Loading...
HomeMy WebLinkAbout3.2 Transit Center Site A-3 Development AgreementPage 1 of 4 STAFF REPORT PLANNING COMMISSION DATE: July 10, 2018 TO: Planning Commission SUBJECT: PUBLIC HEARING: Transit Center Site A-3 Development Agreement for the Ashton at Dublin Station project (PLPA 2017-00036) Prepared by:Martha Battaglia, Associate Planner EXECUTIVE SUMMARY: The Planning Commission will make a recommendation to the City Council regarding a Development Agreement associated with the proposed Ashton at Dublin Station project. The project is comprised of 220 apartment units, residential amenities including a fitness center, pool, roof top lounge, and 331 structured parking spaces on an approximately 2.36 acre site. The City Council denied the project and the Applicant subsequently filed a lawsuit against the City. In accordance with the terms of the settlement agreement with the applicant, the City Council will reconsider the project and this proposed Development Agreement. RECOMMENDATION: Conduct the public hearing, deliberate and adopt a Resolution recommending that the City Council adopt an Ordinance approving the Development Agreement between the City of Dublin and Ashton at Dublin Station, LLC. PROJECT DESCRIPTION: The proposed Ashton at Dublin Station project is located at the northwest corner of DeMarcus Boulevard and Campbell Lane within the Transit Center (Figure 1). The site has a General Plan and Eastern Dublin Specific Plan land use designation of High Density Residential (25+ units per acre) and Planned Development Zoning with a Stage 1 Development Plan that permits a high density residential development. The 2.36 acre project site is the last remaining site with a residential land use designation in the Transit Center. 3.2 Packet Pg. 7 Page 2 of 4 Figure 1. Vicinity Map The Applicant proposed to construct a 220-unit apartment community and related amenities which include a fitness center, pool, roof top lounge, and 331 structured parking spaces, and a mix of units as shown in Table 1 below. The proposed project includes 3, 4 and 5 story elements that are over 2 levels of parking, and vary in height from 61 feet to 83 feet at the peak of the tallest roof element. The project plans are included as Attachment 1. The requested entitlements include a Planned Development Stage 2 Development Plan, Site Development Review, and a Condomi nium Map. Please refer to the Planning Commission Staff Report dated November 14, 2017 for a complete discussion of the proposed project (Attachment 2). Table 1. Unit Mix Unit Type Square Footage # of Units % of Project Jr. 1 Bedroom 640 SF 22 10.0% 1 Bedroom 800 SF 94 42.7% 1+ Bedroom 975 SF 4 1.8% 2 Bedroom 1,120 SF 81 36.8% 2 Bedroom + den 1,240 SF 15 6.8% 3 Bedroom 1,280 SF 4 1.8% Total -- 220 100% On November 14, 2017, the Planning Commission unanimously recommended approval of the proposed project. The City Council held public meetings to consider the proposed project on December 5, 2017, February 6, 2018 and March 6, 2018. Ultimately, the City Council denied the project on March 6, 2018. The Applicant subsequently filed a lawsuit against the City. The City and the Applicant have entered into a settlement agreement. In accordance with the terms of the settlement agreement, the City Council will reconsider the project, and consider entering into a Development Agreement. Pursuant to the Development Agreement Regulations of the Dublin Zoning Ordinance (Chapter 8.56), a Development Agreement requires a public hearing before the Planning Commission. The Planning Commission is required to review the Development Agreement and make a recommendation to the City Council. The City Council will consider the Planning Commission’s recommendation in making a decision regarding a Development Agreement. 3.2 Packet Pg. 8 Page 3 of 4 The Planning Commission is being asked to review and make a recommendation to the City Council regarding the proposed Development Agreement for the Ashton at Dublin Station project. As the Planning Commission previously reviewed and made a recommendation on the project, the City Council will consider the Planning Commission’s recommendation on the project when it reconsiders the project. ANALYSIS: California Government Code §§ 65864 et seq. and Dublin Municipal Code Chapter 8.56 authorize the City to enter into an agreement for t he development of real property with any person having a legal or equitable interest in such property in order to obtain certain commitments and establish certain development rights for the property. Development Agreements are approved by an ordinance of the City Council upon recommendation by the Planning Commission. The proposed Development Agreement addresses the Dublin Transit Center Site A-3. The following is an overview of the terms of the proposed Development Agreement: ➢ Developer to contribute a one-time payment of $600,000. ➢ Impact fees for the project shall be those that are in effect as of June 30, 2018. ➢ Term of the Development Agreement is for 5 years from the effective date. The Agreement is a contract that establishes obligations for both parties. The Development Agreement provides security to the developer that the City will not change its impact fees, zoning and other laws applicable to the project for the term of the Agreement. The City also benefits from entering into the Development Ag reement because the Developer agrees to make the one -time financial contribution to the City. A Resolution recommending that the City Council adopt an Ordinance approving the Development Agreement is included as Attachment 3. The draft Ordinance is included as Attachment 4, with the Development Agreement included as Attachment 5. ENVIRONMENTAL REVIEW: The City has determined that the project qualifies for a statutory exemption from CEQA under Government Code section 65457. The proposed project is consis tent with the General Plan Land Use Designation for Site A-3 and does not exceed the units allowed by the Dublin Transit Center Stage 1 Planned Development Zoning. An EIR has been certified for the Dublin Transit Center Stage 1 Planned Development Zoning. The CEQA document in Support of a Specific Plan Exemption finds that no event as specified in Section 21166 of the Public Resources Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a supplementa l CEQA document. Public Resources Code Section 21166 and CEQA Guidelines Section 15162 identify the conditions requiring subsequent environmental review. After a review of these conditions, the City has determined that no subsequent EIR or Negative Declaration is required for this project. The approval of a Development Agreement does not require additional environmental review. PUBLIC NOTICING: In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project to advertise the project and the upcoming public hearing. A public notice also was published in the East Bay Times and 3.2 Packet Pg. 9 Page 4 of 4 posted at several locations throughout the City. A copy of this Staff Report has been provided to the Applicant. ATTACHMENTS: 