HomeMy WebLinkAbout04-27-1992 HCAC Partial Meeting Minutes Cm. Burton questioned how long it would actually be before we widen
the street.
Mr. Thompson responded that it could be 5 or 6 years.
Cm. Burton felt that $5, 000 is a lot of money to move the berm, but
the risk of a serious accident is great. It is a serious problem.
On motion of Cm. Burton, seconded by Cm. Jeffery, and by unanimous
vote, the Council adopted
RESOLUTION NO. 52 - 92
AWARDING CONTRACT 92-04 TO EAST BAY EXCAVATING, INC. ($24,940.90)
DUBLIN BOULEVARD/SILVERGATE DRIVE MODIFICATION
and directed Staff to issue a change order to the contractor to extend
the contract to include relocation of the asphalt berm at $5,400.
HERITAGE CENTER REPORT (910-40)
Recreation Director Lowart presented the Staff Report which gave a
history of how this report was requested. Staff was directed to
prepare an analysis of the fiscal impact to the City for acquiring,
renovating and maintaining the Heritage Center properties.
Ms. Lowart advised that the City Attorney determined the procedures
which should be following if the City is to acquire the properties.
The City would need to: 1) obtain an appraisal; 2) prepare a legal
description; 3) prepare a purchase or transfer agreement; and 4)
obtain a soils report. Costs were estimated at: Acquisition - $29,400
- $49, 100; Renovation - $257,440; Total one-time costs = $286, 840 -
$306, 540. Maintenance & Operation costs were estimated annually at
$46,470. With regard to acquisition, Ms. Lowart stated she thought
information might be presented this evening identifying that costs
could be lower.
Ms. Lowart stated the City's Building Department inspected both the
church and the school to determine the renovation necessary in order
for the buildings to comply with current building, electrical and
access codes and to identify those areas in need of repair. The
Public Works Department inspected the grounds to determine the initial
maintenance costs.
Ms. Lowart reviewed the Staff Report which identified detailed
information for the old St. Raymond's Church, the old Murray School
and the Dublin Cemetery.
In summary, Ms. Lowart advised that costs for maintenance and
operation of the Heritage Center will vary according to how the
buildings and grounds are utilized. The cost estimates do not provide
for personnel costs associated with direct programming of historical
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ e ■ ■ ■ ■ ■ ■ ■ ■ ■ e ■ ■ ■ ■ ■ ■
CM - VOL 11 - 169
Regular Meeting April 27, 1992
activities, conducting burials at the cemetery or for the costs
associated with Staff support to a historical commission. The
maintenance and operation costs could decrease if the City chooses to
lease the buildings to a non-profit organization, and increase if the
buildings and grounds receive greater use than is currently
anticipated.
Cm. Jeffery questioned if insurance costs were included.
Ms. Lowart stated the property insurance costs would depend on the
value placed on the property. Staff did not anticipate any increase
in the City's liability coverage at this point.
Cm. Moffatt commented that he thought these costs could be spread over
a 10 year period so that they could be amortized. Rejuvenation could
also take place over a period of time.
Ms. Lowart indicated that the sooner the repairs are made, the sooner
it will be accessible to the public.
Mr. Ambrose reminded everyone that there are also certain Americans
With Disabilities Act (ADA) requirements which apply to all public
buildings. The City had a contractor come out and give us an
estimate.
Building Inspector White reiterated that the Building Department did
not give any estimates, but rather contractors did.
Cm. Jeffery clarified that the purpose of this discussion was for the
Council to receive a report only and that no recommendation was made
beyond receiving the report.
Mr. Ambrose stated this was correct as this was the direction of the
Council.
Cm. Jeffery felt it was appropriate to keep in mind that this must go
through the budget process.
Mr. Ambrose stated there is extreme concern about the City's financial
situation. Staff is concerned about committing to any new costs
before it can look at the impacts on existing programs. If the
Council proceeds, no final action can be taken until the City Council
has reviewed the Budget and Capital Improvement Program this year.
