HomeMy WebLinkAboutReso 107-16 Fallon Sports Park Project Mgmt Services RESOLUTION NO. 107 - 16
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * * * * * *
APPROVING A TASK ORDER WITH PAKPOUR CONSULTING GROUP, INC.
FOR PROJECT MANAGEMENT SERVICES
WHEREAS, on June 7, 2016, the City Council approved an amendment to the consultant
services agreement with Pakpour Consulting Group, Inc. for on-call engineering services; and
WHEREAS, the City desires to hire a consultant qualified and experienced in providing
project management for construction projects; and
WHEREAS, Pakpour Consulting Group, Inc. has the demonstrated ability to perform the
project management services; and
WHEREAS, Pakpour Consulting Group, Inc. is available to perform the work specified.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby approve a Task Order with Pakpour Consulting Group, Inc. for project management
services for the Fallon Sports Park — Phase 2 and Jordan Ranch Neighborhood Park Projects,
attached as Exhibit A.
BE IT FURTHER RESOLVED that the City Manager is authorized to execute the
Purchase Orders for said Task Order.
PASSED, APPROVED AND ADOPTED this 21st day of June, 2016, by the following
vote:
AYES: Councilmembers Biddle, Hart, Wehrenberg, and Mayor Pro Tem Gupta
NOES: None
ABSENT: Mayor Haubert
ABSTAIN: None
Mayor Pro Tern
ATT T:
DeP/)y City Clerk
Reso No. 107-16,Adopted 6-21-16, Item 4.9 Page 1 of 1
4 EXHIBIT A TO RESOLUTION
DUBLIN June 21, 2016
I I I i I I`1
THE NEW Joubin Pakpour
AMERICAN Pakpour Consulting Group, Inc.
BACKYARD 5775 Stoneridge Mall Road, Suite 320
Pleasanton, CA 94588
RE:Task Order#1 between the City of Dublin and Pakpour Consulting Group
Mr. Pakpour:
Effective today, this letter shall serve as written authorization for Task Order#1 to
provide project management services on Fallon Sports Park Phase 2 and Jordan
Ranch Neighborhood Park to the City of Dublin. Work shall be completed under the
On-Call Agreement between Pakpour Consulting Group and the Facilities
Development Division of the Department of Public Works. The term for Task Order#1
coincides with the term of the amended on-call agreement. Please review, sign and
date this letter, email a copy back to the City, and send the original back by normal
mail service.
The Not-to-Exceed amount for Task Order#1 shall be $173,355, based on the
attached proposals from Pakpour Consulting Group, dated April 22, 2016. Work is to
be completed as stated in this proposal. A breakdown of work by project authorized to
date under this agreement is as follows:
Task Order#1 for On-Call Engineering Services Agreement Project Amount
Number Authorized
Fallon Sports Park— Phase 2 pk0414 $ 110,565
Jordan Ranch Neighborhood Park pk0514 $ 62,790
Task Order #1 Total $ 173,355
Upon agreement by both City and Pakpour Consulting Group, any substantive
City Council changes to the timeline, not-to-exceed amount, or scope of work will need to be
approved in writing and will result in a revised Task Order issued which will supersede
City Manager this document. All other terms and conditions of the agreement which this task order
is issued from shall remain in full force and effect.
Community Development
If you have any questions or need additional information, please contact Meghan
Economic Development Tiernan, Facilities Development Manager, at (925) 556-4510 or via email, respectively,
at: Meghan.Tiernan @dublin.ca.gov
Finance/IT
' r,_),, Best Regards,
Fire Prevention
Human Resources Meghan Tiernan
Facilities Development Manager
Parks & Community Services
Pakpour Consulting Group,INc.
Police
Authorized Representative(Print)
Public Works
'.. i 3, Title
Date
100 Civic Plaza Authorized Representative(Signature)
Dublin,CA 94568
P 925.833.6650
F 925,833.6651
www.dublin.ca.gov
a,?j ifi {u"II��(j11J1Ji)���i1����
Pak1 nur Consulting Group, Inc.
April 22, 2016
Meghan Tiernan 10027.13
Facility Development Manager
City of Dublin
100 Civic Plaza
Dublin, CA 94568
Subject: Proposal to Provide Project Management Services
Fallon Sports Park—Phase 2 (PK-0414)
Dear Ms.Tiernan,
Thank you for meeting with us on April 18, 2016 to discuss your project management needs for this
project. Based on our meeting and the scope of work detailed below, we prepared this proposal which
allocates up to 15 hours of Lorin Jensen's time per week to this project.
Project Information
Description: 19.75-acre Community Park
Construction: May 2016-June 2017 (54 weeks)
Construction Budget: $13,858,500
General Contractor: Robert A. Bothman, Inc.
Scope of Work
• Become familiar with the Fallon Sports Park— Phase 2 Project (review plans & specs, meet with City
staff and consultants, site visits)
• Coordinate project activities to ensure project progresses on schedule and within the prescribed
budget,
• Act as liaison between the City and consultants and coordinate the work of consultants (landscape
architects, geotechnical engineers, special inspectors)
• Communicate early and often with the Facilities Development Manager and provide regular weekly
project progress updates.
