Loading...
HomeMy WebLinkAboutPC Reso04-30PA02-063 Rec CC San Ramon Village Plaza SDR/Vtmap RESOLUTION NO. 04-30 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN RECOMMENDING APPROVAL BY CITY COUNCIL OF THE VESTING TENTATIVE MAP AND SITE DEVELOPMENT REVIEW FOR SAN RAMON VILLAGE PLAZA DEVELOPMENT PROJECT PA 02-063 (Tract No. 7437) WHEREAS, Mike Banducci of Bancor Properties., on behalf of Oliver Properties (Applicant/Developer), has requested approval of a Planned Development Rezoning Stage 1 Development Plan and Stage 2 Development Plan for the San Ramon Village Plaza mixed-use project, a Vesting Tentative Map for subdivision of a 4.62 acre site located on the east side of San Ramon Road into 3 lots and Site Development Review to allow for the construction of 56 medium density units, with common open space, within the Dublin General Plan Primary Planning Area (APN#941-0164- 001-04 & 941-0164-003-03 (A) (B)); and WHEREAS, a complete application for the above noted entitlement request is available and on file in the Department of Community Development; and WHEREAS, the Applicant/Developer has submitted an application for a General Plan Amendment from Retail/Office to Mixed Use (retail office/medium density) and a Stage 1 and Stage 2 Development Plan for the project site (PA 02-063) as required by Section 8.32 of the Dublin Ordinance to allow redevelopment of the entire site to include remodeling of 14,377 square feet of retail/office building, demolition of 34,000 st. ft. of retail space and the construction of 56 units, in two phases; and, WHEREAS, the Applicant/Developer has submitted Vesting Tentative Map and Site Development Review project plans for the entire site (Exhibit A to Attachment 2), PUD Sheets 4 through 6, Sheets L-1 through L-7 by The Guzzardo Partnership, Architectural Sheets by The Dahlin Group A-1 through A-18 and Vesting Tentative Map sheets C-1 through C-3 by Carlson, Barbee & Gibson dated received March 15, 2004, except as modified by any condition of approval; and WHEREAS, an Initial Study has been prepared for the potential impacts of the project pursuant to CEQA Guidelines Section 15063. Based on the Initial Study, a Mitigated Negative Declaration and Mitigated Monitoring Program has been prepared for the project with the finding that with the implementation of Mitigation Measures contained in the Initial Study, the potential impacts of the project would be reduced to a level of insignificance; and WHEREAS, the Planning Commission did hold a public hearing on said application on April 13, 2004; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, a Staff Report was submitted recommending that the Planning Commission recommend approval of the Vesting Tentative Map and Site Development Review for the San Ramon Village Plaza project to City Council, subject to conditions; and WHEREAS, the Planning Commission did hear and use their independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth. WHEREAS, the Planning Commission hereby determines that because the project was considered by the City Council as "high priority" in its 2003-2004 Goals and Objectives and as provided for in Chapter 8.96, Section 8.96.20.A.3 of the Dublin Zoning Ordinance does hereby transfer original heating jurisdiction to the City Council. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does hereby recommend that the City Council make the following findings and determinations regarding General Plan consistency: 1. A General Plan Amendment from Retail Commercial to Mixed Use and a Stage 1 and a Stage 2 Development Plan have been proposed along with the Tentative Map and Site Development Review applications, and are recommended for approval based upon the reasons stated in the Staff Report and Planning Commission Resolution (Attachment 1). Upon City Council approval of the General Plan Amendment and Stage 1 Development Plan, the land use diagram would be changed for approximately 4.62 acres to reflect the mixed use retail office and medium density for 56 residential units. 2. With the change to the land use diagram, the proposed project is consistent with the adopted Dublin General Plan. The proposed project is also consistent with the goals, policies, and implementation measures of the Dublin General Plan, and with the Dublin Zoning Ordinance. NOW, THEREFORE, BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does recommend that the City Council make the following findings and determinations regarding said proposed Vesting Tentative Map: 1. The Vesting Tentative Map is consistent with the intent of applicable subdivision regulations and related ordinances. 2. The design and improvements of the Vesting Tentative Map are consistent with and conforms to the City's General Plan policies as they apply to the subject property in that it is a subdivision for implementation of a mixed-use retail office/residential project in an area designated for Mixed Use (Retail Office/Medium Density Residential). 3. The Vesting Tentative Map is consistent with the Planned Development Rezone proposed for this project and is, therefore, consistent with the City of Dublin Zoning Ordinance. 4. The project site is located adjacent to major roads on relatively flat topography and is, therefore, physically suitable for the type and density of development. 5. With the incorporation of mitigation measures contained in the Initial Study, Mitigated Negative Declaration and Conditions of Approval, the design of the subdivision will not cause environmental damage or substantially injure fish or wildlife or their habitat or cause public health concerns. 6. The design of the subdivision will not conflict with easements acquired by the public at large or access through or use of property within the proposed subdivision. The City Engineer has reviewed the map and title report and has not found any conflicting easements of this nature. 