Loading...
HomeMy WebLinkAboutItem 8.1 Nielsen School Play Area CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: October 10, 1991 SUBJECT Nielsen School Play Area Renovation EXHIBITS ATTACHED a Cost estimate e Preliminary plan will be available for review at the meeting RECOMMENDATION 1 . Receive presentation from Singer & Hodges 2. Receive public comment 3 . Approve design; direct consultant to proceed with preparation of construction documents FINANCIAL STATEMENT The budget for this project is as follows: Design/Inspection $13 ,800 Improvements $45 , 000 TOTAL $58 , 800 DESCRIPTION Included in the Fiscal Year 91-92 Budget are funds for the renovation of the Nielsen School Playground. This project will be funded, in part, by the Dublin Unified School District and the Nielsen School Parent Faculty Club who have agreed to contribute $21 ,000 towards the project. The City has contracted with the landscape architectural firm of Singer and Hodges , Inc. to prepare the design and construction documents for the project. Singer & Hodges, Inc. has prepared a preliminary design for the play area for review by the City Council and the public. The proposed equipment for the play area includes a modular play system with metal components finished with a powder-coat paint. The equipment will be installed on a "Fibar" base contained by a concrete curb. The preliminary cost estimate for construction of the play area as currently designed is $44 , 160 which is within the amount budgeted for construction. The preliminary design was reviewed and approved by the Parks and Recreation Commission on September 24 , 1991. It is, therefore, recommended that the City Council take the following action: 1 . Receive presentation from Singer & Hodges, Inc. 2 . Receive public comment 3 . Approve design and direct consultant to proceed with preparation of construction documents ---------------------------------------------------------------------- ITEM NO. COPIES TO: Singer & Hodges, Inc. Dublin Unified School District CITY CLERK FILE 6 NIELSEN ELEMENTARY SCHOOL PLAY AREA PRELIMINARY COST ESTIMATE SEPTEMBER 20, 1991 uantit Units Unit Cost item m-., Total Bid Item Descriptions. �._ L-111 `65 $ 1,953. Clearing and Grading 3,004 S.F. Concrete Curb 164 L.F. 55.00 9,020. Play Equipment Allow --- --- 17,030. Fibar 1,956 S.F. 4.60 8,998. Benches 2 EA. 800.00 1600. Subtotal : $ 38,601. 4% Mobilization - 1,544. Subtotal : $ 40,145. 10% Contingency: 4,015. TOTAL: 4_.., -