Loading...
HomeMy WebLinkAboutReso 032-89 HeritageCommPDRezRESOLUTION NO. 32 - 89 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AND ESTABLISHING FINDINGS AND GENERAL PROVISIONS FOR A PLANNED DEVELOPMENT (PD) REZONING CONCERNING PA 88-009.1 HERITAGE COMMONS, SOUTH OF AMADOR VALLEY BOULEVARD BETWEEN THE SOUTHERN PACIFIC RIGHT-OF-WAY AND ALAMO CREEK WHEREAS, CoastFed Properties is requesting the City fezone approximately 17.45 acres lying south of Amador Valley Boulevard between the Southern Pacific right-of-way and Alamo Creek (APN 941-2765-03/04) from Zoning Unit 1497 to a Planned Development (PD) District for a planned residential development of 206 multiple family residential units; and WHEREAS, the Planning Commission did hold public hearings on the project on December 19, 1988, January 17, 1989 and February 21, 1989; and WHEREAS, the Planning Commission adopted Resolution 89-008 recommending approval of PA 88-009.1; and WHEREAS, the City Council did hold a public hearing on said request on March 27, 1989; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, the Staff Report was submitted recommending that the request be approved subject to conditions prepared by Staff and reflected in Planning Commission Resolution 89-008; and WHEREAS, the City Council did hear and consider all said reports, recommendations and testimony as herein set forth; and WHEREAS, pursuant to State and City environmental regulations, a Mitigated Negative Declaration of Environmental Significance has been adopted by the City Council for this project as it will have no significant effect on the environment; and WHEREAS, the rezoning, as modified, is consistent with the City General Plan and Policies; and WHEREAS, the rezoning, as conditioned, will not have a significant environmental impact; and [PA88-O09.1:Reso CC (PD) 3/27/89] WHEREAS, the rezoning is appropriate .for the subject property in terms of being compatible to existing land uses in the area, and will not overburden public services; and WHEREAS, the rezoning will not have substantial adverse effects on health or safety, or be substantially detrimental to the public welfare, or be injurious to property or public improvements; and WHEREAS, there is little or no probability that the rezoning, as modified, will be a detriment to, or interfere with, the City's General Plan. NOW, THEREFORE, BE IT RESOLVED THAT THE Dubiln City Council does hereby approve the Planned Development (PD) Rezoning request PA 88-009.1 subject to the following Conditions of Approval. CONDITIONS OF APPROVAL: Unless otherwise specified, the following conditions shall be complied with prior to issuance of building permits. Each item is subje.zt to review and approval by the Planning Department unless otherwise specified. GENERAL REQUIREMENTS: This approval is for a planned residential development of 206 multi- family dwelling units along with on-site recreation facilities, consistent with the following submittals. Except as specifically modified elsewhere in these Conditions, development shall be generally consistent with the following submittals: Conceptual site plan, floor plans, elevation prepared by the Gasden Company for CoastFed Properties, consisting of six (6) sheets and dated received December 12, 1988 (Architectural Plans) and one (1) sheet dated received October 28, 1988 (Site Plan). B. Conceptual landscape plan prepared by Robert Bucci Associates, consisting of one (1) sheet and dated received November 7, 1988. C. Tentative Tract Map 5883 prepared by Bissel & Xarn, Inc. consisting of one (1) sheet and dated received October 26, 1988. Collectively, these materials shall serve as Exhibit "A" for this project and shall be maintained on file with the Planning Dei~artment. 2. Site Development Review approval for'this project shall be secured prior to issuance of building permits. Except as may be specifically provided for within thlese Conditions of Approval, the development shall be subject to the requirements of the R-S zoning district. [PA88-009.1:ReSo CC (PD) 3/27/89] -2- Any exterior modifications such as trellises, sunshades, patio covers, or fences or other accessory structures must comply with a master plan that is architecturally compatible with approved project design, and approved by the Planning Director for this development prior to permit issuance for the development. The master plan shall remain on file with the City as a guide for future modifications by individual owners. Except as may be specifically provided for within these conditions of approval, the development shall comply with City of Dublin Site Development Review Standard Conditions (see Attachment A). Except as may be specifically provided for within these Conditions of Approval, development shall comply with City of Dublin Police Services Standard Residential Building Security Requirements (see Attachment B). Approval of this Planned Development is for two (2) years as is specified in Section 8-31.2(b) of the Zoning Ordinance. A formal project phasing schedule shall elaborate on this requirement and detail timing of construction Of all major project improvements. If the subject