STAFF REPORT
CITY COUNCIL
DATE:July 19, 2016
TO:
Honorable Mayor and City Councilmembers
FROM:
Christopher L. Foss, City Manager
SUBJECT:
Approval of Agreement with the City of Livermore for Inclusion of Dublin
Street Improvements in City of Livermore Slurry Seal 2016 Project and
Implementation of Parking Regulations along Amador Plaza Road
Prepared by: William Lai, Assistant Civil Engineer
EXECUTIVE SUMMARY:
The City Council will consider approving the Agreement with the City of Livermore to
include micro surfacing pavement treatment of Amador Plaza Road from Dublin
Boulevard to Amador Valley Boulevard in Livermore’s Slurry Seal 2016 Project.
The City Council will also consider implementation of parking restrictions along parts of
Amador Plaza Road from Dublin Boulevard to Amador Valley Boulevard to improve
visibility and safety for vehicle, pedestrian, and bicycle traffic and to accommodate the
installation of bike lanes.
STAFF RECOMMENDATION:
Resolution
Staff recommends that the City Council adopt the Approving an Agreement
between the City of Livermore and City of Dublin to Include City of Dublin Street
Improvements in City of Livermore Slurry Seal 2016 Project 2016-04 and for the City of
Dublin to Reimburse the City of Livermore for the Portion of Work Taking Place Within
Resolution
the City of Dublin; and adopt the Amending the Dublin Traffic Code
Approving Parking Regulations Along Amador Plaza Road.
FINANCIAL IMPACT:
The total bid amount for the Dublin portion of the work is $84,672.90. A 20%
construction contingency, in the amount of $17,000, is requested for unforeseen
construction issues, bringing the total construction contract cost to $101,672.90. A
$4,000 payment to the City of Livermore will compensate for contract administration
costs and is approximately 5% of the Dublin portion of work. The cost to install signs
and paint curbs for the implementation of parking regulations is included in the bid
amount.
There is sufficient budget in the Annual Street Resurfacing Project (CIP No. ST0117),
14
Page of
which includes Measure B, Measure BB, and Gas Tax funding sources, to cover the
cost of this work. Upon approval of the agreement, Staff will transfer $105,672.90 to the
Amador Plaza Road Bicycle and Pedestrian Improvements project (CIP No. ST0815).
There will be no impact to the General Fund.
Project Budget
Expenditures
Project Improvements $84,672.90
Construction Contingency (approx. 20%) $17,000.00
Subtotal, Construction Costs $101,672.90
Project Administration $4,000.00
Total Cost for Improvements $105,672.90
Funding Sources
Measure B - Local Streets and Roads $105,672.90
(from Project No. ST0117)
DESCRIPTION:
The Amador Plaza Road Bicycle and Pedestrian Improvements project (CIP No.
ST0815) is a multi-phase project that implements a Tier 1 project from the City of Dublin
Bicycle and Pedestrian Master Plan by implementing various improvements that
enhance traffic safety, improve traffic circulation, provide pedestrian connections, and
provide bicycle lanes. The first phase of the project was the construction of two mid-
block pedestrian crossings and installation of a raised median to revise vehicle ingress
and egress at the Safeway driveway. The second phase is the installation of on-street
bicycle lanes and modification of on-street parking.
A pavement surface treatment of Amador Plaza Road, between Dublin Boulevard and
Amador Valley Boulevard, is a very small pavement maintenance project of
approximately 90,000 square feet and construction costs would be expected to be high
as a standalone project. In comparison, the previous slurry seal project covered
660,000 square feet of pavement. Rather than developing a small and expensive
project or waiting until summer 2017 to include Amador Plaza Road on a larger
pavement maintenance project, City staff reached out to San Ramon, Pleasanton, and
Livermore, and asked if they would be willing to include a Dublin street with one of their
upcoming pavement projects. The City of Livermore staff was receptive to the idea of
joining forces for a cooperative pilot project.
