Loading...
HomeMy WebLinkAboutFebruary 6, 2018 Sp Mt Staff ReportPage 1 of 3 STAFF REPORT CITY COUNCIL DATE: February 6, 2018 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Study Session: Ashton at Dublin Station (Transit Center Site A-3) Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 (PLPA 2017- 00036) Prepared by: Martha Battaglia, Associate Planner EXECUTIVE SUMMARY: The City Council will hold a Study Session to review the proposed Ashton at Dublin Station project. The proposed project includes 220 residential units and related amenities including a fitness center, pool, roof top lounge, and structured parking on the 2.36-acre A-3 site at the Dublin Transit Center. The application by the property owner, Ashton at Dublin Station, includes a Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit and Tentative Condominium Map. The City Council will review the proposed project and provide feedback and direction to Staff and the Applicant. STAFF RECOMMENDATION: Receive presentations by Staff and the Applicant, and provide feedback regarding the proposed development. Background The proposed Ashton at Dublin Station project is located at the northwest corner of DeMarcus Boulevard and Campbell Lane within the Transit Center as shown in Figure 1 below. The site has a General Plan and Eastern Dublin Specific Plan land use designation of High Density Residential (25+ units per acre) and Planned Development Zoning with a Stage 1 Development Plan that permits a high density residential development. The subject site is surrounded by residential developments on three sides, as shown in Table 1 below. Page 2 of 3 Figure 1. Vicinity Map Table 1. Surrounding Land Uses LOCATION ZONING GENERAL PLAN LAND USE CURRENT USE BUILDING HEIGHT* North PD High-Density Residential Camellia Place (112 units) 55’3”; 4 stories (3 stories over 1 level parking) South PD Public/Semi-Public PG&E Substation N/A East PD High-Density Residential Elan (257 multi-family townhomes & condominiums) 85’ to peak of elevator tower, 79’ to main roofline; 7 stories above grade (5 stories + mezzanine over 2 levels of parking (1 level is subterranean)) West PD Medium-High Density Residential Tribeca (52 townhomes) 37’; 3 stories * Note: Correction to building heights originally listed in the Planning Commission Staff Report dated 11/14/17. The applicant is requesting approval to construct a 220-unit apartment community and related amenities which include a fitness center, pool, roof top lounge, and 331 structured parking spaces. The proposed project includes 3, 4 and 5 story elements that are over 2 levels of parking, and vary in height from 61 feet to 83 feet at the peak of the tallest roof element. The project plans are included as Attachment 1 to this Staff Report. The following is a brief overview of the requested entitlements. Please refer to the Planning Commission Staff Report dated November 14, 2017 for a complete discussion of the proposed project (Attachment 2). Page 3 of 3 • Planned Development Zoning - Planned Development Rezone with a related Stage 2 Development Plan. • Site Development Review Permit - To construct a 220 unit apartment project, with related amenities consisting of a fitness center, pool, roof top lounge and structured parking with 331 spaces. • Tentative Map 8437 - For condominium purposes. On December 5, 2017, the City Council held a Public Hearing to consider the proposed project (Attachments 3). The City Council directed Staff to prepare a resolution of denial for consideration at a future meeting. Subsequently, the applicant requested to delay further consideration in order to give the applicant time to prepare refined design documents and supplemental information to address the concerns expressed by the City Council. On January 9, 2018, the City Council directed Staff to schedule a Study Session to further discuss the project. Tonight the City Council will hold a Study Session to review the proposed project and provide Staff and the applicant with direction. PUBLIC NOTICING: Although not required for this meeting, a public meeting notice was mailed to all property owners and occupants within 300 feet of the proposed project and posted at several locations throughout the City. A copy of this Staff Report was provided to the applicant and was made available on the City’s webpage. ATTACHMENTS: 1. Project Plans 2. Planning Commission Staff Report dated November 14, 2017 without attachments 3. City Council Staff Report dated December 5, 2017 without attachments c BA R C O P Y R I G H T ar c h i t e c t s 8/28/2017 4:25:53 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt A 0 0 - C O V E R S H E E T DU B L I N S T A T I O N EN T I T L E M E N T S R E S U B M I T T A L SI T E D E V E L O P M E N T R E V I E W ( S D R ) PL A N N E D D E V E L O P M E N T Z O N I N G D I S T RI C T S T A G E 2 D E V E L O P M E N T P L A N AU G U S T 2 9 T H , 2 0 1 7 TE L : CO N T A C T : EM A I L : AR C H I T E C T : 90 1 B A T T E R Y S T R E E T , S U I T E 3 0 0 SA N F R A N C I S C O , C A 9 4 1 0 5 (4 1 5 ) 2 9 3 - 5 7 0 0 DA V I D I S R A E L di s r a e l @ b a r a r c h . c o m BA R A R C H I T E C T S TE L : CO N T A C T : EM A I L : CI V I L E N G I N E E R 46 7 0 W I L L O W R O A D , S U I T E 2 5 0 PL E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 3 9 6 - 7 7 5 1 ER I C G I R O D eg i r o d @ b k f . c o m BK F TE L : CO N T A C T : EM A I L : LA N D S C A P E A R C H I T E C T : 23 2 5 3 R D S T R E E T SA N F R A N C I S C O , C A 9 4 1 0 7 (4 1 5 ) 4 3 1 - 7 8 7 8 DA V I D F L E T C H E R df l e t c h e r @ f l e t c h e r s t u d i o . c o m FL E T C H E R S T U D I O AS H T O N A T D U B L I N S T A T I O N , L L C BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/29/2017 8:44:04 AM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PROJECT DATA / SHEET LIST16036 A 01DUBLIN STATION DEMARCUS BOULEVARDSHEET LIST VICINITY MAP DUBLIN BLVD IRON HORSE REGIONAL TRAIL DE MARCUS BLVD CAMPBELL LN.SITECAMP PARKS MILITARY BASE CAMPBELL GREENCAMPBELL LN.HAMLET LN.IRON HORSE PKWYIRON HORSE PKWY DUBLIN/PLEASANTON BART STATIONARTHUR H. BREED, JR. FWY PR O J E C T D A T A SHT NOENTITLEMENTS05/24/17 ENT RESUB 08/28/17 C6.1EROSION CONTROL NOTES AND DETAILSXXC6.0EROSION CONTROL PLANXXC5.1STORMWATER CONTROL DETAILSXC5.0STORMWATER CONTROL PLANXXC4.0UTILITY PLANXXC3.0GRADING PLANXXC2.0CIVIL SITE PLANXXC1.0EXISTING CONDITIONS PLANXXC0.0TITLE SHEETXXCIVIL L6.00CONCEPTUAL LIGHTING PLANXXL5.00CAMPBELL LANE WEST STREETSCAPE PLANXXL4.00CAMPBELL LANE SOUTH STREETSCAPE PLANXXL3.00DEMARCUS BLVD STREETSCAPE PLANXXL2.00SHARED PRIVATE DRIVE STREETSCAPE PLANXXL1.00ILLUSTRATIVE SITE PLANXXLANDSCAPE P 01BUILDING MATERIALSXA 25APPENDIXXA 24GREENPOINT CHECKLISTXXA 23GREENPOINT CHECKLISTXXA 22GREENPOINT CHECKLISTXXA 21ENLARGED TYPICAL UNIT PLANSXXA 20BUILDING SECTIONS - EAST/WESTXXA 19BUILDING SECTIONS - NORTH/SOUTHXXA 18ELEVATIONS - NORTH & EASTXXA 17ELEVATIONS - SOUTH & WESTXXA 16FLOOR PLAN - ROOFXXA 15FLOOR PLAN - LEVEL 7XXA 14FLOOR PLAN - LEVEL 6XXA 13FLOOR PLAN - LEVEL 5XXA 12FLOOR PLAN - LEVEL 4XXA 11FLOOR PLAN - LEVEL 3XXA 10FLOOR PLAN - LEVEL 2XXA 09FLOOR PLAN - LEVEL1XXA 08PERSPECTIVE VIEWXXA 07PERSPECTIVE VIEWXXA 06PERSPECTIVE VIEWXXA 05PERSPECTIVE VIEWXXA 04SITE PLANXXA 03SITE AERIAL DIAGRAMXXA 02EXISTING CONDITIONSXXARCHITECTURAL Ro o f T e r r a c e 92 8 Po d i u m L a n d s c a p e : 2 4 , 9 2 0 Le v e l 1 L a n d s c a p e 1 9 , 0 3 0 Si t e A r e a : 10 2 , 6 7 0 Ef f i c i e n c y ( R e s R e n t a b l e G S F / R e s T o t a l G S F ) 75 % To t a l 21 0 , 0 3 3 2 , 5 0 1 5 8 , 3 4 7 27 8 , 4 1 7 00 0 12 6 , 6 5 7 40 5 , 0 7 4 0 1 6, 7 4 0 2 , 5 0 1 2 , 8 5 9 8 4 4 2 8 0 7 , 5 0 1 20 , 7 2 5 00 0 62 , 8 9 6 83 , 6 2 1 2 9, 6 9 8 0 28 3 8 , 3 0 0 18 , 2 8 1 00 0 63 , 7 6 1 82 , 0 4 2 3 46 , 1 5 3 0 4 6 4 1 , 8 7 8 1 0 , 0 1 2 58 , 5 0 7 00 0 0 58 , 5 0 7 4 48 , 3 6 1 0 1 0 , 2 5 2 58 , 6 1 3 00 0 0 58 , 6 1 3 5 49 , 0 8 5 0 1 0 , 6 9 6 59 , 7 8 1 00 0 0 59 , 7 8 1 6 28 , 3 5 2 0 9 2 8 6 , 5 5 4 35 , 8 3 4 00 0 0 35 , 8 3 4 7 21 , 6 4 4 0 5 , 0 3 2 26 , 6 7 6 00 0 0 26 , 6 7 6 Le v e l " R e n t a b l e " S F L o b b y Fi t n e s s P o o l L e a s i n g L o u n g e C o n f C l u b R m Co r e G r o s s " R e n t a b l e " C o r e G r o s s G r o s s G S F To t a l R e s . Re s . A m e n i t y Re s . R e s . R e t a i l R e t a i l R e t a i l G a r a g e T O T A L PR E L I M I N A R Y A R E A T A B U L A T I O N S DU B L I N S T A T I O N wt 13 0 C l a s s 1 b i k e p a r k i n g s t al l s - ( 1 C l a s s I s p a c e s : 1 D U + 1 C l a s s I s p a c e : e v e r y 4 D U o v e r 1 0 0 ) Re q u i r e d ( T i t l e 2 4 ) : 1 3 0 11 , 6 6 5 13 0 LE V E L A R E A T O T A L CO U N T BI C Y C L E P A R K I N G ( W A L L M O U N T E D ) - 3 % o f a l l p r o v i d e d p a r k i n g ( 3 3 0 s t a l l s ) = 1 1 E V c h a r g i n g s t a t i o n s th e f o l l o w i n g ( p e r C A G r e e n Bu i l d i n g C o d e S e c t i o n 4 . 1 0 6 ) : El e c t r i c a l V e h i c l e P a r k i n g - p r o v i d e i n f r a s t r u c t u r e f o r f u t u r e E V c h a r g i n g s t a t i o n s f o r EV P A R K I N G To t a l r e q u i r e d H C A c c e s i b l e pa r k i n g : 9 a c c e s s i b l e s t a l l s 2% o f r e s i d e n t i a l p a r k i n g ( 2 8 0 st a l l s ) ; 6 a c c e s s i b l e s t a l l s 5% o f g u e s t p a r k i n g ( 5 0 s t al l s ) : 3 a c c e s s i b l e s t a l l s ii i : A c c e s s i b l e r e q u i r e m e n t s : ii : 3 3 0 s t a l l c o u n t i n c l u d e s a c c e s s i b l e p a r k i n g r e q u i r e m e n t s a n d 1 5 % g u e s t p a r k i n g ( 5 0 s t a l l s ) i: 1 . 5 s p a c e s p e r D U = 1 . 5 x 2 2 0 = 3 3 0 TA R G E T P A R K I N G M I X SP A C E S P E R 1 0 0 0 s q f t o f B U I L D I N G 0 . 8 3 SP A C E S P E R U N I T 1 . 5 0 % 7. 3 % 2 4 . 2 % 6 2 . 5 % 3 . 3 % 2 . 7 % 1 0 0 . 0 % To t a l R e q u i r e d H C A c c e s s i b l e P a r k i n g 9 TO T A L 24 8 0 2 0 7 1 1 9 33 1 Un a s s i g n e d A c c e s s i b l e P a r k i n g 5% 3 Un a s s i g n e d / G u e s t P a r k i n g 15 % 5 0 115 4 1 8 3 1 1 9 15 9 As s i g n e d A c c e s i b l e P a r k i n g 2% 6 2 9 3 9 1 2 4 0 0 17 2 As s i g n e d P a r k i n g 2 8 0 8' x 1 7 ' 9 ' x 1 7 ' 9 ' x 1 8 ' 9 ' X 1 8 ' LE V E L C O M P A C T S T A N D A R D E V A D A T O T A L CO U N T PE R C E N T T O T A L H C S T A L L S PA R K I N G S C H E D U L E AC C E S S I B L E P A R K I N G C A L C U L A T I O N S 44 . 5 5 % % T w o B e d r o o m s o r L a r g e r % 1 0 . 0 % 4 1 . 8 % 3 . 6 % 3 5 . 9 % 8 . 6 % 1 0 0 . 0 % TO T A L 22 9 2 8 7 9 1 9 22 0 12 6 - 1 - 9 22 7 - 3 - 12 3 42 0 2 1 8 4 4 8 4 32 0 2 2 0 4 4 9 5 42 1 2 2 0 4 5 1 6 41 2 1 1 0 3 3 0 7 36 1 7 4 2 1 64 0 t y p . S F 8 0 0 t y p . S F 9 7 5 t y p . S F 1 1 2 0 t y p . S F 1 2 8 0 t y p . S F LE V E L 1 B E D J R 1 x 1 B E D 1 + B E D 2 x 2 B E D 3 x 2 B E D T O T A L CO U N T PR E L I M I N A R Y U N I T M I X G 04EGRESS DIAGRAMSXG 03EGRESS DIAGRAMSXA 01.1CODE ANALYSISXA 01PROJECT DATA / SHEET INDEXXXA 00COVER SHEETXXGENERAL SCARLETT DR. BU I L D I N G T A B U L A T I O N TY P E I I I A O V E R T Y P E 1 A 4 & 5 S T O R I E S O V E R P A R K I N G TY P E V A O V E R T Y P E 1 A ST O R Y / H E I G H T P R O P O S E D 3 S T O R I E S O V E R P A R K I N G ST O R Y / H E I G H T A L L O W E D 5 S T O R I E S O V E R P A R K I N G R- 2 R E S I D E N T I A L U N I T S A- 3 R E S I D E N T I A L A M E N I T I E S OC C U P A N C Y G R O U P S S - 2 P A R K I N G G A R A G E SP R I N K L E R S F U L L Y S P R I N K L E R E D ( N F P A 1 3 S Y S T E M ) CO N S T R U C T I O N T Y P E S I A , 1 1 1 - A , V A SE T B A C K R E Q U I R E M E N T S 20 ’ S T O R M W A T E R E A S E M E N T S E T B A C K A T D E MA R C U S B L V D . MA X I M U M H E I G H T 5 S T O R I E S O V E R P A R K I N G DE N S I T Y A B O V E 2 5 . 