1. Project Plans 2. Planning Commission Staff Report dated November 14, 2017 without attachments 3. Resolution Recommending that the City Council Adopt an Ordinance Approving a Development Agreement 4. Draft Ordinance Approving a Development Agreement for the Ashton at Dublin Station Project 5. Exhibit A to Attachment 4 - Draft Development Agreement 3.2 Packet Pg. 10 c BA R C O P Y R I G H T ar c h i t e c t s 2/9/2018 12:29:56 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt A 0 0 - C O V E R S H E E T DU B L I N S T A T I O N EN T I T L E M E N T S R E S U B M I T T A L SI T E D E V E L O P M E N T R E V I E W ( S D R ) PL A N N E D D E V E L O P M E N T Z O N I N G D I S T RI C T S T A G E 2 D E V E L O P M E N T P L A N FE B R U A R Y 9 T H , 2 0 1 8 TE L : CO N T A C T : EM A I L : AR C H I T E C T : 90 1 B A T T E R Y S T R E E T , S U I T E 3 0 0 SA N F R A N C I S C O , C A 9 4 1 0 5 (4 1 5 ) 2 9 3 - 5 7 0 0 DA V I D I S R A E L di s r a e l @ b a r a r c h . c o m BA R A R C H I T E C T S TE L : CO N T A C T : EM A I L : CI V I L E N G I N E E R 46 7 0 W I L L O W R O A D , S U I T E 2 5 0 PL E A S A N T O N , C A 9 4 5 8 8 (9 2 5 ) 3 9 6 - 7 7 5 1 ER I C G I R O D eg i r o d @ b k f . c o m BK F TE L : CO N T A C T : EM A I L : LA N D S C A P E A R C H I T E C T : 23 2 5 3 R D S T R E E T SA N F R A N C I S C O , C A 9 4 1 0 7 (4 1 5 ) 4 3 1 - 7 8 7 8 DA V I D F L E T C H E R df l e t c h e r @ f l e t c h e r s t u d i o . c o m FL E T C H E R S T U D I O AS H T O N A T D U B L I N S T A T I O N , L L C 3.2.a Packet Pg. 11Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:29:57 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PROJECT DATA / SHEET LIST16036 A 01DUBLIN STATION DEMARCUS BOULEVARDSHEET LIST VI C I N I T Y M A P DU B L I N B L V D IRON HORSE REGIONAL TRAIL DE MARCUS BLVD CAMPBELL LN. SI T E CA M P P A R K S M I L I T A R Y B A S E CA M P B E L L G R E E N CA M P B E L L L N . HAMLET LN. IRON HORSE PKWY I R O N H O R S E P K W Y DU B L I N / P L E A S A N T O N B A R T S T A T I O N AR T H U R H . B R E E D , J R . F W Y PR O J E C T D A T A FRENTITLEMENTS05/24/17 ENT RESUB 08/28/17 ENT RESUB 2 02/09/18 C6.1EROSION CONTROL NOTES AND DETAILSXXC6.0EROSION CONTROL PLANXXC5.1STORMWATER CONTROL DETAILSXC5.0STORMWATER CONTROL PLANXXC4.0UTILITY PLANXXC3.0GRADING PLANXXC2.0CIVIL SITE PLANXXC1.0EXISTING CONDITIONS PLANXXC0.0TITLE SHEETXXCIVIL L6.00CONCEPTUAL LIGHTING PLANXXL5.00CAMPBELL LANE WEST STREETSCAPE PLANXXL4.00CAMPBELL LANE SOUTH STREETSCAPE PLANXXL3.00DEMARCUS BLVD STREETSCAPE PLANXXL2.00SHARED PRIVATE DRIVE STREETSCAPE PLANXXL1.00ILLUSTRATIVE SITE PLANXXLANDSCAPE P 01BUILDING MATERIALSXA 25APPENDIXXA 24GREENPOINT CHECKLISTXXA 23GREENPOINT CHECKLISTXXA 22GREENPOINT CHECKLISTXXA 21ENLARGED TYPICAL UNIT PLANSXXA 20BUILDING SECTIONS - EAST/WESTXXA 19BUILDING SECTIONS - NORTH/SOUTHXXA 18ELEVATIONS - NORTH & EASTXXA 17ELEVATIONS - SOUTH & WESTXXA 16FLOOR PLAN - ROOFXXA 15FLOOR PLAN - LEVEL 7XXXA 14FLOOR PLAN - LEVEL 6XXXA 13FLOOR PLAN - LEVEL 5XXXA 12FLOOR PLAN - LEVEL 4XXXA 11FLOOR PLAN - LEVEL 3XXXA 10FLOOR PLAN - LEVEL 2XXXA 09FLOOR PLAN - LEVEL1XXXA 08PERSPECTIVE VIEWXXA 07PERSPECTIVE VIEWXXA 06PERSPECTIVE VIEWXXA 05PERSPECTIVE VIEWXXA 04.3PERSPECTIVE VIEWXA 04.2PERSPECTIVE VIEWXA 04.1PERSPECTIVE VIEWXA 04SITE PLANXXA 03SITE AERIAL DIAGRAMXXA 02EXISTING CONDITIONSXXARCHITECTURAL Ro o f T e r r a c e 9 2 8 Po d i u m L a n d s c a p e : 2 4 , 9 2 0 Le v e l 1 L a n d s c a p e 1 9 , 0 3 0 Si t e A r e a : 10 2 , 6 7 0 Ef f i c i e n c y ( R e s R e n t a b l e G S F / R e s T o t a l G S F ) 75 % To t a l 21 0 , 0 3 3 2 , 5 0 1 5 8 , 3 4 7 27 8 , 4 1 7 00 0 12 6 , 6 5 7 40 5 , 0 7 4 0 1 6, 7 4 0 2 , 5 0 1 2 , 8 5 9 8 4 4 2 8 0 7 , 5 0 1 20 , 7 2 5 00 0 62 , 8 9 6 83 , 6 2 1 2 9, 6 9 8 0 2 8 3 8 , 3 0 0 18 , 2 8 1 00 0 63 , 7 6 1 82 , 0 4 2 3 46 , 1 5 3 0 4 6 4 1 , 8 7 8 1 0 , 0 1 2 58 , 5 0 7 00 0 0 58 , 5 0 7 4 48 , 3 6 1 0 1 0 , 2 5 2 58 , 6 1 3 00 0 0 58 , 6 1 3 5 49 , 0 8 5 0 1 0 , 6 9 6 59 , 7 8 1 00 0 0 59 , 7 8 1 6 28 , 3 5 2 0 9 2 8 6 , 5 5 4 35 , 8 3 4 00 0 0 35 , 8 3 4 7 21 , 6 4 4 0 5 , 0 3 2 26 , 6 7 6 00 0 0 26 , 6 7 6 Le v e l " R e n t a b l e " S F L o b b y Fi t n e s s P o o l L e a s i n g L o u n g e C o n f C l u b R m Co r e G r o s s " R e n t a b l e " C o r e G r o s s G r o s s G S F To t a l R e s . R e s . A m e n i t y R e s . R e s . R e t a i l R e t a i l R e t a i l G a r a g e T O T A L PR E L I M I N A R Y A R E A T A B U L A T I O N S wt 45 . 4 5 % % T w o B e d r o o m s o r L a r g e r % 1 0 . 0 % 4 2 . 7 % 1 . 8 % 3 6 . 8 % 6 . 8 % 1 . 8 % 1 0 0 . 0 % TO T A L 22 9 4 4 8 1 1 5 4 22 0 1 2 7 - - - - 9 2 28 - 2 - - 12 3 42 0 2 1 8 4 - 48 4 32 0 1 2 0 5 - 49 5 42 1 1 2 0 5 - 51 6 41 2 - 13 - 13 0 7 36 - 81 3 2 1 64 0 t y p . S F 8 0 0 t y p . S F 9 7 5 t y p . S F 11 2 0 t y p . S F 1 2 4 0 t y p . S F 1 2 8 0 t y p . S F LE V E L 1 B E D J R 1 x 1 B E D 1 + B E D 2 x 2 B E D 2 x 2 + B E D 3 x 2 B E D T O T A L CO U N T PR E L I M I N A R Y U N I T M I X G 04EGRESS DIAGRAMSXG 03EGRESS DIAGRAMSXA 01.1CODE ANALYSISXA 01PROJECT DATA / SHEET INDEXXXXA 00COVER SHEETXXXGENERAL SCARLETT DR. BU I L D I N G T A B U L A T I O N TY P E I I I A O V E R T Y P E 1 A 4 & 5 S T O R I E S O V E R P A R K I N G TY P E l l l A O V E R T Y P E 1 A ST O R Y / H E I G H T P R O P O S E D 3 S T O R I E S O V E R P A R K I N G ST O R Y / H E I G H T A L L O W E D 5 S T O R I E S O V E R P A R K I N G R- 2 R E S I D E N T I A L U N I T S A- 3 R E S I D E N T I A L A M E N I T I E S OC C U P A N C Y G R O U P S S - 2 P A R K I N G G A R A G E SP R I N K L E R S F U L L Y S P R I N K L E R E D ( N F P A 1 3 S Y S T E M ) CO N S T R U C T I O N T Y P E S I A , 1 1 1 A SE T B A C K R E Q U I R E M E N T S 20 ’ S T O R M W A T E R E A S E M E N T S E T B A C K A T D E MA R C U S B L V D . MA X I M U M H E I G H T 5 S T O R I E S O V E R P A R K I N G DE N S I T Y A B O V E 2 5 . 1 D U / A C SI T E A R E A 1 0 2 , 6 7 0 PR O J E C T U S E RE S I D E N T I A L , R E S I D E N T I A L S U P P O R T A N D PR I V A T E A M E N I T Y , P A R K I N G LA N D U S E H I G H D E N S I T Y R E S I D E N T I A L SP E C I F I C P L A N TR A N S I T C E N T E R D E S I G N A T E D A S P L A N N I N G SU B - A R E A W I T H I N E A S T E R N D U B L I N S P E C I F I C PL A N ZO N I N G D I S T R I C T DU B L I N T R A N S I T C E N T E R - G E N E R A L P L A N / SP E C I F I C P L A N A M E N D M E N T S S T A G E 1 P L A N N E D DE V E L O P M E N T R E Z O N I N G 2 0 0 2 AS S E S S O R S P A R C E L N U M B E R 9 8 6 - 0 0 3 4 - 0 0 9 - 0 0 PR O J E C T A D D R E S S CO R N E R O F D E M A R C U S B L V D . A N D C A M P B E L L LA N E , D U B L I N , C A PR O J E C T N A M E D U B L I N S T A T I O N LA N D S C A P E A R E A S 4 5 , 0 5 9 BI C Y C L E P A R K I N G 1 5 0 PA R K I N G S C H E D U L E 3 3 0 TO T A L U N I T S 2 2 0 LO T C O V E R A G E + / - 8 0 % PR O J E C T D E N S I T Y 9 3 D U / A C R E 13 0 C l a s s 1 b i k e p a r k i n g s t al l s - ( 1 C l a s s I s p a c e s : 1 D U + 1 C l a s s I s p a c e : e v e r y 4 D U o v e r 1 0 0 ) Re q u i r e d ( T i t l e 2 4 ) : 1 3 0 11 , 6 6 5 13 0 LE V E L A R E A T O T A L CO U N T BI C Y C L E P A R K I N G ( W A L L M O U N T E D ) - 3 % o f a l l p r o v i d e d p a r k i n g ( 3 3 0 st a l l s ) = 1 1 E V c h a r g i n g s t a t i o n s th e f o l l o w i n g ( p e r C A G r e e n Bu i l d i n g C o d e S e c t i o n 4 . 