7. Required fire and water service will be provided to the subdivision pursuant to the requirements of water and sewer providers, if standards and conditions are met and fees paid. Sewer service for this subdivision shall be provided pursuant to an agreement between the applicant/developer and DSRSD. School capacity for the residents of this project will be provided pursuant to a school facilities mitigation agreement between the developer and the Dublin Unified School District prior to issuance of building permit, as required city code. 8. The City of Dublin has considered the effect of this project on the housing needs of the region in which it is situated and finds that the public services are available for the project and that impacts to environmental resources will be mitigated to a level of less than significant pursuant to the Mitigated Negative Declaration for the project (PA02-063). 9. The City of Dublin finds that this project does not discharge waste into an existing community sewer system in violation of existing requirements prescribed by a California regional water quality control board pursuant to Division 7 of the Water Code because the Dublin San Ramon Services District has provided conditions of approval, which assure that its standards will be met. NOW, THEREFORE, BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does hereby recommend that the City Council make the following findings and determinations regarding said proposed Site Development Review: 1. The approval of this application (PA 02-063), as conditioned, is consistent with the intent/purpose of Chapter 8.104 (Site Development Review) of the Zoning Ordinance in that it will promote orderly, attractive and harmonious site and structural development, resolves major project-related issues, and ensures compliance with development regulations and the PD Zoning District. 2. The approval of this application, as conditioned, complies with the policies of the General Plan, and the Planned Development Rezone Development Plan for the project that allows for residential development at this location. 3. The approval of this application, as conditioned, is in conformance with regional transportation and growth management plans because road improvements and infrastructure improvements will be made pursuant to a Stage 2 Development Plan and Tentative Map conditions. 4. The approval of this application, as conditioned, is in the best interests of the public health, safety, and general welfare as the development is consistent with all laws and ordinances and implements the Dublin General Plan. 5. The proposed site development, including site layout, vehicular access, circulation and parking, setbacks, height, walls, public safety, and similar elements, as conditioned, has been designed to provide a harmonious environment for the development. 6. The subject site is physically suitable to the type and intensity of the approved development because it is relatively flat and has suitable soils. 7. The visual impacts of the project were reviewed in the Mitigated Negative Declaration and the project is consistent with applicable scenic corridor policies for San Ramon Boulevard and 1-680. 8. The project has been designed with architectural considerations (including the character, scale, design quality, and the relationship among buildings), along with Conditions of Approval, in order to ensure compatibility among the design of this project, the character of adjacent uses, and the requirements of public service agencies. 9. Landscape elements (including the location, type, size, color, texture, and coverage of plant materials, provisions, and similar elements) combined with Conditions of Approval have been established to ensure visual relief and an attractive public environment. BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does hereby recommend that the City Council approve the Vesting Tentative Map and Site Development Review for PA 02-063 subject to the following Conditions of Approval and subject to the adopted Mitigated Negative Declaration and Mitigation Monitoring Program for PA 02-063 and the City Council approval of the proposed General Plan Amendment to Mixed Use (Retail Office/Medium Density Residential) and PD Rezoning with related Stage 1 and Stage 2 Development Plan: CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Department of Community Development review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval: [ADMI Administration/City Attorney, [BI Building division of the Community Development Department, [DSRl Dublin San Ramon Services District, IF] Alameda County Fire Department/City of Dublin Fire Prevention, [FIN} Finance Department, |PL] Planning division of the Community Development Department, [POl Police, IPWl Public Works Department. VESTING TENTATIVE MAP Approval. PA 02-063, Bancor Properties. - San Ramon Village Plaza, Vesting Tentative Map 7437 is approved to subdivide an existing 4.62 acre parcel into three individual lots for a commercial shopping center and 56 townhome-style condominiums and common open space. This approval shall conform generally to the plans, text, and illustrations contained in the Planned Unit Development Plans dated received March 15, 2004, including Sheets 1 through 6, prepared by Carlson, Barbee & Gibson, Inc. (March 10 2004) the Landscape Plans Sheets L1 through L6 prepared by The Guzzardo Partnership, Inc. (March 10, 2004), the Architectural Plans Sheets A-1 through A-18 prepared by the Dahlin Group March 2004), and the Vesting Tentative Map prepared by Carlson, Barbee & Gibson, Inc., Sheets C-1 through C-3 (March 10, 20044), and other plans, programs, texts and diagrams submitted as part of the subdivision proposal on file in the Community Development Department unless modified by the Conditions of Approval contained herein. The Vesting Tentative Map is only effective upon approval by the City Council of the General Plan Amendment, the PD rezoning with Stage 1 and Stage 2 Development Plan. PL, PW Approval of any plan or filing of final map Standard Public Works Conditions of Approval. Developer shall comply with all applicable City of Dublin Standard Public Works