STAFF REPORT
CITY COUNCIL
DATE: March 20, 2018
TO: Honorable Mayor and City Councilmembers
FROM:
Christopher L. Foss, City Manager
SUBJECT:
Zeiss Innovation Center: Planned Development Zoning with a related
Stage 1 and Stage 2 Development Plan (PLPA 2017-00025)
Prepared by: Martha Battaglia, Associate Planner
EXECUTIVE SUMMARY:
The City Council will hold a second reading and consider adopting an Ordinance
amending the Zoning Map and approving a Planned Development Zoning District with a
related Stage 1 and Stage 2 Development Plan for the Zeiss Innovation Center project.
The Zeiss Innovation Center project consists of a 433,090 square foot research and
development campus comprised of two buildings, a parking structure, and associated
site, frontage, and landscape improvements to be built in two phases. On March 6,
2018, the City Council introduced an ordinance approving a Planned Development
Rezone with a Stage 1 and Stage 2 Development Plan for the entire 11.36 acre site.
The City Council also approved a Site Development Review Permit for Phase 1, which
includes a 208,650 square foot research and development building, surface parking and
related site improvements and approved a Supplemental Mitigated Negative Declaration
that was prepared for the project under the California Environmental Quality Act.
STAFF RECOMMENDATION:
Waive the reading and adopt an Ordinance Amending the Zoning Map and Approving a
Planned Development Zoning District with a related Stage 1 and Stage 2 Development
Plan for the Zeiss Innovation Center.
DESCRIPTION
The project site is approximately 11.36 acres of land located on the northeast corner of
Dublin Boulevard and Arnold Road, as shown in the vicinity map below. The site, which
is referred to as Site 15A, is currently owned by the Alameda County Surplus Property
Authority and will be sold to the Applicant. The property has a General Plan and Eastern
Dublin Specific Plan land use designation of Campus Office, which allows for the
development of a “campus-like setting for office and other non-retail commercial uses.”
Typical uses include professional and administrative offices, research and development,
business and commercial services, and limited light manufacturing.
Page 2 of 2
Figure 1: Project Vicinity
The Applicant, Carl Zeiss Inc., plans to consolidate several of their northern California
facilities in Dublin. To accommodate this, they are proposing a campus office
development of up to 433,090 square feet on Site 15A. The project would include two
contemporary office buildings, a parking structure and associated site, frontage and
landscape improvements to be constructed in two phases. Please refer to Attachment 1
for a complete description of the project.
On March 6, 2018, the City Council held a public hearing to consider the proposed
project (Attachment 2). At that meeting, the City Council waived the reading and
introduced an Ordinance to adopt a Planned Development Rezone with a related Stage
1 and Stage 2 Development Plan. The City Council also adopted resolutions adopting a
Supplemental Mitigated Negative Declaration and Mitigation Monitoring and Reporting
Program and approving a Site Development Review Permit for Phase 1 of the Zeiss
Innovation Center project.
This evening the City Council will consider adopting the Ordinance approving the
Planned Development Zoning District with a related Stage 1 and Stage 2 Development
Plan for the Zeiss Innovation Center project (Attachment 3).
ATTACHMENTS:
1. Planning Commission Staff Report dated February 13, 2018, without Attachments
2. City Council Staff Report dated March 6, 2018, without Attachments
3. Ordinance Adopting Planned Development Zoning for the Zeiss Innovation Center
Boulevard
Persimmon
Place
Formerly SAP
Transit Center
Ross Campus Microdental
Hacienda
Crossings
Page 1 of 11
STAFF REPORT
PLANNING COMMISSION
DATE: February 13, 2018
TO: Planning Commission
SUBJECT:
PUBLIC HEARING: Zeiss Innovation Center - Planned Development
Rezone with a related Stage 1 and Stage 2 Development Plan and Site
Development Review Permit (PLPA-2017-00025)
Prepared by:Martha Battaglia, Associate Planner
EXECUTIVE SUMMARY:
The Planning Commission will consider and make a recommendation to the City
Council regarding the Zeiss Innovation Center project. The proposed project consists of
a 433,090 square foot research and development campus comprised of two buildings, a
parking structure, and associated site, frontage, and landscape improvements to be
built in two phases. Requested land use approvals include a Planned Development
Rezone with a related Stage 1 and Stage 2 Development Plan for the entire 11.36 acre
site, and a Site Development Review Permit to construct Phase 1. The initial phase
includes a 208,650 square foot research and development building, surface parking and
related site improvements. A Supplemental Mitigated Negative Declaration was
prepared for the project under the California Environmental Quality Act (CEQA).
RECOMMENDATION:
Disclose ex-parte contacts, conduct the public hearing, deliberate and adopt the
following Resolutions: a) Recommending that the City Council adopt a Resolution
adopting a Supplemental Mitigated Negative Declaration for the Zeiss Innovation Center
project; b) Recommending that the City Council Adopt an Ordinance amending the
Zoning Map and approving a Planned Development Zoning District with a related Stage
1 and Stage 2 Development Plan for the Zeiss Innovation Center project; and c)
Recommending that the City Council adopt a Resolution approving a Site Development
Review Permit for Phase 1 of the Zeiss Innovation Center project.
DESCRIPTION:
Carl Zeiss, Inc. has submitted an application to build a research and development
facility on approximately 11.36 acres of land located on the northeast corner of Dublin
Boulevard and Arnold Road, as shown in the vicinity map below. The property has a
General Plan and Eastern Dublin Specific Plan land use designation of Campus Office,
which allows for the development of a “campus-like setting for office and other non-retail
commercial uses.” Typical uses include professional and administrative offices,
Page 2 of 11
research and development, business and commercial services, and limited light
manufacturing.
