Loading...
HomeMy WebLinkAboutJuly 11, 2018 Agenda PacketSPECIAL MEETING Wednesday, July 11, 2018 9:00 a.m. (Pacific Daylight Saving Time) Council Chamber, 100 Civic Plaza DUBLIN CITY COUNCIL AGENDA /NOTICE Agendas and Staff Reports are posted on the City's Internet Website (www.dublin. ca. gov) Agendas may be picked up at the City Clerk's Office for no charge, or to request information on being placed on alert list, please call 833 -6650. A complete packet of information containing Staff Reports and exhibits relate to each item is available of public review at least 72 hours prior to a Regular City Council Meeting or, in the event that it is delivered to City Council members less than 72 hours prior to a City Council Meeting, as soon as it is so delivered. The packet is available in the City Clerk's Office and also at the Dublin Library. Pursuant to Government Code §54953(b), this meeting will include a teleconference location at IBIS Styles Hotel, 40 Elizabeth Street, Brisbane, Queensland, Australia, Room #201. Mayor David Haubert will be attending the Special Meeting via teleconference. The public shall have the opportunity to address the City Council at this teleconference location pursuant to Government Code Section §54954.3. All votes during the teleconferencing session will be conducted by roll call vote. The teleconference location is accessible to the public and the agenda will be posted at the teleconference location 24 hours before the meeting. Notice is hereby given that a special meeting of the City of Dublin City Council will be held on Wednesday, July 11, 2018, at 9:00 a.m. 1. Call to Order and Pledge of Allegiance 2. Public Comment 3. Consent 3.1. Transit Center Site A -3 Planned Development Zoning with a related Stage 2 Development Plan and a Development Agreement for the Ashton at Dublin Station Project (PLPA 2017- 00036) The City Council will introduce two Ordinances related to the proposed Ashton at Dublin Station project located on Site A -3 of the Transit Center. The first Ordinance approves a Planned Development Zoning Stage 2 Development Plan and the second approves a Development Agreement between the City and Ashton at Dublin Station, LLC. The project is comprised of 220 apartment units, residential amenities including a fitness center, pool, roof top lounge, and 331 structured parking spaces on an approximately 2.36 -acre site. The City Council denied the project and the Applicant subsequently filed a lawsuit against the City. In accordance with the terms of the settlement agreement with the Applicant, the City Council will reconsider the project, and consider the proposed Development Agreement. STAFF RECOMMENDATION: Waive the reading and INTRODUCE an Ordinance Approving a Planned Development Zoning Stage 2 Development Plan for the Transit Center Site A -3; and, waive the reading and INTRODUCE an Ordinance Approving a Development Agreement between the City of Dublin and Ashton Station at Dublin, LLC. 4. Other Business Brief information only reports from City Council and/or Staff, including committee reports and reports by City Council related to meetings attended at City expense (AB 1234). July 11, 2018 Dublin City Council Sp. Mtg. Agenda Page 1 of 2 5. Adjournment 6. Upcoming City Council Schedule: Regular City Council Meeting, July 17, 2018, 7:00 p.m. This AGENDA is posted in accordance with Government Code Section 54954.2(a) If requested, pursuant to Government Code Section 54953.2, this agenda shall be made mailable in appropriate alternative formats to persons with a disability, as required by Section 202 of the Americans with Disabilities Act of 1990 (42 U.S.C. Section 12132), and the federal rides and regulations adopted in implementation thereof. To make a request for disability - related modification or accommodation, please contact the City Clerk's Office (925) 833 -6650 at least 72 hours in advance of the meeting. AFFIDAVIT OF NOTICING AND POSTING: I, Caroline Soto, City Clerk for the City of Dublin, declare that a copy of this agenda / notice was posted in the kiosk in front of the Civic Center and that the City of Dublin City Councilmembers and the Media were provided notice on Monday, July 9, 2018. ATTEST: e. Caroline P. Soto, City Clerk/Records Manager July 11, 2018 Dublin City Council Sp. Mtg. Agenda Page 2 of 2 Page 1 of 4 STAFF REPORT CITY COUNCIL DATE: July 11, 2018 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Transit Center Site A-3 Planned Development Zoning with a related Stage 2 Development Plan and a Development Agreement for the Ashton at Dublin Station project (PLPA 2017-00036) Prepared by: Martha Battaglia, Associate Planner EXECUTIVE SUMMARY: The City Council will introduce two Ordinances related to the proposed Ashton at Dublin Station project located on Site A-3 of the Transit Center. The first Ordinance approves a Planned Development Zoning Stage 2 Development Plan and the second approves a Development Agreement between the City and Ashton at Dublin Station, LLC. The project is comprised of 220 apartment units, residential amenities including a fitness center, pool, roof top lounge, and 331 structured parking spaces on an approximately 2.36 acre site. The City Council denied the project and the Applicant subsequently filed a lawsuit against the City. In accordance with the terms of the settlement agreement with the Applicant, the City Council will reconsider the project, and consider the proposed Development Agreement. STAFF RECOMMENDATION: Waive the reading and INTRODUCE an Ordinance Approving a Planned Development Zoning Stage 2 Development Plan for the Transit Center Site A-3; and, waive the reading and INTRODUCE an Ordinance Approving a Development Agreement between the City of Dublin and Ashton Station at Dublin, LLC. FINANCIAL IMPACT: No financial impact. All costs associated with processing the requested entitlements are borne by the Applicant. PROJECT DESCRIPTION: The proposed Ashton at Dublin Station project is located at the northwest corner of DeMarcus Boulevard and Campbell Lane within the Transit Center (Figure 1). The site has a General Plan and Eastern Dublin Specific Plan land use designation of High Page 2 of 4 Density Residential (25+ units per acre) and Planned Development Zoning with a Stage 1 Development Plan that permits a high density residential development. The 2.36 acre project site is the last remaining site with a residential land use designation in the Transit Center. Figure 1. Vicinity Map The Applicant proposed to construct a 220-unit apartment community and related amenities which include a fitness center, pool, roof top lounge, 331 structured parking spaces, and a mix of units as shown in Table 1 below. The proposed project includes three, four and five story building elements that are constructed over two levels of parking and vary in height from 61 feet to 83 feet at the peak of the tallest roof element. The project plans are included as Attachment 1. The requested entitlements include a Planned Development Stage 2 Development Plan, Site Development Review, and a Condominium Map. Please refer to the Planning Commission Staff Report dated November 14, 2017 for a complete discussion of the proposed project (Attachment 2). Table 1. Unit Mix Unit Type Square Footage # of Units % of Project Jr. 1 Bedroom 640 SF 22 10.0% 1 Bedroom 800 SF 94 42.7% 1+ Bedroom 975 SF 4 1.8% 2 Bedroom 1,120 SF 81 36.8% 2 Bedroom + den 1,240 SF 15 6.8% 3 Bedroom 1,280 SF 4 1.8% Total 220 100% On November 14, 2017, the Planning Commission unanimously recommended approval of the proposed project. The City Council held public meetings to consider the proposed project on December 5, 2017, February 6, 2018, and March 6, 2018. Ultimately, the City Council denied the project on March 6, 2018. The Applicant subsequently filed a lawsuit against the City. The City and the Applicant have entered into a settlement agreement. Page 3 of 4 In accordance with the terms of the settlement agreement, the City Council will reconsider the project, and consider entering into a Development Agreement. The City Council is currently being asked to introduce an Ordinance approving Planned Development Zoning with a Stage 2 Development Plan, and introduce an Ordinance approving a Development Agreement for the Ashton at Dublin Station project. The City Council will hold a public hearing at its July 17, 2018 regular meeting to consider approval of these Ordinances and approval of the proposed Site Development Review Permit and Condominium Map. ANALYSIS: Planned Development Zoning The proposed Planned Development Zoning Stage 2 Planned Development is in compliance with the requirements of the Dublin Zoning Ordinance and will establish the detailed development plan for the site. This includes a pre liminary site plan, development standards, architectural standards, and a preliminary landscape plan. The draft Ordinance approving the Planned Development Zoning and related Stage 2 Development Plan is included as Attachment 3. Development Agreement California Government Code §§ 65864 et seq. and Dublin Municipal Code Chapter 8.56 authorize the City to enter into an agreement for the development of real property with any person having a legal or equitable interest in such property in order to obtain ce rtain commitments and establish certain development rights for the property. The proposed Development Agreement addresses the Dublin Transit Center Site A-3. The following is an overview of the terms of the proposed Development Agreement: ➢ Developer to contribute a one-time payment of $600,000. ➢ Impact fees for the project shall be those that are in effect as of June 30, 2018. ➢ Term of the Development Agreement is for five years from the effective date. The Agreement is a contract that establishes obligations for both parties. The Development Agreement provides security to the developer that the City will not change its impact fees, zoning and other laws applicable to the project for the term of the Agreement. The City also benefits from entering into the Development Agreement because the Developer agrees to make the one -time financial contribution to the City. The draft Ordinance approving the Development Agreement is included as Attachment 4, with the Development Agreement included as Attachment 5. ENVIRONMENTAL REVIEW: Page 4 of 4 The City has determined that the project qualifies for a statutory exemption from CEQA under Government Code section 65457. The proposed project is consistent with the General Plan Land Use Designation for Site A-3 and does not exceed the units allowed by the Dublin Transit Center Stage 1 Planned Development Zoning. An EIR has been certified for the Dublin Transit Center Stage 1 Planned Development Zoning. The CEQA document in Support of a Specific Plan Exemption finds that no event as specified in Section 21166 of the Public Resources Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a supplemental CEQA document. Public Resources Code Section 21166 and CEQA Guidelines Section 15162 identify the conditions requiring subsequent environmental review. After a review of these conditions, the City has determined that no subsequent EIR or Negative Declaration is required for this project. The approval of a Development Agreement does not require additional environmental review. PLANNING COMMISSION REVIEW: The Planning Commission held a Public Hearing on July 10, 2018 to review the proposed Development Agreement. The Planning Commission recommendation will be shared with the City Council prior to the Council taking action on the Development Agreement. ATTACHMENTS: 1. Project Plans 2. Planning Commission Staff Report dated November 14, 2017 without attachments 3. Ordinance Approving a Planned Development Zoning Stage 2 Development Plan 4. Ordinance Approving a Development Agreement between the City of Dublin and Ashton at Dublin Station 5. Exhibit A to Attachment 4 - Development Agreement between the City of Dublin and Ashton at Dublin Station c BA R C O P Y R I G H T ar c h i t e c t s 2/9/2018 12:29:56 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt A 0 0 - C O V E R S H E E T DU B L I N S T A T I O N EN T I T L E M E N T S R E S U B M I T T A L SI T E D E V E L O P M E N T R E V I E W ( S D R ) PL A N N E D D E V E L O P M E N T Z O N I N G D I S T RI C T S T A G E 2 D E V E L O P M E N T P L A N FE B R U A R Y 9 T H , 2 0 1 8 TE L : CO N T A C T : EM A I L : AR C H I T E C T : 90 1 B A T T E R Y S T R E E T , S U I T E 3 0 0 SA N F R A N C I S C O , C A 9 4 1 0 5 (4 1 5 ) 2 9 3 - 5 7 0 0 DA V I D I S R A E L di s r a e l @ b a r a r c h . c o m BA R A R C H I T E C T S TE L : CO N T A C T : EM A I L : CI V I L E N G I N E E R 46 7 0 W I L L O W R O A D , S U I T E 2 5 0 PL E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 3 9 6 - 7 7 5 1 ER I C G I R O D eg i r o d @ b k f . c o m BK F TE L : CO N T A C T : EM A I L : LA N D S C A P E A R C H I T E C T : 23 2 5 3 R D S T R E E T SA N F R A N C I S C O , C A 9 4 1 0 7 (4 1 5 ) 4 3 1 - 7 8 7 8 DA V I D F L E T C H E R df l e t c h e r @ f l e t c h e r s t u d i o . c o m FL E T C H E R S T U D I O AS H T O N A T D U B L I N S T A T I O N , L L C BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:29:57 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PROJECT DATA / SHEET LIST16036 A 01DUBLIN STATION DEMARCUS BOULEVARDSHEET LIST VI C I N I T Y M A P DU B L I N B L V D IRON HORSE REGIONAL TRAIL DE MARCUS BLVD CAMPBELL LN. SI T E CA M P P A R K S M I L I T A R Y B A S E CA M P B E L L G R E E N CA M P B E L L L N . HAMLET LN. IRON HORSE PKWY I R O N H O R S E P K W Y DU B L I N / P L E A S A N T O N B A R T S T A T I O N AR T H U R H . B R E E D , J R . F W Y PR O J E C T D A T A FRENTITLEMENTS05/24/17 ENT RESUB 08/28/17 ENT RESUB 2 02/09/18 C6.1EROSION CONTROL NOTES AND DETAILSXXC6.0EROSION CONTROL PLANXXC5.1STORMWATER CONTROL DETAILSXC5.0STORMWATER CONTROL PLANXXC4.0UTILITY PLANXXC3.0GRADING PLANXXC2.0CIVIL SITE PLANXXC1.0EXISTING CONDITIONS PLANXXC0.0TITLE SHEETXXCIVIL L6.00CONCEPTUAL LIGHTING PLANXXL5.00CAMPBELL LANE WEST STREETSCAPE PLANXXL4.00CAMPBELL LANE SOUTH STREETSCAPE PLANXXL3.00DEMARCUS BLVD STREETSCAPE PLANXXL2.00SHARED PRIVATE DRIVE STREETSCAPE PLANXXL1.00ILLUSTRATIVE SITE PLANXXLANDSCAPE P 01BUILDING MATERIALSXA 25APPENDIXXA 24GREENPOINT CHECKLISTXXA 23GREENPOINT CHECKLISTXXA 22GREENPOINT CHECKLISTXXA 21ENLARGED TYPICAL UNIT PLANSXXA 20BUILDING SECTIONS - EAST/WESTXXA 19BUILDING SECTIONS - NORTH/SOUTHXXA 18ELEVATIONS - NORTH & EASTXXA 17ELEVATIONS - SOUTH & WESTXXA 16FLOOR PLAN - ROOFXXA 15FLOOR PLAN - LEVEL 7XXXA 14FLOOR PLAN - LEVEL 6XXXA 13FLOOR PLAN - LEVEL 5XXXA 12FLOOR PLAN - LEVEL 4XXXA 11FLOOR PLAN - LEVEL 3XXXA 10FLOOR PLAN - LEVEL 2XXXA 09FLOOR PLAN - LEVEL1XXXA 08PERSPECTIVE VIEWXXA 07PERSPECTIVE VIEWXXA 06PERSPECTIVE VIEWXXA 05PERSPECTIVE VIEWXXA 04.3PERSPECTIVE VIEWXA 04.2PERSPECTIVE VIEWXA 04.1PERSPECTIVE VIEWXA 04SITE PLANXXA 03SITE AERIAL DIAGRAMXXA 02EXISTING CONDITIONSXXARCHITECTURAL Ro o f T e r r a c e 9 2 8 Po d i u m L a n d s c a p e : 2 4 , 9 2 0 Le v e l 1 L a n d s c a p e 1 9 , 0 3 0 Si t e A r e a : 10 2 , 6 7 0 Ef f i c i e n c y ( R e s R e n t a b l e G S F / R e s T o t a l G S F ) 75 % To t a l 21 0 , 0 3 3 2 , 5 0 1 5 8 , 3 4 7 27 8 , 4 1 7 00 0 12 6 , 6 5 7 40 5 , 0 7 4 0 1 6, 7 4 0 2 , 5 0 1 2 , 8 5 9 8 4 4 2 8 0 7 , 5 0 1 20 , 7 2 5 00 0 62 , 8 9 6 83 , 6 2 1 2 9, 6 9 8 0 2 8 3 8 , 3 0 0 18 , 2 8 1 00 0 63 , 7 6 1 82 , 0 4 2 3 46 , 1 5 3 0 4 6 4 1 , 8 7 8 1 0 , 0 1 2 58 , 5 0 7 00 0 0 58 , 5 0 7 4 48 , 3 6 1 0 1 0 , 2 5 2 58 , 6 1 3 00 0 0 58 , 6 1 3 5 49 , 0 8 5 0 1 0 , 6 9 6 59 , 7 8 1 00 0 0 59 , 7 8 1 6 28 , 3 5 2 0 9 2 8 6 , 5 5 4 35 , 8 3 4 00 0 0 35 , 8 3 4 7 21 , 6 4 4 0 5 , 0 3 2 26 , 6 7 6 00 0 0 26 , 6 7 6 Le v e l " R e n t a b l e " S F L o b b y Fi t n e s s P o o l L e a s i n g L o u n g e C o n f C l u b R m Co r e G r o s s " R e n t a b l e " C o r e G r o s s G r o s s G S F To t a l R e s . R e s . A m e n i t y R e s . R e s . R e t a i l R e t a i l R e t a i l G a r a g e T O T A L PR E L I M I N A R Y A R E A T A B U L A T I O N S wt 45 . 4 5 % % T w o B e d r o o m s o r L a r g e r % 1 0 . 0 % 4 2 . 7 % 1 . 8 % 3 6 . 8 % 6 . 8 % 1 . 8 % 1 0 0 . 0 % TO T A L 22 9 4 4 8 1 1 5 4 22 0 1 2 7 - - - - 9 2 28 - 2 - - 12 3 42 0 2 1 8 4 - 48 4 32 0 1 2 0 5 - 49 5 42 1 1 2 0 5 - 51 6 41 2 - 13 - 13 0 7 36 - 81 3 2 1 64 0 t y p . S F 8 0 0 t y p . S F 9 7 5 t y p . S F 11 2 0 t y p . S F 1 2 4 0 t y p . S F 1 2 8 0 t y p . S F LE V E L 1 B E D J R 1 x 1 B E D 1 + B E D 2 x 2 B E D 2 x 2 + B E D 3 x 2 B E D T O T A L CO U N T PR E L I M I N A R Y U N I T M I X G 04EGRESS DIAGRAMSXG 03EGRESS DIAGRAMSXA 01.1CODE ANALYSISXA 01PROJECT DATA / SHEET INDEXXXXA 00COVER SHEETXXXGENERAL SCARLETT DR. BU I L D I N G T A B U L A T I O N TY P E I I I A O V E R T Y P E 1 A 4 & 5 S T O R I E S O V E R P A R K I N G TY P E l l l A O V E R T Y P E 1 A ST O R Y / H E I G H T P R O P O S E D 3 S T O R I E S O V E R P A R K I N G ST O R Y / H E I G H T A L L O W E D 5 S T O R I E S O V E R P A R K I N G R- 2 R E S I D E N T I A L U N I T S A- 3 R E S I D E N T I A L A M E N I T I E S OC C U P A N C Y G R O U P S S - 2 P A R K I N G G A R A G E SP R I N K L E R S F U L L Y S P R I N K L E R E D ( N F P A 1 3 S Y S T E M ) CO N S T R U C T I O N T Y P E S I A , 1 1 1 A SE T B A C K R E Q U I R E M E N T S 20 ’ S T O R M W A T E R E A S E M E N T S E T B A C K A T D E MA R C U S B L V D . MA X I M U M H E I G H T 5 S T O R I E S O V E R P A R K I N G DE N S I T Y A B O V E 2 5 . 1 D U / A C SI T E A R E A 1 0 2 , 6 7 0 PR O J E C T U S E RE S I D E N T I A L , R E S I D E N T I A L S U P P O R T A N D PR I V A T E A M E N I T Y , P A R K I N G LA N D U S E H I G H D E N S I T Y R E S I D E N T I A L SP E C I F I C P L A N TR A N S I T C E N T E R D E S I G N A T E D A S P L A N N I N G SU B - A R E A W I T H I N E A S T E R N D U B L I N S P E C I F I C PL A N ZO N I N G D I S T R I C T DU B L I N T R A N S I T C E N T E R - G E N E R A L P L A N / SP E C I F I C P L A N A M E N D M E N T S S T A G E 1 P L A N N E D DE V E L O P M E N T R E Z O N I N G 2 0 0 2 AS S E S S O R S P A R C E L N U M B E R 9 8 6 - 0 0 3 4 - 0 0 9 - 0 0 PR O J E C T A D D R E S S CO R N E R O F D E M A R C U S B L V D . A N D C A M P B E L L LA N E , D U B L I N , C A PR O J E C T N A M E D U B L I N S T A T I O N LA N D S C A P E A R E A S 4 5 , 0 5 9 BI C Y C L E P A R K I N G 1 5 0 PA R K I N G S C H E D U L E 3 3 0 TO T A L U N I T S 2 2 0 LO T C O V E R A G E + / - 8 0 % PR O J E C T D E N S I T Y 9 3 D U / A C R E 13 0 C l a s s 1 b i k e p a r k i n g s t al l s - ( 1 C l a s s I s p a c e s : 1 D U + 1 C l a s s I s p a c e : e v e r y 4 D U o v e r 1 0 0 ) Re q u i r e d ( T i t l e 2 4 ) : 1 3 0 11 , 6 6 5 13 0 LE V E L A R E A T O T A L CO U N T BI C Y C L E P A R K I N G ( W A L L M O U N T E D ) - 3 % o f a l l p r o v i d e d p a r k i n g ( 3 3 0 st a l l s ) = 1 1 E V c h a r g i n g s t a t i o n s th e f o l l o w i n g ( p e r C A G r e e n Bu i l d i n g C o d e S e c t i o n 4 . 