Conditions of Approval dated February 10, 2004 unless specifically modified by these Conditions of Approval. PW Approval of Improvement Plans through completion Action Programs/Mitigation Measures. Applicant/Developer shall comply with all applicable action programs and mitigation measures of the Mitigated Negative Declaration (MND) and Mitigation Monitoring Plan for PA 02-063. PL Approval of Improvement Plans through completion Ordinances/General Plan/Policies. The Developer shall comply with, meet, and/or perform all requirements of the Subdivision Map Act, City of Dublin Subdivision Ordinance, City of Dublin Zoning Ordinance, the City of Dublin General Plan, City of Dublin Standard Conditions of Approval, Public Works Policies and City grading ordinance unless certain Public Works requirements are modified by the City Engineer and Planned Development Standards for Tract 7437. PW, PL Approval of Final Map and Issuance of Building Permits Clarification and Changes to Conditions. In the event that there needs to be clarifications to these conditions of approval, the City Engineer has the authority to clarify the intent of these conditions of approval to the Applicant/Developer without going to a public hearing. The City Engineer also has the authority to make minor modifications to these conditions without going to a public hearing in order for the Applicant/Developer to fulfill needed improvements or mitigations resulting from impacts of this project. PW Approval of Final Map and Improvement Plans Sound wall: A sound barrier/wall shall be installed along the residential area boundary with 1-680. An acoustical consultant shall review the design of the barrier at applicant's expense to confirm that noise levels will achieve the City's goal of CNEL to less than 70 dB ("conditionally acceptable") or better for outdoor common areas, as evaluated in the Noise Study prepared by Rosen, Goldberg & Der dated January 20, 2004. Design of the noise barrier shall include mitigations prescribed in the Noise Study, and/or other design alternatives determined appropriate by the acoustical consultant to achieve this PL Prior to acceptance of improvement plans for final map and construction prior to occupancy of units. PG&E Easement: The Developer coordinate with PG& E for improvements installed in the PG&E Easement, and shall show documentation to the City Public Works Department that PG & E will allow the storm drain improvements, fence/wall and trees shown on the Tentative Map to be installed in their easement (RE: 2619 IM248). PW Approval of Final Map Underground Utility Lines: The Developer shall underground the existing overhead utility lines along the east side of San Ramon Road between Bellina Street and Alcosta Boulevard. PW Acceptance of Improvements Entrances: The entrances from Bellina Street and Alcosta Boulevard to remain standard commercial driveway approaches. The new San Ramon Road entrance shall be a modified driveway type entrances. Driveway Width: The driveway width from Alcosta Boulevard and in front of the retail shops shall be a minimum 24 feet wide from curb to curb. The driveway width may be reduced to 20 feet, where there is no perpendicular parking, subject to the approval of the City Engineer. PW PW Approval of Final Map Improvement Plans Approval of Final Map Improvement Plans Curb Returns: All curb returns at the intersection of the main driveway aisles and private streets shall be a minimum 15-foot radius. This includes all intersections along Bellina Commons. PW Approval of Final Map hnprovement Plans 12. Traffic Signs: Stop Signs shall be place at all exits to public streets. Additional Pw Acceptance of traffic signs and curb markings shall be install as required by the City Engineer. Improvements 13. Private Street Name: Only one name shall be given to the private streets shown on I PW Prior Final the Tentative Map as "Gullo Lane" and "Oliver lane". This street shall be named a I Map "Place" not a "Lane". 14. No Parking. "No Parking" areas on Bellina Street: Parking shall be prohibited on I PW Acceptance of Bellina Street for 50 feet east of the curb return at San Ramon Road and for 70 feet I Improvements west of the project driveway. 15. Sidewalk: A sidewalk shall be provided along the west side of Bellina Commons I PW Approval of Final Map east of Building 11. [ hnprovement Plans 16. Pedestrian Pathway: A pedestrian pathway shall be clearly defined through or I PW Approval of Final Map around the patio area at the south end of the retail building. [ Improvement I Plans 17. Traffic Calming: Traffic signing, pavement design and other traffic calming devices, I Pw Approval of approved by the City Engineer, shall be used on Bellina Commons to discourage I Final Map Improvement traffic from cutting from Bellina Street through the site to Alcosta Boulevard. A speed I Plans or table shall be used for the pedestrian crossing of the pathway to San Ramon I PermitBuilding Boulevard. I 18. Garage Access: The distance from face of garage door to the face of curb or building I Pw Approval of Final Map opposite the garage shall be a minimum 24 feet. I Improvement I Plans/Building Permit 19. Bus Stop: Developer shall install bus stop facilities on San Ramon Road as required / Pw Approval of by LAVTA and approved by the City Engineer. The bus stop shall be located just / Final Map Improvement north of the Bellina Street intersection, not at the location shown on the Tentative / Plans and Map. / prior to occupancy of / first unit. 20. Alameda County Zone 7 Access: The Developer shall provide a 3-foot wide gate / pZ,~e, 7 Approval of with pedestrian access at the east end of the proposed wrought iron fence along the / Planslmpr°vement Alameda County drainage channel. Either through an easement or agreement with Zone 7 the Developer shall provide pedestrian access to the gate for Zone 7 I maintenance. Subject to Alameda County Zone 7 approval, the Developer shall remove the existing chain link fence. The new fence shall be the maintenance I resj~onsibility of the Homeowners Association. 