project is not subdivided, as proposed under Tentative Tract Map 5883, the project shall remain subject to the Conditions of Approval established for that Subdivision, as determined applicable by the City Engineer and the Planning Director. Mitigation measures and monitoring program specified in City Council Resolutions 30-89 and 31-89 are made a part of these Conditions of Approval. AIR QUALITY 10. Particulate Control Dust control measures, as approved by the City Engineer, in conjunction with the project's improvement plans, shall be followed at all times during grading and const'ruction operations. Construction areas shall be sprinkled during periods when work is proceeding and during other periods, as required, to minimize the generation of dust. Graded slopes over 5 feet in height shall be revegetated and hydromulched upon completion of grading operations if to be unlandscaped through the winter season. Where feasible, hydromulch shall be installed in stages. To the extent feasible, phased project construction shall balance cut and fill to avoid off-hauling, or import of material along roadways. [PA88-O09.1:Reso CC (PD) 3/27/89] -3- BIOLOGICAL RESOURCES 11. Loss of Major Trees T~ees identified in the Tree Report, prepared by HortScience, Inc. on October 5, 1988, and the Addendum prepared November 11, 1988, shall be preserved and protected. The project shall implement the Tree Preservation Design, Construction, and Maintenance Guidelines contained in the Tree Report. Within the creek channel, the Applicant shall have the responsibility for implementing these guidelines for a minimum period of'one (1) year from the completion of construction, or until the Alameda County Flood Control District or other public entity accepts the channel, whichever is later. During site preparation and construction, a horticulturalist shall monitor and implement the specific preservation plan, and shall sppervise construction activities, especially .grading and pruning, as needed to implement the plan. A revegetation plan for the creek shall be prepared and implemented which includes the replanting of native species on disturbed areas. The revegetation plan shall include provisions to aid new trees during early years through irrigation, fertilization, deer protection and disease prevention. Areas where existing vegetation shall remain shall be marked on plans. Two new trees of at least 15 gallon size shall be provided within the creek tree planting plan area to mitigate the loss of each existing tree over 6 inches in diameter. To the extent feasible, new trees shall be of the same species as the trees lost. All plans for additional tree planting shall be subject to review and approval by Alameda County Flood Control District Zone 7. Whenever possible, construction activities shall be restricted from within the drip line. At the maximum, no more than 40 percent of the area within the drip line for trees planned to be preserved shall be altered. Placement of rip-rap within the drip line is permitted under supervision of a qualified horticulturalist and as specified in Condition "ll-L" below. During project construction, damaged roots shall be cut cleanly with a saw. Trenches shall be back-filled as soon as possible to avoid exposure of roots from dessication. Irrigation during and following construction shall be provided where necessary. G. Supplemental irrigation for trees subject to stress shall be provided. H. Positive drainage away from tree trunks shall be established and water shall not be allowed to stand at the base of the trees. I. Open areas around trees to be preserved shall not be grubbed where grading activities are not required. [PA88-009.1:Reso CC (PD) 3/27/89] -4- Horticultural care, monitoring of pest population and the incidence of disease and control treatments when necessary, shall be provided. This measure shall apply to all trees with health classified by the Tree Report as A, B, or C an.d as identified by the tree preservation identification list as "preserved" or as having a good or moderate suitability of being preserved. Temporary fences shall be constructed around ~he trees to be preserved to exclude all equipment from within the drip line. Placement of soil and/or rip-rap or other slope protection materials around the base of trees must be accomplished by hand, or with equipment that is not standing within the drip lineof trees to be preserved. All wounds to trees to be preserved shall be repaired promptly, with such repair and pruning to be performed by a qualified arborist. 