1 0 6 ) : El e c t r i c a l V e h i c l e P a r k i n g - p r o v i d e i n f r a s t r u ct u r e f o r f u t u r e E V c h a r g i n g s t a t i o n s f o r EV P A R K I N G To t a l r e q u i r e d H C A c c e s i b l e pa r k i n g : 9 a c c e s s i b l e s t a l l s 2% o f r e s i d e n t i a l p a r k i n g ( 2 8 0 st a l l s ) ; 6 a c c e s s i b l e s t a l l s 5% o f g u e s t p a r k i n g ( 5 0 s t al l s ) : 3 a c c e s s i b l e s t a l l s ii i : A c c e s s i b l e r e q u i r e m e n t s : ii : 3 3 0 s t a l l c o u n t i n c l u d e s a c c e s s i b l e p a r k i n g r e q u i r e m e n t s a n d 1 5 % g u e s t p a r k i n g ( 5 0 s t a l l s ) i: 1 . 5 s p a c e s p e r D U = 1 . 5 x 2 2 0 = 3 3 0 TA R G E T P A R K I N G M I X SP A C E S P E R 1 0 0 0 s q f t o f B U I L D I N G 0 . 8 3 SP A C E S P E R U N I T 1 . 5 0 % 6 . 4 % 3 2 . 1 % 4 9 . 7 % 3 . 3 % 2 . 7 % 1 0 0 . 0 % To t a l R e q u i r e d H C A c c e s s i b l e P a r k i n g 9 TO T A L 21 1 0 6 1 6 4 1 1 9 33 0 Un a s s i g n e d A c c e s s i b l e P a r k i n g 5% 3 Un a s s i g n e d / G u e s t P a r k i n g 15 % 5 0 111 5 5 7 1 1 5 6 15 8 As s i g n e d A c c e s i b l e P a r k i n g 2% 6 210 5 1 9 3 1 5 3 17 2 As s i g n e d P a r k i n g 2 8 0 8' x 1 7 ' 9 ' x 1 7 ' 9 ' x 1 8 ' 9 ' X 1 8 ' LE V E L C O M P A C T S T A N D A R D E V A D A T O T A L CO U N T PE R C E N T T O T A L H C ST A L L S PA R K I N G S C H E D U L E A C C E S S I B L E P A R K I N G C A L C U L A T I O N S 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 12Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:01 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt CODE ANALYSIS16036 A 01.1MSCheckerDUBLIN STATION DEMARCUS BOULEVARD BU I L D I N G A N A L Y S I S 1.BUILDING DESCRIPTION THE PROJECT IS COMPOSED OF (1) INDEPENDENT BUILDING ON ONE PARCEL. THE SITE IS LOCATED ALONG DUBLIN BLVD BETWEEN DEMARCUS BLVD AND CAMPBELL LANE • COMPOSED OF 2 ABOVE GRADE LEVELS IN TYPE IA CONSTRUCTION, COMPOSED OF A COMBINATION OF S-2 PARKING GARAGE, AMENITIES AND R-2 ACCESSORY SPACES • ABOVE THE PODIUM a. TYPE VA AT LEVELS 3-5 ON THE WEST / SOUTH BUILDING b. TYPE IIIA AT LEVELS 3-7 ON THE EAST AND CENTER TOWERS • BUILDING OCCUPANCIES ARE GROUP R-2, GROUP S-2, GROUP A-3 2.OCCUPANCY AND CONSTRUCTION TYPE (CHAPTER 3)LEVEL 1 & LEVEL 2 – CONSTRUCTION TYPE 1A • PARKING GARAGE (2 STORY)OCCUPANCY: S-2 • RESIDENTIAL AMENITY AND ACCESSORY SPACES OCCUPANCY: R-2, A-3 ACCESSORY LEVEL 3-7 – CONSTRUCTION TYPE IIIA AND VA • RESIDENTIAL OCCUPANCY: A-3, R-2 3.HORIZONTAL BUILDING SEPARATION ALLOWANCE / SPECIAL PROVISIONS (SECTION 510.2)THE TWO STORIES ABOVE GRADE PLANE (TYPE IA CONSTRUCTION) SHALL BE CONSIDERED A SEPARATE AND DISTINCT BUILDING FROM THE STORIES ABOVE (TYPE IIIA AND VA) FOR THE FOLLOWING PURPOSES:• DETERMINING AREA LIMITATIONS • CONTINUITY OF FIRE WALLS • LIMITATION OF NUMBER OF STORIES • TYPE OF CONSTRUCTION 4.AUTOMATIC SPRINKLER SYSTEM (SECTION 903)PROJECT TO BE FULLY SPRINKLERED, NFPA 13 SYSTEM, IN ACCORDANCE WITH SECTION 903 6.MIXED USE AND OCCUPANCY • ACCESSORY OCCUPANCIES SHALL BE INDIVIDUALLY CLASSIFIED IN ACCORDANCE WITH SECTION 302.1. THE REQUIREMENTS OF THIS CODE SHALL APPLY TO EACH PORTION OF THE BUILDING BASED ON THE OCCUPANCY CLASSIFICATION OF THAT SPACE. (SECTION 508.2)• ALLOWABLE BUILDING HEIGHT AND NUMBER OF STORIES OF THE BUILDING CONTAINING THE ACCESSORY OCCUPANCIES SHALL BE IN ACCORDANCE WITH SECTION 504 FOR THE MAIN OCCUPANCY OF THE BUILDING.• THE ALLOWABLE AREA OF THE BUILDING SHALL BE BASED ON THE APPLICABLE PROVISIONS OF SECTION 506 FOR THE MAIN OCCUPANCY OF THE BUILDING. AGGREGATE ACCESSORY OCCUPANCIES SHALL NOT OCCUPY MORE THAN 10 PERCENT OF THE FLOOR AREA IF THE STORY IN WHICH THEY ARE LOCATED.7.ALLOWABLE BUILDING AREA CALCULATION TYPE lllA CONSTRUCTION: LEVELS 3-7 ON THE EAST AND CENTER TOWERS BUILDING COMPARTMENT 1:FRONTAGE INCREASE CALCULATION:W = (L1 × w1 + L2 × w2 + L3 × w3…)/F W= (128’ x 30’ + 69’-4” x 30)/ 197’-4”W= 30 AMOUNT OF INCREASE:If = [F/P - 0.25]W/30 If = [197’-4”/525’ - 0.25] 30/30 If = 0.13 ALLOWABLE BUILDING AREA SINGLE-OCCUPANCY, MULTISTORY BUILDING Aa = [At + (NS × If)] × Sa Aa = [24,000 + (24,000 × 0.13)] × 2 Aa = 54,240 SF = MAX ALLOWABLE BUILDING AREA BUILDING COMPARTMENT 2:FRONTAGE INCREASE CALCULATION:W = (L1 × w1 + L2 × w2 + L3 × w3…)/F W = (149’ x 22’ + 75’ x 30’)/224' = 10.218 W= 30 AMOUNT OF INCREASE:If = [F/P - 0.25]W/30 If = [224’/541’’ - 0.25] 30/30 If = 0.16 ALLOWABLE BUILDING AREA SINGLE-OCCUPANCY, MULTISTORY BUILDING Aa = [At + (NS × If)] × Sa Aa = [24,000 + (24,000 × 0.16)] × 2 Aa = 55,680 SF = MAX ALLOWABLE BUILDING AREA 12 . E X I T I N G P R O V I S I O N S OC C U P A N T L O A D S A B O V E W H I C H RE Q U I R E T W O M E A N S O F E G R E S S A S P E R T A B L E 1 0 0 6 . 2 . 1 OC C U P A N C Y LO A D A- 3 4 9 O C C U P A N T S R- 2 1 0 O C C U P A N T S S- 2 2 9 O C C U P A N T S SE P A R A T I O N D I S T A N C E B E T W E E N S T A I R W A Y S M U S T B E N O L E S S T H A N 1 / 3 RD T H E L E N G T H O F M A X I M U M D I A G O N A L O F T H E AR E A S E R V E D P E R 1 0 0 7 . 1 . 2 E X C E P T I O N 2 , P R O V I D E D T H E B U I L DI N G I S E Q U I P P E D W I T H N F P A 1 3 O R N F P A 1 3 R S P R I N K L E R S CO M M O N P A T H O F E G R E S S T R A V E L ( S E C T I O N 1 0 0 6 . 2 . 1 ) OC C U P A N C Y LE N G T H A- 3 7 5 ’ W I T H N F P A 1 3 S P R I N K L E R S Y S T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A R- 2 1 2 5 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A S- 2 1 0 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 0 6 . 2 . 1 F O O T N O T E A EX I T A C C E S S T R A V E L D I S T A N C E ( S E C T I O N 1 0 1 7 ) OC C U P A N C Y LE N G T H A- 3 2 5 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E B R- 2 2 5 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E B S- 2 4 0 0 ’ W I T H N F P A 1 3 S P R I N K L E R S YS T E M P E R T A B L E 1 0 1 7 . 2 F O O T N O T E C AC C E S S I B L E M E A N S O F E G R E S S AN A C C E S S I B L E M E A N S O F E G R E S S S H A L L BE P R O V I D E D I N A T L E A S T T H E S A M E N U MB E R A S T H O S E S P E C I F I E D I N C H A P T E R 10 0 7 . 1 . 1 A N D 1 0 0 6 . 1 – S E E A B O V E F O R R E Q U I R E D N U M B E R O F E X I T S B A S E D O N O C C U P A N T L O A D . A H O R I Z O N T A L E X I T W I L L B E PR O V I D E D I N L I E U O F E L E V A T O R T O M E E T TH E A C C E S S I B L E M E A N S O F E G R E S S R E Q U I R E M E N T S PE R S E C T I O N 1 0 0 9 . 2 . 1 E X C E P T I O N 1 . H O R IZ O N T A L E X I T S A R E P R O V I D E D A T T H E F I R E W A L L S . S E E P L A N S A N D S E C T I O N 1 2 FO R L O C A T I O N S DE A D E N D C O R R I D O R S PE R 1 0 2 0 . 