The Amador Plaza Road work was included as an alternate bid item in Livermore’s
Slurry Seal 2016 Project. Bids were opened on June 22, 2016 and are summarized in
the table below. Since Dublin’s work was an alternate bid item, the basis of awarding
the contract is the lowest base bid for Livermore’s work only. The low bidder for
Livermore’s work is Telfer Pavement Technologies, LLC with a bid of $1,072,335.00 for
the base bid and $84,672.90 for Dublin’s work.
Should the City Council approve this agreement, and should the City of Livermore City
24
Page of
Council approve the agreement and award the contract, the work is expected to be
completed by the middle of November 2016.
City of Livermore Bid Results
Telfer Pavement
Technologies,
American
LLC
Contractor Asphalt Bond Blacktop VSS International
Project Bid
$1,072,335.00
(Basis of $1,128,830.65 $1,188,987.24 $1,225,000.00
Low Bid)
Bid for
$84,672.90
Dublin Work $84,221.20 $101,261.90 $85,000.00
Only
Total $1,157,007.90 $1,213,051.85$1,290,209.14$1,310,000.00
In general, the responsibilities of each agency are outlined below:
1. Livermore will award and administer the construction contract with the low bidder
2. Livermore will pay the contractor for completed construction and will forward
invoices to Dublin for the Amador Plaza Road street improvements
3. Dublin will coordinate the construction schedule and public notification for work
within Dublin.
4. Dublin will perform inspection of the construction work
5. Dublin will pay the cost of construction for work in Dublin plus $4,000 for
Livermore’s project administration services
Pavement Surface Treatment - Micro Surfacing
The City of Dublin has traditionally used a slurry seal as a preventative maintenance
technique to prolong the life of asphalt concrete surfacing. As streets begin showing
wear and stress cracks, it is important to seal the cracks to keep water from getting
under the roadway pavement. Slurry consists of a sand/oil mixture which seals cracks
and provides a new uniform wearing surface.
The City of Livermore has been using micro-surfacing as a preventative maintenance
technique on arterial roadways and Livermore specified micro-surfacing as the
pavement treatment in their 2016 slurry seal project. Micro-surfacing is similar to a
slurry seal except that a polymer-modified, quick-set emulsion is used to bind a more
strictly specified aggregate. Micro-surfacing is a stiffer, slightly thicker pavement
treatment that requires different construction equipment than slurry. The polymer-
modified emulsion results in a chemical reaction to “set” the material after placement,
versus slurry seal which relies on the evaporation of water to “set” the slurry. This
treatment is expected to have a slightly longer life span and to dry much faster, reducing
traffic disruption and allowing vehicles back on the street much sooner. The work will
also include localized repair of failed asphalt and pavement striping. Public Works staff
intends to closely monitor and evaluate the micro-surfacing pilot project to determine
whether future use of micro-surfacing should be considered as part of the City’s
comprehensive pavement management plan.
34
Page of
Parking Restrictions
In accordance with the City of Dublin Bicycle and Pedestrian Master Plan, bike lanes
will be added to Amador Plaza Road as part of this project. Adding bike lanes requires
the removal of on-street parking on one side of the street. The adopted Master Plan
proposed the removal of on-street parking from the east side of Amador Plaza Road.
The project will also install pavement marks (parking “T”s) to better organize the on-
street parking. Staff conducted a community meeting on last July with eight attendees to
discuss the parking removal. Attendees were supportive of this action.
Staff conducted a parking survey and found that the majority of vehicles parked on the
street were present for more than four hours, indicating that parking demand is related
to BART users rather than business patrons. As such, in addition to removing on-street
parking on the east side, Staff proposes to implement Two-Hour parking restrictions
along the west side of the street. Limiting parking duration will increase parking
availability for business patrons and prevent BART users from parking for more than
two hours. The project will also install pavement marks (parking “T”s) to better organize
the on-street parking. Staff conducted a community meeting on July 27, 2015 with eight
attendees to discuss the parking removal. Attendees were supportive of this action.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
Advance notice of construction activity will be mailed to adjacent property owners and
project information will be included on the City’s website. A copy of this staff report was
sent to the City of Livermore.