1 0 6 ) : El e c t r i c a l V e h i c l e P a r k i n g - p r o v i d e i n f r a s t r u ct u r e f o r f u t u r e E V c h a r g i n g s t a t i o n s f o r EV P A R K I N G To t a l r e q u i r e d H C A c c e s i b l e pa r k i n g : 9 a c c e s s i b l e s t a l l s 2% o f r e s i d e n t i a l p a r k i n g ( 2 8 0 st a l l s ) ; 6 a c c e s s i b l e s t a l l s 5% o f g u e s t p a r k i n g ( 5 0 s t al l s ) : 3 a c c e s s i b l e s t a l l s ii i : A c c e s s i b l e r e q u i r e m e n t s : ii : 3 3 0 s t a l l c o u n t i n c l u d e s a c c e s s i b l e p a r k i n g r e q u i r e m e n t s a n d 1 5 % g u e s t p a r k i n g ( 5 0 s t a l l s ) i: 1 . 5 s p a c e s p e r D U = 1 . 5 x 2 2 0 = 3 3 0 TA R G E T P A R K I N G M I X SP A C E S P E R 1 0 0 0 s q f t o f B U I L D I N G 0 . 8 3 SP A C E S P E R U N I T 1 . 5 0 % 6 . 4 % 3 2 . 1 % 4 9 . 7 % 3 . 3 % 2 . 7 % 1 0 0 . 0 % To t a l R e q u i r e d H C A c c e s s i b l e P a r k i n g 9 TO T A L 21 1 0 6 1 6 4 1 1 9 33 0 Un a s s i g n e d A c c e s s i b l e P a r k i n g 5% 3 Un a s s i g n e d / G u e s t P a r k i n g 15 % 5 0 111 5 5 7 1 1 5 6 15 8 As s i g n e d A c c e s i b l e P a r k i n g 2% 6 210 5 1 9 3 1 5 3 17 2 As s i g n e d P a r k i n g 2 8 0 8' x 1 7 ' 9 ' x 1 7 ' 9 ' x 1 8 ' 9 ' X 1 8 ' LE V E L C O M P A C T S T A N D A R D E V A D A T O T A L CO U N T PE R C E N T T O T A L H C ST A L L S PA R K I N G S C H E D U L E A C C E S S I B L E P A R K I N G C A L C U L A T I O N S 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:01 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt CODE ANALYSIS16036 A 01.1MSCheckerDUBLIN STATION DEMARCUS BOULEVARD BU I L D I N G A N A L Y S I S 1.BUILDING DESCRIPTION THE PROJECT IS COMPOSED OF (1) INDEPENDENT BUILDING ON ONE PARCEL. THE SITE IS LOCATED ALONG DUBLIN BLVD BETWEEN DEMARCUS BLVD AND CAMPBELL LANE • COMPOSED OF 2 ABOVE GRADE LEVELS IN TYPE IA CONSTRUCTION, COMPOSED OF A COMBINATION OF S-2 PARKING GARAGE, AMENITIES AND R-2 ACCESSORY SPACES • ABOVE THE PODIUM a. TYPE VA AT LEVELS 3-5 ON THE WEST / SOUTH BUILDING b. TYPE IIIA AT LEVELS 3-7 ON THE EAST AND CENTER TOWERS • BUILDING OCCUPANCIES ARE GROUP R-2, GROUP S-2, GROUP A-3 2.OCCUPANCY AND CONSTRUCTION TYPE (CHAPTER 3)LEVEL 1 & LEVEL 2 – CONSTRUCTION TYPE 1A • PARKING GARAGE (2 STORY)OCCUPANCY: S-2 • RESIDENTIAL AMENITY AND ACCESSORY SPACES OCCUPANCY: R-2, A-3 ACCESSORY LEVEL 3-7 – CONSTRUCTION TYPE IIIA AND VA • RESIDENTIAL OCCUPANCY: A-3, R-2 3.HORIZONTAL BUILDING SEPARATION ALLOWANCE / SPECIAL PROVISIONS (SECTION 510.2)THE TWO STORIES ABOVE GRADE PLANE (TYPE IA CONSTRUCTION) SHALL BE CONSIDERED A SEPARATE AND DISTINCT BUILDING FROM THE STORIES ABOVE (TYPE IIIA AND VA) FOR THE FOLLOWING PURPOSES:• DETERMINING AREA LIMITATIONS • CONTINUITY OF FIRE WALLS • LIMITATION OF NUMBER OF STORIES • TYPE OF CONSTRUCTION 4.AUTOMATIC SPRINKLER SYSTEM (SECTION 903)PROJECT TO BE FULLY SPRINKLERED, NFPA 13 SYSTEM, IN ACCORDANCE WITH SECTION 903 6.MIXED USE AND OCCUPANCY • ACCESSORY OCCUPANCIES SHALL BE INDIVIDUALLY CLASSIFIED IN ACCORDANCE WITH SECTION 302.1. THE REQUIREMENTS OF THIS CODE SHALL APPLY TO EACH PORTION OF THE BUILDING BASED ON THE OCCUPANCY CLASSIFICATION OF THAT SPACE. (SECTION 508.2)• ALLOWABLE BUILDING HEIGHT AND NUMBER OF STORIES OF THE BUILDING CONTAINING THE ACCESSORY OCCUPANCIES SHALL BE IN ACCORDANCE WITH SECTION 504 FOR THE MAIN OCCUPANCY OF THE BUILDING.• THE ALLOWABLE AREA OF THE BUILDING SHALL BE BASED ON THE APPLICABLE PROVISIONS OF SECTION 506 FOR THE MAIN OCCUPANCY OF THE BUILDING. AGGREGATE ACCESSORY OCCUPANCIES SHALL NOT OCCUPY MORE THAN 10 PERCENT OF THE FLOOR AREA IF THE STORY IN WHICH THEY ARE LOCATED.7.ALLOWABLE BUILDING AREA CALCULATION TYPE lllA CONSTRUCTION: LEVELS 3-7 ON THE EAST AND CENTER TOWERS BUILDING COMPARTMENT 1:FRONTAGE INCREASE CALCULATION:W = (L1 × w1 + L2 × w2 + L3 × w3…)/F W= (128’ x 30’ + 69’-4” x 30)/ 197’-4”W= 30 AMOUNT OF INCREASE:If = [F/P - 0.25]W/30 If = [197’-4”/525’ - 0.25] 30/30 If = 0.13 ALLOWABLE BUILDING AREA SINGLE-OCCUPANCY, MULTISTORY BUILDING Aa = [At + (NS × If)] × Sa Aa = [24,000 + (24,000 × 0.13)] × 2 Aa = 54,240 SF = MAX ALLOWABLE BUILDING AREA BUILDING COMPARTMENT 2:FRONTAGE INCREASE CALCULATION:W = (L1 × w1 + L2 × w2 + L3 × w3…)/F W = (149’ x 22’ + 75’ x 30’)/224' = 10.218 W= 30 AMOUNT OF INCREASE:If = [F/P - 0.25]W/30 If = [224’/541’’ - 0.25] 30/30 If = 0.16 ALLOWABLE BUILDING AREA SINGLE-OCCUPANCY, MULTISTORY BUILDING Aa = [At + (NS × If)] × Sa Aa = [24,000 + (24,000 × 0.16)] × 2 Aa = 55,680 SF = MAX ALLOWABLE BUILDING AREA 12 . E X I T I N G P R O V I S I O N S OC C U P A N T L O A D S A B O V E W H I C H RE Q U I R E T W O M E A N S O F E G R E S S A S P E R T A B L E 1 0 0 6 . 2 . 1 OC C U P A N C Y LO A D A- 3 4 9 O C C U P A N T S R- 2 1 0 O C C U P A N T S S- 2 2 9 O C C U P A N T S SE P A R A T I O N D I S T A N C E B E T W E E N S T A I R W A Y S M U S T B E N O L E S S T H A N 1 / 3 RD T H E L E N G T H O F M A X I M U M D I A G O N A L O F T H E AR E A S E R V E D P E R 1 0 0 7 . 1 . 2 E X C E P T I O N 2 , P R O V I D E D T H E B U I L DI N G I S E Q U I P P E D W I T H N F P A 1 3 O R N F P A 1 3 R S P R I N K L E R S CO M M O N P A T H O F E G R E S S T R A V E L ( S E C T I O N 1 0 0 6 . 2 . 1 ) OC C U P A N C Y LE N G T H A- 3 7 5 ’ W I T H N F P A 1 3 S P R I N K L E R S Y S T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A R- 2 1 2 5 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A S- 2 1 0 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A EX I T A C C E S S T R A V E L D I S T A N C E ( S E C T I O N 1 0 1 7 ) OC C U P A N C Y LE N G T H A- 3 2 5 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E B R- 2 2 5 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E B S- 2 4 0 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E C AC C E S S I B L E M E A N S O F E G R E S S AN A C C E S S I B L E M E A N S O F E G R E S S S H A L L BE P R O V I D E D I N A T L E A S T T H E S A M E N U MB E R A S T H O S E S P E C I F I E D I N C H A P T E R 10 0 7 . 1 . 1 A N D 1 0 0 6 . 1 – S E E A B O V E F O R R E Q U I R E D N U M B E R O F E X I T S B A S E D O N O C C U P A N T L O A D . A H O R I Z O N T A L E X I T W I L L B E PR O V I D E D I N L I E U O F E L E V A T O R T O M E E T TH E A C C E S S I B L E M E A N S O F E G R E S S R E Q U I R E M E N T S PE R S E C T I O N 1 0 0 9 . 2 . 1 E X C E P T I O N 1 . H O R IZ O N T A L E X I T S A R E P R O V I D E D A T T H E F I R E W A L L S . S E E P L A N S A N D S E C T I O N 1 2 FO R L O C A T I O N S DE A D E N D C O R R I D O R S PE R 1 0 2 0 . 4 E X C E P T I O N 2 , R - 2 O C C U P A N C I E S A R E A L L O W E D 5 0 F T . D E A D E N D S W H E R E T H E B U I L D I N G I S E Q U I P P E D TH R O U G H O U T W I T H A N A U T O M A T I C S P R I N K L E R S Y S T E M . A 4 8 ” C L E A R W I D T H A T A S T A I R W A Y I S N O T E R E Q U I R E D P E R S E C T I O N 1 0 0 9 . 3 E X C E P T I O N 2 AR E A S O F R E F U G E A R E N O T R E Q U I R E D P E R S E C T I O N 1 0 0 9 . 3 E X C E P T I O N 5 & 8 10 0 9 . 2 – C O N T I N U I T Y O F E X I T S – C H E C K F O R P O D I U M 13 . F I R E W A L L S ( S E C T I O N 7 0 6 ) 14 . A C C E S S I B I L I T Y PR O J E C T I S A P R I V A T E L Y F U N D E D D E V E L O P M E N T , T H E R E F O R E ; § R E S I D E N T I A L O C C U P A N C I E S I N A L L N E W L Y C O N S T R U C T I O N C O V E R E D M U L T I - F A M I L Y D W E L L I N G U N I T S S H A L L M E E T T H E RE Q U I R E M E N T S O F C H A P T E R 1 1 A H O U S I N G A C C E S S I B I L I T Y § R E S I D E N T I A L U N I T B A T H R O O M S : BA T H R O O M S I N 1 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H O P T I O N 2 P E R C B C S E C T I O N 1 1 3 4 A . 2 . 2N D B A T H R O O M S I N 2 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H O P T I O N 2 P E R C B C S E C T I O N 1 1 3 4 A . 2 MA S T E R B A T H R O O M S I N 2 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H I T E M S 7 - 1 2 O F C B C S E C T I O N 1 1 3 4 A . 2 O P T I O N 2 . § C O M M O N U S E F A C I L I T I E S ( S U C H A S L O B B I E S , S H A R E D A M E N I T Y S P A C E S , C O M M O N T O I L E T R O O M S ) S H A L L M E E T T H E RE Q U I R E M E N T S O F C H A P T E R 1 1 2 7 A 15 . L I G H T A N D V E N T I L A T I O N PR O J E C T T O C O M P L Y W I T H C B C S T A N D A R D S F O R L I G H T A N D V E N T I L A T I O N A T H A B I T A B L E R O O M S . P E R S E C T I O N 1 2 0 5 . 2 . 1 N A T U R A L LI G H T I N A N Y R O O M I S P E R M I T T E D T O B E CO N S I D E R E D A S A P O R T I O N O F A N A D J O I N I N G R O O M W H E R E O N E - H A L F O F T H E A R E A O F TH E C O M M O N W A L L I S O P E N A N D U N O B S T R U C T E D A N D P R O V I D E S A N O P E N I N G O F N O T L E S S T H A N 1 / 1 0 TH O F T H E F L O O R A R E A O F TH E I N T E R I O R R O O M O R 2 5 S Q F T , W H I C H E V E R I S G R E A T E R . 16 . P L U M B I N G F I X T U R E C O U N T S CA L I F O R N I A P L U M B I N G C O D E 2 0 1 6 T A B L E A “ O C C U P A N T L O A D F A C T O R " A P P L I E S . * P E R T A B L E 2 9 0 2 . 1 N O T E 3 ; W H E N D E S I G N O C C U P A N T L O A D I S L E S S T H A N 1 0 P E R S O N S , A F A C I L I T Y U S A B L E B Y E I T H E R S E X MA Y B E A P P R O V E D B Y T H E B U I L D I N G O F F I C I A L . 17 . E M E R G E N C Y R E S P O N D E R R A D I O C O V E R A G E R E Q U I R E M E N T PE R 2 0 1 6 C A F I R E C O D E S E C T I O N 5 1 0 , PR O J E C T T O P R O V I D E A P P R O V E D R A D I O C O V E R A G E F O R E M E R G E N C Y R E S P O N D E R S . PR O J E C T T O A L L O W F O R I N S T A L L A T I O N O F A N E M E R G E N C Y R E S P O N D E R S R A D I O C O V E R A G E S Y S T E M . U P O N C O N S T R U C T I O N CO M P L E T I O N , R A D I O T E S T S H A L L B E C O N D U C T E D T O D E T E R M I N E I F A N E M E R G E N C Y R E S P O N D E R S R A D I O C O V E R A G E S Y S T E M S H A L L BE I N S T A L L E D . 18 . E M E R G E N C Y E S C A P E A N D R E S C U E W I N D O W S ( P E R C B C S E C T I O N 1 0 3 0 ) § T Y P E V A C O N S T R U C T I O N : R E Q U I R E D I N G R O U P R O C C U P A N C Y S L E E P I N G R O O M S B E L O W T H E F O U R T H S T O R Y A B O V E GR A D E P L A N E , S E E F L O O R P L A N S L E G E N D F O R E M E R G E N C Y E G R E S S S Y M B O L A N D F L O O R P L A N S F O R L O C A T I O N S . § T Y P E 1 & I I I A C O N S T R U C T I O N : E M E R G E NC Y E S C A P E A N D R E S C U E WI N D O W S A R E N O T R E Q U I R ED I N R - 2 O C C U P A N C Y SL E E P I N G R O O M S , P E R 1 0 3 0 E X C E P T I O N 1 § S E E W I N D O W S C H E D U L E G E N E R A L N O T E S F O R W I N D O W S I Z E R E Q U I R E M E N T S 19 . E N C R O A C H M E N T S SE C T I O N 3 2 0 2 . 3 . 3 S T A T E S E N C R O A C H M E N T S 1 5 ’ O R M O R E A B O V E G R A D E S H A L L N O T B E L I M I T E D BU I L D I N G C O M P A R T M E N T 3 : FR O N T A G E I N C R E A S E C A L C U L A T I O N : W = ( L 1 × w 1 + L 2 × w 2 + L 3 × w 3 … ) / F W= ( 1 1 8 ’ x 3 0 ’ ) / 1 1 8 ’ W= 3 0 AM O U N T O F I N C R E A S E : If = [ F / P - 0 . 2 5 ] W / 3 0 If = [ 1 1 8 ’ / 3 7 3 ’ - 0 . 2 5 ] 3 0 / 3 0 If = 0 . 0 6 AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 2 4 , 0 0 0 + ( 2 4 , 0 0 0 × 0 . 0 6 ) ] × 2 Aa = 5 0 , 8 8 0 = M A X A L L O W A B L E B U I L D I N G A R E A BU I L D I N G C O M P A R T M E N T 4 : *N O F R O N T A G E I N C R E A S E T A K E N AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 2 4 , 0 0 0 + ( 2 4 , 0 0 0 × 0 ) ] × 2 Aa = 4 8 , 0 0 0 = M A X A L L O W A B L E B U I L D I N G A R E A TY P E V A C O N S T R U C T I O N : L E V E L S 3 - 5 O N T H E S O U T H / W E S T B U I L D I N G BU I L D I N G C O M P A R T M E N T 5 : *N O F R O N T A G E I N C R E A S E T A K E N AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 3 6 , 0 0 0 + ( 1 2 , 0 0 0 × 0 ) ] × 2 Aa = 7 2 , 0 0 0 = M A X A L L O W A B L E B U I L D I N G A R E A 8. O C C U P A N C Y S E P A R A T I O N ( T A B L E 5 0 8 . 4 ) OC C U P A N C Y SE P A R A T I O N R E Q D SE P A R A T I O N P R O V I D E D S- 2 T O R - 2 1 H R 3 H R S- 2 T O A - 3 N O N E - R- 2 T O A - 3 1 H R 1 H 9. F I R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S ( T A B L E 6 0 1 A N D 6 0 2 ) FI R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S F O R B U I L D I N G E L E M E N T S ( T A B L E S 6 0 1 ) BU I L D I N G E L E M E N T TY P E I A TY P E I I I A TY P E V A ST R U C T U R A L F R A M E 3 H R 1 H R 1 H R EX T E R I O R B E A R I N G W A L L 3 H R 2 H R 1 H R IN T E R I O R B E A R I N G W A L L 3 H R 1 H R 1 H R EX T E R I O R N O N - B E A R I N G W A L L S E E B E L O W F O R R E Q U I R E M E N T S F O R E X T E R I O R W A L L S B A S E D O N S E P A R A T I O N IN T E R I O R N O N - B E A R I N G W A L L 0 H R 0 H R 0 H R FL O O R 2 H R 1 H R 1 H R RO O F 1 . 5 H R 1 H R 1 H R *N O T E : AL L E X T E R I O R W A L L S I N T H E T Y P E I I I A C O N S T R U C T I O N T O B E 2 H R R A T E D AL L E X T E R I O R W A L L F R A M I N G A N D P L Y W O O D S H E A T H I N G I N T H E T Y P E I I I A C O N S T R U C T I O N T O B E F I R E R E T A R D A N T T R E A T E D (F R T ) FI R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S F O R E X T E R I O R W A L L S B A S E D O N S E P A R A T I O N ( T A B L E 6 0 2 ) FI R E S E P A R A T I O N D I S T A N C E ( F T ) T Y P E I A T Y P E I I I A T Y P E V A X < 5 ' 1 H R * 1 H R * 1 H R * 5' T O 1 0 ' 1 H R * 1 H R 1 H R 10 ' T O 3 0 ' 1 H R 1 H R 1 H R 30 ' < X N O N E N O N E N O N E FI R E R E S I S T A N C E R A T I N G B A S E D O N W A L L T Y P E S : WA L L T Y P E T Y P E I A T Y P E I I I A T Y P E V A SH A F T E N C L O S U R E S 2 H R 2 H R 2 H R EX I T E N C L O S U R E S 2 H R 2 H R 2 H R CO R R I D O R W A L L S , A N D 1 H R 1 H R 1 H R WA L L S S E P A R A T I N G D W E L L I N G U N I T S 10 . E X T E R I O R W A L L O P E N I N G P R O T E C T I O N MA X I M U M A R E A O F E X T E R I O R W A L L O P E N I N G B A S E D O N F I R E S E P A R A T I O N D I S T A N C E P E R T A B L E 7 0 5 . 8 FI R E S E P A R A T I O N D I S T . ( F T ) O P E N I N G P R O T E C T I O N A L L O W A B L E A R E A X < 3 ' U P , S N O T P E R M I T T E D 3' T O 5 ' U P , S 1 5 % 5' T O 1 0 ' U P , S 2 5 % 10 ' T O 1 5 ' U P , S 4 5 % 15 ' T O 2 0 ' U P , S 7 5 % 20 ' T O 2 5 ' U P , S N O L I M I T 11 . P A R K I N G G A R A G E S- 2 O C C U P A N C Y R E Q U I R E M E N T S ( S E C T I O N 4 0 6 ) PA R K I N G G A R A G E I S C L A S S I F I E D A S E N C L O S E D ( 4 0 6 . 2 ) VE N T I L A T I O N : M E C H A N I C A L V E N T I L A T I O N S Y S T E M T O B E P R O V I D E D I N A C C O R D A N C E W I T H T H E C A M E C H A N I C A L C O D E . SE E M E C H A N I C A L D R A W I N G S VE H I C L E B A R R I E R S R E Q U I R E D ( S E C T I O N 4 0 6 . 4 . 3 08.29.17ENT RESUBMITTAL UP DN UP DN 3 3 3 3 3 3 3 3 3 3 3 3 3 EXIT STAIR 1 EX I T S T A I R 3 EL E V A T O R S ELEVATORS VE H I C L E E N T R Y * ** * *EXIT STAIR 2 EGRESS SEPERATION 300' - 4" > MIN. 141'-0" MAX. DIAGONAL LENGTH 423'-0" EX I T A T G R A D E E X I T A T G R A D E RESIDENTIAL UNITS R-2 238333 3 3 4 3 3 3 1 5 1 149 2 1 6 6 34 19 17187FITNESS ROOM A-3 LEASING OFFICE B PA R K I N G S- 2 1 SK A - 3 1 a EGRESS SEPARATION 224' - 9" > MIN. 141'-0" MAX. DIAGONAL LENGTH 423'-0" EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EXIT ACESS TRAVEL = 139'-0"RESIDENTIAL UNITS R-2 3 9 PA R K I N G S- 2 3 3 4 3 3 33 3 5 5 3 1 6 2 163 18 1 14 171 1 SK A - 3 1 a 7 9 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N 1 1 1 ' - 2 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N 9 9 '-7 " > 1 /3 O F T H E D I A G . E G R E S S S E P A R A T I O N 103'-0" > 1/3 OF THE DIAG. EGRESS SEPARATION > 1/3 OF THE DIAG. EGRESS SEPERATION EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 2 9 ' - 7 " EX I T A C E S S TR A V E L = 1 2 6 ' - 6 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " EX I T A C E S S TR A V E L = 1 0 0 ' - 6 " EX I T A C E S S TR A V E L = 1 4 2 ' - 0 " EX I T A C E S S TR A V E L = 1 3 8 ' - 0 " RE S I D E N T I A L U N I T S R- 2 6 23 AM E N I T Y R- 2 39 38 444 385 6 5 5 4 3 4 4 4 4 4 4 5 3 4 5 5 2 8 AM E N I T Y R- 2 5 5 5 5 3 3 3 3 4 5 5 5 7 3 6 4 4 4 5 5 4 5 5 6 4 6 3 0 61 11 0 10 4 49 33 H. E . H. E . H. E . H. E . H. E . USED FOR FRONTAGE INCREASE 75' - 0" US E D F O R F R O N T A G E I N C R E A S E 15 7 ' - 7 " 1 SK A - 3 1 a 1 0 3 ' - 0 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 2 9 ' - 7 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " RE S I D E N T I A L U N I T S R- 2 23 34 AM E N I T Y R- 2 54445 6 5 5 4 3 4 4 4 4 4 4 5 3 4 5 5 3 5 5 5 7 6 3 54 36 14 3 3 3 23 90 OU T D O O R L O U N G E R- 2 EX I T A C E S S TR A V E L = 1 4 7 ' - 0 " 7 9 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N 1 1 1 ' - 2 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N 9 9 '-7 " > 1 /3 O F T H E D I A G . E G R E S S S E P A R A T I O N H. E . H. E . H. E . RO O F A C C E S S 2 - H R R A T E D ST A I R E N C L O S U R E NO T E : NO N - S T O R Y NO S E C O N D E G R E S S RE Q U I R E D RO O F A T LE V E L 6 1 SK A - 3 1 a LEGEND 3 HR RATED FIRE BARRIER / FIRE WALL 0 EXIT ACCESS TRAVEL DISTANCE AND COMMON PATH OF EGRESS TRAVELEGRESS ROUTEOCCUPANT LOAD0 COMBINED NUMBER OF OCCUPANTS AT EXIT OCCUPANT LOAD (PER TABLE 1004.1.1)OCCUPANT LOAD FACTOR - OCCUPANCY 200 G.S.F. - RESIDENTIAL (R-3)50 G.S.F.- FITNESS (A-3)15 G.S.F.- AMENITY (R-2)100 G.S.F.- LEASING (B)200 G.S.F.- PARKING (S-2)300 G.S.F.- MEP (S-2)HORIZONTAL EXITH.E.CODE REFERENCE KEYNOTES2 HR RATED FIRE BARRIER 1 HR RATED FIRE BARRIER *EXITBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:36:00 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedEGRESS DIAGRAMS16036 G 03AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 1 " = 4 0 ' - 0 " G 0 3 1 EX I T D I A G R A M F L O O R P L A N L E V E L 1 1 " = 4 0 ' - 0 " G 0 3 2 EX I T D I A G R A M F L O O R P L A N L E V E L 2 1 " = 4 0 ' - 0 " G 0 3 3 EX I T D I A G R A M F L O O R P L A N L E V E L S 3 - 5 1 " = 4 0 ' - 0 " G 0 3 4 Le v e l 6 08.29.17ENT RESUBMITTAL 3 3 3 3 3 3 3 33SDN 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3333SS SSSSS EX I T A C E S S T R A V E L = 1 0 6 ' - 0 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " RE S I D E N T I A L U N I T S R-2 23 22 29 30 EX I T A C E S S TR A V E L = 1 4 7 ' - 0 " 54445119 5 3 4 5 5 3 5 5 5 7 6 3 3 3EXIT ACESS TRAVEL = 78'-0"7 0 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N M A X . D I A G O N A L L E N G T H 2 3 4 ' - 6 " M A X . D I A G O N A L L E N G T H 2 0 9 ' - 0 "H.E. H. E . 