Figure 1: Project Vicinity
The project site and the site immediately to the east (formerly SAP/Sybase) were originally
one parcel commonly referred to as Site 15. Site 15 previously had a High Density
Residential land use designation. In June 2000, Site 15 was subdivided into two parcels.
The land use designation for the eastern parcel (Site 15B) was changed from High-Density
Residential to Campus Office and approval was granted to develop the two 6-story office
buildings totaling approximately 418,000 square feet that exist today.
In 2001, Cisco Systems submitted an application to develop Sites 15A (project site) and
16A (located south of Dublin Boulevard). The proposal included a General Plan and
Specific Plan Amendment to change the land use designation of Site 15A from High-
Density Residential to Campus Office. The total proposed development between Site 15A
and 16A combined was 862,000 square feet. A total of 433,500 square feet was assigned
to Site 15A. Cisco Systems later withdrew their application; however, the property owner
(Alameda County Surplus Property Authority) continued processing the General Plan and
Specific Plan amendments for Site 15A.
In 2003, the City Council approved the General Plan and Eastern Dublin Specific Plan
Amendment to change the land use designation of the project site to Campus Office
(Resolution 66-03). The City Council also adopted a Mitigated Negative Declaration,
Statement of Overriding Considerations and a Mitigation Monitoring Program for the
project (Resolution 65-03).
The Applicant, Carl Zeiss Inc., is currently proposing a 433,090 square foot campus
office development on Site 15A. The project would include two office buildings, a
Boulevard
Persimmon
Place
Formerly SAP
Transit Center
Ross Campus Microdental
Hacienda
Crossings
Page 3 of 11
parking structure and associated site, frontage and landscape improvements to be
constructed in two phases. The application includes a request for the following:
1. Planned Development Rezone with a related Stage 1 & Stage 2 Development
Plan for the entire site.
2. Site Development Review Permit for the Phase 1 building and related site
improvements.
3. Approval of a Supplemental Mitigated Negative Declaration.
ANALYSIS:
Planned Development Rezone
The proposed Planned Development Rezone with a related Stage 1 and 2 Development
Plan meets the requirements outlined in Chapter 8.32 of the Dublin Zoning Ordinance.
The proposed PD will establish the detailed development plan for the entir e project site.
This includes a list of permitted uses, preliminary site plan, development standards,
architectural standards, phasing and preliminary landscape plan.
The proposed PD will allow Campus Office uses consistent with the intent of the
Campus Office land use designation. The PD includes development standards that
would allow up to 433,090 square feet of development on the project site with a
maximum Floor Area Ratio (FAR) of 0.80 combined across Sites 15A and 15B as
shown in Table 1 below.
Table 1. Floor Area Ratio
Parcel Lot Area Development Floor Area
Ratio
Site 15A (APN: 986-0014-010) 494,842 SF 433,090 SF
Site 15B (APN: 986-0014-011) 625,843 SF 418,442 SF
Total 1,120,685 SF 851,532 SF 76%
The PD allows for buildings of up to 5 stories and a building height of no more than 75
feet to the finished floor of the highest story. The maximum building height is 90 feet
(tower elements, architectural and articulated design features, solar panels and small -
scale wind turbines may extend 10 feet above maximum beyond this height). These
development standards are consistent with the existing office buildings to the east on
Site 15B (formerly Sybase/SAP).
The project is proposed to be developed in two phases as shown in Table 2 and the site
plans below.
Page 4 of 11
Table 2. Phasing Plan
Building/Use Size
(Square
Feet)
Estimated
construction
timeframe
Phase 1 Building 1: R&D, office, warehouse,
showroom/demo center, surface parking and
related improvements.
208,650 SF 2018-2020
Phase 2 Building 2: R&D, office, warehouse
Parking Structure
224,440 SF 2025-2030
Total Project Size 433,090 SF
Phase 1 Site Plan Phase 2 Site Plan
A Resolution recommending that the City Council approve the Planned Development
Zoning is included as Attachment 1 with the draft Ordinance included as Attachment 2
to this Staff Report.
Site Development Review Permit – Phase 1
The first phase of the Zeiss Innovation Center is the 208,650 square foot research and
development facility. This facility will contain research and development labs, offices, a
demonstration center and show room, warehouse, loading area, shipping and receiving,
an employee cafeteria, along with surface parking for 664 vehicles and associated site
improvements such as landscaping and frontage improvements. Please refer to
Attachments 3 and 4 for the project plans.
Site Plan
The project site includes seasonal wetlands that occur as nine separate topographic
depressions where seasonal inundation and/or saturation occur during the rain y
season. The Applicant is proposing to preserve the largest wetland area (W06), which is
located in the approximate center of the project site. The site plan was largely
influenced by the location of W06 and the Applicant’s decision, in consultation with the
environmental resource agencies, to preserve this wetland area (a more in depth
Page 5 of 11
discussion of the wetland is included in the landscape section). Refer to Attachment 3,
Sheet A1.00 for the site plan and Sheet C2.00 for the location of the wetlands.
The proposed building is located at an angle to the site. The longest elevations of the
building are oriented to the north and south (facing Dublin Boulevard). At the
southwestern corner of the building the setback to the property line is approximately 220
feet from Dublin Boulevard. At the southeastern corner of the building the setback to
the property line is approximately 50 feet. Along the western property boundary, the
building setback is 20 feet. The portion of the site fronting Dublin Boulevard consi sts of
generous tree plantings and a bio-retention area. The bio-retention area located in the
southwestern portion of the site covers 11,700 square feet and will treat the stormwater
runoff from building rooftops, surface parking lots, roadways and the Phase 2 parking
garage. An entry plaza is located north of the building, which includes a water feature
and an outdoor seating area.
A trash/recycling enclosure, nitrogen/emergency generator enclosure and loading areas
are located at the east side of the building.