ATTACHMENTS:
1. Location Map
2. Typical Lane Configuration Figure
3. Resolution Approving the Agreement with the City of Livermore for the Inclusion of
Dublin Street Improvements in City of Livermore Slurry Seal 2016 Project 2016-04 with
Agreement as Exhibit A
4. Resolution Amending the Dublin Traffic Code Approving Parking Regulations along
Amador Plaza Road
44
Page of
No Parking Zone
2-Hour Parking Zone
SAFEWAYSAFEWAY
REIREI
SPROUTSSPROUTS
ELEPHANT BARELEPHANT BAR
CHIPOTLECHIPOTLE
PANERA BREADPANERA BREAD
LOCATION MAP
AMA
D
O
R
P
L
A
Z
A
R
O
A
D
AMA
D
O
R
P
L
A
Z
A
R
O
A
D
N
Attachment 1
TYPICAL LANE CONFIGURATION
Attachment 2 N
Attachment 3
RESOLUTION NO. ___- 16
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * * * *
APPROVING AN AGREEMENT BETWEEN THE CITY OF LIVERMORE
AND CITY OF DUBLIN TO INCLUDE CITY OF DUBLIN STREET
IMPROVEMENTS IN CITY OF LIVERMORE SLURRY SEAL 2016
PROJECT 2016-04 AND FOR THE CITY OF DUBLIN TO REIMBURSE THE
CITY OF LIVERMORE FOR THE PORTION OF WORK TAKING PLACE
WITHIN THE CITY OF DUBLIN
WHEREAS, the City of Dublin wishes to perform pavement maintenance work
along Amador Plaza Road between Dublin Boulevard and Amador Valley Boulevard ;
and
WHEREAS, the adopted City of Dublin Bicycle and Pedestrian Master Plan
includes a Tier 1 project which includes installation of mid-block crosswalks, removal of
on-street parking on the east side and installation of bicycle lanes on Amador Plaza
Road; and
WHEREAS, in lieu of bidding a small and relatively expensive slurry seal project
for Amador Plaza Road, the City of Dublin sought a partnership opportunity with the City
of Livermore include pavement maintenance of Amador Plaza Road in a future City of
Livermore project; and
WHEREAS, the City of Livermore conducts an annual pavement maintenance
project; and
WHEREAS, it is financially advantageous for the City of Dublin to add the
Amador Plaza Road maintenance work to the City of Livermore’s Slurry Seal Project
2016; and
WHEREAS, the City of Livermore included the Amador Plaza Road maintenance
work as an alternate bid item to the City of Livermore’s Slurry Seal Project 2016; and
WHEREAS, the City of Livermore did, on June 22, 2016, publically open,
examine and declare all sealed bids for the Slurry Seal Project 2016; and
WHEREAS, the City of Livermore did receive favorable bids for the pavement
maintenance of Amador Plaza Road; and
WHEREAS, the City of Livermore will conduct work in Dublin on behalf of the
City for Dublin; and
WHEREAS, the City of Dublin will reimburse the City of Livermore for the portion
of work taking place within the City of Dublin.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Dublin does hereby approve the Agreement between the City of Livermore and City of
Dublin to include City of Dublin Street Improvements in City of Livermore Slurry Seal
2016 Project 2016-04 and for the City of Dublin to reimburse the City of Livermore for
the portion of work taking place within the City of Dublin (Exhibit 1).
BE IT FURTHER RESOLVED that the City Council of the City of Dublin
authorizes the City Manager, or his/her designee to execute in the name of the City of
Dublin, the Agreement and such other documents, and to take such other and further
action, as necessary and appropriate to carry out the Intent of this Resolution.
PASSED, APPROVED AND ADOPTED this 19th DAY OF JULY, 2016.