1 SK A - 3 1 a LEGEND 3 HR RATED FIRE BARRIER / FIRE WALL 0 EXIT ACCESS TRAVEL DISTANCE AND COMMON PATH OF EGRESS TRAVELEGRESS ROUTEOCCUPANT LOAD0 COMBINED NUMBER OF OCCUPANTS AT EXIT OCCUPANT LOAD (PER TABLE 1004.1.1)OCCUPANT LOAD FACTOR - OCCUPANCY 200 G.S.F. - RESIDENTIAL (R-3)50 G.S.F.- FITNESS (A-3)15 G.S.F.- AMENITY (R-2)100 G.S.F.- LEASING (B)200 G.S.F.- PARKING (S-2)300 G.S.F.- MEP (S-2)HORIZONTAL EXITH.E.CODE REFERENCE KEYNOTES2 HR RATED FIRE BARRIER 1 HR RATED FIRE BARRIER *EXIT RO O F A C C E S S 2 - H R R A T E D ST A I R E N C L O S U R E NO T E : NO N - S T O R Y NO S E C O N D E G R E S S RE Q U I R E D RO O F A T LE V E L 7 ROOF 1 SK A - 3 1 a BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:38:59 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedEGRESS DIAGRAMS16036 G 04AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 1 " = 4 0 ' - 0 " G 0 4 1 EX I T D I A G R A M F L O O R P L A N L E V E L 7 1 " = 4 0 ' - 0 " G 0 4 2 EX I T D I A G R A M R O O F P L A N 08.29.17ENT RESUBMITTAL DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL TITLE SHEET C0.0 NOTES:LEGEND: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EXISTING CONDITIONS PLAN C1.0 UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC C C 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C CC 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE GARAGE FITNESS ROOM LEASING OFFICE LOBBY ELECTRICAL ROOM TRASHTRASHFIRE ROOM WEST FRONTAGE: CAMPBELL LANE 1"=5'A NORTH FRONTAGE: PRIVATE DRIVE 1"=5'B EAST FRONTAGE: DEMARCUS BLVD 1"=5'C SOUTH FRONTAGE: CAMPBELL LANE 1"=5'D SITE PLAN LEGEND: SITE PLAN NOTES: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL CIVIL SITE PLAN C2.0 UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC C C 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C CC 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE LEGEND:GRADING NOTES: DRIVEWAY DETAIL 1"=10' DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL GRADING PLAN C3.0 UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC C C 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C CC 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE LEGEND: NOTES: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UTILITY PLAN C4.0 SLOPE SLOPE SLOPE S L O P E S L O P E S L O P E S L O P E SLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE S L O P E SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE SLOPE SLOPE S L O P E SLOPE S L O P E SLOPE S L O P E SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE SLOPE S L O P E S L O P E SLOPE SLOPE S L O P E CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE NOTES:LEGEND: STORMWATER CONTROL PLAN C5.0 DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 1 FLOW-THRU PLANTER NTS 2 STORMWATER FILTER NTS STORMWATER CONTROL DETAILS C5.1 DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC C C 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C CC 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE x x x x x x x x x x x x x x x x x x x x x x x xx x xxxx xx xxx x xxx x xxxxxxxx xxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x GARAGE FITNESS ROOM LEASING OFFICE LOBBY ELECTRICAL ROOM TRASHTRASHFIRE ROOM DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EROSION CONTROL PLAN C6.0 DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EROSION CONTROL NOTES AND DETAILS C6.1 AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL L1.00 ILLUSTRATIVE SITE PLAN LANDSCAPE SITE PLAN PERCENT LANDSCAPING LEGEND GROUND LEVEL: 69.9% HARDSCAPE, 18,850 SF 25.5% PLANTING AREA, 6,881 SF 3.9% BIORETENTION PLANTER, 1,042 SF 0.7% ARTIFICAL TURF, 185 SF PODIUM: 52.2% HARDSCAPE, 12,778 SF 25.8% RAISED PLANTER, 6,308 SF 11.5% BIORETENTION PLANTER, 2,809 SF 5.5% ARTIFICIAL TURF, 1,355 SF 5.0% POOL, 1,210 SF DE M A R C U S B O U L E V A R D EAST PODIUM COURTYARD WEST PODIUM COURTYARD CA M P B E L L L A N E W E S T CAMPBELL LANE SOUTH SHARED PRIVATE DRIVE CAMELLIA PLACE scale: 1” = 20’N PL PL PLPL GENERAL NOTES: 1. ALL IRRIGATION AT SHRUB AND GROUNDCOVER PLANTINGS TO BE DRIP IRRIGATION. INDIVIDUAL BUBBLERS WILL BE PROVIDED AT TREE PLANTINGS. 2. ALL PLANTING AREAS TO INCLUDE 3” LAYER OF 3/8” BLACK MINI-CHIP MULCH 3. SOIL ANALYSIS TO BE SUBMITTED WITH FINAL LANDSCAPE PLAN WITH BUILDING PERMIT/IMPROVEMENT PLANS 4. MAINTENANCE RESPONSIBILITY FALLS TO OWNER FOR SITE AND SIDEWALK DIRECTLY ADJACENT TO THE BUILDING. THE CITY IS RESPONSIBLE FOR THE STREET AND ANY MEDIAN ISLANDS L3.00L5.00 L2.00 L4.00 SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL SHARED PRIVATE DRIVE STREETSCAPE PLAN AS SHOWN L2.00 1111 FA C E O F B U I L D I N G 15 1 3 ’ - 4 ” 11’-0” 10’-0” 7’-1”1 4 ’ - 6 ” 6’ - 0 ” 7’ - 9 ” 2’ - 8 ” 14 ’ - 2 ” 8’ - 9 ” 1 1 ’ - 1 0 ” 1 0 ’ - 6 ” 1 Gal, 12” O.C. Sedum rubrotinctum Jelly-bean Sedum Water Usage: L LANDSCAPE SITE PLAN SHARED PRIVATE DRIVE CAMELLIA PLACE scale: 1” = 10’ scale: 1/4” = 1’ 3’-4”5’-0”8’-0” PARALLEL PARKING (PLANTED BULBOUT BEYOND) 6” CURB 30” MAX. PLANTING HT. SIDEWALKCONCRETE PLANTER 3’-4”*PLANTER DEPTH VARIES A A’ PL PR O P E R T Y L I N E 10’-4” TYP3’-7”5’-8”9’-6”6’-0”15’-6”8’-11”16’-9”6’-0”2’-0” TYP.37’-2” 26’-0”22’-6”22’-6” 23’-8” TYP.5’-8”4’-0”50’-9” 20’-0” TYP 8’-0” TYP8’-0” TYP 5’-0” TYP 3’-4” TYP N STREETSCAPE SECTION AA’ MATERIALS PLANT PALETTE Limonium californicum Elymus glaucus Echeveria Western Marsh Rosemary BI O R E T E N T I O N ST R E E T S C A P E Blue Wild Rye Raised Concrete Planter/ Bioretention Planter Integral Color Concrete, Color: Southern Blush Echeveria SITE FURNISHINGS 4 5 559 1012 12 12 9 9 181818 11 11 A’ A Faceted Steel Bench Modular Concrete Unit Pavers, Color: Foundry Faceted Steel Retaining/ Planter Wall 8 29 29 29 PL PL 1 Gal, 18” O.C. Water Usage: L 5 Gal, 12” O.C. Water Usage: L 5 Gal, 1’-0” O.C. Water Usage: L Amphitheatre Stair Seating 3 33 42 2 23 LIMIT OF WORK PROPERTY LINE Water Usage: L 1 Gal, 12” O.C. Festuca rubra Creeping Red Fescue Water Usage: L 5 Gal, 4’ O.C. Lavandula dentata var. candicans Gray Leaved French Lavender SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN STREET TREES Arbutus unedo Strawberry Tree 24” Box Water Usage: L 19191919 KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL DEMARCUS BLVD STREETSCAPE PLAN L3.00scale: 1” = 10’N scale: 1/4” = 1’ 20’-0” 2’-6” PLANTING 6’ 11’-0” 10’-0”, VARIES10’-0”, VARIES 5’-0”8’-0” PARALLEL PARKING 6” CURB 11’ WALK WITH 5’X5’ SQ TREE WELL PLANTINGPRIVATE FITNESS AREA STORM DRAIN EASEMENT 1’-6”, MAX PL PR O P E R T Y L I N E STREETSCAPE SECTION BB’ ST R E E T S C A P E 20 20 25 16 16 20’-0” 23’-6” O.C.25’-0” O.C., TYP 25’-0” O.C., TYP FA C E O F B U I L D I N G 4 4 4 SITE FURNISHINGS 5’-0” B 22’-6” O.C.22’-6” O.C.22’-6” O.C.24’-0” O.C.12’-6” O.C., TYP 12’-6” O.C., TYP12’-6” O.C., TYP 12’-6” O.C., TYP 5’-0” TW +0” TW +18” TW +18” TW +18” TW +6” TW +0” TW +6” TW +6” TW +6”TW +0” TW +0” TW +0”TW +0” MATCHLINE, SEE L4.00 TW +18” TW +0” 7’-4” 13’-0” 28’-0” 7’-6”9’-2” 4’-6” 6’-0” 5’-8” 1’-8” 6’-3” 15’-10”20’-0”12’-8” 2’-0”15’-5” 8’-0” 6’-0” 2’-6” B B’ B’ 1 1 11111111 1 2 2 2 2 2222222222 2 3 6 6 8 8 8 8 8 8 1111 11 1111 13 13 13 13 13 13 13 13 13 13 11 11 11 23 11 11 1119 19 19 19 11 11 11 11 DEMARCUS BOULEVARD SH A R E D P R I V A T E D R I V E CA M P B E L L L A N E PL PL ST R E E T S C A P E Water Usage: M Water Usage: L Water Usage: L Water Usage: L 1 Gal, 36” O.C.5 Gal, 48” O.C.1 Gal, 12” O.C. Lomandra longifolia ‘Tanika’Salvia leucantha ‘Midnight’Sempervivum ‘Purple Beauty’ Tanika Lomandra Purple Mexican Sage Hen and Chicks PLANT PALETTE EA S E M E N T 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Raised Concrete Planter/ Bioretention Planter Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Amphitheatre Stair Seating 20’-0” STORM DRAIN EASEMENT Water Usage: L 30’-0” VISIBILITY ZONE, S.C.D. SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. 24” Box Water Usage: M Pyrus calleryana ‘Aristocrat’ Aristocrat Pear Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L MATCHLINE, SEE L3.00 MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST LANDSCAPE SITE PLAN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CAMPBELL LANE SOUTH STREETSCAPE PLAN AS SHOWN L4.00scale: 1” = 20’N PL 7 7 4 4 24 19 24 20 20 18 12 CAMPBELL LANE SOUTH C C’ C’ C 1 1 3 6 11 2121 14 11 3 11 11 11 5’-0” TYP 6’-0” TYP4’-0” 6’-4”8’-0” 20’-0” 7’-0”TYP11’-5”7’-0” 6’-6”6’-11” 11’-0”7’-7” 10’-8” 6’-0” 5’-11” 1’-0” TYP1’-0” TYP 2’-6” TYP LANDSCAPE SITE PLAN PL DE M A R C U S B O U L E V A R D Water Usage: M Water Usage: LWater Usage: L 1 Gal, 6’ O.C.5 Gal, 4’ O.C.1 Gal, 12” O.C. Passiflora incarnata Lavandula dentata var. candicans Festuca glauca Purple Passionflower Gray Leaved French Lavender Douglas Iris 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Water Usage: L Water Usage: L Raised Concrete Planter/ Bioretention Planter Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Amphitheatre Stair Seating PLANTER ISLAND PARALLEL PARKING (BEYOND) 6” CURB SIDEWALKAT-GRADE PLANTING 2’-6”6’-0”4’-0” 8’-0” 1’6”6” scale: 1/4” = 1’ PR O P E R T Y L I N E STREETSCAPE SECTION CC’PLANT PALETTE ST R E E T S C A P E FA C E O F B U I L D I N G SITE FURNISHINGS 48’-6” SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. 26 Platanus acerifolia ‘Bloodgood’ London Plane Tree 24” Box Water Usage: M Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L MA T C H L I N E , S E E L 4 . 0 0 MA T C H L I N E , S E E L 3 . 0 0 MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CAMPBELL LANE WEST STREETSCAPE PLAN AS SHOWN L5.00 BI O R E T E N T I O N scale: 1” = 20’N PLANT PALETTE BI O R E T E N T I O N LANDSCAPE SITE PLAN 4 4 4 8’-0” 20’-0” 23’-7”4’-0” 9’-8” 22’-0”11’-6”14’-10”TYP 14’-5” 2’-0” 6’-0” 6’-0” 2’-0” 6’-0” 2’-0” 4’-11 ” 4’-0”6’-10”2’-0” 9’-0” 5’-10” 5’-0” TYP TYP ST R E E T S C A P E D’ D 3 3 19 19 19 19 19 11 2828 29 29 1111 11 11 11 9 9 5 9 3 3 3 21 18 1818 23 27 20 24 24 11 11 3 5’-0” TYP 6’-0” TYP 1’-0” TYP 2’-6” TYP 2’-1” 13 ’ - 1 0 ” 9’- 7 ” 5’- 0 ” 21 21 21 CAMPBELL LANE WEST PL CA M P B E L L L A N E S O U T H SH A R E D P R I V A T E D R I V E 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Water Usage: LWater Usage: L Limonium californicum Western Marsh Rosemary 1 Gal, 18” O.C. Water Usage: L Water Usage: L 5 Gal, 4’ O.C. Lavandula dentata var. candicans Gray Leaved French Lavender Water Usage: L 1 Gal, 12” O.C. Festuca rubra Creeping Red Fescue scale: 1/4” = 1’ STREETSCAPE SECTION DD’ Raised Concrete Planter/ Bioretention Planter SITE FURNISHINGS Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Concrete Amphitheatre Stair Seating PLANTER ISLAND PARALLEL PARKING (BEYOND) 6” CURB SIDEWALKAT-GRADE PLANTING FA C E O F B U I L D I N G D 2’-6”6’-0”4’-0” 8’-0” 1’6”6” D’ PL PR O P E R T Y L I N E 26 26 SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. Platanus acerifolia ‘Bloodgood’ London Plane Tree 24” Box Water Usage: M Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L 22 TYP MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CONCEPTUAL LIGHTING PLAN L6.00 Stake Mounted LED Path LightPool & Spa LightingPlay LightingTree Uplight Recessed Planter Wall Light String Lights KEY TREE UPLIGHT PLAY LIGHTING POOL & SPA LIGHTING CITY STANDARD STREET LIGHT (E) STAKE MOUNTED LED PATH LIGHT RECESSED PLANTER WALL LIGHT DECORATIVE STRING LIGHTS (STRUNG ALONG TOP OF STEEL TRELLIS & POOL CABANAS) NOTE: LIGHT LOCATIONS ARE CONCEPTUAL AND SUBJECT TO CHANGE PENDING A PHOTOMETRIC STUDY. WILL BE SUBMITTED IN BUILDING/SITEWORK PERMIT PLAN SUBMITTAL scale: 1” = 20’N CAMELLIA PLACE PL PL PLPL SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN DE M A R C U S B O U L E V A R D CA M P B E L L L A N E W E S T CAMPBELL LANE SOUTH SHARED PRIVATE DRIVE LEGEND LIMIT OF WORK PROPERTY LINE PARCEL 3 PM 8275 280 PM 71 CAMPBELL LN CAMPBELL LN DE MARCUS BLVDSHARED PRIVATE DRIVEBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:11 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1" = 50'-0"EXISTING CONDITIONS16036 A 02DUBLIN STATION DEMARCUS BOULEVARD 1 - N O R T H E A S T C O R N E R 2 - N O R T H W E S T C O R N E R 3 - S O U T H W E S T C O R N E R 4 - S O U T H E A S T C O R N E R LA N E DE M A R C U S B L V D LA N E CA M P B E L L L N CA M P B E L L L N DE M A R C U S B L V D 1 " = 5 0 ' - 0 " A 0 2 1 SI T E P L A N - E X I S T I N G 2 1 3 3 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:16 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt SITE AERIAL DIAGRAM16036 A 03DUBLIN STATION DEMARCUS BOULEVARD CAMPBELL GREEN DE MARCUS BLVD DU B L I N B L V D . IRON HORSE REGI ON AL TR AI L CA M P B E L L L N CAMPBELL LN HAMLET LN.ELAN AT DUBLIN STATION 7 STORY MULTI-FAMILY AVALON DUBLIN STATION 5 STORY MULTI-FAMILY CA M E L I A P L A C E 4 S T O R Y M U L T I -FA M I L Y DU B L I N T R A N S I T CE N T E R S I T E A -1 3 S T O R Y M U L T I -FA M I L Y PR O P O S E D D E V E L O P M E N T DE MARCUS BLVD DUBLIN BLVD. SH A R E D P R I V A T E D R I V E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UP A1 9 A0 2 A1 5 A1 9 A1 9 A0 5 UT I L I T Y TRASH FITNESS YOGA ROOM TR A S H GA R A G E EL E C T R I C A L RO O M BO I L E R RO O M BI K E ST O R A G E ID F 40 0 ' - 0 1 / 2 " 258' - 3" 36 4 ' - 8 " 50' - 0" 222' - 10 1/2" PA R C E L " A " PM 7 3 9 5 25 4 P M 2 8 PA R C E L 2 PM 8 2 7 5 28 0 P M 7 1 LOT 1 TRACT 7525 279 PM 97 PA R C E L 1 PM 8 2 7 5 28 0 P M 7 1 PA R C E L 3 PM 8 2 7 5 28 0 P M 7 1 IR O N H O RSE REGIO N AL TR AIL CA M P B E L L L A N E CAMPBELL LANE DE MARCUS BLVDRESIDENT LOADING ZONE 18' - 0"24' - 0"18' - 0"100' - 0" 33 5 . 6 5 ± 333.7 LO B B Y 2 ENTRY PLAZA SH A R E D P R I V A T E D R I V E 6' - 3 1 / 2 " 20' - 3"5' - 3 1/2"2' - 4 1/2" 14' - 3" PR O P E R T Y L I N E PR O P E R T Y L I N E 335.1 ± 333.6± 333.8± 334.0± 334.3 ± 333.5 ± 3 3 5 . 0 33 5 . 9 33 5 . 8 33 5 . 7 5 33 5 . 6 33 5 . 4 33 5 . 3 46 ' - 2 " 17 ' - 0 " 24 ' - 0 " 0' - 0" GA S ME T E R CL O S E T A2 0 PA C K A G E RO O M S01 S01 MAIL LEASINGRESTROOM EL E C T R I C A L RO O M FI R E A C C E S S R O A D 24' - 2 1/2"16' - 2" REMOVE EXISTING MEDIAN26' - 0"14' - 3" FI R E A C C E S S R O A D STAIR 01ELEV 1STAIR 02 ST A I R 0 4 ST A I R 0 3 33 5 . 5 EL E V 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:30 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1" = 20'-0"SITE PLAN16036 A 04•DUBLIN STATION DEMARCUS BOULEVARD 10 204080'600ACCESSIBLE PATH OF TRAVEL05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:34 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 04.1TEAMTEAMDUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD02.09.18ENT RESUMITTAL 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 1:57:51 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 04.2AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T E N T R Y L O B B Y - CAMPBELL LANE AND DE MARCUS BOULEVARD02.09.18ENT RESUMITTAL 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:43 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 04.3AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD NORTHEAST CORNER - DE MARCUS BOULEVARD02.09.18ENT RESUMITTAL 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:47 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 05DUBLIN STATION DEMARCUS BOULEVARD AE R I A L S O U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:52 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 06DUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:56 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 07DUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:31:03 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 08DUBLIN STATION DEMARCUS BOULEVARD NO R T H E A S T C O R N E R - DE MARCUS BOULEVARDNORTHWEST CORNER - CAMPBELL LANE SO U T H E A S T C O R N E R - C A M P B E L L L A N E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UP    5. 8 3 % 11 . 4 0 % 1 A 2 0 22' - 0"18' - 0"24' - 0"17' - 3"18' - 9"24' - 0"17' - 0"2' - 6" 21' - 0" 18' - 0"24' - 2"17' - 0" 17 ' - 0 " 2 4 ' - 0 " 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED UT I L I T Y TRASH FITNESS YOGAROOM TR A S H GA R A G E ELECTRICAL ROOM BO I L E R RO O M BI K E ST O R A G E GA R A G E E N T R Y 7' - 8" 8' - 1 0 1 / 2 " CL TYP 2' - 0"CL TYP 3' - 0" R 2 2' - 0 " CL TYP 3' - 0"CL TYP 3' - 0" CL TYP 27' - 0" R 24' - 0" 2 A 1 9 1 A 1 9 2 A 2 0 0' - 0"0' - 0"0' - 0"RESIDENT LOADING ZONE ID F 9' - 0"14' - 0" 5' - 0 " 9' - 0 " 82 1 S F LO B B Y 2 9' - 0"9' - 0" 9' - 0 " 24' - 0" 9' - 0 " 9' - 0 " 5' - 1 " 4' - 1 " 9' - 0 " 9' - 0 " 4' - 1 " 9' - 0 " 9' - 0 " 9' - 0 " 5' - 1 " 4' - 1 " 9' - 0 " 9' - 0 " 4' - 1 " 5' - 1 " 9' - 0 " SH E A R W A L L 4.15% 37 1 ' - 1 1 " 28' - 7"170' - 0 1/2"34' - 2" -0'-4"-0'-5"-0'-3"0'-0"- 0'-6" GA R A G E F E N C E , N O TH R O U G H A C C E S S SE C U R I T Y G A T E GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T VAN GU E S T GU E S T GUEST TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 1' - 0"TYP 26' - 0" PA C K A G E RO O M EN C R O A C H M E N T S A R E A L L O W E D U N D E R C H A P T E R 3 2 O F TH E 2 0 1 6 C B C 20 1 6 C B C 3 2 0 2 . 3 . 3 E N C R O A C H M E N T S 1 5 O R M O R E F E E T AB O V E G R A D E . EN C R O A C H M E N T S 1 5 F E E T ( 4 5 7 2 M M ) O R MO R E A B O V E G R A D E S H A L L N O T B E L I M I T E D . BU I L D I N G A N D R O O F A B O V E GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T GU E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T GU E S T G U E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T GU E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T 0' - 9 " VA N GU E S T G U E S T GU E S T LEASINGRESTROOMMAIL1 BED JR 1 BED JR REMOVE EXISTING MEDIAN FH 9' - 0 " 7 ' - 6 " 9 ' - 0 " 0'-0" 7' - 1 0 1 / 2 " 9 6 ' - 7 " 9 3 ' - 9 1 / 2 " 11 1 ' - 5 1 / 2 " 3 2 ' - 7 1 / 2 " 4 ' - 1 1 " 3 2 ' - 6 1 / 2 " 2' - 4 1/2"232' - 9 1/2"23' - 0 1/2" 27' - 3 1/2"203' - 11 1/2"27' - 0" 45 ' - 8 " 27 3 ' - 4 1 / 2 " 23' - 6"4' - 9"32' - 6 1/2"20' - 3" 1' - 6 " 1' - 6 " 1 B E D EL E C T R I C A L RO O M GA S ME T E R CL O S E T 50 G U E S T P A R K I N G S P A C E S 96 ' - 7 " CO R R I D O R CO R R I D O R STAIR 01ELEV 1STAIR 02 ST A I R 0 4 EL E V 2 ST A I R 0 3 GU E S T LOBBY 1BARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:31:23 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 116036 A 09DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 2 DN UP 1 A 2 0 11 . 4 0 % 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED1 BED JR 1 BED JR FA N RO O M MAINTENANCE OFFICE 2 BED 2 BED 1 BED GA R A G E FAN ROOM ST O R A G E ST O R A G E 2' - 4 1/2" OPEN TO LOBBY BELOW 2' - 7 " R 2 2' - 0 " 5. 