21. Landscaping. Landscape / Parking Curbs: All landscape areas along the side of a PL, PW Approval of Improvement parking space shall have a 12-inch wide curb (Zoning Ord. 8.76.070 A 19). Plans; 22. Special Paving: Special paving shall be used at entrances to the commercial center ?L, PW Approval of Improvement and at key intersections. Plans; 23. Maintenance of Landscaping: All landscaping materials within the public right-of- PL, PW Prior to approval of way shall be maintained for 90 days and on-site landscaping shall be maintained in Final Map / accordance with the "City of Dublin Standards Plant Material, Irrigation System and applicant shall Maintenance Agreement" by the Developer after City-approved installation. This provide CC&Rs for maintenance shall include weeding, the application of pre-emergent chemical project which applications, and the replacement of materials that die. Any proposed or modified shall include maintenance landscaping to the site, including the removal or replacement of trees, shall require program. rior review and written approval from the Community Development Director. 24. Fire Flow. Provide a letter from DSRSD to ACFD stating what is the available fire [ Approval of Improvement flow. Plans Fire flow and hydrant location. The Fire Prevention Bureau shall approve minimum fire flow and fire hydrant location. The locations as shown on the Tentative Map are not approved. Final location shall be approved by the Fire Prevention Bureau prior to approval of improvement plans for Final Map hnprovement plans ACFD Rules, Regulations and Standards. Applicant/Developer shall comply with all Alameda County Fire Services (ACFD) rules, regulations and standards, including minimum standards for emergency access roads and payment of applicable fees, including a City of Dublin Fire >ital Impact Fee. Issuance of Building Permits After Hours Security. The perimeter of the site shall be fenced during construction, and security lighting and patrols shall be employed as necessary. The Developer shall provide after hours call-out information to Police Services on an "Emergency Response Form." All information shall be kept current and up to date. PL, B Prior to commenceme nt of site work and on-going during Construction Covenants, Conditions and Restrictions (CC&Rs). A Homeowners Association shall be formed by recordation of a declaration of Covenants, Conditions, and Restrictions to govern use and maintenance of common areas and facilities. Said declaration shall set forth the Association name, bylaws, rules and regulations. The CC&Rs shall ensure that there is adequate provision for the maintenance, in good repair and on a regular basis, of the landscaping, irrigation, fences, walls, drainage, lighting, signs and other improvements in private common areas and within the adjacent street frontage right of way along Bellina Street, San Ramon Road and Alcosta Boulevard. The Developer shall submit a copy of the CC&R document to the ; for review and approval relative to this condition. Affordable Housing Agreement. An Affordable Housing Agreement shall be entered into by the Developer and the City of Dublin as required by Section 8.68 of the Dublin Municipal Code. PW PL Approval of Final Map Final Map SITE DEVELOPMENT PERMIT (PA#02-063) Approval. PA 02-063, Bancor Properties - San Ramon Village Plaza Site Development Permit is approved to remodel a portion of an existing commercial shopping center and construct 56 townhome style condominium residences and common open space. This approval shall conform generally to the plans, text, and illustrations contained in the Planned Unit Development Plans dated received March 15, 2004, including Sheets 1 through 6, prepared by Carlson, Barbee & Gibson, Inc. (March 10, 2004), Sheets L1 through L7 prepared by The Guzzardo Partnership, Inc. (March 10, 2004), the Architectural Plans Sheets A-1 through A- l 8 prepared by the Dahlin Group (March 10, 2004), and the Vesting Tentative Map prepared by Carlson, Barbee & Gibson, Inc., Sheets C-1 through C-3 (March 10, 2004), and all plans, programs, texts and diagrams submitted as part of the Stage 1, Stage 2 Development Plan, Tentative Map and Site Development Review proposal on file in the Community Development Department unless modified by the Conditions of Approval contained herein. The Vesting Tentative Man and Site Development Review are only effective upon approval by the City Council of the General Plan Amendment, PD rezoning with Stage 1 Development Plan and the Stage 2 Development Plan. PL Standard Conditions (Site Development Review). The project shall comply with the City of Dublin Site Development Review Standard Conditions. PL, B Standard Public Works Conditions of Approval. Developer shall comply with all applicable City of Dublin Standard Public Works Conditions of Approval dated February 10, 2004 unless specifically modified by these Conditions of Approval. PW Term. Approval of the Site Development Review shall be valid for one year from effective date of permit approval. If construction has not commenced by that time, this approval shall be null and void. The approval period for Site Development Review may be extended six (6) additional months by the Director of Community Development upon determination that the Conditions of Approval remain adequate to assure that the above stated findings of approval will continue to be met. (Applicant/Developer must submit a written request for the extension expiration date of the Site Development Review.) PL Building Codes and Ordinances. All project construction shall conform to all codes and ordinances in effect at the time of the building permit. Construction drawings: Construction plans shall be fully dimensioned (including building elevations) accurately drawn (depicting all existing and proposed conditions on site), and prepared and signed by a California licensed Architect or Engineer. All structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape plan and details