1 D U / A C SI T E A R E A 1 0 2 , 6 7 0 PR O J E C T U S E RE S I D E N T I A L , R E S I D E N T I A L S U P P O R T A N D PR I V A T E A M E N I T Y , P A R K I N G LA N D U S E H I G H D E N S I T Y R E S I D E N T I A L SP E C I F I C P L A N TR A N S I T C E N T E R D E S I G N A T E D A S P L A N N I N G SU B - A R E A W I T H I N E A S T E R N D U B L I N S P E C I F I C PL A N ZO N I N G D I S T R I C T DU B L I N T R A N S I T C E N T E R - G E N E R A L P L A N / SP E C I F I C P L A N A M E N D M E N T S S T A G E 1 P L A N N E D DE V E L O P M E N T R E Z O N I N G 2 0 0 2 AS S E S S O R S P A R C E L N U M B E R 9 8 6 - 0 0 3 4 - 0 0 9 - 0 0 PR O J E C T A D D R E S S CO R N E R O F D E M A R C U S B L V D . A N D C A M P B E L L LA N E , D U B L I N , C A PR O J E C T N A M E D U B L I N S T A T I O N LA N D S C A P E A R E A S 4 5 , 0 5 9 BI C Y C L E P A R K I N G 1 5 0 PA R K I N G S C H E D U L E 3 3 5 TO T A L U N I T S 2 2 0 LO T C O V E R A G E + / - 8 0 % PR O J E C T D E N S I T Y 9 3 D U / A C R E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:26:16 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt CODE ANALYSIS16036 A 01.1MSCheckerDUBLIN STATION DEMARCUS BOULEVARD BU I L D I N G A N A L Y S I S 1.BUILDING DESCRIPTION THE PROJECT IS COMPOSED OF (1) INDEPENDENT BUILDING ON ONE PARCEL. THE SITE IS LOCATED ALONG DUBLIN BLVD BETWEEN DEMARCUS BLVD AND CAMPBELL LANE • COMPOSED OF 2 ABOVE GRADE LEVELS IN TYPE IA CONSTRUCTION, COMPOSED OF A COMBINATION OF S-2 PARKING GARAGE, AMENITIES AND R-2 ACCESSORY SPACES • ABOVE THE PODIUM a. TYPE VA AT LEVELS 3-5 ON THE WEST / SOUTH BUILDING b. TYPE IIIA AT LEVELS 3-7 ON THE EAST AND CENTER TOWERS • BUILDING OCCUPANCIES ARE GROUP R-2, GROUP S-2, GROUP A-3 2.OCCUPANCY AND CONSTRUCTION TYPE (CHAPTER 3)LEVEL 1 & LEVEL 2 – CONSTRUCTION TYPE 1A • PARKING GARAGE (2 STORY)OCCUPANCY: S-2 • RESIDENTIAL AMENITY AND ACCESSORY SPACES OCCUPANCY: R-2, A-3 ACCESSORY LEVEL 3-7 – CONSTRUCTION TYPE IIIA AND VA • RESIDENTIAL OCCUPANCY: A-3, R-2 3.HORIZONTAL BUILDING SEPARATION ALLOWANCE / SPECIAL PROVISIONS (SECTION 510.2)THE TWO STORIES ABOVE GRADE PLANE (TYPE IA CONSTRUCTION) SHALL BE CONSIDERED A SEPARATE AND DISTINCT BUILDING FROM THE STORIES ABOVE (TYPE IIIA AND VA) FOR THE FOLLOWING PURPOSES:• DETERMINING AREA LIMITATIONS • CONTINUITY OF FIRE WALLS • LIMITATION OF NUMBER OF STORIES • TYPE OF CONSTRUCTION 4.AUTOMATIC SPRINKLER SYSTEM (SECTION 903)PROJECT TO BE FULLY SPRINKLERED, NFPA 13 SYSTEM, IN ACCORDANCE WITH SECTION 903 6.MIXED USE AND OCCUPANCY • ACCESSORY OCCUPANCIES SHALL BE INDIVIDUALLY CLASSIFIED IN ACCORDANCE WITH SECTION 302.1. THE REQUIREMENTS OF THIS CODE SHALL APPLY TO EACH PORTION OF THE BUILDING BASED ON THE OCCUPANCY CLASSIFICATION OF THAT SPACE. (SECTION 508.2)• ALLOWABLE BUILDING HEIGHT AND NUMBER OF STORIES OF THE BUILDING CONTAINING THE ACCESSORY OCCUPANCIES SHALL BE IN ACCORDANCE WITH SECTION 504 FOR THE MAIN OCCUPANCY OF THE BUILDING.• THE ALLOWABLE AREA OF THE BUILDING SHALL BE BASED ON THE APPLICABLE PROVISIONS OF SECTION 506 FOR THE MAIN OCCUPANCY OF THE BUILDING. AGGREGATE ACCESSORY OCCUPANCIES SHALL NOT OCCUPY MORE THAN 10 PERCENT OF THE FLOOR AREA IF THE STORY IN WHICH THEY ARE LOCATED.7.ALLOWABLE BUILDING AREA CALCULATION TYPE lllA CONSTRUCTION: LEVELS 3-7 ON THE EAST AND CENTER TOWERS BUILDING COMPARTMENT 1:FRONTAGE INCREASE CALCULATION:W = (L1 × w1 + L2 × w2 + L3 × w3…)/F W= (128’ x 30’ + 69’-4” x 30)/ 197’-4”W= 30 AMOUNT OF INCREASE:If = [F/P - 0.25]W/30 If = [197’-4”/525’ - 0.25] 30/30 If = 0.13 ALLOWABLE BUILDING AREA SINGLE-OCCUPANCY, MULTISTORY BUILDING Aa = [At + (NS × If)] × Sa Aa = [24,000 + (24,000 × 0.13)] × 2 Aa = 54,240 SF = MAX ALLOWABLE BUILDING AREA BUILDING COMPARTMENT 2:FRONTAGE INCREASE CALCULATION:W = (L1 × w1 + L2 × w2 + L3 × w3…)/F W = (149’ x 22’ + 75’ x 30’)/224' = 10.218 W= 30 AMOUNT OF INCREASE:If = [F/P - 0.25]W/30 If = [224’/541’’ - 0.25] 30/30 If = 0.16 ALLOWABLE BUILDING AREA SINGLE-OCCUPANCY, MULTISTORY BUILDING Aa = [At + (NS × If)] × Sa Aa = [24,000 + (24,000 × 0.16)] × 2 Aa = 55,680 SF = MAX ALLOWABLE BUILDING AREA 12 . E X I T I N G P R O V I S I O N S OC C U P A N T L O A D S A B O V E W H I C H RE Q U I R E T W O M E A N S O F E G R E S S A S P E R T A B L E 1 0 0 6 . 2 . 1 OC C U P A N C Y LO A D A- 3 4 9 O C C U P A N T S R- 2 1 0 O C C U P A N T S S- 2 2 9 O C C U P A N T S SE P A R A T I O N D I S T A N C E B E T W E E N S T A I R W A Y S M U S T B E N O L E S S T H A N 1 / 3 RD T H E L E N G T H O F M A X I M U M D I A G O N A L O F T H E AR E A S E R V E D P E R 1 0 0 7 . 1 . 2 E X C E P T I O N 2 , P R O V I D E D T H E B U I L DI N G I S E Q U I P P E D W I T H N F P A 1 3 O R N F P A 1 3 R S P R I N K L E R S CO M M O N P A T H O F E G R E S S T R A V E L ( S E C T I O N 1 0 0 6 . 2 . 1 ) OC C U P A N C Y LE N G T H A- 3 7 5 ’ W I T H N F P A 1 3 S P R I N K L E R S Y S T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A R- 2 1 2 5 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A S- 2 1 0 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A EX I T A C C E S S T R A V E L D I S T A N C E ( S E C T I O N 1 0 1 7 ) OC C U P A N C Y LE N G T H A- 3 2 5 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E B R- 2 2 5 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E B S- 2 4 0 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E C AC C E S S I B L E M E A N S O F E G R E S S AN A C C E S S I B L E M E A N S O F E G R E S S S H A L L BE P R O V I D E D I N A T L E A S T T H E S A M E N U MB E R A S T H O S E S P E C I F I E D I N C H A P T E R 10 0 7 . 1 . 1 A N D 1 0 0 6 . 1 – S E E A B O V E F O R R E Q U I R E D N U M B E R O F E X I T S B A S E D O N O C C U P A N T L O A D . A H O R I Z O N T A L E X I T W I L L B E PR O V I D E D I N L I E U O F E L E V A T O R T O M E E T TH E A C C E S S I B L E M E A N S O F E G R E S S R E Q U I R E M E N T S PE R S E C T I O N 1 0 0 9 . 2 . 1 E X C E P T I O N 1 . H O R IZ O N T A L E X I T S A R E P R O V I D E D A T T H E F I R E W A L L S . S E E P L A N S A N D S E C T I O N 1 2 FO R L O C A T I O N S DE A D E N D C O R R I D O R S PE R 1 0 2 0 . 4 E X C E P T I O N 2 , R - 2 O C C U P A N C I E S A R E A L L O W E D 5 0 F T . D E A D E N D S W H E R E T H E B U I L D I N G I S E Q U I P P E D TH R O U G H O U T W I T H A N A U T O M A T I C S P R I N K L E R S Y S T E M . A 4 8 ” C L E A R W I D T H A T A S T A I R W A Y I S N O T E R E Q U I R E D P E R S E C T I O N 1 0 0 9 . 3 E X C E P T I O N 2 AR E A S O F R E F U G E A R E N O T R E Q U I R E D P E R S E C T I O N 1 0 0 9 . 3 E X C E P T I O N 5 & 8 10 0 9 . 2 – C O N T I N U I T Y O F E X I T S – C H E C K F O R P O D I U M 13 . F I R E W A L L S ( S E C T I O N 7 0 6 ) 14 . A C C E S S I B I L I T Y PR O J E C T I S A P R I V A T E L Y F U N D E D D E V E L O P M E N T , T H E R E F O R E ; § R E S I D E N T I A L O C C U P A N C I E S I N A L L N E W L Y C O N S T R U C T I O N C O V E R E D M U L T I - F A M I L Y D W E L L I N G U N I T S S H A L L M E E T T H E RE Q U I R E M E N T S O F C H A P T E R 1 1 A H O U S I N G A C C E S S I B I L I T Y § R E S I D E N T I A L U N I T B A T H R O O M S : BA T H R O O M S I N 1 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H O P T I O N 2 P E R C B C S E C T I O N 1 1 3 4 A . 2 . 2N D B A T H R O O M S I N 2 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H O P T I O N 2 P E R C B C S E C T I O N 1 1 3 4 A . 2 MA S T E R B A T H R O O M S I N 2 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H I T E M S 7 - 1 2 O F C B C S E C T I O N 1 1 3 4 A . 2 O P T I O N 2 . § C O M M O N U S E F A C I L I T I E S ( S U C H A S L O B B I E S , S H A R E D A M E N I T Y S P A C E S , C O M M O N T O I L E T R O O M S ) S H A L L M E E T T H E RE Q U I R E M E N T S O F C H A P T E R 1 1 2 7 A 15 . L I G H T A N D V E N T I L A T I O N PR O J E C T T O C O M P L Y W I T H C B C S T A N D A R D S F O R L I G H T A N D V E N T I L A T I O N A T H A B I T A B L E R O O M S . P E R S E C T I O N 1 2 0 5 . 2 . 1 N A T U R A L LI G H T I N A N Y R O O M I S P E R M I T T E D T O B E CO N S I D E R E D A S A P O R T I O N O F A N A D J O I N I N G R O O M W H E R E O N E - H A L F O F T H E A R E A O F TH E C O M M O N W A L L I S O P E N A N D U N O B S T R U C T E D A N D P R O V I D E S A N O P E N I N G O F N O T L E S S T H A N 1 / 1 0 TH O F T H E F L O O R A R E A O F TH E I N T E R I O R R O O M O R 2 5 S Q F T , W H I C H E V E R I S G R E A T E R . 16 . P L U M B I N G F I X T U R E C O U N T S CA L I F O R N I A P L U M B I N G C O D E 2 0 1 6 T A B L E A “ O C C U P A N T L O A D F A C T O R " A P P L I E S . * P E R T A B L E 2 9 0 2 . 1 N O T E 3 ; W H E N D E S I G N O C C U P A N T L O A D I S L E S S T H A N 1 0 P E R S O N S , A F A C I L I T Y U S A B L E B Y E I T H E R S E X MA Y B E A P P R O V E D B Y T H E B U I L D I N G O F F I C I A L . 17 . E M E R G E N C Y R E S P O N D E R R A D I O C O V E R A G E R E Q U I R E M E N T PE R 2 0 1 6 C A F I R E C O D E S E C T I O N 5 1 0 , PR O J E C T T O P R O V I D E A P P R O V E D R A D I O C O V E R A G E F O R E M E R G E N C Y R E S P O N D E R S . PR O J E C T T O A L L O W F O R I N S T A L L A T I O N O F A N E M E R G E N C Y R E S P O N D E R S R A D I O C O V E R A G E S Y S T E M . U P O N C O N S T R U C T I O N CO M P L E T I O N , R A D I O T E S T S H A L L B E C O N D U C T E D T O D E T E R M I N E I F A N E M E R G E N C Y R E S P O N D E R S R A D I O C O V E R A G E S Y S T E M S H A L L BE I N S T A L L E D . 18 . E M E R G E N C Y E S C A P E A N D R E S C U E W I N D O W S ( P E R C B C S E C T I O N 1 0 3 0 ) § T Y P E V A C O N S T R U C T I O N : R E Q U I R E D I N G R O U P R O C C U P A N C Y S L E E P I N G R O O M S B E L O W T H E F O U R T H S T O R Y A B O V E GR A D E P L A N E , S E E F L O O R P L A N S L E G E N D F O R E M E R G E N C Y E G R E S S S Y M B O L A N D F L O O R P L A N S F O R L O C A T I O N S . § T Y P E 1 & I I I A C O N S T R U C T I O N : E M E R G E NC Y E S C A P E A N D R E S C U E WI N D O W S A R E N O T R E Q U I R ED I N R - 2 O C C U P A N C Y SL E E P I N G R O O M S , P E R 1 0 3 0 E X C E P T I O N 1 § S E E W I N D O W S C H E D U L E G E N E R A L N O T E S F O R W I N D O W S I Z E R E Q U I R E M E N T S 19 . E N C R O A C H M E N T S SE C T I O N 3 2 0 2 . 3 . 3 S T A T E S E N C R O A C H M E N T S 1 5 ’ O R M O R E A B O V E G R A D E S H A L L N O T B E L I M I T E D BU I L D I N G C O M P A R T M E N T 3 : FR O N T A G E I N C R E A S E C A L C U L A T I O N : W = ( L 1 × w 1 + L 2 × w 2 + L 3 × w 3 … ) / F W= ( 1 1 8 ’ x 3 0 ’ ) / 1 1 8 ’ W= 3 0 AM O U N T O F I N C R E A S E : If = [ F / P - 0 . 2 5 ] W / 3 0 If = [ 1 1 8 ’ / 3 7 3 ’ - 0 . 2 5 ] 3 0 / 3 0 If = 0 . 0 6 AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 2 4 , 0 0 0 + ( 2 4 , 0 0 0 × 0 . 0 6 ) ] × 2 Aa = 5 0 , 8 8 0 = M A X A L L O W A B L E B U I L D I N G A R E A BU I L D I N G C O M P A R T M E N T 4 : *N O F R O N T A G E I N C R E A S E T A K E N AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 2 4 , 0 0 0 + ( 2 4 , 0 0 0 × 0 ) ] × 2 Aa = 4 8 , 0 0 0 = M A X A L L O W A B L E B U I L D I N G A R E A TY P E V A C O N S T R U C T I O N : L E V E L S 3 - 5 O N T H E S O U T H / W E S T B U I L D I N G BU I L D I N G C O M P A R T M E N T 5 : *N O F R O N T A G E I N C R E A S E T A K E N AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 3 6 , 0 0 0 + ( 1 2 , 0 0 0 × 0 ) ] × 2 Aa = 7 2 , 0 0 0 = M A X A L L O W A B L E B U I L D I N G A R E A 8. O C C U P A N C Y S E P A R A T I O N ( T A B L E 5 0 8 . 