HomeMy WebLinkAbout05-10-2016 PC Minutes E<ts Planning Commission Minutes
Tuesday, May 10, 2016
1. CALL TO ORDER & PLEDGE OF ALLEGIENCE TO THE FLAG
A regular meeting of the City of Dublin Planning Commission was held on Tuesday, May 10,
2016, in the City Council Chambers located at 100 Civic Plaza Chair Kohli called the
meeting to order at 7:00 pm
Present: Chair Kohli, Vice Chair Mittan, Commissioners Bhuthimethee and Goel, Jeff Baker,
Assistant Community Development Director; Kit Faubion, Assistant City Attorney; Kristi
Bascom, Principal Planner; and Debra LeClair, Recording Secretary.
Absent. Cm. Do
2. ORAL COMMUNICATIONS — NONE
3. CONSENT CALENDAR —
3.1 Minutes of the April 12, 2016 Planning Commission Meeting. On a motion by Cm
Cm. Goel and seconded by Cm Bhuthimethee, on a vote of 4-0-1, (Cm. Do absent)
the Planning Commission approved the minutes of the April 12, 2016 meeting
4. WRITTEN COMMUNICATIONS — NONE
5. PUBLIC HEARINGS — NONE
6. UNFINISHED BUSINESS — NONE
7. NEW BUSINESS —
7.1 Kaiser Dublin Medical Center Project Update (PA 08-050) The Planning
Commission will receive a report on the status of the project and a presentation from
both City Staff and the Project Applicant on the detailed site and architectural designs
for the first phase of the medical campus as well as an overview of the medical
campus master plan
Vice Chair Mittan recused himself from Item 7.1 due to his ownership of a rental property within
500 feet of the project
Kristi Bascom, Principal Planner, presented the project as outlined in the Staff Report.
Cm. Bhuthimethee asked why the project update at this time
Ms Bascom answered that, due to the size and magnitude of the project, Staff wanted to give
the Planning Commission a preview of what will come before them in the future and give them
an opportunity to ask questions.
Jeff Baker, Assistant Community Development Director, added that there is interest in the
community and Staff wanted to ensure that the community is informed and has an opportunity to
ask questions and provide input
Cm. Goel asked if the Planning Commission will receive a presentation for the commercial
portion (Phase lb) with the next presentation, since the timing is the same as Phase la.
Ms. Bascom stated that Kaiser was hoping to have the commercial center Phase 1 b proceed at
the same time as Phase la; however, the commercial site has not been defined as yet The
application will be submitted in the future, but it has not been received by City Staff yet.
Cm Goel asked how the height of the complex will compare to the adjacent buildings
Mr Baker answered that the recently approved Aloft Hotel at the tallest element will be
approximately 53 feet, with the main building being approximately 48 feet tall at 4 stories He
stated that the Grafton Plaza residential was approved at 3 stories and will be approximately 42
feet at the peak of the roof Across Dublin Blvd. there are similar heights in the 40-50 foot
range
Cm. Goel asked about elevation changes across Dublin Blvd and if those developments are
also approximately 45 feet tall
Mr Baker stated that the properties across Dublin Blvd. are approximately 40-50 feet in height
from Dublin Blvd. to the peak of the roof
Cm Goel asked about receiving a copy of the environmental document as part of the
presentation
Ms. Bascom responded that the Planning Commission will receive a copy of the Draft EIR as
well as the public comments and response to those comments. She stated that there were no
comments received regarding building heights. She pointed out the buildings and their proximity
to the project on a slide
Hollis Harris, Kaiser Permanente, Applicant, spoke in favor of the project. She stated that
Kaiser is ready to build the complex and with 134,000 members of Kaiser Permanente they are
excited to expand into the Tn-Valley She stated that the existing clinics in Pleasanton, San
Ramon and Livermore will remain open because they are primary care facilities. The current
application will provide specialists, radiation, an oncology center and an infusion center She
thanked City Staff for their collaborative effort. She stated that Kaiser wanted to the complex to
be visible but as unobtrusive as possible in order to preserve the character of Dublin.
Tyler Krehlik, SmithGroupJJR, Architect, spoke in favor of the project and introduced his team.
