Loading...
HomeMy WebLinkAboutItem 4.08 Amador Plaza Rd Park Reg STAFF REPORT CITY COUNCIL DATE:July 19, 2016 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Approval of Agreement with the City of Livermore for Inclusion of Dublin Street Improvements in City of Livermore Slurry Seal 2016 Project and Implementation of Parking Regulations along Amador Plaza Road Prepared by: William Lai, Assistant Civil Engineer EXECUTIVE SUMMARY: The City Council will consider approving the Agreement with the City of Livermore to include micro surfacing pavement treatment of Amador Plaza Road from Dublin Boulevard to Amador Valley Boulevard in Livermore’s Slurry Seal 2016 Project. The City Council will also consider implementation of parking restrictions along parts of Amador Plaza Road from Dublin Boulevard to Amador Valley Boulevard to improve visibility and safety for vehicle, pedestrian, and bicycle traffic and to accommodate the installation of bike lanes. STAFF RECOMMENDATION: Resolution Staff recommends that the City Council adopt the Approving an Agreement between the City of Livermore and City of Dublin to Include City of Dublin Street Improvements in City of Livermore Slurry Seal 2016 Project 2016-04 and for the City of Dublin to Reimburse the City of Livermore for the Portion of Work Taking Place Within Resolution the City of Dublin; and adopt the Amending the Dublin Traffic Code Approving Parking Regulations Along Amador Plaza Road. FINANCIAL IMPACT: The total bid amount for the Dublin portion of the work is $84,672.90. A 20% construction contingency, in the amount of $17,000, is requested for unforeseen construction issues, bringing the total construction contract cost to $101,672.90. A $4,000 payment to the City of Livermore will compensate for contract administration costs and is approximately 5% of the Dublin portion of work. The cost to install signs and paint curbs for the implementation of parking regulations is included in the bid amount. There is sufficient budget in the Annual Street Resurfacing Project (CIP No. ST0117), 14 Page of which includes Measure B, Measure BB, and Gas Tax funding sources, to cover the cost of this work. Upon approval of the agreement, Staff will transfer $105,672.90 to the Amador Plaza Road Bicycle and Pedestrian Improvements project (CIP No. ST0815). There will be no impact to the General Fund. Project Budget Expenditures Project Improvements $84,672.90 Construction Contingency (approx. 20%) $17,000.00 Subtotal, Construction Costs $101,672.90 Project Administration $4,000.00 Total Cost for Improvements $105,672.90 Funding Sources Measure B - Local Streets and Roads $105,672.90 (from Project No. ST0117) DESCRIPTION: The Amador Plaza Road Bicycle and Pedestrian Improvements project (CIP No. ST0815) is a multi-phase project that implements a Tier 1 project from the City of Dublin Bicycle and Pedestrian Master Plan by implementing various improvements that enhance traffic safety, improve traffic circulation, provide pedestrian connections, and provide bicycle lanes. The first phase of the project was the construction of two mid- block pedestrian crossings and installation of a raised median to revise vehicle ingress and egress at the Safeway driveway. The second phase is the installation of on-street bicycle lanes and modification of on-street parking. A pavement surface treatment of Amador Plaza Road, between Dublin Boulevard and Amador Valley Boulevard, is a very small pavement maintenance project of approximately 90,000 square feet and construction costs would be expected to be high as a standalone project. In comparison, the previous slurry seal project covered 660,000 square feet of pavement. Rather than developing a small and expensive project or waiting until summer 2017 to include Amador Plaza Road on a larger pavement maintenance project, City staff reached out to San Ramon, Pleasanton, and Livermore, and asked if they would be willing to include a Dublin street with one of their upcoming pavement projects. The City of Livermore staff was receptive to the idea of joining forces for a cooperative pilot project. The Amador Plaza Road work was included as an alternate bid item in Livermore’s Slurry Seal 2016 Project. Bids were opened on June 22, 2016 and are summarized in the table below. Since Dublin’s work was an alternate bid item, the basis of awarding the contract is the lowest base bid for Livermore’s work only. The low bidder for Livermore’s work is Telfer Pavement Technologies, LLC with a bid of $1,072,335.00 for the base bid and $84,672.90 for Dublin’s work. Should the City Council approve this agreement, and should the City of Livermore City 24 Page of Council approve the agreement and award the contract, the work is expected to be completed by the middle of November 2016. City of Livermore Bid Results Telfer Pavement Technologies, American LLC Contractor Asphalt Bond Blacktop VSS International Project Bid $1,072,335.00 (Basis of $1,128,830.65 $1,188,987.24 $1,225,000.00 Low Bid) Bid for $84,672.90 Dublin Work $84,221.20 $101,261.90 $85,000.00 Only Total $1,157,007.90 $1,213,051.85$1,290,209.14$1,310,000.00 In general, the responsibilities of each agency are outlined below: 1. Livermore will award and administer the construction contract with the low bidder 2. Livermore will pay the contractor for completed construction and will forward invoices to Dublin for the Amador Plaza Road street improvements 3. Dublin will coordinate the construction schedule and public notification for work within Dublin. 