i q9
A
Properties front the section of Dougherty w
Op
Road between Dublin Boulevard and the a
Southern Pacific Right-of-Way will be m
completely developed in the near future. "a�`"0� "Z
There are sections of the street on the
east side that have not been widened.
Some right-of-way will need to be
purchased to complete this project.
Redevelopment of existing uses may require
dedication of right-of-way and
installation of improvements, which will
reduce the costs of the City project.
The City has received $17,400 of the
$1 ,050,000 in reimbursements needed to
fund this project.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Testing $ 3,000 001 $22,000 $433,000 $ 455,000
Prelim Engineer 10,000 300 $628,000 628,000
Environmental 12,000
Right-of-way
survey 20,000
Title Reports 2,000
Design 49,000
Inspection 22,000
Improvements 560,000
Right-of-way 362,000
Project Mgr 25,000
Staking 10,000
Permits 8,000
TOTAL --> $1,083,000 TOTALS --> $22,000 $433,000 $628,000 $1,083,000
36 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Dublin Boulevard Bridge over STREETS
Alamo Creek Repair
DESCRIPTION-LOCATION
This project would repair the deck and
foundation of the concrete bridge on
Dublin Boulevard over the Alamo Creek
channel,
(9 T
� S
� n
E n o
t ° c
N O
S
i BRiChlaN n
A � y
i 0 yE O
PVE TAMA nACN P4 °
SHANNON p0 �POO
O T q n
a qq
v� a
09
w
uN `VO m i0
°Jg��NE o mm2
COMMENTS
�590
Through the performance of maintenance
checks, it was discovered that the pile
foundations have become exposed due to the
erosion of storm waters running beneath
the bridge. Also, the deck is showing
some narrow cracks on the surface. It is
proposed to test and seal the concrete
deck as Phase One of this project and to
key in and rip-rap the slopes under the
bridge as Phase II.
i
ESTIMATED COSTS FINANCING YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Testing $ 3,000 001 $38,500 $184,500 $223,000
Design 16,000
Inspection 4,000
Improvement 200,000
TOTAL --> $223,000 TOTALS --> $38,500 $184,500 $223,000
- 37 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Street Subdrains STREETS
DESCRIPTION-LOCATION
This project would provide interceptor
trench drains at several locations
throughout Dublin in paved street areas.
The drain design includes a perforated
pipe surrounded by drain rock and filter
fabric. This pipe is directed to an p �l
existing storm drain. The streets needing
these drains are: Village Parkway, Amador
Valley Boulevard, San Ramon Road, and J y
Stagecoach Road. SNA NNOIA NAC�P�P
a 9q
v, a
P
u
N 0`'Jo PmC y°fQ Q91
1.65
COMMENTS
There are a number of locations in street
areas where subsurface water is being
concentrated. This is causing the
pavement structural sections to fail.
This water is due to natural spring,
median watering and private property
watering. The subdrain will drain away
the damaging water and prolong the life of
the pavement.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 10,000 001 $260,000 $260,000
Inspection 10,000
Improvement 240,000
TOTAL --> $2609000 TOTALS --> $260,000 $260,000
38 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Landscaping Silvergate Medians STREETS
Assigned
DESCRIPTION-LOCATION
This project would upgrade the landscaping
that exists in the medians at the south
end of Silvergate Drive and install new
landscaping in the medians at the east end '10T
of the street. Both areas would be fully `� 0
o
irrigated. E
o =
Z
z BR/ChION y
0
O O Ey O +
2 pVE -MA RACK PJpy o
SHANNON 9 p00
Q PtD y `fo
a RH
Q. yy as
9
6
0`40 9mc c(o Q�1
OUO�'N O mmZ
%-560
COMMENTS
'The landscaping on the south end of
Silvergate Drive has never reached its
potential, basically due to lack of
irrigation, plus the need for a more
integrated design for the plant materials.
The medians at the east end of the street
have never been landscaped and have been
left as bare soil. The annual irrigation
and maintenance costs are estimated at
$5,000.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Engr $ 8,000 001 $145,000 $145,000
Design 12,000
Inspection 5,000
Improvements 120,000
TOTAL --> $145,000 TOTALS --> $145,000 $145,000
- 39 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
9656 Traffic Signals - Village Parkway at STREETS
Brighton Drive and at Tamarack Drive
DESCRIPTION-LOCATION
This project would provide for the
installation of traffic signals at the
intersections of Village Parkway and
Brighton Drive and Village Parkway and
Tamarack Drive. These signals would be c"
interconnected to the other existing a N
traffic signals on Village Parkway south
of this project. ,°
E p
z ' IAM ACN P,PyO c
J
SNAN N00 PO °O
P
9p P N n
j q9
r a
9
6
J 1.500
COMMENTS
A traffic study conducted during Fiscal
Year 1983-84 found that these signals were
marginally warranted. The City has
applied for funding for this project.
Annual maintenance and electricity costs
are estimated at $10,000.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 20,000 001 $10,000 $270,400 $280,400
Inspection 10,000
Improvements 250,000
Fees 400
TOTAL --> $280,400 TOTALS --> $10,000 $270,400 $280,400
- 40 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet Downtown Street Light Additions STREETS
Assigned
DESCRIPTION-LOCATION This project will complete the
installation of street lights in the
downtown area including Golden Gate Drive
(7), Clark Avenue (9), Sierra Court (4), C,1+
q T
Sierra Lane (6), and Amador Valley n
Boulevard east of Village Parkway (4) .