• Maintain records as directed by City staff and prepare reports. Respond to inquiries regarding the
status of projects. Develop and disseminate informational materials, as needed.
• Represent City at construction progress meetings to ensure construction is in compliance with City
plans and specifications.
Exhibit A to Resolution- Page 2 of 5
5776 Stoneridge Mall Road,Suite 320,Pleasanton,CA 94588
(925)224-7717• FAX(925)224-7726•www.pcgengr.com �a�rr�toa)II)P nt G i°ihlied coej
• Attend weekly 1-on-1 (or as-needed) meetings with the Facilities Development Manager.
• Attend monthly City Manager CIP update meetings.
• Attend meetings with City staff, as needed.
• Prepare draft staff reports, as needed.
• Provide administrative and technical support to the Facilities Development Manager.
Budget
We propose a time and materials budget for an average of 15 hours per week for 54 weeks. We will only
bill for Lorin's actual time spent on the project. The billing rate and direct cost multiplier used for this
proposal are from our 2014 on-call engineering contract.
Lorin Jensen, P.E.—54 weeks x 15 hours per week x$130 per hour $105,300.00
Direct Cost Multiplier 5%, covers all direct expenses $5,265.00
Total: $110,565.00
Thank you once again for considering Pakpour Consulting Group for this project. Should you have any
questions please do not hesitate to contact me at(925) 224-7717.
Very truly yours,
Pakpour C , Iting Group, Inc.
Joubin Pakpour, P.E.
Principal Engineer
1:\Projects\D,blln-10027.00\13-Fallon Sports Park PM\Contract\Agoncy\13-Du61in-Tiernan-1G.04.22,Fallon Sports Park Proposal.docx
Exhibit A to Resolution- Page 3 of 5
April 22,2016—Page 2
Tiernan—Proposal to Provide Project Management for Fallon Sports Park—Phase II
IffumogieDWEIRfiT
IP'NIIP.�D�'�
Pakpnur Consulting Grin ip, Inc,
April 22, 2016
Meghan Tiernan 10027.14
Facility Development Manager
City of Dublin
100 Civic Plaza
Dublin,CA 94568
Subject: Proposal to Provide Project Management Services
Jordan Ranch Park (PK-0514)
Dear Ms.Tiernan,
Thank you for meeting with us on April 18, 2016 to discuss your project management needs for this
project. Based on our meeting and the scope of work detailed below, we prepared this proposal which
allocates up to 10 hours of Lorin Jensen's time per week to this project.
Protect Information
Description: 5.0-acre Neighborhood Park
Construction: May 2016- March 2017(46 weeks)
Construction Budget: $1,600,000
General Contractor: Goodfellow Top Grade Construction
Scope of Work
• Become familiar with the Jordan Rank Park Project (review plans & specs, meet with City staff and
consultants,site visits)
• Coordinate project activities to ensure project progresses on schedule and within the prescribed
budget.
• Act as a liaison between the City and consultants and coordinate the work of consultants (landscape
architects, geotechnical engineers, special inspectors)
• Communicate early and often with the Facilities Development Manager and provide weekly regular
project progress updates.
• Maintain records as directed by City staff and prepare reports. Respond to inquiries regarding the
status of projects. Develop and disseminate informational materials, as needed.
• Represent City at construction progress meetings to ensure construction is in compliance with City
plans and specifications.
Exhibit A to Resolution- Page 4 of 5
5776 Stoneridge Mall Road,Suite 320,Pleasanton,CA 94588
(925)224-7717 • FAX(925)224-7726 •www.pcgengr.com Trot e li tint C:c nilicel �,i
• Attend weekly 1-on-1 (or as-needed) meetings with the Facilities Development Manager.
• Attend monthly City Manager OP update meetings.
• Attend meetings with City staff, as needed.
• Prepare draft staff reports, as needed.
• Provide administrative and technical support to the Facilities Development Manager.
Budget
We propose a time and materials budget for an average of 10 hours per week for 46 weeks. We will only
bill for Lorin's actual time spent on the project. The billing rate and direct cost multiplier used for this
proposal are from our 2014 on-call engineering contract.
Lorin Jensen, P.E.—46 weeks x 10 hours per week x$130 per hour $59,800.00
Direct Cost Multiplier 5%, covers all direct expenses $2,990.00
Total: $62,790.00
Thank you once again for considering Pakpour Consulting Group for this project. Should you have any
questions please do not hesitate to contact me at (925) 224-7717.
Very truly yours,
Pakpour Con, ulting Group, Inc.
/�//%//i
Azi
Joutiin Pakpour, P,E.
Principal Engineer
0,Projects\Dublin-10021.00\14-lordan Ranch Park PM\Contract\Agency\14.6ubiln-Tiernan-16.04.22-Jordan Ranch Park Proposal.doev
Exhibit A to Resolution- Page 5 of 5
April 22,2016—Page 2
Tiernan—Proposal to Provide Project Management for Jordan Ranch Park
1