4. Dublin will perform inspection of the construction work 5. Dublin will pay the cost of construction for work in Dublin plus $4,000 for Livermore’s project administration services Pavement Surface Treatment - Micro Surfacing The City of Dublin has traditionally used a slurry seal as a preventative maintenance technique to prolong the life of asphalt concrete surfacing. As streets begin showing wear and stress cracks, it is important to seal the cracks to keep water from getting under the roadway pavement. Slurry consists of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. The City of Livermore has been using micro-surfacing as a preventative maintenance technique on arterial roadways and Livermore specified micro-surfacing as the pavement treatment in their 2016 slurry seal project. Micro-surfacing is similar to a slurry seal except that a polymer-modified, quick-set emulsion is used to bind a more strictly specified aggregate. Micro-surfacing is a stiffer, slightly thicker pavement treatment that requires different construction equipment than slurry. The polymer- modified emulsion results in a chemical reaction to “set” the material after placement, versus slurry seal which relies on the evaporation of water to “set” the slurry. This treatment is expected to have a slightly longer life span and to dry much faster, reducing traffic disruption and allowing vehicles back on the street much sooner. The work will also include localized repair of failed asphalt and pavement striping. Public Works staff intends to closely monitor and evaluate the micro-surfacing pilot project to determine whether future use of micro-surfacing should be considered as part of the City’s comprehensive pavement management plan. 34 Page of Parking Restrictions In accordance with the City of Dublin Bicycle and Pedestrian Master Plan, bike lanes will be added to Amador Plaza Road as part of this project. Adding bike lanes requires the removal of on-street parking on one side of the street. The adopted Master Plan proposed the removal of on-street parking from the east side of Amador Plaza Road. The project will also install pavement marks (parking “T”s) to better organize the on- street parking. Staff conducted a community meeting on last July with eight attendees to discuss the parking removal. Attendees were supportive of this action. Staff conducted a parking survey and found that the majority of vehicles parked on the street were present for more than four hours, indicating that parking demand is related to BART users rather than business patrons. As such, in addition to removing on-street parking on the east side, Staff proposes to implement Two-Hour parking restrictions along the west side of the street. Limiting parking duration will increase parking availability for business patrons and prevent BART users from parking for more than two hours. The project will also install pavement marks (parking “T”s) to better organize the on-street parking. Staff conducted a community meeting on July 27, 2015 with eight attendees to discuss the parking removal. Attendees were supportive of this action. NOTICING REQUIREMENTS/PUBLIC OUTREACH: Advance notice of construction activity will be mailed to adjacent property owners and project information will be included on the City’s website. A copy of this staff report was sent to the City of Livermore. ATTACHMENTS: 1. Location Map 2. Typical Lane Configuration Figure 3. Resolution Approving the Agreement with the City of Livermore for the Inclusion of Dublin Street Improvements in City of Livermore Slurry Seal 2016 Project 2016-04 with Agreement as Exhibit A 4. Resolution Amending the Dublin Traffic Code Approving Parking Regulations along Amador Plaza Road 44 Page of No Parking Zone 2-Hour Parking Zone SAFEWAYSAFEWAY REIREI SPROUTSSPROUTS ELEPHANT BARELEPHANT BAR CHIPOTLECHIPOTLE PANERA BREADPANERA BREAD LOCATION MAP AMA D O R P L A Z A R O A D AMA D O R P L A Z A R O A D N Attachment 1 TYPICAL LANE CONFIGURATION Attachment 2 N Attachment 3 RESOLUTION NO. ___- 16 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * APPROVING AN AGREEMENT BETWEEN THE CITY OF LIVERMORE AND CITY OF DUBLIN TO INCLUDE CITY OF DUBLIN STREET IMPROVEMENTS IN CITY OF LIVERMORE SLURRY SEAL 2016 PROJECT 2016-04 AND FOR THE CITY OF DUBLIN TO REIMBURSE THE CITY OF LIVERMORE FOR THE PORTION OF WORK TAKING PLACE WITHIN THE CITY OF DUBLIN WHEREAS, the City of Dublin wishes to perform pavement