Z 9AOh'pN n
Z
P
A6 LAMA HACK
SHANNON p° �p0
O y q
i QH
9 D
09
w
N p`q0
pVO�`N mmy
ySU
COMMENTS
A number of street lights have been
installed in the downtown area over the
past seven years, together with other
street and traffic signal projects. This
project will complete the lighting of the
remaining streets in the downtown.
commercial areas.
It is proposed to install the lights on
Golden Gate Drive as Phase I of this
project, with the remainder in Phase II.
Annual energy costs are estimated to be
$2,500.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Design $ 17,000 001 $53,000 $182,000 $235,000
Inspection 8,000
Improvements 210,000
TOTAL --> $235,000 TOTALS --> $53,000 $182,000 $235,000
41 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet New Street Parallel to and STREETS
Assigned South of Dublin Boulevard
DESCRIPTION-LOCATION
This project will construct a 68-foot-wide
roadway between Amador Plaza Road and
Regional Street south of and parallel to
Dublin Boulevard. It includes two 20-foot
paved lanes, one 12-foot two-way left turn
lane, and a total of 16 feet of E S
combination sidewalk and landscaping along
the sides of the travelway.
i
O E
z pE 7AMA HACK p,py`• .
SNAN NON 90 BPD°
O
H So
a qA
r a
o byo Y
9
O
W 4
o v
N BLNO m 9�f0 i
ONBJN °
,.,BO
COMMENTS
The need for a connector road for three
long commercial cul-de-sacs was identified
in the City's Downtown Study. The need
will become more apparent as this portion
of the Central Business District develops
further and the proposed BART parking lot
is constructed along Golden Gate Drive.
It is expected that this project would be
funded through private contributions in
the form of a downtown traffic development
fee and/or as offsite environmental
mitigation improvements.
A total of $4,800 in reimbursements have
been collected to date for this project.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Engr $ 20,000 300 $2,241,000 $1,275,000 $3,516,000
Design 100,000
Inspection 50,000
Right-of-way 2,121,000
Improvements 1,218,000
Permits 7,000
TOTAL --> $3,516,000 TOTALS --> $2,241,000 $1,275,000 $3,516,000
- 42 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
Not Yet I-580 Offramp Improvements STREETS
Assigned at San Ramon Road
DESCRIPTION-LOCATION
This project would provide modifications
to the I-580 westbound offramp including a
traffic signal to control the conflict
between the northbound traffic from C,,q
Pleasanton and the westbound-to-northbound
off-ramp traffic. f S
° €
s ' aq,N,oN x
y
OE
TAMA RACK p.JP�y C
SHANNON p0 �p00
G F
y A
a' 9q
aP 9y a
Y� Y
~ 9
t7
W
y
90
. � 0LV0
DUPJN o mm2 O
COMMENTS
,.580
This improvement was identified as being a
necessary traffic improvement through the
City's Downtown Improvement Study. It is
anticipated to be funded through a traffic
mitigation fee for the Dublin Downtown
Commerical area. As it is on the State
right-of-way, coordination and permits
would be required from Caltrans.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Engr $ 10,000 300 $65,000 $660,000 $725,000
Design 55,000
Inspection 30,000
Improvements 610,000
Staking 10,000
Testing 10,000
TOTAL --> $725,000 TOTALS --> $65,000 $660,000 $725,000
43 - CITY OF DUBLIN, CALIFORNIA
1990-95 CAPITAL IMPROVEMENT PROGRAM
PROJECT NO. PROJECT DESCRIPTION ACTIVITY
new Road Parallel to Southern Pacific STREETS
Right-of-Way - Dougherty Road
to Dublin Boulevard Extension
DESCRIPTION-LOCATION - --
This project would provide a 4-lane
roadway connection between Dougherty Road
and the easterly extension of Dublin
Boulevard (parallel to the Southern
Pacific Railroad Right-of-Way) .
£ C NN 2
i BAi�tiro y
i m N `VO aaA
pVE TAMA NACN Pte'* O
SHANNON
G �
N 4
a" 9q
s,� a
COMMENTS 0
y 0 Q�r
This road is included in Dublin General N o�e�`NBLID
Plan and would serve to relieve the
Dougherty Road/Dublin Boulevard
intersection of much of the southbound to
eastbound turning traffic. At this time,
it is assumed that right-of-way could be
obtained from the U. S. Army (Camp Parks)
and/or Alameda County at no cost.
A total of $12,400 in reimbursements has
been collected for this project.
ESTIMATED COSTS FINANCING/YEARS SCHEDULE
Fund Prior Years 1990-91 1991-92 1992-93 1993-94 1994-95 TOTALS
Prelim Topography $ 20,000 300 $1,738,000 $1,738,000
Design 120,000
Inspection 60,000
Construction 1,500,000
Staking 30,000
Permits 6,000
Tests 2,000
TOTAL --> $1,738,000 TOTALS --> $1,738,000 $1,738,000
- 44 - CITY OF DUBLIN, CALIFORNIA