Loading...
HomeMy WebLinkAbout4.6 - 1159 Downtown Wi-Fi Page 1 of 2 STAFF REPORT CITY COUNCIL DATE: September 20, 2016 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Amendment to the Consulting Services Agreement with SmartWave Technologies Prepared by: Tim Eisler, Information Systems Manager EXECUTIVE SUMMARY: The City Council will consider approving an amendment to the consulting services agreement with SmartWave Technologies LLC for the design and installation of a no - fee public access Wi-Fi system within a portion of the Downtown area. STAFF RECOMMENDATION: Staff recommends that the City Council approve the Resolution Approving an Amendment to the Consulting Services Agreement with SmartWave Technologies LLC; and approve the budget change. FINANCIAL IMPACT: The existing agreement with SmartWave Technologies LLC (SmartWave) to design and install the Downtown Wi-Fi system was $71,294, with a 10% contingency included for a total project cost of $78,424. Redesign of the Public Safety Complex necessitated a reconfiguration of the project and additional design work, which increases the fee to $81,947. Staff recommends a contingency of 10%, for a total project cost of $89,699. The Downtown Wi-Fi project is funded by the Downtown Public Improvement Reserve in the General Fund. A budget change of $11,275 from the reserve is now needed for the additional costs. DESCRIPTION: On January 19, 2016, the City Council approved the consulting services agreement with SmartWave LLC to design and implement a pilot project for Downtown Wi-Fi. The proposed areas covered by the pilot project are between Dublin Blvd. and Amador Valley Blvd. at its northern and southern borders, and the area between Amador Plaza Page 2 of 2 Road and Village Parkway at its eastern and western borders. Co verage is also extended to the Golden Gate Drive area south of Dublin Blvd. to the freeway, and from Amador Plaza Road to the end of St. Patrick Way. The pilot area will piggyback on the public Wi-Fi internet service provided at the Civic Center. In the original design, the Civic Center Wi-Fi service would have been routed to the Downtown area from antennas placed atop the Public Safety Complex and the Senior Center, but the redesign of the Public Safety Complex for Police Services removed the possibility of using the Public Safety Complex rooftop. SmartWave and Staff have reviewed other possible configurations, and have entered into an agreement with Downtown Displays LLC to use the Downtown sign as the routing point back to the Civic Center rooftop. The relocation of the antennas required a new network configuration with additional hardware and installation costs, and prolonged the expected implementation time. Approval of the attached budget change form (Attachment 3), in the amount of $11,275, will cover the additional implementation costs. Annual maintenance and internet service costs were included in the Fiscal Year 2016 -17 Adopted Budget in the Information Technology Fund. NOTICING REQUIREMENTS/PUBLIC OUTREACH: None. ATTACHMENTS: 1. Resolution Approving an Amendment to the Consulting Services Agreement with SmartWave Technologies LLC 2. Exhibit A to the Resolution: Amendment to the Consulting Services Agreement with SmartWave Technologies LLC 3. Attachment A to Exhibit A 4. Budget Change Form RESOLUTION NO. XX - 16 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * * * APPROVING AN AMENDMENT TO THE CONSULTING SERVICES AGREEMENT WITH SMARTWAVE TECHNOLOGIES, LLC WHEREAS, On January 19, 2016, the City entered into an Agreement with SmartWave Technologies, LLC (hereinafter referred to as “Contractor”) to assist with the design and installation of a no-fee public access Wi-Fi system within a portion of the City’s Downtown area; and WHEREAS, the City and the Contractor wish to extend the term of Agreement to December 31, 2016; and WHEREAS, the City agrees to increase the Consultant compensation from the original not to exceed amount of $71,294 to a not to exceed amount of $81,947 for services performed, plus a contingency amount of $7,752; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the Amendment