12. Riparian Habitat Loss Temporary fencing shall be provided during the construction for those areas of riparian habitat not intended to be included within the construction zone. B. An erosion and siltation control plan shall be incorporated within the grading plan for the project. A revegetation effort shall be implemented on all reconstructed channel banks as soon as possible after construction is completed to enhance riparian habitat consistent with proper channel maintenance for flood control· Such revegetation plans shall include the following: (1) Use of trees, shrubs and vine species native to the region. (2) Use of shrubs with high wildlife value on the lower channel slopes. (3) Use of indigenous tree species, such as valley oak, live oak and buckeye, on the upper channel slopes together with shrubs and vines to approximate a natural riparian community. (4) Trees, shrubs and vines may be established from seeds, liner stock or small container stock (one gallon) or hydromulch where feasible. (5) Undertaking of an irrigation program to aid survival of woody plants during the first few summers. Where feasible, fixed irrigation shall be installed. [PA88-009.1:Reso CC (PD) 3/27/89] -5- (6) Inclusion within the revegetation plan of portions of the existing riparian corridor which are intended to be left in their present condition, including provisions for native trees, shrubs and vines, where they do not now exist. (7) Obtaining the approval of Alameda County Flood Control District for the revegetation plan, which shall be consistent with Flood Control maintenance requirements. <8) Provision of revegetation along the riparian corridor and the successful establishment of planrings. Subsequent maintenance and management of vegetation in the stream channel will be the Applicant's responsibility for one (1) year following completion of construction. 13. Construction Phase ImpaCts A. Except with the permission of the City Engineer, earth moving shall be undertaken and carried out during the dry season. Prior to winter rains, all bare ground shall be hydroseeded. If grading is undertaken during winter time conditions, a plan shall be submitted for stabilization and control of erosion. Such plan may include mechanical soil stabilization, sediment barriers, and settling ponds. Conditions of the California Department of Fish and Game Stream Alteration Permit shall be followed to minimize erosion during construction in the creek channel. D. Sediment control measures shall be used within construction areas to reduce movement of silt and other sediment from the site. In order to protect both the riparian corridor and isolated trees from construction equipment, vehicular activity, and dumping of trash and debris, areas not intended to be graded shall be protected with temporary fencing. 14. Long Term Impacts Human use of the riparian corridor and stream channel shall be restricted and, where feasible, fencing erected for this purpose. ENERGY 15. All units shall contain standard and currently available energy saving devices, and shall be insulated in accordance with Title 24, State of California Administrative Code. All buildings shall be designed to comply with Title 24 Energy Regulations. 16. All units shall be provided with separately metered Igas for hot water. All meters shall be screened from view within an enclosure that is compatible in design, location and materials to that of the building to which it is to be installed. [PA88-009.1:Reso CC (PD) 3/27/89] -6- 17. 18. 19. Exterior lighting fixtures shall be energy efficient, fluorescent or metal vapor lighting. Landscape design shall incorporate use of solar shading for south- and west-facing walls. Recreation area pools shall incorporate solar heaters. The developer shall submit documentation that the number, size, lo.zation and design at the solar collector panels will suffice to provide adequate pool heating for a reasonable length of time in each calendar year. Heating of the pools may be supplemented by gas heaters. The use of pool covers may be used in place of or in conjunction with solar heaters providing the Applicant can demonstrate reasonable energy conservation to the satisfaction of the Planning Director. HYDROLOGY AND WATER QUALITY 20. Increased Flows A hydraulic analysis shall be prepared to demonstrate that sufficient capacity exists in the Alamo Creek .zhannel to meet the future flows both of this project and future buildout of the Alamo Creek drainage. B. Six-foot black clad chain link fencing shall be installed along both sides of the creek. 21. Increased Erosion and Sedimentation Grading within Alamo Creek shall be limited to the period from April 15 through October 1 of each year. An erosion control plan shall be prepared by the developer's Engineer and submitted with the grading plan. The plan shall be in use until permanent storm sewers have been installed and streets paved, and then these erosion control iplans shall be modified to the new Conditions. Erosion control plans shall include, as required, hydromulching cut-and-fill slopes, sediment barriers, and sedimentation basis and ponds. Grading shall be conducted in such a manner that standing water is not retained in the vicinity of trees to be preserved. A permanent revegetation plan shall be prepared for revegetation of the channel, consistent with the requirements of Alameda County Flood Control District Zone 7. Culverts discharging into the stream channel shall be constructed in such a manner as to avoid erosion by providing impervious spillways on the side slopes into the bottom of the channel [PA88-O09.1:Reso CC (PD) 3/27/89] -7- Final improvement plans prepared for the channel shall maintain the maximum amount of existing channel vegetation feasible and shall preserve existing tree stands identified in the Tree Report, October 5, 1988 and Addendum, November 11, 1988, prepared by HortScience, Inc. MUNICIPAL SERVICES AND FACILITIES 22. Water Supply The project shall incorporate all reasonable water conservation measures including water conservation appliances and separate metering of gas for hot water heaters. The project Architect, or Civil Engineer, shall provide a letter to the Planning Director or Building Inspector stating the water conservant toilets, shower heads, and automatic dishwashers with low flow cycles will be installed in the units in this project. 