HomeMy WebLinkAboutAttach 5 MitigationMont&ReptPrgCity of Dublin, Ultimate Right-of-Way Lines Tassajara Road and Fallon Road Mitigation Monitoring and Reporting Program May 2004 n Measure Implementing Monitoring Monitoring Verification Responsibility Responsibility Schedule ~esthetics). Visual impacts Dublin Public Dublin Public Construction Plans 1 be reduced by sensitive Works Department Works Department and Specifications sing gradual transitions ural slopes and by ~blin EIR Mitigation kesthetics). Dublin Public Dublin Public Construction Plans ~tural contours shall Works Department Works Department and Specifications hall maintain the uch as possible, .evelopment areas poses only. (Eastern ieasure 3.8/4.1) aesthetics). Graded Dublin Public Dublin Public Construction Plans ~red to resemble Works Department Works Department and Specifications ~ immediate area. aall be revegetated iitable to hillside )ublin EIR 4.4) Mitigation Mitigation Measure 1 ( of extensive grading ,' engineering design, by from graded areas to revegetation. (Eastern Dub Measure 3.8/4.0). Mitigation Measure 2 (, Alterations of existing natt be minimized. Grading natural topography as Grading beyond actual shall be for remedial purg Dublin EIR Mitigation Mc Mitigation Measure 3 ( slopes shall be re-contoured tc existing landforms in the Cut and graded slopes ~, with native vegetation environments. (Eastern Mitigation Measure 3.8 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 4 (Aesthetics). The Dublin Public Dublin Public Construction Plans height of cut and fill slopes shall be Works Department Works Department and Specifications minimized to the greatest degree possible. Grades for cut and fill slopes should be 3:1 or less wherever feasible. (Eastern Dublin EIR Mitigation Measure 3.8/4.5) Mitigation Measure 5 (Aesthetics). Street Dublin Public Dublin Public Construction Plans lights installed as part of the road widening Works Department Works Department and Specifications plan shall be equipped with cut-off lenses to prevent spill over of light beyond the roadway. Lighting levels shall be limited to the minimum level of illumination needs for safety purposes. Mitigation Measure 6 (Air Quality). Future Dublin Public Dublin Public Construction Plans precise road improvement plans and Works Department Works Department and Specifications specifications shall include comprehensive dust control measures for all construction projects, including but not limited to watering of construction sites, daily clean up of dust and mud, revegetation of graded areas and similar steps. (EDSP EIR Mitigation Measure 3.11/1.0) Page 2 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measures 7 (Air Quality). Future precise road improvement plans and specifications shall include scheduling of construction of activities during non-peak traffic times, installation of emission controls on construction vehicles and similar steps. (EDSP EIR Mitigation Measures 3.11/2.0-4.0) Mitigation Measure 8 (Biological Resources). Pre-construction surveys to determine if western burrowing owl, are present within the area of disturbance of the road widening should be conducted by a qualified biologist no more than 30 days prior to the initiation of any construction related activities. Dublin Public Works Department Dublin Public Works Department Construction Plans and Specifications Dublin Public Works Department Dublin Public Works Department Prior to construction Page 3 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification If burrowing owls are observed on or near the project site during these surveys, the project will implement an exclusion zone around the nest location. Exclusion zones should be 160 feet during the non-breeding season of September 1-January 31. Passive relocation of owls that includes the placement of one-way doors over burrow entrances, allowing owls to exit but not return, may be used at that time. During the breeding season of February 1-August 31, exclusion zones should be at least 250 feet from occupied burrows. Ail project related activity will occur outside of the exclusion area until the young have fledged (California Department of Fish and Game, 1995). If owls are detected breeding within the construction zone, 6.5 acres of burrowing owl habitat shall be preserved for each active nest detected. The location of the preserved habitat shall be determined in consultation with the CDFG. To the fullest extent possible, mitigation areas shall be located on the adjoining property where owl habitat is identified. Page 4 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 9 (Biological Resources). Surveys to determine if California tiger salamander are present within the area of disturbance of the road widening should be conducted by a qualified biologist. These surveys should be conducted in accordance with the protocols outlined by the CDFG. If California tiger salamanders are determined to be present, the project will implement a salvage program. The salvage program will include placement of fencing to prevent movement of salamanders into the project site and trapping in the project area to capture salamanders for relocation to off-site locations. The project shall preserve California tiger salamander habitat at a 1:1 (mitigation area: impact area) replacement ratio. All preserved acreage must be protected in perpetuity by designation as permanent open space with a conservation easement placed over it. The location of the preserved habitat