Loading...
HomeMy WebLinkAboutItem 4.7 - 1708 Structure Page 1 of 3 STAFF REPORT CITY COUNCIL DATE: November 21, 2017 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Emerald Glen Recreation and Aquatic Complex - BuyBoard Authorization, Purchase of Concession Building and Related Equipment from Public Restroom Company, and Authorization for Closeout (CIP No. PK0105) Prepared by: Michael Boitnott, Capital Improvement Program Manager EXECUTIVE SUMMARY: The City Council will consider authorizing membership with the National Purchasing Cooperative (dba BuyBoard), which allows public agencies to purchase products and services from vendors established through a cooperative public bid process. The City Council will also consider authorizing the purchase of a conces sions building from the Public Restroom Company for the Emerald Glen Recreation and Aquatic Complex Project (CIP No. PK0105), and approving a budget change to increase project funding for project close-out. STAFF RECOMMENDATION: Adopt the Resolution Authorizing the City to Become a Member of BuyBoard and Purchase a Concession Building From the Public Restroom Company for the Emerald Glen Recreation and Aquatic Complex Project (CIP No. PK0105), and approve the budget change. FINANCIAL IMPACT: The total adopted budget for the Emerald Glen Recreation and Aquatic Complex Project (CIP No. PK0105) which included design, inspection, administration, improvements, and other miscellaneous costs was $43,830,945. Inclusion of a concession building and the close-out of various construction items require the City Council’s approval of a budget increase of $1,300,000, from the Public Facility Fees Fund, Information Technology Fund, and Vehicle Registration Fee Fund. DESCRIPTION: On August 15, 2017, the City Council a pproved the addition of a concessions building to the Emerald Glen Recreation and Aquatic Complex. The design team has finalized the plans and specification for the 750 square -foot pre-manufactured structure and equipment for concessions building. Staff has worked with the Public Restroom Page 2 of 3 Company to provide a pre-manufactured concession building that meets the project requirements and that can be constructed within the time allotted for the project. The Public Restroom Company, through a cooperative government purchasing program called BuyBoard, has provided a quoted price of $404,610, which includes an allowance of $15,000 for City requested modifications. Staff has reviewed the price provided, checked references and necessary licenses, and recommends that the City Council adopt the Resolution authorizing the City of Dublin to participate as member of BuyBoard and to procure the concessions building from the Public Restroom Company. There is no cost for the City to become a member of BuyBoard. The only requirement is to enter into a cooperative agreement. Section 2.36.100(B)(9) of the Dublin Municipal Code allows for exceptions to the typical public bidding process when the City is able to procure items from a competitive bid process administered by another public agency. Purchases made in this manner in excess of $45,000 still require City Council approval (Section 2.36.090). The Public Restroom Company offers its products to local government agencies through an agreement with BuyBoard. The BuyBoard agreement was submitted through a competitive proposal process which then can be utilized by various other public and state agencies. Concession Building Description The concessions building will be located off the pool deck between the outdoor sports pool and the main building. The building will provide three walkup windows, two for serving the water park and a third outside the park to serve events at the sports pool when slide portion of the park is closed. Attachment 4 provides a rendering of the building and a portion of the building plans. This structure will be equipped to provide a wide variety of meal options from prepackaged to prepared onsite hot food. The building can stand alone with onsite refrigeration and freezer space, type 1 hood with a fl attop griddle and fryers, sandwich station, dry storage, beverage dispensers, and microwave to name a few. In total, the concession building is estimated to cost approximately $700,000, which includes the pre-manufactured building, site improvements, utilities, design, inspection, testing, and administration. The City design team is completing the plans and specifications for the site improvements, utilities, and building foundation. These improvements are needed before the City takes delivery of the pre -manufactured building. Bids for these improvements will be solicited in accordance with the City’s purchasing guidelines and the Public Contract Code. Staff believes, for a building of this type and size, the purchase of a pre-manufactured building will reduce construction duration and costs as compared to constructing the building in the field. The Wave – Construction Status Staff is working with the general contractor and other specialty contractors to complete and close out the improvements for the ne arly 32,000 square-foot Emerald Glen Recreation and Aquatic Complex. As part of that close -out process, Staff has determined that an additional budget appropriation of $1,100,000 from Public Facility Fees will be required ($700,000 for concessions and $400 ,000 for close-out of the Page 3 of 3 original improvements, which includes all of the add -alternate items that were requested by the City Council). The budget change (Attachment 5) also includes a $200,000 budget increase for a fiber network connection between the Civic Center and the facility, funded by the Information Technology Fund ($150,000) and the Vehicle Registration Fee Fund ($50,000). Staff recommends City Council approve the budget change of $1,300,000 and authorize the City Manager or designee to approve the Final Project Contract Change Order up to the available funds designated for Project No. PK0105. NOTICING REQUIREMENTS/PUBLIC OUTREACH: None. ATTACHMENTS: 1. Resolution Authorizing Membership with BuyBoard and the Purchase of a Concession Building from the Public Restroom Company 2. Exhibit A to the Resolution - National Purchasing Cooperative Interlocal Participation Agreement 3. Exhibit B to the Resolution – Agreement with Public Restroom Company 4. Floor Plan and Rendering of the Concessions Building 5. Budget Change Form ATTACHMENT 1 RESOLUTION NO. XX - 17 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * * * AUTHORIZING THE CITY OF DUBLIN TO BECOME A MEMBER OF BUYBOARD AND PURCHASE A CONCESSION BUILDING FROM THE PUBLIC RESTROOM COMPANY FOR THE EMERALD GLEN RECREATION AND AQUATIC COMPLEX (CIP NO. PK0105) WHEREAS, the City Council on August 15, 2017, expanded the project scope for the Emerald Glen Recreation and Aquatic Complex to include a Concessions Building; and NOW, THEREFORE BE IT RESOLVED, the City Council of the City of Dublin does hereby authorize the City of Dublin to become a member of BuyBoard and authorizes the City Manager to execute the National Purchasing Cooperative Interlocal Participation Agreement, attached hereto as Exhibit A. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby approve the purchase of a concessions building from the Public Restroom Company for the Emerald Glen Recreation and Aquatic Complex (CIP No. PK0105). BE IT FURTHER RESOLVED that the City Manager, or designee, is authorized to execute the Agreement for the purchase of the concessions building attached hereto as Exhibit B. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or his designee to approve the Final Project Contract Change Order based on the available funds designated for Project No. PK0105. PASSED, APPROVED AND ADOPTED this 21st day of November 2017, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk Page 1 of 6 (Revised by the Cooperative Board of Directors on March 10, 2016). NATIONAL PURCHASING COOPERATIVE INTERLOCAL PARTICIPATION AGREEMENT This Interlocal Participation Agreement ("Agreement") is made and entered into on the date indicated below by and between The National Purchasing Cooperative ("Cooperative"), an adminis trative agency of cooperating local governments, acting on its own behalf and the behalf of all participating local governments, and the undersigned local government ("Cooperative Member"). I. RECITALS WHEREAS, the National Purchasing Cooperative was formed on May 26, 2010, pursuant to MD. CODE ANN., STATE FIN. & PROC. § 13-110 (West 2009), and R.I.GEN.LAWS § 16-2-9.2 (2009); and WHEREAS, the purpose of this Agreement is to facilitate compliance with state procurement requirements, to identify qualified vendors of commodities, goods and services, to relieve the burdens of the governmental purchasing function, and to realize the various potential economies, including administrative cost savings, for Cooperative Members; NOW THEREFORE, in consideration of the mutual covenants, promises and obligations contained herein, the undersigned Cooperative Member and the Cooperative agree as follows. II. TERMS AND CONDITIONS 1. Adopt Organizational Interlocal Cooperation Agreement. The Cooperative Member by the execution or acceptance of this Agreement hereby adopts and approves the Organizational Interlocal Agreement dated May 26, 2010, which agreement is incorporated herein by reference (and is available from the Cooperative upon request). The Organizational Interlocal Agreement established the Cooperative as an administrative agency of its collective participants, and Cooperative Member agrees to become a participant or additional party to that Organizational Interlocal Agreement. 