Access, Circulation, and Parking
Vehicular access to the project will be provided primarily by an existing shared driveway
on Central Parkway called Park Place. A secondary access for delivery and emergency
vehicles will be provided through the adjacent Park Place campus by way of an existing
driveway on Dublin Blvd.
A surface parking lot is proposed north of the building. This surface parking lot will be
replaced by a second office building and parking structure when Phase 2 is developed.
The Phase 1 site plan identifies 664 parking spaces, and includes 40 spaces for electric
vehicles and charging facilities.
The proposed building will include research and development labs and offices.
Therefore, the parking requirement is a blend of two different use types. The total
required parking for the Phase 1 office building (208,650 square feet) is 614 parking
spaces as shown in Table 3 below. The project will include 50 more vehicular spaces
than is required. The project also provides 35 long-term and 35 short term bicycle
parking spaces in both lockers and racks.
Table 3: Required Parking
Use Parking Requirement Total Area Required Number of
Parking Spaces
Laboratory Space 1 per 300 square feet 36,483 SF 122
All other areas (office,
showroom, cafeteria,
etc.)
1 per 350 square feet 172,167 SF 492
Total Stalls Required 614
Total Stalls Provided 664
Surplus 50
Page 6 of 11
The Applicant will also be providing shuttle service to and from the East
Dublin/Pleasanton BART station as part of their Transport ation Demand Management
(TDM) program.
Building Design/Architecture
The north/south orientation of the building was designed to provide naturally lit interior
spaces. The building orientation is to the landscaped corner at Dublin Boulevard and
Arnold Road. The east elevation of the building pulls south to accommodate the
preserved wetland area on the north side of the building. The proposed office building is
3 stories and is 50 feet to the top of the roof and 62 feet to the top of the roof screen.
The project architecture is
contemporary with angular lines
and includes high quality
exterior materials. Overall the
proposed Zeiss Innovation
Center building design is
modern, with extensive glass
glazing on all four elevations.
Façade treatments include
glass panels, façade glazing,
translucent glass, and metal
panels. Separating the individual glass panels are translucent vertical “fins” on all
elevations of the building. The vertical fins will control the light entering the building and
create texture on the façade. Different types of glass are used in different areas of the
building. Translucent glass is used on the first floor where the labs are located and also
surround the stairwells. The translucent glass allows light to pass through; however, the
light is diffused so that people and objects on the opposite side are not clearly visible.
Transparent glass is used on the first floor at the lobby and on the upper floors where
the offices, open space areas and cafeteria are located. Please refer to Attachment 3,
Sheets A2.02 and A2.03 for the building elevations.
The contemporary design of the Zeiss Innovation Center complements the surrounding
area. The adjacent office building, BART station, Persimmon Place, and The Boulevard
residential development all have contemporary architecture with color palettes and
urban forms that are clean and simple and site designs that emphasizes interaction and
access to common spaces. The following are schematic views of the proposed project.
Please refer to Attachments 3 and 4 for complete plans.
Page 7 of 11
Landscape Plan
Landscape features are located on both the north and south sides of the building. To
the north of the building is an enhanced seasonal wetland and a surrounding buffer
planted with wetland and native plants. The proposed project would avoid and enhance
the largest wetland located on the site by planting native wetland vegetation, and
preserving the upland buffer around its perimeter. The Applicant is preserving 0.85
View from Dublin Blvd.
Zeiss Innovation Center Aerial
Entry Plaza Area
Page 8 of 11
acres on the site, which includes the 0.58 acre wetland area and an additional 0.27 acre
buffer area.
The Applicant proposes to create a park-like environment adjacent to the wetland that is
accessible to the public. An impervious pathway is proposed to be constructed wi thin
the buffer surrounding the seasonal wetland. Located west of the seasonal wetland are
a 20-foot wide pedestrian boardwalk, landscaped garden, and a permanent water
feature. An outdoor seating area is proposed just north of the building near the water
feature, as shown in the rendering above.
Landscaping south of the building would include shrubs surrounding a landscaped bio -
retention basin. A grove of trees is proposed south of the building. Shrubs and trees are
also proposed around the perimeter of the project site. The trees along the perimeter of
the site are all 24” box. The interior of the site includes a mix of tree sizes consisting of
15 gallon, 24” box, 36” box and 48” box. Refer to Attachment 3, Sheet L4.01 for
additional information on tree species and sizes, and the plant palette.
Public Art Compliance
The Applicant has elected to provide public art on the project site. The location of the
public art has not yet been finalized. The art piece and location is subject to review by
the Heritage and Cultural Arts Commission and approval by the City Council. However,
the Applicant is proposing to locate public art near the wetland area where it will be
accessible to the public.
A Resolution recommending that the City Council approve the Site Development
Review Permit for Phase 1 is included as Attachment 5 to this Staff Report with the
Draft City Council Resolution included as Attachment 6.
CONSISTENCY WITH THE GENERAL PLAN AND ZONING ORDINANCE :
The proposed project is consistent with the General Plan and Eastern Dublin Specific
Plan Land Use designation of Campus Office, which allows for research and
development uses. The proposed project has been reviewed for conformance with the
Community Design and Sustainability Element of the General Plan. The project has
been designed to be compatible with adjacent and surrounding developments.
Pedestrian circulation and gathering spaces have been linked together with sidewalks
and public streets. In general the proposed project furthers the goals of the Community
Design and Sustainability Element of the General Plan by providing a high quality
building that is utilizing contemporary, high-quality materials and finishes in compliance
with the design guidelines.
REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES:
The Building Division, Fire Prevention Bureau, Public Works Department, and Dublin
San Ramon Services District reviewed the project and provided Conditions of Approval
where appropriate to ensure that the project is established in compliance with al l local
ordinances and regulations. Conditions of Approval from these departments and
agencies have been included in the attached Resolution pertaining to the Site
Development Review (Attachment 6).
