Loading...
HomeMy WebLinkAboutOrd 01-18 Adopting Planned Development Zoning for the Zeiss Innovation Center ORDINANCE NO. 01 — 18 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * * * * * AMENDING THE ZONING MAP AND APPROVING A PLANNED DEVELOPMENT ZONING DISTRICT WITH A RELATED STAGE 1 AND STAGE 2 DEVELOPMENT PLAN FOR THE ZEISS INNOVATION CENTER PROJECT PLPA 2017-00025 (APN 986-0014-010-00) The Dublin City Council does ordain as follows: SECTION 1. RECITALS A. The Applicant, Carl Zeiss Inc., proposes to construct the Zeiss Innovation Center project, which consists of a 433,090 square foot research and development campus comprised of two buildings, a parking structure, and associated site, frontage, and landscape improvements. Requested land use approvals include a Planned Development Rezone with a Stage 1 and Stage 2 Development Plan, a Site Development Review Permit for Phase 1 (a 208,650 square foot research and development building), and a Supplemental Mitigated Negative Declaration. These planning and implementing actions are collectively known as the "Zeiss Innovation Center Project" or the "Project." B. The project site is approximately 11 .36 acres located at the northeast corner of Dublin Boulevard and Arnold Road (APN 986-0014-010-00). C. The project is located in the General Plan Eastern Extended Planning Area and the Eastern Dublin Specific Plan area, for which the City Council certified a Program Environmental Impact Report by Resolution 51-93 ("Eastern Dublin EIR" or "EDEIR", SCH 91103064) on May 10, 1993, which resolution is incorporated herein by reference. The Eastern Dublin EIR identified significant impacts from development of the Eastern Dublin area, some of which could not be mitigated to less than significant. Upon approval of the Eastern Dublin General Plan Amendment and Specific Plan, the City Council adopted mitigations, a mitigation monitoring program and a Statement of Overriding Considerations (Resolution 53-93, incorporated herein by reference). D. In 2001, the City prepared a modified Initial Study to evaluate whether additional environmental review than in the Eastern Dublin EIR was needed for a proposed Cisco development project. Based on the Initial Study, the City prepared a Mitigated Negative Declaration dated June 2001 (SCH 1991103064). The City Council adopted a Mitigated Negative Declaration (MND), Statement of Overriding considerations and a Mitigation Monitoring Program for the change in the General Plan designation and zoning on the project site to Campus Office on April 15, 2003 (Resolution No. 65-03, incorporated herein by reference). E. The City prepared a modified Initial Study to determine whether supplemental environmental review was required for the proposed Zeiss Innovation Center project under CEQA standards. The Initial Study examined whether there were substantial changes to the proposed development, substantial changes in circumstances, or new information, any of which would result in new or more severe significant impacts than analyzed in the prior Eastern Dublin EIR and Cisco MND or whether any standards for supplemental environmental review were met. F. Upon completion of the Initial Study it was determined that there were new potentially significant impacts associated with the project related to biological resources; therefore, a Supplemental Mitigated Negative Declaration was prepared to analyze those biological impacts. Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 1 of 10 G. The Supplemental Mitigated Negative Declaration/Initial Study was circulated for public review from December 13, 2017 to January 30, 2018. H. The City of Dublin received four comment letters during the public review period. Following a public hearing on February 13, 2018, the Planning Commission adopted Resolution 18-02 recommending that the City Council adopt the Supplemental Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the project, which resolution is incorporated herein by reference and available for review at City Hall during normal business hours. J. Following a public hearing on February 13, 2018, the Planning Commission adopted Resolution 18-03, recommending approval of the Planned Development Rezone and related Stage 1 and 2 Development Plan, which resolution is incorporated herein by reference and available for review at City Hall during normal business hours. K. A Staff Report, dated March 6, 2018, and incorporated herein by reference, described and analyzed the Project, including the Planned Development Rezone and related Stage 1 and 2 Development Plan, for the City Council. L. On March 6, 2018, the City Council held a properly noticed public hearing on the project, including the proposed Planned Development Rezone and related Stage 1 and 2 Development Plan, at which time all interested parties had the opportunity to be heard. M. The City Council considered the Supplemental Mitigated Negative Declaration and related prior CEQA documents and all above referenced reports, recommendations, and testimony prior to taking action on the project. SECTION 2: FINDINGS A. Pursuant to Section 8.32.070 of the Dublin Municipal Code, the City Council finds as follows. 