He presented the architectural design of the project and listed the services that will be provided
and the garden atmosphere of the site.
Don (chino, SmithGroupJRR, Design Architect, spoke in favor of the project and gave an
overview of the design of the entire project, i e , building elevations, building massing,
pedestrian access and the "building within a garden" concept
Jimmy Chen, RHAA, Landscape Architect, spoke in favor of the project and gave an overview of
the landscaping plan including the water detention basins
Mr. Krehlik thanked the Planning Commission for their time.
Cm Bhuthimethee asked Ms Harris how she felt the project would improve the Dublin
community.
Ms. Harris responded that, currently the 134,000 Kaiser Members must drive to Walnut Creek
for hospital services and the traffic is challenging. She felt that it is important for Dublin
residents to be able to take care of their health care needs in their own community in a nice
setting and felt that the complex will be a benefit for the local community and a slightly broader
community outside the TTl-Valley area.
Cm Bhuthimethee asked how the project will fit into the City and benefit the Dublin community
Ms. Harris stated that Kaiser is embarking on a new core value of total health, which is mind,
body and spirit and a community that links it all together She stated that for a community to be
healthy, they need to have good health care, as well as good schools, shopping experiences,
and housing and Kaiser would like to become an integral part of that community
Cm. Bhuthimethee asked if there is a linear accelerator in the project
Mr Krehlik answered that there will be 4 linear accelerators on-site allowing for radiation therapy
at the center The accelerators are stored within shielded bunkers of 4-7 feet thick concrete
around each room He stated that the radiation shielding was designed by a radiation physicist
and approved by the Radiological Board of the State of California
Cm Bhuthimethee asked about the energy center
Mr. Krehlik responded that the energy center is a large building that houses the main
transformer vaults, boilers, water heaters, and chillers for the air conditioning. The energy
center would be associated with the high acuity medical building in Phase 2.
Cm Bhuthimethee asked about the artwork and where it would be located
Mr. Krehlik answered that the proposed artwork would be on the north side of the building facing
Dublin Blvd He stated that they studied where the best place for the art would be and decided
that, to give the artist the most freedom and not burden them with solar control, the north side
would be best. On the south side of the building they will need to do solar control to keep glare
and heat out of the building He also felt that having the artwork face away from the community
would not be a good idea.
Cm. Bhuthimethee asked if there would be artwork seen from the 1-580 freeway
Mr (chino stated that the artwork that is currently being considered has a kinetic quality so that it
changes as you move past it
Cm Bhuthimethee asked if there will be artwork for each phase or will this be representing the
entire campus
Mr. Ichino stated that, according to the Dublin Arts Program, each building would require artwork
specific to each phase
Cm. Bhuthimethee felt that Kaiser has chosen a great location for the Phase la building, and
will be interested to see how artwork will enhance the elevations facing 1-580 freeway.
Mr (chino answered that facing 1-580 will have a different perceptual scale being seen from an
automobile on the freeway.
Cm. Goel asked the landscape architect if there will be an elevated deck surface in the "outdoor
rooms" as shown on one of the slides
Mr. Chen answered that the deck will not be elevated and the slide was to show the general
concept of the roof
Cm. Goel stated that he liked the elevated deck concept and felt that it would bring out some
emphasis or "zen" to the area. He suggested that, when the proposal is submitted, they add
more textures and colors that will work with the overall environment
Cm. Goel asked if the plant materials and selections will take into consideration allergies. He
felt that some of the plant materials listed could be pollen producing and wanted to ensure that
some consideration was made for allergies He also wanted to ensure that the plant materials
would also be drought tolerant and suggested a more Japanese environment
Mr Chen answered that, while refining the design, they will be more strategic regarding
allergies. He stated that he appreciated Cm. Goel's comments and will take them into
consideration during the design phase
Cm Goel mentioned Phase la as the center of the project with landscaping where Phase 3 will
be built in the future He asked if they would remove the landscaping and replant that area as
part of their strategy, and if the concept for the entire project will be "a building in a garden."
