HomeMy WebLinkAboutReso 53-04 CivlEngLandSurveying RESOLUTION NO. 53 - 04
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
AMENDMENT TO AGREEMENT WITH
RUGGERI-JENSEN-AZAR & ASSOCIATES FOR
CML ENGINEERING AND LAND SURVEYING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Ruggeri-Jensen-Azar &
Associates (hereinafter referred to as "CONSULTANT"), entered into a Consulting Services Agreement
on July 1, 2003, to provide civil engineering and land surveying services to CITY; and
WHEREAS, CITY has requested that CONSULTANT perform additional work that was not
originally anticipated in the Agreement; and
WHEREAS, said additional work is described in a revised Scope of Work submitted by
CONSULTANT to replace Exhibit "A" of the Agreement; and
WHEREAS, the revised Scope of Work has been reviewed and the terms determined to be
reasonable and appropriate; and
WHEREAS, the revised Scope of Work necessitates an increase of the not-to-exceed by $12,000
for a total of $48,000.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby approve an amendment to the Consulting Services Agreement between CITY and CONSULTANT
pursuant to Exhibit "A" of this Resolution~ All other terms of the original Agreement shall remain in full
force and effect.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute in duplicate the
agreement amendment attached hereto as Exhibit "A".
PASSED, APPROVED AND ADOPTED this 6th day of April, 2004.
AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika, and Mayor Lockhart
NOES: None
ABSENT: None
ATTEST:
& t~4t~ · -~~'~'~ · .~~'q ~ Mayor
~-- ' CiW Clerk' g
GSCC-~S~pfi~~A ~end,d~ Gt~ 4.3)
EXHIBIT "A" OF RESOLUTION ~)D -04
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND RUGGERI-JENSEN-AZAR & ASSOCIATES
FOR CIVIL ENGINEERING AND LAND SURVEYING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Ruggeri-Jensen-
Azar & Associates (hereinafter referred to as "CONSULTANT"), entered into a Consulting ServiCes
Agreement on July 1, 2003, to provide civil engineering and land surveying services to CITY; and
WHEREAS, CITY has asked CONSULTANT to perform additional work that was not
originally anticipated in the Agreement; and
WHEREAS, said additional work is described ina revised Scope of Work to replace
Exhibit "A" of the Agreement; and
WHEREAS, the revised Scope of Work includes a budget increase of $12,000 for a total
not-to-exceed budget of $48,000; and
WHEREAS, the Public Works Director hasreviewed the revised Scope of Work and
concluded that the terms are reasonable and appropriate'.
NOW, THEREFORE, the parties agree as-follows:
The revised Scope of Work attached hereto shall replace Exhibit "A" to the Consulting Services
Agreement between CITY and CONSULTANT. All other terms of the original Agreement shall remain
in full force and effect.
CITY OF DUBLIN
ATTEST:
'"'--~--City ~C~er~r-
RUGGERI-JENSEN-AZAR & ASSOCIATES
Principal
Date: ~ _ zz -qb
.~ uggeri -
l:~ ~lensen - . . ' ~
· '-~ J~zar&Assoclates ~ -.
March 17, 2004
Michael Stella .
City of Dublin Public Works Department
100 Civic Plaza
Dublin, CA 94568
RE: Engineering.Scope of Work and Compensation for Tassajara and Fallon Roads North
Precise Plan Line CIP 96400, Dublin, California
Dear Michael:
Enclosed is the 'REVISED Scope of Work and Compensation amounts per your comments-dated
March 17, 2004 for the engineering services for TaSsajara and Fallon Roads North Precise Plan Line
CIP 96400, Dublin, Califomia.
If these are accepfable to you, they will become part of the contract, which We will be preparing
using a format acceptable to both of us.
Please call ifyo~ haVe any questions.
Very truly yours,
RUGGERI-JENSEN-AZAR & ASSOCIATES
Enclosure
GAAdmin\PROPOSAL\CITYPROPkDUBLrN~tassajararoad.p01 .wpd
4690 Chabot Drive, Suite 200 · Pleasanton CA 94588 - Phone (925) 227-9100 o Fax (925) 227-9300
(uggeri -, '
l~,nz~ern~ ~, s s oc iat es
EXItlBI'T "A"
SCOPE OF WORK
(Revised March 17, 2004)
This Scope of Work is prepared for the City of Dublin (Client) byP~uggeri-Jensen-Azar & AssoCiates
(Consultant).
Scope of Work
This Scope of Work' is based on the Preliminary Tassajra and Fallon Roads ultimate alignments
concepts prepared by Consultant in May 2003. Consultant team to include a principal, project
manager, .project engineer, senior technicians, senior surveyor, field survey manager, field survey
crew and an administrative assistant. We will submit our first' ,submittal package to the City two
weeks after Notice-to-Proceed.
I. BASIC SERVICES
A. Tassdjara and Fallon Roads Precise Plan Line
Based on iaput fi.om City staff and adjoining property owners, Consultant will prepare
precise plan line for 'the ultimate roadway configuration for:
1. Tassaj ara Road' from its current terminus south of the Kobold property to Contra
Costa County limit.
2. Fallon Road - fi.om southerly property line of the Silyeria property to the proposed
intersection with Tassajara Road. -
Precise Plan line will include the following:
a. Existing topography.
b. i Conceptual horizontal and vertical alignments configurations.
c. Approximate grading conform limit will be shown. Per ,~ ,-~,~l,a ,,~ J ~-,,~ 5, ~v~,.,,
proposal. Revision: Existing and proposed sections to be provided as required by City'
staff.
d.' TYPical cross sections.
e. Creek and hydrologic setback line if requested by the City staff.
