CITY COUNCIL IvlEETZNG DATE: May 1, 2001
Award of Bid - Contract No. 01-04, Shannon Center Parking Lot,
Hansen Drive & Bedford Court Improvements
Report Prepared by.' Lee S. Thompson, Public Works Director
ATTACHMENTS:
1)
2)
3)
Resolution of Award
Budget Change Form
Bid Results
· 1)
RECOMMENDATION~XL~ 2)
Adopt resolution awarding bid to Bruce Carone Grading &
Paving, Inc.
Approve budget change in the amount of $39,746 from.
General Fund Reserves
FINANCIAL STATEMENT:
The following is a breakdown of funds budgeted and low bid for
the three Capital Improvements Projects incorporated in this
Contract:
Improvements
Budget
Low Bid Low Bid plus 10% Contingency
Shannon Center Parking Lot
Hansen DriVe
Bedford Court
$30,000 $70,058.60 $77,065.00
$94,050 $73,387.20 $80,726.00
$10,300 $14,823.00 $16,305.00
TOTAL: $134,350 $158,268.80 $174,094.00
All three CIP's are funded by the City's General Fund (001). A budget change in the amount of $39,746
will be necessary to fund this project with a 10% contingency.
DESCRIPTION: On March 6, 2001, the City Council authorized Staff to solicit bids
for Contract No. 01-04, Shannon Center Parking Lot, Hansen Drive & Bedford Court Improvements. The
projects, with descriptions, are as follows:
1. Shannon Park & Community Center Parking Lot Paving: The asphalt parking lot at the Shannon Park
and Community Center has failed in several areas and the surface is badly weathered. This project
g:XmiscprojXshannon-hansen-bedfordXAS award
COPIES TO: Bidders
ITEM NO.
will repair the failed areas and repave with 2-inch asphalt concrete. In addition, the parking stalls will
be striped with thermoplastic.
Bedford Court Subdrain: The roadway of Bedford Court has been damaged by underground springs.
This project will install a 60Olineal foot subdrain system to eliminate some of the water causing the
deterioration of the roadway bed.
Hansen Drive Drainage Improvements: Underground springs have also caused damage to the Hansen
Drive roadway. A new subdrain system will be installed to eliminate some of the water, and the street'
will receive a 1-1/2 inch overlay from the west end of Hansen Drive to Silvergate Drive.
The three projects were combined into one contract as a cost savings measure.
A total of six bids were received for the project (Attachment 3). The low bidder was Bruce Carone
Grading & Paving, Inc., with a bid of $158,268.80. The bids received were higher than budgeted due to
expanded scope of work for the Shannon Community Center parking lot and Bedford Court
improvements. The parking lot will be reconstructed with two inches of asphalt instead of a 1½" overlay
and will also have a subdrain system installed to reduce pavement damage from underground springs. A
portion of the subdrain at Bedford Court has been relocated undemeath the existing sidewalk to maximize
the subdrain effectiveness.
Staff has reviewed the bid results, checked the references, and recommends that the City Council adopt
the resolution awarding Contract No. 01-04, Shannon Center Parking Lot, Hansen Drive &'Bedford Court
Improvements, to Bruce Carone Grading & Paving, Inc., and approve a budget change in the amount of
$39,746 from General Fund Reserves.
-2-
RESOLUTION NO. - 01
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
AWARDING CONTRACT NO. 01-04
SHANNON CENTER PARKING LOT, HANSEN DRIVE & BEDFORD COURT
IMPROVEMENTS
WHEREAS, the City of Dublin did, on April 24, 2001, publicly open, examine, and
declare all sealed bids for doing the work described in the approved Plans, Specifications, and
Modifications for Contract No. 01-04, Shannon Center Parking Lot, Hartsen Drive & Bedford Court
Improvements, authorized by the City Council on March 6; 2001, which Plans, Specifications, and
Modifications are hereby expressly referred to for a description of said work and for all particulars relative
to the proceedings under the request for bids; and
WHEREAS, said bids were submitted to the City Engineer, who has recommended that
the bid hereinafter mentioned is the lowest and best bid for doing said work;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby award City of Dublin Contract No. 01-04 to the lowest responsible bidder therefor, to wit, Bruce
Carone Grading & Paving, Inc., at a bid of One Hundred Fifty-Eight Thousand Two Hundred Sixty-Eight
Dollars and Eighty Cents ($158,268.80), the particulars of which bid are on file in the Office of the City
Engineer.
PASSED, APPROVED AND ADOPTED this 1st day of May, 2001.