23. Fire Protection All dwelling units within the project shall incorporate smoke detectors and spark arrestors on fireplaces. Maintenance loads for the creek shall be available for emergency access. Emergency access routes are subject to the approval of DRFA (Dougherty Regional Fire Authority). Fire hyrdants at the locations approved by DRFA shall be installed and operable, to the satisfaction of DRFA prior tocombustible construction. Provision of raised blue reflectorized pavement markers shall be made in the center of the private vehicle accessways at each fire hydrant. Each building and residence unit shall include a lighted, clearly visible address. A lighted, clearly visible project directory shall be provided at all major project access ways. 24. Police Protection A. Emergency access along the Alamo Creek channel maintenance road shall be developed. 25. Recreation Parkland shall be dedicated or in-lieu fees shall be paid, or a combination of both shall be provided prior to issuance of Building Permits or prior to recordation of the Final Map, whichever occurs first, in accordance with the Subdivision Ordinance. The parkland dedication required is approximately 1.854 acres (0.009 acres/~elling units x number of dwelling units). In lieu fees are equal to the then current value of one acre of the developable acreage of the .area to be subdivded times parkland dedication. Parkland dedication credit may be available for on-site recreational facilities. Preliminary calculations of dedication credit are 0.1333 acres. Final calculations on parkland [PA88-009.1:Reso CC (PD) 3/27/89] dedication credit are subject to review and approval of the Planning Director and City Engineer based on final improvements, site and landscaping plans. NOISE 26. Second floor units in the four buildings nearest Amador Valley Boulevard (Buildings 23-26) shall have windows and doors in low air infiltration rate frames as specified in the Noise Assessment pre~pared by Illingworth & Rodkin dated November 11, 1988. 27. The above described units must be mechanically ventilated or air conditioned to enable the occupants to close the windows for noise control. SITE DEVELOPMENT REVIEW SUBMITTAL 28. Open Space Deck dimensions for second floor elevations shall have a minimum dimension of seven feet, excluding fencing or 'railing and a minimum of 70 square feet in area. B. Private useable open space (patios) for ground level units shall be a minimum of 140 square feet in area. 29. Architectural Design Site Development Review submittals shall include plans at an appropriate design scale which detail that: All dwelling units are oriented properly and at a sufficient distance from each other, from parking and vehicular areas, and group use areas. Parking and vehicular areas shall be screened with patio fences or appropriate landscaping from view of ground floor dwelling units. To the extent feasible, west-facing units have sun-shading devices or landscape screeningto prevent over-heating of units. Architectural design is compatible in color and finish with its surroundings. 30. The developer shall obtain written approval from the local postal authority on the location and size of mail receptacles. 31. At-grade patios shall be individually fenced and shall be supplied with soil preparation to accommodate future planting. Individual hose-bibs for each ground level unit patio area shall be provided by the developer. The hose-bibs may be left in a "roughed-out" stage until such time as the units are put up for individual sale. The layout of the enclosed patio areas (regarding size and placement of concrete patio -9- [PA88-009.1:Reso CC (PD) 3/27/89] 32. 33. 34. 35. 36. 37~ 38° 39. 40. pads and the design of the enclosing fencing and retaining walls) shall be subject to review and approval as part of the Sit.