Dublin Schools Facilities Task Force
Report Prepared by Singer & Hodges, Inc.
Provide Staff with Input on
Prioritization of Projects
$2,861,740 - $4,470,440
DESCRIPTION At the May 9, 1989 meeting of the Dublin
City Council, the Council received the final report from the
Dublin Schools Facilities Task Force. As a result of the report,
the City Council authorized staff to seek the services of a
professional landscape architect to prepare cost estimates for
the improvements identified in the Task Force report.
Exhibit A contains the report prepared by Singer & Hodges, Inc.
for athletic field and park area renovation. The report includes
a brief summary of each project and the costs associated with the
project.
Staff has been meeting with representatives from the Dublin Joint
Unified School District to develop project priorities, as well as
a Joint Facility Use/Development Agreement between the City and
the School District. Once these are developed, a joint City
Council/School Board meeting will be scheduled to discuss
implementation.
Although the Task Force members identified priorities for
projects in the final report, it is recommended that the
Commission further review the projects as well as the associated
costs and develop a revised priority list. The projects to be
included are listed below:
C.H. Frederiksen School Kindergarten Tot Lot
C.H. Frederiksen School Playground
C.H. Frederiksen School Athletic Field Upgrade
Dublin Elementary School Athletic field Renovation
Dublin Elementary School Mini Park Development
Dublin High School Football Field Renovation
Dublin High School Football Field Alternates
Dublin High School Tennis Court Renovation
Dublin High School Baseball Fields
Dublin High School Athletic Fields
Murray School Athletic Field Renovation
Nielsen School Athletic Field Renovation
Wells -Cronin School Athletic Field Renovation/
Play Area Renovation
Staff will incorporate those priorities recommended by the
Commission, the Task Force and the School District to develop a
draft project list and timeframe.
ITEM NO. ;v " 1J
CITY OF DUBLIN
DUBLIN SCHOOL DISTRICT
ATHLETIC FIELD
PARK AREA RENOVATION
COST ESTIMATES
Prepared for:
Prepared by:
City of Dublin
6500 Dublin Boulevard
Dublin, California
Singer & Hodges, Inc.
1512 Franklin Street
Oakland, California
SINGER & HODGES, Inc.
LANDSCAPE ARCHITECTURE
1512 FRANKLIN STREET
OAKLAND, CA 94612
(415) 891-9669
This report outlines the estimated costs of renovating and upgrading the Dublin
Schools facilities to meet school and community needs for improved sports fields
and play areas.
The following pages illustrate detailed cost estimates for the renovation of open
space at the following schools; C.H. Frederiksen, Dublin Elementary, Dublin High,
Murray, Nielsen and Wells -Cronin. The cost summary for each of the projects can
be found below:
C.H. Frederiksen School
$ 133,890.00
Dublin Elementary School
787,280.00
Dublin High School
1,052,250.00
Murray School
317,570.00
Nielsen School
302,050.00
Wells -Cronin Schools
268,700.00
Total
$2,861,740.00
Dublin High School Football
Field Alternates $1,608,700.00
Parking lot and school lighting costs have not been included in the individual
school cost estimate but it is estimated that lighting would add approximately
$8,400.00 to the cost of each elementary school estimate and approximately $20,000.
to the high school estimate.
PHILIP SINGER, ASLA RONALD HODGES, ASLA JOHN MONTAGUE, ASLA
Registration No. 1475 Registration No. 1356 Registration No. 2153
SINGER & HODGES, Inc.
LANDSCAPE ARCHITECTURE 1512 FRANKLIN STREET
OAKLAND, CA 94612
(415) 891-9669
This report outlines the estimated costs of renovating and upgrading the Dublin
Schools facilities to meet school and community needs for improved sports fields
and play areas.
The following pages illustrate detailed cost estimates for the renovation of open
space at the following schools; C.H. Frederiksen, Dublin Elementary, Dublin High,
Murray, Nielsen and Wells -Cronin. The cost summary for each of the projects can
be found below:
C.H. Frederiksen School
$ 133,890.00
Dublin Elementary School
787,280.00
Dublin High School
1,052,250.00
Murray School
317,570.00
Nielsen School
302,050.00
Wells -Cronin Schools
268,700.00
Total
$2,861,740.00
Dublin High School Football
Field Alternates $1,608,700.00
Parking lot and school lighting costs have not been included in the individual
school cost estimate but it is estimated that lighting would add approximately
$8,400.00 to the cost of each elementary school estimate and approximately $20,000.
to the high school estimate.
PHILIP SINGER, ASLA RONALD HODGES, ASLA JOHN MONTAGUE, ASLA
Registration No. 1475 Registration No. 1356 Registration No. 2153
C.H. Frederiksen School
Athletic fields are in good shape. Low spots in the athletic fields should be
filled and reseeded and the irrigation system repaired. Additional work at this
school includes renovation of the children's play area to include a kindergarten
tot lot and a playground in the turf area.