Page 9 of 11
ENVIRONMENTAL REVIEW:
The development on the project site has been addressed in two prior CEQA documents,
an Environmental Impact Report (EIR) for the Eastern Dublin Specific Plan and a
Mitigated Negative Declaration (MND) for the proposed Cisco project. The project site is
located within the Eastern Dublin Specific Plan area and was addressed in the General
Plan Amendment/Eastern Dublin Specific Plan EIR. The General Plan Amendment and
Eastern Dublin Specific Plan were adopted by the City Council to encourage orderly
growth of the Eastern Dublin Specific Plan area. The Eastern Dublin Specific Plan EIR
is a Programmatic EIR and evaluated the potential environmental effects of urbanizing
Eastern Dublin.
On May 10, 1993, the Dublin City Council adopted Resolution No. 51 -93, certifying an
Environmental Impact Report for the Eastern Dublin General Plan Amendment and
Eastern Dublin Specific Plan (Eastern Dublin EIR, SCH #91103064). The certified EIR
consisted of a Draft EIR and Responses to Comments bound volumes, as well as an
Addendum dated May 4, 1993, assessing a reduced development alternative. The City
Council adopted Resolution No. 53-93 approving a General Plan Amendment and a
Specific Plan for the reduced area alternative on May 10, 1993. On August 22, 1994,
the City Council adopted a second Addendum updating wastewater disposal plans for
Eastern Dublin.
The Eastern Dublin EIR addressed the cumulative effects of developing in agricultural
and open space areas and the basic policy considerations accompanying the change in
character from undeveloped to developed lands.
In 2001, the City prepared an Initial Study to evaluate site-specific impacts of the proposal
to change the General Plan and Eastern Dublin Specific Plan land use designation of Site
15A from High Density Residential to Campus Office. The Initial Study included a greater
level of detail than the program EIR. Based on the Initial Study, the City prepared and
circulated a Mitigated Negative Declaration (Cisco Systems MND, SCH #1991103064). It
was determined that with the implementation of Mitigation Measures previously adopted
for the Program EIR and with site-specific Mitigation Measures contained in the Initial
Study, potential site specific impacts of the proposed project would be reduced to a level of
insignificance, and therefore, the proposed project would not have a significant effect on
the environment.
Consistent with CEQA section 21166 and related CEQA Guidelines sections
15162/15163, the City prepared an Initial Study to determine whether additional
environmental review was required for the proposed project. The Initial Study examined
whether there were substantial changes to the proposed development, substantial
changes in circumstances, or new information, any of which would result in new or more
severe significant impacts than analyzed in the prior EIR and MND or if any other CEQA
standards for supplemental environmental review were met. The Initial Study
determined that there were new potentially significant impacts associated with the
project related to biological resources; therefore, a Supplemental Mitigated Negative
Declaration was prepared to analyze those biological impacts. A Resolution
recommending that the City Council adopt the Supplemental Mitigated Negative
Declaration is included as Attachment 7 with the draft City Council Resolution included
as Attachment 8. The Supplemental Mitigated Negative Declaration/Initial Study is
included as Attachment 9.
Page 10 of 11
The project is subject to mitigations identified in the Supplemental Mitigated Negative
Declaration, the previously adopted Mitigated Negative Declaration, and the Eastern
Dublin Specific Plan EIR as applicable. The City will monitor the Applicant’s compliance
with mitigation measures as the project is constructed and operated under the Mitigation
Monitoring and Reporting Program adopted in conjunction with the project approvals.
The Mitigation Monitoring and Reporting Program is included as Attachment 10.
The Supplemental Mitigated Negative Declaration/Initial Study was circulated for a
public review period from December 13, 2017 to January 30, 2018. The City received
four comment letters during the public review period. Though not required by CEQA, the
City prepared a response to the comments (Attachment 11).
The environmental effects of the project are discussed in deta il in the Supplemental
MND for the project. However, the following is a summarized list of potential project
impacts on biological resources and the mitigation measures recommended by the
Supplemental MND to reduce these impacts to a less-than-significant level.
Potential Impacts – Biological Resources
Seasonal wetlands are located on 1.03 acres of the project site and occur as nine
separate topographic depressions where seasonal inundation and/or saturation occur
during the rainy season. Vegetation within the seasonal wetlands is sparse, and
dominated by a mixture of predominantly non -native grasses and forbs, all of which are
adapted to high levels of disturbance. Implementation of the proposed project would
result in permanent impacts to 0.45 acres of seasonal wetlands and preserve the
remaining 0.58 acres. In addition to the seasonal wetlands, two locally rare plant
species were identified, namely; Congdon’s tarplant and California dock.
Mitigation Measure BIO-1 requires a pre-construction survey be conducted for
Burrowing Owls prior to any ground disturbance and mitigation for any impacts on the
owls. Mitigation Measure BIO-2 requires that rare plant surveys be conducted within the
construction zone and mitigation for impacts on protected plant speci es. Mitigation
Measure BIO-3 requires the performance of pre-construction breeding bird surveys be
conducted no more than 14 days prior to initial ground disturbance and avoidance of
disturbance of any active nests. Mitigation Measure BIO-4 requires the Applicant to
obtain all required resource agency permits and approval of a wetland mitigation plan
that ensures no-net loss of wetland and waters habitat prior to obtaining the first site
grading or building permit for development activities involving ground disturbance.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
In accordance with the City’s policy, the Applicant installed a Planning Application
Notice Sign along the project frontages. The sign includes details about the project and
how to find out more information. The project is also included on the City’s Project
Development Website.
