HomeMy WebLinkAbout4.09 AI TrafficSignal00-08CITY CLERK FILE # 600-35 AGENDA STATEMENT CiTY COUNCIL MEETING DATE: April 17, 2001 SUBJECT: Acceptance of Work - Contract No. 00-08, Traffic Signals - Village Parkway at Tamarack Drive, Brighton Drive and Davona Drive Report Prepared by.' Lee S. Thompson, Public Works Director ATTACHMENTS: 1) '2) Budget Change Form Contract Change Order No. 4 RECOMMENDATION: 1) 3) Accepi improvements under Contract No. 00-08 and authorize the release of retention after 35 days if there are no subcontractor claims Approve budget change in the amount of $5,858 from Measure B (Fund 217), $6,644 from TIF (Fund 300) and $14,318 from Gas Tax Reserves (Fund 206) Approve Contract Change Order No. 4 FINANCIAL STATEMENT: Fund FY 00-01 Budget Estimated Actual Salaries/Miscellaneous Inspection/Testing 217 $ 5,000 $ 10,858 300 $ 7,000 $ 20,744 Improvements 210 $ 300,000 $ 300,000 300 $ 99,000 $100,197 206 $ 61,765 $ 67,786 TOTAL: $ 472,765 $ 499,585 This project is funded by the Transportation Equity Act for the 21st Century (TEA 21) (210), Measure B (217), Traffic Impact Fees (300) and Gas Tax (206). A budget change of $5,858 from Measure B, $6,644 (maximum amount) from TIF and the remaining difference of $14,318 from Gas Tax reserves is required to complete the project. DESCRIPTION: At the meeting of July 18, 2000, the Dublin City Council awarded Contract No. 00-08, Traffic Signals - Village Parkway at Tamarack Drive, Brighton Drive and Davona Drive, to Wingard Engineering. g:XmiscprojWPW-3 signals\agstaccept COPIES TO: Wingard Engineering ITEM NO. This project installed three traffic signals on Village Parkway at Tamarack Drive, Brighton Drive and Davona Drive, as well as interconnected the signals to the City's existing traffic signals on Village Parkway south of this project. The project is over budget primarily due to increased inspection time, PG&E fees and extra work. Contract .Change Order No. 4 (Attachment 2) in the amount of $2,468.05, covers extra work for sign panels and substitution of concrete mix to increase concrete strength. The cost of this change order exceeds the total 5% contingency for this project, thus requiring Council approval for payment. The City Engineer has reviewed the work on the project and has determined that the work is complete. Staff recommends that the City Council accept the improvements under Contract No. 00-08 and authorize the release of retention after 35 days if there are no subcontractor claims. Staff further recommends approving a budget change in the amount of $5,858 from Measure B (Fund 219), $6,644 (maximum) from Traffic Impact Fees (Fund 300) and $14,318 from Gas Tax reserves (Fund 206) and approving Contract Change Order No. 4. -2- CITY OF DUBLIN BUDGET CHANGE FORM New Appropriations (City Council Approval Required): Budget Transfers: CHANGE FORM # From Unappropriated Reserves (If Other than General Fund, Fund No - 206) From New Revenues I)ECREASE BUI)GET ACCOUNT Name: A'MOIINT Account #: Name: From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council ApproVal Required) Other !~'CREASE BRIDGET ACCOIJ.~"i;' ............ A~IOUNT" Name: Improvements - Traffic Signals $6,021 Account #: 206-96560-750-050 Name: Improvements - Traffic Signals $1,197 Account #: Account #: 300-96560-750-050 Name: Name: Salaries $5,858 ACcount #: Account #: 217-96560-701-001 Name: Name: Inspections $5,447 Account #: Account #: 300-96560-740-079 Name: Name: TIF Revenue $6,644 Account #: Account #: 300-570-005 Name: Name: Inspections Account #: Account #: 206-96560-740-079 $8,297 City Manager: Date: Signature ASD/Fin Mgr' ,(~,.,~,/ VX-/e~-,jx~ Date: Signature REASON FOR BUDGET CHANGE ENTRY: Project cost for construction administration and improvements exceeded the budgeted amount. Mayor: Date: Signature Posted By: Date: H..ICC-FOR.t4SIFORAI-budget change. doe Signature DATE: April 4, 2001 PROJECT NAME: CIP #: CONTRACT NO: CONTRACTOR: PERCENT COMPLETED: CONTRACT AMOUNT: APPROVED BUDGET AMT: CHANGERORDERS: CHANGE ORDER SUMMARY Traffic Signals - Village Parkway at Tamarack, Brighton and Davona Drives 96560 00-08 Wingard Engineering 99% $438,824.00 $460,765.00 CHANGE ORDER#1 CHANGE ORDER#2 CHANGE ORDER#3 CHANGE ORDERS4 CHANGE ORDER#5 $2,850.77 $12,080.22 $5,590.71 $2,468.05 TOTAL OF CHANGE ORDERS: $22,989.75 CURRENT CHANGE ORDER DESCRIPTION: Substitute concrete slurry with six-sack concrete as backfill material for trenches and purchase sign panels and fitting. ADJUSTED CONTRACT AMOUNT: PROGRESS PAYMENTS MADE: PAYMENT #1 PAYMENT #2 PAYMENT #3 PAYMENT ~ PAYMENT #5 PAYMENT #6 PAYMENT #7 PAYMENT #8 PAYMENT #9 $461.813.75 $51,893.78 $22 902.21 $102 129.50 $73 561.25 $18 490.14 $97 332.41 $22 066.17 $20 518.34 $3 452.84 TOTAL PROGRESS PAYMENTS: REMAINING BALANCE ON CONTRACT: RECOMMENDATION: SIGNATURES: APPROVED Y pD~clEW[or~c~,~tor $412.346.64 $49,467.11 APPROVED DENIED City Manager APPROVED DENIED Mayor CITY OF DUBLIN CONTRACT CHANGE ORDER NO. 4 PAGE 1 OF 1__ PAGES PROJECT/ROAD: CONTRACT NO.: Traffic Signals - Village Parkway at Tamarack Drive, Brighton 'Drive & Davona Drive 00-08 TO: Wingard Engineering, P.O. Box 99, Bethel Island, CA 94511-0099 You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the Public Works Director. Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change requested by: City -' The last percentage shown is the net accumulated increase or decrease from the original quantity in the Engineer's Estimate. 1. Substitute concrete slurry trench backfill with six-sack concrete backfill at agreed lump sum price. $1,713.13 2. Furnish the following sign panels and firings at agreed lump sum price: $ a. Five (5) R73-2 signs. b. One (1) R34-2 sign. c. Six (6) Type N Markers. d. Six (6) 24"x30" R7 signs. 754.92 ESTIMATED COST INCREASE: $ 2,468.05 BY REASON OF THIS ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED. 0 WORKING DAYS SS;~ED BY: Ass"' { r Date APPROVAL RE MENDED BY: - a Sr. Civil Engineer %iliSdDate We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, fumish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. If the Contractor does not s~gn acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.