2. Term. The initial term of this Agreement shall commence on the date it is executed by both parties and shall automatically renew for successive one-year terms unless sooner terminated in accordance with the provisions of this Agreement. 3. Termination. (a) By the Cooperative Member. This Agreement may be terminated by the Cooperative Member at any time by thirty (30) days prior written notice to the Cooperative, provided any amounts owed to any vendor have been fully paid. Page 2 of 6 (Revised by the Cooperative Board of Directors on March 10, 2016). (b) By the Cooperative. The Cooperative may terminate this Agreement by: (1) Giving ten (10) days notice by certified mail to the Cooperative Member if the Cooperative Member breaches this Agreement; or (2) Giving thirty (30) days notice by certified mail to the Cooperative Member with or without cause. (c) Termination Procedure. If the Cooperative Member terminates its participation under this Agreement or breaches this Agreement, or if the Cooperative terminates participation of the Cooperative Member, the Cooperative Member shall bear the full financial responsibility for all of its purchases made from vendors under or through this Agreement. The Cooperative may seek the whole amount due, if any, from the terminated Cooperative Member. In addition, the Cooperative Member agrees it will not be entitled to a distribution which may occur after the Cooperative Member terminates from the Cooperative. 4. Payments by Cooperative Member. The Cooperative Member will make timely payments to the vendor for the goods, materials and services received in accordance with the terms and conditions of the bid invitation, instructions, and all other applicable procurement documents. Payment for goods, materials and services and inspections and acceptance of goods, materials and services ordered by the procuring Cooperative Member shall be the exclusive obligation of the procuring Cooperative Member, and not the Cooperative. Furthermore, the Cooperative Member is solely responsible for negotiating and securing ancillary agreements from the vendor on such other terms and conditions, including provisions relating to insurance or bonding, that the Cooperative Member deems necessary or desirable under federal, state or local law, local policy or rule, or within its business judgment. 5. Payments by Vendors. The parties agree that the Cooperative will require payment from vendors which are selected to provide goods, materials or services to Cooperative Members. Such payment (hereafter “Vendor Fees”) may be up to two percent (2%) of the purchase price paid by Cooperative Members or a flat fee amount that may be set from time to time by the Cooperative Board of Directors. Cooperative Member agrees that these Vendor Fees fairly compensate the Cooperative for the services and functions performed under this Agreement and that these Vendor Fees enable the Cooperative to pay the administrative, endorsement, licensing, marketing, and other expenses involved in successfully operating a program of electronic commerce for the Cooperative Members. Further, Cooperative Member affirmatively disclaims any rights to such Vendor Fees, acknowledging all such fees are the property of the Cooperative. Similarly, in no event shall a Cooperative Member be responsible for payment of Vendor Fees. 6. Distribution. From time to time, and at the sole discretion of the Cooperative Board of Directors, the Cooperative may issue a distribution to Cooperative Members under a plan developed by the Cooperative Board of Directors. The Cooperative Member acknowledges that a distribution is never guaranteed and will depend on the overall financial condition of the Cooperative at the time of the distribution and the purchases made by the Cooperative Member. 7. Administration. The Cooperative may enter into contracts with others, including non-profit associations, for the administration, operation and sponsorship of the purchasing program provided by this Agreement. The Cooperative will provide reports, at least annually, to the Cooperative Member electronically or by Page 3 of 6 (Revised by the Cooperative Board of Directors on March 10, 2016). mail. Cooperative Member will report purchase orders generated under this Agreement to the Cooperative or its designee, in accordance with instructions of the Cooperative. 8. BuyBoard®. Cooperative Member will have a non-exclusive license to use the BuyBoard electronic purchasing application (BuyBoard) during the term of this Agreement. Cooperative Member acknowledges and agrees that the BuyBoard electronic application and trade name are owned by the Texas Association of School Boards, Inc., and that neither the Cooperative nor the Cooperative Member has any proprietary rights in the BuyBoard electronic application or trade name. The Cooperative Member will not attempt to resell, rent, or otherwise distribute any part of BuyBoard to any other party; nor will it attempt to modify the BuyBoard programs on the server or acquire the programming code. The Cooperative Member may not attempt to modify, adapt, translate, distribute, reverse engineer, decompile, or disassemble any component of the application. The Cooperative Member will use BuyBoard in accordance with instructions from the Cooperative (or its designee) and will discontinue use upon termination of participation in the Cooperative. The Cooperative Member will maintain equipment, software and conduct testing to operate the BuyBoard system at its own expense. III. GENERAL PROVISIONS 1. Amendment by Notice. The Board may amend this Agreement, provided that prior written notice is sent to the Cooperative Member at least 60 days prior to the effective date of any change described in such amendment and provided that the Cooperative Member does not terminate its participation in the Cooperative before the expiration of said 60 days. 2. Authorization to Participate and Compliance with L ocal Policies. Each Cooperative Member represents that its governing body has duly authorized its participation in the Cooperative and that the Cooperative Member will comply with all state and local laws and policies pertaining to purchasing of goods and services through its membership in the Cooperative. 3. Bylaws. The Cooperative Member agrees to abide by the Bylaws of the Cooperative, as they may be amended, and any and all written policies and procedures established by the Cooperative. Notwithst anding the foregoing, the Cooperative shall provide written notice to the Cooperative Member of any amendment to the Bylaws of the Cooperative and any written policy or procedure of the Cooperative that is intended to be binding on the Cooperative Member. The Cooperative shall promptly notify all Cooperative Members in writing of any Bylaw amendment, policy or procedure change. 4. Cooperation and Access. The Cooperative Member agrees that it will cooperate in compliance with any reasonable requests for information and/or records made by the Cooperative. The Cooperative reserves the right to audit the relevant records of any Cooperative Member. Any breach of this provision shall be considered material and shall make the Agreement subject to termination on ten (10) days written notice to the Cooperative Member. 5. Coordinator. The Cooperative Member agrees to appoint a program coordinator who shall have express authority to represent and bind the Cooperative Member, and the Cooperative will not be requir ed to contact any other individual regarding program matters. Any notice to or any agreements with the coordinator shall be binding upon the Cooperative Member. The Cooperative Member reserves the right to change the coordinator as needed by giving written notice to the Cooperative. Such notice is not effective until actually received by the Cooperative. Page 4 of 6 (Revised by the Cooperative Board of Directors on March 10, 2016). 6. Current Revenue. The Cooperative Member hereby represents that all payments, fees, and disbursements required of it hereunder shall be made from current revenues budgeted and available to the Cooperative Member. 