1. The Zeiss Innovation Center Project ("the Project") PD-Planned Development zoning meets the purpose and intent of Chapter 8.32 in that it provides a comprehensive development plan that creates a desirable use of land that is sensitive to surrounding land uses by virtue of the layout and design of the site plan. 2. Development of the Zeiss Innovation Center project under the PD-Planned Development zoning will be harmonious and compatible with existing and future development in the surrounding area in that the site will provide new office buildings in an area that has similar uses nearby and is also adjacent to existing and future workplaces and residential neighborhoods. B. Pursuant to Sections 8.120.050.A and B of the Dublin Municipal Code, the City Council finds as follows. 1. The PD-Planned Development zoning for the Zeiss Innovation Center project will be harmonious and compatible with existing and potential development in the surrounding area in that the proposed site plan has taken into account sensitive adjacencies and will provide employment opportunities to the surrounding neighborhoods. The proposed site plan has Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 2 of 10 taken into account a land use type and density that is compatible with the adjacent areas and densities. 2. The project site is physically suitable for the type and intensity of the zoning district being proposed in that the project site is flat with improved public streets on three sides and served by existing public utilities. The project site conditions are documented in the Supplemental Mitigated Negative Declaration/Initial Study and prior certified Environmental Impact Report (EIR) and Mitigated Negative Declaration, and the project will implement all adopted mitigation measures, as applicable. There are no site conditions that were identified in the Supplemental Mitigated Negative Declaration/Initial Study that will present an impediment to development of the site for the proposed campus office development. 3. The PD-Planned Development zoning will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare in that the project will comply with all applicable development regulations and standards and will implement all adopted mitigation measures, as applicable. The project uses are compatible with surrounding uses. 4. The PD-Planned Development zoning is consistent with and in conformance with the Dublin General Plan and the Eastern Dublin Specific Plan, in that the proposed use as a research and development facility is consistent with the existing Campus Office land use designations for the site. Pursuant to the California Environmental Quality Act, the City Council finds as follows: 1. Pursuant to the California Environmental Quality Act, the City Council adopted a Supplemental Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program via Resolution 21-18 on March 6, 2018, prior to approving the project. SECTION 3: ZONING MAP AMENDMENT Pursuant to Chapter 8.32, Title 8 of the City of Dublin Municipal Code the City of Dublin Zoning Map is amended to rezone the property described below to a Planned Development Zoning District and supersedes and replaces the previously adopted zoning (Resolution 105-85): 11.36 acres located on the northeast corner of Dublin Boulevard and Arnold Road. (Assessor Parcel Numbers 986-0014-010-00) ("the Property"). Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 3 of 10 A map of the rezoning area is shown below: j P r; r a r , y _:. ,'i..i' _,.' "1 :.... :.li.:.,- ....:-..:- „ ' ' ..// / 'FMS a 1 . u� _•'t ..7 - . '•y • ! f .i I II r , , . i ___, i SECTION 4. APPROVAL OF STAGE 1 & STAGE 2 DEVELOPMENT PLAN The regulations for the use, development, improvement, and maintenance of the Property are set forth in the following Stage 1 and Stage 2 Development Plan for the entire 11.36 acre project area, which is hereby approved. Any amendments to the Stage 1/Stage 2 Development Plan shall be in accordance with section 8.32.080 of the Dublin Municipal Code or its successors. The following Stage 1 and Stage 2 Development Plans meet all the requirements for Stage 1 and Stage 2 Development Plans as set forth in Chapter 8.32 of the Dublin Zoning Ordinance. Stage 1 & Stage 2 Development Plan 1. Statement of