8 3 % R 24' - 0" 2 A 1 9 1 A 1 9 2 A 2 0 ID F TRASH 7' - 1 0 1 / 2 " 37 1 ' - 1 1 " 20' - 3" 2' - 4 1/2"232' - 9 1/2"23' - 0 1/2" 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " -1' - 0" 9' - 0 " 9' - 0 " 5 ' - 1 " 4' - 1 " 9' - 0 " 9' - 0 " 5' - 1 " 4' - 1 " 9' - 0 " 9' - 0 " 4' - 1 " 5' - 1 " 9 ' - 0 " 5' - 1 " 9' - 0 " 9' - 0 " 4' - 1 " 24' - 0"18' - 0"4' - 2" 17 ' - 0 " 2 4 ' - 0 " 18' - 0"24' - 2"17' - 0"22' - 0"18' - 0"24' - 0"17' - 3"18' - 9"24' - 0"17' - 0" 9' - 0"5' - 0"9' - 0" 9' - 0 " 9' - 0" 9' - 0 " CL TYP 2' - 0"CL TYP 3' - 0"CL TYP 3' - 0"CL TYP 3' - 0"CL TYP. 3' - 0"CL TYP 3' - 10" TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 1' - 0" TYP 2' - 10" 12 ' - 0 " 11 ' - 5 " 12 ' - 0 " 12 ' - 0 " 34 6 ' - 0 " 12' - 0"12' - 0" 12 ' - 0 " 19 0 ' - 4 1 / 2 " 14 4 ' - 1 " 4 ' - 1 1 " 3 2 ' - 6 1 / 2 " 27' - 0"203' - 11 1/2"27' - 3 1/2" 45 ' - 8 " 27 3 ' - 4 1 / 2 " 23' - 6"4' - 9"32' - 6 1/2"20' - 3" EL E V 2 AM E N I T Y LO B B Y 2 CONF CONFELEV 1 STAIR 06 CO R R I D O R LOBBY 2BARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:00:30 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 216036 A 10DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 2 DN 1 A 2 0 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D + 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 2 B E D 1 B E D J R 1+ B E D 2 B E D 2 B E D 2 B E D 1 B E D J R 1 B E D J R 1+ B E D 1 B E D 2 B E D 2 B E D 2 B E D + 1 B E D J R 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 BED1 BED 2 BED +1 BED 1 BED 1 BED2 BED2 BED COMMUNITY ROOM ? ? ? 2 A 1 9 1 A 1 9 2 A 2 0 ? 5' - 3 1 / 2 " 1 9 0 ' - 3 1 / 2 " 14 4 ' - 2 " 4 ' - 1 1 " 3 2 ' - 6 1 / 2 " 37 1 ' - 1 1 " 137' - 2 1/2"15' - 10 1/2" 3 7 ' - 8 1 /2 " 1 1 6 ' - 1 " 9 ' - 9 " 6 6 ' - 8 " 3 ' - 5 " 1 8 ' - 1 1 /2 " 28 3 ' - 3 1 / 2 " 37' - 6 1/2"32' - 6 1/2" 13' - 9"39' - 11 1/2"158' - 8 1/2" 7 0 ' - 1 1 / 2 " 13' - 0 1/2"75' - 8"13' - 3 1/2" 14 ' - 3 " PO D I U M C O U R T Y A R D (S E E L A N D S C A P E D R A W I N G S ) PO D I U M C O U R T Y A R D (S E E L A N D S C A P E D R A W I N G S ) 7 0 ' - 1 " 9 ' - 0 " BRIDGE ABOVE 9' - 4 " C L 3 9 ' - 9 " 35 8 ' - 6 1 / 2 " 24 ' - 6 1 / 2 " 35 9 ' - 0 " 359' - 0" 35 9 ' - 0 " 35 9 ' - 0 " 24 ' - 7 " 8 ' - 1 1 " 3 ' - 3 " 2' - 4 1 / 2 " 37 7 ' - 5 " 20' - 3"2 BED +1 BED ST O R A G E ? 1 B E D ? ? BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:03:10 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 316036 A 11DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 2 1 A 2 0 2 B E D + 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED2 BED 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1+ B E D 2 B E D 1 B E D J R 1 B E D J R 2 B E D + 2 BED +2 BED +1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 2 B E D + 1 BED 1 B E D J R OPEN TO BELOW TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 27' - 0"204' - 0 1/2"27' - 2 1/2"137' - 2 1/2"15' - 10 1/2" 3 7 ' - 8 1 /2 " 1 1 6 ' - 1 " 9 ' - 9 " 6 6 ' - 8 " 3 ' - 5 " 1 8 ' - 1 1 /2 " 7 0 ' - 1 1 / 2 " 13' - 0 1/2"75' - 8"13' - 3 1/2" 14 ' - 3 " 14 ' - 3 " UN I T A B O V E B R E E Z E W A Y 9 ' - 0 " C L 3 9 ' - 9 " 35 ' - 4 " 50' - 11 1/2" 10 0 ' - 1 0 1 / 2 " 1 0 ' - 8 " 3 2 ' - 7 1 / 2 " 4 ' - 1 1 " 3 2 ' - 7 1 / 2 " 37 9 ' - 1 0 1 / 2 " 20' - 2" 34' - 2" 2' - 4"34' - 2"221' - 9" 2' - 4 1 / 2 " 4 3 ' - 2 1 / 2 " 33 4 ' - 3 " 20' - 3" 21 ' - 3 1 / 2 " 2 1 ' - 1 1 " 26 4 ' - 2 " 70' - 1" ST O R A G E ST O R A G E ? ST O R A G E 2 BED 1 BEDELEV 1 EL E V 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:07:39 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 416036 A 12DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 2 1 A 2 0 2 B E D + 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED2 BED 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1+ B E D 1 B E D J R 1 B E D J R 2 B E D + 2 BED +2 BED +1 BED 1 BED1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 2 B E D + 1 BED 1 B E D J R TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 23' - 0"4' - 0 1/2"204' - 0 1/2"27' - 2 1/2"137' - 2 1/2" 76 ' - 7 1 / 2 " 15' - 10 1/2" 3 7 ' - 8 1 /2 " 1 1 6 ' - 1 " 9 ' - 9 1 /2 " 6 6 ' - 8 " 3 ' - 5 " 1 8 ' - 1 1 /2 " 7 0 ' - 1 1 / 2 " 13' - 0 1/2"75' - 8"13' - 3 1/2" 14 ' - 3 " 14 ' - 3 " 1 B E D J R 2 1 ' - 5 1 / 2 " 9 ' - 0 " C L 3 9 ' - 9 " 45' - 8"10' - 8"32' - 7 1/2"4' - 11"32' - 7 1/2" 37 9 ' - 1 0 1 / 2 " 20' - 2" 221' - 9"34' - 2"2' - 4" 34' - 2" 21 ' - 3 1 / 2 " 28 6 ' - 1 " 70' - 1" 2' - 4 1 / 2 " 37 7 ' - 6 " 20' - 1 1/2"50' - 11 1/2"2 BED ST O . ST O R A G E ST O R A G E 2 B E D ELEV 1 EL E V 2 ST O R A G E BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:21:03 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 516036 A 13DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 2 1 A 2 0 RESIDENT LOUNGE 3 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED2 BED2 BED 1 B E D J R 2 B E D 1 B E D J R 1 B E D J R 2 BED 1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 2 B E D + 1 BED 1 B E D TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 27' - 0"196' - 9"34' - 6"112' - 4"15' - 10 1/2" 3 7 ' - 8 1 /2 " 1 1 6 ' - 1 " 9 ' - 9 1 /2 " 6 6 ' - 8 " 3 ' - 5 " 7 0 ' - 1 1 / 2 " 1 B E D J R 2 1 ' - 5 1 / 2 " 9 ' - 0 " 56' - 0" 56 ' - 0 " 56' - 0"20' - 3" 10 0 ' - 1 0 1 / 2 " 1 0 ' - 8 " 3 2 ' - 7 1 / 2 " 4 ' - 1 1 " 3 2 ' - 6 1 / 2 " 7' - 2 1/2"43' - 7 1/2"8' - 2"144' - 11"25' - 3"31' - 7 1/2"33' - 5"5' - 0 1/2" ST O R A G E STAIR 01STAIR 02 ST A I R 0 3 1 BED ME C H A N I C A L EN C L O S U R E ME C H A N I C A L EN C L O S U R E BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:26:16 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 616036 A 14DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 2 1 A 2 0 OPEN TO RESIDENT LOUNGE BELOW1 BED 1 BED 1 BED 1 BED2 BED3 BED3 BED 3 B E D 2 B E D 2 B E D 2 B E D 1 B E D J R 2 B E D 2 B E D 1 B E D 1 B E D J R 2 B E D 2 B E D + 1 B E D J R 1 B E D ? TRASH 2 A 1 9 1 A 1 9 2 A 2 0 DS DS ? ME C H A N I C A L EN C L O S U R E ME C H A N I C A L EN C L O S U R E OPEN TO DECK BELOW B R I D G E B E L OW 3 ' - 1 0 1 / 2 " 6 6 ' - 8 " 3 ' - 5 " 3 ' - 4 " 7 0 ' - 1 1 / 2 " 3 ' - 4 " 7 0 ' - 1 " 3 ' - 1 1 " 3' - 6 1/2"65' - 0 1/2"3' - 11 1/2"31' - 6 1/2"192' - 2 1/2"34' - 6"31' - 7 1/2"33' - 5"65' - 0 1/2"25' - 1" RO O F O V E R H A N G ROOF OVERHANG ROOF OVERHANG RO O F O V E R H A N G C L 3 9 ' - 8 3 / 4 " 66 ' - 4 " 66' - 4" 66 ' - 3 " 1' - 10 1/2"2' - 0"8' - 6 1/2" 1 ' - 1 1 1 /2 " 2 2 5 ' - 1 1 1 /2 " 1 ' - 1 1 " 25' - 3"2 BED ? ? STAIR 01STAIR 02 ME C H A N I C A L EN C L O S U R E BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:27:07 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 716036 A 15DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 2 DNSLOPESLOPESLOPE S L O P E S L O P E S L O P E S L O P E SLOPE SL O P E SL O P E SLOPE SL O P E S L O P E SL O P E SLOPE SL O P E SL O P E SL O P E SL O P E S L O P E SL O P E S L O P E SL O P E SLOPE SL O P E SL O P E SLOPE SL O P E SLOPE SL O P E S L O P E S L O P E SL O P E SLOPE SL O P E S L O P E SLOPE S L O P E SLOPE S L O P E SL O P E SLOPE SLOPESLOPESLOPESLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SL O P E S L O P E S L O P E S L O P E 1 A 2 0 OPEN TO BELOW 2 A 1 9 1 A 1 9 2 A 2 0 DA S H E D L I N E I N D I C A T E S A R E A DE S I G N A T E D F O R F U T U R E S O L A R PA N E L S ( 1 0 % O F R O O F A R E A M I N . ) ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N ME C H A N I C A L EN C L O S U R E ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N DS DS DS DS DS DS DS DS B E L O W DS DSDSDSDS DS DS B E L O W DSDS DS BR I D G E B E L O W ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N 83' - 2"76' - 9" DS DS DS DS DSDSDSDSDS 76 ' - 9 " 83 ' - 7 " 66 ' - 3 " 33 ' - 7 " 6' - 4" 2 9 ' - 7 1 / 2 " 7 ' - 7 " 73 ' - 5 " 12 3 ' - 1 1 " 73' - 1" 37 8 ' - 9 " 21' - 3 1/2" 2' - 4 1 / 2 " 37 6 ' - 3 1 / 2 " 21' - 4 1/2" 43 ' - 2 1 / 2 " 1 4 1 ' - 5 1 / 2 " 73 ' - 5 " 4 5 ' - 2 1 / 2 " 7 3 ' - 1 " 20' - 11"204' - 8 1/2"32' - 7 1/2" 255' - 11"2' - 4" 10' - 11 1/2"23' - 2 1/2" 7 8 ' - 1 1 / 2 " 1 9 ' - 5 " BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:33:34 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - ROOF16036 A 16DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0" 1 6 2 15 13 7 1 7 3 2 PENTHOUSE ROOF 418' - 8" EN C R O A C H M E N T S A R E A L L O W E D U N D E R C H A P T E R 3 2 O F TH E 2 0 1 6 C B C 20 1 6 C B C 3 2 0 2 . 3 . 3 E N C R O A C H M E N T S 1 5 O R M O R E F E E T AB O V E G R A D E . EN C R O A C H M E N T S 1 5 F E E T ( 4 5 7 2 M M ) O R MO R E A B O V E G R A D E S H A L L N O T B E L I M I T E D . 23' - 9" 4' - 4"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0" 3 8 7156 1 LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"2 6 1 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PENTHOUSE ROOF 418' - 8"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0" 7 8 3 3 1 8 A 2 5 1 1 / 1 6 " = 1 ' - 0 " A 1 7 2 SO U T H E L E V A T I O N 1 / 1 6 " = 1 ' - 0 " A 1 7 1 WE S T E L E V A T I O N BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:15 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"EXTERIOR ELEVATIONS - SOUTH & WEST16036 A 17DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'0 MA T E R I A L S L E G E N D NO . M A T E R I A L 1 C E M E N T P L A S T E R 2F I B E R C E M E N T P A N E L 3 T I L E O R T H I N S E T M A S O N R Y P R O D U C T 4 F I B E R C E M E N T A C C E N T P A N E L 5 M E C H A N C I A L S C R E E N 6 P E R F O R A T E D M E T A L S C R E E N 7G L A Z I N G 8 P E R F O R A T E D M E TA L B A L U S T R A D E 9 M E T A L P A N E L 10 G L A Z E D B A L C O N Y D O O R 11 S T O R E F R O N T W I N D O W S Y S T E M 12 M T L P A N E L 13 D E C O R T I V E M E T A L F I N 14 C A N O P Y 15 F I B E R C E M E N T L A P S I D I N G 16 M E T A L S U N S H A D E 17 V I N Y L W I N D O W 18 B A L C O N Y 19 J U L I E T B A L C O N Y 20 S T E E L B R I D G E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 15 2 2 8 15 7 2 7 8 6 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"6 LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"18 5 3 7 15 2 7 8 7 8 8 7 2 8 15 3 PENTHOUSE ROOF 418' - 8"MEASURED TO THE MIDPOINT OF SLOPED ROOF 13' - 0"12' - 0"10' - 4"10' - 4"10' - 4"10' - 4"14' - 8"25' - 0"56' - 0"81' - 0" 2 5 5 A 2 5 2 1 / 1 6 " = 1 ' - 0 " A 1 8 2 EA S T E L E V A T I O N 1 / 1 6 " = 1 ' - 0 " A 1 8 1 NO R T H E L E V A T I O N BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:24 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"EXTERIOR ELEVATIONS - NORTH & EAST16036 A 18DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'0 MA T E R I A L S L E G E N D NO . M A T E R I A L 1 C E M E N T P L A S T E R 2 F I B E R C E M E N T P A N E L 3 T I L E O R T H I N S E T M A S O N R Y P R O D U C T 4 F I B E R C E M E N T A C C E N T P A N E L 5 M E C H A N C I A L S C R E E N 6 P E R F O R A T E D M E T A L S C R E E N 7G L A Z I N G 8 P E R F O R A T E D M E T A L B A L U S T R A D E 9 M E T A L P A N E L 10 G L A Z E D B A L C O N Y D O O R 11 S T O R E F R O N T W I N D O W S Y S T E M 12 M T L P A N E L 13 D E C O R T I V E M E T A L F I N 14 C A N O P Y 15 F I B E R C E M E N T L A P S I D I N G 16 M E T A L S U N S H A D E 17 V I N Y L W I N D O W 18 B A L C O N Y 19 J U L I E T B A L C O N Y 20 S T E E L B R I D G E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED 2 BED GA R A G E GA R A G E 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PROPERTY LINE CAMPBELL LN PROPERTY LINE SHARED PRIVATE DRIVE MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D GA R A G E GA R A G E ME C H A N I C A L EN C L O S U R E PROPERTY LINE CAMPBELL LN PROPERTY LINE SHARED PRIVATE DRIVE 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:31 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"BUILDING SECTIONS -NORTH/SOUTH16036 A 19DUBLIN STATION DEMARCUS BOULEVARD 1 / 1 6 " = 1 ' - 0 " A 1 9 2 BU I L D I N G S E C T I O N - N O R T H / S O U T H 1 / 1 6 " = 1 ' - 0 " A 1 9 1 BU I L D I N G S E C T I O N - N O R T H / S O U T H 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" GA R A G E GA R A G E 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 3 B E D 3 B E D 3 B E D 1+ B E D 1+ B E D 1+ B E D 1 B E D J R 1 B E D J R 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"RESIDENT LOUNGE 3 BED 3 BEDCOMMUNITY / CLUB /REC ROOM LOBBY1 BEDPROPERTY LINE PROPERTY LINE DE MARCUS BVLD CAMPBELL LN MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"3 BED LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" BO I L E R RO O M BI K E ST O R A G E GARAGE GARAGE GA R A G E GA R A G E S T O R A G E FITNESS2 BED2 BED2 BED2 BED2 BED3 BED1 BED 1 BED 1 BED 1 BED 1 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PROPERTY LINE PROPERTY LINE DE MARCUS BVLD CAMPBELL LN 1 B E D J R 1 B E D J R 1 B E D J R 1 B E D J R 1 B E D J R 10' - 4"7' - 10"10" 59' - 0" 56' - 0"25' - 0"81' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOFBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:36 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"BUILDING SECTIONS -EAST/WEST16036 A 20DUBLIN STATION DEMARCUS BOULEVARD 1 / 1 6 " = 1 ' - 0 " A 2 0 2 BU I L D I N G S E C T I O N - E A S T / W E S T 1 / 1 6 " = 1 ' - 0 " A 2 0 1 BU I L D I N G S E C T I O N - E A S T / W E S T 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL A1 3 70 7 S F BEDROOM LI V I N G DI N I N G KITCHEN EN T R Y BATHROOMCLOSET B1 2 99 0 S F LI V I N G DI N I N G KITCHEN EN T R Y CL O S E T BE D R O O M 1 MA S T E R BE D R O O M CL O S E T BA T H R O O M BA T H R O O M C0 1 11 8 0 S F LI V I N G KITCHEN DI N I N G DE N / O F F I C E BE D R O O M 2 MA S T E R BE D R O O M BA T H R O O M BA T H R O O M CLOSET CL O S E T EN T R Y CL O S E T S0 1 56 0 S F KITCHEN ENTRY DI N I N G BATHROOMBEDROOMLIVINGBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:30 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/4" = 1'-0"ENLARGED TYPICAL UNIT PLANS16036 A 21DUBLIN STATION DEMARCUS BOULEVARD 1 / 4 " = 1 ' - 0 " A 2 1 2 TY P . 1 B E D R O O M U N I T 1 / 4 " = 1 ' - 0 " A 2 1 3 TY P . 2 B E D R O O M U N I T 1 / 4 " = 1 ' - 0 " A 2 1 4 TY P . 3 B E D R O O M U N I T 2'4'8'16'12'0 1 / 4 " = 1 ' - 0 " A 2 1 1 TY P . J R . 1 B E D R O O M U N I T 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:35 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 22DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:41 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 23DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:45 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 24DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL F.O.S. F.O.S. FD B - c c - 0 0 6 ST U C C O R E T U R N NA I L F I N W I N D O W WD . F R A M I N G , S S D . DR A I N A G E M A T SE A L A N T & B A C K E R R O D SI L L B E L O W ST U C C O LEVEL 1 334' - 0"LEVEL 2 346' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"4 A 25SIM.THINSET TILE CEMENT PLASTER COLOR O2WIN FRAME COLOR O1 PERFORATED METAL BALUSTRADE PERFORATED METAL SCREEN CEMENT PLASTER COLOR O2 LE V E L 1 33 4 ' - 0 " LE V E L 2 34 6 ' - 0 " LE V E L 3 35 9 ' - 0 " LE V E L 4 36 9 ' - 4 " LE V E L 5 37 9 ' - 8 " LE V E L 6 39 0 ' - 0 " LE V E L 7 40 0 ' - 4 " FI B E R C E M E N T LA P S I D I N G WI N F R A M E CO L O R O 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:55 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedAPPENDIX16036 A 25AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 3 " = 1 ' - 0 " A 2 5 4 TY P I C A L R E C E S S E D W I N D O W J A M B 1 / 4 " = 1 ' - 0 " A 2 5 1 EN L A R G E D W E S T E L E V A T I O N 0 2 1 / 4 " = 1 ' - 0 " A 2 5 2 EN L A R G E D N O R T H E L E V A T I O N 08.29.17ENT RESUBMITTAL COLOR 04 CO L O R 0 2 C O L O R 0 3 COLOR 05 CO L O R 0 1 W I N C O L O R 0 2 W I N C O L O R 0 2 W I N C O L O R 0 2 WIN COLOR 02 STOREFRONT COLORBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:39:08 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedBUILDING MATERIALS16036 P 01RV/MS PCDUBLIN STATION DEMARCUS BOULEVARD MA T E R I A L S CO L O R S FIBER CEMENT PANEL CE M E N T P L A S T E R FI B E R C E M E N T S I D I N G 08.29.17ENT RESUBMITTAL Page 1 of 11 STAFF REPORT PLANNING COMMISSION DATE: November 14, 2017 TO: Planning Commission SUBJECT: PUBLIC HEARING: Ashton at Dublin Station (Transit Center Site A -3) Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 (PLPA 2017- 00036) Prepared by: Martha Battaglia, Associate Planner EXECUTIVE SUMMARY: The Applicant, Ashton at Dublin Station, is proposing to construct a residential project comprised of 220 apartment units, and related amenities including a fitness center, pool, roof top lounge, and 331 spaces of structured parking on an approximately 2.36 -acre site located within the Dublin Transit Center. The proposed mix of residential units includes 122 one-bedroom units, 79 two-bedroom units and 19 three-bedroom units. The site has a land use designation of High Density Residential (25.1 or greater units per acre). The application includes a Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 for condominium purposes. The Planning Commission will review the proposed project and make a recommendation to the City Council. RECOMMENDATION: Disclose ex-parte contacts, conduct the public hearing, deliberate and adopt the following Resolutions: a) Recommending that the City Council adopt an Ordinance rezoning the Dublin Transit Center Site A-3 project site to PD-Planned Development and approving a Stage 2 Development Plan; and b) Recommending that the City Council approve the Site Development Review Permit and Tentative Map 8437 for the Dublin Transit Center Site A-3 project. PROJECT DESCRIPTION: Background The Dublin Transit Center area generally is bounded on the north by Dublin Boulevard, on the south by Interstate 580 and the existing Dublin/Pleasanton BART station, on the east by Arnold Road, and on the west by the Iron Horse Trail (Figure 1). Page 2 of 11 In December 2002, the City Council adopted entitlements establishing the Transit Center. This included General Plan and Eastern Dublin Specific Plan Amendments (Resolution 216-02) to incorporate this area into the Eastern Dublin Specific Plan area and establishing land uses. The project included Planned Development Zoning with a Stage 1 Development Plan (Ordinance 21-02) which established the permitted uses; site areas and proposed densities; maximum number of residential units and non - residential square footage; and a Master Landscaping Plan. The approval also included a Master Development Agreement (Ordinance 5 -03) approved in May 2003. The Dublin Transit Center project area allows for the development of 1,500 residential units on Sites A, B and C; two million square feet of campus office and up to 300 residential units on Sites D and E; and 70,000 square feet of retail uses at street level on Sites B through E, and a 1-acre Village Green located between Sites B and C. Sites A, B and C have been developed with the exception of Site A -3, which is