HomeMy WebLinkAboutReso 88-04 I-580TassajInterchan RESOLUTION NO. 88 - 04
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT NO. 2 TO AGREEMENT WITH S&C ENGINEERS, INC.,
FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE
1-580/TASSAJARA ROAD INTERCHANGE IMPROVEMENT PROJECT
WHEREAS, the 1-580/Tassajara Road Interchange Improvement project was constructed as part
of the development process in Eastern Dublin; and
WHEREAS, on January 16, 2001, the City Council approved an agreement for consulting
services with S&C Engineers, Inc. (S&C), to perform constructability review for the 1-580/Tassajam Road
Interchange Improvement Project; and
WHEREAS, on December 4, 2001, S&C's Scope of Work was expanded under Amendment
No. 1 to include construction management under Phase II of the original scope of work; and
WHEREAS, during construction of the project, several Caltmns and City initiated change orders
required additional inspection, contract administration, testing and surveying work from S&C and S&C's
subeonsultants and these change orders were not included in S&C's original scope of work; and
WHEREAS, it is necessary to expand S&C's scope of work to include these additional tasks;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby approve Amendment No. 2 to the agreement with S&C to modify the scope of work to include
additional tasks and to provide additional compensation of $90,009.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the agreement.
PASSED, APPROVED AND ADOPTED this 1st day of June, 2004.
AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika and Mayor Lockhart
NOES: None
ABSENT: None
ABSTAIN: None ~~ ~d/~/~Mayor-
ATTES~j~/j
-'"-~ L ~ty Clefk '
K2/G/6- 1-04/reso-S&C.doe (Item 4.5)
g:\engr~eso S&C amendment2 580-Tass.
EXHIBIT "A" OF RESOLUTION ~ -04'
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND S&C ENGINEERS, INCORPORATED
FOR CONSTRUCTION MANAGEMENT SERVICES
WltEREAS, the City of Dublin (hereinafter referred to as "CITY") and S&C Engineers,
Inc. (hereinafter referred to as "S&C"), entered into an agreement on January 16, 2001 to perform
preconstmction tasks, including constructability review for the Interstate 580/Tassajara Road Interchange
Improvement Project; and
WItEREAS, in December 2001, S&C's scope of work was expanded under Amendment
No. 1 to include construction management under Phase II of the original scope of work; and
WltEREAS, during construction of the project, several Caltrans and City initiated change
orders required additional inspection, contract administration, testing and surveying work from S&C and
their sub consultants and these change orders were not included in S&C's original scope of work; and
WHEREAS, it is necessary to expand S&C's scope of work to include these additional
tasks.
NOW, THEREFORE, the parties hereto agree as follows:
Scope of Work
Scope of Work shall be modified to include additional scope of work as described in S&C's letter
dated April 12, 2004 (attached).
Extension of Term
The total cost for time-and-materials work under this amendment shall not exceed an additional
$90,009 based on the attached letter.
CI~TY OF DUBLIN /i
City ~Xrwk'h' ',._ S&C ENGINEERS, INC.
/~? James E. Scott, President
g:engr-contract\S&C\amendment2