Uses. PD — Campus Office Permitted Uses • Corporate, professional, technical and administrative offices. • Research and development laboratories and offices. • Storage and sale of material produced on the site. • Light manufacturing and processing that is conducted entirely indoors and that produce no noxious odors, hazardous materials or excessive noise. • Accessory and incidental amenity uses to offices, including but not limited to employee cafeterias, employee fitness centers, day care centers, employee training facilities and showroom/demonstration center. Conditional Uses Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 4 of 10 • Community, religious and institutional facilities. • In-patient and out-patient health facilities. • Public facilities and uses. • Retail commercial establishments to serve site users. • Eating and drinking establishments (excluding employee-serving facilities). 2. Sites Area & Proposed Densities. a. 11.36 acres b. 433,090 square feet 3. Phasing Plan. Building/Use Size (SF)* Phase 1 Building 1 208,650 Phase 2 Building 2 224,440 Phase 2 Parking Structure Total Project Size 433,090 SF *The square footage allocated to Phases 1 and 2 can be adjusted with approval by the Community Development Director provided that the project remains consistent with the development standards and overall square footage of development. Phase 1 Site Plan PROPOSED EXISTING mum soueUO PA MICRODENTAL I __.. FNIRANCE LABORATORIES PROPERTY BOUNDARY h PROPOSED PROPOSED L!�;, l PA ING AREA CONDENSATE , rn WATER SRN PROPGSED ,` PEDEBTIIWI i' { ENTRANIE ..i PROPOSED L LON NG AREA 111111111': R RENCENTIAL DEVELOPMENT _ �� (POOPOTHE S) y r ''•. L i' MR coRNER SAP 1 \ $AP FORMER WILDING yI Rao f s,.TRFOa OMOPMENT PROPOSED r _ T ' BIORETEPIRON . y ,�-� AREA ,'t BIKE FRIENDLY ROAD I z �� : 1 — .� =IRE CITY OF -�--t.' � �OIBLN) EXISTNG LOADING AREA FOR IIO41E000011 —- ^_ NORDSTROM RACK 71. PERSRIMOI PLACE ! ..TT ± Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 5 of 10 Phase 2 Site Plan EXISTING PARKING r — = PROPOSED DUBLIN BOULEVARD . VELIGIAAR MICR ARE A OF - - ' ENTRAW_E LABORATORIES s' -4 PROPER, . "_-max....__ !�'NLONDARY _ --.-1 W PROPOSED PROPOSED "I p' 21 -- PME(IM.AREA NONDENSATE I .I PROPOSED "°•••••_'''. . nT- fRRASR RIM C v.N . <•PROPOSED OEVELOPMENT AR.P•iAj;�Q i PEOESI RLAN IPNASE II 1 I -s-.. ENTRANCE — — f — — I1111,II'.... PROPOSED ,. — 3�p- LOADING AREA RESIDENTIAL C. - DEVELOPMENT 11 (PROPOSED BV� 4 )� OTHERS) ii \ � MIEIId1ND •O I 1 EX STING PARKING AREA '\\ /—FOR FORMER SAP .1.; I / BU LDWG 41 A i f — I_ PROPOSED\ - EXISTING FORMER R&D 71 V SA`WII.[Krvc. • DEVELOPMENT g i/ PROPOSED I r BIORETENTION ;1 1 AREA i.(-__ -.. 9E FRIENDLY LAI€8 ROAD AR _j ... n (PER aNE TARES Y -.. / TA NW IRE CRY OF AREA EXISTING LOAD NG FOR NdAEGOOS8. NORDSTROM RACK& IT_PERSIMMON PLACE DOWN BOULEVARD .C� u '.._ ........ O 4. General Plan and Eastern Dublin Specific Plan Consistency. The project is consistent with the General Plan and Eastern Dublin Specific Plan land use designation of Campus Office, which permits a floor area ratio of 0.25 to 0.80. The FAR for the site is based upon the combined square footages for entire Site 15 (15A: APN 986-0014-010& 15B: APN 986-0014-011). 5. Inclusionary Zoning Regulations. The project is not subject to the Inclusionary Zoning Regulations (Chapter 8.68) for the provision of affordable housing because the regulations apply only to residential development projects of 20 units or more. 6. Aerial Photo. 1 '� J 'y... it - .lep.. �Ry !'' ie..�y irx1 - E.N r ..'` ? . e•Y IAN_.... _,: _ - dT! •'-.7N'�+7�.IY�XRF�G�' - �`^-- -. y -aw_ 1 • F _ c . '4 - • . . .`` '6- _=I may,`4.- 7`. Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 6 of 10 7. Site Plan (Phases 1 & 2). CENTR.--isa _ i~' I ii i F At TOwAWoVOOI111I�O 44 lriM e•_,,.:-.,.-.-..., __ 1/ �{ a r .•„ W a . o I „ 1 E„ 1Ilr ai° u '' , 0 ' 'I ..., .1. • --z-„, ,,,p,-, cra ` �.•.� `� _ 1f .1�a ' �''., �'�� �`° tJ .". *C anlscsio '0 00,_ ---o•rr .• .u..wv it —f I IL Ell il I Are- ..:.: P0.1•.11 -�- ' - O ') rice 1 YTi l IRiU a '. ,o, , _,i r I,• MIONN%N,,. j 11'1 T I H I I I J 110016/610 1 I ( L I ,Lein 4. II i %I., I, 1. .11 .1111;1I y r.' l , :......v...., c 'ki, - k 1 -1-' .IGt41Mff ' i 111 II. iliV ii"iii a �"�, ' MI 11 1 i1 t . ` ; „ ....ate. DUBLIN BLw ..."' 