7. Defense and Prosecution of Claims. The Cooperative Member authorizes the Cooperative to regulate the commencement, defense, intervention, or participation in a judicial, administrative, or other governmental proceeding or in an arbitration, mediation, or any other form of alternative dispute resolution, or other appearances of the Cooperative in any litigation, claim or dispute which arises from the services provided by the Cooperative on behalf of its members, collectively or individually. Neither this provision nor any other provision in this Agreement will create a legal duty for the Cooperative to provide a defense or prosecute a claim; rather, the Cooperative may exercise this right in its sole discretion and to the extent permitted or authorized by law. The Cooperative Member shall reasonably cooperate and supply any information necessary or helpful in such prosecution or defense. Subject to specific revocation, the Cooperative Member hereby designates the Cooperative to act as a class representative on its behalf in matters arising out of this Agreement. 8. Governance. The Board of Directors (Board) will govern the Cooperative in accordance with the Bylaws. 9. Legal Authority. The Cooperative Member represents to the Cooperative the following: a) The Cooperative Member has conferred with legal counsel and determined it is duly authorized by the laws of the jurisdiction in which the Cooperative Member lies to participate in cooperative purchasing, and specifically, the National Purchasing Cooperative. b) The Cooperative Member possesses the legal authority to enter into this Agreement and can allow this Agreement to automatically renew without subsequent action of its governing body. c) Purchases made under this Agreement will satisfy all procedural procurement requirements that the Cooperative Member must meet under all applicable local policy, regulation, or state law. d) All requirements––local or state–for a third party to approve, record or authorize the Agreement have been met. 10. Disclaimer. THE COOPERATIVE, ITS ENDORSERS, SPONSORS AND SERVICING CONTRACTORS, INCLUDING THE NATIONAL SCHOOL BOARDS ASSOCIATION (NSBA) AND THE TEXAS ASSOCIATION OF SCHOOL BOARDS, INC. (TASB), DO NOT WARRANT THAT THE OPERATION OR USE OF COOPERATIVE SERVICES WILL BE UNINTERRUPTED OR ERROR FREE. THE COOPERATIVE, ITS ENDORSERS, SPONSORS AND SERVICING CONTRACTORS, HEREBY DISCLAIM ANY AND ALL WARRANTIES, EXPRESS OR IMPLIED, IN REGARD TO ANY INFORMATION, PRODUCT OR SERVICE FURNISHED UNDER THIS AGREEMENT, INCLUDING WITHOUT LIMITATION, ANY AND ALL IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. 11. Limitation of Liability. Without waiver of the disclaimer or other limitation of liability in this Agreement, the parties agree that: (a) Neither party waives any immunity from liability afforded under law; Page 5 of 6 (Revised by the Cooperative Board of Directors on March 10, 2016). (b) In regard to any lawsuit or formal adjudication arising out of or relating to this Agreement, neither party shall be liable to the other under any circumstance for special, incidental, consequential, or exemplary damages; (c) The maximum amount of damages recoverable will be limited to the amount of fees which the Cooperative received as a direct result of the Cooperative Member’s purchase activity, within 12 months of when the lawsuit or action was filed; and (d) In the event of a lawsuit or formal adjudication the prevailing party will be entitled to recover reasonable attorney’s fees. Without waiver of the disclaimer or other limitation of liability in this Agreement, the parties further agree to limit the liability of the Cooperative’s Endorsers, Sponsors and Servicing Contractors (defined in Paragraph 11, above) up to the maximum amount each received from or through the Cooperati ve, as a direct result of the undersigned Cooperative Member’s purchase activity, within 12 months of the filing of any lawsuit or action. 12. Limitation of Rights. Except as otherwise expressly provided in this Agreement, nothing in this Agreement is intended to confer upon any person, other than the parties hereto, any benefits, rights, or remedies under or by reason of this Agreement. 13. Merger/Entirety. This Agreement, together with the Cooperative’s Bylaws and Organizational Interlocal Agreement, represents the complete understanding of the Cooperative and Cooperative Member. To the extent there exists any conflict between the terms of this Agreement and that of prior agreements, the terms of this Agreement shall control and take precedence over all prior participation agreements. 14. Notice. Any written notice to the Cooperative may be given by e-mail to NSBA at BuyBoard@nsba.org; by U.S. mail, postage prepaid, and delivered to the National Purchasing Cooperative, 1680 Duke Street FL2, Alexandria, VA, 22314; or other mode of delivery typically used in commerce and accessible to the intended recipient. Notices to Cooperative Member may be given by e-mail to the Cooperative Member’s Coordinator or other e-mail address of record provided by the Cooperative Member; by U.S. mail, postage prepaid, and delivered to the Cooperative Member’s Coordinator or chief executive officer (e.g., superintendent, city manager, county judge or mayor); or other mode of delivery typically used in commerce and accessible to the intended recipient. 15. Severability. If any portion of this Agreement shall be declared illegal or held unenforceable for any reason, the remaining portions shall continue in full force and effect. 16. Signatures/Counterparts. The failure of a party to provide an original, manually executed signature to the other party will not affect the validity, enforceability or binding effect of this Agreement because either party may rely upon an electronic or facsimile signature as if it were an original. Furthermore, this Agreement may be executed in several separate counterparts, each of which shall be an original and all of which shall constitute one and the same instrument. 17. Authority. By the execution and delivery of this Agreement, each undersigned individual represents that he or she is authorized to bind the entity that is a party to this Agreement. Page 6 of 6 (Revised by the Cooperative Board of Directors on March 10, 2016). IN WITNESS WHEREOF, the parties, acting through their duly authorized representatives, accept this Agreement. TO BE COMPLETED BY THE NATIONAL PURCHASING COOPERATIVE: By: Date: Deputy Associate Executive Director, Member & Leadership Services National School Boards Association On behalf of the National Purchasing Cooperative TO BE COMPLETED BY COOPERATIVE MEMBER: ONLINE AT BUYBOARD.COM VIA ELECTRONIC SIGNATURE Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 1 of 10 FINAL PROJECT BID: Emerald Glen Park Concession Building, Dublin, CA Bid Date: November 14, 2017 Project Ref #10289 Contractor License # 822966B Dealer License # DL1109895 Manufacturer License # MF1277003 DIR # 1000005303 Our Offer to Sell: 1. Wave Concession Building delivered to site @ $373,986 Public Restroom Company herein bids to furnish (building only per plans and specifications, delivered to site with all costs except installation including applicable taxes excluding retention.(Retention is not allowed as this is materials or a product fully assembled before shipment to the site and therefore not subject to retention.) Added to previous quote: a.) Mapes counter canopy over serving windows; one over dual windows and one over single serving window@$9,610. b.) Code compliant grease trap in maintenance closet under pultruded access grating floor opening cover @$3044. c.) Allowance for owner in project process modifications @$15,000. 2. Installation: Turnkey Installation of the Building above @ $30,624 with retention allowed. Public Restroom Company also includes in this two part quotation our turnkey installation package for this building. Our national factory authorized installation team will: a. Arrive onsite to confirm and verify the owner provided scope of work in preparation for installation including access to the site. b. Verify the building pad size, building corners, finished slab elevation, utility depth and location, meter size and distance from building, and compaction compliance. c. Excavate the utility trenches for placement of our prefabricated underground piping tree for plumbing and electrical, set the kit in place, provide the water test for inspection before backfilling, and then place the site adjacent coarse sand you provide to us alongside the building pad and screed it level for final building placement. We will need onsite water availability for wetting the sand bed before building placement to consolidate the pad. d. Set the building on the site pad. e. Connect the utility piping stub ups to the building piping stub down building points of connection for water, sewer, and electrical conduit to the building internal electrical panel. 