AYES:
NOES:
ABSENT:
ABSTAINING:
ATTEST:
Mayor
City Clerk
i
CITY OF DUBLIN
BUDGET CHANGE FORM
CHANGE FORM #
New Appropriations (City Council Approval Required):
Budget Transfers:
From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000)
(If Other than General Fund, Fund No - ) Within Same Department Activity
From New Revenues Between Departments (City Council Approval Required)
Other
Name:
Hansen Drive Drainage Imp.- Name: · Shannon Center Parking Lot -
Improvements $13,324 Improvements $47,065
Account #: 001-96023-750-050
Name:
Account #: 001-95405-750-050
Name: Bedford Court Subdrain -
Improvements
$6,005
Account #:
Account #: 001-96021-750-050
Name: Name:
Account #: Account #:
Name: Name:
Account #: Account #:
Name: Name:
Account #: Account #:
City Manager: Date:
Signature
Signature
REASON FOR BUDGET CHANGE ENTRY:
The low bid for Shannon Community Center parking lot and Bedford Court improvements, including a 10%
contingency, exceeded the budgeted amount for improvements.
Mayor: Date:
Signature
Posted By: 'Date:
Signature
BID RESULTS - CONTRACT 01-04~ SHANNON CENTER PARKING LOT, HANSEN DR. & BEDFORD CT IMPROVEMENTS
BID OPENING DATE - APRIL 24, 2001
BID
ITEM ITEM DESCRIPTION
Shannon Center Parking Lot
1 Edge Drain (including 4" PVC)
2 A.C. Pavement Removal
3 Base Failure Repair, 4"
4 2" A.C. Pavement
5 Striping and Signing
Hansen Drive Improvements
6 Edge Drain (Including Connections)
7 Base Failure Repair, 4"
8 Plane A.C. Pavement, 6' W~de
9 Paement Reinforcing Fabric
10 Install I 1/2"A.C. Overlay
11 Adjust Storm Drain Manhole to Grade
12 Adjust Monuments to Grade
13 12" Stop Bar, Thermoplastic
14 Detail 22, Thermoplastic
15 "STOP" Legend, Thermoplastic
16 Blue Reflective Markers
Bedford Court improvements
17 Edge Drain (Includes Solid PVC)
TOTAL BID:
BID
ITEM ITEM DESCRIPTION
Shannon Center Parking Lot
1 Edge Drain (Including 4" PVC)
2 A.C. Pavement Removal
3 Base Failure Repair, 4"
4 2" A.C. Pavement
5 Striping and Signing'
Hartsen Drive Improvements
ENGINEER'S ESTIMATE BRUCE CARONE
UNIT UNIT
MEAS. QTY UNIT PRICE TOTAL PRICE PRICE TOTAL PRICE
LF 147 $ 25.00'$ 3,675.00 $ 16.00 $ 2,352.00
SF 47,507 $ 0.25 $ 11,876.75 $ 0.44 $ 20,903.08
SF 655 $ 2.10 $ 1,375,50 $ 4.5O $ 2,947.50
SF 47,507 $ "0.67 $ 31,829.69 $ O.86 $ 40,856.02
LS 1 $ 4,000.00 $ 4,000.00 $3,000.00 $ 3,000.00
LF 700 $ "" 30.00 $ 21,000.00 $ 20.00 $ 14,000.00
SF 4,336 $ 2.10 $ 9,105.60 $ 3.40 $ 14,742.40
SF 16,800 $ 0.20'$ 3,360.00 $ 0.34 $ 5,712.00
SF 42,000 $ 0.13 $ 5,460.00 $ 0.13 $ 5,460.00
SF 58,800 $ 0.50 $ 29,400.00 $ 0.53 $ 31;164,00
EA 2 $ 250.00 $ 500.00 $ 398.00 $ 796.00
EA 2 $ 150.00 $ 300.00 $ 290.00 $ 580.00
LF 116 $ 3.00 $ 348.00 $ 5.30 $ 614.80