In accordance with State law, a public hearing notice was published in the East Bay
Times and posted at several locations throughout the City. Notices were mailed to all
property owners and tenants within 300 feet of the project site. Notices were also mailed
to interested parties, which included the agencies that provided comments on the
Page 11 of 11
Supplemental Mitigated Negative Declaration. A copy of the Staff Report has been
provided to the Applicant and posted to the City’s website.
ATTACHMENTS:
1. Resolution Recommending Adoption of a Planned Development Zoning Ordinance
2. Exhibit A to Attachment 1. Draft City Council Ordinance Adopting Planned
Development Zoning
3. Project Plans
4. Color Renderings
5. Resolution Recommending City Council Approval of the Site Development Review
Permit for Phase 1
6. Exhibit A to Attachment 5. Draft City Council Resolution Approving the Site
Development Review Permit for Phase 1
7. Resolution Recommending Adoption of a Supplemental Mitigated Negative
Declaration
8. Exhibit A to Attachment 7. Draft City Council Resolution Adopting the Supplemental
Mitigated Negative Declaration
9. Exhibit A to Attachment 8. Zeiss Innovation Center Supplemental Mitiga ted Negative
Declaration/Initial Study
10. Exhibit B to Attachment 8. Mitigation Monitoring and Reporting Program
11. Response to Comments February 2018
Page 1 of 4
STAFF REPORT
CITY COUNCIL
DATE: March 6, 2018
TO: Honorable Mayor and City Councilmembers
FROM:
Christopher L. Foss, City Manager
SUBJECT:
Zeiss Innovation Center: Planned Development Zoning with a related
Stage 1 and Stage 2 Development Plan, and Site Development Review
Permit (PLPA 2017-00025)
Prepared by: Martha Battaglia, Associate Planner
EXECUTIVE SUMMARY:
The City Council will consider the Zeiss Innovation Center project, which consists of a
433,090 square foot research and development campus comprised of two buildings, a
parking structure, and associated site, frontage, and landscape improvements to be
built in two phases. Requested approvals include a Planned Development Rezone with
a Stage 1 and Stage 2 Development Plan for the entire 11.36 acre site, a Site
Development Review Permit for Phase 1, which includes a 208,650 square foot
research and development building, surface parking and related site improvements and
adoption of a Supplemental Mitigated Negative Declaration that was prepared for the
project in accordance with the California Environmental Quality Act.
STAFF RECOMMENDATION:
Conduct the public hearing, deliberate and a take the following actions: a) Adopt the
Resolution adopting a Supplemental Mitigated Negative Declaration and Mitigation
Monitoring and Reporting Program for the Zeiss Innovation Center; b) Waive the
reading and INTRODUCE an Ordinance Amending the Zoning Map and Approving a
Planned Development Zoning District with a related Stage 1 and Stage 2 Deve lopment
Plan for the Zeiss Innovation Center; and c) Adopt the Resolution Approving the Site
Development Review Permit for Phase 1 of the Zeiss Innovation Center project.
DESCRIPTION
The project site is approximately 11.36 acres of land located on the no rtheast corner of
Dublin Boulevard and Arnold Road, as shown in the vicinity map below. The site, which
is referred to as Site 15A, is currently owned by the Alameda County Surplus Property
Authority and will be sold to the Applicant. The property has a General Plan and Eastern
Dublin Specific Plan land use designation of Campus Office, which allows for the
development of a “campus-like setting for office and other non-retail commercial uses.”
Page 2 of 4
Typical uses include professional and administrative offices, r esearch and development,
business and commercial services, and limited light manufacturing.
Figure 1: Project Vicinity
Current Request
The Applicant, Carl Zeiss Inc., plans to consolidate several of their northern California
facilities in Dublin. To accommodate this, they are proposing a campus office
development of up to 433,090 square feet on Site 15A. The project would include two
contemporary office buildings, a parking structure and associated site, frontage and
landscape improvements to be constructed in two phases.
Phase 1 of the Zeiss Innovation Center includes a 208,650 square foot, 3 -story
research and development building. This facility will contain research and development
labs, offices, a demonstration center and show room, warehouse, loading area, shipping
and receiving, an employee cafeteria. The site plan includes surface parking for 664
vehicles and associated site improvements including enhanced seasonal wetlands and
walking trail, entry plaza and fountain, landscaping and f rontage improvements.
Phase 2 will be built in the future to include a second research and development
building of up to 224,440 square feet and a parking structure to support both Phase 1
and 2. The majority of the surface parking will be eliminated wit h construction of the
Phase 2 improvements. Please refer to the Planning Commission Staff Report
(Attachment 1) for a complete analysis of the project.
The following is a brief overview of the requested entitlements.
Boulevard
Persimmon
Place
Formerly SAP
Transit Center
Ross Campus Microdental
Hacienda
Crossings
Page 3 of 4
1. Planned Development Rezone with a related Stage 1 & Stage 2 Development
Plan for the entire site (Attachment 2).
2. Site Development Review Permit for the Phase 1 building and related site
improvements (Attachment 3, 4 & 5).
3. Supplemental Mitigated Negative Declaration (Attachment 6).
PLANNING COMMISSION REVIEW:
The Planning Commission held a Public Hearing on February 13, 2018 to review the
proposed project. Two members of the public spoke in opposition to the project and
submitted comment letters (Attachment 7). The Planning Commission un animously
recommended that the City Council approve the project (Attachment 8).
ENVIRONMENTAL REVIEW:
The development on the project site has been addressed in three CEQA documents, an
Environmental Impact Report (EIR) for the Eastern Dublin Specific Pl an, a Mitigated
Negative Declaration (MND) for the proposed Cisco project and a Supplemental
Mitigated Negative Declaration for the proposed project. The project site is located
within the Eastern Dublin Specific Plan area and was addressed in the General Plan
Amendment/Eastern Dublin Specific Plan EIR (Eastern Dublin EIR, SCH #91103064).