shall be consistent with each other. B PL, B, PW Issuance of building permits On-going Improvement Plans through completion On-going Through completion Issuance of Building Permits Building Permits. To apply for building permits, Applicant/Developer shall submit eight (8) sets of construction plans to the Building Division for plan check. Each set of plans shah have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participation non-City agencies prior to the issuance of building permits. B Issuance of Building Permits Engineer Observation. The Engineer of record shall be retained to provide 8 observation services for all components of the lateral and vertical design of the building, including nailing, holddowns, straps, shear, roof diaphragm and structural frame of building. A written report shall be submitted to the City Inspector prior to scheduling the final frame inspection. Phased Occupancy Plan. If occupancy is requested to occur in phases, then all 8, eL physical improvements within each phase shall be required to be completed prior to occupancy of any buildings within that phase except for items specifically excluded in an approved Phased Occupancy Plan, or minor handwork items, approved by the Department of Community Development. The Phased Occupancy Plan shall be submitted to the Director of Community Development and Public Works for review and approval a minimum of 45 days prior to the request for occupancy of any building covered by said Phased Occupancy Plan. Any phasing shall provide for adequate vehicular access to all parcels in each phase, and shall substantially conform to the intent and purpose of the subdivision approval. No individual building shall be occupied until the adjoining area is finished, safe, accessible, and provided with all reasonable expected services and amenities, and separated form remaining additional construction activity. Subject to approval of the Director of Community Development, the completion of landscaping may be deferred due to inclement weather with the posting of a bond fro the value of the deferred landscaping and associated improvements. Permits for Accessory items. City of Dublin Building Permits shall be obtained 8, eL prior to installation of all accessory buildings, signage, and play structures, Mail Kiosks, etcetera. Access to the Play Structure shall meet the disabled accessible requirements. All electrical, and plumbing to exterior lights and fountains shall have Building Division permits. Air Conditioning Units - Air conditioning units and ventilation ducts shall be 8, PL screened from public view with materials compatible to the main building and shall not be roof mounted. Units shall be permanently installed on concrete pads or other non-movable materials. The Building Official and Director of Community Development shall approve location and screening materials prior to installation. Temporary Fencing. Temporary Construction fencing shall be installed along ~erimeter of all work under construction. B, P, PW Through construction and prior to final frame inspection Prior to occupancy of each affected unit Prior to installation of improvements Occupancy of Unit Through Completion Occupancy of Unit Automatic Garage Door Openers - Automatic garage door openers shall be provided for all dwelling units and shall be of a roll,up type. Garage doors shall not intrude into the private access easements. B, PL Addressing. a) Provide a site plan with the City of Dublin's address grid overlaid on the plans (1 to 30 scale). Highlight all exterior door openings on plans (front, rear, garage, etc.). (Prior to release of addresses) b) Provide plan for display of addresses. The Building Official and Director of Community Development shall approve plan prior to issuance of the first building permit. (Prior to permitting) c) Addresses will be required on the front of the dwellings. Addresses are also required near the garage door opening if the opening is not on the same side of the dwelling as the front door. (Prior to permitting) d) Town homes / Condos are required to have address ranges posted on street side of the buildings. (Occupancy of any Unit). e) Address signage shall be provided as per the Dublin Residential Security Code. (Occupancy of any Unit). f) Provide a site plan with the approved addresses in 1 to 400 scale prior to PL Issuance of Building Permits and through compl~ion approval or release of the project addresses. (Prior to permitting). Exterior address numbers shall be backlight and be posted in such a way that they may be seen from the street. (Prior to permit issuance, and through completion) Retaining walls. All retaining walls over 30 inches in height and in a walkway shall be provided with guardrails. All retaining walls over 24 inches with a surcharge or 36 inches without a surcharge shall obtain permits and inspections from Building Division. B, PW Issuance of Building Permits Green Building Guidelines. To the extent practical, the applicant shall incorporate Green Building Measures. Green Building plan shall be submitted to the Building Official for review. Issuance of Building Permits Storage Area and Meter Closets. Storage area and meter closets shall be provide with 1-hour fire resistive construction designed to the Building Code. These areas shall be 3rovided with T ~e "X" 5/8 >sum Board. Issuance of building permits Automatic Fire Sprinklers. The applicant/developer shall provide automatic sprinklers in the residential and commercial buildings. Installation permits are required from the Fire Department prior to the start of work on the systems. Buildings with over 100 sprinklers shall have the sprinkler system monitored by a UL listed central station. Prior to issuance of Building Permits and installation prior to occupancy Fire Alarm systems. The applicant/developer shall provide fire alarm systems in the buildings as required by the California Building Code. Prior to issuance of Building Permits and installation prior Fire apparatus roadways: Fire apparatus roadways must