4 ) OC C U P A N C Y SE P A R A T I O N R E Q D SE P A R A T I O N P R O V I D E D S- 2 T O R - 2 1 H R 3 H R S- 2 T O A - 3 N O N E - R- 2 T O A - 3 1 H R 1 H 9. F I R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S ( T A B L E 6 0 1 A N D 6 0 2 ) FI R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S F O R B U I L D I N G E L E M E N T S ( T A B L E S 6 0 1 ) BU I L D I N G E L E M E N T TY P E I A TY P E I I I A TY P E V A ST R U C T U R A L F R A M E 3 H R 1 H R 1 H R EX T E R I O R B E A R I N G W A L L 3 H R 2 H R 1 H R IN T E R I O R B E A R I N G W A L L 3 H R 1 H R 1 H R EX T E R I O R N O N - B E A R I N G W A L L S E E B E L O W F O R R E Q U I R E M E N T S F O R E X T E R I O R W A L L S B A S E D O N S E P A R A T I O N IN T E R I O R N O N - B E A R I N G W A L L 0 H R 0 H R 0 H R FL O O R 2 H R 1 H R 1 H R RO O F 1 . 5 H R 1 H R 1 H R *N O T E : AL L E X T E R I O R W A L L S I N T H E T Y P E I I I A C O N S T R U C T I O N T O B E 2 H R R A T E D AL L E X T E R I O R W A L L F R A M I N G A N D P L Y W O O D S H E A T H I N G I N T H E T Y P E I I I A C O N S T R U C T I O N T O B E F I R E R E T A R D A N T T R E A T E D (F R T ) FI R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S F O R E X T E R I O R W A L L S B A S E D O N S E P A R A T I O N ( T A B L E 6 0 2 ) FI R E S E P A R A T I O N D I S T A N C E ( F T ) T Y P E I A T Y P E I I I A T Y P E V A X < 5 ' 1 H R * 1 H R * 1 H R * 5' T O 1 0 ' 1 H R * 1 H R 1 H R 10 ' T O 3 0 ' 1 H R 1 H R 1 H R 30 ' < X NO N E N O N E N O N E FI R E R E S I S T A N C E R A T I N G B A S E D O N W A L L T Y P E S : WA L L T Y P E T Y P E I A T Y P E I I I A T Y P E V A SH A F T E N C L O S U R E S 2 H R 2 H R 2 H R EX I T E N C L O S U R E S 2 H R 2 H R 2 H R CO R R I D O R W A L L S , A N D 1 H R 1 H R 1 H R WA L L S S E P A R A T I N G D W E L L I N G U N I T S 10 . E X T E R I O R W A L L O P E N I N G P R O T E C T I O N MA X I M U M A R E A O F E X T E R I O R W A L L O P E N I N G B A S E D O N F I R E S E P A R A T I O N D I S T A N C E P E R T A B L E 7 0 5 . 8 FI R E S E P A R A T I O N D I S T . ( F T ) O P E N I N G P R O T E C T I O N A L L O W A B L E A R E A X < 3 ' UP , S NO T P E R M I T T E D 3' T O 5 ' UP , S 15 % 5' T O 1 0 ' UP , S 25 % 10 ' T O 1 5 ' UP , S 45 % 15 ' T O 2 0 ' UP , S 75 % 20 ' T O 2 5 ' UP , S NO L I M I T 11 . P A R K I N G G A R A G E S- 2 O C C U P A N C Y R E Q U I R E M E N T S ( S E C T I O N 4 0 6 ) PA R K I N G G A R A G E I S C L A S S I F I E D A S E N C L O S E D ( 4 0 6 . 2 ) VE N T I L A T I O N : M E C H A N I C A L V E N T I L A T I O N S Y S T E M T O B E P R O V I D E D I N A C C O R D A N C E W I T H T H E C A M E C H A N I C A L C O D E . SE E M E C H A N I C A L D R A W I N G S VE H I C L E B A R R I E R S R E Q U I R E D ( S E C T I O N 4 0 6 . 4 . 3 08.29.17ENT RESUBMITTAL UP UP UPDN DN UP DN DN EXIT STAIR 1 EX I T S T A I R 3 EL E V A T O R S ELEVATORS VE H I C L E E N T R Y * ** * *EXIT STAIR 2 EGRESS SEPERATION 300' - 4" > MIN. 141'-0" MAX. DIAGONAL LENGTH 423'-0" EX I T A T G R A D E EX I T A T G R A D E RESIDENTIAL UNITS R-2 238333 3 3 4 3 3 3 1 5 1 149 2 1 6 6 34 19 17187FITNESS ROOM A-3 LEASING OFFICE B PA R K I N G S- 2 EGRESS SEPARATION 224' - 9" > MIN. 141'-0" MAX. DIAGONAL LENGTH 423'-0" EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EXIT ACESS TRAVEL = 139'-0"RESIDENTIAL UNITS R-2 3 9 PA R K I N G S- 2 3 3 4 3 3 33 3 5 5 3 1 6 2 163 18 1 14 171 7 9 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N 1 1 1 ' - 2 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N 9 9 '-7 " > 1 /3 O F T H E D I A G . E G R E S S S E P A R A T I O N 103'-0" > 1/3 OF THE DIAG. EGRESS SEPARATION > 1/3 OF THE DIAG. EGRESS SEPERATION EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 2 9 ' - 7 " EX I T A C E S S TR A V E L = 1 2 6 ' - 6 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " EX I T A C E S S TR A V E L = 1 0 0 ' - 6 " EX I T A C E S S TR A V E L = 1 4 2 ' - 0 " EX I T A C E S S TR A V E L = 1 3 8 ' - 0 " RE S I D E N T I A L U N I T S R- 2 6 23 AM E N I T Y R- 2 39 38 444 385 6 5 5 4 3 4 4 4 4 4 4 5 3 4 5 5 2 8 AM E N I T Y R- 2 5 5 5 5 3 3 3 3 4 5 5 5 7 3 6 4 4 4 5 5 4 5 5 6 4 6 3 0 61 11 0 10 4 49 33 H. E . H. E . H. E . H. E . H. E . USED FOR FRONTAGE INCREASE 75' - 0" US E D F O R F R O N T A G E I N C R E A S E 14 9 ' - 6 " 12 5 ' - 5 " 1 0 3 ' - 0 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 2 9 ' - 7 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " RE S I D E N T I A L U N I T S R- 2 23 34 AM E N I T Y R- 2 54445 6 5 5 4 3 4 4 4 4 4 4 5 3 4 5 5 3 5 5 5 7 6 3 54 36 14 3 3 3 23 90 OU T D O O R L O U N G E R- 2 EX I T A C E S S TR A V E L = 1 4 7 ' - 0 " 7 9 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N 1 1 1 ' - 2 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N 9 9 '-7 " > 1 /3 O F T H E D I A G . E G R E S S S E P A R A T I O N H. E . H. E . H. E . RO O F A C C E S S 2 - H R R A T E D ST A I R E N C L O S U R E NO T E : NO N - S T O R Y NO S E C O N D E G R E S S RE Q U I R E D RO O F A T LE V E L 6 LEGEND 3 HR RATED FIRE BARRIER / FIRE WALL 0 EXIT ACCESS TRAVEL DISTANCE AND COMMON PATH OF EGRESS TRAVELEGRESS ROUTEOCCUPANT LOAD0 COMBINED NUMBER OF OCCUPANTS AT EXIT OCCUPANT LOAD (PER TABLE 1004.1.1)OCCUPANT LOAD FACTOR - OCCUPANCY 200 G.S.F. - RESIDENTIAL (R-3)50 G.S.F.- FITNESS (A-3)15 G.S.F.- AMENITY (R-2)100 G.S.F.- LEASING (B)200 G.S.F.- PARKING (S-2)300 G.S.F.- MEP (S-2)HORIZONTAL EXITH.E.BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:30:49 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedEGRESS DIAGRAMS16036 G 03AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 1 " = 4 0 ' - 0 " G 0 3 1 EX I T D I A G R A M F L O O R P L A N L E V E L 1 1 " = 4 0 ' - 0 " G 0 3 2 EX I T D I A G R A M F L O O R P L A N L E V E L 2 1 " = 4 0 ' - 0 " G 0 3 3 EX I T D I A G R A M F L O O R P L A N L E V E L S 3 - 5 1 " = 4 0 ' - 0 " G 0 3 4 Le v e l 6 08.29.17ENT RESUBMITTAL DN DN EX I T A C E S S T R A V E L = 1 0 6 ' - 0 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " RE S I D E N T I A L U N I T S R-2 23 22 29 30 EX I T A C E S S TR A V E L = 1 4 7 ' - 0 " 54445119 5 3 4 5 5 3 5 5 5 7 6 3 3 3EXIT ACESS TRAVEL = 78'-0"7 0 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N M A X . D I A G O N A L L E N G T H 2 3 4 ' - 6 " M A X . D I A G O N A L L E N G T H 2 0 8 ' - 9 "H.E. H. E . LEGEND 3 HR RATED FIRE BARRIER / FIRE WALL 0 EXIT ACCESS TRAVEL DISTANCE AND COMMON PATH OF EGRESS TRAVELEGRESS ROUTEOCCUPANT LOAD0 COMBINED NUMBER OF OCCUPANTS AT EXIT OCCUPANT LOAD (PER TABLE 1004.1.1)OCCUPANT LOAD FACTOR - OCCUPANCY 200 G.S.F. - RESIDENTIAL (R-3)50 G.S.F.- FITNESS (A-3)15 G.S.F.- AMENITY (R-2)100 G.S.F.- LEASING (B)200 G.S.F.- PARKING (S-2)300 G.S.F.- MEP (S-2)HORIZONTAL EXITH.E. RO O F A C C E S S 2 - H R R A T E D ST A I R E N C L O S U R E NO T E : NO N - S T O R Y NO S E C O N D E G R E S S RE Q U I R E D RO O F A T LE V E L 7 ROOFBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:31:10 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedEGRESS DIAGRAMS16036 G 04AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 1 " = 4 0 ' - 0 " G 0 4 1 EX I T D I A G R A M F L O O R P L A N L E V E L 7 1 " = 4 0 ' - 0 " G 0 4 2 EX I T D I A G R A M R O O F P L A N 08.29.17ENT RESUBMITTAL DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL TITLE SHEET C0.0 NOTES:LEGEND: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EXISTING CONDITIONS PLAN C1.0 UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC CC 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C C C 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DE M A R C U S B O U L E V A R D CA M P B E L L L A N E GARAGE FITNESS ROOM LEASING OFFICE LOBBY ELECTRICAL ROOM TRASHTRASHFIRE ROOM WEST FRONTAGE: CAMPBELL LANE 1"=5'A NORTH FRONTAGE: PRIVATE DRIVE 1"=5'B EAST FRONTAGE: DEMARCUS BLVD 1"=5'C SOUTH FRONTAGE: CAMPBELL LANE 1"=5'D SITE PLAN LEGEND: SITE PLAN NOTES: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL CIVIL SITE PLAN C2.0 UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC CC 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C C C 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DE M A R C U S B O U L E V A R D CA M P B E L L L A N E LEGEND:GRADING NOTES: DRIVEWAY DETAIL 1"=10' DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL GRADING PLAN C3.0 UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC CC 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C C C 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DE M A R C U S B O U L E V A R D CA M P B E L L L A N E LEGEND: NOTES: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UTILITY PLAN C4.0 SLOPE SLOPE SLOPE S L O P E S L O P E S L O P E S L O P E SL O P E SLOPE SLOPE SL O P E SLOPE S L O P E SLOPE SL O P E SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE S L O P E SLOPE SL O P E SLOPE SLOPE SL O P E SLOPE SL O P E SLOPE SLOPE S L O P E SLOPE SL O P E SLOPE S L O P E SLOPE S L O P E SL O P E S L O P E SLOPE SL O P E SL O P E SL O P E SL O P E SL O P E SL O P E SL O P E SL O P E SL O P E S L O P E SLOPE SLOPE S L O P E S L O P E SL O P E SL O P E S L O P E CAMPBELL LANE DE M A R C U S B O U L E V A R D CA M P B E L L L A N E NOTES:LEGEND: STORMWATER CONTROL PLAN C5.0 DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 1 FLOW-THRU PLANTER NTS 2 STORMWATER FILTER NTS STORMWATER CONTROL DETAILS C5.1 DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC CC 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C C C 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DE M A R C U S B O U L E V A R D CA M P B E L L L A N E x x x x x x x x x x x x x x x x x x x x x x x xx x xxxx xx xxx x xxx x xxxxxxxx xxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x GARAGE FITNESS ROOM LEASING OFFICE LOBBY ELECTRICAL ROOM TRASHTRASHFIRE ROOM DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EROSION CONTROL PLAN C6.0 DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DU B L I N , C A SI T E A - 3 3/ 1 6 / 2 0 1 7 1 0 : 1 8 : 3 0 AM C: \ A u t o d e s k \ 1 6 0 3 6 U D R D u b l i n - C E N T R A L _ a l i n k . r v t 16036 ENTITLEMENTS DU B L I N S T A T I O N D E M A R C U S B O U L E V A R D ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EROSION CONTROL NOTES AND DETAILS C6.1 AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL L1.00 ILLUSTRATIVE SITE PLAN LANDSCAPE SITE PLAN PERCENT LANDSCAPING LEGEND GROUND LEVEL: 69.9% HARDSCAPE, 18,850 SF 25.5% PLANTING AREA, 6,881 SF 3.9% BIORETENTION PLANTER, 1,042 SF 0.7% ARTIFICAL TURF, 185 SF PODIUM: 52.2% HARDSCAPE, 12,778 SF 25.8% RAISED PLANTER, 6,308 SF 11.5% BIORETENTION PLANTER, 2,809 SF 5.5% ARTIFICIAL TURF, 1,355 SF 5.0% POOL, 1,210 SF DE M A R C U S B O U L E V A R D EAST PODIUM COURTYARD WEST PODIUM COURTYARD CA M P B E L L L A N E W E S T CAMPBELL LANE SOUTH SHARED PRIVATE DRIVE CAMELLIA PLACE scale: 1” = 20’N PL PL PLPL GENERAL NOTES: 1. ALL IRRIGATION AT SHRUB AND GROUNDCOVER PLANTINGS TO BE DRIP IRRIGATION. INDIVIDUAL BUBBLERS WILL BE PROVIDED AT TREE PLANTINGS. 