the subject of this Staff Report. Project Site Site A-3 is the last remaining site with a residential land use designation in the Transit Center. The 2.36 acre site is located south of a private street, east and north of Campbell Lane, and west of DeMarcus Boulevard as shown in Figure 1. The site has a General Plan and EDSP land use designation of High Density Residential and Planned Development Zoning with a Stage 1 Development Plan. Figure 1. Vicinity Map The project site is rectangular in shape and has a relatively flat topography. The project site is paved and has previously been used as a parking lot and a construction staging area. There are no permanent structures, existing drainage courses, or native vegetation located on the site. Surrounding street improvements are limited to curb s and gutters along DeMarcus Boulevard and Campbell Lane. This vacant site is surrounded by existing developments (Table 1). Page 3 of 11 Table 1. Surrounding Land Uses LOCATION ZONING GENERAL PLAN LAND USE CURRENT USE OF PROPERTY Building Height North PD High Density Residential Camellia Place – 112 units 53 feet 3 stories over 1 level of parking South PD Public/Semi-Public PG&E Substation N/A East PD High Density Residential Elan – 257 multi- family townhomes & condominiums 65 feet 5 stories over parking West PD Medium-High Density Residential Tribeca – 52 townhomes 40 feet 3 stories Current Request Ashton at Dublin Station is requesting approval of a 220 -unit apartment building, which includes residential amenities consisting of a fitness center, pool, roof top lounge, and 331 spaces of structured parking. The proposed mix of residential units includes 122 one-bedroom units, 79 two-bedroom units and 19 three-bedroom units. The current request for the proposed project includes: • Planned Development Zoning - Planned Development Rezone with a related Stage 2 Development Plan. • Site Development Review Permit - Site Development Review Permit for 220 apartment units, with related amenities and structured parking with 331 spaces. • Subdivision - Tentative Map 8437 for condominium purposes. ANALYSIS: Planned Development Zoning The application includes a Planned Development Rezone with a related Stage 2 Development Plan. The existing Planned Development Zoning Stage 1 Development Plan established a maximum building height for high density residential of 5 stories over parking and a parking standard of 1.5 spaces per unit for residential land uses. The project site is part of Site A, an 8.29 net acre area delineated as Sites A -1, A-2 and A-3. The Planned Development Zoning originally anticipated up to 530 units across all of Site A. The number was later reduced to 430 units when 100 units were transferred to Site C. The total number of units constructed in the Dublin Transit Center project area, including the proposed project, would be 1,451 units. This is 46 units less than Page 4 of 11 anticipated for Site A, and 49 units less than the total allocation of 1,500 units for the overall Transit Center, as shown in Table 2. Table 2. Transit Center Residential Development Site Project Name Units Constructed/Proposed Units Permitted Difference A-1 Tribeca (52 Units) 384 430 46 A-2 Camellia Place (112 Units) A-3 Ashton @ Dublin Station (220 units) B-1 Elan (257 Units) 562 565 3 B-2 Eclipse (305 units) C-1 Avalon (505 units) 505 505 --- Total 1,451 1,500 49 The proposed Stage 2 Planned Development Zoning is in compliance with the requirements of the Dublin Zoning Ordinance and will establish the detailed development plan for the site. This includes a preliminary site plan, development standards, architectural standards, and a preliminary landscape. The project is compatible with the land use concept to maximize transit opp ortunities presented by the adjacent Dublin/Pleasanton BART Station; conforms to the development standards adopted for the Dublin Transit Center; and contributes to a vibrant, pedestrian friendly environment. A Resolution recommending that the City Coun cil adopt an Ordinance approving the Planned Development Rezone with related Stage 2 Development Plan for the Dublin Transit Center Site A-3 is included as Attachment 1, with the draft City Council Ordinance included as Exhibit A. Site Development Review Site Plan The primary entry lobby is located near the northwest corner of DeMarcus Boulevard and Campbell Lane. The primary entry lobby that fronts on this corner has a two story volume and is set back to accommodate a pedestrian plaza. A secondary entr y lobby is located mid-block on the north side of the building along the private street that is shared with Camellia Place. Similar to the primary entry, the building is set back creating a smaller pedestrian plaza with landscaping. Vehicle access to the structured parking will be through a garage entry located on Campbell Lane. The project includes frontage improvements and landscaping consistent with the improvements throughout the Transit Center. Page 5 of 11 Residential amenities including a lobby, fitness center and a leasing office (approximately 6,200 square feet) are proposed along DeMarcus Boulevard. Ground - floor residential units with front stoops are proposed on the north elevation, which enhance the residential scale and character established by the Camelli a Place residential project across the street. Architecture The project architecture has a contemporary aesthetic with angular lines and includes a variety of high quality exterior materials and colors. Façade treatments include stucco, fiber cement and metal accent, metal window surrounds, limited areas of storefront glazing and metal and translucent entry canopies. Balconies and screening inserts used within the garage include translucent perforated metal screening. The proposed project includes unique architectural features and massing elements to provide visual interest as well as open space for the occupants. The design includes two opposing yet complementary tilted overhanging roof forms which accentuate the taller massing elements of the building. The roof design allows the top-level units to have generous windows and optimized views of the surrounding area. The project’s design provides visual interest as viewed from Interstate 580 to the south and the pedestrian pathways along DeMarcus Boulevard and Campbell Lane. The design of the east podium courtyard allows glimpse in from the surrounding area and also provides a strong pedestrian visual scale for the project. The two-story parking podium façades face Campbell Lane to the west and south. The parking garage has been designed to include architectural elements that provide functional screening as well as visual interest. The façade of the parking structure is comprised of framed openings which provide articulation and depth along the ground floor. Infill surfaces fill the frames and angle inward in varying directions. The architecture elements described can be seen in the renderings below. Aerial at SE corner – Campbell Lane & DeMarcus Blvd. Page 6 of 11 The massing of the proposed building is consistent with the scale of the adjacen t buildings with the tallest massing located at the east side of the project opposite the adjacent buildings along DeMarcus Boulevard (Elan and Avalon). The lowest massing is located on the west side opposite the lower height townhouses across Campbell Lan e (Tribeca). The proposed range of building heights, including 3, 4 and 5 residential stories, over parking podium gives the project a sense of visual interest and variation in roof profile, and it enables the building to respond contextually to the preexi sting massing variation within the Transit Center. A feature of the building projects over a portion of the sidewalk adjacent to Campbell Lane. The total projection area is approximately 300 square feet as shown in Figure 2 below. The projection into the right-of-way includes living space, balconies and roof overhang. The projection starts on the third floor at 23 feet above grade so as not to conflict with use of the sidewalk. SE corner – Campbell Lane & DeMarcus Blvd. NE corner – DeMarcus Blvd. SW corner – Campbell Lane NW corner – Campbell Lane Page 7 of 11 Figure 2. Right Of Way Projection The City will quitclaim fee title ownership of the area with the proposed building projection, while reserving a public access easement and a utility easement over the area. These easements will allow for continued use of this area by the public and utility companies. Landscaping The landscaping has been designed to be consistent with and completes the streetscape as identified in the Design Guidelines for the overall Dublin Transit Center. Similar to other higher density residential developments, landscaping and recreational amenities are used to provide quality open areas and visual relief. Plantings and hardscape elements are used to create neighborhood identification and an attractive community entry. Colored concrete unit pavers connect the project site with the rest of the Dublin Transit Center, while helping to define the main entries and gathering spaces. The landscape plan includes trees, along with flowering shrubs and groundcover, which line and define the project entry. Perimeter areas are proposed to be landscaped wit h a variety of drought tolerant plant materials that are low maintenance and encourage water conservation. Please refer to Sheets L2.00-L5.00 of the attached plans (Exhibit A to the City Council Resolution) for the proposed plant palette. Page 8 of 11 The project includes two podium level roof courtyards and a swimming pool on the third floor. Amphitheater stair seating is proposed near the project’s southeast corner within the pedestrian plaza. Benches and raised planters are located throughout the landscape public spaces. There is a 20’ storm drain easement located along the eastern property boundary along DeMarcus Boulevard. This easement area is planted with a variety of taller flowering shrubs and succulents that delineate the space without using fences or walls . In compliance with water quality requirements, flow through planters are located on the northern portion of the project site and within the open courtyard areas. The plantings within these areas include grasses and flowering plants. Private sidewalks with public access are proposed on all four frontages. The project includes a variety of site lighting, including tree uplight, pool & spa lighting, stake mounted LED lights along pathways, recessed planter wall lights and decorative string lights. The conceptual lighting plan is shown on Sheet L6.00 of the attached plans. Floor Plans The project includes a mix of studio, one, two and three -bedroom flats that vary in size and layout. The floor plans are shown on Sheet A21 of the attached plans. Access to the units would be primarily from interior corridors with exception to the stoop units along the private street facing Camellia Place to the north. An open -air bridge comprised primarily of perforated metal screen is visible from the south elevation and provides a connection across the eastern podium. Table 3 below details the square footage of the individual units as well as the percentage of each unit type within the project. TABLE 3. Floor Plans Unit Type Square Footage # of Units % of Project Jr. 1 Bedroom 640 SF 22 10.0% 1 Bedroom 800 SF 92 41.8% 1+ Bedroom 975 SF 8 3.6% 2 Bedroom 1,120 SF 79 35.9% 3 Bedroom 1,280 SF 19 8.6% Total 100% Parking The Development Regulations for the Dublin Transit Center require 1.5 parking spaces per unit, which includes guest parking. Based on this standard, a total of 330 spaces would be required. The proposed project provides 331 spaces located within a two – Page 9 of 11 story podium parking garage. Fifteen percent (15%) of the required parking spaces (50 spaces) are unassigned guest parking spaces. Additionally, surface stalls will be located on the public streets along the project frontage, which are not included in the parking requirement for the project. Bicycle storage parking is provided on the first floor of the parking garage. A total of 130 bicycle parking stalls are provided. Affordable Housing/Inclusionary Zoning The Dublin Transit Center requires 15% of the residential units be affordable units. The Camellia Place apartment project on Site A-2 has been used to satisfy the very low and low portion of the inclusionary housing requirement for the project. Ten percent (10%) of the units in the proposed project are required to be affordable to moderate income household earning between 80% and 120% of the area median income adjusted for actual household size. The affordable units are required to reflect the range of numbers of bedrooms provided in the project. The applicant proposes to provide the required number of moderate income units (22) which will include a range of one, two and three - bedroom units. A Condition of Approval has been placed on the project that requires the applicant to enter into an Affordable Housing Agreement. Public Art Compliance The project is part of a comprehensive plan to provide public art as part of the Dublin Transit Center project. The public art requirement has already bene satisfied. Tentative Map Although the project is proposed for occupancy as apartments, the Applicant is requesting approval of a Tentative Map for condominium purposes as is common with other recent apartment projects. A Resolution recommending that the City Council approve the Site Development Review Permit and Tentative Map is included as Attachment 2, with the dra ft City Council Resolution included as Exhibit A. CONSISTENCY WITH THE GENERAL PLAN AND ZONING ORDINANCE: The project site has a current General Plan and EDSP land use designation of High Density Residential and consistent Planned Development Zoning. The proposed project is consistent with the land use designation and zoning. The project will contribute to housing opportunities and diversity of product type and complement the surrounding neighborhoods. The proposed project has been reviewed for conformance with the Community Design and Sustainability Element of the General Plan. The project has been designed to be compatible with adjacent and surrounding development. Pedestrian circulation and Page 10 of 11 gathering spaces have all been linked together with sidewal ks and public and private streets. In general, the proposed project furthers the goals of the Community Design and Sustainability Element of the General Plan by providing a high quality of life and preserving resources and opportunities for future generations. REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES: The Building Division, Fire Prevention Bureau, Public Works Department, and Dublin San Ramon Services District reviewed the project and provided Conditions of Approval where appropriate to ensure that the Project is established in compliance with all local Ordinances and Regulations. Conditions of Approval from these departments and agencies have been included in the attached Resolution pertaining to the Site Development Review Permit and Tentative Map (Exhibit A to Attachment 2). ENVIRONMENTAL REVIEW: The City has determined that the project qualifies for a statutory exemption from CEQA under Government Code section 65457. The proposed project is consistent with the General Plan Land Use Designation for Site A-3 and does not exceed the units allowed by the Dublin Transit Center Stage 1 Planned Development Zoning. An EIR has been certified for the Dublin Transit Center Stage 1 Planned Development Zoning. The CEQA document in Support of a Specific Plan E xemption finds that no event as specified in Section 21166 of the Public Resources Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a supplemental CEQA document. Public Resources Code Section 21166 and CEQA Guidelines Section 15162 identify the conditions requiring subsequent environmental review. After a review of these conditions, the City has determined that no subsequent EIR or Negative Declaration is required for this project. The CEQA Analysis in Support of a Specific Plan Exemption is included as Attachment 3. The 2002 Dublin Transit Center EIR, upon which the exemption relies, is available for review at the Planning Division in City Hall during normal business hours. PUBLIC NOTICING: In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project to advertise the project and the and posted at several locations throughout the City. A copy of this Staff Report has b een provided to the Applicant. ATTACHMENTS: 1. PC Resolution recommending that the City Council adopt an Ordinance Rezoning the Dublin Transit Center Site A-3 1a. Exhibit A to Attachment 1 Page 11 of 11 2. PC Resolution recommending that the City Council approve the SDR & Tentative Map for site A-3 2a. Exhibit A to Attachment 2 2b. Exhibit A to City Council Resolution approving the SDR & Tentative Map 3. Ashton at Dublin Station_CEQA Analysis 1 ORDINANCE NO. XX – 18 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * * * * * * APPROVING A PLANNED DEVELOPMENT ZONING STAGE 2 DEVELOPMENT PLAN FOR THE TRANSIT CENTER SITE A-3 APN: 986-0034-009-00 PLPA 2017-00036 The Dublin City Council does ordain as follows: SECTION 1. RECITALS A. The Applicant, Ashton at Dublin Station, proposes to construct a residential project comprised of 220 apartment units, residential amenities including a fitness center, pool, roof top lounge, and 331 spaces of structured parking on an approximately 2.36-acre site. The applications include a Planned Development Zoning Stage 2 Development Plan, Site Development Review Permit, Tentative Map 8437 for condominium purposes, and a Development Agreement. The proposed development and applications are collectively known as the “Project”; and B. The project site is approximately 2.36 acres located at the northwest corner of Campbell Lane and DeMarcus Boulevard (APN 986-0034-009-00); and C. To comply with the California Environmental Quality Act (CEQA), the State guidelines and City environmental regulations, the City prepared a CEQA Analysis in Support of a Specific Plan Exemption; and D. Following a public hearing on November 14, 2017, the Planning Commission adopted Resolution 17-12, recommending approval of the Planned Development Zoning Stage 2 Development Plan, which resolution is incorporated herein by reference and available for review at City Hall during normal business hours; and E. A Staff Report, dated December 5, 2017 and March 6, 2018 and incorporated herein by reference, described and analyzed the project, including the Planned Development Zoning Stage 2 Development Plan, for the City Council; and F. On December 5, 2017, the City Council held a properly noticed public hearing on the project, including the proposed Planned Development Zoning Stage 2 Development Plan, at which time all interested parties had the opportunity to be heard. The City Council continued the item. The City Council held a Study Session on February 6, 2018. The project was agendized for February 20, 2018 City Council meeting and was continued to March 6, 2018; and G. The City Council denied the project on March 6, 2018, and the Applicant subsequently filed a lawsuit against the City; and H. In accordance with the settlement agreement, the City Council will reconsider the project, and consider the proposed Development Agreement; and 2 I. The City Council considered the CEQA Analysis and related prior CEQA documents and all above referenced reports, recommendations, and testimony prior to taking action on the project. SECTION 2: FINDINGS A. Pursuant to Section 8.32.070 of the Dublin Municipal Code, the City Council finds as follows. 