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________________
Mayor
ATTEST:
_______________________________________
City Clerk
Attachment: Exhibit 1
Livermore and Dublin Slurry Seal Agreement Page 1
AGREEMENT BETWEEN THE CITY OF LIVERMORE AND CITY OF DUBLIN TO
INCLUDE CITY OF DUBLIN STREET IMPROVEMENTS IN CITY OF LIVERMORE
SLURRY SEAL 2016 PROJECT 2016-04
This Agreement (“Agreement”) is entered into on _________, 2016 by and between the
City of Livermore (“Livermore”), a California municipal corporation, and the City of
Dublin (“Dublin”), a California municipal corporation. When used in this Agreement, the
term “Parties” shall refer to and include Livermore and Dublin.
RECITALS
A. As part of Livermore’s Pavement Management Program, Livermore conducts an
annual slurry seal project to resurface City streets. Dublin has requested that Livermore
include Dublin street improvements as part of that work.
B. Livermore has prepared Slurry Seal 2016 Project 2016-04 to seek bids for street
improvements in Livermore (“Project”). The request for bids sought proposals for work
in Livermore (“Livermore Work”). Additionally, the bid request included technical
specifications and requirements prepared by Dublin for slurry s eal work on two streets
in Dublin as an optional additional Project component, entitled Schedule B of the Project
bid documents (“Dublin Work”).
C. Livermore’s request for bids specified that the Project contract, if awarded, would
be awarded to the bidder th at submitted the lowest bid for the Livermore Work and that
Livermore would award the low-bidder’s additional Dublin Work bid component if
authorized by Dublin.
D. Livermore has received and opened bids for the Project and Livermore staff has
identified Telfer Pavement Technologies, LLC (“Telfer”) as the responsible bidder who
submitted the lowest bid for the Livermore Work. The Bid Form, Document 00410,
Submitted by Telfer as part of its Project bid shows its bid for the Livermore Work and
Dublin Work and is attached hereto as Exhibit A.
E. Dublin concurs in Livermore’s staff identification of Telfer as the lowest
responsible bidder and finds Telfer acceptable to complete the Dublin Work.
F. By entering into this Agreement, Dublin authorizes Livermore to award Tel fer’s
bid proposal to undertake the Dublin Work. The purpose of this Agreement is to provide
the terms pursuant to which Livermore will administer the overall Project and the Dublin
will reimburse Livermore for the Dublin Work.
NOW, THEREFORE, in consideration of the performance of the terms and
conditions set forth in this Agreement, the parties agree as follows:
Livermore and Dublin Slurry Seal Agreement Page 2
AGREEMENT
1. Livermore Authority. Dublin authorizes Livermore to act as its agent to
award and administrate the contract for the Project includ ing the Dublin Work.
Livermore will award the contract to perform the Dublin Work pursuant to the terms of
this Agreement. In so doing, Livermore is acting as the agent of Dublin for construction
purposes only. Livermore will not maintain the Dublin Work improvements once the
construction work is completed.
2. Low Bid Requirements. Pursuant to the Public Contract Code, Livermore
will only award the Project to a responsible bidder that submits the lowest responsive
bid for the Project work. The bidder to whom L ivermore ultimately awards the Project or
Livermore Work shall be referred to in this agreement as, “Contractor.”
3. Term. This Agreement shall be effective from the date both parties have
signed it to July 1, 2017 unless terminated as set forth in this Agreement.
4. Dublin Directive to Award. By entering into this Agreement, Dublin
directs Livermore to award the bid for the Dublin Work and to proceed with the Dublin
Work. Livermore’s City Council is not bound by Dublin’s directive to award the Dublin
Work and may still determine not to award the bid for the Dublin Work and/or Project at
all, in which case this Agreement terminates. If Dublin has not approved and executed
this Agreement by July 20, 2016, Livermore will not award the Dublin Work.
5. Interagency Payment Limits. No Livermore funds shall be expended to
complete the Dublin Work and no Dublin funds shall be expended to complete of the
Livermore Work.
6. Administration Fee. If Livermore awards the Dublin Work, Dublin shall
pay Livermore $4,000 to compensate Livermore for the administrative services provided
by Livermore, which is approximately 5 percent of the anticipated cost of the Dublin
Work.