~ Develpment Review submittal. The developer's Engineer shall develop the expected truck length and turning radius criteria to use the private streets (fire equipment, delivery, garbage or moving trucks, etc.) and design the curb radii accordingly and submit this data and design criteria with the improvement plans. Parking stalls shall be a minimum depth of eighteen (18) feet and a minimum width of nine (9) feet for standard-sized stalls and a minimum depth of sixteen (16) feet and a minimum width of eight (8) feet for compact-sized stalls. A two (2) foot overhang into landscaped areas may be included in parking stall length. Special private storage areas of at least 120 cubic feet per unit shall be provided within or adjacent to each unit. Details of the location and design of these areas shall be subject to review and approval as part of Site Development Review submittals. Information detailing the design, location and materials of all fencing, and of retaining walls over two feet in height, shall be subject to review and approval of the Planning Director. Slopes for areas adjoining both public and private roadways shall be designed to maximize the level areas available for landscape treatment and for general safety consideration and shall be subject to review and approval through the Site Development Review process. Light standards (freestanding, pedestrian and/or wall mounted) utilized in this project shall be of a design which shields the light sources from view from off-site while providing for adequate security and safety illumination. Light standards shall .be subject to review and approval as part of the Site Development Review submittal as 'regards design, location, number and illumination intensity. Handicapped ramps and access as required by Title 24, State of California, shall be provided (parking and walkways serving on-site recreational facilities). Handicapped parking stalls, appropriately signed, shall be provided evenly throughout the project with their location and design as part of the Site Development Review submittal. The use of entrance gates at any portion of this development are specifically disallowed unless architectural treatment, traffic and emergency access impacts are addressed and approved through the Site Development Review process. A pedestrian circulation plan shall be submitted as i?art of the Site Development Review materials. The plan shall include section details of the pathway system and a detailed pedestrian walkway lighting plan. [PA88-009.1:Reso CC (PD) 3/27/89] -10- 41. Signs established at entrances for project identification purposes shall be subject to review and approval as part of the Site Development Review submittal. SOILS, GEOLOGY AND SEISMICITY 42. Seismic Activity An updated Geotechnical Investigation Report shall be prepared and submitted with the project improvement plans. 43. Soils and Slope Stability All foundation design, grading operations and site construction work shall be consistent with the recommendati.Dns of the Geotechnical Investigation Report, prepared by Bay Soils, Inc. and dated January 13, 1981, or the updated report, if different. B. No cuts or fill slopes shall exceed a slope of 2:1. Where possible, cuts or fills should be designed at 2.5:1 or flatter. C. All fills of sufficient height shall be keyed into the existing soils as recommended by the soils report prepared for this site. D. All cut slopes of sufficient height should have bench gutters to prevent drainage over the face of the slopes. Prior to any grading of the site, a detailed plan covering grading (including phasing), drainage, water quality, erosion and sedimen- tation control for construction and the post-construction period shall be prepared by the project Civil Engineer and/or Engineering Geologist, and shall be approved by the City Engineer. Said plans shall include detailed design, location, and maintenance criteria of all erosion and sediment control measures. The plans shall attempt to assure that no increase in sediment or pollutants from the site will occur. The plan shall provide for long-term maintenance of all permanent erosion and sediment control measures· F. A report addressing the liquefaction danger to buildings adjacent to Alamo Creek shall be prepared. Sub-drains shall be installed in all existing natural drainages which are to receive material. Installation shall be per the requirements of the Soils Engineers. H. Full-time soils inspection by the Soils Engineer representative during mass grading operations shall be provided by the developer. I. All property including maintenance roads shall be graded to slope away from the creek to protect slopes from erosion. [PA88-009.1:Reso CC (PD) 3/27/89] The design of all multi-family residences shall be reviewed by a licensed structural engineer for seismic requirements prior to the issuance of building permits. Where import depth of non-expansive soils is less than 2.5 feet thick, post tension slabs should be used to avoid potential damage from expansive soils. L. All import soil brought onto the site shall be of a non-expansive nature· Where soil or geotechnical conditions encountered in grading operations are different from that anticipated in the soil and geological investigation reports, or where sucl~ conditions warrant changes to the recommendations contained in a site-specific/ project-specific soils and geotechnical report which shall be submitted for review and approval by the City .and shall be accompanied by an engineering and geological olpinion as to the safety of the site from hazards of erosion, settlement and seismic activity. 44. Mass Grading A. Cuts and fills shall be designed to balance whenever possible to avoid the need of offsite hauling. Cut-and-fill slopes shall be contour-rounded to conform as closely as possible with the natural slopes, to avoid a man-made appearance, and to form a gradual transition to natural terrain. C. Variable slopes shall be used to mitigate environmental and visual impacts of grading. 