1. The Transit Center Site A-3 Project Planned Development zoning meets the purpose and intent of Chapter 8.32 in that it provides a comprehensive development plan that creates a desirable use of land that is sensitive to surrounding land uses by virtue of the lay out and design of the site plan. 2. Development of the project under the Planned Development zoning and the related Stage 2 Development Plan will be harmonious and compatible with existing and future development in the surrounding area in that the site will provide residential development consistent with the surrounding development. The proposed project maintains the urban character anticipated by the existing approvals for the Transit Center including the existing Planned Development Zoning and Stage 1 Development Plan. The proposed project will contribute to housing opportunities and diversity of product type as a complement to the surrounding neighborhoods. B. Pursuant to Sections 8.120.050.A and B of the Dublin Municipal Code, the City Council finds as follows. 1. The Planned Development zoning for the project and the related Stage 2 Development Plan will be harmonious and compatible with existing and potential development in the surrounding area in that the proposed site plan has taken into account a land use type and density that is compatible with the adjacent areas and densities. In addition, the massing of the proposed building is consistent with the scale of the adjacent buildings with the tallest masses located at the east side opposite the adjacent buildings along DeMarcus Boulevard (Elan and Avalon), and the lowest masses located on the west side opposite the lower townhouses across Campbell Lane (Tribeca). 2. The project site is physically suitable for the type and intensity of the zoning district being proposed in that the project site is flat with improved streets on four sides and served by existing public utilities. The project site conditions are documented in the CEQA Analysis for this project and prior certified Environmental Impact Reports (EIR), and the project will implement all adopted mitigation measures, as applicable. There are no site conditions that were identified in the CEQA Analysis that will present an impediment to development of the site for the proposed residential development. There are no major physical or topographic constraints and thus the site is physically suitable for the type and intensity of the residential development approved through the Planned Development zoning. 3. The Planned Development zoning will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare in that the project will comply with all applicable development regulations and standards and will implement all adopted mitigation measures, as applicable. The project uses are compatible with surrounding uses. 3 4. The Planned Development zoning is consistent with the Dublin General Plan and the Eastern Dublin Specific Plan, in that the proposed residential density and uses are consistent with the High Density Residential land use designation for the site. Pursuant to the California Environmental Quality Act, the City Council finds as follows: 1. The project is found to be exempt from CEQA pursuant to Government Code section 65457 for residential projects that are consistent with a Specific Plan. The project is within the scope of the Final Environmental Impact Report for the Dublin Transit Center General Plan Amendment, Eastern Dublin Specific Plan Amendment, Stage 1 Planned Development Zoning, Tentative Parcel Map, and Development Agreement (SCH 2001120395) which was certified by the City Council Resolution No. 215 -02 dated November 19, 2002. The CEQA Analysis prepared for the project is incorporated herein by this reference and determined that no event as specified in Section 21166 of the Public Recourses Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a Supplemental CEQA document. SECTION 3: ZONING MAP AMENDMENT Pursuant to Chapter 8.32, Title 8 of the City of Dublin Municipal Code the City of Dublin Zoning Map is amended to rezone the property described below to include the Planned Development Zoning Stage 2 Development Plan: 2.36 acres at the northwest corner of Campbell Lane and DeMarcus Boulevard (APN 986-0034-009-00).) (“Project site”, or “Property”). A map of the zoning area is shown below: SECTION 4. APPROVAL OF STAGE 2 DEVELOPMENT PLAN The regulations for the use, development, improvement, and maintenance of the project site are set forth in the following Stage 2 Development Plan for the project area, which is hereby 4 approved. Any amendments to the Stage 2 Development Plan shall be in accordance with section 8.32.080 of the Dublin Municipal Code or its successors. Stage 2 Development Plan for the Transit Center Site A-3 Project This is a Stage 2 Development Plan pursuant to Chapter 8.32 of the Dublin Zoning Ordinance. This Development Plan meets all the requirements for the Stage 2 Development Plan set forth in Chapter 8.32 of the Zoning Ordinance and is adopted as part of the Planned Development Zoning for the Transit Center Site A-3 project, PLPA-2017-00036. The Planned Development District allows flexibility needed to encourage innovative development while ensuring that the goals, policies and action programs of the General Plan, Eastern Dublin Specific Plan, and provisions of Chapter 8.32, Planned Development Zoning District of the Zoning Ordinance are satisfied. 1. Statement of Compatibility with Stage 1 Development Plan. The Ashton at Dublin Station Stage 2 Development Plan is consistent with the Stage 1 Development Plan for Site A of the Dublin Transit Center, in that it provides for High Density Residential uses as approved in Ordinance 21-02. 2. Statement of Uses. Permitted, Conditional and Accessory Uses shall be as adopted by Ordinance 21 -02, the Dublin Transit Center Stage 1 Planned Development Zoning Development Plan (PA00 -013). 3. Stage 2 Site Plan. The site plan shall generally be as shown in the conceptual site plan below. 5 4. Site area, proposed densities. • Site Area: 2.36 acres • Density: 25+ dwelling units/acre 5. Development Regulations. The following development regulations are in addition to those identified in the Planned Development Zoning Stage 1 Development Plan (Ordinance 21-02). DEVELOPMENT REGULATIONS Maximum Number of Units 220 Maximum Number of 3 Bedroom Units 2% Maximum Building Height 85 feet Minimum Common Outdoor Space 15%(1) (1) Percentage of total site acreage. 6. Preliminary/Master Neighborhood Landscape Plan. The street level landscape shall be as generally depicted below and shall comply with the Transit Center Stage 1 Development Plan and Design Guidelines and reflect the following standards: • Create comfortable outdoor spaces for residents and visitors, which include amenities such as planting areas, seat walls with stone blocks that serve as outdoor seating, and podium courtyards. • Create a visual buffer and soften the edge between t he public realm and the site. • Treat stormwater runoff on the site through the utilization of flow through planters and mechanical devices. • Utilize plants that provide a year round vegetated landscape with seasonality, color, and interest for an attractive visual environment. 6 7. Architectural Standards. The architectural design of the project shall reflect the following standards: • Utilize a contemporary architecture style. • Employ high quality materials to provide visual interest in the project and to complement its surroundings. • Incorporate features such as different wall planes, heights, wall textures, roof elements, light fixtures and landscaping to contribute layers of detail at the pedestrian level. • Provide functional outdoor plazas where people can gather and socialize, with landscaping, outdoor seating, enhanced paving treatment, and other features to provide an appropriate urban scale for the development. Illustrative examples of architectural style: 7 8. Aerial Photo. 9. Applicable Requirements of Dublin Zoning Ordinance. Except as specifically provided in the Dublin Transit Center Stage 1 Planned Development Zoning Development Plan (Ordinance 21-02) and this Stage 2 Development Plan, the use, development, improvements and maintenance of the property shall be governed by the provisions of the closest comparable Zoning District as determined by the Community Development Director and of the Dublin Zoning Ordinance pursuant to Section 8.32.060.C. No development shall occur on this property until a Site Development Review Permit has been approved for the property. SECTION 5. POSTING OF ORDINANCE The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public spaces in the City of Dublin in accordance with Section 36933 of the Government Code of the State of California. SECTION 6. EFFECTIVE DATE This Ordinance shall take effect thirty (30) days following its adoption. PASSED AND ADOPTED BY the City Council of the City of Dublin, on this _________ day of _____________ 2018, by the following votes: AYES: NOES: ABSENT: ABSTAIN: 8 _____________________________ Mayor ATTEST: _____________________________ City Clerk 1 of 3 ORDINANCE NO. xx – 18 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * * * * * * APPROVING THE DEVELOPMENT AGREEMENT BETWEEN THE CITY OF DUBLIN AND ASHTON AT DUBLIN STATION, LLC PLPA-2017-00036 THE CITY COUNCIL OF THE CITY OF DUBLIN DOES HEREBY ORDAIN AS FOLLOWS: Section 1: RECITALS A. The Applicant, Ashton at Dublin Station, is proposing to construct a residential project comprised of 220 units, residential amenities including a fitness center, pool, roof top lounge, and 331 spaces of structured parking spaces on approximately 2.36 -acre site located on Site A-3 in the Dublin Transit Center. The proposed development and applications are collectively known as the “Project”; and B. The City Council denied the project on March 6, 2018, and the Applicant subsequently filed a lawsuit against the City; and C. In accordance with the settlement agreement, the City Council will reconsider the project , and consider the proposed Development Agreement; and D. The Planning Commission held a public hearing on the proposed Development Agreement on July 10, 2018 for which public notice was given by law; and E. The Planning Commission made its recommendation to the City Council on the Development Agreement by Resolution 18-xx; and F. A public hearing on the proposed Development Agreement was h eld before the City Council on July ____, 2018 for which public notice was given as provided by law; and G. The City Council has considered the recommendation of the Planning Commission including the Planning Commission’s reasons for its recommendation, the C ity Council Staff Report dated July ______, 2018 and all comments received in writing and all testimony received at the public hearing. Section 2: FINDINGS AND DETERMINATIONS Therefore, on the basis of: a) the foregoing Recitals which are incorporated herein, b) the City of Dublin General Plan, Eastern Dublin Specific Plan and Transit Center Stage 1 Development Plan, c) the Staff Report, and, on the basis of the specific conclusions set forth below, the City Council finds and determines that: 1. The proposed Development Agreement is consistent with the objectives, policies, general land uses and programs specified in the General Plan and Eastern Dublin Specific Plan in that: a) the General Plan and Eastern Dublin Specific Plan land use designation for the subject site is High Density Residential and the Development Agreement is consistent with 2 of 3 that designation; and b) the Development Agreement is consistent with the fiscal policies in relation to the provision of infrastructure and public services of the General Plan and Eastern Dublin Specific Plan. 2. The proposed Development Agreement is compatible with the uses authorized in, and the regulations prescribed for, the land use designation in which the real property is located. 3. The proposed Development Agreement is in conformity with the public convenience, general welfare and good land use practice in that the proposed project will implement land use guidelines that are in place at the time the project is approved. 4. The proposed Development Agreement will not be detrimental to the health, safety, and general welfare in that the project will proceed in accordance with the General Plan, Eastern Dublin Specific Plan, Planned Development Zoning, and any Conditions of Approval for the proposed project. 5. The proposed Development Agreement will not adversely affect the orderly development of the property or the preservation of property values in that the development will be consistent with the City of Dublin General Plan, Eastern Dublin Specific Plan, Planned Development Zoning, and future project approvals. Section 3: APPROVAL The City Council hereby approves the Development Agreement (Exhibit A to the Ordinance) and authorizes the City Manager to execute it. Section 4: RECORDATION Within ten (10) days after the Development Agreement is fully executed by all parties, the City Clerk shall submit the Agreement to the County Recorder for recordation. Section 5: EFFECTIVE DATE AND POSTING OF ORDINANCE This Ordinance shall take effect and be in force thirty (30) days from and after the date of its final adoption. The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public places in the City of Dublin in accordance with Section 39633 of the Government Code of California. PASSED, APPROVED, AND ADOPTED BY the City Council of the City of Dublin on this _______ day of , 2018, by the following votes: AYES: NOES: ABSENT: ABSTAIN: 3 of 3 _____________________________ Mayor ATTEST: ___________________________________ City Clerk RECORDING REQUESTED BY: CITY OF DUBLIN WHEN RECORDED MAIL TO: City Clerk City of Dublin 100 Civic Plaza Dublin, CA 94568 Fee Waived per GC 27383 Space above this line for Recorder’s use DEVELOPMENT AGREEMENT BETWEEN THE CITY OF DUBLIN AND ASHTON AT DUBLIN STATION, LLC FOR THE ASHTON AT DUBLIN STATION PROJECT Page 2 THIS DEVELOPMENT AGREEMENT (this “Agreement” or this “Development Agreement”) is made and entered in the City of Dublin on this __ day of ___________, 2018 (the “Effective Date”), by and between the City of Dublin, a Municipal Corporation (hereafter “City”) and Ashton at Dublin Station, LLC, a Delaware limited liability company (hereafter “Developer”) pursuant to the authority of §§ 65864 et seq. of the California Government Code and Dublin Municipal Code, Chapter 8.56. City and Developer are, from time-to-time, individually referred to in this Agreement as a “Party,” and are collectively referred to as “Parties.” RECITALS A. California Government Code §§ 65864 et seq. (“Development Agreement Statute”) and Chapter 8.56 of the Dublin Municipal Code (hereafter “Chapter 8.56”) authorize the City to enter into a Development Agreement for the development of real property with any person having a legal or equitable interest in such property in order to establish certain development rights in such property. B. Developer owns certain real property (the “Property”) consisting of approximately 2.36 acres of land, as more particularly described in Exhibit A attached hereto and incorporated herein by reference. C. City has previously approved various land use approvals in connection with the development of the Dublin Transit Center Project, including the Project, which approvals include, without limitation, a General Plan and Eastern Dublin Specific Plan Amendment for the Dublin Transit Center Project (Resolution No. 216-02 adopted on November 19, 2002), a Stage 1 Planned Development Zoning and Development Plan (Ord. No. 21-02 adopted on December 3, 2002; amended by Ord. No. 06-11 adopted on June 7, 2011), and a Master Development Agreement (Ord. No. 05-03 adopted on May 6, 2003; amended by Ord. No. 24-05 adopted on October 4, 2005) (collectively referred to herein as the “Transit Center Approvals”). D. Developer has applied for, and City has approved, various land use approvals in connection with a high-density residential development of two hundred twenty (220) units and related amenities (the “Project”), including, without limitation, a Stage 2 Planned Development Rezoning and Development Plan for the Transit Center Site A-3 (Ord. No. ___ adopted by the City Council on ______, 2018), and a Site Development Review (SDR) approval permit and Tentative Map 8437 for the Transit Center Site A-3 Project (Resolution No. ___ adopted on ______, 2018), and the DA Approving Ordinance (defined below) (collectively with the Transit Center Approvals, referred to herein as the “Project Approvals”). E. City desires the timely, efficient, orderly and proper development of the Project. F. The City Council has found that, among other things, this Development Agreement is consistent with its General Plan and the Eastern Dublin Specific Plan (“Specific Plan”), as both have been amended by the Project Approvals, and has been Page 3 reviewed and evaluated in accordance with the Development Agreement Statute and Chapter 8.56. The proposed project is consistent with the General Plan Land Use Designation for Site A-3 and does not exceed the units allowed by the Dublin Transit Center Stage 1 Planned Development Zoning. G. City and Developer have reached agreement and desire to express herein a Development Agreement that will facilitate development of the Project subject to conditions set forth herein. H. City has undertaken, pursuant to the California Environmental Quality Act (Public Resources Code Section 21000 et seq., hereinafter “CEQA”), the required analysis of the environmental effects that would be caused by the Project and has determined that the project qualifies for a statutory exemption from CEQA under Government Code section 65457. An EIR has been certified for the Transit Center Approvals. Public Resources Code Section 21166 and CEQA Guidelines Section 15162 identify the conditions requiring subsequent environmental review. The CEQA document in Support of a Specific Plan Exemption finds that no event as specified in Section 21166 of the Public Resources Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a subsequent or supplemental EIR or Negative Declaration. I. On ___________, 2018, the City Council of the City of Dublin adopted Ordinance No. ___ approving this Development Agreement (the “DA Approving Ordinance”). The DA Approving Ordinance took effect on ____________, 2018. NOW, THEREFORE, with reference to the foregoing recitals and in consideration of the mutual promises, obligations and covenants herein contained, City and Developer agree as follows: AGREEMENT 1. Description of Property. The Property that is the subject of this Agreement is described in Exhibit A attached hereto (“Property”). 