2. ALL PLANTING AREAS TO INCLUDE 3” LAYER OF 3/8” BLACK MINI-CHIP MULCH 3. SOIL ANALYSIS TO BE SUBMITTED WITH FINAL LANDSCAPE PLAN WITH BUILDING PERMIT/IMPROVEMENT PLANS 4. MAINTENANCE RESPONSIBILITY FALLS TO OWNER FOR SITE AND SIDEWALK DIRECTLY ADJACENT TO THE BUILDING. THE CITY IS RESPONSIBLE FOR THE STREET AND ANY MEDIAN ISLANDS L3.00L5.00 L2.00 L4.00 SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL SHARED PRIVATE DRIVE STREETSCAPE PLAN AS SHOWN L2.00 1111 FA C E O F B U I L D I N G 15 1 3 ’ - 4 ” 11’-0” 10’-0” 7’-1”1 4 ’ - 6 ” 6’ - 0 ” 7’ - 9 ” 2’ - 8 ” 14 ’ - 2 ” 8’ - 9 ” 1 1 ’ - 1 0 ” 1 0 ’ - 6 ” 1 Gal, 12” O.C. Sedum rubrotinctum Jelly-bean Sedum Water Usage: L LANDSCAPE SITE PLAN SHARED PRIVATE DRIVE CAMELLIA PLACE scale: 1” = 10’ scale: 1/4” = 1’ 3’-4”5’-0”8’-0” PARALLEL PARKING (PLANTED BULBOUT BEYOND) 6” CURB 30” MAX. PLANTING HT. SIDEWALKCONCRETE PLANTER 3’-4”*PLANTER DEPTH VARIES A A’ PL PR O P E R T Y L I N E 10’-4” TYP3’-7”5’-8”9’-6”6’-0”15’-6”8’-11”16’-9”6’-0”2’-0” TYP.37’-2” 26’-0”22’-6”22’-6” 23’-8” TYP.5’-8”4’-0”50’-9” 20’-0” TYP 8’-0” TYP8’-0” TYP 5’-0” TYP 3’-4” TYP N STREETSCAPE SECTION AA’ MATERIALS PLANT PALETTE Limonium californicum Elymus glaucus Echeveria Western Marsh Rosemary BI O R E T E N T I O N ST R E E T S C A P E Blue Wild Rye Raised Concrete Planter/ Bioretention Planter Integral Color Concrete, Color: Southern Blush Echeveria SITE FURNISHINGS 4 5 559 1012 12 12 9 9 181818 11 11 A’ A Faceted Steel Bench Modular Concrete Unit Pavers, Color: Foundry Faceted Steel Retaining/ Planter Wall 8 29 29 29 PL PL 1 Gal, 18” O.C. Water Usage: L 5 Gal, 12” O.C. Water Usage: L 5 Gal, 1’-0” O.C. Water Usage: L Amphitheatre Stair Seating 3 33 42 2 23 LIMIT OF WORK PROPERTY LINE Water Usage: L 1 Gal, 12” O.C. Festuca rubra Creeping Red Fescue Water Usage: L 5 Gal, 4’ O.C. Lavandula dentata var. candicans Gray Leaved French Lavender SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN STREET TREES Arbutus unedo Strawberry Tree 24” Box Water Usage: L 19191919 KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL DEMARCUS BLVD STREETSCAPE PLAN L3.00scale: 1” = 10’N scale: 1/4” = 1’ 20’-0” 2’-6” PLANTING 6’ 11’-0” 10’-0”, VARIES10’-0”, VARIES 5’-0”8’-0” PARALLEL PARKING 6” CURB 11’ WALK WITH 5’X5’ SQ TREE WELL PLANTINGPRIVATE FITNESS AREA STORM DRAIN EASEMENT 1’-6”, MAX PL PR O P E R T Y L I N E STREETSCAPE SECTION BB’ ST R E E T S C A P E 20 20 25 16 16 20’-0” 23’-6” O.C.25’-0” O.C., TYP 25’-0” O.C., TYP FA C E O F B U I L D I N G 4 4 4 SITE FURNISHINGS 5’-0” B 22’-6” O.C.22’-6” O.C.22’-6” O.C.24’-0” O.C.12’-6” O.C., TYP 12’-6” O.C., TYP12’-6” O.C., TYP 12’-6” O.C., TYP 5’-0” TW +0” TW +18” TW +18” TW +18” TW +6” TW +0” TW +6” TW +6” TW +6”TW +0” TW +0” TW +0”TW +0” MATCHLINE, SEE L4.00 TW +18” TW +0” 7’-4” 13’-0” 28’-0” 7’-6”9’-2” 4’-6” 6’-0” 5’-8” 1’-8” 6’-3” 15’-10”20’-0”12’-8” 2’-0”15’-5” 8’-0” 6’-0” 2’-6” B B’ B’ 1 1 11111111 1 2 2 2 2 2222222222 2 3 6 6 8 8 8 8 8 8 1111 11 1111 13 13 13 13 13 13 13 1313 13 11 11 11 23 11 11 1119 19 19 19 11 11 11 11 DEMARCUS BOULEVARD SH A R E D P R I V A T E D R I V E CA M P B E L L L A N E PL PL ST R E E T S C A P E Water Usage: M Water Usage: L Water Usage: L Water Usage: L 1 Gal, 36” O.C.5 Gal, 48” O.C.1 Gal, 12” O.C. Lomandra longifolia ‘Tanika’Salvia leucantha ‘Midnight’Sempervivum ‘Purple Beauty’ Tanika Lomandra Purple Mexican Sage Hen and Chicks PLANT PALETTE EA S E M E N T 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Raised Concrete Planter/ Bioretention Planter Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Amphitheatre Stair Seating 20’-0” STORM DRAIN EASEMENT Water Usage: L 30’-0” VISIBILITY ZONE, S.C.D. SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. 24” Box Water Usage: M Pyrus calleryana ‘Aristocrat’ Aristocrat Pear Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L MATCHLINE, SEE L3.00 MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST LANDSCAPE SITE PLAN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CAMPBELL LANE SOUTH STREETSCAPE PLAN AS SHOWN L4.00scale: 1” = 20’N PL 7 7 4 4 24 19 24 20 20 18 12 CAMPBELL LANE SOUTH C C’ C’ C 1 1 3 6 11 2121 14 11 3 11 11 11 5’-0” TYP 6’-0” TYP4’-0” 6’-4”8’-0” 20’-0” 7’-0”TYP11’-5”7’-0” 6’-6”6’-11” 11’-0”7’-7” 10’-8” 6’-0” 5’-11” 1’-0” TYP1’-0” TYP 2’-6” TYP LANDSCAPE SITE PLAN PL DE M A R C U S B O U L E V A R D Water Usage: M Water Usage: LWater Usage: L 1 Gal, 6’ O.C.5 Gal, 4’ O.C.1 Gal, 12” O.C. Passiflora incarnata Lavandula dentata var. candicans Festuca glauca Purple Passionflower Gray Leaved French Lavender Douglas Iris 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Water Usage: L Water Usage: L Raised Concrete Planter/ Bioretention Planter Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Amphitheatre Stair Seating PLANTER ISLAND PARALLEL PARKING (BEYOND) 6” CURB SIDEWALKAT-GRADE PLANTING 2’-6”6’-0”4’-0” 8’-0” 1’6”6” scale: 1/4” = 1’ PR O P E R T Y L I N E STREETSCAPE SECTION CC’PLANT PALETTE ST R E E T S C A P E FA C E O F B U I L D I N G SITE FURNISHINGS 48’-6” SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. 26 Platanus acerifolia ‘Bloodgood’ London Plane Tree 24” Box Water Usage: M Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L MA T C H L I N E , S E E L 4 . 0 0 MA T C H L I N E , S E E L 3 . 0 0 MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CAMPBELL LANE WEST STREETSCAPE PLAN AS SHOWN L5.00 BI O R E T E N T I O N scale: 1” = 20’N PLANT PALETTE BI O R E T E N T I O N LANDSCAPE SITE PLAN 4 4 4 8’-0” 20’-0” 23’-7”4’-0” 9’-8” 22’-0”11’-6”14’-10”TYP 14’-5” 2’-0” 6’-0” 6’-0” 2’-0” 6’-0” 2’-0” 4’-11 ” 4’-0”6’-10”2’-0” 9’-0” 5’-10” 5’-0” TYP TYP ST R E E T S C A P E D’ D 3 3 19 19 19 19 19 11 2828 29 29 1111 11 11 11 9 9 5 9 3 3 3 21 18 1818 23 27 20 24 24 11 11 3 5’-0” TYP 6’-0” TYP 1’-0” TYP 2’-6” TYP 2’-1” 13 ’ - 1 0 ” 9’- 7 ” 5’- 0 ” 21 21 21 CAMPBELL LANE WEST PL CA M P B E L L L A N E S O U T H SH A R E D P R I V A T E D R I V E 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Water Usage: LWater Usage: L Limonium californicum Western Marsh Rosemary 1 Gal, 18” O.C. Water Usage: L Water Usage: L 5 Gal, 4’ O.C. Lavandula dentata var. candicans Gray Leaved French Lavender Water Usage: L 1 Gal, 12” O.C. Festuca rubra Creeping Red Fescue scale: 1/4” = 1’ STREETSCAPE SECTION DD’ Raised Concrete Planter/ Bioretention Planter SITE FURNISHINGS Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Concrete Amphitheatre Stair Seating PLANTER ISLAND PARALLEL PARKING (BEYOND) 6” CURB SIDEWALKAT-GRADE PLANTING FA C E O F B U I L D I N G D 2’-6”6’-0”4’-0” 8’-0” 1’6”6” D’ PL PR O P E R T Y L I N E 26 26 SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. Platanus acerifolia ‘Bloodgood’ London Plane Tree 24” Box Water Usage: M Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L 22 TYP MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CONCEPTUAL LIGHTING PLAN L6.00 Stake Mounted LED Path LightPool & Spa LightingPlay LightingTree Uplight Recessed Planter Wall Light String Lights KEY TREE UPLIGHT PLAY LIGHTING POOL & SPA LIGHTING CITY STANDARD STREET LIGHT (E) STAKE MOUNTED LED PATH LIGHT RECESSED PLANTER WALL LIGHT DECORATIVE STRING LIGHTS (STRUNG ALONG TOP OF STEEL TRELLIS & POOL CABANAS) NOTE: LIGHT LOCATIONS ARE CONCEPTUAL AND SUBJECT TO CHANGE PENDING A PHOTOMETRIC STUDY. WILL BE SUBMITTED IN BUILDING/SITEWORK PERMIT PLAN SUBMITTAL scale: 1” = 20’N CAMELLIA PLACE PL PL PLPL SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN DE M A R C U S B O U L E V A R D CA M P B E L L L A N E W E S T CAMPBELL LANE SOUTH SHARED PRIVATE DRIVE LEGEND LIMIT OF WORK PROPERTY LINE PARCEL 3 PM 8275 280 PM 71 CAMPBELL LN CAMPBELL LN DE MARCUS BLVDSHARED PRIVATE DRIVEBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:26:23 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1" = 50'-0"EXISTING CONDITIONS16036 A 02DUBLIN STATION DEMARCUS BOULEVARD 1 - N O R T H E A S T C O R N E R 2 - N O R T H W E S T C O R N E R 3 - S O U T H W E S T C O R N E R 4 - S O U T H E A S T C O R N E R LA N E DE M A R C U S B L V D LA N E CA M P B E L L L N CA M P B E L L L N DE M A R C U S B L V D 1 " = 5 0 ' - 0 " A 0 2 1 SI T E P L A N - E X I S T I N G 2 1 3 3 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:26:27 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt SITE AERIAL DIAGRAM16036 A 03DUBLIN STATION DEMARCUS BOULEVARD CAMPBELL GREEN DE MARCUS BLVD DU B L I N B L V D . IRON HORSE REGI ON AL TR AI L CA M P B E L L L N CAMPBELL LN HAMLET LN.ELAN AT DUBLIN STATION 7 STORY MULTI-FAMILY AVALON DUBLIN STATION 5 STORY MULTI-FAMILY CA M E L I A P L A C E 4 S T O R Y M U L T I -FA M I L Y DU B L I N T R A N S I T CE N T E R S I T E A -1 3 S T O R Y M U L T I -FA M I L Y PR O P O S E D D E V E L O P M E N T DE MARCUS BLVD DUBLIN BLVD. SH A R E D P R I V A T E D R I V E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UP UP 1 B E D 1 B E D 2 B E D 1 B E D 1 B E D 1 B E D FI R E RO O M TRASH FITNESS YOGA/STRETCH LOBBY TR A S H GA R A G E EL E C T R I C A L RO O M BO I L E R RO O M BI K E ST O R A G E ID F 40 0 ' - 0 1 / 2 " 258' - 3" 36 4 ' - 8 " 50' - 0" 222' - 10 1/2" PA R C E L " A " PM 7 3 9 5 25 4 P M 2 8 PA R C E L 2 PM 8 2 7 5 28 0 P M 7 1 LOT 1 TRACT 7525 279 PM 97 PA R C E L 1 PM 8 2 7 5 28 0 P M 7 1 PA R C E L 3 PM 8 2 7 5 28 0 P M 7 1 IR O N H O RSE REGIO N AL TR AIL CA M P B E L L L A N E CAMPBELL LANE DE MARCUS BLVDRESIDENT LOADING ZONE VE H I C U L A R E N T R Y 24 ' - 0 " 18' - 0"24' - 0"18' - 0"22' - 0"18' - 0"24' - 0"18' - 0"18' - 0" 33 5 . 6 5 ± 333.7 LO B B Y ENTRY PLAZA SH A R E D P R I V A T E D R I V E 5' - 1 1 1 / 2 " 2' - 7 " 5' - 6 " 20' - 4"6' - 0 1/2"2' - 4 1/2" 15' - 0" PR O P E R T Y L I N E PR O P E R T Y L I N E 335.1 ± 333.6± 333.8± 334.0± 334.3 ± 333.5 ± 3 3 5 . 0 33 5 . 9 33 5 . 8 33 5 . 7 5 33 5 . 6 33 5 . 4 33 5 . 3 46 ' - 7 " 17 ' - 0 " 24 ' - 0 " 1' - 6" GA S ME T E R CL O S E T 1 B E D J R PA C K A G E S 1 BED JR 1 BED JR MAIL LEASINGCONFCONF EL E C T R I C A L RO O M FI R E A C C E S S R O A D 24' - 2 1/2"16' - 2" REMOVE EXISTING MEDIAN26' - 0"14' - 3" FI R E A C C E S S R O A D STAIR 02ELEVSTAIR 03 ST A I R ST A I R 0 4 STAIR 01 33 5 . 5 EL E V BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:26:47 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1" = 20'-0"SITE PLAN16036 A 04DUBLIN STATION DEMARCUS BOULEVARD 10 204080'600ACCESSIBLE PATH OF TRAVEL05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:26:51 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 05DUBLIN STATION DEMARCUS BOULEVARD AE R I A L S O U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:26:56 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 06DUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:27:01 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 07DUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:27:10 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 08DUBLIN STATION DEMARCUS BOULEVARD NO R T H E A S T C O R N E R - DE MARCUS BOULEVARDNORTHWEST CORNER - CAMPBELL LANE SO U T H E A S T C O R N E R - C A M P B E L L L A N E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UP UP    6% 12 % 1 A 2 0 22' - 0"18' - 0"24' - 0"18' - 0"18' - 0"24' - 0"17' - 0"2' - 6" 21' - 0" 18' - 0"24' - 2"17' - 0" 18 ' - 0 " 24 ' - 0 " 1 B E D 1 B E D 2 B E D 1 B E D 1 B E D 1 B E D FI R E RO O M TRASH 1956 SFFITNESS 284 SF YOGA/STRETCH 2028 SFLOBBY TR A S H GA R A G E ELECTRICAL ROOM 24 ' - 0 " BO I L E R RO O M BI K E ST O R A G E GA R A G E E N T R Y 8' - 5" 8' - 6 " CL TYP 2' - 0" C C C C C C C C C C C C C C C C C C C CC C C C C C C C C CC CC CL TYP 3' - 0" R 2 2' - 0 " CL TYP 3' - 0"CL TYP 3' - 0" CL TYP 3' - 10" R 24' - 0" 2 A 1 9 1 A 1 9 2 A 2 0 8% 3' - 0 " 3' - 0 " 1' - 6"1' - 6" 1' - 6 " 3' - 0" 3' - 0 " 1' - 6 " 1' - 6"RESIDENT LOADING ZONE ID F 6% 1' - 0 " 1' - 6 " 9' - 0"14' - 0" 5' - 0 " 9' - 0 " 12 7 7 S F LO B B Y 9' - 0"9' - 0" 4' - 4" 5' - 0 " 9' - 0 " 24' - 0" 9' - 0 " 3' - 1 1 / 2 " 9' - 0 " 5' - 0 " 4' - 0 " 9' - 0 " 9' - 0 " 4' - 0 " 5' - 0 " 9 ' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " 5' - 0 " 4' - 0 " 9' - 0 " 9' - 0 " 4' - 0 " 5' - 0 " 9' - 0 " SH E A R W A L L 2' - 6 " 8% 37 1 ' - 7 1 / 2 " 28' - 2"170' - 4"34' - 2" -0'-4"-0'-5"-0'-3"0'-0"- 0'-6" GA R A G E F E N C E , N O TH R O U G H A C C E S S SE C U R I T Y G A T E GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T VAN GU E S T GU E S T GUEST TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 1' - 0" TYP 2' - 10" PA C K A G E S EN C R O A C H M E N T S A R E A L L O W E D U N D E R C H A P T E R 3 2 O F TH E 2 0 1 6 C B C 20 1 6 C B C 3 2 0 2 . 