Mr Chen stated that when they started the design process they looked at all the phases
together but they have not developed design concepts for the different phases
Ms Harris stated that what they do in Phase la will set the tone for the entire campus She
stated that, as the project is built out, it will look like one cohesive design element
Cm Goel asked if installation of a sub drainage basin will not only help with retention on the site
but percolation as well
Mike Hastings, Engineer, Sherwood Design Engineers, answered that they are utilizing the
regional water quality basin for the portion allotted which will allow them to drain directly to the
culverts that drain to the basin. He stated that they will manage water through bio retention and
will treat all of the water to the standards that are required
Cm Goel asked about traffic along Dublin Blvd and turning movements in and out of the facility.
He asked how this correlates to the overall regional plan for Dublin Blvd
Mr. Hastings responded that there is a full transportation study with the EIR and all the
improvements with each phase will be more than adequate to handle the increased traffic loads
Cm Goel asked if Dublin Blvd , at this site, will be a Level of Service (LOS) F in 2040
Mr Hastings answered no; he did not recall the details of the 2040 situation, but with Phase la
all the required improvements will be completed
Cm Goel asked if the project will meet the parking requirements.
Mr Hastings stated that there are approximately 200 parking spaces more than required.
Chair Kohli asked what uses will be allowed in Phase 1b, and the estimated number of
employees working in the overall facility
Ms Harris answered that the first building Phase la, will have approximately 400-500
employees on a daily basis; evenings and weekends will have a much smaller crew. She stated
that there will be a broad range of uses allowed for Phase lb because of the rapidly changing
medical care and what is provided She stated that uses such as office, retail, R&D, senior
housing, or a skilled nursing facility will be allowed as they continue to determine the best use
for the very large parcel
Chair Kohli asked additional questions about the type of retail tenants that might be allowed to
operate in a commercial center at this site using a yogurt shop as an example
Ms. Harris stated that she is unsure at this time how the land will be developed She stated that
Kaiser will ensure that their members' needs are met first. She stated that there could be a
yogurt shop but was not sure. She stated that, at full build out, there should be approximately
2,500 employees at the site.
Mr. Baker mentioned that, with the commercial component, a wide range of uses are proposed
to be allowed, these are not necessarily all Kaiser serving uses, and could be a retail center or
skilled nursing, there are a host of uses that could be allowed
Chair Kohli felt that, when the uses are determined, the projects will come to the Planning
Commission
Ms Harris stated that they have tried to allow for maximum potential uses, but whatever use is
determined will come before the Planning Commission
Cm. Goel asked if there will be a full medical facility at the Kaiser project
Ms Harris answered that the name "high acuity medical center" Phase 2 could be a hospital
She stated that health care is a rapidly changing field and she was not sure at this time but
wanted to preserve the right for a hospital, but does not want to promise a hospital and not
deliver one.
Cm Goel felt that this is the best location for a hospital, due to the traffic congestion along the
tri-valley corridor and encouraged them to include a maternity ward
Ms Harris answered that the location is the reason they purchased the property, but hospitals
are incredibly expensive and an involved process to be build She stated that, at some point,
she could see a hospital on the campus. She stated that the first building will include an urgent
care facility which will be staffed by ER doctors and patients can avoid going to Walnut Creek
ER and come to Dublin instead
Scott Mittan, Planning Commissioner, spoke as a resident. He stated that he is in favor of the
overall concept. He encouraged the Planning Commissioners to scrutinize the project in high
detail and determine the development of the entire project so that they get it right at this point
He suggested that they demand high quality building materials. He felt that with the amount of
high density residential close by that pedestrian traffic should be considered paying attention to
the look and feel of getting to the facility He was concerned with the amount of the parcel
dedicated to a parking lot and would like to see enhanced paving materials. He wanted to
ensure that there is good access to public transportation. He was concerned with the noise
impact of ambulances at the possible hospital site. He asked if safety issues related to the
Livermore Airport were considered in the EIR He wanted to ensure that there was a good
transition from the future residential and the commercial site so that it all blends together
Robert Upham, resident, was concerned about traffic in Dublin and how this project will impact
the city. He asked if the facility will be open to everyone in Dublin or only Kaiser members and if
so, he felt that it would not serve the entire community.
Janice Wei, resident, was concerned about traffic and public transportation to the Kaiser facility,
but stated that she is in favor of the hospital. She was also concerned about the number of
employees and patients and how that would affect the traffic situation.