2. Interest of Developer. Developer has a legal interest in the Property in that it is the owner of the Property. 3. Relationship of City and Developer. It is understood that this Agreement is a contract that has been negotiated and voluntarily entered into by the City and Developer and that Developer is not an agent of the City. The City and Developer hereby renounce the existence of any form of joint venture or partnership between them, and agree that nothing contained herein or in any document executed in connection herewith shall be construed as making the City and Developer joint venturers or partners. Page 4 4. Effective Date and Term 4.1 Effective Date. The effective date of this Agreement (“Effective Date”) is _______________ (as first set forth above). 4.2 Term. The term of this Agreement shall commence on the Effective Date and shall continue for five (5) years thereafter, unless said term is otherwise extended or terminated as provided in this Agreement. In the event that any third-party lawsuit is filed challenging the City’s issuance of the Project Approvals or its compliance with CEQA, the term of this Agreement shall be automatically extended for a duration equal to the time from the filing of such lawsuit to the entry of an order dismissing or otherwise terminating such lawsuit, which duration shall include any appeals. 4.3 Term of Project Approvals. The term of any Project Approvals for the Property or any Portion thereof, specifically including the Site Development Review approval permit and Tentative Map No. 8347 approved by Resolution No. _____, shall be extended automatically for the Term of this Agreement. 5. Vested Rights/Use of the Property/Applicable Law/Processing 5.1 Right to Develop. Developer shall have the vested right to develop the Project on the Property in accordance with the terms and conditions of this Agreement, the Project Approvals (as and when issued), and any amendments to any of them as shall, from time to time, be approved pursuant to this Agreement, and the City’s ordinances, codes, resolutions, rules, regulations and official policies governing the development, construction, subdivision, occupancy and use of the Project and the Property including, without limitation, the General Plan, the Dublin Municipal Code, and the Specific Plan, the permitted uses of the Property, density and intensity of use of the Property and the maximum height, bulk and size of proposed buildings, and the provisions for reservation or dedication of land for public purposes that are in force and effect on the Effective Date of this Agreement (collectively, “Applicable Law”). In exercising its discretion when acting upon subsequent project approvals, City shall apply the Applicable Law as the controlling body of law (within which Applicable Law such discretion shall be exercised). Notwithstanding the foregoing or anything to the contrary herein, any amendment to the Project Approvals shall not become part of the law Developer is vested into under this Agreement unless an additional amendment of this Agreement is entered into between Developer and City in accordance with this Agreement. In the event that such amendments to the Project Approvals are sought for any distinct portion of the Property or Project, such amendments shall not require amendment of this Agreement with respect to any other portion of the Property or Project, except to the extent set forth in such amendment. 5.2 Fees, Exactions, Dedications. The City shall not apply to the Project any development impact fee or any application, processing or inspection fee (collectively, “Fees”) that the City first enacts after the Effective Date. Furthermore, the rate imposed for each such applicable Fee shall be the lower of (a) the rate in effect on June 30, 2018, as set forth in the schedule attached hereto as Exhibit B, or (b) the rate Page 5 in effect at the time such Fee is payable under the terms of the legislation imposing the particular Fee. Notwithstanding the foregoing, the City shall be permitted to impose any Exaction on a subsequent project approval that requires an amendment to the Project Approvals. 5.3 Construction Codes. Notwithstanding the provisions of Section 5.1 above, to the extent Applicable Law includes requirements under the state or locally adopted building, plumbing, mechanical, electrical and fire codes (collectively the “Codes”), the Codes included shall be those in force and effect at the time Developer submits its application for the relevant building, grading, or other construction permits to City. In the event of a conflict between such Codes and the Project Approvals, the Project Approvals shall, to the maximum extent allowed by law, prevail. For construction of public infrastructure, the Codes applicable to such construction shall be those in force and effect at the time of execution of an improvement agreement between City and Developer pursuant to Chapter 9.16 of the Dublin Municipal Code. 5.4 Omitted. 5.5 New Rules and Regulations. During the term of this Agreement, the City may apply new or modified ordinances, resolutions, rules, regulations and official policies of the City to the Property which were not in force and effect on the Effective Date only to the extent they are not in conflict with the vested rights granted by this Agreement, the Applicable Law, the Project Approvals or this Agreement. In addition to any other conflicts that may occur, each of the following new or modified ordinances, resolutions, rules, regulations or official policies shall be considered a per se conflict with the Applicable Law: 5.5.1 Any application or requirement of such new or modified ordinances, resolutions, rules, regulations or official policies that would (i) cause or impose a substantial financial burden on, or materially delay development of the Property as otherwise contemplated by this Agreement or the Project Approvals, (ii) frustrate in a more than insignificant way the intent or purpose of the Project Approvals or preclude compliance therewith including, without limitation, by preventing or imposing limits or controls in the rate, timing, phasing or sequencing of development of the Project; (iii) prevent or limit the processing or procuring of subsequent project approvals; or (iv) reduce the density or intensity of use of the Property as a whole, or otherwise requiring any reduction in the square footage of, or total number of, proposed buildings, structures and other improvements, in a manner that is inconsistent with or more restrictive than the limitations included in this Agreement and the Project Approvals; and/or 5.5.2 If any of such ordinances, resolutions, rules, regulations or official policies do not have general (City-wide) applicability. Developer specifically acknowledges that it will be subject to new or modified ordinances, resolutions, rules, regulations or official policies that implement the Municipal Regional Stormwater NPDES Permit issued by the Regional Water Quality Page 6 Control Board for the San Francisco Bay Region from time to time (the “MRP”) to the extent that the permit does not include exemptions that apply to the Project. 5.6 Moratorium Not Applicable. Notwithstanding anything to the contrary contained herein, if a City ordinance, resolution, policy, directive, or other measure is enacted or becomes effective, whether by action of the City or by initiative, and if it imposes a building moratorium which affects all or any part of the Project, City agrees that such ordinance, resolution or other measure shall not apply to the Project, the Property, this Agreement or the Project Approvals unless the building moratorium is imposed as part of a declaration of a local emergency or state of emergency as defined in Government Code section 8558, provided that to the extent a moratorium applies to all or any part of the Project then the Term shall automatically be extended for a period of time equal to the period of the moratorium. 5.7 Revised Application Fees. Notwithstanding section 5.2 above, any existing application, processing and inspection fees that are revised during the term of this Agreement shall apply to the Project provided that (1) such fees have general applicability and are consistent with State law limitations that processing fees not exceed the estimated reasonable cost of providing the service for which they are charged; (2) the application of such fees to the Property is prospective; and (3) the application of such fees would not prevent, impose a substantial financial burden on, or materially delay development in accordance with this Agreement. By so agreeing, Developer does not waive its rights to challenge the legality of any such application, processing and/or inspection fees. 5.8 New Taxes. This Agreement shall not prohibit the application of any subsequently enacted city-wide taxes to the Project provided that (1) the application of such taxes to the Property is prospective, and (2) the application of such taxes would not prevent development in accordance with this Agreement. By so agreeing, Developer does not waive its rights to challenge the legality of any such taxes, facially or as applied to its Project or Property, or to claim exemption from any taxes to the extent allowed by law. 5.9 Development of the Project; Phasing, Timing. Since the California Supreme Court held in Pardee Construction Co. v. City of Camarillo (1984) 37 Cal. 3d 465, that the failure of the parties therein to provide for the timing of development resulted in a later adopted initiative restricting the timing of development to prevail over such parties’ agreement, it is the Parties’ intent to cure that deficiency by acknowledging and providing that this Agreement contains no requirements that Developer must initiate or complete any action, including without limitation, development of the Project within any period of time set by City. Nothing in this Agreement is intended to create nor shall it be construed to create any affirmative development obligations to develop the Project at all or in any particular order or manner, or liability in Developer under this Agreement if the development fails to occur. It is the intention of this provision that Developer be able to develop the Property in accordance with its own time schedules and the Project Approvals. Page 7 5.10 Processing. Nothing in this Agreement shall be construed to limit the authority or obligation of City to hold necessary public hearings, nor to limit the discretion of City or any of its officers or officials with regard to subsequent project approvals that require the exercise of discretion by City, provided that such discretion shall be exercised consistent with the vested rights granted by this Agreement, the Applicable Law and this Agreement. 6. Community Benefits. 6.1 Community Benefit Payment. Concurrently with the Effective Date of this Agreement, Developer has contributed the sum of Six Hundred Thousand Dollars ($600,000) to the City as a Community Benefit, to be allocated by the City toward improvements in Don Biddle Community Park, in accordance with the Master Plan adopted for the park. 6.2 Affordable Housing. Developer shall ensure that a minimum of 10% of the units in the Project shall be made affordable for fifty-five (55) years to households earning between 80% and 120% of area median income, pursuant to an Affordable Housing Agreement with the City, which agreement shall comply with the City’s Inclusionary Zoning Ordinance (Municipal Code Chapter 8.68) and shall satisfy Developer’s obligations thereunder. 6.3 Right-of-Way Purchase. As consideration for Developer’s purchase of approximately three hundred (300) square feet of the City’s right-of-way in accordance with the terms and conditions of the Project Approvals, Developer shall contribute the purchase price of Twenty-Five Thousand Dollars ($25,000), prior to issuance of building permits for the Project. 7. Amendment or Cancellation. 7.1 Modification Because of Conflict with State or Federal Laws. The Project and Property shall be subject to state and federal laws and regulations and this Agreement does not create any vested right in state and federal laws and regulations in effect on the Effective Date. In the event that state or federal laws or regulations enacted after the Effective Date of this Agreement prevent or preclude compliance with one or more provisions of this Agreement or require changes in plans, maps or permits approved by the City, the parties shall meet and confer in good faith in a reasonable attempt to modify this Agreement to comply with such federal or state law or regulation. Any such amendment or suspension of the Agreement shall be subject to approval by the City Council (in accordance with Chapter 8.56). Each Party agrees to extend to the other its prompt and reasonable cooperation in so modifying this Agreement or approved plans. 7.2 Amendment by Mutual Consent. This Agreement may be amended in writing from time to time by mutual consent of the parties hereto and in accordance with the procedures of State law and Chapter 8.56. When a Party seeking such an amendment owns or has an equitable right to only a portion of the whole of the Property Page 8 (“Portion”), then such Party may only seek amendment of this Agreement as directly relates to the Portion, and the party owning any other Portion shall not be required or entitled to be a signatory or to consent to an amendment that affects only another party’s Portion. If any Portion of the Property is subject to a document which creates an association which oversees common areas and any construction or reconstruction on or of the same, then the association shall be deemed to be the “owner” of that Portion of the Property for the purpose of amending this Agreement. 7.3 Major Amendments. Any amendments to this Agreement which relate to (a) the Term; (b) the permitted uses of the Property as provided in paragraph 5.1; (c) provisions for “significant” reservation or dedication of land; (d) conditions, terms, restrictions or requirements for subsequent discretionary actions; (e) an increase in the density or intensity of use of the overall Project; (f) the maximum height or size of proposed buildings; or (g) monetary contributions by Developer as provided in this Agreement, shall be deemed a “Major Amendment” and shall require notice or public hearing before the Planning Commission and the City Council before the parties may execute an amendment hereto. The City’s Public Works Director shall determine whether a reservation or dedication is “significant” in the context of the overall Project. 7.4 Minor Amendments. Any amendment that is not a Major Amendment shall be deemed a “Minor Amendment” and shall not, except to the extent otherwise required by law, require notice or public hearing before the parties may execute an amendment hereto. The City Manager or his or her designee shall have the authority to determine if an amendment is a Major Amendment subject to Section 7.3 above or a Minor Amendment subject to this Section 7.4. The City Manager shall have the authority to review, approve, and execute amendments to this Agreement provided that such amendments are not Major Amendments. 7.5 Cancellation by Mutual Consent. Except as otherwise permitted herein, this Agreement may be canceled in whole or in part only by the mutual consent of the parties or their successors in interest, in accordance with the provisions of Chapter 8.56. Any fees paid pursuant to this Agreement prior to the date of cancellation shall be retained by the City. 8. Annual Review. 8.1 Review Date. The annual review date for this Agreement shall be between July 15 and August 15, 2019 and thereafter between each July 15 and August 15 during the Term. 8.2 Initiation of Review. The City’s Community Development Director shall initiate the annual review, as required under Section 8.56.140 of Chapter 8.56, by giving to Developer thirty (30) days’ written notice that the City intends to undertake such review. Developer shall provide evidence to the Community Development Director prior to the hearing on the annual review, as and when reasonably determined necessary by the Community Development Director, to demonstrate good faith Page 9 compliance with the provisions of the Agreement. The burden of proof by substantial evidence of compliance is upon Developer. 8.3 Staff Reports. To the extent practical, the City shall deposit in the mail to Developer a copy of all staff reports, and related exhibits concerning contract performance at least five (5) days prior to any public hearing addressing annual review. 8.4 Costs. Costs reasonably incurred by the City in connection with the annual review shall be paid by Developer in accordance with the City’s schedule of fees in effect at the time of review. 9. Default. 9.1 Remedies Available. Upon the occurrence of an event of default, the parties may pursue all remedies at law or in equity which are not otherwise provided for in this Agreement or in the City’s regulations governing development agreements, expressly including, but not limited to, the remedy of specific performance of this Agreement. 9.2 Notice and Cure. Upon the occurrence of an event of default by either party, the nondefaulting party shall serve written notice of such default upon the defaulting party. If the default is not cured by the defaulting party within thirty (30) days after service of such notice of default, the nondefaulting party may then commence any legal or equitable action to enforce its rights under this Agreement; provided, however, that if the default cannot be cured within such thirty (30) day period, the nondefaulting party shall refrain from any such legal or equitable action so long as the defaulting party begins to cure such default within such thirty (30) day period and diligently pursues such cure to completion. Failure to give notice shall not constitute a waiver of any default. 