7. Livermore Standards. Although Livermore will endeavor to consult with
Dublin and make efforts to meet all reasonable Dublin requests, Dublin agrees
Livermore shall determine when the Dublin Work is complete and that Livermore
standards shall govern all of the Project work, including the Dublin Work.
8. Livermore Responsibilities. Livermore shall do all of the following:
(a) Award and administer the construction contract for the entire
Project including the Dublin W ork, including payments, price quote requests, work
directives, change orders, and other construction documents. Livermore will consult with
Dublin about matters involved with the Dublin Work, but Livermore is authorized to
make decisions concerning the Project including the Dublin Work.
Livermore and Dublin Slurry Seal Agreement Page 3
(b) File a Notice of Completion for the entire Project and, at Project
completion, the City Council of Livermore shall determine whether to accept the work
conducted in Livermore for maintenance.
(c) Notify Dublin when Livermore files a Notice of Completion for the
Project.
(d) Pay the Contractor for completed construction of the Livermore
Work. Forward the invoices for payments to Dublin for the Dublin Work.
(e) Assign Dublin all of Livermore’s rights and cooperate with Dublin to
enable Dublin to pursue warranty claims and defective work claims on behalf of Dublin
against the Contractor following Project completion.
9. Dublin Obligations. Dublin shall do all of the following:
(a) Attend the preconstruction meeting for the Project.
(b) Obtain any necessary regulatory permits required for the Dublin
Work at Dublin’s expense.
(c) Coordinate the schedule for Dublin Work with the Contractor.
(d) Provide notice required by Dublin or any law or regulation to any
person or entity entitled to notice of the Dublin Work.
(e) Inspect the Dublin Work and coordinate any necessary material
testing with the Contractor and pay for all material testing costs.
(f) Participate with Livermore in negotiating any change orders for the
Dublin Work with the Contractor. Dublin agrees that Livermore shall be the final
decision-maker concerning any change orders concerning any of the Project work.
(g) Provide any information Contractor requires concerning the Dublin
Work as part of a properly-submitted Request for Information.
(h) Provide Livermore timely written notice when the Dublin Work is
substantially complete including a list of any punch list of items remaining outstanding
on the Dublin Work. If Dublin has not provided this information when desired by
Livermore, Livermore shall provide written notice to Dublin seeking the information. Ten
calendar days after sending this notice, Livermore may proceed to determine whether
the Dublin Work is substantially complete and may provide Contractor a punch list of
outstanding Dublin Work to be completed, a copy of which shall be provided to Dublin.
(i) Notify Livermore when all punch list work items for the Dublin Work
have been completed. If Dublin has not provided this information when desired by
Livermore, Livermore shall provide written notice to Dublin seeking the information. Ten
calendar days after sending this notice, Livermore may proceed to determine whether
Livermore and Dublin Slurry Seal Agreement Page 4
the punch list items for the Dublin Work is complete, a copy of which shall be provided
to Dublin.
(j) Make payments for the Dublin Work to Livermore, to be provided to
the Contractor pursuant to the terms of the Project contract, in the amount provided in
the Project bid, subject to authorized change orders, plus the Administrative Fee of
$4,000 as set forth above. Livermore shall make all payments owed to the Contractor
for all Project work and provide Dublin copies of invoices and payments for the Dublin
Work. Dublin shall refund Livermore for payments Livermore makes for the Dublin
Work. Dublin’s payments shall be made payable to the City of Livermore, reference
Slurry Seal 2016 Project 2016-04 on the payments. Payments shall be made within 30
calendar days of the date Dublin receives invoices from Livermore.
(k) Notify Livermore in writing regarding any warranty issues
concerning the Dublin Work. The warranty period for the Dublin Work shall extend one
year from the date the entire Project is accepted by the Livermore City Council.
(l) Inspect any warranty repairs made to the Dublin Work and notify
Livermore in writing if repairs are unacceptable within five calendar days of a repair.
(m) Dublin shall be responsible to accept the Dublin Work for public
maintenance.