Cm. Burton stated we may be able to accomplish some of the costs
through the Measure AA grant funds.
Guy Houston advised that his background is in real estate development
and he felt that some of the costs for acquisition might be cut down.
The only property being sold is for $10,700. A second property is a
leasehold interest and the third property, the cemetery, would be a
gift to the City. It doesn't make sense to do an appraisal. He
estimated that an appraisal for the church property would be about
$2,500. He distributed information from Chicago Title Company which
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
CM - VOL 11 - 170
Regular Meeting April 27, 1992
•
indicated they would charge $500 total for each of the 3 properties.
It is not customary to get toxic reports on every piece of property,
and he thought this could be dismissed altogether.
Gordon Rasmussen, President of DCI felt that most of the costs were
exaggerated. They have $1, 060 per year insurance costs and
maintenance runs less than $2 , 000 per year. They are not trying to
put something onto the City, but trying to make a gift. Staff's
figures are disturbing. They know what it costs to take care of the
cemetery because they have done it for over 100 years. You do not
need a soils report for a cemetery. They do not plan to bring the
cemetery out to the road, but rather to end it where it is now.
Marie Cronin, President of DHPA, past president of LAVHS and member of
the DCI stated the City was to be commended for its interest in
pursuing possible acquisition of the Heritage Center. The Staff
Report did a good job of covering the many phases, however, the cost
breakdowns and financial statement needs major analysis. The costs
listed in the report are ridiculous. To throw money away like this
would be financially irresponsible. A lot of the more expensive
things have already been done. Their annual budget for maintenance
has been $1, 500 - $2 , 000. For the school, the insurance costs are
about $1, 000. Soils reports are unneeded. She has been involved in
the Heritage Center since the late 1950's. Staff's report is riddled
with about $200, 000 of overcosts. She recommended that the City
Council approve the concept of acquisition of the Heritage Center for
Dublin's 10 year anniversary.
Val Hatheway stated everyone had talked about the costs, but no one
talks about the value. You can't replace an original item. Year by
year, deterioration has taken place and items, one by one, disappear.
If the historical value means anything to the people, now is the time
to act. People need to think of the value.
Dorothy Maddox stated she had been a teacher for over 20 years. One
of the best ways for children to learn is to learn about the history
of their community. She has taken her classes there year after year.
Tom McCormick, 7170 Emerald Avenue, Vice President of DHPA thanked the
City Council for bringing this project this far. It is essential to
support preservation and we need to move forward with this. He has
experience in preparing budgets and has major budget responsibilities
and stated he felt the report is grossly exaggerated. He had never
seen such estimates in his whole life. The budget needs to be
completely reworked. People in the community who have budget
experience could help out. He found it unbelievable that no revenue
was included in the budget. He is constantly being asked by people
who want to use the church for weddings. Some realistic figures, plus
revenue could give the City something they could live with. This
budget is a disgrace. It's time to approve acquisition of the
properties.
Cm. Jeffery questioned the fact that revenue could support the
facility.
e e ® ® ® ® ® ® ■ • • ® • • • ® e s ® e • e ® ■ e • e ® o e ®
CM - VOL 11 - 171
Regular Meeting April 27, 1992
Mr. McCormick clarified that he did not say that revenue could support
the total program, but it could help.
Zev Kahn stated he found problems with the proposal from Staff. He
felt what could facilitate this whole thing would be to bring all the
groups together. When you recommend code compliance and areas of
concern, you need to identify this. A lot of the issues are not code
issues. The City could coordinate all the items. Corporations could
help. He agreed that we are financially strapped and it will take
some innovative thought to make this work. Everyone could benefit
from this and there would be pride that the community could do some of
the work. A lot of the items seem to be cleanliness items rather than
code. A lot of the work could be done on a volunteer basis and a task
force could deal with a lot of this.
Pete Hegarty stated he has been involved as past president of DHPA.