Bid Item Descriptions Quantity Units Unit Cost Item Total
Kindergarten Tot Lot
Adjustments to Fencing and
Bicycle Parking
Removal of Paving and
Demolition to Accommodate
Kindergarten Tot Lot
Tot Lot Curb
Sand
Play Equipment
Play Ground in Turf Area
Allow --- --- $ 3,200.
1,200 S.F. 2.00 2,400.
140 L.F. 29.00 4,060.
36 YD. 35.00 1,260.
Allow --- ___ 15,000.
Tot Lot Subtotal: $ 25,920.
Lawn Clearing Allow
Adjustments to A.C. Paving Allow --- ---
Grading 1,800 S.F. .50
Play Area Curb 170 L.F. 33.00
Sand 50 YD. 35.00
Play Equipment Allow --- ---
Play Area Subtotal:
Combined Tot Lot and Play
Area Subtotal:
15% Contingency:
14% Design, Engineering, and
Contract Administration:
TOTAL:
Athletic Field Upgrade and Minor Renovation
Minor Filling and Reseeding
of Low Spots
Aeration
Irrigation Repair
Replace Small Backstops
Cost Summary
1,200 C.Y. 18.00
Allow --- ---
Allow --- ---
2 EA. 1,800.00
Subtotal:
15% Contingency:
14% Design, Engineering, and
Contract Administration:
TOTAL:
Kindergarten Tot Lot/Playground in Turf Area
Athletic Field Upgrade and Minor Renovation
TOTAL:
-2-
$ 500.
2,500.
900.
5,610.
1,750.
20,000.
$ 31,200.
57,120.
8,570.
8,000.
73,690.
$ 21,600.
500.
20,000.
3,600.
$ 52,700.
7,000.
7,500.
60,200.
$ 73,690.
_ 60,200.
133 890.
Dublin Elementary School
Undevelope
field and
Turf areas
should be
Bid Item D
d space adjacent to this site creates
neighborhood park. Currently, the s
need complete regrading, reseeding,
replaced. Existing play courts would
escriptions Quantity Uni
Athletic Field Renovation
Clearing
Regrading
New Irrigation
New Seeded Turf
Replace Backstop
Removal of Existing Basket-
ball Back Boards and Posts
Conversion of Playcourts to
Parking, (1" of A.C. Lift)
New Drainage to Channel
2 New Infields
60-Day Maintenance Period
the
ports
and
be
is
potential for a combined sports
field is in poor condition.
new irrigation. Both backstops
converted to parking.
Unit Cost Item Total
174,000
S.F.
.03
$ 5,200.
174,000
S.F.
.25
43,500.
174,000
S.F.
.40
70,000.
174,000
S.F.
.26
45,250.
2
EA.
Allow
8,000.
Allow --- --- 5,000.
76,000 S.F.
Allow ---
14,000 S.F.
2 M0. 1
Subtotal:
15% Contingency:
14% Design, Engineering,
Contract Administration:
TOTAL:
Conversion of Lot "B" and Swimming Pool Area to Mini Park
Paving Removal
Clearing
Regrading
Drainage
Irrigation
Seeded Turf
Parking Lot Resurfacing
Tree Planting
Walks & Park Furniture
Play Area
60-Day Maintenance Period
20,000 S.F.
103,000 S.F.
103,000 S.F.
Allow ---
95,500 S.F.
103,000 S.F.
7,500 S.F.
Allow ---
Allow ---
Allow ---
2 M0. 1
Subtotal:
15% Contingency:
14% Design, Engineering,
Contract Administration:
TOTAL:
-3-
1.00
.70
,600.00
2.00
.03
.25
.40
.26
1.50
76,000.
8,000.
9,800.
3,200.
$ 273,950.
41,000.
44,000.
$ 358,950.
$ 40,000.
3,000.
26,000.
15,000.
38,500.
27,000.
11,250.
10,000.
15,000.
35,000.
2.000.
$ 222,750.
34,160.
and
$ 35,970.
$ 292,880.
Dublin Elementary School Continued
Bid Item Descriptions
Quantity Units Unit Cost
Item Total
Adjacent Lot "A"
Clearing
97,500 S.F.
.03
$ 3,000.
Regrading
97,500 S.F.
.25
25,000.
Irrigation
97,500 S.F.
.40
39,000.
Seeded Turf
97,500 S.F.
.26
25,500.
Backstop
Allow ---
---
4,000.
Infield
Allow
4,900.
60-Day Maintenance Period
2 M0.
800.00
1,600._
Subtotal:
$ 103,000.
15% Contingency:
15,450.
14% Design, Engineering,
and
Contract Administration:
17,000.