The Eastern Dublin Specific Plan EIR is a Programmatic EIR and evaluated the
potential environmental effects of urbanizing Eastern Dublin. In 2001, the City prepared
and adopted a Mitigated Negative Declaration (Cisco Systems MND, SCH #1991103064)
to evaluate site-specific impacts of the change to the General Plan and Eastern Dublin
Specific Plan land use designation of Site 15A from High Density Residential to Campus
Office. The Mitigated Negative Declaration determined that with the implementation of
Mitigation Measures previously adopted for the Eastern Dublin Specific Plan EIR and with
site-specific Mitigation Measures contained in the Mitigated Negative Declaration, potential
site-specific impacts of the proposed project would be reduced to a level of insignificance,
and therefore, the proposed project would not have a significant effect on the environment.
Consistent with CEQA section 21166 and related CEQA Guidelin es sections
15162/15163, the City prepared an Initial Study to determine whether additional
environmental review was required for the proposed project. The Initial Study examined
whether there were substantial changes to the proposed development, substant ial
changes in circumstances, or new information, any of which would result in new or more
severe significant impacts than analyzed in the prior EIR and MND or if any other CEQA
standards for supplemental environmental review were met. The Initial Study
determined that there were new potentially significant impacts associated with the
project related to biological resources; therefore, a Supplemental Mitigated Negative
Declaration was prepared to analyze those biological impacts. The Supplemental
Mitigated Negative Declaration/Initial Study is included as Attachment 9.
The project is subject to mitigations identified in the Supplemental Mitigated Negative
Declaration, the Mitigated Negative Declaration, and the Eastern Dublin Specific Plan
EIR as applicable. The City will monitor the Applicant’s compliance with mitigation
measures as the project is constructed and operated under the Mitigation Monitoring
Page 4 of 4
and Reporting Program adopted in conjunction with the project approvals. The
Mitigation Monitoring and Reporting Program is included as Attachment 10.
The Supplemental Mitigated Negative Declaration/Initial Study was circulated for a
public review period from December 13, 2017 to January 30, 2018. The City received
four comment letters during the public review period. The City also received two letters
objecting to the CEQA analysis after the close of the comment period just prior to the
Planning Commission meeting. Though not required by CEQA, the City prepared
responses to the issues raised in the comment letters (Attachment 11).
The environmental effects of the project are discussed in detail in the documents
referenced above.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
In accordance with the City’s policy, the Applicant installed a Planning Application
Notice Sign along the project frontages. The sign includes details about the project and
how to find out more information. The project is also included on the City’s Project
Development Website.
In accordance with State law, a public hearing notice was publi shed in the East Bay
Times and posted at several locations throughout the City. Notices were mailed to all
property owners and tenants within 300 feet of the project site. Notices were also mailed
to interested parties, which included those that provided comments regarding the
Supplemental Mitigated Negative Declaration. A copy of the Staff Report has been
provided to the Applicant and posted to the City’s website.
ATTACHMENTS:
1. Planning Commission Staff Report dated 2.13.18 without attachments
2. Ordinance Adopting Planned Development Zoning with a Stage 1 and 2 Development
Plan
3. Resolution Approving a Site Development Review Permit for Phase 1
4. Exhibit A to Attachment 3 - Project Plans
5. Exhibit B to Attachment 3 - Color Renderings
6. Resolution Adopting the Supplemental Mitigated Negative Declaration
7. Planning Commission Draft Meeting Minutes Dated February 13, 2018
8. Planning Commission Resolutions No. 18-02, 18-03 & 18-04
9. Exhibit A to Attachment 6 - Supplemental Mitigated Negative Declaration & Initial
Study
10. Exhibit B to Attachment 6 - Mitigation Monitoring and Reporting Program
11. Response to Comments
1
ORDINANCE NO. XX – 18
AN ORDINANCE OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * * * * * * * * *
AMENDING THE ZONING MAP AND APPROVING A PLANNED DEVELOPMENT ZONING
DISTRICT WITH A RELATED STAGE 1 AND STAGE 2 DEVELOPMENT PLAN FOR THE
ZEISS INNOVATION CENTER PROJECT
PLPA 2017-00025
(APN 986-0014-010-00)
The Dublin City Council does ordain as follows:
SECTION 1. RECITALS
A. The Applicant, Carl Zeiss Inc., proposes to construct the Zeiss Innovation Center project,
which consists of a 433,090 square foot research and development campus comprised of two
buildings, a parking structure, and associated site, frontage, and landscape improvements.
Requested land use approvals include a Planned Development Rezone with a Stage 1 and
Stage 2 Development Plan, a Site Development Review Permit for Phase 1 (a 208,650 square
foot research and development building), and a Supplemental Mitigated Negative Declaration.
These planning and implementing actions are collectively known as the “Zeiss Innovation
Center Project” or the “Project”; and
B. The project site is approximately 11.36 acres located at the northeast corner of Dublin
Boulevard and Arnold Road (APN 986-0014-010-00).
C. The project is located in the General Plan Eastern Extended Planning Area and the
Eastern Dublin Specific Plan area, for which the City Council certified a Program Environmental
Impact Report by Resolution 51-93 (“Eastern Dublin EIR” or “EDEIR”, SCH 91103064) on May
10, 1993, which resolution is incorporated herein by reference. The Eastern Dublin EIR
identified significant impacts from development of the Eastern Dublin area, some of which could
not be mitigated to less than significant. Upon approval of the Eastern Dublin General Plan
Amendment and Specific Plan, the City Council adopted mitigations, a mitigation monitoring
program and a Statement of Overriding Considerations (Resolution 53 -93, incorporated herein
by reference).