be installed, and fire hydrants in service, prior to the commencement of vertical framing or combustible storage placed on site. hnprovement plans and prior to commencement of vertical framing. Knox boxes: Knox boxes are required at the entrance to the building and at any F gates in the Fire Department access roads. Occupancy of units Residential Security. The project shall comply with the City of Dublin Residential Security Requirements and the Conditions of Approval for the Vesting Tentative Map 7414. PO, B Occupancy of Units Projected Timeline. Developer shall submit a projected timeline for project completion to the Dublin Police Services Department, to allow estimation of staffing requirements and assignments. PO Issuance of Building Permits for each Phase Addressing: Addressing and building numbers shall be visible from approaches to the buildings. Addressing an building in the commercial portion of the project shall be visible from the approaches to the building: · If there are exterior doors on the rear, the business name and address is to be painted on the door in a contrasting color. The lettering shall comply with the Building Department Standards. · Employee exit doors shall be equipped with 180 degree viewers if there is not a bur ' resistant window panel in the door from which to scan the exterior. Fencing during construction: The perimeter of the site shall be fenced during construction, and security lighting and patrols shall be employed as necessary. Entrances: All entrances to the commercial area parking shall be posed with appropriate signs per Sec 22658(a) of the California Vehicle Code, to assist in removin vehicles at the owner's/manager's request. 10 PO, B Prior to issuance of building permits and through completion of Improvements PO, PL Issuance of Grading/Sitework Permit PO Completion of improvements Posting: CC&R's for the residential portion of the project will include posting of private street areas in accordance with California Vehicle Code Section 22568, sections 1 and 2. Fire lanes will also be posted in accordance with California Vehicle Code Section 22500.1. "No Trespassing" signs shall be placed along pedestrian pathways, open space areas and the "tot lot" to indicated private use areas. Prior to occupancy of units Lighting: The applicant shall submit a final lighting plan for approval by the Dublin Police Department. Lighting fixtures shall be of a vandal resistant type. Issuance of building permits Graffiti: The applicant shall keep the site clear of graffiti vandalism on a regular and continuous basis at all times. Graffiti resistant materials should be used On-going Security Program: The applicant shall work with the Dublin Police on an ongoing basis to establish and effective theft prevention and security program. Prior to occupancy/on- Self-policing: Primary living areas and windows of individual units should be focused for observation of common use areas; adjacent units, recreation areas, and child play areas to for and a sense of community. Parking. Applicant/Developer shall provide parking in compliance with the PD Stage 2 Development Plan (PUD Sheet 5) Recreational Vehicle Parking. Recreation vehicle (as defined in the Dublin Zoning Ordinance) parking shall be prohibited on public streets and along the main private street of the project. Signs shall be posted to that effect. Final Landscape and Irrigation Plans: A Final Landscape and Irrigation Plan prepared and stamped by a State licensed landscape architect or registered engineer, generally consistent with the preliminary landscape plan prepared by The Guzzardo Partnership, dated March 10, 2004, except as modified by Conditions of Approval below, along with a cost estimate of the work and materials proposed, shall be submitted for review and approval by the Community Development Director. Landscape & irrigation plans shall be at a scale not less than 1"=20'. Key areas such as major intersections and plazas shall be at a scale not less than 1" =10'. Final Landscape Plan Review: The final plant palette varieties shall be subject to review and approval of the Director of Community Development and reviewed by the City's Landscape Architect to determine compatibility with reclaimed water use, where appropriate. An irrigation plan shall be submitted with Final Landscape Plans indicating that the system is designed for reclaimed water, where DSRSD. PL, PW PL, PW PL, PW PL Issuance of Building permits Completion of Improvements Acceptance of Improvements by City Council Approval of Improvement Plans; Landscaping to be Constructed Prior to Acceptance of Improvements or Occupancy of First Unit in affected Phase Issuance of Building Permits Landscaping (project frontage): Applicant/Developer shall construct all landscaping within the site and along the project frontage from the face of curb to the site right-of-way to the design and specifications of the City of Dublin, and to the satisfaction of the City Engineer, Director of Community Development and City's Consulting Landscape Architect. Street trees that are required to be removed for undergrounding of utilities shall be replaced by the applicant with minimum 24 - inch trees as approved by the City Landscape Architect. PL, PW Approval of Improvement Plans Landscaping (yards/common areas): All front yards and common areas shall be landscaped by the Applicant/Developer prior to occupancy of the adjacent homes. PL Prior to Occupancy of first Unit in affected Phase 11 Entry Pilaster: Entry pilasters shall be designed to reflect the building architecture and to be in scale with the pedestrian environment. PL, PW Approval of Landscape Plans/Construction prior to occupancy of first unit Landscaping at Street/Drive Aisle Intersections: Landscaping shall not obstruct the sight distance of motorists, pedestrians or bicyclists. Except for trees, landscaping at drive aisle intersections shall not be taller than 30 inches above the curb. Landscaping shall be kept at a minimum height and fullness giving patrol officers