4 E X C E P T I O N 2 , R - 2 O C C U P A N C I E S A R E A L L O W E D 5 0 F T . D E A D E N D S W H E R E T H E B U I L D I N G I S E Q U I P P E D TH R O U G H O U T W I T H A N A U T O M A T I C S P R I N K L E R S Y S T E M . A 4 8 ” C L E A R W I D T H A T A S T A I R W A Y I S N O T E R E Q U I R E D P E R S E C T I O N 1 0 0 9 . 3 E X C E P T I O N 2 AR E A S O F R E F U G E A R E N O T R E Q U I R E D P E R S E C T I O N 1 0 0 9 . 3 E X C E P T I O N 5 & 8 10 0 9 . 2 – C O N T I N U I T Y O F E X I T S – C H E C K F O R P O D I U M 13 . F I R E W A L L S ( S E C T I O N 7 0 6 ) 14 . A C C E S S I B I L I T Y PR O J E C T I S A P R I V A T E L Y F U N D E D D E V E L O P M E N T , T H E R E F O R E ; § R E S I D E N T I A L O C C U P A N C I E S I N A L L N E W L Y C O N S T R U C T I O N C O V E R E D M U L T I - F A M I L Y D W E L L I N G U N I T S S H A L L M E E T T H E RE Q U I R E M E N T S O F C H A P T E R 1 1 A H O U S I N G A C C E S S I B I L I T Y § R E S I D E N T I A L U N I T B A T H R O O M S : BA T H R O O M S I N 1 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H O P T I O N 2 P E R C B C S E C T I O N 1 1 3 4 A . 2 . 2N D B A T H R O O M S I N 2 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H O P T I O N 2 P E R C B C S E C T I O N 1 1 3 4 A . 2 MA S T E R B A T H R O O M S I N 2 - B E D R O O M U N I T S S H A L L C O M P L Y W I T H I T E M S 7 - 1 2 O F C B C S E C T I O N 1 1 3 4 A . 2 O P T I O N 2 . § C O M M O N U S E F A C I L I T I E S ( S U C H A S L O B B I E S , S H A R E D A M E N I T Y S P A C E S , C O M M O N T O I L E T R O O M S ) S H A L L M E E T T H E RE Q U I R E M E N T S O F C H A P T E R 1 1 2 7 A 15 . L I G H T A N D V E N T I L A T I O N PR O J E C T T O C O M P L Y W I T H C B C S T A N D A R D S F O R L I G H T A N D V E N T I L A T I O N A T H A B I T A B L E R O O M S . P E R S E C T I O N 1 2 0 5 . 2 . 1 N A T U R A L LI G H T I N A N Y R O O M I S P E R M I T T E D T O B E CO N S I D E R E D A S A P O R T I O N O F A N A D J O I N I N G R O O M W H E R E O N E - H A L F O F T H E A R E A O F TH E C O M M O N W A L L I S O P E N A N D U N O B S T R U C T E D A N D P R O V I D E S A N O P E N I N G O F N O T L E S S T H A N 1 / 1 0 TH O F T H E F L O O R A R E A O F TH E I N T E R I O R R O O M O R 2 5 S Q F T , W H I C H E V E R I S G R E A T E R . 16 . P L U M B I N G F I X T U R E C O U N T S CA L I F O R N I A P L U M B I N G C O D E 2 0 1 6 T A B L E A “ O C C U P A N T L O A D F A C T O R " A P P L I E S . * P E R T A B L E 2 9 0 2 . 1 N O T E 3 ; W H E N D E S I G N O C C U P A N T L O A D I S L E S S T H A N 1 0 P E R S O N S , A F A C I L I T Y U S A B L E B Y E I T H E R S E X MA Y B E A P P R O V E D B Y T H E B U I L D I N G O F F I C I A L . 17 . E M E R G E N C Y R E S P O N D E R R A D I O C O V E R A G E R E Q U I R E M E N T PE R 2 0 1 6 C A F I R E C O D E S E C T I O N 5 1 0 , PR O J E C T T O P R O V I D E A P P R O V E D R A D I O C O V E R A G E F O R E M E R G E N C Y R E S P O N D E R S . PR O J E C T T O A L L O W F O R I N S T A L L A T I O N O F A N E M E R G E N C Y R E S P O N D E R S R A D I O C O V E R A G E S Y S T E M . U P O N C O N S T R U C T I O N CO M P L E T I O N , R A D I O T E S T S H A L L B E C O N D U C T E D T O D E T E R M I N E I F A N E M E R G E N C Y R E S P O N D E R S R A D I O C O V E R A G E S Y S T E M S H A L L BE I N S T A L L E D . 18 . E M E R G E N C Y E S C A P E A N D R E S C U E W I N D O W S ( P E R C B C S E C T I O N 1 0 3 0 ) § T Y P E V A C O N S T R U C T I O N : R E Q U I R E D I N G R O U P R O C C U P A N C Y S L E E P I N G R O O M S B E L O W T H E F O U R T H S T O R Y A B O V E GR A D E P L A N E , S E E F L O O R P L A N S L E G E N D F O R E M E R G E N C Y E G R E S S S Y M B O L A N D F L O O R P L A N S F O R L O C A T I O N S . § T Y P E 1 & I I I A C O N S T R U C T I O N : E M E R G E NC Y E S C A P E A N D R E S C U E WI N D O W S A R E N O T R E Q U I R ED I N R - 2 O C C U P A N C Y SL E E P I N G R O O M S , P E R 1 0 3 0 E X C E P T I O N 1 § S E E W I N D O W S C H E D U L E G E N E R A L N O T E S F O R W I N D O W S I Z E R E Q U I R E M E N T S 19 . E N C R O A C H M E N T S SE C T I O N 3 2 0 2 . 3 . 3 S T A T E S E N C R O A C H M E N T S 1 5 ’ O R M O R E A B O V E G R A D E S H A L L N O T B E L I M I T E D BU I L D I N G C O M P A R T M E N T 3 : FR O N T A G E I N C R E A S E C A L C U L A T I O N : W = ( L 1 × w 1 + L 2 × w 2 + L 3 × w 3 … ) / F W= ( 1 1 8 ’ x 3 0 ’ ) / 1 1 8 ’ W= 3 0 AM O U N T O F I N C R E A S E : If = [ F / P - 0 . 2 5 ] W / 3 0 If = [ 1 1 8 ’ / 3 7 3 ’ - 0 . 2 5 ] 3 0 / 3 0 If = 0 . 0 6 AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 2 4 , 0 0 0 + ( 2 4 , 0 0 0 × 0 . 0 6 ) ] × 2 Aa = 5 0 , 8 8 0 = M A X A L L O W A B L E B U I L D I N G A R E A BU I L D I N G C O M P A R T M E N T 4 : *N O F R O N T A G E I N C R E A S E T A K E N AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 2 4 , 0 0 0 + ( 2 4 , 0 0 0 × 0 ) ] × 2 Aa = 4 8 , 0 0 0 = M A X A L L O W A B L E B U I L D I N G A R E A TY P E V A C O N S T R U C T I O N : L E V E L S 3 - 5 O N T H E S O U T H / W E S T B U I L D I N G BU I L D I N G C O M P A R T M E N T 5 : *N O F R O N T A G E I N C R E A S E T A K E N AL L O W A B L E B U I L D I N G A R E A SI N G L E - O C C U P A N C Y , M U L T I S T O R Y B U I L D I N G Aa = [ A t + ( N S × I f)] × S a Aa = [ 3 6 , 0 0 0 + ( 1 2 , 0 0 0 × 0 ) ] × 2 Aa = 7 2 , 0 0 0 = M A X A L L O W A B L E B U I L D I N G A R E A 8. O C C U P A N C Y S E P A R A T I O N ( T A B L E 5 0 8 . 4 ) OC C U P A N C Y SE P A R A T I O N R E Q D SE P A R A T I O N P R O V I D E D S- 2 T O R - 2 1 H R 3 H R S- 2 T O A - 3 N O N E - R- 2 T O A - 3 1 H R 1 H 9. F I R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S ( T A B L E 6 0 1 A N D 6 0 2 ) FI R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S F O R B U I L D I N G E L E M E N T S ( T A B L E S 6 0 1 ) BU I L D I N G E L E M E N T TY P E I A TY P E I I I A TY P E V A ST R U C T U R A L F R A M E 3 H R 1 H R 1 H R EX T E R I O R B E A R I N G W A L L 3 H R 2 H R 1 H R IN T E R I O R B E A R I N G W A L L 3 H R 1 H R 1 H R EX T E R I O R N O N - B E A R I N G W A L L S E E B E L O W F O R R E Q U I R E M E N T S F O R E X T E R I O R W A L L S B A S E D O N S E P A R A T I O N IN T E R I O R N O N - B E A R I N G W A L L 0 H R 0 H R 0 H R FL O O R 2 H R 1 H R 1 H R RO O F 1 . 5 H R 1 H R 1 H R *N O T E : AL L E X T E R I O R W A L L S I N T H E T Y P E I I I A C O N S T R U C T I O N T O B E 2 H R R A T E D AL L E X T E R I O R W A L L F R A M I N G A N D P L Y W O O D S H E A T H I N G I N T H E T Y P E I I I A C O N S T R U C T I O N T O B E F I R E R E T A R D A N T T R E A T E D (F R T ) FI R E R E S I S T A N C E R A T I N G R E Q U I R E M E N T S F O R E X T E R I O R W A L L S B A S E D O N S E P A R A T I O N ( T A B L E 6 0 2 ) FI R E S E P A R A T I O N D I S T A N C E ( F T ) T Y P E I A T Y P E I I I A T Y P E V A X < 5 ' 1 H R * 1 H R * 1 H R * 5' T O 1 0 ' 1 H R * 1 H R 1 H R 10 ' T O 3 0 ' 1 H R 1 H R 1 H R 30 ' < X N O N E N O N E N O N E FI R E R E S I S T A N C E R A T I N G B A S E D O N W A L L T Y P E S : WA L L T Y P E T Y P E I A T Y P E I I I A T Y P E V A SH A F T E N C L O S U R E S 2 H R 2 H R 2 H R EX I T E N C L O S U R E S 2 H R 2 H R 2 H R CO R R I D O R W A L L S , A N D 1 H R 1 H R 1 H R WA L L S S E P A R A T I N G D W E L L I N G U N I T S 10 . E X T E R I O R W A L L O P E N I N G P R O T E C T I O N MA X I M U M A R E A O F E X T E R I O R W A L L O P E N I N G B A S E D O N F I R E S E P A R A T I O N D I S T A N C E P E R T A B L E 7 0 5 . 