3. Owner Final Tie In of Utilities and other site work: The exterior utility connections for water, sewer and electrical 6’ or less from the footprint of the building are by owner. Exhibit B Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 2 of 10 4. Total Cost of building and installation @ $ 404,610 OWNER SCOPE OF WORK WITH FOOTINGS: Owner Scope of Work Background: Owner shall survey the site, establish survey for the building pad and prefabricated building slab elevation and front corners, excavate for building footings, locate footing sleeves for electrical, waste, and water, pour the footings DEAD LEVEL ON TOP, furnish nominal 2” coarse concrete sand base adjacent to subgrade pad, and provide location for utility POC’s nominally 6’ outside the foundation. Preparation of Building Pad: Owner is responsible for providing the building subgrade pad and footings to depth per local code or owner engineer recommendation and Public Restroom Company design specifications. ` Subgrade Pad/Foundation Requirements: 1. Owner shall survey the building site and provide a finished slab elevation for the prefabricated building. The building pad size we require is larger than the final actual building footprint. Provide building front corner stakes with 10’ offsets. 2. Excavate the existing site to the depth of the required footings to local code if required. 3. Furnish coarse concrete sand adjacent to subgrade pad so PRC can cut the utility trenches, install underground utilities, and screed sand. Owner verification of site access to allow Building Delivery: 1. You certify to PRC that suitable delivery access to the proposed building site is available. Suitable access is defined as 14’ minimum width, 16’ minimum height, and sufficient turning radius for a crane and 70’ tractor-trailer. 2. Our cost is based upon the crane we provide being able to get within 35’ from the building center and for the delivery truck to be no more than 35’ from the crane center picking point. 3. If the path to the building site traverses curbs, underground utilities, landscaping, sidewalks, or other obstacles that could be damaged, it is the Owner’s responsibility for repair and all costs, if damage occurs. 4. If trench plating is required, it shall be the cost responsibility of the Owner. 5. If unseen obstacles are present when site installation begins, it is the Owner’s responsibility to properly mark them and verbally notify PRC before installation. Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 3 of 10 Installation Notice and Site Availability: PRC will provide sufficient notice of delivery of the prefabricated building. The Owner shall make the site available during the delivery period. During the delivery period, on an improved site, Owner should stop site watering several days before delivery to minimize the impact on the soils for the heavy equipment needed for installation. Caution: If site is not ready for our field crew to perform their installation and if no notice of delay in readiness from Owner is received, PRC will provide a change order for re-mobilization on a daily basis until the site is ready for us. Ready means that the site pad is completed, the corner required survey stakes are in place, the slab elevation stakes are in place, the location of the front of the building is confirmed on site, and access to the site is available from an improved roadway. Owner shall sign the change order before we will continue delivery. Public Restroom Company will “turn-key” set the buildings including the hook up of utilities inside the building (only) when they are available. PRC will use its own factory trained staff for the installation. Utility Connections: 1. The Owner is responsible for flushing all water service lines at least 30 minutes to remove debris before final connection. 2. The Owner is responsible for the final exterior connections of water, sewer, and electrical at the exterior of building POC’s. 3. PRC provides a POC for water, a POC DWV waste line with a clean out your service connection, and an electrical schedule 80 PVC sleeve at an exterior POC. 4. PRC provides and connects the interior building utility connections and the Owner or their subcontractor makes the exterior connections to POC’s for services. Special Conditions, Permits, and Inspection Fees: Follow any published specifications governing local building procedures for applicable building permit fees, health department fees, all inspection fees, site concrete testing fees, and compaction tests, if required by Owner. PRC is responsible for all required State inspections and final State insignia certification of the building, if applicable. Jurisdiction for Off-site Work: Jurisdiction, for permitting and inspection of this building shall be either the State agency who manages prefabricated building compliance in the state or the local CBO (when the State does not provide certification.) If the responsibility for building inspection is the local CBO, we will Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 4 of 10 provide a certified plan set, calculations, and a third party engineer inspection report for any and all closed work the local official cannot see. PUBLIC RESTROOM COMPANY SCOPE OF WORK: Our In Plant/Off-Site Construction Scheduling System: PRC has several off-site manufacturing centers in the United States, strategically located, with the proper equipment and trained staff to fabricate our custom buildings to our high quality fit and finish standards. PRC manages quality control in our off-site production facility to comply with the approved drawings and provides an inspection certification and photos as required. When proprietary materials, which we have designed and fabricated, are part of the project, PRC supplies the manufacturing centers with these proprietary PRC components. We then schedule the in plant construction process to coordinate with your delivery date through our Operations Division field staff. We guaranty on time at cost delivery weather permitting. Special Payment and Billing Terms: We will invoice for our design, engineering, and architectural plans upon our submittal to you. Then, we invoice on a monthly in plant percentage of completion supported by photographs, State third party inspection reports, and State certification and expect timely payment at least every 30 days. In the event of project stoppage, additional fees may be assessed for re-mobilization, storage, crane costs, etc. Our discounted project costs are based upon timely payments. Delays in payment could change delivery schedules and project costs. Delivery and Installation: Site Inspection: PRC staff, upon site arrival, will verify the required dimensions of the building pad and the corner locations/elevation. We will also verify the delivery path from an accessible road or street and install the underground utilities to the point of connection nominally 6’ from the exterior of the building. Installation: PRC will install the building turn-key, except for any exclusion (listed under “Exclusions,” herein.) Installation of Utilities under the Prefabricated Building: We fabricate off-site an underground utilities (water, and DWV piping and fittings) preassembled plumbing and electrical tree. Our site staff will set the underground tree in the Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 5 of 10 excavated trench (excavation by owner to the proper depth per local code) into code depth excavated trenches and our staff will install the coarse concrete sand to bed the piping per our submitted drawing. Your utility POC’s start nominally 6’ from the building footprint where we pick up the task and connect your services to the building stub downs. We provide all the under slab piping (including the driven electrical ground rod or lightning rod, if applicable.) The owner brings utility services to within 6’ of the pad. Connection of Utilities Post Building Placement: After placement of the building on the pad by PRC, our field staff will tie in the water and sewer connection “inside” the building only and terminate at a point of connection (POC) outside the building clearly marked for each utility service. The Owner is responsible for final utility point of service connections at the nominal 6’ from building locations. Electrical: PRC provides the electrical conduit to the POC 6’ from the building. The Owner pulls the wire and ties it off on the electrical panel. Plumbing: PRC provides the POC up to 6’ from the building footprint and the Owner connects the water to our stub out location. Sewer: Some sites depending on the local jurisdiction will require an outside house trap which Owner shall install if needed. PRC will provide you with a sewer point of connection including a clean out to which Owner will terminate the site sewer service. Testing of Water, Sewer, and Electrical in Plant and Final Site Utility Connection: Before the building leaves the manufacturing center, PRC certifies a pressure water piping test, DWV, and the electrical connections for compliance with code. While the building is fully tested for leaks at the plant before shipment, road vibration may loosen some plumbing slip fittings and require tightening once the building services (water) is completed. Owner is responsible for minor fitting tightening to handle small slip fitting leaks caused by transportation. Time of Completion: PRC estimates a 120 day schedule to complete our scope of work from receipt of written notice to proceed together with signed approved architectural submittals from all authorities required to approve them. If we receive notice to proceed by 11-15-17 we can deliver end of February early March. Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 6 of 10 INCLUDED COMPONENTS IN BID: 1. Exterior to follow architecture and finishes on drawings by Dahlin Group. 2. Mapes canopies over serving windows. 3. Coiling window shutters over serving windows. 4. Exterior lighting per Dahlin Group design, LED. 5. Serving window counters at 34” maximum above building interior floor with exterior sidewalk by others to meet 34” maximum height. 6. Interior tile floors Quarry style in color by Dahlin Group with two part black epoxy grout. 7. Interior tile base shall match floor with same grout. 8. HVAC shall be roof mounted blow down units to code. 9. Roof mounted electrical service box for step down transformer by other to connect to service panel in mechanical closet below. 10. Roof mounted service line for fiber line to TI closet. 11. Data IT service lines to cash register positions in kitchen serving area. 12. Furnish safe opening in floor of IT room for floor safe per owner specification. 13. Furnish 2-20 amp single duplex outlets and 2 double duplex outlets at locations by Dahlin Group. 14. Furnish door locks wired for card reader unit to be furnished by owner or others. 15. Exterior doors shall be 14 gauges metal door and jamb painted light color with panic hardware service and heavy duty door closer and air curtain with door jamb micro switch. 16. Serving self-closing windows shall comply with CFSC 216 square inches with tempered glazing. 17. Stainless serving counters per plan shall be commercial gauges to comply with CFSC. 18. Interior doors shall be vinyl surfaced solid core rehung with hardware per standard CBC requirements. 19. All plumbing shall be PVC/DWV and water service in PEX or copper per application with backflow prevention devices for ice maker and Soda dispenser. Floor sinks to code (2) shall be field installed post setting of building. 3 Compartment stainless code compliant scullery sink and prep sink shall be commercial grade with drain boards. 20. Interior lighting shall be LED wrap around covered. 21. Hood shall be custom fabricated dual wall with insulation to fire code with built in makeup air and roof exhaust. Ansul spray system shall be built in with interlock electrical outlets for all owner furnished high power cooking devices. 22. Electrical distribution panel shall be snap on breakers. 23. Interior wall finish shall be PVC panels for ease of cleaning. 24. Ceiling shall be James Hardie composite fiber cement panels painted two coats of 4 mil high gloss industrial paint. 25. Water Heater shall be 50 gallon 12 KW heater low boy in mechanical room. Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 7 of 10 26. Mop Sink shall be floor mounted fiber stone with mop holder. 27. Dahlin Group shall review final plan submittals with cut sheets and approve before construction. NOT INCLUDED IN BID: 1. All other plan shown food service and restaurant equipment, stainless tables, storage shelving, lockers, pot racks, storage shelving above equipment, door hardware card reader lockset, exterior menu sign, transformer, telecommunications equipment including antenna, internal communication equipment if any, foundation, and final utility connections by others. Other Exclusions/Exceptions: 1. Access issues for delivery of the building when the owner has not provided a proper path to the final site. This exclusion covers sites whose access is limited by trees, inaccessible roadways, overhead power lines at location where crane will lift building, grade changes, berms, or uneven site grades, or when the path of travel is over improvements such as sidewalks, all of which are not within the scope of work by PRC. Any site soils damage or other site improvements if damaged during installation are by owner. 2. If weather on site causes site delivery issues the delivery may have to be diverted to an offsite location and the additional costs will be a change order to the bid. Our staff works with the owner in advance to make sure sound decisions for delivery are made to avoid this issue. But sometimes owners take risks for weather but this risk is clearly at the owner’s risk not PRC. 3. Any trench plates needed for protection of site soils, sidewalks, or site utilities. 4. Sidewalks outside the building footprint. 5. Survey, excavation, and installation of the building pad and footings, if required, per our plans previously sent. 6. Soil conditions not suitable for bearing 1500 psf. If no soils testing report is available before bid, owner must verify site supporting soils at a minimum of 1000 psf are the least we can place our structures on or owner or engineer of record must design a foundation system to meet the imposed loads of site placement. 7. Improper water pressure, an undersized meter, or improper water volume flow to the building may necessitate a change order for the structure to install a 30 gallon pressure tank to provide the minimum flow rate and pressure. Building water service chlorination, post installation, is by owner, not PRC. 8. Building permits, a site survey, special inspection fees, minor trash removal, final utility connections to the onsite water, sewer and electrical are by others and since the building is fully inspected and tested in plant, minor plumbing leaks (if water is not available when building site work installation is completed,) is by others. Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 8 of 10 9. Our crane costs, which are included herein, are based on a maximum 35’ radius from the center pin of the crane to center point of the furthest building module roof. If additional distance requires a larger crane, additional costs may be assessed by the crane company and a change order will be sent to the owner. 10. The owner shall be responsible for minor shrink wrap trash for building delivery protection and minor site debris removal or a location for placement on site (nominally one pickup truck of shipping materials.) 11. Site Traffic Control: If applicable, shall be by Owner not PRC. Insurance and Prevailing Wage Certification: PRC shall comply with the required insurance requirements, wage reports, and safety requirements for the project, including OSHA regulations. Special Insurance to protect the Building before acceptance: As PRC requires payment for each month of off-site construction, and since the building is not on owner property where their insurance will cover the building, we provide a special policy that insures the property even when paid for off-site until the building is finally accepted by the owner. The policy provides the owner as additional insured during this period. PRC provides the Owner a policy rider to cover the building while it is being built off-site, while in transit to the job site, during and after it is installed on-site until final acceptance. This special policy covers the project up to $1,000,000. This exceeds the cost of our scope on this project. Errors and Omissions Insurance: Our firm employs licensed architects, engineers, and drafting staff to provide design of our buildings. Since these buildings are required to meet accessibility standards and building codes on site, and since we are the designer, we carry Errors and Omissions Insurance (E & O) to protect our clients from any errors. The policy covers a limit of up to $2,000,000 per occurrence and is more clearly explained in the insurance certificates we provide after receipt of a purchase order. WARRANTY PUBLIC RESTROOM COMPANY (Company) herein warrants that all work under this contract will be free from faulty materials and improper workmanship, except from proper and usual wear, and agrees to replace or repair, without cost to the Owner, all work found to be improper or imperfect, upon proper notice to the address stated below. Our Warranty is valid for 5 years from date of acceptance but shall be extended to 20 years for structural failure. Our extended warranties shall have no effect on any required Performance and Payment Bonds who’s Surety shall assume no liability to the Company, the Owner, or any third parties should Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 9 of 10 the Company fail for any reason to deliver acceptable maintenance warranties beyond the one year period. The warranty extension is solely between the owner and PRC and not the owner, bonding company, or architect/engineer of record. Our warranty is enforceable only if all work performed by Company has been fully paid, including change orders, if applicable. Company has no responsibility for vandalism, neglect, abuse, or improper maintenance of the final completed