3 . 3 E N C R O A C H M E N T S 1 5 O R M O R E F E E T AB O V E G R A D E . EN C R O A C H M E N T S 1 5 F E E T ( 4 5 7 2 M M ) O R MO R E A B O V E G R A D E S H A L L N O T B E L I M I T E D . BU I L D I N G A N D R O O F A B O V E GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T GU E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T GU E S T G U E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T GU E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T CC C 1' - 7 " 0' - 8" 1' - 0 " 0' - 9 " C CC VA N GU E S T G U E S T CC C C C C C GU E S T 826 SFLEASING119 SFCONF135 SFCONF422 SFMAIL1 BED JR 1 BED JR CCCCCC REMOVE EXISTING MEDIAN FH 9' - 0 " 9 ' - 0 " 9 ' - 0 " 1' - 1 0 " 0'-0" 8' - 1 " 73 ' - 7 1 / 2 " 2 0 ' - 4 1 / 2 " 1 0 0 ' - 3 " 1 1 ' - 5 " 3 1 ' - 4 " 6 ' - 0 1 / 2 " 3 2 ' - 1 " 2' - 4 1/2"232' - 8"23' - 2 1/2" 27' - 4 1/2"203' - 2"27' - 8 1/2" 2' - 7 " 41 ' - 0 " 27 5 ' - 5 1 / 2 " 23' - 6"5' - 1"32' - 1"20' - 4" 1' - 6 " 1' - 6 " 1 B E D J R EL E C T R I C A L RO O M GA S ME T E R CL O S E T 50 G U E S T P A R K I N G S P A C E S 96 ' - 5 1 / 2 " CO R R I D O R CO R R I D O R STAIR 02ELEVSTAIR 03 ST A I R EL E V ST A I R 0 4 STAIR 01BARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:27:32 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 116036 A 09DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UPDN DN UP 1 A 2 0 12 % 1 B E D 1 B E D 1 B E D 2 B E D 1 B E D 1 B E D 1 BED1 BED JR 1 BED JR ST O . STORAGE 2 BED 2 BED 1 BED STORAGE TR A S H ST O R A G E 2' - 4 1/2" OPEN TO LOBBY BELOW 2' - 7 " R 2 2' - 0 " 6% 4' - 4 1 / 2 " 9' - 0 " C CCCCC C C C C C CC C C CC CC C C C C C C C C C C C C C C C C C C C C C R 24' - 0" 2 A 1 9 1 A 1 9 2 A 2 0 ID F TRASH 8' - 1 " 37 1 ' - 7 1 / 2 " 20' - 4" 2' - 4 1/2"232' - 8"23' - 2 1/2" 9' - 0 " 5 ' - 4 1 / 2 " 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " 4' - 4 1 / 2 " 9' - 0 " 9' - 0 " 5' - 4 1 / 2 " 9' - 0 " 5 ' - 0 " 4' - 0 " 9' - 0 " 9' - 0 " 5' - 0 " 4' - 0 " 9' - 0 " 9' - 0 " 4' - 0 " 5' - 0 " 9 ' - 0 " 5' - 0 " 9' - 0 " 9' - 0 " 4' - 0 " 24' - 0"18' - 0"4' - 7" 18 ' - 0 " 24 ' - 0 " 18' - 0"24' - 2"17' - 0"22' - 0"18' - 0"24' - 0"18' - 0"18' - 0"24' - 0"17' - 0" 9' - 0"5' - 0"9' - 0"5' - 0"9' - 0" 9' - 0 " 5 ' - 0 " 9' - 0 " 9' - 0" 9' - 0" 4' - 4"5' - 0 " 9' - 0 " CL TYP 2' - 0"CL TYP 3' - 0"CL TYP 3' - 0"CL TYP 3' - 0"CL TYP. 3' - 0"CL TYP 3' - 10" TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 1' - 0" TYP 2' - 10" 13 ' - 0 " 12 ' - 5 " 13 ' - 0 " 13 ' - 0 " 34 7 ' - 0 " 13' - 0"13' - 0" 13 ' - 0 " 73 ' - 7 " 20 ' - 4 1 / 2 " 10 0 ' - 3 " 42' - 9 1/2"6' - 0 1/2"32' - 1"27' - 8 1/2"203' - 2"27' - 4 1/2" 2' - 7 " 41 ' - 0 " 27 5 ' - 5 1 / 2 " 23' - 6"5' - 1"32' - 1"20' - 4" 28' - 2" 96 ' - 6 " SE R V I C E S ST A I R 0 4 EL E V OV E R S I Z E D PA C K A G E S LO B B Y LOBBYCONFCONFSTAIR 02ELEVSTAIR 03 ST A I R STAIRSTAIR 01 CO R R I D O R BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:27:42 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 216036 A 10DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL DN 1 A 2 0 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 3 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 2 B E D 1 B E D J R 1+ B E D 2 B E D 2 B E D 2 B E D 1 B E D J R 1 B E D J R 1+ B E D 1 B E D 2 B E D 2 B E D 3 B E D 1 B E D J R 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 BED1 BED 3 BED 1 BED 1 BED 1 BED2 BED2 BED COMMUNITY / CLUB /REC ROOM TR A S H TRASH AM E N I T Y 2 A 1 9 1 A 1 9 2 A 2 0 ID F 5' - 6 " 96 ' - 5 1 / 2 " 73 ' - 7 1 / 2 " 20 ' - 4 1 / 2 " 14 3 ' - 0 " 5' - 11 1/2"32' - 3" 37 1 ' - 7 1 / 2 " 136' - 3"14' - 3"16' - 1" 3 8 ' - 2 1 /2 " 1 1 4 ' - 6 1 /2 " 1 0 ' - 0 " 6 6 ' - 5 1 / 2 " 2 ' - 1 0 1 / 2 " 1 8 ' - 1 1 /2 " 17 ' - 1 " 11 9 ' - 7 1 / 2 " 26 ' - 1 1 " 12 0 ' - 1 " 37' - 5"32' - 1 1/2" 20' - 5 1/2"158' - 6" 232' - 6" 6 9 ' - 4 " 13' - 10 1/2"75' - 1"12' - 10 1/2" 14 ' - 7 1 / 2 " 14 ' - 3 " PO D I U M C O U R T Y A R D (S E E L A N D S C A P E D R A W I N G S ) PO D I U M C O U R T Y A R D (S E E L A N D S C A P E D R A W I N G S ) 6 9 ' - 6 " 9 ' - 1 1 / 2 " BRIDGE ABOVE 9' - 4 " CL39' - 11" C L 4 0 ' - 0 " 35 9 ' - 0 " 25 ' - 0 " 35 9 ' - 0 " 359' - 0" 35 9 ' - 0 " 35 9 ' - 0 " 25 ' - 0 " 25 ' - 0 " 8 ' - 9 1 / 2 " 3 ' - 2 1 /2 " 3' - 0" 2' - 5 " 37 7 ' - 3 1 / 2 " 20' - 4"3 BED1 BED SE R V I C E S SE R V I C E S 1 B E D J R SE R V I C E S SE R V I C E S STAIR 02ELEVSTAIR 03 ST A I R EL E V ST A I R 0 4 STAIR 01BARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:28:00 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 316036 A 11DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 1 A 2 0 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED2 BED2 BED 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1+ B E D 1+ B E D 1 B E D J R 1 B E D J R 3 B E D 3 BED 3 BED1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 3 B E D 1 BED 1 B E D J R OPEN TO BELOW TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 27' - 8"203' - 2"27' - 4 1/2"136' - 3"14' - 3"16' - 1" 3 8 ' - 2 1 /2 " 1 1 4 ' - 6 1 /2 " 1 0 ' - 0 " 6 6 ' - 5 1 / 2 " 2 ' - 1 0 1 / 2 " 1 8 ' - 1 1 /2 " 6 9 ' - 4 " 13' - 10 1/2"75' - 1"12' - 10 1/2" 14 ' - 7 1 / 2 " 14 ' - 7 1 / 2 " UN I T A B O V E B R E E Z E W A Y 9 ' - 1 1 / 2 " C L 4 0 ' - 0 " 35 ' - 4 " 35' - 4" 35 ' - 4 " 35 ' - 4 " 49' - 0"10' - 4" 20 ' - 4 1 / 2 " 10 0 ' - 3 " 11' - 5"31' - 4"5' - 11 1/2"32' - 2 1/2" 7' - 1 1 " 37 1 ' - 9 1 / 2 " 20' - 4" 158' - 6"40' - 2"34' - 2" 2' - 3"34' - 2"198' - 7 1/2"23' - 2 1/2" 2' - 5 " 41 ' - 0 " 33 6 ' - 3 1 / 2 " 20' - 4" 21 ' - 4 " 1 9 ' - 8 " 11 9 ' - 9 " 27 ' - 0 " 12 0 ' - 0 1 / 2 " 69' - 6" SE R V I C E S SE R V I C E S SE R V I C E S SE R V I C E S 1 BED COMMUNITY / CLUB /REC ROOMSTAIR 02ELEVSTAIR 03 ST A I R EL E V ST A I R 0 4 STAIR 01BARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:28:13 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 416036 A 12DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 1 A 2 0 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED2 BED 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1+ B E D 1 B E D J R 1 B E D J R 3 B E D 3 BED 3 BED1 BED2 BED1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 3 B E D 1 BED 1 B E D J R TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 23' - 2 1/2"4' - 5 1/2"203' - 2"27' - 4 1/2"136' - 3"14' - 3" 75 ' - 6 " 16' - 1" 3 8 ' - 2 1 /2 " 1 1 4 ' - 6 1 /2 " 1 0 ' - 0 " 6 6 ' - 5 1 / 2 " 2 ' - 1 0 1 / 2 " 1 8 ' - 1 1 /2 " 6 9 ' - 4 " 13' - 10 1/2"75' - 1"12' - 10 1/2" 14 ' - 7 1 / 2 " 14 ' - 7 1 / 2 " 1 B E D J R 2 3 ' - 1 1 " 9 ' - 0 " C L 4 0 ' - 0 " 45' - 8" 94 ' - 4 " 75 ' - 1 0 1 / 2 " 20 ' - 5 " 10 0 ' - 2 " 11' - 5"31' - 4"5' - 11 1/2"32' - 2 1/2" 7' - 1 1 " 37 1 ' - 9 1 / 2 " 20' - 4" 23' - 2 1/2"198' - 7 1/2"34' - 2"2' - 3" 158' - 6"40' - 2"34' - 2" 21 ' - 4 " 1 9 ' - 8 " 11 9 ' - 9 " 27 ' - 0 " 12 0 ' - 0 1 / 2 " 69' - 6" 2' - 5 " 37 7 ' - 3 1 / 2 " 20' - 4"49' - 0"10' - 4"1 BED ST O R A G E SE R V I C E S SE R V I C E S 1+ B E D STAIR 02ELEVSTAIR 03 ST A I R EL E V ST A I R 0 4 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:28:26 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 516036 A 13DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 1 A 2 0 RESIDENT LOUNGE 3 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 BED2 BED2 BED 1 B E D J R 1+ B E D 1 B E D J R 1 B E D J R 3 BED 2 BED1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 3 B E D 1 BED 1 B E D TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 27' - 8"196' - 0"34' - 6 1/2"109' - 8"14' - 3"16' - 1" 3 8 ' - 2 1 /2 " 1 1 4 ' - 6 1 /2 " 1 0 ' - 0 " 6 6 ' - 5 1 / 2 " 2 ' - 1 0 1 / 2 " 6 9 ' - 4 " OUTDOOR LOUNGE 1 B E D J R 2 3 ' - 1 1 " 9 ' - 0 " PR I V A T E R O O F TE R R A C E 56' - 0"56' - 0" 56 ' - 0 " 56' - 0"20' - 4" 20 ' - 4 1 / 2 " 10 0 ' - 3 " 11' - 5"31' - 4"5' - 11 1/2"32' - 3"7' - 2"41' - 10"10' - 0"144' - 2" 18 4 ' - 2 1 / 2 " 25' - 8" 12 0 ' - 0 1 / 2 " 31' - 4"32' - 10 1/2"5' - 4" SE R V I C E S ELEV STAIR 02STAIR ST A I R EL E V BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:28:38 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 616036 A 14DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 1 A 2 0 OPEN TO RESIDENT LOUNGE BELOW1 BED 1 BED 1 BED 2 BED1 BED3 BED3 BED 3 B E D 2 B E D 2 B E D 2 B E D 1 B E D J R 2 B E D 2 B E D 1 B E D 1 B E D J R 2 B E D 3 B E D 1 B E D J R 1 B E D TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 DS DS ID F PR I V A T E R O O F TE R R A C E ME C H A N I C A L EN C L O S U R E ME C H A N I C A L EN C L O S U R E OPEN TO DECK BELOW B R I D G E B E L OW 4 ' - 0 " 6 6 ' - 5 1 / 2 " 2 ' - 1 0 1 / 2 " 4 ' - 0 " 6 9 ' - 4 " 4 ' - 0 " 6 9 ' - 4 " 4 ' - 0 " 4' - 0"64' - 2"4' - 1"31' - 10"191' - 10"34' - 6 1/2"31' - 4"32' - 10 1/2"64' - 2"26' - 7" RO O F O V E R H A N G ROOF OVERHANG ROOF OVERHANG RO O F O V E R H A N G PR I V A T E R O O F TE R R A C E C L 4 0 ' - 0 " 66 ' - 4 " 66' - 4"56' - 0" 66 ' - 4 " 2' - 1"2' - 0"8' - 7 1/2" 2 ' - 0 " 2 2 5 ' - 1 0 " 2 ' - 0 " 18 4 ' - 2 1 / 2 " 25' - 8"1+ BED SE R V I C E S EL E V S T A I R ELEV STAIR 02STAIR 03BARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:28:49 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 716036 A 15DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL DN SLOPESLOPE SLOPE S L O P E S L O P E S L O P E S L O P E SLOPE SL O P E SL O P E SLOPE SL O P E S L O P E SL O P E SLOPE SL O P E SL O P E SL O P E SL O P E S L O P E SL O P E S L O P E SL O P E SLOPE SL O P E SL O P E SLOPE SL O P E SLOPE SL O P E SL O P E S L O P E SL O P E SLOPE SL O P E S L O P E SLOPE S L O P E SLOPE S L O P E SL O P E SLOPE SLOPESLOPESLOPESLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SL O P E S L O P E S L O P E S L O P E 1 A 2 0 OPEN TO BELOW 2 A 1 9 1 A 1 9 2 A 2 0 DA S H E D L I N E I N D I C A T E S A R E A DE S I G N A T E D F O R F U T U R E S O L A R PA N E L S ( 1 0 % O F R O O F A R E A M I N . ) ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N ME C H A N I C A L EN C L O S U R E ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N DS DS DS DS DS DS DS DS B E L O W DS DSDSDSDS DS DS B E L O W DSDS DS BR I D G E B E L O W ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N 77' - 8"78' - 0"83' - 4"77' - 1" DS DS DS DS DSDSDSDSDS 77 ' - 8 " 84 ' - 5 " 66 ' - 4 " 33 ' - 7 " 6' - 3" 2 9 ' - 7 " 7 ' - 6 " 94 ' - 4 " 6' - 1 1 / 2 " 72 ' - 9 " 17 ' - 5 1 / 2 " 10 7 ' - 6 1 / 2 " 72' - 4" 7' - 1 1 " 37 0 ' - 6 1 / 2 " 21' - 7" 2' - 5 " 37 5 ' - 1 1 1 / 2 " 21' - 8" 41 ' - 0 " 11 9 ' - 9 " 23 ' - 1 0 " 72 ' - 9 1 / 2 " 46 ' - 3 1 / 2 " 72' - 4"21' - 1 1/2"204' - 7 1/2"32' - 5 1/2" 23' - 2 1/2"232' - 9 1/2"2' - 3" 11' - 1 1/2"23' - 0 1/2"40' - 2"158' - 6" 7 7 ' - 5 " 1 9 ' - 6 " BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:04 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - ROOF16036 A 16DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0" 1 6 2 15 13 7 1 7 3 2 PENTHOUSE ROOF 418' - 8" EN C R O A C H M E N T S A R E A L L O W E D U N D E R C H A P T E R 3 2 O F TH E 2 0 1 6 C B C 20 1 6 C B C 3 2 0 2 . 