maintenance work along Amador Plaza Road between Dublin Boulevard and Amador Valley Boulevard ; and WHEREAS, the adopted City of Dublin Bicycle and Pedestrian Master Plan includes a Tier 1 project which includes installation of mid-block crosswalks, removal of on-street parking on the east side and installation of bicycle lanes on Amador Plaza Road; and WHEREAS, in lieu of bidding a small and relatively expensive slurry seal project for Amador Plaza Road, the City of Dublin sought a partnership opportunity with the City of Livermore include pavement maintenance of Amador Plaza Road in a future City of Livermore project; and WHEREAS, the City of Livermore conducts an annual pavement maintenance project; and WHEREAS, it is financially advantageous for the City of Dublin to add the Amador Plaza Road maintenance work to the City of Livermore’s Slurry Seal Project 2016; and WHEREAS, the City of Livermore included the Amador Plaza Road maintenance work as an alternate bid item to the City of Livermore’s Slurry Seal Project 2016; and WHEREAS, the City of Livermore did, on June 22, 2016, publically open, examine and declare all sealed bids for the Slurry Seal Project 2016; and WHEREAS, the City of Livermore did receive favorable bids for the pavement maintenance of Amador Plaza Road; and WHEREAS, the City of Livermore will conduct work in Dublin on behalf of the City for Dublin; and WHEREAS, the City of Dublin will reimburse the City of Livermore for the portion of work taking place within the City of Dublin. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the Agreement between the City of Livermore and City of Dublin to include City of Dublin Street Improvements in City of Livermore Slurry Seal 2016 Project 2016-04 and for the City of Dublin to reimburse the City of Livermore for the portion of work taking place within the City of Dublin (Exhibit 1). BE IT FURTHER RESOLVED that the City Council of the City of Dublin authorizes the City Manager, or his/her designee to execute in the name of the City of Dublin, the Agreement and such other documents, and to take such other and further action, as necessary and appropriate to carry out the Intent of this Resolution. PASSED, APPROVED AND ADOPTED this 19th DAY OF JULY, 2016. AYES: NOES: ABSENT: ABSTAIN: ________________________________________ Mayor ATTEST: _______________________________________ City Clerk Attachment: Exhibit 1 Livermore and Dublin Slurry Seal Agreement Page 1 AGREEMENT BETWEEN THE CITY OF LIVERMORE AND CITY OF DUBLIN TO INCLUDE CITY OF DUBLIN STREET IMPROVEMENTS IN CITY OF LIVERMORE SLURRY SEAL 2016 PROJECT 2016-04 This Agreement (“Agreement”) is entered into on _________, 2016 by and between the City of Livermore (“Livermore”), a California municipal corporation, and the City of Dublin (“Dublin”), a California municipal corporation. When used in this Agreement, the term “Parties” shall refer to and include Livermore and Dublin. RECITALS A. As part of Livermore’s Pavement Management Program, Livermore conducts an annual slurry seal project to resurface City streets. Dublin has requested that Livermore include Dublin street improvements as part of that work. B. Livermore has prepared Slurry Seal 2016 Project 2016-04 to seek bids for street improvements in Livermore (“Project”). The request for bids sought proposals for work in Livermore (“Livermore Work”). Additionally, the bid request included technical specifications and requirements prepared by Dublin for slurry s eal work on two streets in Dublin as an optional additional Project component, entitled Schedule B of the Project bid documents (“Dublin Work”). C. Livermore’s request for bids specified that the Project contract, if awarded, would be awarded to the bidder th at submitted the lowest bid for the Livermore Work and that Livermore would award the low-bidder’s additional Dublin Work bid component if authorized by Dublin. D. Livermore has received and opened bids for the Project and Livermore staff has identified Telfer Pavement Technologies, LLC (“Telfer”) as the responsible bidder who submitted the lowest bid for the Livermore Work. The Bid Form, Document 00410, Submitted by Telfer as part of its Project bid shows its bid for the Livermore Work and Dublin Work and is attached hereto as Exhibit A. E. Dublin concurs in Livermore’s staff identification of Telfer as the lowest responsible bidder and finds Telfer acceptable to complete the Dublin Work. F. By entering into this Agreement, Dublin authorizes Livermore to award Tel fer’s bid proposal to undertake the Dublin Work. The purpose of this Agreement is to provide the terms pursuant to which Livermore will administer the overall Project and the Dublin will reimburse Livermore for the Dublin Work. NOW, THEREFORE, in consideration of the performance of the terms and conditions set forth in this Agreement, the parties agree as follows: Livermore and Dublin Slurry Seal Agreement Page 2 AGREEMENT 1. Livermore Authority. Dublin authorizes Livermore to act as its agent to award and administrate the contract for the Project includ ing the Dublin Work. Livermore will award the contract to perform the Dublin Work pursuant to the terms of this Agreement. In so doing, Livermore is acting as the agent of Dublin for construction purposes only. Livermore will not maintain the Dublin Work improvements once the construction work is completed. 