10. Indemnity and Liability.
(a) Dublin agrees that in exchange for Livermore’s agreement to
administrate the bidding, award, and construction of the Dublin Work, that Dublin’s sole
remedy for any damage arising out of Livermore’s performance of its obligations is a
claim for specific performance.
(b) Dublin and Livermore agree that they are not indemnifying each
other for claims, harms, or damages of any kind arising out of or related to this
Agreement. Instead, indemnification for the Project work shall be provided to Livermore
pursuant to the terms of the contract it enters into with the Contractor, for which
Livermore will request insurance and performance, payment, and maintenance bonds.
Livermore agrees that Dublin may pursue any claim related to the Dublin Work against
the Contractor which Livermore could pursue directly against the Contractor in court and
pursuant to the dispute resolution provisions of the contract for the Project.
(c) To the extent not adjudicated as the legal responsibility of the
Contractor, Dublin and not Livermore shall be responsible for any third party claim for
personal injury or money damages related to or arising out of the Dublin Work.
(d) To the extent not adjudicated as the legal responsibility of the
Contractor, Livermore and not Dublin shall be responsible for any third party claim for
personal injury or money damages related to or arising out of the Livermore Work.
Livermore and Dublin Slurry Seal Agreement Page 5
(e) Livermore represents and warrants that the Contractor will be
contractually required to name the City of Dublin, its officials, employees, agents and
volunteers as additional insureds and all such insurance will remain in effect until the
Project has been accepted for maintenance by Livermore and Dublin, for the work in
their respective cities.
11. Termination. Until the Dublin Work commences, Livermore may terminate
this Agreement for any reason at Livermore’s sole discretion by providing thirty (30)
days’ written notice to Dublin.
12. Notices. Wherever this Agreement requires notice or demand be given,
such notice or demand shall be made in writing and forwarded by registered mail or
overnight delivery, addressed as follows:
City: City Engineer
ATTN: Project 2016-04
City of Livermore
1052 S. Livermore Avenue
Livermore, California 94550
Dublin: Andrew Russell
City of Dublin
100 Civic Plaza
Dublin, CA 94568
Any party may change such address or contact person by written notice by registered
mail to the other.
13. Modification. This Agreement may only be modified or amended by
written agreement signed by both parties hereto.
14. Entire Agreement. This instrument, including any attachments hereto,
constitutes the entire agreement of the parties relating to the subject matter of this
Agreement and correctly sets forth the rights, duties and obligatio ns of each party to the
other.
15. Partial Invalidity. If any provision or portion of this Agreement shall be
deemed invalid, it is agreed that such invalidity shall affect only such provision or portion
thereof, and the remainder of this contract shall remain in force and effect.
//
//
//
//
Livermore and Dublin Slurry Seal Agreement Page 6
IN WITNESS WHEREOF, the parties to this Agreement have executed this
Agreement as of the dates set forth below.
City of Livermore
By: ___________________________
Marc Roberts
Livermore City Manager
Date: _____________
Approved as to form:
By: __________________________
Livermore City Attorney
ATTEST:
_____________________________
Susan Neer, Livermore City Clerk
City of Dublin
By: _______________________
Christopher L. Foss
Dublin City Manager
Date: _______________
Approved as to form:
By: __________________________
John D. Bakker, City Attorney
ATTEST:
_____________________________
Caroline Soto, Dublin City Clerk
2673282.7
Attachment 4
RESOLUTION NO. __– 16
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * * * *
AMENDING THE DUBLIN TRAFFIC CODE APPROVING PARKING REGULATIONS ALONG
AMADOR PLAZA ROAD
WHEREAS,
in conformance with recommendations for the City’s Bicycle and Pedestrian
Master Plan, bike lanes are to be installed along both sides of Amador Plaza Road between
Dublin Boulevard and Amador Valley Boulevard; and
WHEREAS,
there is insufficient space to install bike lanes and allow on-street parking
on both sides of the street; and
WHEREAS
, it is important to provide adequate sight visibility for vehicular, bicycle, and
pedestrian traffic; and
WHEREAS
, current on-street parking does not provide adequate turn-over for
businesses in the area for all retail use; and
WHEREAS
, it is important to encourage parking for retail use to enhance economic
development; and
NOW, THEREFORE, BE IT RESOLVED,
that the City Council of the City of Dublin
hereby adopts the following parking regulation:
Section 1:
The following language shall be deleted from Section 6.28.010 (“No
Parking Zones: Designated”) of the City of Dublin Traffic Code:
Amador Plaza Road
On the east curbline, from a point 500 feet south of the south curbline of Amador Valley
Boulevard, south a distance of 20 feet. (Ord. 11-85)
On the easterly curbline from the southerly curbline of Amador Valley Boulevard, southerly a
distance of 250 feet.