building. The warranties expressed herein are exclusive, and are in lieu of all other warranties expressed or implied, including those of merchantability and fitness. There are no warranties which extend beyond those described on the face of this Warranty. The foregoing shall constitute the full liability of the Company and be the sole remedy to the Owner. Term of Offer to Sell and Owner’s Acceptance: This offer is valid for acceptance within 30 days, or when a part of a public bid for the applicable duration imposed within the Owner’s bid documents. Acceptance is by approving our post bid preliminary notice to begin drawings subject to final owner approval of our submittals and receipt of a contract or a purchase order/contract. Special Notice of Possible Project Cost Increases as a Result of Late Payments: In the event of delayed or late payment, PRC shall have the right to remedies including late charges, overall project total cost increases, and other damages as allowed by applicable law. The contract price quoted herein is a discounted price based upon our receipt of progress payments as invoiced on the agreed billing schedule of PRC. In the event of non-payment, PRC will provide a 5 day written notice to cure and if payment is still not received, the discounted price for the payment due may increase, to an undetermined amount, to cover work stoppage, remobilization, cancellation of materials and subsequent restocking charges, resale of the contracted building to another party, storage fees, additional crane fees, travel and per diem costs for field crews, and any other cost applicable to the project, as allowed by law. Interest if applicable to non-payment will be assessed at the maximum amount allowed by law or 18% whichever is greater. Venue for Contract Jurisdiction: Public Restroom Company requires all contracts accepted by our firm to hold that the venue for legal jurisdiction for this contract offer and acceptance shall be Douglas County, Nevada. In the event of your default, PRC shall be entitled to the full amount due including reasonable attorney fees, costs, storage, expenses of physical recovery, and statutory interest, as allowed by law. Emerald Glen Park Concession Building, Dublin, CA | 11/8/2017| Reference #:10289-10-25-2017-1 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 10 of 10 No modifications to this offer shall be authorized unless confirmed in writing by the President of PRC. Offered by: Public Restroom Company by _________________________________ Charles E. Kaufman, President This provides conditional acceptance of this preliminary purchase order for this building subject to acceptance of the submittals, furnished by Public Restroom Company. Once you accept the preliminary submittals, this shall become a final purchase agreement or at your discretion the final purchase order or a contract may be substituted with this attached. Accepted by: _______________________________ _______________________________ Authorized Signature Date _______________________________ _______________________________ Printed Name Legal Entity Name and Address OVERVIEW FROM SEATING AREA VIEW FROM POOL DECK VIEW FROM COMMUNITY ROOM VIEW FROM PARKING LOT 0.49% B L D G . I N V 3 6 7 .0 0 6 "S S B L D G . I N V 3 6 7 .0 0 B L D G . I N V 3 6 7 .0 0 B L D G . I N V 3 6 9 . 5 0 B L D G . I N V 3 6 7 . 0 0 BLDG. INV369.50 BLDG. INV366.67 9LF8"SS BLDG. INV363.67 INV364.42 2"W1 "W INV368.94 INV368.63 INV368.88 INV369.18 10"SD 95LF 10"SD @0.42% 15"SD INV365.50 TWO 10"SD INV368.50 INV368.50 (E) 15"HDPE INV370.75 INV370.75 INV373.46 INV371.10 INV370.61 INV368.80 INV368.11 INV369.12 INV367.07 INV366.59 INV368.60 I N V 3 6 8 . 6 2 G R @ F G C D - 4 0 7 I N V 3 6 8 . 8 7 INV368.97 INV366.61 GR @ FG INV366.52 INV369.00 CAP 4"PVC SS 20LF 4"PVC SS@12.40% INV366.25 GR @ FG INV365.13 CD-407 INV366.05 80LF 4"PVC SS @1.41% 3 0 L F 4 "P V C S S @ 1 .5 6 %98LF 4"PVC SS@1.96% 6LF 4"PVCSS@2.00% INV367.18 INV367.65 INV368.88 INV369.00 145LF 4"SD@1.02% 209LF 6"SD@1.00% I N V 36 3. 0 3 ( E ) 1 5 " I N V 3 62 . 4 2 ± 52LF 6"SS@0.90% 99LF 6"PVC SS @ 1.23% INV362.25 100LF 6"PV C SS @ 7.98 % INV369.50 INV369.50 INV369.50 INV369.50 INV369.50 INV369.50 I N V 3 6 9 . 2 0 8"WL INV368.72 #5 EVAULT. TOP @ FG 2"W 6"FIRE 6" 4 "C W 6 "F IR E INV370.93 I N V 3 6 5 .5 0 INV368.40 I N V 3 6 9 . 0 0 C/O @ FGINV366.64 INV366.48 C/O @ FGINV365.87 INV365.85 INV365.57 INV370.15 INV371.13 INV369.70 INV370.45 INV370.45 INV371.13 INV370.13 INV367.41 INV370.40 B L D G . I N V 3 6 8 . 7 1 INV365.75 INV368.78 BLDG. INV369.50 INV369.07 INV370.07 INV370.30 INV370.03 INV369.59 INV366.91INV366.90 INV366.89 INV366.48 I N V 3 6 6 .3 1 INV365.82 INV365.56 INV365.50 INV368.82 I N V 3 6 5 . 2 8 11LF 6"SD @0.91% 92LF 8"SD @2.95% 4 0 L F 8 "S D @ 1 .0 8 % 14LF 8"SD @0.86% 2 8 L F 4 " S D 2 7 L F 8 "S D @ 1 .2 2 % 10LF 8"SD @1.10%3 3 L F 8 "S D @ 1 .5 8 %1 8 L F 4 " S D 57LF 8"SD @0.79% 2 L F 4 " S D @ 6 . 5 0 % 54LF 6"SD @0.65% 14LF 8"SD @0.71% 29LF 4"SD @2.86% 27LF 8"SD @0.63% 7LF 8"SD @0.86% 19 LF 4"SD 39LF 8"SD @1.10% 3 9 L F 8 " S D @ 0 . 8 1 % 11LF 8"SD @0.83% 2 9 L F 4 "S D @ 0 .9 4 % 3LF 8"SD@0.77% 60LF 4"SD @0.82% 5 9 L F 4 " S D @ 0 . 8 1 % 1 9 8 L F 1 5 " S D @ 0 . 2 7 % 1 98LF 1 5"SD @0.75% 8 9 L F 6 "S D @ 1 .0 0 % 21LF 15"SD @0.76% 23LF 6"SD@4.87% 30LF 6"SD @2.30% 5 4 L F 1 0 "S D @ 1 .9 3 % @ 0 . 7 7 % 30LF 10"SD @3.40% 11LF 6"SD @4.91% 67LF 12"SD @ 0.33% 23LF 12"SD @0.33% 1 7 L F 1 2 "S D @ 0 .3 3 % 5 8 L F 1 2 "S D @ 0 .3 3 % 14LF 6"SD @0.79% 6 7 L F 6 " S D @ 0 . 6 1 % 2 6 L F 8 " S D @ 0 . 6 5 % 1 1 0 L F 8 " S D @ 0 . 4 5 % 5 2 L F (T ) 3 4 L F 8 "S D @ 1 .5 3 % 3 0 L F 4 "S D @ 5 .6 3 % 7 1 L F 4 "S D @ 0 .3 9 %1 7 L F 4 " S D @ 0 . 4 1 % 1 2 L F 4 "S D @ 1 .0 0 % 4 " S D @ 1 0 % 8LF 4"SD@31.88% INV366.41W-12 2 14 4 5 12 INV369.53 12"SDINV368.00 SSCO @ FG @2.00% 8"SS @2% INV366.67 SSCO @ FG 7LF 4"SS @41.43% 14LF 4"SD @38.43% INV363.77 69LF 4"SS @4.79%WYE INV366.61 SSCO @ FG I N V 3 6 6 . 9 0 1 0 L F 4 " S S @ 2 . 0 0 % S S C O @ F G I N V 3 6 7 . 5 9 2 0 L F 4 " S S @ 4 . 8 5 % 9 5 L F 4 "S S @ 2 .0 0 %S S C O @ F G I N V 3 7 0 .1 6 94LF 6"SS @ 5.61% INV366.75 SSCO @ 372.00 141LF 6"SS @1.00% INV366.22 INV366.55 SSCO @ 372.00 S S C O @ F G WYE INV365.18SD INV366.67 WYE INV364.76 S S C O @ F G I N V 3 6 4 .6 8 1 0 4 L F 6 " S S @ 1 . 0 0 % 8 67LF 4"SD @0.52% 8"WL8"W L 3"F IRE S-10 S-10 S-2S-5 S-10 S-10 S-10 W-2 W-2 W-2W-2 W-6 W-13W-1 W-8 W-13 W-1 W-13 W-1 W-6 S-10 S-10 S -1 0 S -1 0 S -1 0 W-13 W-1 TYP W-13W-1 W-6 S -1 0 S - 1 0 S-10 S - 1 0 W-6 S-10 S-10 W-19 I N V 3 6 8 .0 0 8 "W I N V 3 6 6 .2 0 CL200 PIPE W-8 2"X2"X1" TEE 2" INV368.00 2"TEEINV369.10 8"W INV366.20 TOP BURY 371.95 INV367.38 INV367.31 W-12 INV365.78 6"F INV366.28 8"W INV366.20 8"W INV366.20 6"F INV366.28 8"W INV366.20 INV369.20 SD INV368.80 S D I N V 3 6 8 . 7 8 8 " W T O P 3 6 6 . 8 7 4"SD INV368.71 15"SD TOP366.68 6"W INV366.28 8 " W I N V 3 6 6 . 2 0 6 " 4" INV368.61 W INV369.52 SD TOP369.20 SD INV368.95 SS TOP368.38 9 11 13 1 8 " W L 8 " WL 8"WL 6 " F I N V 3 6 7 . 7 0 8 " S D T O P 3 6 6 . 9 2 4 "W I N V 3 6 8 .1 7 6 "S S T O P 3 6 5 .0 5 4 " W I N V 3 6 8 . 2 4 ( 1 1 . 2 5 ° B E N D ) 6 " F I N V 3 6 4 . 2 4 ( 1 1 . 2 5 ° B E N D ) 4 " W I N V 3 6 8 . 2 4 ( C A P ) 6 " F I N V 3 6 4 . 2 4 ( C A P ) 16 17 18 @ 4 . 7 8 % @ 3 . 9 3 % @2.00% B L D G . I N V 3 6 7 .0 0 8"W TOP366.87 ASS. INV353.73 IRRIGATION POINT OF CONNECTION (E) IRR RWL NEW PG&E XFMR.SEE ELECTRICALPLANS (E1.1) INV366.75 INV366.05 INV364.85 INV366.59 S-10 S-10 S-10 S-12A 3"W 15LF 6"PVCSS@2.00% S-10 S-10 S-10 S S @ 1 . 2 3 % 85LF 6"PVC SS@ 1.23% 50LF 6"PVC PVC SS @ 1.23.% INV369.48 22LF 4"PVC SS@2.00% INV369.92 W-12 INV366.28 6"FIRE INV369.17 26LF 4"SD @1.00%I N V 3 6 8 .9 1 3"FIRE 118LF 15" HDPE SD @ 3.03% 130LF 36" HDPE SD @0.10% GR @ FG INV363.00 CD-407 GR @ FG INV363.20 CD-407 6" 45° BEND INV363.68 8" WL 45° BEND INV361.80 8" WL 8"WL TOP364.92 4"SS INV366.11 8"WLINV364.25 8"WL INV364.25 8"W INV366.20 4"SD INV369.36 8"W TOP366.87 6"F INV366.28 8"W INV366.20 8 "W L 20 W-1 2"W W-2 W-2 W-19 W-1 W-23 3" DBL DETECTOR CHECK ASSMBLY W-13 W-1 W-13 W-7 FUT. BLDG SPRINKLER LINE W-1 W-13 FUT. FIRE HYDRANT 3"FIRE FUT. DOMESTIC WATER.DO NOT INSTALL METER.FUT. BLDG SPRINKLER LINE INV364.25 8"W INV364.20 4"SD INV366.00 8"W TOP365.02 8"WL 8"WL 8"WL 15"SD INV362.0± 8"W TOP361.00 8"W INV362.13 6"SS TOP361.13 W-20AW-22 W-23 8"WL W-13 W-1 INV369.25 INV368.45 INV368.14 77LF 4"SD @1.05% 24LF 4"SD @1.05% 29LF 4"SD @1 .05% @1.05% THREE (3) 36" HDPE PIPES (601LF TOTAL, NOT PERFORATED) TO SERVE AS A DETENTION FACILITY. STRAIGHT GRADE EACH PIPE FROM ITS LOWER END TO ITS UPPER END. BACKFILL WITH PEA GRAVEL AT 90% COMPACTION TO 6" OVER THE PIPES, INSTALL MIRAFI 140N FILTER FABRIC, THEN CONTINUE BACKFILLING WITH NATIVE MATERIAL AT 90% COMPACTION. SEE SHEET C6.3 FOR ADDITIONAL DETAILS FOR THIS BIO-DETENTION BASIN SEE SHEET C6.1 FOR ADDITIONAL DETAILS FOR THIS BIO-DETENTION BASIN SEE SHEET C6.2 FOR ADDITIONAL DETAILS FOR THIS BIO-DETENTION BASIN W-20A INV366.52 INV368.45 4" SD INV367.17 8"W TOP365.95 SS TOP365.47 SS INV366.19 SD TOP365.78 BLDG. INV369.50 INV369.50 U/D COTG I N V 3 6 9 .5 0U/D C O T G CONNECT U/D's I N V 3 6 9 .5 0U/D C O T G I N V 3 6 9 . 