8. Development Regulations. The following development regulations apply to the project: 5 floors and no more than 75 feet to the finished floor of the highest story. Maximum building Maximum Building Height height is 90 feet (tower elements, architectural and articulated design features, solar panels and small-scale wind turbines may extend 10 feet above maximum beyond this height). Maximum Building Area 433,0901 Maximum Floor Area 0.802 Along Dublin Blvd: 50 feet Minimum Setbacks Along Arnold Road: 20 feet Along Central Parkway: 20 feet Parking Stall Dimensions Standards Full Size Space: 8'6"x18 Compact Car Space: 8'6"x15 (1) Excludes the parking garage (2) Floor area ratio for the site is based upon the combined square footage for Site 15A& 15B 9. Architectural Standards. The project's architectural style is modern with clean lines and extensive glass glazing on all elevations. The architectural design of the project shall reflect the following standards: Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 7 of 10 • Employ high quality materials to provide visual interest in the project and to complement its surroundings. • Use diversity of textures in the building finishes providing a varied and interesting base form for the buildings. • Incorporate features such as different wall planes, heights, wall textures, roof elements, signs, light fixtures and landscaping to contribute layers of detail at the pedestrian level. • Provide functional outdoor spaces where people will gather and socialize, with landscaping, outdoor seating, enhanced paving treatment, and other features to provide an appropriate urban scale for the development. • Develop an architectural vocabulary that will be represented in future phases of the development to create a sense of harmony between building forms and landscape. Illustrative examples of architectural style: ' 4 f' 1Ir it-- � I IFn .0 1 163% !i! Ir Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 8 of 10 10.Preliminary Landscape Plan. 1' ' IMP • •VA 's • sl -4:N:: vc.e:.:kii.<i :; e:--.,,:z:sf�`+YC'.t-.LiW7G;�: ` --i 1! r I° 1 _ =I= _— '— i I.- -4: .— R._ 0_ — .._ Kg _ F Li-. 1 -i- i- f .1••••01 1 . 7-i 6 I 0 (75 i . 16) E) gs,,, . .i ,TE: Aii _ : , _ :..._ ._......, _ t _._ .,...„ • ,....,, ._., _._ , 0.17, --24-7-7=: —7-"F. -. - M -d -g, i--, --zi, -„ I = - �! I -, _--_ ESN.RE PJN-E ' , i . I _ ' � / y i I i � ,,4;• . g ...s2.e 2: w«mot _ _-. ••.\` . mi i-. e x tii WE ` J .i'.t' • ;:.t-:r. :. .- 1 n, i $ I 1 E _. .. __ '4:. --- 1-!' t'1'..42;',. .,..., ,,__.; [ ri t ,,,, Y r �...y.� 'i�Y,:::,,,t-, -. .._,f IJ W---!1L LL_J L r I I , _ ,I , ii. , i ..., r---1ri- § _._. �____ _ 1.- _ _ _ ..i.H_,A1 ,, The conceptual landscape design of the project shall reflect the following standards. The landscape design shall: • Create a park-like environment that is accessible to the public. • Provide interpretive and educational components to enrich visitor's experience on the site. • Treat the site's storm water in a set of basins throughout the site that are linked to the site's water infrastructure. • Create a visual buffer and soften the edge between the public realm and the site. • Utilize plants that provide a year round vegetated landscape with seasonality, color, and interest for an attractive visual environment. 11.Transportation Demand Management Plan. Transportation Demand Management (TDM) measures will be implemented by the property owner to reduce potential impacts on the City's Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 9 of 10 road network. The TDM measures are programs and solutions that will reduce drive alone trips to and from the site. A TDM goal of 20% trip reduction has been determined for the project. The TDM Plan is subject to review and approval by the City's Transportation and Operations Manager. The implementation of the TDM measures and the reduction of vehicle trips will be monitored by the City's Transportation and Operations Manager through the approval of a yearly TDM report prepared by the property owner. The Plan shall include the following elements: a. Identification of the property owner's TDM Coordinator at the site. b. A toolkit of TDM measures to reduce drive alone trips to and from the site and a commitment to implement each measure. c. Implementation plan and monitoring procedures. d. Requirement to provide annual traffic monitoring that will include vehicle counts at the driveways. e. Conformance to the toolkit measures. f. Additional measures to increase TDM adherence if the target of 20% is not met. g. Potential penalties, if the target is not met. SECTION 5. POSTING OF ORDINANCE The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public spaces in the City of Dublin in accordance with Section 36933 of the Government Code of the State of California. SECTION 6. EFFECTIVE DATE This Ordinance shall take effect thirty (30) days following its adoption. PASSED, APPROVED AND ADOPTED this 20th day of March, 2018, by the following vote: AYES: Councilmembers Goel, Gupta, Hernandez, and Mayor Haubert NOES: ABSENT: ABSTAIN: Mayor ATTEST: 61,0 City Clerk Ord No. 01-18, Adopted 3/20/2018, Item No. 4.9 Page 10 of 10