8 FI R E S E P A R A T I O N D I S T . ( F T ) O P E N I N G P R O T E C T I O N A L L O W A B L E A R E A X < 3 ' U P , S N O T P E R M I T T E D 3' T O 5 ' U P , S 1 5 % 5' T O 1 0 ' U P , S 2 5 % 10 ' T O 1 5 ' U P , S 4 5 % 15 ' T O 2 0 ' U P , S 7 5 % 20 ' T O 2 5 ' U P , S N O L I M I T 11 . P A R K I N G G A R A G E S- 2 O C C U P A N C Y R E Q U I R E M E N T S ( S E C T I O N 4 0 6 ) PA R K I N G G A R A G E I S C L A S S I F I E D A S E N C L O S E D ( 4 0 6 . 2 ) VE N T I L A T I O N : M E C H A N I C A L V E N T I L A T I O N S Y S T E M T O B E P R O V I D E D I N A C C O R D A N C E W I T H T H E C A M E C H A N I C A L C O D E . SE E M E C H A N I C A L D R A W I N G S VE H I C L E B A R R I E R S R E Q U I R E D ( S E C T I O N 4 0 6 . 4 . 3 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 13Attachment: 1. Project Plans (Transit Center Site A-3) UP DN UP DN 3 3 3 3 3 3 3 3 3 3 3 3 3 EXIT STAIR 1 EX I T S T A I R 3 EL E V A T O R S ELEVATORS VE H I C L E E N T R Y * ** * *EXIT STAIR 2 EGRESS SEPERATION 300' - 4" > MIN. 141'-0" MAX. DIAGONAL LENGTH 423'-0" EX I T A T G R A D E E X I T A T G R A D E RESIDENTIAL UNITS R-2 238333 3 3 4 3 3 3 1 5 1 149 2 1 6 6 34 19 17187FITNESS ROOM A-3 LEASING OFFICE B PA R K I N G S- 2 1 SK A - 3 1 a EGRESS SEPARATION 224' - 9" > MIN. 141'-0" MAX. DIAGONAL LENGTH 423'-0" EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EXIT ACESS TRAVEL = 139'-0"RESIDENTIAL UNITS R-2 3 9 PA R K I N G S- 2 3 3 4 3 3 33 3 5 5 3 1 6 2 163 18 1 14 171 1 SK A - 3 1 a 7 9 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N 1 1 1 ' - 2 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N 9 9 '-7 " > 1 /3 O F T H E D I A G . E G R E S S S E P A R A T I O N 103'-0" > 1/3 OF THE DIAG. EGRESS SEPARATION > 1/3 OF THE DIAG. EGRESS SEPERATION EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 2 9 ' - 7 " EX I T A C E S S TR A V E L = 1 2 6 ' - 6 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " EX I T A C E S S TR A V E L = 1 0 0 ' - 6 " EX I T A C E S S TR A V E L = 1 4 2 ' - 0 " EX I T A C E S S TR A V E L = 1 3 8 ' - 0 " RE S I D E N T I A L U N I T S R- 2 6 23 AM E N I T Y R- 2 39 38 444 385 6 5 5 4 3 4 4 4 4 4 4 5 3 4 5 5 2 8 AM E N I T Y R- 2 5 5 5 5 3 3 3 3 4 5 5 5 7 3 6 4 4 4 5 5 4 5 5 6 4 6 3 0 61 11 0 10 4 49 33 H. E . H. E . H. E . H. E . H. E . USED FOR FRONTAGE INCREASE 75' - 0" US E D F O R F R O N T A G E I N C R E A S E 15 7 ' - 7 " 1 SK A - 3 1 a 1 0 3 ' - 0 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N EX I T A C E S S T R A V E L = 1 0 7 ' - 0 " EX I T A C E S S T R A V E L = 1 2 9 ' - 7 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " RE S I D E N T I A L U N I T S R- 2 23 34 AM E N I T Y R- 2 54445 6 5 5 4 3 4 4 4 4 4 4 5 3 4 5 5 3 5 5 5 7 6 3 54 36 14 3 3 3 23 90 OU T D O O R L O U N G E R- 2 EX I T A C E S S TR A V E L = 1 4 7 ' - 0 " 7 9 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N 1 1 1 ' - 2 " > 1 / 3 O F T H E D I A G . E G R E S S S E P A R A T I O N 9 9 '-7 " > 1 /3 O F T H E D I A G . E G R E S S S E P A R A T I O N H. E . H. E . H. E . RO O F A C C E S S 2 - H R R A T E D ST A I R E N C L O S U R E NO T E : NO N - S T O R Y NO S E C O N D E G R E S S RE Q U I R E D RO O F A T LE V E L 6 1 SK A - 3 1 a LEGEND 3 HR RATED FIRE BARRIER / FIRE WALL 0 EXIT ACCESS TRAVEL DISTANCE AND COMMON PATH OF EGRESS TRAVELEGRESS ROUTEOCCUPANT LOAD0 COMBINED NUMBER OF OCCUPANTS AT EXIT OCCUPANT LOAD (PER TABLE 1004.1.1)OCCUPANT LOAD FACTOR - OCCUPANCY 200 G.S.F. - RESIDENTIAL (R-3)50 G.S.F.- FITNESS (A-3)15 G.S.F.- AMENITY (R-2)100 G.S.F.- LEASING (B)200 G.S.F.- PARKING (S-2)300 G.S.F.- MEP (S-2)HORIZONTAL EXITH.E.CODE REFERENCE KEYNOTES2 HR RATED FIRE BARRIER 1 HR RATED FIRE BARRIER *EXITBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:36:00 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedEGRESS DIAGRAMS16036 G 03AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 1 " = 4 0 ' - 0 " G 0 3 1 EX I T D I A G R A M F L O O R P L A N L E V E L 1 1 " = 4 0 ' - 0 " G 0 3 2 EX I T D I A G R A M F L O O R P L A N L E V E L 2 1 " = 4 0 ' - 0 " G 0 3 3 EX I T D I A G R A M F L O O R P L A N L E V E L S 3 - 5 1 " = 4 0 ' - 0 " G 0 3 4 Le v e l 6 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 14Attachment: 1. Project Plans (Transit Center Site A-3) 3 3 3 3 3 3 3 33SDN 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3333SS SSSSS EX I T A C E S S T R A V E L = 1 0 6 ' - 0 " EX I T A C E S S TR A V E L = 1 2 8 ' - 0 " RE S I D E N T I A L U N I T S R-2 23 22 29 30 EX I T A C E S S TR A V E L = 1 4 7 ' - 0 " 54445119 5 3 4 5 5 3 5 5 5 7 6 3 3 3EXIT ACESS TRAVEL = 78'-0"7 0 '-1 0 " > 1 /3 O F T H E D I A G .E G R E S S S E P A R A T I O N M AX . D IA GONA L L EN GT H 23 4' - 6" M A X . D I A G O N A L L E N G T H 2 0 9 ' - 0 "H.E. H. E . 1 SK A - 3 1 a LEGEND 3 HR RATED FIRE BARRIER / FIRE WALL 0 EXIT ACCESS TRAVEL DISTANCE AND COMMON PATH OF EGRESS TRAVELEGRESS ROUTEOCCUPANT LOAD0 COMBINED NUMBER OF OCCUPANTS AT EXIT OCCUPANT LOAD (PER TABLE 1004.1.1)OCCUPANT LOAD FACTOR - OCCUPANCY 200 G.S.F. - RESIDENTIAL (R-3)50 G.S.F.- FITNESS (A-3)15 G.S.F.- AMENITY (R-2)100 G.S.F.- LEASING (B)200 G.S.F.- PARKING (S-2)300 G.S.F.- MEP (S-2)HORIZONTAL EXITH.E.CODE REFERENCE KEYNOTES2 HR RATED FIRE BARRIER 1 HR RATED FIRE BARRIER *EXIT RO O F A C C E S S 2 - H R R A T E D ST A I R E N C L O S U R E NO T E : NO N - S T O R Y NO S E C O N D E G R E S S RE Q U I R E D RO O F A T LE V E L 7 ROOF 1 SK A - 3 1 a BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:38:59 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedEGRESS DIAGRAMS16036 G 04AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 1 " = 4 0 ' - 0 " G 0 4 1 EX I T D I A G R A M F L O O R P L A N L E V E L 7 1 " = 4 0 ' - 0 " G 0 4 2 EX I T D I A G R A M R O O F P L A N 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 15Attachment: 1. Project Plans (Transit Center Site A-3) DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL TITLE SHEET C0.0 3.2.a Packet Pg. 16 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) NOTES:LEGEND: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EXISTING CONDITIONS PLAN C1.0 3.2.a Packet Pg. 17 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC C C 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C CC 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE GARAGE FITNESS ROOM LEASING OFFICE LOBBY ELECTRICAL ROOM TRASHTRASHFIRE ROOM WEST FRONTAGE: CAMPBELL LANE 1"=5'A