3 . 3 E N C R O A C H M E N T S 1 5 O R M O R E F E E T AB O V E G R A D E . EN C R O A C H M E N T S 1 5 F E E T ( 4 5 7 2 M M ) O R MO R E A B O V E G R A D E S H A L L N O T B E L I M I T E D . 23' - 9" 4' - 4"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0" 3 8 7156 1 LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"2 6 1 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PENTHOUSE ROOF 418' - 8"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0" 7 8 3 3 1 8 A 2 5 1 1 / 1 6 " = 1 ' - 0 " A 1 7 2 SO U T H E L E V A T I O N 1 / 1 6 " = 1 ' - 0 " A 1 7 1 WE S T E L E V A T I O N BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:15 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"EXTERIOR ELEVATIONS - SOUTH & WEST16036 A 17DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'0 MA T E R I A L S L E G E N D NO . MA T E R I A L 1 C E M E N T P L A S T E R 2F I B E R C E M E N T P A N E L 3 T I L E O R T H I N S E T M A S O N R Y P R O D U C T 4 F I B E R C E M E N T A C C E N T P A N E L 5 M E C H A N C I A L S C R E E N 6 P E R F O R A T E D M E T A L S C R E E N 7G L A Z I N G 8 P E R F O R A T E D M E TA L B A L U S T R A D E 9 M E T A L P A N E L 10 G L A Z E D B A L C O N Y D O O R 11 S T O R E F R O N T W I N D O W S Y S T E M 12 M T L P A N E L 13 D E C O R T I V E M E T A L F I N 14 C A N O P Y 15 F I B E R C E M E N T L A P S I D I N G 16 M E T A L S U N S H A D E 17 V I N Y L W I N D O W 18 B A L C O N Y 19 J U L I E T B A L C O N Y 20 S T E E L B R I D G E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 15 2 2 8 15 7 2 7 8 6 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"6 LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"18 5 3 7 15 2 7 8 7 8 8 7 2 8 15 3 PENTHOUSE ROOF 418' - 8"MEASURED TO THE MIDPOINT OF SLOPED ROOF 13' - 0"12' - 0"10' - 4"10' - 4"10' - 4"10' - 4"14' - 8"25' - 0"56' - 0"81' - 0" 2 5 5 A 2 5 2 1 / 1 6 " = 1 ' - 0 " A 1 8 2 EA S T E L E V A T I O N 1 / 1 6 " = 1 ' - 0 " A 1 8 1 NO R T H E L E V A T I O N BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:24 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"EXTERIOR ELEVATIONS - NORTH & EAST16036 A 18DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'0 MA T E R I A L S L E G E N D NO . MA T E R I A L 1 C E M E N T P L A S T E R 2 F I B E R C E M E N T P A N E L 3 T I L E O R T H I N S E T M A S O N R Y P R O D U C T 4 F I B E R C E M E N T A C C E N T P A N E L 5 M E C H A N C I A L S C R E E N 6 P E R F O R A T E D M E T A L S C R E E N 7G L A Z I N G 8 P E R F O R A T E D M E T A L B A L U S T R A D E 9 M E T A L P A N E L 10 G L A Z E D B A L C O N Y D O O R 11 S T O R E F R O N T W I N D O W S Y S T E M 12 M T L P A N E L 13 D E C O R T I V E M E T A L F I N 14 C A N O P Y 15 F I B E R C E M E N T L A P S I D I N G 16 M E T A L S U N S H A D E 17 V I N Y L W I N D O W 18 B A L C O N Y 19 J U L I E T B A L C O N Y 20 S T E E L B R I D G E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED 2 BED GA R A G E GA R A G E 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PROPERTY LINE CAMPBELL LN PROPERTY LINE SHARED PRIVATE DRIVE MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D GA R A G E GA R A G E ME C H A N I C A L EN C L O S U R E PROPERTY LINE CAMPBELL LN PROPERTY LINE SHARED PRIVATE DRIVE 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:31 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"BUILDING SECTIONS -NORTH/SOUTH16036 A 19DUBLIN STATION DEMARCUS BOULEVARD 1 / 1 6 " = 1 ' - 0 " A 1 9 2 BU I L D I N G S E C T I O N - N O R T H / S O U T H 1 / 1 6 " = 1 ' - 0 " A 1 9 1 BU I L D I N G S E C T I O N - N O R T H / S O U T H 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" GA R A G E GA R A G E 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 3 B E D 3 B E D 3 B E D 1+ B E D 1+ B E D 1+ B E D 1 B E D J R 1 B E D J R 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"RESIDENT LOUNGE 3 BED 3 BEDCOMMUNITY / CLUB /REC ROOM LOBBY1 BEDPROPERTY LINE PROPERTY LINE DE MARCUS BVLD CAMPBELL LN MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"3 BED LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" BO I L E R RO O M BI K E ST O R A G E GARAGE GARAGE GA R A G E GA R A G E ST O R A G E FITNESS2 BED2 BED2 BED2 BED2 BED3 BED1 BED 1 BED 1 BED 1 BED 1 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PROPERTY LINE PROPERTY LINE DE MARCUS BVLD CAMPBELL LN 1 B E D J R 1 B E D J R 1 B E D J R 1 B E D J R 1 B E D J R 10' - 4"7' - 10"10" 59' - 0" 56' - 0"25' - 0"81' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOFBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:36 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"BUILDING SECTIONS -EAST/WEST16036 A 20DUBLIN STATION DEMARCUS BOULEVARD 1 / 1 6 " = 1 ' - 0 " A 2 0 2 BU I L D I N G S E C T I O N - E A S T / W E S T 1 / 1 6 " = 1 ' - 0 " A 2 0 1 BU I L D I N G S E C T I O N - E A S T / W E S T 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL K W/D WS DW REF VL K L K W/D WS DW REF V L L K L L W/ D V WS Q DW REF W/D Q V DW REF L 1 B E D 70 7 S F BEDROOM LI V I N G DI N I N G KITCHEN EN T R Y BATHROOMCLOSET 2 B E D 99 0 S F LI V I N G DI N I N G KITCHEN EN T R Y CL O S E T BE D R O O M 1 MA S T E R BE D R O O M CL O S E T BA T H R O O M BA T H R O O M 3 B E D 11 8 0 S F LI V I N G KITCHEN DI N I N G DE N / O F F I C E BE D R O O M 2 MA S T E R BE D R O O M BA T H R O O M BA T H R O O M CLOSET CL O S E T EN T R Y CL O S E T 1 B E D J R 56 0 S F KITCHEN ENTRY DI N I N G BATHROOMBEDROOMLIVINGBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:43 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/4" = 1'-0"ENLARGED TYPICAL UNIT PLANS16036 A 21DUBLIN STATION DEMARCUS BOULEVARD 1 / 4 " = 1 ' - 0 " A 2 1 2 TY P . 1 B E D R O O M U N I T 1 / 4 " = 1 ' - 0 " A 2 1 3 TY P . 2 B E D R O O M U N I T 1 / 4 " = 1 ' - 0 " A 2 1 4 TY P . 3 B E D R O O M U N I T 2'4'8'16'12'0 1 / 4 " = 1 ' - 0 " A 2 1 1 TY P . J R . 1 B E D R O O M U N I T 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:47 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 22DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:50 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 23DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:53 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 24DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL F.O.S. F.O.S. FD B - c c - 0 0 6 ST U C C O R E T U R N NA I L F I N W I N D O W WD . F R A M I N G , S S D . DR A I N A G E M A T SE A L A N T & B A C K E R R O D SI L L B E L O W ST U C C O LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"4 A 25SIM.THINSET TILE CEMENT PLASTER COLOR O2WIN FRAME COLOR O1 PERFORATED METAL BALUSTRADE PERFORATED METAL SCREEN CEMENT PLASTER COLOR O2 LE V E L 1 33 4 ' - 0 " LE V E L 2 34 7 ' - 0 " LE V E L 3 35 9 ' - 0 " LE V E L 4 36 9 ' - 4 " LE V E L 5 37 9 ' - 8 " LE V E L 6 39 0 ' - 0 " LE V E L 7 40 0 ' - 4 " FI B E R C E M E N T LA P S I D I N G WI N F R A M E CO L O R O 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:30:01 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedAPPENDIX16036 A 25AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 3 " = 1 ' - 0 " A 2 5 4 TY P I C A L R E C E S S E D W I N D O W J A M B 1 / 4 " = 1 ' - 0 " A 2 5 1 EN L A R G E D W E S T E L E V A T I O N 0 2 1 / 4 " = 1 ' - 0 " A 2 5 2 EN L A R G E D N O R T H E L E V A T I O N 08.29.17ENT RESUBMITTAL COLOR 04 CO L O R 0 2 C O L O R 0 3 COLOR 05 CO L O R 0 1 W I N C O L O R 0 1 W I N C O L O R 0 1 W I N C O L O R 0 2 WIN COLOR 02 STOREFRONT COLORBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:31:18 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedBUILDING MATERIALS16036 P 01RV/MS PCDUBLIN STATION DEMARCUS BOULEVARD MA T E R I A L S CO L O R S FIBER CEMENT PANEL CE M E N T P L A S T E R FI B E R C E M E N T S I D I N G 08.29.17ENT RESUBMITTAL Page 1 of 11 STAFF REPORT PLANNING COMMISSION DATE: November 14, 2017 TO: Planning Commission SUBJECT: PUBLIC HEARING: Ashton at Dublin Station (Transit Center Site A-3) Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 (PLPA 2017- 00036) Prepared by: Martha Battaglia, Associate Planner EXECUTIVE SUMMARY: The Applicant, Ashton at Dublin Station, is proposing to construct a residential project comprised of 220 apartment units, and related amenities including a fitness center, pool, roof top lounge, and 331 spaces of structured parking on an approximately 2.36-acre site located within the Dublin Transit Center. The proposed mix of residential units includes 122 one-bedroom units, 79 two-bedroom units and 19 three-bedroom units. The site has a land use designation of High Density Residential (25.1 or greater units per acre). The application includes a Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 for condominium purposes. The Planning Commission will review the proposed project and make a recommendation to the City Council. RECOMMENDATION: Disclose ex-parte contacts, conduct the public hearing, deliberate and adopt the following Resolutions: a) Recommending that the City Council adopt an Ordinance rezoning the Dublin Transit Center Site A-3 project site to PD-Planned Development and approving a Stage 2 Development Plan; and b) Recommending that the City Council approve the Site Development Review Permit and Tentative Map 8437 for the Dublin Transit Center Site A-3 project. PROJECT DESCRIPTION: Background The Dublin Transit Center area generally is bounded on the north by Dublin Boulevard, on the south by Interstate 580 and the existing Dublin/Pleasanton BART station, on the east by Arnold Road, and on the west by the Iron Horse Trail (Figure 1). Page 2 of 11 In December 2002, the City Council adopted entitlements establishing the Transit Center. This included General Plan and Eastern Dublin Specific Plan Amendments (Resolution 216-02) to incorporate this area into the Eastern Dublin Specific Plan area and establishing land uses. The project included Planned Development Zoning with a Stage 1 Development Plan (Ordinance 21-02) which established the permitted uses; site areas and proposed densities; maximum number of residential units and non- residential square footage; and a Master Landscaping Plan. The approval also included a Master Development Agreement (Ordinance 5-03) approved in May 2003. The Dublin Transit Center project area allows for the development of 1,500 residential units on Sites A, B and C; two million square feet of campus office and up to 300 residential units on Sites D and E; and 70,000 square feet of retail uses at street level on Sites B through E, and a 1-acre Village Green located between Sites B and C. Sites A, B and C have been developed with the exception of Site A-3, which is the subject of this Staff Report. Project Site Site A-3 is the last remaining site with a residential land use designation in the Transit Center. The 2.36 acre site is located south of a private street, east and north of Campbell Lane, and west of DeMarcus Boulevard as shown in Figure 1. The site has a General Plan and EDSP land use designation of High Density Residential and Planned Development Zoning with a Stage 1 Development Plan. Figure 1. Vicinity Map The project site is rectangular in shape and has a relatively flat topography. The project site is paved and has previously been used as a parking lot and a construction staging area. There are no permanent structures, existing drainage courses, or native vegetation located on the site. Surrounding street improvements are limited to curbs and gutters