D. In 2001, the City prepared a modified Initial Study to evaluate whether additional
environmental review than in the Eastern Dublin EIR was needed for a proposed Cisco
development project. Based on the Initial Study, the City prepared a Mitigated Negative
Declaration dated June 2001 (SCH 1991103064). The City Council adopted a Mitigated
Negative Declaration (MND), Statement of Overriding considerations and a Mitigation
Monitoring Program for the change in the General Plan designation and zoning on the project
site to Campus Office on April 15, 2003 (Resolution No. 65 -03, incorporated herein by
reference).
E. The City prepared a modified Initial Study to determine whether supplemental
environmental review was required for the proposed Zeiss Innovation Center project under
CEQA standards. The Initial Study examined whether there were substantial changes to the
proposed development, substantial changes in circumstances, or new information, any of which
2
would result in new or more severe significant impacts than analyzed in the prior Eastern Dublin
EIR and Cisco MND or whether any standards for supplemental en vironmental review were met.
F. Upon completion of the Initial Study it was determined that there were new potentially
significant impacts associated with the project related to biological resources; therefore, a
Supplemental Mitigated Negative Declaration was prepared to analyze those biological impacts.
G. The Supplemental Mitigated Negative Declaration/Initial Study was circulated for public
review from December 13, 2017 to January 30, 2018.
H. The City of Dublin received four comment letters during the public review period.
I. Following a public hearing on February 13, 2018, the Planning Commission adopted
Resolution 18-02 recommending that the City Council adopt the Supplemental Mitigated
Negative Declaration and Mitigation Monitoring and Reporting Program for the project, which
resolution is incorporated herein by reference and available for review at City Hall during normal
business hours.
J. Following a public hearing on February 13, 2018, the Planning Commission adopted
Resolution 18-03, recommending approval of the Planned Development Rezone and related
Stage 1 and 2 Development Plan, which resolution is incorporated herein by reference and
available for review at City Hall during normal business hours.
K. A Staff Report, dated March 6, 2018, and incorporated herein by reference, described
and analyzed the Project, including the Planned Development Rezone and related Stage 1 and
2 Development Plan, for the City Council.
L. On March 6, 2018, the City Council held a properly noticed public hearing on the project,
including the proposed Planned Development Rezone and related Stage 1 and 2 Development
Plan, at which time all interested parties had the opportunity to be heard .
M. The City Council considered the Supplemental Mitigated Negative Declaration and
related prior CEQA documents and all above referenced reports, recommendations, and
testimony prior to taking action on the project.
SECTION 2: FINDINGS
A. Pursuant to Section 8.32.070 of the Dublin Municipal Code, the City Council finds as follows.
1. The Zeiss Innovation Center Project (“the Project”) PD-Planned Development zoning
meets the purpose and intent of Chapter 8.32 in that it provides a comprehensive
development plan that creates a desirable use of land that is sensitive to surrounding
land uses by virtue of the layout and design of the site plan.
2. Development of the Zeiss Innovation Center project under the PD-Planned Development
zoning will be harmonious and compatible with existing and future development in th e
surrounding area in that the site will provide new office buildings in an area that has
similar uses nearby and is also adjacent to existing and future workplaces and residential
neighborhoods.
3
B. Pursuant to Sections 8.120.050.A and B of the Dublin Mu nicipal Code, the City Council finds
as follows.
1. The PD-Planned Development zoning for the Zeiss Innovation Center project will be
harmonious and compatible with existing and potential development in the surrounding
area in that the proposed site plan has taken into account sensitive adjacencies and will
provide employment opportunities to the surrounding neighborhoods. T he proposed site
plan has taken into account a land use type and density that is compatible with the
adjacent areas and densities.
2. The project site is physically suitable for the type and intensity of the zoning district being
proposed in that the project site is flat with improved public streets on three sides and
served by existing public utilities. The project site conditions are documented in the
Supplemental Mitigated Negative Declaration/Initial Study and prior certified
Environmental Impact Report (EIR) and Mitigated Negative Declaration, and the project
will implement all adopted mitigation measures , as applicable. There are no site
conditions that were identified in the Supplemental Mitigated Negative Declaration/Initial
Study that will present an impediment to development of the site for the proposed
campus office development.
3. The PD-Planned Development zoning will not adversely affect the health or safety of
persons residing or working in the vicinity, or be detrimental to the public health, safety
and welfare in that the project will comply with all applicable development regulations and
standards and will implement all adopted mitigation measures, as applicable. The project
uses are compatible with surrounding uses.
4. The PD-Planned Development zoning is consistent with and in conformance with the
Dublin General Plan and the Eastern Dublin Specific Plan, in that the proposed use as a
research and development facility is consistent with the existing Campus Office land use
designations for the site.
Pursuant to the California Environmental Quality Act, the City Council finds as follows:
1. Pursuant to the California Environmental Quality Act, the City Council adopted a
Supplemental Mitigated Negative Declaration and Mitigation Monitoring and Reporting
Program via Resolution 21-18 on March 6, 2018, prior to approving the project.
SECTION 3: ZONING MAP AMENDMENT
Pursuant to Chapter 8.32, Title 8 of the City of Dublin Municipal Code the City of Dublin Zoning
Map is amended to rezone the property described below to a Planned Development Zoning
District and supersedes and replaces the previously adopted zoning (Resolution 105 -85):
11.36 acres located on the northeast corner of Dublin Boulevard and Arnold Road .
(Assessor Parcel Numbers 986-0014-010-00) (“the Property”).
4
A map of the rezoning area is shown below:
SECTION 4. APPROVAL OF STAGE 1 & STAGE 2 DEVELOPMENT PLAN
The regulations for the use, development, improvement, and maintenance of the Property are
set forth in the following Stage 1 and Stage 2 Development Plan for the entire 11.36 acre project
area, which is hereby approved. Any amendments to the St age 1/Stage 2 Development Plan
shall be in accordance with section 8.32.080 of the Dublin Municipal Code or its successors.