and the general public surveillance capabilities of the area. PL, PW Approval of Landscape Plans Parking Area Tree Wells: Tree wells shall be centered on parking stripes wherever possible. Tree wells placed in front of parking spaces shall provide a minimum 3' clearance to the tree trunk. Tree wells shall be fitted with ornamental cast iron tree grates. Tree grates must have narrow openings to met handicap standards and meet the approval of the City Engineer. PL, PW Approval of Landacape Plans Landscape Screening of Parking: Landscaping shall screen parking with berming or combination ofberming and landscaping to achieve an immediate 2-3 foot tall screen from the finish grade of the parking stalls as viewed from the adjacent major road. PL, PW Approval of Landscape Plan; Corner Public Art Plaza/Landscaping. The comer public art plaza feature/landscaping at the intersection of San Ramon Road and Alcosta Boulevard shall be landscaped, paved and include the features (i.e., public art, seatwall, bench, etc.) as generally shown on Sheet L-6 of the project plans dated March 2004. The location/siting of the public art plaza shall be subject to approval by the City Engineer to ensure that it meets site distance requirements and that it does not conflict with utilities. The public art and landscaping features shall be subject to the review and approval by the Community Development Director and shall be included as part of the Final Landscape and Irrigation Plan sub~rfittal. Responsibility for maintenance of the improvements associated with the public art plaza and landscaping shall be that of the Applicant/Developer. Since the Applicant will maintain these features which are partly within the public right-of-way, the Applicant shall enter into an "Agreement for Long Term Encroachments" with the City that regulates this type of encroachment. of Walls and Trash Enclosures: The Applicant/Developer shall screen all walls and the sides of walls surrounding trash enclosures. The use of vines is encouraged Air Conditioning Units: All Air Conditioning units shall be screened from view with either walls or plant material to the satisfaction of the Community Development Director and City's Consulting Landscape Architect. Utility Screening: All above grade utilities shall be screened from view with either walls or plant material to the satisfaction of the Community Development Director and City's Consulting Landscape Architect. PL, PW Approval of Landscape Plan Approval of Landscape Plans; PL, PW Prior to Approval of Landscape Plans; PL, PW Approval of Landscape Plans; 12 46 Wrought Iron Fencing, 6' High: Construct the wrought iron fencing from Pr, PW Approval of Improvement building 9 to building 10 along San Ramon Valley Blvd. Construct fencing from Plans; buildings 7 to 8. Construct fencing from building 6 to the sound wall providing a Landscaping to be 3' wide maintenance gate for Alameda County Zone 7 access. Constructed Prior to Acceptance of Improvements or Occupancy of First Unit in affected Phase 47. Wrought Iron Fencing, 4' High: Construct fencing from the 6' high fencing at PL, Pw Approval of Improvement building 8 to the 6' high fencing at building 9. Construct fencing from the 6' high Plans; fencing at building 10 to the front of building 10. Landscaping to be Constructed Prior to Acceptance of Improvements or Occupancy of Ist Unit in affected Phase 48. Water Efficient Landscaping Ordinance: The Applicant/Developer shall Pt~, PW Approval of submit written documentation to the Public Works Department (in the form of a Landscape plans Landscape Documentation Package and other required documents) that the development conforms to the City's Water Efficient Landscaping Ordinance. 49. Fire-resistant or drought tolerant plant varieties. Fire-resistant or drought PI, F Approval of Landscape Plan/ tolerant plant varieties shall be provided in the plant palette to the maximum Installation prior extent possible, to issuance of Building Permits 50 Lighting: The Applicant/Developer shall prepare a lighting iso chart to the PL, PO, PW Approval to occupancy of first satisfaction of the Director of Public Works, Director of Community unit; Development, the City's Consulting Landscape Architect and Dublin Police Services. Exterior lighting shall be provided within the parking lot and on the building, and shall be ora design and placement so as not to cause glare onto adjoining properties, businesses or to vehicular traffic. Lighting used after daylight hours shall be adequate to provide for security needs (1.5 foot candles). 51. Health, Design and Safety Standards. Prior to final approval allowing PW, PL Occupancy of Unit occupancy of any new home, the physical condition of the subdivision and the lot where the home is located shall meet minimum health, design, and safety standards including, but not limited to the following: a. The streets providing access to the home shall be complete to allow for PL Occupancy of Unit safe traffic movements to and from the home. b. All traffic striping and control signing on streets providing access to the PW Occupancy of Unit home shall be in place. c. All street name signs on streets providing access to the homes shall be in PL Occupancy of Unit place. d. All streetlights on streets providing access to the homes shall be energized PW Occupancy of Unit and functioning. e. All repairs to the street, curb, gutter, and sidewalk that may create a hazard PW Occupancy of Unit shall be required or any non-hazardous repairs shall be complete and bonded for. f. Town homes shall have the dwelling address posted and backlit at or near ~, F, PL Occupancy of Unit the front door and the garage vehicle door. g. The lot shall be finish graded, and final grading inspection shall have been u Occupancy of Unit approved by the Building Department. h. All sewer clean-outs, water meter boxes, and other utility boxes shall be PW Occupancy of Unit set to grade to the approval of the Director of Public Works. 