to the Consulting Services Agreement with SmartWave Technologies, LLC to perform the design and installation of a Wi-Fi system as attached hereto as “Exhibit A to the Resolution.” BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the amendment to the Agreement, to approve the use of the contingency amount of $7,752 as necessary and make minor modifications to the Agreement, including time extensions (if needed), in order to carry out the intent of the Resolution . PASSED, APPROVED AND ADOPTED this 20th day of September, 2016, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk PlM AMEMOMEMTTO CCMSIILPHGSERNCE MEEMEMT BEI W FEN THE C" OF DUBLIN PMO SMgMI W /NE TECMMOLIX'RS, ILC Wl1EMEP5, m January, 19, Sai has Gly of WNm 1'Clml and 3mme ae Teubnalo;iea, LLC FiCms al mmred imoa UmalOy Saw hey PgnmlaM (YgdmmmY): am WMEAERS, Pe CTy and Consubam nobody drip¢ b de'dtic Tam of Samaras umil BawnMl 31. Sol S; am WMFR the Ciir am c,maYHnl able m osay,tl m he meaty Cdrymnyn be Val al in ur,addl egbry mare demand su hundred neery mire Mao and army atr qma Oral M Sm. xNN is en irweaae Negbhs dmand her handed fwrcl and "as ma 41 SAMAId%in Fa Imeal parcemnl all January 19, 2016 WMEM r deImuase In Compnsaden¢ rtlebd he a Wlge'ma err, ryaKtl title Pl�ment Of an gamma man be>uut 3meM eaapm m Shal bxaRa m me Bb mmash ma M .. TIEIiEFOME, for 9mtl and call mvitlaNm, Pe handsome an hoisi b hereby aamea6 . meftmerfem b amamdad as mamma %1 3emm� l l Tamm re s.a _wd a rehamal niasal and macda he she 6 n9: 1.1 aS> s Tglam WdupgreamM NeA Rib mtlp tlelefiM ndetlabonsgd&and oOxamLhallcnape Mocha Mhamm a iceoded bEToth A and LO'¢uMn1 hall of NPau'ark bananas in ENrdb de prbr m Pal edam, uaphh has lean m der fgreanim b Nymae m 9Umtl as wp la;xplw i mindbybay TMEman dead not CaiwbmPmnplNdemvrosmet, byalegpr¢mmSall a aflai Pe CTy's rghlbmrmineo Pe Agreement, az proWW Mr Sa<Nne. 21 SaPbn2 rCy_yii n pLi shall be immedln lb emmy and replaced wish Ph m nnng: 2. [p My agemeCM NRnded -ddmry mnearie�edrpoav crosnlmrxammrrem ®b o1wMffiMVg anybmRrylNValpns Pal may as sam nd, Onsullards names, far to be Formal and Mmbunatle wsainarrN under the Ogre¢ robe eherom mndtl lay mday Personal ant consultant proposal atlatletl as ENI°Il 0. moral be Steal ldmn warm, Pa Fgmmnl wim"Val 411y Nall pay CooMam M seam rendered manned pp qk /gredmm an be am arm in me manner ul mM Moran. The mYm slashed ter shall be me only paymmd teen Ciry m Famished M ream rendered purhuam W Pb agreement. Comnlmm shall Same ae;mama to an'm ma mmrcr ®edmness' �mnlaS Wmy mwre4m� Posy Gn. COmmlmrl :nail rglblY LiryM CmoAmmanoclryaelmdWm9aaN ythated mngermapon had Lycibm Cammadd uNV the Idem bi utyn ONINNYenimayd chst, a w iming the C� amrede� CCremder inGudea ,d eaand mnema m employees am suemneumina adaies and OereRs d eymVr Maee Kid hcwtiiae 6 ChrK,lKiCmeaapw,rdy, Ore onee Matter agree VIAmnpenNm Mremder la in@Med m Ni the w If aaddhayn w any census 11,16, mmenes m Kh CwwlW, t ana'm emplkams, agents, IN ladmnaaan5 MNuyo CO ttnaeraeLnad m mapinvdiM m.adi mngiawona derine mmcenaddm 33 Eedi m the amm inmi®etanr"th Ue Fear Atmdreet am ma cwwlmnr Nor oMpm at of the m1a and cemao ad tn1 rowmem. a) M rmeam liedids Nod, m ea a away ne! di Carewbm pusaam m me ftre omry am beem am New fipn IN m Ki KwlIMude cwmgl tali ne Kne ae dehydaN added 5) T2 vdMdre4searcueng li Ammdmea e6, ON testaments ramencedln ll m aerury urCnwMM mS N,,,,W and vamnr and they have On Kid m .dot and xlsl aNmdb w and Caddiddatm the Intel and mnamo5 Of tdbAa.aamenL CITY OF W CONSULTAOT alNewplmrLFms,CMMaI Atiymm w New[ omite P. SOw. Litrtlan Mpm aam Fam: down , Fitly AYwrey SmartWAVE Technologies LLC 1275 Hwy 23 NW, Ste 101 Suwanee, GA 30024 8/30/16 Project: Dublin WiFi - Phase 1 Tim Eisler City of Dublin 100 Civic Plaza Dublin, CA 94568 tim.eisler@dublin.ca.gov MATERIAL / EQUIPMENT DESCRIPTION MANF. PART #QUANTITY UNIT PRICE Materials/Equipment Virtual SmartZone 3.0 or newer software virtual appliance, 1 Instance, includes 1 AP license L09-VSCG-WW00 1 ea $697.00 AP management license for SZ-100/vSZ 3.X, 1 Ruckus AP access point L09-0001-SG00 22 ea $65.00 ZoneFlex T300, omni, outdoor access point, 802.11ac 2x2:2 internal BeamFlex+, dual band concurrent, one ethernet port, PoE input, includes mounting bracket and one year warranty. 