9.3 No Damages against City. Notwithstanding anything to the contrary contained herein, in no event shall damages be awarded against the City upon an event of default or upon termination of this Agreement. 10. Estoppel Certificate. Either party may, at any time, and from time to time, request written notice from the other party requesting such party to certify in writing that, (a) this Agreement is in full force and effect and a binding obligation of the parties, (b) this Agreement has not been amended or modified either orally or in writing, or if so amended, identifying the amendments, and (c) to the knowledge of the certifying party, the requesting party is not in default in the performance of its obligations under this Agreement, or if in default, to describe therein the nature and amount of any such defaults. A party receiving a request hereunder shall execute and return such certificate within thirty (30) days following the receipt thereof, or such longer period as may reasonably be agreed to by the parties. The City Manager of the City shall be authorized to execute any certificate requested by Developer. Should the party receiving the request not execute and return such certificate within the applicable period, this shall not be deemed to be a default, provided that such party shall be Page 10 deemed to have certified that the statements in clauses (a) through (c) of this section are true, and any party may rely on such deemed certification. 11. Mortgagee Protection; Certain Rights of Cure. 11.1 Mortgagee Protection. This Agreement shall be superior and senior to any lien placed upon the Property, or any portion thereof after the date of recording this Agreement, including the lien for any deed of trust or mortgage (“Mortgage”). Notwithstanding the foregoing, no breach hereof shall defeat, render invalid, diminish or impair the lien of any Mortgage made in good faith and for value, but all the terms and conditions contained in this Agreement shall be binding upon and effective against any person or entity, including any deed of trust beneficiary or mortgagee (“Mortgagee”) who acquires title to the Property, or any portion thereof, by foreclosure, trustee’s sale, deed in lieu of foreclosure, or otherwise. 11.2 Mortgagee Not Obligated. Notwithstanding the provisions of Section 11.1 above, no Mortgagee shall have any obligation or duty under this Agreement, before or after foreclosure or a deed in lieu of foreclosure, to construct or complete the construction of improvements, or to guarantee such construction of improvements, or to guarantee such construction or completion, or to pay, perform or provide any fee, dedication, improvements or other exaction or imposition; provided, however, that a Mortgagee shall not be entitled to devote the Property to any uses or to construct any improvements thereon other than those uses or improvements provided for or authorized by the Project Approvals or by this Agreement. 11.3 Notice of Default to Mortgagee and Extension of Right to Cure. If the City receives notice from a Mortgagee requesting a copy of any notice of default given Developer hereunder and specifying the address for service thereof, then the City shall deliver to such Mortgagee, concurrently with service thereon to Developer, any notice given to Developer with respect to any claim by the City that Developer has committed an event of default. Each Mortgagee shall have the right during the same period available to Developer to cure or remedy, or to commence to cure or remedy, the event of default claimed set forth in the City’s notice. The City, through its City Manager, may extend the thirty-day cure period provided in paragraph 12.2 for not more than an additional sixty (60) days upon request of Developer or a Mortgagee. 12. Severability. The unenforceability, invalidity or illegality of any provisions, covenant, condition or term of this Agreement shall not render the other provisions unenforceable, invalid or illegal. 13. Attorneys’ Fees and Costs. 13.1 Prevailing Party. If the City or Developer initiates any action at law or in equity to enforce or interpret the terms and conditions of this Agreement, the prevailing party shall be entitled to recover reasonable attorneys’ fees and costs in addition to any other relief to which it may otherwise be entitled. Page 11 13.2 Third Party Challenge. If any person or entity not a party to this Agreement initiates an action at law or in equity to challenge the validity of any provision of this Agreement or the Project Approvals, the parties shall cooperate in defending such action. Developer shall bear its own costs of defense as a real party in interest in any such action, and shall reimburse the City for all reasonable court costs and attorneys’ fees expended by the City in defense of any such action or other proceeding. 14. Transfers and Assignments. 14.1 Agreement Runs with the Land. All of the provisions, rights, terms, covenants, and obligations contained in this Agreement shall be binding upon the Parties and their respective heirs, successors and assignees, representatives, lessees, and all other persons acquiring the Property, or any portion thereof, or any interest therein, whether by operation of law or in any manner whatsoever. All of the provisions of this Agreement shall be enforceable as equitable servitude and shall constitute covenants running with the land pursuant to applicable laws, including, but not limited to, Section 1468 of the Civil Code of the State of California. Each covenant to do, or refrain from doing, some act on the Property hereunder, or with respect to any owned property, (a) is for the benefit of such properties and is a burden upon such properties, (b) runs with such properties, and (c) is binding upon each party and each successive owner during its ownership of such properties or any portion thereof, and shall be a benefit to and a burden upon each party and its property hereunder and each other person succeeding to an interest in such properties. 14.2 Right to Assign. Developer may wish to sell, transfer or assign all or portions of its Property to other developers (each such other developer is referred to as a “Transferee”). In connection with any such sale, transfer or assignment to a Transferee, Developer may sell, transfer or assign to such Transferee any or all rights, interests and obligations of Developer arising hereunder and that pertain to the portion of the Property being sold or transferred, to such Transferee, provided, however, that: except as provided herein, no such transfer, sale or assignment of Developer’s rights, interests and obligations hereunder shall occur without prior written notice to City and approval by the City Manager, which approval shall not be unreasonably withheld or delayed. 14.3 Approval and Notice of Sale, Transfer or Assignment. The City Manager shall consider and decide on any transfer, sale or assignment within ten (10) days after Developer’s notice, provided all necessary documents, certifications and other information are provided to the City Manager to enable the City Manager to determine whether the proposed Transferee can perform Developer’s obligations hereunder. Notice of any such approved sale, transfer or assignment (which includes a description of all rights, interests and obligations that have been transferred and those which have been retained by Developer) shall be recorded in the official records of Alameda County, in a form acceptable to the City Manager, concurrently with such sale, transfer or assignment. Page 12 14.4 Considerations for Approval of Sale, Transfer or Assignment. In considering the request, the City Manager shall base the decision upon the proposed assignee's reputation, experience, financial resources and access to credit and capability to successfully carry out the development of the Property to completion. The City Manager's approval shall be for the purposes of: a) providing notice to City; b) assuring that all obligations of Developer are allocated as between Developer and the proposed purchaser, transferee or assignee as provided by this Agreement; and c) assuring City that the proposed purchaser, transferee or assignee is financially capable of performing Developer's obligations hereunder not withheld by Developer. Notwithstanding the foregoing, the City Manager’s approval shall not be required for an assignment to an entity or entities controlling Developer, controlled by Developer, or under common control with Developer, provided that Developer owns and controls no less than fifty percent (50%) of such successor entity. 14.5 Release upon Transfer. Upon the transfer, sale, or assignment of all of Developer’s rights, interests and obligations hereunder pursuant to Section 14.2 of this Agreement, Developer shall be released from the obligations under this Agreement, with respect to the Property transferred, sold, or assigned, arising subsequent to the date of City Manager approval of such transfer, sale, or assignment; provided, however, that if any transferee, purchaser, or assignee approved by the City Manager expressly assumes all of the rights, interests and obligations of Developer under this Agreement, Developer shall be released with respect to all such rights, interests and assumed obligations. In any event, the transferee, purchaser, or assignee shall be subject to all the provisions hereof and shall provide all necessary documents, certifications and other necessary information prior to City Manager approval. 14.6 Developer’s Right to Retain Specified Rights or Obligations. Developer may withhold from a sale, transfer or assignment of this Agreement or any portion of the Property transferred, certain rights, interests and/or obligations which Developer wishes to retain, provided that Developer specifies such rights, interests and/or obligations in a written document to be appended to this Agreement and recorded with the Alameda County Recorder prior to the sale, transfer or assignment of the Property. Developer’s purchaser, transferee or assignee shall then have no interest or obligations for such rights, interests and obligations and this Agreement shall remain applicable to Developer with respect to such retained rights, interests and/or obligations. 14.7 Omitted. 15. Bankruptcy. The obligations of this Agreement shall not be dischargeable in bankruptcy. 16. Indemnification. Developer agrees to indemnify, defend and hold harmless the City, and its elected and appointed councils, boards, commissions, officers, agents, employees, and representatives from any and all claims, costs (including legal fees and costs) and liability for any personal injury or property damage which may arise directly or indirectly as a result of any actions or inactions by Developer, or any actions or inactions of Developer’s contractors, subcontractors, Page 13 agents, or employees in connection with the construction, improvement, operation, or maintenance of the Project, provided that Developer shall have no indemnification obligation with respect to negligence or wrongful conduct of the City, its contractors, subcontractors, agents or employees or with respect to the maintenance, use or condition of any improvement after the time it has been dedicated to and accepted by the City or another public entity (except as provided in an improvement agreement or maintenance bond). If City is named as a party to any legal action, City shall cooperate with Developer, shall appear in such action and shall not unreasonably withhold approval of a settlement otherwise acceptable to Developer. 17. Insurance. 17.1 Commercial General Liability Insurance. During the term of this Agreement, Developer shall maintain in effect a policy of commercial general liability insurance with a per-occurrence combined single limit of not less than one million dollars ($1,000,000.00). The policy so maintained by Developer shall name the City as an additional insured and shall include either a severability of interest clause or cross- liability endorsement. City and Developer agree that such insurance may include alternative risk management programs, including self-insurance or a combination of self-insurance and insurance, provided that such alternative risk management programs provide protection equivalent to that specified under this Agreement. 17.2 Workers Compensation Insurance. During the term of this Agreement Developer shall maintain Worker’s Compensation insurance for all persons employed by Developer for work at the Project site. Developer shall require each contractor and subcontractor similarly to provide Worker’s Compensation insurance for its respective employees. Developer agrees to indemnify the City for any damage resulting from Developer’s failure to maintain any such insurance. 17.3 Evidence of Insurance. Prior to issuance of any permits for the Project, including grading permits, Developer shall furnish the City satisfactory evidence of the insurance required in Sections 17.1 and 17.2 and evidence that the carrier is required to give the City at least fifteen days prior written notice of the cancellation or reduction in coverage of a policy unless replaced with similar coverage. The insurance shall extend to the City, its elective and appointive boards, commissions, officers, agents, employees and representatives and to Developer performing work on the Project. 18. Sewer and Water. Developer acknowledges that it must obtain water and sewer permits from the Dublin San Ramon Services District (“DSRSD”) which is another public agency not within the control of the City. City agrees that it shall not take any action with DSRSD opposing Developer’s efforts to reserve water and sewer capacity sufficient to serve the Project described herein. 19. Notices. All notices required or provided for under this Agreement shall be in writing. Notices required to be given to the City shall be addressed as follows: Page 14 City Manager City of Dublin 100 Civic Plaza Dublin, CA 94568 Fax No. (925) 833-6651 Notices required to be given to Developer shall be addressed as follows: Ashton at Dublin Station, LLC c/o UDR, Inc. 1745 Shea Center Drive, Suite 200 Highlands Ranch, CO 80129 Attn: Warren L. Troupe and David G. Thatcher With a copy to: Morrison & Foerster LLP 425 Market Street San Francisco, 94105-2482 Attn: Megan A. Jennings A party may change address by giving notice in writing to the other party and thereafter all notices shall be addressed and transmitted to the new address. Notices shall be deemed given and received upon personal delivery, or if mailed, upon the expiration of 48 hours after being deposited in the United States Mail. Notices may also be given by overnight courier which shall be deemed given the following day or by facsimile transmission which shall be deemed given upon verification of receipt. 20. Agreement is Entire Understanding. This Agreement constitutes the entire understanding and agreement of the parties. 21. Exhibits. The following document is referred to in this Agreement and is attached hereto and incorporated herein as though set forth in full: Exhibit A Legal Description of Property Exhibit B Schedule of Impact Fees 22. Recitals. The foregoing Recitals are true and correct and are made a part hereof. 23. Counterparts. This Agreement is executed in two (2) duplicate originals, each of which is deemed to be an original. 24. Recordation. The City shall record a copy of this Agreement within ten (10) days following execution by all parties. Page 15 25. No Third Party Beneficiaries. Nothing contained in this Agreement is intended to or shall be deemed to confer upon any person, other than the Parties and their respective permitted successors and assigns, any rights or remedies hereunder. [Execution Page Follows] Page 16 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the date and year first above written. CITY OF DUBLIN By: __________________________ Chris Foss, City Manager Attest: ________________________ Caroline Soto, City Clerk Approved as to form ________________________ John Bakker, City Attorney DEVELOPER Ashton at Dublin Station, LLC, a Delaware limited liability company By: _______________ Its: _______________ By: __________________________ Name: _______________________ Its: ____________________________ 2977065.5 (NOTARIZATION ATTACHED) Exhibit A Legal Description of Property THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF DUBLIN, COUNTY OF ALAMEDA, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Parcel A: Parcel 3, Parcel Map 8275, filed March 29, 2005, Book 280 of Parcel Map 71, Alameda County Records. Parcel B: An ingress and egress easement over and across that portion of Parcel 2, as shown on Parcel Map 8275, filed March 29, 2005 in Book 280 of Parcel Map, Page 71, Alameda County Records, designated thereon as “RIEE” or “Reciprocal Ingress Egress Easement” for the purposes of vehicular ingress and egress and pedestrian ingress and egress. APN: 986-0034-009 Paid To Fee Type Fee Detail Per home Total City of Dublin Impact Fee-Public Facility Community Parks, Improvements $2,761 $607,420 City of Dublin Impact Fee-Public Facility Community Buildings $2,281 $501,820 City of Dublin Impact Fee-Public Facility Libraries $164 $36,080 City of Dublin Impact Fee-Public Facility Civic Center $910 $200,200 City of Dublin Impact Fee-Public Facility Neighborhood Parks Improvements $1,614 $355,080 City of Dublin Impact Fee-Public Facility Aquatic Center $205 $45,100 City of Dublin Impact Fee-Public Facility Community Nature parks, Improvements $175 $38,500 City of Dublin Impact Fee-Public Facility Community Parks, Land $4,992 $1,098,240 City of Dublin Impact Fee-Public Facility Neighborhood Parks, Land $2,248 $494,560 City of Dublin Impact Fee-Public Facility Community Nature Parks, Land $0 $0 -------------------------------------------------------------------------------------------------------------------------------------------------------------------$267-----------------------------$45~54_0 _______________________ City of Dublin Impact Fee Fire Impact Fee (MF Res.) City of Dublin Impact Fee Eastern Dublin Traffic Impact Fee (Res ., Inside Transit Center) $4,587 $1,009,140 City of Dublin Impact Fee Noise Mitigation Fee (Res.) $3 $627 TOTAL IMPACT FEES/DU $20,147 $4,432,307 I city of Dublin Building Permit PLAN CHECK FEE*I$3,632 1$798,932 *includes Building Permit Fee, Permit Application Fee, Fire New Building Construction Plan Check, CAL Green Inspection Fee, SMIP-Multi-Family, CAL Green Application Fee, C&D Compliance Fee Res, Plan Storage Fee, Greer Building Fee-State, Impervious SQ FT-Zone 7, Fire New Building Construction Inspection, Adjusted Plan Check, Grading Permit Fee, Site Work Fee, Additional Plan Check-Hourly Fees, and all other Permit and Plan Check Fees. Exhibit B