along DeMarcus Boulevard and Campbell Lane. This vacant site is surrounded by existing developments (Table 1). Page 3 of 11 Table 1. Surrounding Land Uses LOCATION ZONING GENERAL PLAN LAND USE CURRENT USE OF PROPERTY Building Height North PD High Density Residential Camellia Place – 112 units 53 feet 3 stories over 1 level of parking South PD Public/Semi-Public PG&E Substation N/A East PD High Density Residential Elan – 257 multi- family townhomes & condominiums 65 feet 5 stories over parking West PD Medium-High Density Residential Tribeca – 52 townhomes 40 feet 3 stories Current Request Ashton at Dublin Station is requesting approval of a 220-unit apartment building, which includes residential amenities consisting of a fitness center, pool, roof top lounge, and 331 spaces of structured parking. The proposed mix of residential units includes 122 one-bedroom units, 79 two-bedroom units and 19 three-bedroom units. The current request for the proposed project includes: • Planned Development Zoning - Planned Development Rezone with a related Stage 2 Development Plan. • Site Development Review Permit - Site Development Review Permit for 220 apartment units, with related amenities and structured parking with 331 spaces. • Subdivision - Tentative Map 8437 for condominium purposes. ANALYSIS: Planned Development Zoning The application includes a Planned Development Rezone with a related Stage 2 Development Plan. The existing Planned Development Zoning Stage 1 Development Plan established a maximum building height for high density residential of 5 stories over parking and a parking standard of 1.5 spaces per unit for residential land uses. The project site is part of Site A, an 8.29 net acre area delineated as Sites A-1, A-2 and A-3. The Planned Development Zoning originally anticipated up to 530 units across all of Site A. The number was later reduced to 430 units when 100 units were transferred to Site C. The total number of units constructed in the Dublin Transit Center project area, including the proposed project, would be 1,451 units. This is 46 units less than Page 4 of 11 anticipated for Site A, and 49 units less than the total allocation of 1,500 units for the overall Transit Center, as shown in Table 2. Table 2. Transit Center Residential Development Site Project Name Units Constructed/Proposed Units Permitted Difference A-1 Tribeca (52 Units) 384 430 46 A-2 Camellia Place (112 Units) A-3 Ashton @ Dublin Station (220 units) B-1 Elan (257 Units) 562 565 3 B-2 Eclipse (305 units) C-1 Avalon (505 units) 505 505 --- Total 1,451 1,500 49 The proposed Stage 2 Planned Development Zoning is in compliance with the requirements of the Dublin Zoning Ordinance and will establish the detailed development plan for the site. This includes a preliminary site plan, development standards, architectural standards, and a preliminary landscape. The project is compatible with the land use concept to maximize transit opportunities presented by the adjacent Dublin/Pleasanton BART Station; conforms to the development standards adopted for the Dublin Transit Center; and contributes to a vibrant, pedestrian friendly environment. A Resolution recommending that the City Council adopt an Ordinance approving the Planned Development Rezone with related Stage 2 Development Plan for the Dublin Transit Center Site A-3 is included as Attachment 1, with the draft City Council Ordinance included as Exhibit A. Site Development Review Site Plan The primary entry lobby is located near the northwest corner of DeMarcus Boulevard and Campbell Lane. The primary entry lobby that fronts on this corner has a two story volume and is set back to accommodate a pedestrian plaza. A secondary entry lobby is located mid-block on the north side of the building along the private street that is shared with Camellia Place. Similar to the primary entry, the building is set back creating a smaller pedestrian plaza with landscaping. Vehicle access to the structured parking will be through a garage entry located on Campbell Lane. The project includes frontage improvements and landscaping consistent with the improvements throughout the Transit Center. Page 5 of 11 Residential amenities including a lobby, fitness center and a leasing office (approximately 6,200 square feet) are proposed along DeMarcus Boulevard. Ground- floor residential units with front stoops are proposed on the north elevation, which enhance the residential scale and character established by the Camellia Place residential project across the street. Architecture The project architecture has a contemporary aesthetic with angular lines and includes a variety of high quality exterior materials and colors. Façade treatments include stucco, fiber cement and metal accent, metal window surrounds, limited areas of storefront glazing and metal and translucent entry canopies. Balconies and screening inserts used within the garage include translucent perforated metal screening. The proposed project includes unique architectural features and massing elements to provide visual interest as well as open space for the occupants. The design includes two opposing yet complementary tilted overhanging roof forms which accentuate the taller massing elements of the building. The roof design allows the top-level units to have generous windows and optimized views of the surrounding area. The project’s design provides visual interest as viewed from Interstate 580 to the south and the pedestrian pathways along DeMarcus Boulevard and Campbell Lane. The design of the east podium courtyard allows glimpse in from the surrounding area and also provides a strong pedestrian visual scale for the project. The two-story parking podium façades face Campbell Lane to the west and south. The parking garage has been designed to include architectural elements that provide functional screening as well as visual interest. The façade of the parking structure is comprised of framed openings which provide articulation and depth along the ground floor. Infill surfaces fill the frames and angle inward in varying directions. The architecture elements described can be seen in the renderings below. Aerial at SE corner – Campbell Lane & DeMarcus Blvd. Page 6 of 11 The massing of the proposed building is consistent with the scale of the adjacent buildings with the tallest massing located at the east side of the project opposite the adjacent buildings along DeMarcus Boulevard (Elan and Avalon). The lowest massing is located on the west side opposite the lower height townhouses across Campbell Lane (Tribeca). The proposed range of building heights, including 3, 4 and 5 residential stories, over parking podium gives the project a sense of visual interest and variation in roof profile, and it enables the building to respond contextually to the preexisting massing variation within the Transit Center. A feature of the building projects over a portion of the sidewalk adjacent to Campbell Lane. The total projection area is approximately 300 square feet as shown in Figure 2 below. The projection into the right-of-way includes living space, balconies and roof overhang. The projection starts on the third floor at 23 feet above grade so as not to conflict with use of the sidewalk. SE corner – Campbell Lane & DeMarcus Blvd. NE corner – DeMarcus Blvd. SW corner – Campbell Lane NW corner – Campbell Lane Page 7 of 11 Figure 2. Right Of Way Projection The City will quitclaim fee title ownership of the area with the proposed building projection, while reserving a public access easement and a utility easement over the area. These easements will allow for continued use of this area by the public and utility companies. Landscaping The landscaping has been designed to be consistent with and completes the streetscape as identified in the Design Guidelines for the overall Dublin Transit Center. Similar to other higher density residential developments, landscaping and recreational amenities are used to provide quality open areas and visual relief. Plantings and hardscape elements are used to create neighborhood identification and an attractive community entry. Colored concrete unit pavers connect the project site with the rest of the Dublin Transit Center, while helping to define the main entries and gathering spaces. The landscape plan includes trees, along with flowering shrubs and groundcover, which line and define the project entry. Perimeter areas are proposed to be landscaped with a variety of drought tolerant plant materials that are low maintenance and encourage water conservation. Please refer to Sheets L2.00-L5.00 of the attached plans (Exhibit A to the City Council Resolution) for the proposed plant palette. Page 8 of 11 The project includes two podium level roof courtyards and a swimming pool on the third floor. Amphitheater stair seating is proposed near the project’s southeast corner within the pedestrian plaza. Benches and raised planters are located throughout the landscape public spaces. There is a 20’ storm drain easement located along the eastern property boundary along DeMarcus Boulevard. This easement area is planted with a variety of taller flowering shrubs and succulents that delineate the space without using fences or walls. In compliance with water quality requirements, flow through planters are located on the northern portion of the project site and within the open courtyard areas. The plantings within these areas include grasses and flowering plants. Private sidewalks with public access are proposed on all four frontages. The project includes a variety of site lighting, including tree uplight, pool & spa lighting, stake mounted LED lights along pathways, recessed planter wall lights and decorative string lights. The conceptual lighting plan is shown on Sheet L6.00 of the attached plans. Floor Plans The project includes a mix of studio, one, two and three-bedroom flats that vary in size and layout. The floor plans are shown on Sheet A21 of the attached plans. Access to the units would be primarily from interior corridors with exception to the stoop units along the private street facing Camellia Place to the north. An open-air bridge comprised primarily of perforated metal screen is visible from the south elevation and provides a connection across the eastern podium. Table 3 below details the square footage of the individual units as well as the percentage of each unit type within the project. TABLE 3. Floor Plans Unit Type Square Footage # of Units % of Project Jr. 1 Bedroom 640 SF 22 10.0% 1 Bedroom 800 SF 92 41.8% 1+ Bedroom 975 SF 8 3.6% 2 Bedroom 1,120 SF 79 35.9% 3 Bedroom 1,280 SF 19 8.6% Total 100% Parking The Development Regulations for the Dublin Transit Center require 1.5 parking spaces per unit, which includes guest parking. Based on this standard, a total of 330 spaces would be required. The proposed project provides 331 spaces located within a two– Page 9 of 11 story podium parking garage. Fifteen percent (15%) of the required parking spaces (50 spaces) are unassigned guest parking spaces. Additionally, surface stalls will be located on the public streets along the project frontage, which are not included in the parking requirement for the project. Bicycle storage parking is provided on the first floor of the parking garage. A total of 130 bicycle parking stalls are provided. Affordable Housing/Inclusionary Zoning The Dublin Transit Center requires 15% of the residential units be affordable units. The Camellia Place apartment project on Site A-2 has been used to satisfy the very low and low portion of the inclusionary housing requirement for the