TOTAL:
$ 135.4sn_
Cost Summar
Athletic Field Renovation $ 358,950.
Conversion of Lot "B and Swimming Pool Area to Mini Park 292,880.
Adjacent Lot "A" 135,450.
TOTAL: $ 787 _ mn _
-4-
Dublin High School
Major improvements will be necessary to create a high quality, multi -use sports
facility for school and public use. All baseball and softball fields need minor
to moderate regrading and filling, reseeding, adjustment and addition of sprinkler
heads, new backstops, infields, and bleachers.
The football field needs regrading, reseeding, adjustment and addition of sprink-
lers, new goal posts, seating for bleachers, a snackbar/restroom facility, and
buffer planting. Alternative proposals include new bleachers, artificial turf, a
new press box and scoreboard, and new lighting. The track can be repaired or
replaced with an all-weather surface. The tennis courts need to be resurfaced.
Access paths should be constructed between the parking areas and the sports fields
Bid Item Descriptions
Football Field Renovation
Clearing
Regrade
Adjust Sprinkler Heads to
New Elevations
New Sprinkler Heads
Seeded Turf
Minor Refilling and
Renovation of Track Surface
New Aluminum Bleacher
Seating
New Railing for Bleachers
Upgrade Existing Stadium
Lights
New Snack Bar and 10 Units
Restroom (5 Units Each Side)
Planting Zone Behind Bleachers
60-Day Maintenance
Football Field Alternatives
Quantity
Units
Unit Cost
110,000
S.F.
.03
110,000
S.F.
.25
2.5
ACRES
2,000.00
20
EA.
125.00
110,000
S.F.
.26
46,000
S.F.
.25
Allow --- ---
Allow --- -
--
Allow --- ---
Allow
Allow
2 M0. 1,000.00
Subtotal:
15% Contingency:
14% Design, Engineering, and
Contract Administration:
TOTAL:
Item Total
$ 3,300.
27,500.
5,000.
2,500.
29,000.
11,500.
40,000.
6,000.
45,000.
225,000.
7,000.
2.000.
$ 403,800.
60,600.
65,000.
$ 529,400.
Note: Construction contingency, design, and engineering costs included in
alternative item totals.
All -Weather Track*
Artificial Turf and Asphalt
Subsurface*
New Press Box
New Score Board
New Lighting @ 50 Foot
Candles*
New Bleachers*
Allow --- ---
Al low --- ---
Al low --- ---
Al low ---
Al low --- ---
Al low --- ---
-5-
$ 78,000.
910,000.
78,000.
17,000.
170,500.
520,000.
Dublin High School Continued (2)
Bid Item Descriptions Quantity Units Unit Cost Item Total
Football Field Alternatives Continued
* In the event alternate football field improvements are implemented, delete the
following renovation costs:
1. All-weather Track. Delete cost of existing track surface renovation,
$11,500.00.
2. Artificial Turf. Delete renovation and improvement of existing turf field
cost of $67,300.00.
3. New Stadium Lighting.
Delete cost of upgrading existing lights,
$45,000.00.
4. New Bleachers. Delete
cost of replacing existing bleacher seats,
$41,000.00.
Alternate Total
$1,773,500.
Subtract Improvement Costs
Listed Above (*1-4)
- 164,800.
Actual Alternate Cost Total:
$1,608,700.
Baseball Fields
Clearing
110,000 S.F. .03
$ 3,300.
Filling Low Spots, Partial
Regrading, Reseeding
1,800 C.Y. 18.00
32,400.
Grading Undeveloped Area
68,000 S.F. .25
17,000.
Adjust Sprinkler Heads to
New Elevations is Regraded
Areas and Replace 1/4 of
Heads
Allow
10,000.
New Irrigation System
68,000 S.F. .40
27,200.
Major Aeration
Allow --- ---
1,000.
Seeded Turf
68,000 S.F. .26
18,000.
60-Day Maintenance Period
2 M0. 15600.00
3,200.
Boys Varsity Field Fencing,
Backstop, and Dugout
Bleacher on Mound
Allow --- ---
30,000.
Landsacping and Wall at
Mound
Allow --- ---
Paving
Allow -__ ---
5,000.
15,000.
Infield
Allow --- ---
9,000.
Jr. Varsity Field Fencing,
Backstop, and Dugout
Bleachers
Allow --- ---
8,600.
Paving
Allow --- ---
15,000.
Infield
Allow --- ---
9,000._
Subtotal:
$ 206,700.
15% Contingency
31,000.
14% Design, Engineering, and
Contract Administration:
32,280.
TOTAL:
$ 270,980.
Dublin High School Continued (3
Bid Item Descriptions Quantity Units Unit Cost Item Total
Girls Athletic Fields and Undeveloped Area
Clearing
171,000
S.F.
.03
$ 5,150.
Filling Low Spots, Partial
Regrading, Reseeding
350
C.Y.