NORTH FRONTAGE: PRIVATE DRIVE 1"=5'B EAST FRONTAGE: DEMARCUS BLVD 1"=5'C SOUTH FRONTAGE: CAMPBELL LANE 1"=5'D SITE PLAN LEGEND: SITE PLAN NOTES: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL CIVIL SITE PLAN C2.0 3.2.a Packet Pg. 18 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC C C 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C CC 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE LEGEND:GRADING NOTES: DRIVEWAY DETAIL 1"=10' DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL GRADING PLAN C3.0 3.2.a Packet Pg. 19 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC C C 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C CC 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE LEGEND: NOTES: DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL UTILITY PLAN C4.0 3.2.a Packet Pg. 20 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) SLOPE SLOPE SLOPE S L O P E S L O P E S L O P E S L O P E SLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE S L O P E SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE SLOPE SLOPE S L O P E SLOPE S L O P E SLOPE S L O P E SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SLOPE SLOPE S L O P E S L O P E SLOPE SLOPE S L O P E CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE NOTES:LEGEND: STORMWATER CONTROL PLAN C5.0 DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 3.2.a Packet Pg. 21 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) 1 FLOW-THRU PLANTER NTS 2 STORMWATER FILTER NTS STORMWATER CONTROL DETAILS C5.1 DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 3.2.a Packet Pg. 22 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) UP UP 6%12% CCCCCCCCCCCCCCCCCCC CCC CCCCCCC CC C C 8% 3' - 0"3' - 0" 0' - 0" 0' - 0"0' - 0" 3' - 0" 3' - 0" 0' - 0" 0' - 0" 6% 1' - 0" 0' - 0" 8% CCC 1' - 7"0' - 8" 1' - 0" 0' - 9" C CCCCCCCCC CC C C CC 1' - 10" 1'-6" 1'-6" CAMPBELL LANE DEMARCUS BOULEVARD CAMPBELL LANE x x x x x x x x x x x x x x x x x x x x x x x xx x xxxx xx xxx x xxx x xxxxxxxx xxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x GARAGE FITNESS ROOM LEASING OFFICE LOBBY ELECTRICAL ROOM TRASHTRASHFIRE ROOM DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EROSION CONTROL PLAN C6.0 3.2.a Packet Pg. 23 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) DRAWNBY C P HECKEDBY ROJECTNO DATE ISSUE DRA C P HE RO DA SCALE:AS NOTED DUBLIN, CA SITE A-3 3/16/2017 10:18:30 AM C:\Autodesk\16036 UDR Dublin-CENTRAL_alink.rvt 16036 ENTITLEMENTS DUBLIN STATION DEMARCUS BOULEVARD ACM JCJ 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL EROSION CONTROL NOTES AND DETAILS C6.1 3.2.a Packet Pg. 24 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL L1.00 ILLUSTRATIVE SITE PLAN LANDSCAPE SITE PLAN PERCENT LANDSCAPING LEGEND GROUND LEVEL: 69.9% HARDSCAPE, 18,850 SF 25.5% PLANTING AREA, 6,881 SF 3.9% BIORETENTION PLANTER, 1,042 SF 0.7% ARTIFICAL TURF, 185 SF PODIUM: 52.2% HARDSCAPE, 12,778 SF 25.8% RAISED PLANTER, 6,308 SF 11.5% BIORETENTION PLANTER, 2,809 SF 5.5% ARTIFICIAL TURF, 1,355 SF 5.0% POOL, 1,210 SF DE M A R C U S B O U L E V A R D EAST PODIUM COURTYARD WEST PODIUM COURTYARD CA M P B E L L L A N E W E S T CAMPBELL LANE SOUTH SHARED PRIVATE DRIVE CAMELLIA PLACE scale: 1” = 20’N PL PL PLPL GENERAL NOTES: 1. ALL IRRIGATION AT SHRUB AND GROUNDCOVER PLANTINGS TO BE DRIP IRRIGATION. INDIVIDUAL BUBBLERS WILL BE PROVIDED AT TREE PLANTINGS. 2. ALL PLANTING AREAS TO INCLUDE 3” LAYER OF 3/8” BLACK MINI-CHIP MULCH 3. SOIL ANALYSIS TO BE SUBMITTED WITH FINAL LANDSCAPE PLAN WITH BUILDING PERMIT/IMPROVEMENT PLANS 4. MAINTENANCE RESPONSIBILITY FALLS TO OWNER FOR SITE AND SIDEWALK DIRECTLY ADJACENT TO THE BUILDING. THE CITY IS RESPONSIBLE FOR THE STREET AND ANY MEDIAN ISLANDS L3.00L5.00 L2.00 L4.00 SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE 3.2.a Packet Pg. 25 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL SHARED PRIVATE DRIVE STREETSCAPE PLAN AS SHOWN L2.00 1111 FA C E O F B U I L D I N G 15 1 3 ’ - 4 ” 11’-0” 10’-0” 7’-1”1 4 ’ - 6 ” 6’ - 0 ” 7’ - 9 ” 2’ - 8 ” 14 ’ - 2 ” 8’ - 9 ” 1 1 ’ - 1 0 ” 1 0 ’ - 6 ” 1 Gal, 12” O.C. Sedum rubrotinctum Jelly-bean Sedum Water Usage: L LANDSCAPE SITE PLAN SHARED PRIVATE DRIVE CAMELLIA PLACE scale: 1” = 10’ scale: 1/4” = 1’ 3’-4”5’-0”8’-0” PARALLEL PARKING (PLANTED BULBOUT BEYOND) 6” CURB 30” MAX. PLANTING HT. SIDEWALKCONCRETE PLANTER 3’-4”*PLANTER DEPTH VARIES A A’ PL PR O P E R T Y L I N E 10’-4” TYP3’-7”5’-8”9’-6”6’-0”15’-6”8’-11”16’-9”6’-0” 2’-0” TYP.37’-2” 26’-0”22’-6”22’-6” 23’-8” TYP.5’-8”4’-0”50’-9” 20’-0” TYP 8’-0” TYP8’-0” TYP 5’-0” TYP 3’-4” TYP N STREETSCAPE SECTION AA’ MATERIALS PLANT PALETTE Limonium californicum Elymus glaucus Echeveria Western Marsh Rosemary BI O R E T E N T I O N ST R E E T S C A P E Blue Wild Rye Raised Concrete Planter/ Bioretention Planter Integral Color Concrete, Color: Southern Blush Echeveria SITE FURNISHINGS 4 5 55 9 1012 12 12 9 9 181818 11 11 A’ A Faceted Steel Bench Modular Concrete Unit Pavers, Color: Foundry Faceted Steel Retaining/ Planter Wall 8 29 29 29 PL PL 1 Gal, 18” O.C. Water Usage: L 5 Gal, 12” O.C. Water Usage: L 5 Gal, 1’-0” O.C. Water Usage: L Amphitheatre Stair Seating 3 33 42 2 23 LIMIT OF WORK PROPERTY LINE Water Usage: L 1 Gal, 12” O.C. Festuca rubra Creeping Red Fescue Water Usage: L 5 Gal, 4’ O.C. Lavandula dentata var. candicans Gray Leaved French Lavender SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN STREET TREES Arbutus unedo Strawberry Tree 24” Box Water Usage: L 19191919 KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST 3.2.a Packet Pg. 26 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL DEMARCUS BLVD STREETSCAPE PLAN L3.00scale: 1” = 10’N scale: 1/4” = 1’ 20’-0” 2’-6” PLANTING 6’ 11’-0” 10’-0”, VARIES10’-0”, VARIES 5’-0”8’-0” PARALLEL PARKING 6” CURB 11’ WALK WITH 5’X5’ SQ TREE WELL PLANTINGPRIVATE FITNESS AREA STORM DRAIN EASEMENT 1’-6”, MAX PL PR O P E R T Y L I N E STREETSCAPE SECTION BB’ ST R E E T S C A P E 20 20 25 16 16 20’-0” 23’-6” O.C.25’-0” O.C., TYP 25’-0” O.C., TYP FA C E O F B U I L D I N G 4 4 4 SITE FURNISHINGS 5’-0” B 22’-6” O.C.22’-6” O.C.22’-6” O.C.24’-0” O.C.12’-6” O.C., TYP 12’-6” O.C., TYP12’-6” O.C., TYP 12’-6” O.C., TYP 5’-0” TW +0” TW +18” TW +18” TW +18” TW +6” TW +0” TW +6” TW +6” TW +6”TW +0” TW +0” TW +0”TW +0” MATCHLINE, SEE L4.00 TW +18” TW +0” 7’-4” 13’-0” 28’-0” 7’-6”9’-2” 4’-6” 6’-0” 5’-8” 1’-8” 6’-3” 15’-10”20’-0”12’-8” 2’-0”15’-5” 8’-0” 6’-0” 2’-6” B B’ B’ 1 1 11111111 1 2 2 2 2 2222222222 2 3 6 6 8 8 8 8 8 8 1111 11 1111 13 13 13 13 13 13 13 13 13 13 11 11 11 23 11 11 11 19 19 19 19 11 11 11 11 DEMARCUS BOULEVARD SH A R E D P R I V A T E D R I V E CA M P B E L L L A N E PL PL ST R E E T S C A P E Water Usage: M Water Usage: L Water Usage: L Water Usage: L 1 Gal, 36” O.C.5 Gal, 48” O.C.1 Gal, 12” O.C. Lomandra longifolia ‘Tanika’Salvia leucantha ‘Midnight’Sempervivum ‘Purple Beauty’ Tanika Lomandra Purple Mexican Sage Hen and Chicks PLANT PALETTE EA S E M E N T 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Raised Concrete Planter/ Bioretention Planter Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Amphitheatre Stair Seating 20’-0” STORM DRAIN EASEMENT Water Usage: L 30’-0” VISIBILITY ZONE, S.C.D. SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. 