2. Low Bid Requirements. Pursuant to the Public Contract Code, Livermore will only award the Project to a responsible bidder that submits the lowest responsive bid for the Project work. The bidder to whom L ivermore ultimately awards the Project or Livermore Work shall be referred to in this agreement as, “Contractor.” 3. Term. This Agreement shall be effective from the date both parties have signed it to July 1, 2017 unless terminated as set forth in this Agreement. 4. Dublin Directive to Award. By entering into this Agreement, Dublin directs Livermore to award the bid for the Dublin Work and to proceed with the Dublin Work. Livermore’s City Council is not bound by Dublin’s directive to award the Dublin Work and may still determine not to award the bid for the Dublin Work and/or Project at all, in which case this Agreement terminates. If Dublin has not approved and executed this Agreement by July 20, 2016, Livermore will not award the Dublin Work. 5. Interagency Payment Limits. No Livermore funds shall be expended to complete the Dublin Work and no Dublin funds shall be expended to complete of the Livermore Work. 6. Administration Fee. If Livermore awards the Dublin Work, Dublin shall pay Livermore $4,000 to compensate Livermore for the administrative services provided by Livermore, which is approximately 5 percent of the anticipated cost of the Dublin Work. 7. Livermore Standards. Although Livermore will endeavor to consult with Dublin and make efforts to meet all reasonable Dublin requests, Dublin agrees Livermore shall determine when the Dublin Work is complete and that Livermore standards shall govern all of the Project work, including the Dublin Work. 8. Livermore Responsibilities. Livermore shall do all of the following: (a) Award and administer the construction contract for the entire Project including the Dublin W ork, including payments, price quote requests, work directives, change orders, and other construction documents. Livermore will consult with Dublin about matters involved with the Dublin Work, but Livermore is authorized to make decisions concerning the Project including the Dublin Work. Livermore and Dublin Slurry Seal Agreement Page 3 (b) File a Notice of Completion for the entire Project and, at Project completion, the City Council of Livermore shall determine whether to accept the work conducted in Livermore for maintenance. (c) Notify Dublin when Livermore files a Notice of Completion for the Project. (d) Pay the Contractor for completed construction of the Livermore Work. Forward the invoices for payments to Dublin for the Dublin Work. (e) Assign Dublin all of Livermore’s rights and cooperate with Dublin to enable Dublin to pursue warranty claims and defective work claims on behalf of Dublin against the Contractor following Project completion. 9. Dublin Obligations. Dublin shall do all of the following: (a) Attend the preconstruction meeting for the Project. (b) Obtain any necessary regulatory permits required for the Dublin Work at Dublin’s expense. (c) Coordinate the schedule for Dublin Work with the Contractor. (d) Provide notice required by Dublin or any law or regulation to any person or entity entitled to notice of the Dublin Work. (e) Inspect the Dublin Work and coordinate any necessary material testing with the Contractor and pay for all material testing costs. (f) Participate with Livermore in negotiating any change orders for the Dublin Work with the Contractor. Dublin agrees that Livermore shall be the final decision-maker concerning any change orders concerning any of the Project work. (g) Provide any information Contractor requires concerning the Dublin Work as part of a properly-submitted Request for Information. (h) Provide Livermore timely written notice when the Dublin Work is substantially complete including a list of any punch list of items remaining outstanding on the Dublin Work. If Dublin has not provided this information when desired by Livermore, Livermore shall provide written notice to Dublin seeking the information. Ten calendar days after sending this notice, Livermore may proceed to determine whether the Dublin Work is substantially complete and may provide Contractor a punch list of outstanding Dublin Work to be completed, a copy of which shall be provided to Dublin. (i) Notify Livermore when all punch list work items for the Dublin Work have been completed. If Dublin has not provided this information when desired by Livermore, Livermore shall provide written notice to Dublin seeking the information. Ten calendar days after sending this notice, Livermore may proceed to determine