45. Engineered slopes shall be contoured to blend into the natural topography and shall not, to the extent feasible, exceed 2.5:1 slopes. TRAFFIC AND CIRCULATION 46. The developer shall construct a median break with left turn pocket at the project entry as described in the Traffic Study prepared by Abrams Associates, December 5, 1988. MISCELLANEOUS 47. The project shall be constructed as approved. Minor modifications in the design, but not the use, may be approved by Staff. Any other change will require Planning Commission approval thr.gugh the Conditonal Use Permit review process or, depending on the magnitude of the modification, submittal of a new Planned Development Rezoning submittal. The four buildings closest to Amador Valley Boulevard shall not exceed a maximum deviation of five feet from the pad elevations indicatedon the Revised Tentative Map and Development Plan, dated received October 26, 1988. [PA88-009.1:Reso CC (PD) 3/27/89] 48. If occupancy is to occur in phases, all physical improvements shall be required to be in place prior to occupancy except for items specifically excluded in a Construction-Phased Occupancy Plan approved by the Planning Department. No individual unit shall be occupied until the adjoining area is finished, safe, accessible, pr,Dvided with all reasonable expected services and amenities, and completely separated from remaining additional construction activity. Any approved Construction-Phased Occupancy Plan shall have sufficient cash deposits or other assurances to guarantee that the project and all associated improvements shall be installed in a timely and satisfactory manner. At the request of the Planning Director, written acknowledgements of continuing construction activity shall be secured from the property owners and any and all occupants or tenants for the portions of the project to be occupied, and shall be filed with the Planning Department. Said acknowledgements for a subdivision shall be part of the settlement documents between the developer and buyer. 49. Prior to final inspection and occupancy of any units: 5O. A. Storm drainage facilities shall have been installed as approved by the City Engineer. Fire protection devices shall have been installed, be operable, and conform to the specifications of and inspections by the Dublin San Ramon Services District Fire Department. C. Cable TV hook-up shall be provided to each unit. As-built drawings showing the locations of all underground utilities (water, storm and sanitary sewer, gas, electric, telephone and cable TV) shall be provided to the City. E. Street name signs, bearing such names as are a~pproved by the Planning Director, shall have been installed. Prior to occupancy of any unit, each phase of develo~pment landscaping, irrigation, fencing and landscape lighting in accordance with approved landscape and erosion control plans shall have been installed, or a bond or letter of credit for the landscaping, lighting, appurtenant structures, and irrigation system shall be provided to the City. A statement from the project Landscape Architect shall certify that the landscaping has been installed in accordance with the plans and shall be submitted to the Building Official and Planning Director. 51. Should the project be phased: A. The undeveloped area shall be maintained as ac.zeptable to DRFA and shall be kept free of trash and debris. Each phase shall be landscaped and developed such that should construction.of subsequent phases be delayed, the constructed phase(s) will appear as a completed project. [PA88-009.1:Reso CC (PD) 3/27/89] -13- 52. 53. 54. 55. Should the units be initially occupied asapartment units, the following reports shall be filed with, and approved by, the City Engineer at the time the units are put up for individual sale. A report by a licensed roofing contractor certifying that the roofs of all the structures are in good condition and not likely to be in need of replacement for at least 10 years. A reserve deposit may be established to cover the estimated prorated costs of roof replacement where replacement will be required prior to 10 years. A report by a professional Engineer attesting, to the extent reasonably feasible, that the structure of all buildings, pavements, storm draininage facilities, and the interior and exterior plumbing', electrical systems, and utility and mechanical equipment to be owned in common, or as part of the individual condominiums, are in good and Serviceable condition. A report by a licensed painting contractor that paint throughout the project is in good condition and that the building exteriors should not require repainting for at least five years. A reserve deposit may be established to cover the estimated prorated costs for the repainting of the units where repainting will be required prior to a 5-year period. A report by a licensed termite and pest control specialist certifying that the structures are free of infestation and structural