HomeMy WebLinkAboutItem 4.9 - 2098 Dublin Blvd Rule 20A Acceptance Page 1 of 2 STAFF REPORT CITY COUNCIL DATE: July 17, 2018 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Acceptance of Work – Project No. ST1012, Dublin Boulevard Rule 20A Underground Utility District 2013-1 “Sierra Court to Dublin Court” Prepared by: Michael Boitnott, Capital Improvement Program Manager EXECUTIVE SUMMARY: The City Council will consider the acceptance of the Dublin Boulevard Rule 20A Underground Utility District 2013-1 “Sierra Court to Dublin Court” project, CIP No. ST1012. The project included the placement of Pacific Gas and Electric (PG&E), AT&T, and Comcast facilities in a joint utility trench and removing the overhead electrical and communication cables and wooden utility poles along the Dublin Boulevard from Sierra Court to Dublin Court ahead of widening Dublin Boulevard to six lanes. STAFF RECOMMENDATION: Adopt the Resolution Accepting Dublin Boulevard Rule 20A Underground Utility District 2013-1 “Sierra Court to Dublin Court” (CIP No. ST1012). FINANCIAL IMPACT: The Dublin Boulevard Rule 20A Underground Utility District 2013 -1 “Sierra Court to Dublin Court” project, CIP No. ST1012, is the first phase of the widening project and has a total budget of $3,350,000. Fun ding for the Rule 20A portion of the project was provided by PG&E Rule 20A credits, PG&E in-lieu credits, and reimbursements from Comcast and AT&T. The project is now complete, with approximately $3,250,000 in incurred costs. The remaining budget of approximately $1 00,000 will be retained in the project to fund any final project closeout expenses relating to the Rule 20A portion of the work. Any remaining PG&E credits will remain in the City’s account for the next undergrounding project. DESCRIPTION: On May 2, 2017, the City Council awarded a contract to St. Francis Electric, LLC. in the amount of $1,499,956.75 for the Dublin Boulevard Rule 20A Underground Utility District 2013-1 “Sierra Court to Dublin Court” project, CIP No. ST1012. The work consisted of undergrounding existing overhead utilities for PG&E, Comcast, AT&T and Sprint. The Page 2 of 2 improvements eliminated overhead utility lines on wooden poles on both sides of Dublin Boulevard between Sierra Court and Dublin Court, installing the utilities underground, and reconnecting overhead services to customers with new underground service connections. The Rule 20A portion of work had to be completed in advance of the Dublin Boulevard widening project to clear the right -of-way for the installation of the new roadway improvements from Sierra Court to Dublin Court. Two change orders were issued on the project in the total amount of $138,418.70. These two change orders included final quantity adjustments, installation of a pedestrian button at Dublin Boulevard/Dublin Court, and adjustments to two PG&E utility vaults. Staff has determined that the project is complete and recommends that the City Council accept the project and begin the warranty period for the Rule 20A portion of the work. NOTICING REQUIREMENTS/PUBLIC OUTREACH: A copy of this staff report was sent to St. Francis Electric, LLC. ATTACHMENTS: 1. Resolution Accepting Dublin Boulevard Rule 20A Underground Utility District 2013 -1 “Sierra Court to Dublin Court” (CIP No. ST1012) RESOLUTION NO. - 18 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * ACCEPTING DUBLIN BOULEVARD RULE 20A UNDERGROUND UTILITY DISTRICT 2013-1 “SIERRA COURT TO DUBLIN COURT” (CIP NO. ST1012) WHEREAS, on May 2, 2017, the City of Dublin entered a contract with St. Francis Electric, LLC to perform Project No. ST1012, Dublin Boulevard Rule 20A Underground Utility District 2013-1 “Sierra Court to Dublin Court”; and WHEREAS, said improvements have been completed in accordance with pl ans and specification, and any approved modifications thereof, to the satisfaction of the City Engineer of the City of Dublin. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby accept the improvements, Project No. ST1012, Dublin Boulevard Rule 20A Underground Utility District 2013-1 “Sierra Court to Dublin Court” and authorize Staff to file a Notice of Completion with Alameda County. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or his designee to release the retention, if after 35 days of filing the Notice of Completion there are no subcontractor claims. PASSED, APPROVED AND ADOPTED this 17th day of July, 2018, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ________________________________________ Mayor ATTEST: _____________________________ City Clerk