5 0 U / D C O T G I N V 3 6 9 . 5 0 U / D C O T G I N V 3 6 9 .5 0U/D C O T G I N V 3 6 9 .5 0U/D C O T G C O N N E C T U /D 's I N V 3 6 9 .5 0U/D C O T G I N V 3 6 9 .5 0U/D C O T G INV369.50 U/D COTG INV369.50U/D COTG 21 7 6 L F 4 " S D @ 0 . 8 3 % 8 6 L F 6 " P V C INV369.16 INV369.64 INV369.75 66LF 4"SD @0.95% #4 #5 #5AB #5A #6 #6AB #6A #6B # 7 #8 #12 #13 #14 #14A #15 #16 #16A #17 #18 #22 #23 #24 #25 #26 #26A #27 #28 #28 #2 9 #30 #29A # 3 0 A #31 #32 #38 #39 #39A #40 #41 #42 #42A #43 #44A #45 #46 #4 5 D #45C #45CA #45B #45BA #4 5 A #4 5 C B #4 5 D A #47 #48 #49 #49A #49B 13LF 4"SD@1.23% #46 #50 #48A #3 #29B #52 7 3 L F 4 "S D @ 2 .4 1 % 2"W W-8 W-19 W-21 1 1 L F 8"W INV362.13 13LF 4"SD 9 4 L F 4 "S S @ 2 .0 0 % S S C O @ F G I N V 3 6 7 .8 3 S -1 0 6 6 L F 4 " S D 6" 10 C/O @ FG C /O @ F G U /D C O T G 6 6 L F 6 " S S @ 1 . 0 0 % PIV 2" 4" 5 .0 0 ' 5 .0 0 ' 5.00' R=392' R=392' R=592' R = 5 9 2 ' R = 3 5 2 ' R=352' R=492' R =4 9 2 ' 72° BEND 25° BEND R=200' R=362.25' 1" 2" 2" 2" W-13 W-13 1"W-19 1" FUT. DOMESTIC WATER. DO NOT INSTALL METER. W-1 2" 2"1" 1" 1"W-21 2" INV369.50 2" 2" S E E L A N D C A P E P L A N S 23 17LF 4"PVC SS @ 3.16% 43LF 4"PVC SS @ 3.16% 38LF 4"PVC SS @ 3.16% 5LF 4"PVC SS @ 3.16% D C B A INV369.76 C/O @ FG CAP GAS FORFUTURE USE CAP GAS FORFUTURE USE HDPE PIPE SHALL BE ADS, OR APPROVED EQUAL, AND CONFORM TO ASTM F2306. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR APPROVAL PRIOR TO INSTALLATION. 24 I N V 3 6 7 . 4 0 4 "CW IN V 36 8 .2 5 6 "F I R E I N V36 7 .1 2 25 4 2 L F 4 " S D @ 0 . 5 2 % THIS 4"SD UNDER DRIVEWAY TO BE SDR26 8"W INV362.5030"SD TOP361.50 26 2 C6.2 U/D COTG INV368.20 U/D COTGINV368.05 4 "S D I N V 3 6 6 .9 8 6 "S S T O P 3 6 5 .2 1 POTABLE POTABLE 2 0 ° B E N D NO JOINTS IN SS FOR 10' ON BOTH SIDES OF 8"W. USE CLASS 200 (DR14 PER AWWA C900) FOR SS, CENTERED OVER THE 8"W. 4"SS TO BE SLEEVED WITH 8"PVC SDR26, CENTERED OVER THE CROSSING; FILL SLEEVE WITH CONTROLLED DENSITY FILL. 8"W PIPE SEGMENT ALSO TO BE CENTERED ABOUT THE CROSSING. 69LF TWIN 10"SD @0.45% 15LF TWIN 10"SD @0.87% 8 1 LF 1 5 " S D @ 0 . 2 7 % 9 3 L F 1 2 " S D @ 0 . 6 5 % 94LF 10"SD @0.30% IRRIGATION IRRIGATION 40LF 6"SS @ 10.03 % B L D G . I N V 3 6 7 .0 0 W Y E I N V 3 6 5 .4 6 S -1 0 S S C O @ F G . 4 " S S 141LF 6"SS @1.00% S S C O @ F G WYE I NV365. 34 S - 1 0 W-1 W-13 8"WL 6"FIRE 8"WL W-22 WITH TRAFFICLOADING BOX AND R=500' 6"FIRE 45° BEND DOWN8"W INV362.50 45° BEND UP8"W INV361.08 45° BEND DOWN8"W INV 362.50 45° BEND UP8"W INV 358.50 90° BEND INV 361.08 8"INV 361.08 15"SD TOP 361.036"W INV 362.03 4"SS INV 365.066"W TOP 362.53 45° BEND DOWN 6"W INV 362.03 45° BEND UP 6"W INV 361.16 REMOVE (E) 24" HDPE STUBAND CONNECT NEW 15" SDTO (E) MH. INV 359.30±. 11 C2.2 3"CW 3 "C W MINIMUM 1' CLEARAT ALL CROSSINGS 3"CW INV363.706"W TOP 362.53 4" 2" METER 3" BFP 3"CW 15"SD TOP 361.303"CW INV 363.70 4"SS INV 365.513"CW TOP 364.18 30"SD TOP 361.713"CW INV 362.71 INV362.03 INV354.27 INSTALL SAMPLINGMANHOLE PER DSRSDDETAIL S-11 INV354.03; RIM AT FG CONNECT TO (E) 6"SS 12LF 6"PVCSS@2.00% THREE VALVES REMOVE TREES AS REQUIRED 58LF 4" PERF PIPE. MATCH INVERTS OF DETENTION PIPES. R = 7 4 5 ' L = 9 4 ' 25°± BEND 20°± BEND L=96' R=745' 4 " U / D ' s I NV 3 6 5 . 6 4 U /D C O T G I N V 3 6 5 .9 0 U / D C O T G INV366.25 U/D COTG 1 5 L F 8 " S D @ 1 . 0 8 % I N V 3 7 0 .3 2 6 3 L F 4 " S D @ 2 . 0 0 % INV 371.58 RISER 376.20 30LF 4"SD @ 1.12% INV 370.79 RISER 374.80 3 4 L F 8 " S D @ 0 . 8 1 % I N V 3 6 9 . 4 8 1 0 L F 4 " S D @ 2 . 0 0 % 2 3 L F 4 "S D @ 0 .5 2 % I N V 3 6 9 . 6 0 R I S E R 3 7 3 . 5 2 INV 369.68 RISER 374.10 4 "S D @ 3 .0 0 % I N V 3 6 8 .2 1 I N V 3 6 7 .7 1 @ 8 .1 4 %1 4 L F 4 "S D 3 I N L E T S A L L I N V 3 6 8 . 8 5 W Y E S I N T O S I N G L E L I N E . R I S E R S T O E L E V 3 7 3 . 3 5 @ 6 .3 3 %9 L F 4 "S D SEE ARCHITECTURAL PLANS FOR PLINTH INLET. PROVIDE RISER TO ELEVATION SHOWN; TO BE TRIMMED TO GRATE ELEVATION DURING PLINTH INSTALLATION. 1 1 1 1 1 INV 368.78 RISER 373.28 1 1 1" NEW 1" GAS LINE AT 1/4 LB PRESSURE BY CONTRACTOR FOR FIRE PIT STUB OUTS NEW 1" GAS LINE AT 1/4 LB PRESSURE BY CONTRACTOR FOR FIRE PIT STUB OUTS 3" 3" 3" 3" CAP GAS FOR FUTURE 3" 1" 1 " SD I N V 3 6 7 . 8 3 I N V 3 6 7 . 0 4 I N V 3 6 6 . 3 7 I N V 3 6 6 . 0 8 I N V 3 6 6 . 5 8 I N V 3 6 7 . 0 1 I N V 3 6 7 . 8 3 1 1 L F 4 " S D @ 6 . 1 1 % 1 1 L F 4 " S D @ 6 . 1 1 % 2 1 L F 4 " S D @ 3 . 8 9 % 1 1 L F 4 " S D @ 3 . 8 9 % 1 3 L F 4 " S D @ 3 . 8 9 % 1 0 L F 4 " S D @ 3 . 8 9 % 1 -S E E F O R D E T A I L S F O R T H I S P E R F O R A T E D S E C T I O N R E F E R T O 8 /S 1 .1 F O R P I P E A N D F O O T I N G C L E A R A N C E R E Q U I R E M E N T S T U D U D U D U D U D U D U D U D 2 "C W 2 " C W 4 "S S 369 2'-0" CLR. 6 " F I N V 3 6 7 . 0 0 ( C A P ) V A N NO PARKING N O PARKI NG NO PARKING VAN V P LE V VP VP VP LE V LEV LEV VP VP VP VP VP VP VP VP VP VP LEV LEV NOPARKING NO PARKING VP VP V P VP N O P A R K I N G LEV LEV LEV LEV LEV VP VP VP VP VP ELECTRIC VEHICLE CHARGING STATION ELECTRIC VEHICLE CHARGING STATION ELECTRIC VEHICLE CHARGING STATION ELECTRIC VEHICLE CHARGING STATION ELECTRIC VEHICLE CHARGING STATION ELECTRI C VEHICLE CHARGI NG STATION ELEC TRI C VE H ICLE CHARGI NG ST ATI ON ELECTRIC VEHICLE CHARGING STATION ELECTRIC VEHICLE CHARGING STATION LEV LEV LEV LEV LEV VAN NO PARKING VAN N O P A R K I N G ELECTRICVEHICLECHARGINGSTATIONNO PARKING NO PARKING BBBB B B B B 2 A B 1 C 2 A B 1 C GROUPBX GFI GFI GFI LP-31 LP-29 LP-27 GFI LP-25 LP-25 GFI GFI LP-31 LP-27 GFI GFI LP-29 GFI LP-27 GFI LP-25 J J J J J J J J J J J J J J J J J J J J J J J J J J J LS-5 PANEL 'LS' -SEE E5.1 LS-27 (#10) LS-29 (#10) LS-10(#10) LS-10 LS-10 LS-4,6 LS-2,4 LS-2,4 LS-4,6 LS-4,6 LS-2,4 LS-2,4 LS-8 (#10) LS-2,4 LS-18 55LB-55 (#10) 55 55 55 8 18 18 18 16 16 16 16 LS-16,18 (#10) 20 20 20 20 LS-20 (#10) G FI8 G FI 8 G FI8 GFI8 G FI8 J J J J J FIRE LANE (E) POOL STORAGE BUILDING (E) COMPETITION POOL (E) SLIDES (E) ACTIVITY POOL (E) AQUATICS CENTER BUILDING UTILITY SITE PLAN NOTES • CONTRACTOR TO VERIFY ALL UTILITY POINT OF CONNECTION LOCATIONS PRIOR TO BEGINNING WORK. CONTRACTOR TO NOTIFY OWNER AND DESIGN TEAM OF ANY CONFLICTS OF UTILITY LOCATIONS. SITE PLAN SYMBOLS SCOPE OF WORK BOUNDARY 1/4" 1/2" 1" 2" 1 4 8 16 SCALE: 1/8" = 1'-0"SCALE: 1 = 1 1 2 4 8 SCALE: 1/4" = 1'-0" 1 4 8 16 SCALE: 3/32" = 1'-0" 1 2 4 SCALE: 3/16" = 1'-0" 812 SCALE: 3/8" = 1'-0" 412 SCALE: 1/2" = 1'-0" 414816 SCALE: 1/16" = 1'-0" 32 TRUE NORTH PROJECT NORTH JOB NO. DRAWN CHECK SHEET 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 N O T F O R C O N S T R U C T I O N SEAL / SIGNATURE CONSULTANT 11/7/2017 5:34:50 PM A1.1 562.015 Author Checker REFERENCE SITE UTILITY PLAN EM E R A L D G L E N P A R K - C O N C E S S I O N B U I L D I N G 4201 CENTRAL PARKWAY DUBLIN, CA 94568 ISSUE SET 00.00.00 REVISIONS 1" = 30'-0" 1 REFERENCE SITE PLAN FLOOR PLAN GENERAL NOTES • WALL HEIGHTS TYPICAL TO BOTTOM OF FLOOR OR ROOF FRAMING EXCEPT WHERE INDICATED ON PRE- MANUFACTURED BUILDING DESIGN CONSULTANT DRAWINGS • ALL SHEATHING SURFACE PLANES TO BE CONTINUOUS. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED AND SANDED SMOOTH WITH NO VISIBLE JOINTS. THE CONTRACTOR SHALL PATCH AND REPAIR ALL SURFACES TO MATCH ADJACENT OR ADJOINING SURFACES WHEREVER REQUIRED. • PROTECT FROM FREEZING, INSULATE AND WRAP ALL PLUMBING AND FIRE SPRINKLER PIPES, FITTINGS AND OTHER ITEMS EXPOSED TO AN EXTERIOR WALL/ SOFFIT OR ROOF SURFACE. • PRE-MANUFACTURED BUILDING DESIGN CONSULTANT TO COORDINATE EXACT LOCATION AND DESIGN OF FLOORING AND EQUIPMENT LAYOUT WITH OWNER PRIOR TO INSTALLATION. • PROVIDE FIRE BLOCKING AND DRAFT STOPPING AT ALL UNSPRINKLERED COMBUSTIBLE CONSTRUCTION IN STUD WALLS, CONCEALED SPACES, FURRED AREAS (10'-0" MAX. HORIZONTAL AND VERTICAL INTERVALS) AT FLOOR / CEILING AND ROOF / CEILING AND OTHER LOCATIONS PER CBC 717.2 • FOR INTERIOR FINISHES, SEE FINISH SCHEDULE FE FLOOR PLAN SYMBOLS 5'-0" DIA. WHEELCHAIR CLEARANCE 30" X 48" WHEELCHAIR CLEARANCE WALL TYPE -SEE PARTITION SCHEDULE A9.2 101 WINDOW TYPE -SEE SCHEDULE A7.1 DOOR TYPE -SEE SCHEDULE A7.1 ROOM NUMBER 101 WALL FRAMING, SEE PARTITION SCHEDULE SEMI RECESSED FIRE EXTINGUISHER CABINET WITH CLASS K FIRE EXTINGUISHER. 