The following Stage 1 and Stage 2 Development Plans meet all the requirements for Stage 1
and Stage 2 Development Plans as set forth in Chapter 8.32 of the Dublin Zoning Ordinance.
Stage 1 & Stage 2 Development Plan
1. Statement of Uses.
PD – Campus Office
Permitted Uses
• Corporate, professional, technical and administrative offices.
• Research and development laboratories and offices.
• Storage and sale of material produced on the site.
• Light manufacturing and processing that is conducted entirely indoors and that
produce no noxious odors, hazardous materials or excessive noise .
• Accessory and incidental amenity uses to offices, including but not limited to
employee cafeterias, employee fitness centers, day care centers, employee
training facilities and showroom/demonstration center.
5
Conditional Uses
• Community, religious and institutional facilities.
• In-patient and out-patient health facilities.
• Public facilities and uses.
• Retail commercial establishments to serve site users.
• Eating and drinking establishments (excluding employee -serving facilities).
2. Sites Area & Proposed Densities.
a. 11.36 acres
b. 433,090 square feet
3. Phasing Plan.
Building/Use Size (SF)*
Phase 1 Building 1 208,650
Phase 2 Building 2 224,440
Phase 2 Parking Structure
Total Project Size 433,090 SF
*The square footage allocated to Phases 1 and 2 can be adjusted with approval by the Community
Development Director provided that the project remains consistent with the development standards and
overall square footage of development.
Phase 1 Site Plan
6
Phase 2 Site Plan
4. General Plan and Eastern Dublin Specific Plan Consistency. The project is consistent
with the General Plan and Eastern Dublin Specific Plan land use designation of Campus
Office, which permits a floor area ratio of 0.25 to 0.80. The FAR for the site is based upon
the combined square footages for entire Site 15 (15A: APN 986-0014-010& 15B: APN 986-
0014-011).
5. Inclusionary Zoning Regulations. The project is not subject to the Inclusionary Zoning
Regulations (Chapter 8.68) for the provision of affordable housing because the regulations
apply only to residential development projects of 20 units or more.
6. Aerial Photo.
7
7. Site Plan (Phases 1 & 2).
8. Development Regulations.
The following development regulations apply to the project:
Maximum Building Height
5 floors and no more than 75 feet to the finished
floor of the highest story. Maximum building
height is 90 feet (tower elements, architectural
and articulated design features, solar panels and
small-scale wind turbines may extend 10 feet
above maximum beyond this height).
Maximum Building Area 433,0901
Maximum Floor Area 0.802
Minimum Setbacks
Along Dublin Blvd: 50 feet
Along Arnold Road: 20 feet
Along Central Parkway: 20 feet
Parking Stall Dimensions Standards Full Size Space: 8’6”x18
Compact Car Space: 8’6”x15
(1) Excludes the parking garage
(2) Floor area ratio for the site is based upon the combined square footage for Site 15A & 15B
9. Architectural Standards.
The project’s architectural style is modern with clean lines and extensive glass glazing on all
elevations.
8
The architectural design of the project shall reflect the following standards:
• Employ high quality materials to provide visual interest in the project and to
complement its surroundings.
• Use diversity of textures in the building finishes providing a varied and interesting
base form for the buildings.
• Incorporate features such as different wall planes, heights, wall textures, roof
elements, signs, light fixtures and landscaping to contribute layers of detail at the
pedestrian level.
• Provide functional outdoor spaces where people will gather and socialize, with
landscaping, outdoor seating, enhanced paving treatment, and other features to
provide an appropriate urban scale for the development.
• Develop an architectural vocabulary that will be represented in future phases of
the development to create a sense of harmony between building forms and
landscape.
Illustrative examples of architectural style:
9
10. Preliminary Landscape Plan.
The conceptual landscape design of the project shall reflect the following standards. The
landscape design shall:
• Create a park-like environment that is accessible to the public.
• Provide interpretive and educational components to enrich visitor’s experience on the
site.
• Treat the site’s storm water in a set of basins throughout the site that are linked to the
site’s water infrastructure.
• Create a visual buffer and soften the edge between the public realm and the site.
• Utilize plants that provide a year round vegetated landscape with seasonality, color,
and interest for an attractive visual environment.
11. Transportation Demand Management Plan. Transportation Demand Management (TDM)
measures will be implemented by the property owner to reduce potential impacts on the
City’s road network. The TDM measures are programs and solutions that will reduce drive
10
alone trips to and from the site. A TDM goal of 20% trip reduction has been determined for
the project.
The TDM Plan is subject to review and approval by the City’s Tra nsportation and Operations
Manager. The implementation of the TDM measures and the reduction of vehicle trips will be
monitored by the City’s Transportation and Operations Manager through the approval of a
yearly TDM report prepared by the property owner.
The Plan shall include the following elements:
a. Identification of the property owner’s TDM Coordinator at the site.
b. A toolkit of TDM measures to reduce drive alone trips to and from the site and a
commitment to implement each measure.
c. Implementation plan and monitoring procedures.
d. Requirement to provide annual traffic monitoring that will include vehicle counts at the
driveways.
e. Conformance to the toolkit measures.
f. Additional measures to increase TDM adherence if the target of 20% is not met.
g. Potential penalties, if the target is not met.
SECTION 5. POSTING OF ORDINANCE
The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3)
public spaces in the City of Dublin in accordance with Section 36933 of the Government Code of
the State of California.
SECTION 6. EFFECTIVE DATE
This Ordinance shall take effect thirty (30) days following its adoption.
PASSED AND ADOPTED BY the City Council of the City of Dublin, on this 20th day of
March 2018, by the following votes:
AYES:
NOES:
ABSENT:
ABSTAIN:
_____________________________
Mayor
ATTEST:
_____________________________
City Clerk