will require the approval of the CDFG. CDFG approved mitigation habitat must be secured prior to construction of the bridge. To the fullest extent possible, mitigation areas shall be located on the adjoining property where tiger salamander habitat is identified. Dublin Public Works Department Dublin Public Works Department Prior to construction Page 5 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 10 (Biological Resources). Preconstruction surveys for the presence of San Joaquin kit fox shall be completed as required by the Eastern Dublin Specific Plan EIR. If San Joaquin kit fox are observed on or near the project site during these surveys, consultation with the U.S. Fish and Wildlife Service will be initiated and the project will incorporate the Terms and Conditions contained in the Biological Opinion. Mitigation Measures 3.7/18.0 through 19.0 as set forth in the Eastern Dublin EIR shall also be implemented. Dublin Public Works Department Dublin Public Works Department Prior to construction Page 6 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 11 (Biological Resources). Measures shall be implemented to ensure California red-legged frogs and western pond turtle are not present within the disturbance area during development. Any project related work in or along the tributaries shall be restricted to the period when these features are dry (usually from mid-summer through October). A USFWS and CDFG approved biologist shall conduct pre-construction surveys to determine if California red-legged frog or western pond turtle are present within this area within three days prior to any construction activities. If any red-legged frogs are found, the biologist shall contact the USFWS to determine if moving them is appropriate. Immediately following the preconstruction survey, all portions of the project site proposed for grading shall be separated from open space areas by fencing appropriate to prevent California red-legged frogs and western pond turtle from entering the development area. Dublin Public Works Department Dublin Public Works Department Prior and during construction Page 7 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification A second survey shall be conducted within the fenced area no earlier than 24 hours before the onset of activities to ensure no California red-legged flogs or pond turtles are entrapped in the construction area by the fence. Any western pond turtles found within this area will be captured and relocated downstream. If relocation of red- legged frogs is allowed by the USFWS, any California red-legged frogs captured will be relocated downstream. Page 8 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 12 (Biological Resources). All trees within the construction zone which will need to be removed for road widening should be cut during the non- nesting season (August 1 to January 30) in the year prior to when road widening is expected to occur. If tree removal cannot occur as outlined above and must take place when road widening occurs then pre- construction surveys for active nests will be required. Surveys to determine the presence of raptor nests should be conducted by a qualified biologist no more than 30 days prior to the initiation of any construction related activities. If raptors are observed nesting on or near the project site during these surveys, exclusion zones will be established around all active nests. The project will consult with CDFG to determine the size of the exclusion zone, usually 100-300 feet, around the nest location. All project related activity will occur outside of the exclusion area until the young in the nest have fledged. Dublin Public Works Department Dublin Public Works Department As noted in Mitigation Measure Page 9 City of Dublin, Ultimate Right-of-Way Lines for Tassaj ara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 13 (Biological Resources). Surveys of the existing southern tributary culvert should be conducted by a qualified biologist to determine the presence of roosting bats no more than 30 days prior to the initiation of any construction related activities. If a bat roost is observed in the culvert during these surveys, the biologist will determine the type of roost, (daytime, nighttime, or maternity), and construction on and in the immediate vicinity of the culvert will stop until the bats have been excluded from the roost site. If a nighttime roost is present, any demolition work on the culvert will be limited to daytime hours when bats are not present. If a daytime roost is present, the roost site will be outfitted with bat exclusion devices that allow bats to exit the roost site, but not return. Demolition of the culvert will begin only after the biologist has determined that the roost has been successfully abandoned. If a maternity roost is present, the exclusion zone will remain in place until the young have fledged. After fledging, bats will be excluded and the culvert demolished as specified for a daytime roost. Both new bridges should be designed to permit bats to establish roost, after construction. Dublin Public Works Department Dublin Public Works Department Prior to construction near bridges Page l0 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 14 (Biological Resources). The project will determine the size of the two populations and preserve habitat that supports a known population of Congdon's tarplant at an acreage ratio of 1:1 (preserved: impacted) Dublin Public Works Department Dublin Public Works