18.00
6,300.
Adjust Sprinkler Heads to
New Elevations in Regraded
Area and Replace 1/4 of Heads
Allow
---
---
10,000.
New Irrigation
75,000
S.F.
.40
30,000.
Seeded Turf
171,000
S.F.
.26
44,500.
Redo Infield
Allow
---
---
6,000.
New Backstops
Allow
---
---
5,000.
Paved Access
Allow
---
---
-20,000.
Security Lighting @ Access
Allow
---
---
12,000.
60-Day Maintenance Period
2
Mo. 1,600.00
3,200.
Subtotal:
$ 142,150.
15% Contingency:
21,320.
14% Design, Engineering,
and
Contract
Administration:
22,900.
TOTAL:
$ 186.37n_
Tennis Court Area Renovation
Court Improvements, Resurfacing
10 Tennis Courts Allow --- --- $ 40,000.
Access from Court Area to
Football Field Allow --- --- 10,000.
Subtotal: $ 50,000.
15% Contingency 7,500.
14% Design, Engineering, and
Contract Administration: 8,000.
TOTAL: $ 65.500_
Cost Summar
Football Fields $ 529,400.
Baseball Fields 270,980.
Girls Athletic Fields 186,370.
Tennis Court Area Renovation 65,500.
TOTAL: $1.052,250.
Football Field Alternates $1,608,700.
-7-
Murray School
This site requires major renovation, including extensive grading and reseeding,
addition of an irrigation system and a paved walk, and renovation of backstops.
Bid Item Descriptions
Quantity
Units Unit Cost
Item Total
Clearing
270,000
S.F.
.03
$ 8,100.
Remove Sand Stockpile
2,500
S.F.
.25
625.
Minor Regrading Entire
Athletic Field
270,000
S.F.
.15
40,500.
New Irrigation System
270,000
S.F.
.40
108,000.
New Seeded Turf
270,000
S.F.
.26
70,200.
Renovate Backstops
Allow
---
---
2,000.
Paved Walkway (4" Wide
A.C.)
1,800
S.F.
2.20
4,000.
Walkway Header
900
L.F.
3.50
3,150.
60-day Maintenance Period
2
M0. 2,400.00
4,800.
Subtotal:
$ 241,375.
15% Contingency:
36,195.
14% Design, Engineering,
and
Contract
Administration:
40,000.
TOTAL:
$ 317,570.
Nielsen School
To make best use of this site, we recommend connecting
it to adjacent
Mape Park
by removing an existing concrete
drainage
swale. This
will require construction
of a drainage system. In
addition, the site
needs considerable regrading and
reseeding, some irrigation
installation,
turf renovation, reconstruction of a
play area, a new backstop,
and capping of
an abandoned
well.
Bid Item Descriptions
Quantity
Units
Unit Cost
Item Total
Clearing
230,000
S.F.
.03
$ 00.
Cap Well
Allow
___
---
2,,500.
Remove "V" Ditch and
Add Drain
335
L.F.
50.00
16,750.
Regrading
230,000
S.F.
.25
57,500.
Adjust Existing Sprinkler
System to New Elevations
40
EA.
70.00
2,800.
New Irrigation
142,000
S.F.
.40
56,800.
New Seeded Turf
230,000
S.F.
.26
59,800.
Replace Backstop
Allow
4,000.
60-Day Maintenance Period
2
M0.
2,000.00
4,000.
Subtotal:
15% Contingency:
14% Design, Engineering, and
Contract Administration:
TOTAL:
Alternate No. 1,
Renovate Existing Play Area Allow ---
Grand Total:
• -9-
$ 211,050.
32,000.
34,000.
$ 277,050.
$ 25,000.
$ 302,050.
Wells -Cronin School
The athletic fields shared
by the Wells
and Cronin schools require moderate
.renovation. Most of the turf needs regrading and
reseeding. Approximately
one third of the sprinklers
need replacement; the
rest need adjustment.
The
backstop should be repaired.
The play area requires major renovation,
includ-
ing drainage work.
Bid Item Descriptions
Quantity
Units
Unit Cost Item Total
Clearing
250,000
S.F.
.03 $
7,500.
Regrading
250,000
S.F.
.25
62,500.
Adjust Existing Sprinkler
Heads to New Elevations
3.8
Acres
2,000
7,600.
New Sprinkler Heads
83,250
S.F.
.40
33,300.
Seeded Turf
250,000
S.F.
.26
65,000.
Repair Backstops
2
EA.
Allow
4,000.
Renovate Play Area
Allow
---
---
20,000.
60-Day Maintenance Period
2
M0.
2 400 00
4 800
Subtotal: $ 204,700.
15% Contingency: 31,000.
14% Design, Engineering, and
Contract Administration: 33,000.
TOTAL: ?AA Inn
-10-