24” Box Water Usage: M Pyrus calleryana ‘Aristocrat’ Aristocrat Pear Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L MATCHLINE, SEE L3.00 MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST LANDSCAPE SITE PLAN 3.2.a Packet Pg. 27 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CAMPBELL LANE SOUTH STREETSCAPE PLAN AS SHOWN L4.00scale: 1” = 20’N PL 7 7 4 4 24 19 24 20 20 18 12 CAMPBELL LANE SOUTH C C’ C’ C 1 1 3 6 11 2121 14 11 3 11 11 11 5’-0” TYP 6’-0” TYP4’-0” 6’-4”8’-0” 20’-0” 7’-0”TYP11’-5”7’-0” 6’-6”6’-11” 11’-0”7’-7” 10’-8” 6’-0” 5’-11” 1’-0” TYP1’-0” TYP 2’-6” TYP LANDSCAPE SITE PLAN PL DE M A R C U S B O U L E V A R D Water Usage: M Water Usage: LWater Usage: L 1 Gal, 6’ O.C.5 Gal, 4’ O.C.1 Gal, 12” O.C. Passiflora incarnata Lavandula dentata var. candicans Festuca glauca Purple Passionflower Gray Leaved French Lavender Douglas Iris 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Water Usage: L Water Usage: L Raised Concrete Planter/ Bioretention Planter Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Amphitheatre Stair Seating PLANTER ISLAND PARALLEL PARKING (BEYOND) 6” CURB SIDEWALKAT-GRADE PLANTING 2’-6”6’-0”4’-0” 8’-0” 1’6”6” scale: 1/4” = 1’ PR O P E R T Y L I N E STREETSCAPE SECTION CC’PLANT PALETTE ST R E E T S C A P E FA C E O F B U I L D I N G SITE FURNISHINGS 48’-6” SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. 26 Platanus acerifolia ‘Bloodgood’ London Plane Tree 24” Box Water Usage: M Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L MA T C H L I N E , S E E L 4 . 0 0 MA T C H L I N E , S E E L 3 . 0 0 MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST 3.2.a Packet Pg. 28 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CAMPBELL LANE WEST STREETSCAPE PLAN AS SHOWN L5.00 BI O R E T E N T I O N scale: 1” = 20’N PLANT PALETTE BI O R E T E N T I O N LANDSCAPE SITE PLAN 4 4 4 8’-0” 20’-0” 23’-7”4’-0” 9’-8” 22’-0”11’-6”14’-10”TYP 14’-5” 2’-0” 6’-0” 6’-0” 2’-0” 6’-0” 2’-0” 4’-11 ” 4’-0”6’-10”2’-0” 9’-0” 5’-10” 5’-0” TYP TYP ST R E E T S C A P E D’ D 3 3 19 19 19 19 19 11 2828 29 29 11 11 11 11 11 9 9 5 9 3 3 3 21 18 1818 23 27 20 24 24 11 11 3 5’-0” TYP 6’-0” TYP 1’-0” TYP 2’-6” TYP 2’-1” 13 ’ - 1 0 ” 9’- 7 ” 5’- 0 ” 21 21 21 CAMPBELL LANE WEST PL CA M P B E L L L A N E S O U T H SH A R E D P R I V A T E D R I V E 5 Gal, 24” O.C.1 Gal, 12” O.C. Anigozanthos ‘Bush Tango’Sedum rubrotinctum Orange Kangaroo Paw Jelly-bean Sedum Water Usage: LWater Usage: L Limonium californicum Western Marsh Rosemary 1 Gal, 18” O.C. Water Usage: L Water Usage: L 5 Gal, 4’ O.C. Lavandula dentata var. candicans Gray Leaved French Lavender Water Usage: L 1 Gal, 12” O.C. Festuca rubra Creeping Red Fescue scale: 1/4” = 1’ STREETSCAPE SECTION DD’ Raised Concrete Planter/ Bioretention Planter SITE FURNISHINGS Faceted Steel Bench Faceted Steel Retaining/ Planter Wall Concrete Amphitheatre Stair Seating PLANTER ISLAND PARALLEL PARKING (BEYOND) 6” CURB SIDEWALKAT-GRADE PLANTING FA C E O F B U I L D I N G D 2’-6”6’-0”4’-0” 8’-0” 1’6”6” D’ PL PR O P E R T Y L I N E 26 26 SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN LIMIT OF WORK PROPERTY LINE STREET TREES 30” MAX. PLANTING HT. Platanus acerifolia ‘Bloodgood’ London Plane Tree 24” Box Water Usage: M Echeveria Echeveria 5 Gal, 1’-0” O.C. Water Usage: L 22 TYP MATERIALS Integral Color Concrete, Color: Southern Blush Modular Concrete Unit Pavers, Color: Foundry KEY SIDEWALK, INTEGRAL COLOR CONC COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST SIDEWALK, MODULAR CONC UNIT PAVERS MANUF: BELGARD COLOR: FOUNDRY FINISH: SMOOTH SIZE: 6X12 SIDEWALK, CITY STANDARD CONC PARALLEL PARKING TOWNHOME STOOP PUBLIC FLEX SPACE AMPHITHEATRE STAIR SEATING, INTEGRAL COLOR CONCRETE COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST FACETED STEEL BENCH, HEIGHT: 18” FLOW THROUGH PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 1 2 3 4 5 6 7 8 9 PLANTING AREA - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP CITY STD. CROSSWALK (E) RAISED CROSSWALK (E) BULB-OUT (E) UTILITY VAULT UTILITIES (PROPOSED), SCREENED W/PLANTING (E) STREET SIGN (E) LIGHT POLE 11 14 15 16 17 18 19 FACETED STEEL PLANTER HEIGHT: 18” - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 22 12 (E) PLANTER ISLAND 21 GARAGE ENTRY ACCESSIBLE PEDESTRIAN RAMP DEPRESSED CURB WITH BOLLARDS 13 20 23 24 25 26 27 28 29 MODULAR STEEL RETAINING WALL, HEIGHT VARIES: 0”-18” (E) FIRE HYDRANT TRAFFIC BOLLARD CITY STD. CURB RAMP ARTIFICIAL TURF STOOP PLANTER, NATURAL CONCRETE, HEIGHT: 18” FINISH: MED SANDBLAST - 3/8” BLACK MINI-CHIP MULCH, 3” DEEP 10 STREET TREE: Platanus acerifolia ‘Bloodgood’ (E) STREET TREE: Platanus acerifolia ‘Bloodgood’, TBC STREET TREE: Pyrus calleryana ‘Aristocrat’ STREET TREE: Arbutus unedo (E) STREET TREE: Pyrus calleryana ‘Aristocrat’ (E) STREET TREE: Arbutus unedo PRIVATE REALM TREE: Lagerstroemia indica (E) STREET TREE: Laurus nobilis ‘Saratoga’ FUTURE STREET TREE (N.I.C.) INTEGRAL COLOR CONCRETE SEATWALL COLOR: SOUTHERN BLUSH FINISH: MED SANDBLAST 3.2.a Packet Pg. 29 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) AS SHOWN 05.24.17 08.28.17 ENTITLEMENTS ENT RESUBMITTAL CONCEPTUAL LIGHTING PLAN L6.00 Stake Mounted LED Path LightPool & Spa LightingPlay LightingTree Uplight Recessed Planter Wall Light String Lights KEY TREE UPLIGHT PLAY LIGHTING POOL & SPA LIGHTING CITY STANDARD STREET LIGHT (E) STAKE MOUNTED LED PATH LIGHT RECESSED PLANTER WALL LIGHT DECORATIVE STRING LIGHTS (STRUNG ALONG TOP OF STEEL TRELLIS & POOL CABANAS) NOTE: LIGHT LOCATIONS ARE CONCEPTUAL AND SUBJECT TO CHANGE PENDING A PHOTOMETRIC STUDY. WILL BE SUBMITTED IN BUILDING/SITEWORK PERMIT PLAN SUBMITTAL scale: 1” = 20’N CAMELLIA PLACE PL PL PLPL SHARED PRIVATE DR DE M A R C U S B L V D CA M P B E L L L N CAMPBELL LN NTS N KEY PLAN DE M A R C U S B O U L E V A R D CA M P B E L L L A N E W E S T CAMPBELL LANE SOUTH SHARED PRIVATE DRIVE LEGEND LIMIT OF WORK PROPERTY LINE 3.2.a Packet Pg. 30 At t a c h m e n t : 1 . P r o j e c t P l a n s ( T r a n s i t C e n t e r S i t e A - 3 ) PARCEL 3 PM 8275 280 PM 71 CAMPBELL LN CAMPBELL LN DE MARCUS BLVDSHARED PRIVATE DRIVEBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:11 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1" = 50'-0"EXISTING CONDITIONS16036 A 02DUBLIN STATION DEMARCUS BOULEVARD 1 - N O R T H E A S T C O R N E R 2 - N O R T H W E S T C O R N E R 3 - S O U T H W E S T C O R N E R 4 - S O U T H E A S T C O R N E R LA N E DE M A R C U S B L V D LA N E CA M P B E L L L N CA M P B E L L L N DE M A R C U S B L V D 1 " = 5 0 ' - 0 " A 0 2 1 SI T E P L A N - E X I S T I N G 2 1 3 3 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 31Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:16 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt SITE AERIAL DIAGRAM16036 A 03DUBLIN STATION DEMARCUS BOULEVARD CAMPBELL GREEN DE MARCUS BLVD DU B L I N B L V D . IRON HORSE REGI ON AL TR AI L CA M P B E L L L N CAMPBELL LN HAMLET LN.ELAN AT DUBLIN STATION 7 STORY MULTI-FAMILY AVALON DUBLIN STATION 5 STORY MULTI-FAMILY CA M E L I A P L A C E 4 S T O R Y M U L T I -FA M I L Y DU B L I N T R A N S I T CE N T E R S I T E A -1 3 S T O R Y M U L T I -FA M I L Y PR O P O S E D D E V E L O P M E N T DE MARCUS BLVD DUBLIN BLVD. SH A R E D P R I V A T E D R I V E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 32Attachment: 1. Project Plans (Transit Center Site A-3) UP A1 9 A0 2 A1 5 A1 9 A1 9 A0 5 UT I L I T Y TRASH FITNESS YOGA ROOM TR A S H GA R A G E EL E C T R I C A L RO O M BO I L E R RO O M BI K E ST O R A G E ID F 40 0 ' - 0 1 / 2 " 258' - 3" 36 4 ' - 8 " 50' - 0" 222' - 10 1/2" PA R C E L " A " PM 7 3 9 5 25 4 P M 2 8 PA R C E L 2 PM 8 2 7 5 28 0 P M 7 1 LOT 1 TRACT 7525 279 PM 97 PA R C E L 1 PM 8 2 7 5 28 0 P M 7 1 PA R C E L 3 PM 8 2 7 5 28 0 P M 7 1 IR O N H O RSE REGIO N AL TR AIL CA M P B E L L L A N E CAMPBELL LANE DE MARCUS BLVDRESIDENT LOADING ZONE 18' - 0"24' - 0"18' - 0"100' - 0" 33 5 . 