LF 50 $ 3.00 $ 150.00 $ 2.65 $ 132.50
EA I $ 100.00 $ 100.00 $ 106.00 $ 106.00
EA 3 $ 18.00 $ 54.00' $ 26.50 $ 79.50
LF 549 $ 35.00 $ 19,215.00 $
$141,749.54
MCK SERVICES
UNIT TOTAL
PRICE PRICE
$ 40.00 $ 5,880.00
$ 0.27 $ 12,826.89
$ 8.25 $ 5,403.75
$ 0.75 $ 35,630.25
$ 3,250.00 $ 3,250.00
$ 40,00 $ 28,000.00
$ 2.95 $ 12,791.20
$ 0.52 $ 8,736.00
$ 0.13 $ 5,460.00
$ 0.62 $ 36,456.00
$ 150.00 $ 300.00
$ 150.00' $ 300.00
$ 5.00 $ 580.00
$ 2.50 $ 125.00
$ 100.00 $ 100.00
$ 25.00 $ 75.0O
27.00 $"14,823.00 $ 45.00 $ 24,705~00
$158,268.80 * $180,619.09
· Total adjusted after verification
BAY CITIES GALEDRIGE
UNIT UNIT
MEAS. QTY UNIT PRICE TOTAL PRICE PRICE TOTAL PRICE
LF 147 $ 23.75 $ 3,491.25 $ 55.40 $ 8,143.80
...... SF 47,507 $ 0.50 $ 23,753.50 $ 0.42 $ 19,952.94
SF 655 $ 5.60 $ 3,668.00 $ 3.05 $ 1,997.75
SF 47,507 $ 0.85 $ 40,380.95 $ 0.93 $ 44,181.51
LS 1 $~3,588.00 $ 3,588.00 $1,200.00 $ 1,200.00
$ $
700 $ 31.00 $ '21,700.00 $ 41.43 $ 29,001.00
SF 4,336 $ 4.70 $ 20,379.20 $ 3.88 $ 16,823.68
SF' 16,800 $ 0.50 $ 8,400.00 $"' 0.22 $ 3,696.00
SF 42,000 $ 0.15 $ 6,300.0O $ 0.14 $' 5,880.00
SF 58,800 $ 0.65 $ 38,220.00 $ 0.61 $ 35,868.00
EA 2 $ 278.75 $ 557.50 $ 450.00 $ 900.00
EA 2 $ 167.25 $ 334.50 $ 300.00 $ 600.00
LF 116 $ 5.60 $ 649.60 $ 4.32 $ 501.12
' LF 50 $ 2.80 $ 140.00 $ 7.00 $ 350.00
EA 1 $ 111.00 $ 111.00 $ 300.00 $ 300.00
EA 3 $ 28.00 $ 84.00 $ 33.34 $ 100.02
549 $ 23.35 $ 12,819.15 $ 48.51 $ 26,631.99
$184,576.65 $196,127.81
6 Edge Drain (Including ConnectiOns) .... LF -
7 Base Failure Repair, 4"
8 Plane A.C. Pavement, 6' Wide
9 Paement Reinforcing Fabric
10 Install 11/2"A.C. Overlay_
11 Adjust Storm Drain Manhole to Grade
h'"12 Adjust Monuments to Grade
13 12" Stop Bar, Thermoplastic
14 Detail 22, Thermoplastic
15 "STOP" Legend, Thermoplastic
16 Blue Reflective Markers
Bedford Court Improvements
17 Edge Drain (includes Solid PVC) LF
TOTAL BID:
TOP GRADE
UNIT
PRICE TOTAL PRICE
$ 45.00 $ 6,615.00
$ 0.35 $ 16,627.45
$ 1.30 $ 851.50
$ 0.80 $ 38,005,60
$ 2,897.00 $ 2,897.00
$ 45.00 $ 31,500.00
$ 2.00 $ 8,672.00
$ 0.30 $ 5,040.00
$ 0.17 $ 7,140.00
$ 0.55 $ 32,340.00
$1,000.00 $ 2,000.00
$ 350.00 $ 700.00
$ 4.50 $ 522.00
$ 2.25 $ 112.50
$ 90.00 $ 90.00
$ 22.50 $ 67.50
$ 50.00 $ 27,450.00
$180,630.55
REDGWICK
UNIT TOTAL
PRICE PRICE
$ 44.00 $ 6,468.00
$ 0.56 $ 26,603,92
$ 6.00 $ 3,930.00
$ 0.81 $ 38,480.67
$ 4,554,61 $ 4,554.81
$ 44.00 $ 30,800.00
$ 3.60 $ 15,609.60
$ 0.50 $ 8,400.00
$ 0.13 $ 5,460.00
$ 0.55 $ 32,340.00 *
$ 548.00 $ 1,096.00
$ 500.00 $ 1,000.00
$ 5.50 $ 638.00
$ 2.50 $ 125.00
$ 110.00 $ 110.00
$ 27.00 $ 81.00
$ 50.00 $ 27,450.00 *
$203,147.00 *
· Extensions & Total adjusted after verification