Loading...
HomeMy WebLinkAboutReso 70-04 BuildRemedAmendAgmt RESOLUTION NO. 70 - 04 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AN AMENDMENT WITH THE ZAHN GROUP, INC. FOR DESIGN OF BUILDING REMEDIATION AND RESTORATION FOR WATER INTRUSION AND MANAGEMENT OF BUILDING REMEDIATION AND RESTORATION PROJECT WHEREAS, the City Council approved a contract with Zahn Group, Inc., on March 16, 2004 for consulting services related to water intrusion investgafion and management of an enviromental remediation contract; and WHEREAS, the City wishes to revise the scope of service to include additional consulting services for remediation and restoration of the building to eliminate the water intrusion; and WHEREAS, Staff is recommending that City Council approve Exhibit A to amend the contract with Zahn Group, Inc.; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin approves a contract amendment, hereto attached as Exhibit "A," with the Zahn Group, Inc., for additional consulting services related to water intrusion investigation and management of an enviromental remediation contract. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the agreement. PASSED, APPROVED AND ADOPTED this 20th day of April, 2004. AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika and Mayor Lockhart NOES: None ABSENT: None ATTEST: ~/ Mayor -'--~J ~Clerk~ ~ K2/G/4-20-04/reso-zahn-'~emediation.doc (Item 7.2) g: lengr-contract~zahn~reso remediation contract EXHIBIT "A" OF RESOLUTION 170 -04 AMENDMENT TO AGREEMENT -BETWEEN CITY OF DUBLIN AND THE ZAHN GROUP, INC., FOR DESIGN OF BUILDING REMEDIATION AND RESTORATION FOR WATER INTRUSION AND MANAGEMENT OF BUILDING REMEDIATION AND RESTORATION PROJECT WHEREAS, the City of Dublin (hereinafter referred to as "CITY")and the Zahn Group, Inc. (hereinafter referred to as "CONSULTANT"), entered into an agreement on March 16, 2004, to provide water intrusion investigation and management of the environmental remediation project to CITY; and WHEREAS, the City wishes to revise the scope of services, attached herewith, to include additional work to repair the buildings and eliminate the water intrusion; and WHEREAS, the change in scope of services requires a change in compensation; NOW, THEREFORE, the parties hereto agree as follows: 1) The scope of services shall be revised to include the following: design documents for water intrusion remediation and restoration and construction management of water intrusion remediation and restoration. -2) The compensation for services related to the projects listed above shall be on a time and materials basis as per the original rate schedule, with a total contract cost not to exceed $106,760. CITY OF DUBLIN THE Z~ GRO~, ~C. Date: G:kEngr-contracfizahn groupkamendment 4-20-04.doc ¢'~'~"4"~'~) April 14, 2004 . Ms. Melissa Morton x~ Director Public Works Depa~ment City of Dublin 1'00 Civio Plaza Dublin, CA 94568 Re: Water Intrusion Remediation Program - City Hall ZG Project Number 04M025B Dear Ms. 'Mo~on, The Zahn Group (ZG) team is pleased to provide you with a proposal to remediate the identified water leaks at City Hall. We have identified tasks that will enable our team to resolve the leaks. We will utilize this information to formulate a strategy to mediate this problem, ~.~ ~O~ Our approach is as follows: ~ ~ A. Design Phase %~v~ 1. Prepare 100% NE drawings and specifications relating to windows and ~ glass, the exterior wall, the sub-drain, and modifications to the irrigation system and landscape. 2. Process the documents with the City building depa~ment. 3. Make corrections per Ci~ requirements. 4: Obtain the necessaw permits. ' ~ oo~ 5. Prepare a cost estimate for the work. ~ ~*.~ ~o~ B. Construction Phase - Construction Management Se~ices 1. Assist Owner with proposal analysis - ¢~g 2. Pre-construction meeting with Contractor and Owner ~'~&~.~-~ 3. Daily job review -~'ge*' 4. Weekly job meeting on progress 5. Prepare punchlist and review with Contractor 6. Process punchlist 7. Process payments to Contractor 8. Prepare final repo~ to Owner Our estimate for these services is a not-to-exceed maximum budget of $74,760.00. John Croswhite will contact you to meet with you to discuss our proposal. If you have any questions for him prior to this meeting, please contact him via cell-phone at 415- 279-6261. We appreciate this oppo~unity to assist the Ci~ of Dublin with resolving this troubling ma~er. Yew .truly yours, .¢. ~ THE.~HN GROUP, INC. President CitY of Dublin Water Intrustion RemediatioT¥ Program at City Hall ZG Proiect Number 04M025B Estimate as of April 14, 2004 Project Dir. Architect 'CADD Operator Project Coord. Design Documents for Water Intrusion Remediation Program $145.00 $135.00 $65.00 $65.00 Activity 1 Prepare 100% ,A/E drawings and specifications 24 40 60 . 40 a. Window and glass b. Exterior Wall ' c. Sub-drain d. irrigation and landscape modification I 2 Process with building department 8 3 IMake corrections per City requirements ' 2 16 16 12 4 Obtain necessary permits 2 5 Prepare cost estimate 16 t2 44 76 76 52 $6,380.00 $10,260.00 $4,940.00 $3,380.00 Expenses: Document Reproduction $1,800.00 Sub Total Design $26,760.00 Project Dir. Architect Const. Mgr, Project Coord. Construction Management of Water Intrusion Remediation Program $145.00 $135.00 $125.00 $65.00 Activity 1 Assist Owner with Proposal Anaylsis 12 12 2 2 Pre-Construction Meeting with Contractor & Owner 4 4 4 3 Daily Job review (10 weeks) .' 40 40 100 20 4 Weekly Job meeting on Progress 10 10 20 5 Prepare Punch List & review with Contractor 2 4 2 4 6 Process Punch List t2 12 4 7 Process Payment 6 6 6 6 8 Prepare Final Report to Owner 16 8 ' 8 24 80 80 154 I 84 $11,600.00 $10,800:00 $19,250.00 $5,460.00 Expenses: Document Reproduction, Delivery, Misc. $890.00 Sub Total Construction Management $48,000.00 Pr~oject Total $74,760.00