Department Prior to construction Page 11 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 15 (Biological Resources). a) Prior to initiation of work in the northern tributary a Creek Restoration Plan will be prepared which specifies how the disturbed reach of the stream will be placed in a stable condition and its banks revegetated with riparian species native to this tributary or Tassajara Creek. This plan will require the review and approval of the Corps, DFG and RWQCB. c) Individual grade control structures will have vertical drops of no more than two feet or cascade drops of no more than three feet at any specific location to allow for unimpeded movement of aquatic species. c) All potentially jurisdictional areas located adjacent to the project area will be avoided during construction and no fill will be allowed to enter these areas. Exclusion fencing (construction or silt fencing) will be installed at the boundary between these features and the active project area to protect them and to delimit the boundary of construction and heavy equipment activity. A biological monitor shall oversee the installation of the fencing and periodically monitor the development sites to document avoidance of the off-site areas. The monitor will provide a report to the City and other agencies documenting the avoidance during construction. Dublin Public Works Department Dublin Public Works Department Prior to construction Page 12 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification d) during project construction, no material shall be allowed to enter, or be stored in, any off-site potentially jurisdictional areas. Project related dirt and other material shall be kept at least 50 feet far away from off-site drainage features. All equipment washing will occur downslope from off-site drainage features. Mitigation Measure 16 (Cultural Resources). Final Dublin Public Dublin Public Construction Plans roadway construction plan(s) and specifications shall Works Department Works Department and Specifications require mechanical or hand subsurface testing on all locations of prehistoric resources to determine the presence or absence of midden deposits. (Eastern Dublin EIR Mitigation Measure 3.9/1.0) Mitigation Measure 17 (Cultural Resources). Final Dublin Public Dublin Public Construction Plans roadway construction plan(s) and specifications shall Works Department Works Department and Specifications requires all locations containing either midden components or concentrations of cultural materials on the surface to be recorded on State of California survey forms. (Eastern Dublin EIR Mitigation Measure 3.9/2.0.) Page 13 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Monitoring Verification Responsibility Schedule Mitigation Measure 18 (Cultural Dublin Public Dublin Public Construction Plans Resources). Final roadway construction Works Department Works Department and Specifications plan(s) and specifications shall require evaluative testing if proposed development would directly or indirectly impact recorded and mapped location of resources. (Eastern Dublin EIR Mitigation Measure 3.9/3.0) Mitigation Measure 19 (Cultural Dublin Public Dublin Public Construction Plans Resources). Final roadway construction Works Department Works Department and Specifications I plan(s) and specifications shall require a qualified archeologist to develop protection programs for significant resources whose conditions would be altered by proposed development. (Eastern Dublin EIR Mitigation Measure 3.9/4.0) Mitigation Measure 20 (Cultural Dublin Public Dublin Public Construction Plans Resources). Final roadway construction Works Department Works Department and Specifications plan(s) and specifications shall require grading and construction to cease in the event that historic or prehistoric resources are discovered during such activities. (Eastern Dublin EIR Mitigation Measure 3.9/5.0) Mitigation Measure 21 (Geology). Setbacks shall be Dublin Public Dublin Public Construction Plans established from unstable and potentially unstable Works Department Works Department and Specifications landforms as well as use of appropriate project engineering design techniques to ensure safety. (Eastern Dublin EIR Mitigation Measure 3.6/2.0) Page 14 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Monitoring Verification Responsibility Schedule Mitigation Measure 22 (Geology). Appropriate Dublin Public Dublin Public Construction Plans grading and design shall be used to completely Works Department Works Department and Specifications remove unstable and potentially unstable materials in hillside development areas. (Eastern Dublin Mitigation Measure 3.6/3.0) ~--Mitigation Measure 23 (Geology). Engineering Dublin Public Dublin Public Construction Plans techniques and improvements, such as retention Works Department Works Department and Specifications structures, drainage improvements, properly designed keyways and adequate compaction shall be used to improve the stability of fill areas and to reduce seismically induced fill settlement. (Eastern Dublin EIR Mitigation Measure 3.6/4.0 and 5.0) Mitigation Measure 24 (Geology). Roads, structural Dublin Public Dublin Public Construction Plans foundations, utilities shall be designed in such a Works Department Works Department and Specifications manner as to accommodate estimated settlement without failure, especially across areas of cut and fill. (Eastern Dublin Mitigation Measure 3.6/6.0) Mitigation Measure 25 (Geology). Grading Dublin Public Dublin Public Construction Plans activities shall be timed to avoid the rainy season as Works Department Works Department and Specifications much as possible and that interim erosion control measures be taken to control runoff and minimize erosion. (Eastern Dublin EIR Mitigation Measure 3.6/27.0) Page15 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Monitoring Verification Responsibility Schedule Mitigation Measure 26 (Geology). Long-term Dublin Public Dublin Public Construction Plans erosion and sedimentation shall be reduced through Works Department Works Department and Specifications appropriate design, construction and continued maintenance of surface and subsurface drainage. Future road improvement plan(s) and specifications for this project incorporate erosion control plans for all aspects of the project that would involve trenching, excavation or stockpiling of dirt. The plan(s) shall be prepared by a registered civil engineer and be consistent with applicable City of Dublin and Regional Water Quality Control Board guidelines and standards. (Eastern Dublin EIR Mitigation Measure 3.6/28.0) ~itigation Measure 27 (Geology). A design-level Dublin Public Dublin Public Construction Plans geotechnical investigation shall be prepared to Works Department Works Department and Specifications characterize site-specific soils and bedrock conditions and to formulate specific design criteria for development projects. (Eastern Dublin EIR Mitigation Measure 3.6/14.0) Mitigation Measure 28 (Geology). Specific measures Dublin Public Dublin Public Construction Plans shall be included in future specific roadway plan(s) Works Department Works Department and Specifications and specifications to control moisture in the soil to reduce impacts from expansion soil and rock. (Eastern Dublin EIR Mitigation Measure 3.6/15.0) Page 16 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Monitoring Verification Responsibility Schedule Mitigation Measure 29 (Geology). Appropriate Dublin Public Dublin Public Construction Plans foundation and pavement design shall be employed, Works Department Works Department and Specifications based on a site-specific geotechnical study, for new structures to minimize effects of expansive soil and rock. (Eastern Dublin EIR Mitigation Measure 3.6/16.0) Mitigation Measure 30 (Hydrology and Water Dublin Public Dublin Public Construct/on Plans Quality). The proposed project shall incorporate Best Works Department Works Department and Specifications Management Practices to minimize stormwater pollution. (Eastern Dublin EIR Mitigation Measure 3.5/53.0) Mitigation Measure 31 (Hydrology and Water Dublin Public Dublin Public Construction Plans Quality). The proposed project shall meet all water Works Department Works Department and Specifications quality standards set forth in the City's NPDES Permit. (Eastern Dublin EIR Mitigation Measure 3.6/54.0) Mitigation Measure 32 (Hydrology and Water Dublin Public Dublin Public Construction Plans Quality). The proposed project shall meet water Works Department Works Department and Specifications quality standards imposed under the Alameda County Clean Water Program. (Eastern Dublin EIR Mitigation Measure 3.6/55.0) Mitigation Measure 33 (Hydrology and Water Dublin Public Dublin Public Construction Pla~s Quality). Storm drain outfall structures installed as Works Department Works Department and Specifications part of the proposed project shall be equipped with storm drain filters as approved by the Dublin Public Works Department. Page 17 City of Dublin, Ultimate Right-of-Way Lines for Tassajara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 34 (Noise). Construction Management Plan(s) shall be filed with the City of Dublin Public Works Department prior to commencement of any construction. The Plan(s) shall identify specific measures to be taken to minimize short-term noise on local resident, including but not limited to limitations on hours of operation for construction, including unloading of material, equipment warm up and tune-up times, and a requirement that all gasoline-powered equipment be equipped with mufflers. (Eastern Dublin EIR Mitigation Measure 3.10/4.0) Mitigation Measure 35 (Noise). Requires compliance with local noise standards relating to construction activities, including limitation on hours of construction operation. (Eastern Dublin EIR Mitigation Measure 3.10/5.0) Dublin Public Works Department Dublin Public Works Department Dublin Public Works Department Dublin Public Works Department Prior to construction During construction Page 18 City of Dublin, Ultimate Right-of-Way Lines for Tassaj ara Road and Fallon Road Mitigation Measure Implementing Responsibility Monitoring Responsibility Monitoring Schedule Verification Mitigation Measure 36. (Traffic and Transportation). A Traffic Construction Management Plan shall be prepared by the City of Dublin Public Works Department prior to commencement of construction, identifying specific methods to be undertaken to ensure that access to abutting properties is maintained for residents and emergency vehicles. The Management Plan shall be reviewed and approved by the Alameda County Fire Department and Dublin Police Services Department. Key elements of the Traffic Construction Management Plan shall be incorporated into project plans and specifications for implementation by the project contractor. Dublin Public Works Department Dublin Public Works Department Prior to construction Page 19