damage caused by pests. Should the units be initially occupied as apartment units, all appliances shall either be replaced with new units or the initial buyers provided with a oneoyear's parts and warranty guarantee on all appliances at the time the units are put up for individual sale. The developer shall provide guarantees that a minim~ of 10% of the multi-family units in the project shall be maintained as rental units for a period of five years. The document providing said agreement shall be subject to review and approval by the City Attorney. Developer agrees that until the Condition has been satisfied, there shall be no conversion of condominium units for sale. The minimum distances between buildings, building appurtenances and other project improvements shall comply with the chart in Attachment The term "building" shall refer to the exterior side of building walls containing heated space. Exceptions to the standard setbacks are possible thr.Dugh review and approval by the Planning Director through the Site D.~velopment Review process. [PA88-009.1:Reso CC (PD) 3/27/89] -14- PASSED, APPROVED AND ADOPTED this 27th day of March, 1989. AYES: Councilmembers Hegarty, Jeffrey, Vonheeder, and Mayor Moffatt NOES: None ABSENT: Councilmember Sn~ Mayo~/~~~~r~~ [PA88-009.1:Reso CC (PD) 3/27/89] -15- CIT/OF DUBLIN SITE DEVELOPMF3T REVIEW STA~2~ CO~)ITIONS All projects approved by the City of Dublin shall meet the following standard conditions unless specifically exempted by the Planning Department. 1. Final buildin~ and site de~eloument plans shall be reviewed and approved by the Plannin~ Department staff prior to the issuance of a buildin~ permit. All such plans shall insure: a. That standard commercial or residential security'requirements as established by the Dublin Police Department are provided. b. That ramps, special parking ~.paces, signing, and other appropriate physical features for the handicapped, are provided'throughout the site for all publicly used facilities. c. That continuous concrete curbing is provided for all parking stalls. That exterior lighting of the building and site is not directed onto adjacent properties and the liEht source is shielded from direc= offsite viewing. That all mechanical equipment, including electrical and gas meters, is architecturally screened from view, and that electrical transformers are either undergrounded or architecturally screened. f. That all trash enclosures are of a sturdy material (preferably masonry) and in harmony with the architecture of the building(s). g. That all vents, gutters, downspouts, ~_ashings, etc., are painted to match the color of adjacent surface. That all materials and colors are to be as approved by the Dublin ~lanning Department. Once constructed or installed, a~l improvements are to be maintained in accordance with the approved plans. Any changes which affect the exterior character shall be resubmitted to the Dublin Planning Department for approval. That each parking space designated for compact cars be identified with a pavement marking reading "Small Car Only" or its equivalent, and additional signing be provided if necessary. That all exterior architectural elements visible from view and not detailed on the plans be finished in a style and in materials in harmony with the extey~r of the bui]ding. That all other public agencies that require review of the project be supplied with copies of the final building and si~e plans and that compliance be obtained with at least their minimum Code requirements. ~'A - -~ Final ,l~ndscape plans, trriKation system ~lans, tree preservation techniques, and ~uarantees, shall be reviewed and approved by the Dublin ?lanntn~ Department prior to the issuance of the buildinK permit. All suc~i submittals shall insure: ,/ ;/a. That plant material is utilized which ~ill be capable of healthy growth within the given range of -.soil and climate. That proposed landscape screening is of a height and density so that in provides a pgsitive visual impact within three years from the time of plantingf c. That unless unusual circumstances prevail, at least 75% of the proposed trees on the site are a minimu~of 15 gallons in size, and'at least 50% of the proposed shnfDs on the site are minimum of 5 gallons in size. ? d. That a plan for an automaticSirrigation system be provided which assures that all plants get adequate water· In unusual circumstances, and if approved by Staff, a manual or quick coupler = system may be used. e. That concrete curbing is to be used at the edges of all planters " and paving surfaces. f. That all cut and fill slopes in excess of 5 feet in height are rounded both horizontally and vertically. g. That all cut and fill slopes graded and not constructed on by September 1, of any given year, are hydroseeded withperennial or native grasses and flowers, and that stockpiles of loose soil existing on that date are hydroseeded in a similar marm. er. That the area under the drip line of all existing oaks, walnuts, etc., which are to be saved are fenced during construction and grading operations and no activity is permitted under them that will cause soil compaction or damage