On the west curbline, from a point 20 feet south of the south curbline of Amador Valley
Boulevard, south a distance of 40 feet; on the west curbline from a point 90 feet south of the
south curbline of Amador Valley Boulevard, south a distance of 50 feet; on the west curbline
from a point 605 feet south of the south curbline of Amador Valley Boulevard, south a distance
of 20 feet; on the west curbline from a point 220 feet north of the north curbline of Dublin
Boulevard, north a distance of 30 feet; on the west curbline from a point 275 feet north of the
north curbline of Dublin Boulevard, north a distance of 30 feet. (Ord. 11-85).
C:\Users\gloriam\AppData\Local\Temp\4.8 attch 4_589131\4.8 attch 4.doc
On the east curbline from a point 20 feet north of the north curbline of Dublin Boulevard, north a
distance of 184 feet; on the east curbline from a point 353 feet north of the north curbline of
Dublin Boulevard, north a distance of 30 feet. (Ord. 24-85).
On the northeasterly curbline from a point 555 feet northwesterly from the northwesterly
curbline of Dublin Boulevard, northwesterly a distance of 170 feet.
On both curblines, from Dublin Boulevard north to the first driveway. (Reso 170-02)
On the east side of Amador Plaza, southerly for a distance of 15 feet from the northern
driveway for the Downtown Safeway Center. (Administrative Approval 4/28/03)
Section 2:
The following language shall be added to Section 6.28.010 (“No Parking
Zones: Designated”) of the City of Dublin Traffic Code:
Amador Plaza Road
On the east curbline from the south curbline of Amador Valley Boulevard a distance of 200 feet
south
On the east curbline from a point 240 feet south of the south curbline of Amador Valley
Boulevard to the north curbline of Dublin Boulevard
On the west curbline from the south curbline of Amador Valley Boulevard south a distance of
180 feet.
On the west curbline from a point 510 feet south of the south curbline of Amador Valley
Boulevard south a distance of 60 feet
On the west curbline from a point 610 feet south of the south curbline of Amador Valley
Boulevard south a distance of 160 feet
On the west curbline from a point 590 feet north of the north curbline of Dublin Boulevard a
distance of 80 feet north
On the west curbline from the north curbline of Dublin Boulevard a distance of 310 feet north.
Section 3:
The following language shall be added to Section 6.32.50 (“Two-Hour
Parking”) of the City of Dublin Traffic Code:
Amador Plaza Road
On the east curbline from a point 200 feet south of the south curbline of Amador Valley
Boulevard a distance of 40 feet south
On the west curbline from a point 180 feet south of the south curbline of Amador Valley
Boulevard a distance of 330 feet south
C:\Users\gloriam\AppData\Local\Temp\4.8 attch 4_589131\4.8 attch 4.doc
On the west curbline from a point 570 feet south of the south curbline of Amador Valley
Boulevard a distance of 40 feet south.
On the west curbline from a point 770 feet south of the south curbline of Amador Valley
Boulevard a distance of 240 feet south
On the west curbline from a point 310 feet north of the north curbline of Dublin Boulevard a
distance of 280 feet north
th
PASSED, APPROVED AND ADOPTED
this 19 day of July, 2016, by the following vote:
AYES
:
NOES
:
ABSENT
:
ABSTAIN
:
_______________________________
Mayor
ATTEST
:
___________________________________
City Clerk