G 91.dminXPROPOSAL\CITYPROP~DUBL1N~tassajararoad p01 ,wpd 2 Initial (P, JA) t)
.~., lensen -
J zar &,Associates
---~ . -~x~~'~''~, ............................ .
f. Conceptual bridge design for the tributary crossing north of the proposed Tassajara &
Fallon Road intersections.
g. Plan and legal descriptions for the proposed right-of-waY l~oundaries in 8 ½" x 11"
format. Revision: Resolve boundary discrepancy at SpersJTage property per comments
by MacKay & Somps.
h. Reduced copies of the plan view alignments.
B. Meetings and Processing
Attend meetings with City staff,, other Consultants and affected propertyowners during the
precise'plan approval process. We have budgeted 24 hours for this task.
II. ADDITIONAL SERVICES
The services to be' provided under the terms of this Scope of Work are exphmtly those.detailed
herein. All items of work not ~exPressty described in the Scope of Work shall be deemed
"Additional Services" and compensation th'erefor ghall.be as set forth in'Exhibit "B".-
G XAdm/nkPROPOSAL\CITYPROP'~DUBLINXtassajararoad.p01.wpd 3 Initial (RJA) t)
uggeri - -
¢ '-lensen -
' '. J zar &Associates
EXHIBIT "B"
COMPENSATION
City.of Dublin (Client) shall ~compensate Ruggeri-Jensen-Azar & Associates (Consultant) for the
performance of the work described in Exhibit "A" and such additions as may be made hereto
purs~uant to Paragraph II of Exhibit "A", as hereafter set forth.
I. Compensation '
Compensation for this project will be on a Time & Material basis not to exceed the fees in Items
A &'B below without prior authorization by City staff:
Al Tassajara and Fallon Roads, Precise Plan Ling ' $32,000
B. Meetings and Processing ............................................. $ 4,000
C. Revisions to Original Scope ........................................ $12,000
Total'(Time & Material not to exceed without prior authorization) = $36,0,00
'$48,000
II. Other Items
A. - Compensation for Additional Services:
Compensation for additional services will l~e made in accordance with the Rate and
Expense Schedules per Exhibit "B:I !' attached hereto.
B. Compensation for Reprpduction Work:
Reproduction work will be.billed at Consultant's cost plus 10% per the attached Exhibit
C. Wage Increase:
The fee for any work under Paragraph I of Exhibit "A" w41,1 be performed 0ha time and
'material rate up to June 30, 2004. The fee for work which has been authorized and could
not be reasonably completed prior to 'June 30, 2004 shall annually.on July 1 be increased
proportionately to the increases in costs incurred by Ruggeri-Jensen-Azar & Associates for
labor and expenses. The maximum increase on compensation after June 30, 2004 shall not
exceed 10% per year for services covered by this Scope of Work.
In/t/al (ILIA) t)
lensen -
J' zar &Associates
The 'fee for any worl~ under Paragraph II and 1II of Exhibit "A" will be performed per the
most current Exhibit "B 1"
D. Invoices:
Invoices shall be rendered at the end of each month for each phase of the work, for that
potion of the work completed in the prior calendar month, and shall be payable within 30
days. Interest at a rate of 1% per month shall be applied to any overdue invoices.
G:~.dmin\PR. OPOSAL\CITYPROP~[;,UBLrN~tassajararoad.p0I.wpd 5 7 ~' Initial (RJA) ~ent)
lensen -
'L ' ) zar & Associates
RATE AND EXPENSE SCHEDULES
(effective through July 31, 2004) ~
HOURLY RATE SCHEDULE FOR PROFESSIONAL SERVICES
Classification Rate
Senior Project Manager ............................................................ $169.00
Project Manager ............................................ 153.00
Senior: Engineer, Surveyor, Planner ' . .............................. 142.00
Sr. Graphic Artist .................. '.' .......... ~ .................................... 136:00
Associate: Engineer, Shrveyor, Planner ............................................... 129.00
Engineer, Sui-v6yor, Plar~n~ er 108'.00
Assistant: Engineer, Surveyor, Plmmer ' 95.00
Senior Technician ................................................................. 11'8.00
Technician - . ............................ ' t04~00
Assistant Technician ................. ' ................................................ 84.00
Administrative Assistant ............................................................ 72.00
Clerical ' . ........................................... 57.00
Field Survey Manager ......................... .... ' ................................ 139,00
2-Person Survey Crew ' r ............................ : .......... ,.. 213.00
3-Person Survey C?ew ............................................ · ................ 267.00
Principal ................................................................. - ...... 1'87.00
Deposition/Court Appearance ................................................ Minimurn~ 1000.00
EXPENSE SCHEDULE
Global Positions System (GPS) ................ Personnel Charge'~ Hourly Rate plus $75.00 per hour
Multimedia Projector ...........................................$200.00 per day (one day min)
3-D Gr/aphics Rendering (computer only) .......................................... $25/per hour
Comptlter Plot ..................... ' ........................... ($10.00/sf) $20.00 (min.) each
Computer Plot (color/mylar) ....................................($20.00/s.f.) $50.00 (mn.) each
Colorprint (8 V2 x 11 or 11 x. 17) ............................................... $10.00 each
Reproduction - In-House ........ ~ ............................................. $2.00 per print
Client-Requested Overtime .......... ~ .' ................................ Hourly Rate plus 25%
All other expenses, including: .......................................... Acfual Cost plus 15%
Delivery Service Travel & Expenses
Outside Reproduction Filing or Permit Fees
Mileage - Auto
Outside Consultants
G:~Admln~PROPOSAL\CITYPROP~DUB LIN~tassajararoad. p01
Initial (RJA)