The Heritage Center is a very rich resource to the community. They
also have 1 1/2 acres on the other side of the creek, which does have
value and does have use. He highly recommended that the City go
forward with this. There has always been a dispute over who donated
the property and has always been a fly in the ointment. Unless we
act, we are going to lose this. Putting a plaque here and there is
not the same. The community will supply a lot of what is needed.
Luke Seeger, on the Board of DCI, requested that the City Council take
time and sit down and get estimates. There are people and companies
in this community who care. Fund raisers could be held. Large
corporations such as Hexcel bend over backwards to help restore the
damaged headstones. If people knew what was going on, they might be
willing to jump in and help to take some of the burden off our
shoulders.
Mayor Snyder advised that this will be discussed at some length at
budget time. If someone knows a better source for obtaining estimates
they can come forward. He stated he took umbridge with criticism of
Staff's report. It is not Staff's place to make decisions regarding
such things as volunteers.
Cm. Jeffery stated the issue is not support or non support at all.
There is not a person on the City Council who does not support this,
but rather differences are how it should be done. She was interested
in looking at the best way to do it.
Cm. Burton thanked everyone for coming.
On motion of Cm. Burton, seconded by Cm. Howard, and by majority vote,
the Council referred the budget and acqusition papers to the already
established task force to prepare documents prior to budget time and
to clarify some of the figures with the understanding that the task
force is to pursue acquisition. The task force was instructed to
prepare purchase agreements, clarify the budget and make a
presentation to the Park & Recreation Commission. Cm. Jeffery and
Mayor Snyder voted against this motion.
■ ® s IS ® • e v ■ IN o ® o u e • ■ o • • ■ e ® ® ® ® ® • IN • NI ® •
CM - VOL 11 - 172
Regular Meeting April 27, 1992
Cm. Jeffery stated she felt this action was inappropriate at this
time. Anything that is going into the budget needs to be considered
all together.
TEN YEAR CITYHOOD CELEBRATION (950-40)
Recreation Director Lowart presented the Staff Report related to plans
for the July 4th Family Picnic, one component of the Ten-Year Cityhood
Celebration. The event would be scheduled at the Dublin Sports
Grounds on Saturday, July 4th and would be from 12 : 00 noon to 4 : 00
p.m. Activities would include games, contests, entertainment and a
barbecue lunch to be prepared by "celebrity chefs". The preliminary
budget is $7, 500; with $2, 000 to be expended during the current Fiscal
Year and the remaining $5, 500 to be included in the 1992-93 budget.
Ms. Lowart advised that the planning committee also looked at the
possibility of having an evening event with a laser light show.
Cm. Moffatt asked if the activity could be scaled down to fit the
budget. -
Ms. Lowart stated she would need to know exactly what this meant.
Cm. Howard pointed out that the money is already budgeted.
Mayor Snyder stated if you don't use the money in the designated
fiscal year, it goes back into the General Fund.
Cm. Burton stated he thought it would be a lot worse if it failed to
be a successful event. We are on a conservative budget right now. He
liked the idea of a celebration, but we have already spent $14 , 000.
Cm. Howard stated she felt that most people go out of town at that
time.
Cm. Moffatt stated he hoped this wouldn't interfere with the tree
lighting ceremony in December.
Mayor Snyder stated there was no need to spend time working on this if
it isn't supported by a majority, which it doesn't appear to be.
Cm. Howard didn't feel there was enough time left to plan this event.
Cm. Burton suggested that this celebration be dropped, but Staff could
come back with something more modest.
On motion of Cm. Burton, seconded by Cm. Moffatt, and by majority
vote, the Council cancelled the 4th of July community picnic event.
Cm. Jeffery voted against this motion.
* * * *
E • • • • s • • ■ s • ® • e • • w • e • s M E N E M II • o ■ • • ■ •
CM - VOL 11 - 173
Regular Meeting April 27, 1992