1 W 6 A A CR CARD READER, SEE HARDWARE INFORMAITON AND SPECIFICAITONS 110 GFCI EXTERIOR OUTLET WITH LOCKABLE COVER, U.N.O. SLAB PLAN SYMBOLS HB WATER CONNECTION TYPICAL FLOOR SINK, SEE PRE- MANUFACTURED BUILDING DESIGN CONSULTANT HOLE IN SLAB FOR FLOOR SAFE, CONTRACTOR TO PROVIDE AND INSTALL FLOOR SAFE CURB, CMU BLOCK CUT TO 3" WITH 1/2" MORTAR BED SLAB PLAN GENERAL NOTES • FOR UNDERGROUND UTILITY LOCATIONS SEE SITE PLAN SHEET A1.1 • FOR ALL FINISH GRADES, S.L.D. • VERIFY LOCATION AND HEIGHTS OF HARDSCAPE SLABS WITH LANDSCAPE PRIOR TO SETTING BUILDING PAD. 1 1 A A B B C C 2 2 HB 28 ' - 0 " 6'- 0 " 5'-6 1/4" 5'-2" 14'-7 19/32" 29'-0" 14 ' - 0 " U.N.O. 7 5/8" TYP. CONTRACTOR TO PROVIDE AND INSTALL FLOOR SAFE, SEE EQUIPMENT SCHEDULE SHEET A2.3 A5.1 A5.1 A8.1 2C 4 2 1 1 A A A5.1 1 A5.13 2 A6.1 2 A6.1 3 A6.1 3 A6.1 2B 2A 2D B B C C 2 2 1 A6.1 1 A6.1 A8.1 1A 1B 1C 1D 2'-4"19'-7"6'-9" 1'- 9 " 9'- 9 " 2'- 6 " 14 ' - 0 " 28'-8" - W 6 A - W 4 A - W 6 A 9'- 9 " F.E.C. - W 4 A (E) FENCE, TYP. 125 101-2 125 101-1 125 101-3 1 2 CT-21 28'-8" 3 14 ' - 0 " 14 ' - 0 " 486 SF CONCESSIONS 101A CR 22.01 22.02 22.02 22.03 22.03 22.03 22.04 22.04 A7.1 2 A7.1 3 A9.2 25 W 6 A FINISH PLAN NOTES • SEE FLOOR PLAN AND INTERIOR ELEVATION FOR FINISH MATERIALS. • ALL FLOORS TO BE CT-21, U.O.N. • ALL CEILING TO BE FRC-1, U.O.N. • PAINT LAYERING: (1) PRIMER; (2) PAINT COLOR • PROVIDE PAINT BRUSHOUTS TO ARCHITECT FOR REVIEW PRIOR TO START OF WORK. • PROVIDE FINISH SAMPLES OF ALL TILE & GROUT TO ARCHITECT FOR REVIEW PROIR TO PURCHASE AND INSTALLATION. • ALL ELECTRICAL COVER PLATES ON ACCENT WALLS SHALL BE PAINTED TO MATCH ACCENT WALL • THROUGHOUT KITCHEN, SLOPE TILE FOR POSITIVE DRAINAGE TO FLOOR DRAINS, MIN. 1/16" PER FOOT • ALL RECESSED WALL CABINETS SHALL BE PAINTED TO MATCH ACCENT WALL. FINISH: SEMI-GLOSS • FOR WALL FINISH INFORMATION NOT SHOWN SEE INTERIOR ELEVATIONS • FOR CEILING FINISH INFORMATION SEE REFLECTED CEILING PLAN FINISH PLAN SYMBOLS INTERIOR FINISH MATERIAL, SEE A7.1CT-21 TRUE NORTH PROJECT NORTH JOB NO. DRAWN CHECK SHEET 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 N O T F O R C O N S T R U C T I O N SEAL / SIGNATURE 11/7/2017 5:34:54 PM A2.1 562.015 LM GM SLAB PLAN FLOOR PLAN EM E R A L D G L E N P A R K - C O N C E S S I O N B U I L D I N G 4201 CENTRAL PARKWAY DUBLIN, CA 94568 ISSUE SET 00.00.00 1/4" = 1'-0" 2 SLAB PLAN 0 8 164 0 8 164 REVISIONS 1/4" = 1'-0" 1 FLOOR PLAN KEYNOTE LEGEND 22.01EXTERIOR OUTLET WITH LOCKABLE COVER 22.02ELECTRICAL TO BLANK COVER PLATE 22.03COVER PLATE AT 5' ELEVATION ON WALL 22.04DOWNSPOUT PROVIDED BY PRE-MANUFACTURED BUILDING DESIGN CONSULTANT 1 1 A B C 2 2 14 ' - 0 " 14 ' - 0 " EQ - 21 EQ - 04 EQ - 02 EQ - 30 29 36 36 EQ - 28 EQ - 35 EQ - 01 EQ - 34 EQ - 03 EQ - 18 SINGLE HOOD ABOVE SERVING GRILL AND FRYERS EQ - 16 EQ - 22 EQ - 23 28 ' - 0 " EQ - 01 WINDOW A PICK-UP FOOD WINDOW B ORDER FOOD EQ - 20 WINDOW C ORDER AND PICK-UP FOOD EQ - 02 (E) FENCE, TYP. EQ - 25 EQ - 34 EQ - 34 EQ - 32 EQ - 31 EQ - 02 EQ - 11EQ - 07EQ - 05 EQ - 38 EQ - 12 EQ - 08 EQ - 15 EQ - 14 EQ - 13 EQ - 06 EQ - 19 EQ - 18 EQ - 26 EQ - 27 ON SHELF ABOVE COUNTER EQ - 09 5'-0" EQ - 39 5'-6" EQ - 14 EQ - 17 EQ - 10 EQ - 10 4'-0"4'-0"4'-11"4'-0"11'-9" EQ -10 EQ - 37 EQ - 37 40 EQ - 01 I.T. EQ - 41 MIN. 1'- 0 " UTILITY EQ - 42 EQ - 43 16 ' - 6 " 9'- 9 " 1'- 9 " EQ - 10 28'-8" EQ -24 ELECTRICAL PANEL, PROVIDED BY PRE-MANUFACTURED BUILDING DESIGN CONSULTANT EQUIPMENT PLAN NOTES • O.F.O.I. OWNER FURNISHED OWNER INSTALLED • V.F.V.I. PRE-MANUFACTURED BUILDING DESIGN CONSULTANT FURNISHED, PRE- MANUFACTURED BUILDING DESIGN CONSULTANT INSTALLED • C.F.C.I.CONTRACTOR FURNISHED CONTRACTOR INSTALLED 1 2 SCALE: 1/2" = 1'-0" 4 TRUE NORTH PROJECT NORTH JOB NO. DRAWN CHECK SHEET 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 N O T F O R C O N S T R U C T I O N SEAL / SIGNATURE CONSULTANT 11/7/2017 5:34:56 PM A2.3 562.015 LM GM EQUIPMENT PLAN AND SCHEDULE EM E R A L D G L E N P A R K - C O N C E S S I O N B U I L D I N G 4201 CENTRAL PARKWAY DUBLIN, CA 94568 ISSUE SET 00.00.00 1/2" = 1'-0" EQUIPMENT PLAN 0 8 164 PLUMBING FIXTURES TYPE MARKMANUFACTURERMODEL DESCRIPTION TYPE COMMENTSCOMMENTS 29 ADVANCE 9-0-20 AND K240 MOP SINK WITH MOP RACK K-242V.F.V.I. 36 WATTS FS-7128 Inch Square x 6 Inch Deep Sanitary Floor Sink V.F.V.I. 36 WATTS FS-7128 Inch Square x 6 Inch Deep Sanitary Floor Sink V.F.V.I. 40 ADVANCE 94-K6-54-18D CORNER TWO DRAIN BOARDS V.F.V.I. REVISIONS SPECIALTY EQUIPMENT TAG NO.DESCRIPTION MANUFACTURERMODEL NO.NOTES COMMENTS EQ - 01CASH REGISTER --PROVIDE POWER AND WIRED INTERNET CONNECTION O.F.O.I. EQ - 02TRASH CAN RUBBERMAIDFG354060GRAY23 GAL SLIM JIM, GRA C.F.C.I. EQ - 03PRETZEL HOLDER --J&J SNACKFOODS O.F.O.I EQ - 04COUNTER TOP SOFT SERVE MACHINE SPACEMAN6235AH O.F.O.I. EQ - 05COFFEE MACHINE BUNN SH-DUAL-DBC-00 00 C.F.C.I. EQ - 06CUSTOM SS COUNTER (NO BACKSPLASH) PEACH CULINARYCUSTOMCUSTOM 42" HIGH SS COUNTERTOP WITH SHELVES BELOW (NO BACKSPLASH C.F.C.I. EQ - 07PLASTIC UTENSILS, STRAWS, ETC DISPENSER ---O.F.O.I EQ - 08CUSTOM SS SERVING COUNTER PEACH CULINARYCUSTOM30" X 78" SS COUNTER WITH 1 SHELF BELOW AND 1 SHELF ABOV C.F.C.I. EQ - 09HEAT LAMP --C.F.C.I. EQ - 10WALL SHELVES JOHN BOOSEWS8-1296 V.F.V.I. EQ - 111 CU. FT. PROGRAMMABLE MICROWAVE AMANA RC22S2 C.F.C.I. EQ - 12CUSTOM SS COUNTERTOP (WITH BACKSPLASH) PEACH CULINARYCUSTOMCUSTOM LENGTH SS COUNTER C.F.C.I. EQ - 13FUNNEL CAKE FRYER PARAGON INTERNATIONAL PARAFRYER 4400 C.F.C.I. EQ - 14COUNTER TOP FRYERGLOBE PF16E C.F.C.I. EQ - 1536" ELECTRIC COUNTER TOP GRIDDLE GMCW EL1636 C.F.C.I. EQ - 16PANINI PRESS SIRMAN CORT LL O.F.O.I EQ - 17SANDWICH TABLE TURBO AIRMST-72 C.F.C.I. EQ - 18HAND SINK Advance Tabco7-PS-87-1X V.F.V.I. EQ - 19PRODIGY PLUS ICE MACHINE 356LB PRODUCTION SCOTSMANC0322 WITH MODULAR BIN B9485 (ALLOWS FOR FUTURE EXPANSION TO DOUBLE PRODUCTION) C.F.C.I. EQ - 20SODA TOWER -8V_KO MAY REQUIRE SS TABLE BELOW O.F.O.I EQ - 21BIB RACK --O.F.O.I EQ - 22WORK TABLE (WITH BACKSPLASH) 24" X 48" --C.F.C.I. EQ - 23PREP SINK WELDED ON WORK TABLE ADVANCE (1) TA-11B SINKS V.F.V.I. EQ - 24TYPE I HOOD V.F.V.I. EQ - 25UNDER SINK GREASE INTERCEPTOR --V.F.V.I. EQ - 26CUSTOM SS COUNTER--20" X 28" SS COUNTER WITH 1 SHELF BELOW C.F.C.I. EQ - 27WATER HEATER --V.F.V.I. EQ - 28CHEMICAL UNIT --O.F.O.I EQ - 30FLY FAN BERNER ASR-1-36 V.F.V.I. EQ - 313 DOOR FRIDGE TURBO AIRM3R72-3 C.F.C.I. EQ - 322 DOOR FREEZER TRUE T-49F C.F.C.I. EQ - 34DRY GOOD STORAGE NEXEL S1848Z 18x48 C.F.C.I. EQ - 35CO2 --O.F.O.I EQ - 37UNDER COUNTER FREEZERTRUE TUC - 60F - HC C.F.C.I. EQ - 38STAINLESS STEEL STORAGE CABINET ADVANCE TABCOHDRC-306 C.F.C.I. EQ - 39CUSTOM SS COUNTER ON ROLLERS --18" X 60" SS COUNTER WITH 1 SHELF BELOW C.F.C.I. EQ - 411 DOOR FRIDGE TRUE T-23-HC C.F.C.I. EQ - 42LARGE FLOOR SAFE PROTEX SAFE COIF-2500C C.F.C.I. EQ - 43IT RACK --C.F.C.I. 8 INCH SQUARE X 6 INCH DEEP SANITARY FLOOR SINK 8 INCH SQUARE X 6 INCH DEEP SANITARY FLOOR SINK ADVANCE EQ -# # ELEVATION GENERAL NOTES • SEE FINISH SCHEDULE FOR EXTERIOR FINISH MATERIALS • PAINT ALL EXPOSED MATERIAL SURFACES • ALL EXTERIOR FINISH TO BE U.O.N. • ALL EXTERIOR PAINT TO BE U.O.N. • ALL ROOFS TO BE U.O.N. • ALL GUTTER AND DOWNSPOUTS TO BE PAINTED TO MATCH ADJACENT SIDING • FOR FINISHES RELATED TO HARDSCAPE AND SITE ACCESSORIES S.L.D. • FOR ALL DOORS AND WINDOWS SEE SCHEDULE • FOR ALL T.O.R., T.O.W. AND T.O.P. HEIGHTS SEE ROOF PLAN • FOR TYPICAL PLASTER EXPANSION JOINTS, CENTER AT OPENINGS AND ALIGN WITH ARCHITECTURAL FRAMING. • ALL MECHANICAL VENT/LOUVERS ARE TO BE FLAME AND EMBER RESISTANT CP-1 PNT-1 RF-1 GROUND FLOOR 0" ROOF 9'-0" TOP OF PARAPET 12'-4" 1 3 A6.1 FCB-2 CP-1 PNT-1 TY P . 4'- 0 " 2 PNT-3 FCB-2 FCB-2 CP-2 PNT-4 1'- 0 " 8'- 8 1 / 2 " 3 1 / 2 " 2 A9.2 11 A9.2 SIM TYP. 2" GROUND FLOOR 0" ROOF 9'-0" TOP OF PARAPET 12'-4" 1 3 A6.1 FCB-1 CP-1 PNT-1 TY P . 4'- 0 " 2 CP-1 PNT-2 FCB-1 FCB-1 FCB-1 GROUND FLOOR 0" ROOF 9'-0" TOP OF PARAPET 12'-4" A2 A6.1 FCB-1 CP-1 PNT-1 BC1 A6.1 FCB-2 FCB-2FCB-2 CP-1 PNT-4 1'- 0 " 8'- 1 0 " GROUND FLOOR 0" ROOF 9'-0" TOP OF PARAPET 12'-4" A 2 A6.1 FCB-1 CP-1 PNT-1 FCB-2 TY P . 4'- 0 " B C 1 A6.1 PNT-2 FCB-2FCB-2 1 4 8 16 SCALE: 1/8" = 1'-0"PROJECT NORTH JOB NO. DRAWN CHECK SHEET 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 N O T F O R C O N S T R U C T I O N SEAL / SIGNATURE CONSULTANT 11/7/2017 5:34:56 PM A5.1 562.015 LM GM EXTERIOR ELEVATIONS EM E R A L D G L E N P A R K - C O N C E S S I O N B U I L D I N G 4201 CENTRAL PARKWAY DUBLIN, CA 94568 ISSUE SET 00.00.00 1/4" = 1'-0" 1 NORTH 1/4" = 1'-0" 2 SOUTH 1/4" = 1'-0" 3 EAST 1/4" = 1'-0" 4 WEST 0 8 164 0 8 164 0 8 164 0 8 164 REVISIONS Budget Change Reference #: From Un-Appropriated Reserves X Budget Transfer Between Funds From Designated Reserves Other Account Amount Account Amount pk0105.9400.9402 - Improvements $1,300,000 3500.9501.49999 (Transfers In)$1,300,000 pk0105.4105 (4105.9501.89101) - PFF - Community Buildings - Transfers Out $1,100,000 pk0105.6605 (6605.9501.89101) - IT Fund- Transfers Out $150,000 pk0105.2212 (2212.9501.89101) -ACTC Vehicle Registration Fee - Transfers Out $50,000 11/21/2017 Posted By:Date: As Presented at the City Council Meeting **********Finance Use Only********** CITY OF DUBLIN Purchase of a pre-manufactured concessions building and closeout of the original improvements are funded by Public Facilities Fund; fiber network connection between the Civic Center and the Wave is funded by the Information Technology Fund and ACTC - Vehicle Registration Fee Fund. REASON FOR BUDGET CHANGE FISCAL YEAR 2017-18 BUDGET CHANGE FORM DECREASE BUDGET AMOUNT INCREASE BUDGET AMOUNT City Council's Approval Required EXP: Emerald Glen Recreation and Aquatic Complex - Improvements \\cc-uem\users\carolines\appdata\roaming\iqm2\minutetraq\dublinca@dublinca.iqm2.com\work\attachments\2701 2701