to the tree. That a guarantee from the owners or contractors shall be required guaranteeing all schrub's and ground cover, all trees, and the . irrigation system for one year. That a permanent maintenance agreement on all landscaping will be required from the o~-ner insuring regular irrigation, fertilization and weed abatement. Final inspection or occuoancv permits will not be ~ranted until all construction and landscapin~ is complete in accordance with approved plans and the conditions required by the CiB'. DUBLIN POLICE SERVICES STANDARD RESIDENTIAL BUILDING SEC1]RIT~RECOMMENDATIONS 1. DOORS A. All exterior wood doors and doors leading from garages into interior dwelling areas of the residence shall be of solid wood construction, no less than 1- 3/4 inches thick. B. Auxiliary lo,--ks are to be added to each door and shall be double cylinder deadbolt locks when there is a windo,~ within forty inches of the locking =~device. Deadbolt locks m,ist have a minimum one inch throw or equivalent burglary resistant locks where permitted by the fire code. If the cylinder of the lock protrudes from the face of the door, it must be fitted with a cylinder ring guard so it cannot be gripped by pliers or other wrenching devices. C. High security strike plates shall be fitted to all doors with wooden jambs when an auxiliary deadbolt lock is installed. The strike plate shall have a minimum of two woc, d screws of ~ ~nches-in length ....... engage the upright door studs. D. In-swinging doors shall have rabitted jambs or alternative means Of ~renq~,,~nino. E. Exterior hinges s~ail have nc, n-remova~ie hinge pins. F. Exterior and interior garage-out-s,~inging doors shall have non-removable, hidden or non-accessible hinge pins. G. Double hung doors shall have one of the doors secured with two cane bolts of hardened steel. The bolts shall engage a metal strike to a depth of nnt less than. 3/8 inch and be a minimum 1/4 inch diameter. H. Sliding glass doors shall meet the uniform building code for shatter resistance. Sliding glass doors shall be fitted ,'~h locking device,. that shall engage the strike sufficient!): to prevent its being disengaged by any possible movement of the door ~ithin the space or clearances provided for installation and operation. The bolt and strike shall be reinforced by hardened material so as to p~event their separation by pu~iing, .pryin.g or similar ' 'attack. An auxili'i~ ibcking device shall Ge installed on "'the door'which may-be-a pin lock or similar device'-of not ........ less than ~/4 inch diameter. The pin shall be of hardened material and engage the metal portion of the sliding door. ............. The primary locking device function may be operable by a keyed or code lock inside and out as permitted by the fire department or building codes. Double sliding glass doors shall be locked at the meeting rail. Each. segment, of or sliding portion of, the door shall be fitted with an auxiliary s~curity lock, I. Entry doors shall b~ fitted with a minimum 180 de~ree peephole. ,~. 2. W I NDOWS A. All accessible dwelling win~ows shall be secured as.follows: sliding glass windows shallibe secured on the inside with a locking device capable of withstandin~ prying or wrenching. An auxiliary lock shall be installed on each sliding window that prevents movement in the sliding track. Windows shall meet the uniform building security code for shatter resistance. B. Louvered windnws s};all not be used within eight feet of ground level, adjacent structures, or fire escapes. C. Casement type windows shall be secured with a metal to mesa! locking device contacting both frames of the window at the meeting edge. Auxiliary locks such as a pin that penetrates both frame structures shall be installed on casement and double hung windows. D. Windows fitted with a crank type _tsar opening devices shall be fitted with a pc, sitive window lock that engages metal to metal. 3. LIGHTING A. Dwellings-shall be fitted with lighting over all exterior entryways. The minimum standards ~~--'~ be a 60 watt incandescent light or the equivalent in tumins. B. Street or apartment numbers shall be illuminated from the interior and contain numerals of nct less that 2 I/2 inches. 4. GARAGE AND STORAGE AREAS A. Garage doors shall be secured with a m~ta! to metal locking device that prevents the door from being pulled or pried up fro~ the out. side, No~electric garag~ door open~-'s ............ portal'tied°that will 'automatically aztiv~te when the forced open. Garage doors fitted with automatic openers ~ shall be permitted with an alternative form of locking device activated from the interior of ti~e garage. Exterior PA88-009,1 ~ STANDARD S~BACK REQUIREMENTS (in feet) To Building. From Building 20 Appurtenance 15 Patio Fence 10 Private Roads 15 Amador Valley' BlVd, 25 Creek Fence" 10 Parking Areas 10 · Property Lines 15 Building Appurt, Patio Fence Carport 10 10 5 2O 15 (a) 10 5 i0 (a) (a) Applies to patio fences parallel to creek fence or property line: (1) 10 feet if a pathway falls between the two fences; (2) 5 feet if no pathway falls between the two fences, TO EXHIBIT D PA 88-009 HERITAGE PD REZONING