901-T300-xx01 21 ea $907.00 ZoneFlex T301n, 30x30 deg, Outdoor 802.11ac 2x2:2, narrow beam, dual band concurrent access point, one ethernet port, PoE input 901-T301-xx61 1 ea $1,047.00 P300, single unit, outdoor 802.11ac 2X2:2 bridge, 5 GHz internal antenna, optional antenna support, one ethernet port, PoE input, includes mounting brackets and one year warranty. 901-P300-XX01 11 ea $837.00 One 5GHz directional antenna, dual-polarized 12.5dBi gain and 120 degrees 3dBm beam width, including one dual plane adjustable wall/pole mounting kit and two 1m RF cables with N-Type connectors. 911-1212-DP01 2 ea $280.00 One high gain directional antenna, dual-polarized 21dBi gain and 10degrees 3dBm beam width, including one dual plane adjustable wall/pole 911-2101-DP01 2 ea $210.00 Photocell Adpater with 1 PoE 48VDC RJ45 End - 5 Ft SWPHTCL5-1POE 15 ea $238.00 Photocell Adpater, 120V, 15-ft, stripped ends SWPHTCL15-120V 7 ea $69.00 Outdoor PoE Switch, 3 Port 100/1000Mbps, 802.3at 30W PDS-102GO/AC/M 7 ea $399.00 Mounting Brackets for Outdoor Units PD-OUT/MBK/G 7 ea $42.00 4+1 Outdoor Switch, 60W per port, Managed PoE, AC Input PDS-104GO 1 ea $874.00 Mounting Brackets for PDS-104GO PD-OUT/MBK/S 1 ea $39.00 CAT6 Cabling Materials for wiring BSUs and Fiber Gateways SWCAT5E0D 4 ea $122.00 POE Surge Protection 100/1000Mbps SWCMJPOE8A 4 ea $54.00 Radio Mounting Hardware - Pole Mounts - 22 Mesh, 7 CPEs, 4 BSU SWMNTPL 31 ea $84.00 Base Station mounting hardware - SLED - Downtown SWSLED 1 ea $313.00 Shipping, grounding, weatherproofing, misc and consumable items SWMISC 1 ea $1,250.00 Crane Rental for Sign Installation CRANE 1 ea $1,250.00 Manufacturer Support Partner WatchDog Support - vSZ-RTU, 1 YR S02-VSCG-1L00 1 ea $200.00 Partner WatchDog Support Per SZ/vSZ AP, 1 YR S02-0001-1LSG 22 ea $30.00 PRICING Materials/Equip $47,442.00 Professional Svcs $30,080.00 Tax (9.5%)$4,425.29 GRAND TOTAL $81,947.29 Pricing Notes: 1.Sales Taxes are included. SmartWave will pay any and all applicable sales tax. 2.Payment Terms are Net-30 receipt of an invoice. Invoices will be provided monthly. 3.SmartWave will retain ownership of the equipment until payment is made in full. 4.Price provided is for the Phase 1 coverage area only. 5.Price assumes use of network switches at City Hall. 6.Price assumes radios and outdoor switches can be mounted on poles selected, and all poles are powered via POE. 7.Price assumes mesh radio mounted on a street light can be powered via a photocell adapter. 8.Price is subject to change upon completion of a field survey. 9.Professional Services include site survey, design, installation and training. 10.Price assumes the City has an existing VMWare Platform to host the vSCG Controller Software. 11.Price is inclusive of Bucket Truck Rental and Crane Rental for Target Sign Installation. 12.Price assumes Traffic Plans are not required or are provided by others. 13.Price assumes that traffic cones are acceptable for safety during street installation work. 14.Ongoing Support/Optimization services can be provided per Section 6 of Proposal for $450/AP/Year. ***ALL PRICES ARE GOOD FOR 30 DAYS FROM DATE OF QUOTE*** ATTACHMENT A TO EXHIBIT A Budget Change Reference #: From Un-Appropriated Reserves Budget Transfer Between Funds From Designated Reserves X Other Account Amount Account Amount 1001.1901.64001 $11,275 9/20/2016 Posted By:Date: As Presented at the City Council Meeting **********Finance Use Only********** CITY OF DUBLIN Increased cost due to relocation of antennas and resulting new network configuration. Funded by the Downtown Public Improvement Committed Reserves in the General Fund. REASON FOR BUDGET CHANGE FISCAL YEAR 2016-17 BUDGET CHANGE FORM DECREASE BUDGET AMOUNT INCREASE BUDGET AMOUNT General Fund - Non Departmental Program - Contracted Services City Council's Approval Required \\ccfileserver1\departments\Administrative Services\Agenda Items For City Council\Staff Reports\Calendar 2016\IS\SmartWave\Budget Change Smartwave Budget Change Smartwave