13 i. The homes shall have received all necessary inspections and have final B Occupancy of Unit approval by the Building Department to allow occupancy. j. All fire hydrants in streets providing access to the homes shall be operable F Occupancy of Unit to City and ACFD standards. k. All streets providing access to the homes shall be improved to an adequate Pw, F Occupancy of Unit width and manner to allow for fire engine circulation to the approval of the Director of Public Works and ACFD. 1. All mailbox units shall be at the back of the curb/sidewalk as appropriate. PL Occupancy of Unit The developer shall submit a mailbox design and location plan to indicate where mailboxes and associated lighting will be accommodated. The Postmaster shall be consulted for design criteria. Architectural enhancements should be provided to community mailboxes where visible from the project streets. m. Exterior lighting shall be provided for dwelling entrances and shall be of a Pt~, Po Occupancy of Unit desi and lacement so as not to cause lare onto ad'oinin~ properties. 52. Architectural drawings: Residential Units and the commercial building shall Pt~ Issuance of comply with the architectural drawings submitted by The Dahlin Group (March Building Permits 2004). Final colors shall be reviewed by the City's Architect and approved by the Community Development Director, and shall generally conform to the colors and materials approved for the Ramon Village Plaza project PA 02-063, on file in the City of Dublin Department of Community Development. 53. Porches/decks: Porches or decks exposed to a CNEL of 65 or greater dBA as Pt~ Issuance of identified in the Noise Study by Rosen, Goldberg and Der dated January 20, 2004 Building Permits shall be designed to be partially or fully enclosed to help mitigate this potential impact. Final designs of the residential are subject to review and approval by the Community Development Director. Final approval shall require a written statement by a licensed acoustical consultant confirming that the units as designed have achieved the City's interior living and exterior recreation noise goals. The elimination of porches or decks shall be considered a maj or amendment of this permit and shall require approval by the Planning Commission and City Council. 54. Glare/Reflective Finishes - The use of reflective finishes on building exteriors is PL Issuance of prohibited. In order to control the effects of glare within this subdivision, Building Permits reflective glass shall not be used on all east-facing windows. 55. Affordable Housing Agreement. An Affordable Housing Agreement shall be PL Final Map and prior to occupancy entered into by the Developer and the City of Dublin as required by Section 8.68 of units in affected of the Dublin Munici ~al Code. phase. 56. Action Programs/Mitigation Measures. Applicant/Developer shall comply with p~ Approval of Improvement all applicable action programs and mitigation measures of the Mitigated Negative Plans through ~ ~ Plan forP5 0?063. ___._ completion 57. The applicant/developer shall submit a master sign program for the commercial pi Prior to installation of and residential components of the project. The sign program shall conform to the building City of Dublin Sign Ordinance in effect at the time of the application. The master permit/installation sign program be shall be subject to review and approval of the Director of of signs. Community Development and reviewed by the City's Contract Architect to determine compatibility of design with the buildings. 14 58. Solid Waste/Recycling. Applicant/Developer shall comply with the City's solid ^~)M On-going waste management and recycling requirements. 59. Refuse Collection. The refuse collection service provider shall provide a letter Occupancy of first building. confirming that adequate space is provided to accommodated collection and Provisions for sorting ofpetrucible solid waste as well as source-separated recyclable materials collection to be generated by the residents within the project, shown on plans. 60. Fees. Applicant/Developer shall pay all applicable fees in effect at the time of PW, PL Various times, but no later than building permit issuance, including, but not limited to, Planning fees, Building Issuance of fees, Dublin San Rarnon Services District fees, Public Facilities fees, Dublin Building Permits Unified School District School Impact fees, Public Works Traffic Impact fees, Alameda County Fire Services fees; Noise Mitigation fees, Inclusionary Housing In-Lieu fees; Alameda County Flood and Water Conservation District (Zone 7) Drainage and Water Connection fees; and any other fees as noted in the Development Agreement. Un-issued building permits subsequent to new or revised TIF's shall be subject to recalculation and assessment of the fair share of the new or revised fees. 61. Parkland Dedication - The developer shall be required to pay a Public Facilities PL Issuance of Fee in the amounts and at the times set forth in the City of Dublin Resolution No. Building permit 60-99, adopted by the City Council on April 6, 1999, or in the amounts and at the times set forth in any resolution revising the amount of the Public Facilities Fee, as implemented by the Administrative Guidelines adopted by Resolution 195-99. No credit against the dedication requirement shall be given for open space within this project. 62. School Mitigation Agreement. The Developer shall enter into a School m. Building Permits for each affected Mitigation Agreement with the Dublin Unified School District. Phase 63. Compliance With Requirements. Applicant/Developer shall comply with all r, PW, PO, Approval of Zone 7, Improvement applicable requirements of the Alameda County Fire Department, Public Works r)s[t, PL Plans Department, Dublin Police Service, Alameda County Flood Control District Zone 7, and Dublin San Ramon Services District. PASSED, APPROVED AND ADOPTED this 13th day of April, 2004. AYES: Cm. Fasulkey, Nassar, Jennings, King, and Machtmes NOES: ABSENT: ABSTAIN: ATTEST: Planning Mana~r g:\pa02-063\Reso VTMSDR 15