whether Livermore and Dublin Slurry Seal Agreement Page 4 the punch list items for the Dublin Work is complete, a copy of which shall be provided to Dublin. (j) Make payments for the Dublin Work to Livermore, to be provided to the Contractor pursuant to the terms of the Project contract, in the amount provided in the Project bid, subject to authorized change orders, plus the Administrative Fee of $4,000 as set forth above. Livermore shall make all payments owed to the Contractor for all Project work and provide Dublin copies of invoices and payments for the Dublin Work. Dublin shall refund Livermore for payments Livermore makes for the Dublin Work. Dublin’s payments shall be made payable to the City of Livermore, reference Slurry Seal 2016 Project 2016-04 on the payments. Payments shall be made within 30 calendar days of the date Dublin receives invoices from Livermore. (k) Notify Livermore in writing regarding any warranty issues concerning the Dublin Work. The warranty period for the Dublin Work shall extend one year from the date the entire Project is accepted by the Livermore City Council. (l) Inspect any warranty repairs made to the Dublin Work and notify Livermore in writing if repairs are unacceptable within five calendar days of a repair. (m) Dublin shall be responsible to accept the Dublin Work for public maintenance. 10. Indemnity and Liability. (a) Dublin agrees that in exchange for Livermore’s agreement to administrate the bidding, award, and construction of the Dublin Work, that Dublin’s sole remedy for any damage arising out of Livermore’s performance of its obligations is a claim for specific performance. (b) Dublin and Livermore agree that they are not indemnifying each other for claims, harms, or damages of any kind arising out of or related to this Agreement. Instead, indemnification for the Project work shall be provided to Livermore pursuant to the terms of the contract it enters into with the Contractor, for which Livermore will request insurance and performance, payment, and maintenance bonds. Livermore agrees that Dublin may pursue any claim related to the Dublin Work against the Contractor which Livermore could pursue directly against the Contractor in court and pursuant to the dispute resolution provisions of the contract for the Project. (c) To the extent not adjudicated as the legal responsibility of the Contractor, Dublin and not Livermore shall be responsible for any third party claim for personal injury or money damages related to or arising out of the Dublin Work. (d) To the extent not adjudicated as the legal responsibility of the Contractor, Livermore and not Dublin shall be responsible for any third party claim for personal injury or money damages related to or arising out of the Livermore Work. Livermore and Dublin Slurry Seal Agreement Page 5 (e) Livermore represents and warrants that the Contractor will be contractually required to name the City of Dublin, its officials, employees, agents and volunteers as additional insureds and all such insurance will remain in effect until the Project has been accepted for maintenance by Livermore and Dublin, for the work in their respective cities. 11. Termination. Until the Dublin Work commences, Livermore may terminate this Agreement for any reason at Livermore’s sole discretion by providing thirty (30) days’ written notice to Dublin. 12. Notices. Wherever this Agreement requires notice or demand be given, such notice or demand shall be made in writing and forwarded by registered mail or overnight delivery, addressed as follows: City: City Engineer ATTN: Project 2016-04 City of Livermore 1052 S. Livermore Avenue Livermore, California 94550 Dublin: Andrew Russell City of Dublin 100 Civic Plaza Dublin, CA 94568 Any party may change such address or contact person by written notice by registered mail to the other. 13. Modification. This Agreement may only be modified or amended by written agreement signed by both parties hereto. 14. Entire Agreement. This instrument, including any attachments hereto, constitutes the entire agreement of the parties relating to the subject matter of this Agreement and correctly sets forth the rights, duties and obligatio ns of each party to the other. 15. Partial Invalidity. If any provision or portion of this Agreement shall be deemed invalid, it is agreed that such invalidity shall affect only such provision or portion thereof, and the remainder of this contract shall remain in force and effect. // // // // Livermore and Dublin Slurry Seal Agreement Page 6 IN WITNESS WHEREOF, the parties to this Agreement have executed this Agreement as of the dates set forth below. City of Livermore By: ___________________________ Marc Roberts Livermore City Manager Date: _____________ Approved as to form: By: __________________________ Livermore City Attorney ATTEST: _____________________________ Susan Neer, Livermore City Clerk City of Dublin By: _______________________ Christopher L. Foss Dublin City Manager Date: _______________ Approved as to form: By: __________________________ John D. Bakker, City Attorney ATTEST: _____________________________ Caroline Soto, Dublin City Clerk 2673282.7 Attachment 4 RESOLUTION NO. __– 16 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * AMENDING THE DUBLIN TRAFFIC CODE APPROVING PARKING REGULATIONS ALONG AMADOR PLAZA ROAD WHEREAS, in conformance with recommendations for the City’s Bicycle and Pedestrian Master Plan, bike lanes are to be installed along both sides of Amador Plaza Road between Dublin Boulevard and Amador Valley Boulevard; and WHEREAS, there is insufficient space to install bike lanes and allow on-street parking on both sides of the street; and WHEREAS , it is important to provide adequate sight visibility for vehicular, bicycle, and pedestrian traffic; and WHEREAS , current on-street parking does not provide adequate turn-over for businesses in the area for all retail use; and WHEREAS , it is important to encourage parking for retail use to enhance economic development; and NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Dublin hereby adopts the following parking regulation: Section 1: The following language shall be deleted from Section 6.28.010 (“No Parking Zones: Designated”) of the City of Dublin Traffic Code: Amador Plaza Road On the east curbline, from a point 500 feet south of the south curbline of Amador Valley Boulevard, south a distance of 20 feet. (Ord. 11-85) On the easterly curbline from the southerly curbline of Amador Valley Boulevard, southerly a distance of 250 feet. On the west curbline, from a point 20 feet south of the south curbline of Amador Valley Boulevard, south a distance of 40 feet; on the west curbline from a point 90 feet south of the south curbline of Amador Valley Boulevard, south a distance of 50 feet; on the west curbline from a point 605 feet south of the south curbline of Amador Valley Boulevard, south a distance of 20 feet; on the west curbline from a point 220 feet north of the north curbline of Dublin Boulevard, north a distance of 30 feet; on the west curbline from a point 275 feet north of the north curbline of Dublin Boulevard, north a distance of 30 feet. (Ord. 11-85). C:\Users\gloriam\AppData\Local\Temp\4.8 attch 4_589131\4.8 attch 4.doc On the east curbline from a point 20 feet north of the north curbline of Dublin Boulevard, north a distance of 184 feet; on the east curbline from a point 353 feet north of the north curbline of Dublin Boulevard, north a distance of 30 feet. (Ord. 24-85). On the northeasterly curbline from a point 555 feet northwesterly from the northwesterly curbline of Dublin Boulevard, northwesterly a distance of 170 feet. On both curblines, from Dublin Boulevard north to the first driveway. (Reso 170-02) On the east side of Amador Plaza, southerly for a distance of 15 feet from the northern driveway for the Downtown Safeway Center. (Administrative Approval 4/28/03) Section 2: The following language shall be added to Section 6.28.010 (“No Parking Zones: Designated”) of the City of Dublin Traffic Code: Amador Plaza Road On the east curbline from the south curbline of Amador Valley Boulevard a distance of 200 feet south On the east curbline from a point 240 feet south of the south curbline of Amador Valley Boulevard to the north curbline of Dublin Boulevard On the west curbline from the south curbline of Amador Valley Boulevard south a distance of 180 feet. On the west curbline from a point 510 feet south of the south curbline of Amador Valley Boulevard south a distance of 60 feet On the west curbline from a point 610 feet south of the south curbline of Amador Valley Boulevard south a distance of 160 feet On the west curbline from a point 590 feet north of the north curbline of Dublin Boulevard a distance of 80 feet north On the west curbline from the north curbline of Dublin Boulevard a distance of 310 feet north. Section 3: The following language shall be added to Section 6.32.50 (“Two-Hour Parking”) of the City of Dublin Traffic Code: Amador Plaza Road On the east curbline from a point 200 feet south of the south curbline of Amador Valley Boulevard a distance of 40 feet south On the west curbline from a point 180 feet south of the south curbline of Amador Valley Boulevard a distance of 330 feet south C:\Users\gloriam\AppData\Local\Temp\4.8 attch 4_589131\4.8 attch 4.doc On the west curbline from a point 570 feet south of the south curbline of Amador Valley Boulevard a distance of 40 feet south. On the west curbline from a point 770 feet south of the south curbline of Amador Valley Boulevard a distance of 240 feet south On the west curbline from a point 310 feet north of the north curbline of Dublin Boulevard a distance of 280 feet north th PASSED, APPROVED AND ADOPTED this 19 day of July, 2016, by the following vote: AYES : NOES : ABSENT : ABSTAIN : _______________________________ Mayor ATTEST : ___________________________________ City Clerk C:\Users\gloriam\AppData\Local\Temp\4.8 attch 4_589131\4.8 attch 4.doc