project. Ten percent (10%) of the units in the proposed project are required to be affordable to moderate income household earning between 80% and 120% of the area median income adjusted for actual household size. The affordable units are required to reflect the range of numbers of bedrooms provided in the project. The applicant proposes to provide the required number of moderate income units (22) which will include a range of one, two and three- bedroom units. A Condition of Approval has been placed on the project that requires the applicant to enter into an Affordable Housing Agreement. Public Art Compliance The project is part of a comprehensive plan to provide public art as part of the Dublin Transit Center project. The public art requirement has already bene satisfied. Tentative Map Although the project is proposed for occupancy as apartments, the Applicant is requesting approval of a Tentative Map for condominium purposes as is common with other recent apartment projects. A Resolution recommending that the City Council approve the Site Development Review Permit and Tentative Map is included as Attachment 2, with the draft City Council Resolution included as Exhibit A. CONSISTENCY WITH THE GENERAL PLAN AND ZONING ORDINANCE: The project site has a current General Plan and EDSP land use designation of High Density Residential and consistent Planned Development Zoning. The proposed project is consistent with the land use designation and zoning. The project will contribute to housing opportunities and diversity of product type and complement the surrounding neighborhoods. The proposed project has been reviewed for conformance with the Community Design and Sustainability Element of the General Plan. The project has been designed to be compatible with adjacent and surrounding development. Pedestrian circulation and Page 10 of 11 gathering spaces have all been linked together with sidewalks and public and private streets. In general, the proposed project furthers the goals of the Community Design and Sustainability Element of the General Plan by providing a high quality of life and preserving resources and opportunities for future generations. REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES: The Building Division, Fire Prevention Bureau, Public Works Department, and Dublin San Ramon Services District reviewed the project and provided Conditions of Approval where appropriate to ensure that the Project is established in compliance with all local Ordinances and Regulations. Conditions of Approval from these departments and agencies have been included in the attached Resolution pertaining to the Site Development Review Permit and Tentative Map (Exhibit A to Attachment 2). ENVIRONMENTAL REVIEW: The City has determined that the project qualifies for a statutory exemption from CEQA under Government Code section 65457. The proposed project is consistent with the General Plan Land Use Designation for Site A-3 and does not exceed the units allowed by the Dublin Transit Center Stage 1 Planned Development Zoning. An EIR has been certified for the Dublin Transit Center Stage 1 Planned Development Zoning. The CEQA document in Support of a Specific Plan Exemption finds that no event as specified in Section 21166 of the Public Resources Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a supplemental CEQA document. Public Resources Code Section 21166 and CEQA Guidelines Section 15162 identify the conditions requiring subsequent environmental review. After a review of these conditions, the City has determined that no subsequent EIR or Negative Declaration is required for this project. The CEQA Analysis in Support of a Specific Plan Exemption is included as Attachment 3. The 2002 Dublin Transit Center EIR, upon which the exemption relies, is available for review at the Planning Division in City Hall during normal business hours. PUBLIC NOTICING: In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project to advertise the project and the and posted at several locations throughout the City. A copy of this Staff Report has been provided to the Applicant. ATTACHMENTS: 1. PC Resolution recommending that the City Council adopt an Ordinance Rezoning the Dublin Transit Center Site A-3 1a. Exhibit A to Attachment 1 Page 11 of 11 2. PC Resolution recommending that the City Council approve the SDR & Tentative Map for site A-3 2a. Exhibit A to Attachment 2 2b. Exhibit A to City Council Resolution approving the SDR & Tentative Map 3. Ashton at Dublin Station_CEQA Analysis Page 1 of 4 STAFF REPORT CITY COUNCIL DATE: December 5, 2017 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Ashton at Dublin Station (Transit Center Site A-3) Planned Development Rezone with a Related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 (PLPA 2017-00036) Prepared by: Martha Battaglia, Associate Planner EXECUTIVE SUMMARY: The Applicant, Ashton at Dublin Station, is proposing to construct a residential project comprised of 220 apartment units, and related amenities including a fitness center, pool, roof top lounge, and 331 spaces of structured parking on an approximately 2.36-acre site located within the Dublin Transit Center. The proposed mix of residential units includes 122 one-bedroom units, 79 two-bedroom units and 19 three-bedroom units. The site has a land use designation of High Density Residential (25.1 or greater units per acre). The application includes a Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 for condominium purposes. Staff recommends that the project be found exempt from CEQA pursuant to Government Code 65457 for residential projects that are consistent with a specific plan. STAFF RECOMMENDATION: Conduct the public hearing, deliberate and a take the following actions: a) Waive the reading and INTRODUCE an Ordinance Approving a Planned Development Rezone District and Related Stage 2 Development Plan for the Transit Center Site A-3, APN: 986-0034-009-00, PLPA 2017-00036; and, b) Adopt the Resolution Approving A Site Development Review Permit and Tentative Map 8437 for the Transit Center Site A-3 Project, APN: 986-0034-009-00, PLPA-2017-00036. FINANCIAL IMPACT: No financial impact to the City. All costs associated with this request are borne by the Applicant. Page 2 of 4 PROJECT DESCRIPTION: Background The Dublin Transit Center area generally is bounded on the north by Dublin Boulevard, on the south by Interstate 580 and the existing Dublin/Pleasanton BART station, on the east by Arnold Road, and on the west by the Iron Horse Trail (Figure 1). In December 2002, the City Council adopted entitlements establishing the Transit Center. This included General Plan and Eastern Dublin Specific Plan Amendments (Resolution 216-02), a Planned Development Rezone with a Stage 1 Development Plan (Ordinance 21-02), and subsequently, a Master Development Agreement (Ordinance 5- 03) adopted in 2003. Together, these entitlements allow development of up to 1,500 residential units on Sites A, B and C of the Transit Center. Sites A, B and C have been developed with the exception of Site A-3, which is the subject of this Staff Report. Project Site Site A-3 is the last remaining site with a residential land use designation in the Transit Center. The 2.36-acre site is located south of a private street, east and north of Campbell Lane, and west of DeMarcus Boulevard as shown in Figure 1. The site has a General Plan and EDSP land use designation of High Density Residential and Planned Development Zoning with a Stage 1 Development Plan. Figure 1. Vicinity Map Current Request The property owner, Ashton at Dublin Station is requesting approval of a 220-unit apartment building, with residential amenities including of a fitness center, pool, roof top lounge, and 331 spaces of structured parking. The proposed mix of residential units includes 122 one-bedroom units, 79 two-bedroom units and 19 three-bedroom units. The following is a brief overview of the requested entitlements. Please refer to the Planning Commission Staff Report (Attachment 1) for a complete analysis of the project. • Planned Development Zoning - Planned Development Rezone with a related Stage 2 Development Plan (Attachment 2). Page 3 of 4 • Site Development Review Permit - To construct a 220-unit apartment project, with related amenities and structured parking with 331 spaces (Attachment 3 and 4). • Tentative Map 8437 - For condominium purposes (Attachment 3 and 4). The City Council is being requested to take action on the Ashton at Dublin Station project because it includes an approval for which the City Council is the decision maker (i.e. the Planned Development Zoning). Consistent with past practice, the Planning Commission is the reviewing body and the City Council is the decision making body for this entire project application. PLANNING COMMISSION REVIEW: The Planning Commission held a Public Hearing on November 14, 2017 to review the proposed project (Attachment 5). Six members of the public spoke in opposition to the project. The City also received thirteen comment letters regarding the proposed project (Attachment 6). After conducting the Public Hearing, the Planning Commission recommended that the City Council approve the proposed project (Attachments 7, 8 and 9). PUBLIC NOTICING: In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project to advertise the project and posted at several locations throughout the City. A copy of this Staff Report has been provided to the Applicant. ENVIRONMENTAL REVIEW: The City has determined that the project qualifies for a statutory exemption from CEQA under Government Code section 65457. The proposed project is consistent with the General Plan Land Use Designation for Site A-3 and does not exceed the units allowed by the Dublin Transit Center Stage 1 Planned Development Zoning. An EIR has been certified for the Dublin Transit Center Stage 1 Planned Development Zoning. The CEQA document in Support of a Specific Plan Exemption finds that no event as specified in Section 21166 of the Public Resources Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a supplemental CEQA document. Public Resources Code Section 21166 and CEQA Guidelines Section 15162 identify the conditions requiring subsequent environmental review. After a review of these conditions, the City has determined that no subsequent EIR or Negative Declaration is required for this project. The CEQA Analysis in Support of a Specific Plan Exemption is included as Attachment 10. The 2002 Dublin Transit Center EIR, upon which the exemption relies, is available for review at the Planning Division in City Hall during normal business hours. ATTACHMENTS: 1. Planning Commission Staff Report dated November 14, 2017 without attachments Page 4 of 4 2. Ordinance Rezoning the Dublin Transit Center Site A-3 Project Site to PD-Planned Development and Approving a Stage 2 Development Plan 3. Resolution Approving a Site Development Review Permit and Tentative Map 8437 for the Dublin Transit Center Site A-3 Project 4. Exhibit A to City Council Resolution - Site Development Review and Tentative Map 5. Draft Planning Commission Meeting Minutes dated November 14, 2017 6. Public Comment Letters 7. Planning Commission Resolution 17-12 Recommending that the City Council Adopt an Ordinance Rezoning the Dublin Transit Center Site A-3 8. Planning Commission Resolution 17-13 Recommending that the City Council Approve the Site Development Review for Site A-3 9. Planning Commission Resolution 17-14 Recommending that the City Council Approve the Tentative Map for Site A-3 10. Ashton at Dublin Station CEQA Analysis Update