Ms. Bascom stated that there was a detailed traffic analysis completed with the City's EIR which
takes into account the existing and future conditions and at build out. She stated that the
document looks at all development within the community that has been planned for at the year
2040 when the facility would be fully operational. She stated that, not only does it take into
account all the development, but it takes into account all the traffic improvements that are
planned. There will be a number of traffic improvements that will be triggered by the Kaiser
project; additional lanes in the immediate vicinity, roadway width; and activating signals that are
not currently operating. She stated that there will be a lot of improvements that were planned
for in the long term that will come on board as additional projects are built She added that the
project site was designed to account for additional rights of way for CalTrans and for the BART
extension to Livermore.
Ms Harris responded to the question regarding if anyone can come into a Kaiser facility, she
stated that it is not a yes or no question. She added that anyone can come in, but Kaiser
members pay a fee to have access to Kaiser health care If a resident is not a member they can
be seen but on a fee-for-service basis. She added that there is a pharmacy that can be used
by anyone, as well as Vision Essentials which is the eye care section where anyone can buy
eye glasses and contact lenses She stated that a hospital cannot deny service to anyone that
comes to the ER. She conferred with her legal counsel and then stated that, as part of the
community benefit, when there are members of the community that need healthcare, Kaiser will
work to provide that. She added that Kaiser has a broad community benefit outreach that will
start to be a factor in the community
j
Mr Krehlik responded to the pedestrians question - He stated that there is full pedestrian
access to the front doors from the sidewalks along Dublin Blvd which will be built to City design
standards He pointed out the bus stop on the campus and regarding the ambulance and noise
question — he stated that, for Phase 1a, the ambulances are there only for scheduled transport
of cancer patients and no sirens would be needed
Mr. Upham asked where he can obtain the results of the traffic study and was concerned with
the results
Cm. Goel stated that he assumed that the traffic study took into account the MTC's 2040
projections for the regional network and takes into account Dublin Blvd., 1-580 and all tributary
corridors. He asked when the traffic study was completed
Ms Bascom answered that the EIR was released for public review in February and March which
means the traffic study was completed prior to that
Cm. Goel asked if the traffic study took into account the Eastern Dublin Specific Plan and all the
developments that are currently known He asked if the study included Fallon Road as a
corridor, 1-580 and the east and west movement on Dublin Blvd
Ms Bascom responded that the traffic study looked at the entire circulation system throughout
the City, both current and future
Cm. Goel felt that the resident was asking if there would be a BART station near the Kaiser
facility but the last known public information shows that the first BART station to the east would
be near Isabel in Livermore and would not be close to the Kaiser facility
Ms. Harris thanked the Planning Commission for their comments and questions which will give
them a lot to work on
Cm Bhuthimethee asked if the comments received regarding the ER were available for review.
Ms Bascom responded that they are public information and will appear in the Final ER when it
is published
Mr Baker reminded the Planning Commission that this item was informational only and no
action will be taken tonight However, the Applicant and Staff will take their comments and bring
the project back at a future date for consideration
Cm Goel felt that pedestrian access was important and suggested providing some additional
safety elements such as color to the crosswalks and a safe landing area. He was in support of
the overall design of the project and felt that using more enhanced materials in the parking lot
would help He assumed that the EIR would address the residents' concerns regarding the
Livermore Airport and the noise element
Chair Kohli thanked the members of the public for attending the meeting and providing
comments. He also thanked the Applicant for the presentation and stated that he is looking
forward to continuing the discussion and felt that the hub will set the tone for the rest of the
project and wanted to create a project that truly represents Dublin and benefits the community
but stays in line with the Kaiser mission.
8. OTHER BUSINESS - Brief INFORMATION ONLY reports from the Planning Commission
and/or Staff, including Committee Reports and Reports by the Planning Commission related
to meetings attended at City Expense (AB 1234)
9. ADJOURNMENT- The meeting was adjourned at 8 33 37 PM
Respectfully submitted,
Plan Commission Chair
ATTEST:
h
Pr-Jeff Baker
Assistant Community Development Director
G 1MINUTES120161PIANMNG COMMISSIOMD5 1016 FINAL PC MINUTES(CF)docx
o ! ..