6 5 ± 333.7 LO B B Y 2 ENTRY PLAZA SH A R E D P R I V A T E D R I V E 6' - 3 1 / 2 " 20' - 3"5' - 3 1/2"2' - 4 1/2" 14' - 3" PR O P E R T Y L I N E PR O P E R T Y L I N E 335.1 ± 333.6± 333.8± 334.0± 334.3 ± 333.5 ± 3 3 5 . 0 33 5 . 9 33 5 . 8 33 5 . 7 5 33 5 . 6 33 5 . 4 33 5 . 3 46 ' - 2 " 17 ' - 0 " 24 ' - 0 " 0' - 0" GA S ME T E R CL O S E T A2 0 PA C K A G E RO O M S01 S01 MAIL LEASINGRESTROOM EL E C T R I C A L RO O M FI R E A C C E S S R O A D 24' - 2 1/2"16' - 2" REMOVE EXISTING MEDIAN26' - 0"14' - 3" FI R E A C C E S S R O A D STAIR 01ELEV 1STAIR 02 ST A I R 0 4 ST A I R 0 3 33 5 . 5 EL E V 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:30 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1" = 20'-0"SITE PLAN16036 A 04•DUBLIN STATION DEMARCUS BOULEVARD 10 204080'600ACCESSIBLE PATH OF TRAVEL05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 33Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:34 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 04.1TEAMTEAMDUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 34Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 1:57:51 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 04.2AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T E N T R Y L O B B Y - CAMPBELL LANE AND DE MARCUS BOULEVARD02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 35Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:43 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 04.3AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD NORTHEAST CORNER - DE MARCUS BOULEVARD02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 36Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:47 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 05DUBLIN STATION DEMARCUS BOULEVARD AE R I A L S O U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 37Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:52 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 06DUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 38Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:30:56 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 07DUBLIN STATION DEMARCUS BOULEVARD SO U T H E A S T C O R N E R - CAMPBELL LANE AND DE MARCUS BOULEVARD05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 39Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:31:03 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt PERSPECTIVE VIEWS16036 A 08DUBLIN STATION DEMARCUS BOULEVARD NO R T H E A S T C O R N E R - DE MARCUS BOULEVARDNORTHWEST CORNER - CAMPBELL LANE SO U T H E A S T C O R N E R - C A M P B E L L L A N E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 40Attachment: 1. Project Plans (Transit Center Site A-3) UP    5. 8 3 % 11 . 4 0 % 1 A 2 0 22' - 0"18' - 0"24' - 0"17' - 3"18' - 9"24' - 0"17' - 0"2' - 6" 21' - 0" 18' - 0"24' - 2"17' - 0" 17 ' - 0 " 2 4 ' - 0 " 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED UT I L I T Y TRASH FITNESS YOGAROOM TR A S H GA R A G E ELECTRICAL ROOM BO I L E R RO O M BI K E ST O R A G E GA R A G E E N T R Y 7' - 8" 8' - 1 0 1 / 2 " CL TYP 2' - 0"CL TYP 3' - 0" R 2 2' - 0 " CL TYP 3' - 0"CL TYP 3' - 0" CL TYP 27' - 0" R 24' - 0" 2 A 1 9 1 A 1 9 2 A 2 0 0' - 0"0' - 0"0' - 0"RESIDENT LOADING ZONE ID F 9' - 0"14' - 0" 5' - 0 " 9' - 0 " 82 1 S F LO B B Y 2 9' - 0"9' - 0" 9' - 0 " 24' - 0" 9' - 0 " 9' - 0 " 5' - 1 " 4' - 1 " 9' - 0 " 9' - 0 " 4' - 1 " 9' - 0 " 9' - 0 " 9' - 0 " 5' - 1 " 4' - 1 " 9' - 0 " 9' - 0 " 4' - 1 " 5' - 1 " 9' - 0 " SH E A R W A L L 4.15% 37 1 ' - 1 1 " 28' - 7"170' - 0 1/2"34' - 2" -0'-4"-0'-5"-0'-3"0'-0"- 0'-6" GA R A G E F E N C E , N O TH R O U G H A C C E S S SE C U R I T Y G A T E GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T VAN GU E S T GU E S T GUEST TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 1' - 0"TYP 26' - 0" PA C K A G E RO O M EN C R O A C H M E N T S A R E A L L O W E D U N D E R C H A P T E R 3 2 O F TH E 2 0 1 6 C B C 20 1 6 C B C 3 2 0 2 . 3 . 3 E N C R O A C H M E N T S 1 5 O R M O R E F E E T AB O V E G R A D E . EN C R O A C H M E N T S 1 5 F E E T ( 4 5 7 2 M M ) O R MO R E A B O V E G R A D E S H A L L N O T B E L I M I T E D . BU I L D I N G A N D R O O F A B O V E GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T GU E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T GU E S T G U E S T G U E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T GU E S T G U E S T GU E S T G U E S T G U E S T GU E S T G U E S T G U E S T 0' - 9 " VA N GU E S T G U E S T GU E S T LEASINGRESTROOMMAIL1 BED JR 1 BED JR REMOVE EXISTING MEDIAN FH 9' - 0 " 7 ' - 6 " 9 ' - 0 " 0'-0" 7' - 1 0 1 / 2 " 9 6 ' - 7 " 9 3 ' - 9 1 / 2 " 11 1 ' - 5 1 / 2 " 3 2 ' - 7 1 / 2 " 4 ' - 1 1 " 3 2 ' - 6 1 / 2 " 2' - 4 1/2"232' - 9 1/2"23' - 0 1/2" 27' - 3 1/2"203' - 11 1/2"27' - 0" 45 ' - 8 " 27 3 ' - 4 1 / 2 " 23' - 6"4' - 9"32' - 6 1/2"20' - 3" 1' - 6 " 1' - 6 " 1 B E D EL E C T R I C A L RO O M GA S ME T E R CL O S E T 50 G U E S T P A R K I N G S P A C E S 96 ' - 7 " CO R R I D O R CO R R I D O R STAIR 01ELEV 1STAIR 02 ST A I R 0 4 EL E V 2 ST A I R 0 3 GU E S T LOBBY 1BARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:31:23 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 116036 A 09DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 41Attachment: 1. Project Plans (Transit Center Site A-3) DN UP 1 A 2 0 11 . 4 0 % 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED1 BED JR 1 BED JR FA N RO O M MAINTENANCE OFFICE 2 BED 2 BED 1 BED GA R A G E FAN ROOM ST O R A G E ST O R A G E 2' - 4 1/2" OPEN TO LOBBY BELOW 2' - 7 " R 2 2' - 0 " 5. 8 3 % R 24' - 0" 2 A 1 9 1 A 1 9 2 A 2 0 ID F TRASH 7' - 1 0 1 / 2 " 37 1 ' - 1 1 " 20' - 3" 2' - 4 1/2"232' - 9 1/2"23' - 0 1/2" 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " -1' - 0" 9' - 0 " 9' - 0 " 5 ' - 1 " 4' - 1 " 9' - 0 " 9' - 0 " 5' - 1 " 4' - 1 " 9' - 0 " 9' - 0 " 4' - 1 " 5' - 1 " 9 ' - 0 " 5' - 1 " 9' - 0 " 9' - 0 " 4' - 1 " 24' - 0"18' - 0"4' - 2" 17 ' - 0 " 2 4 ' - 0 " 18' - 0"24' - 2"17' - 0"22' - 0"18' - 0"24' - 0"17' - 3"18' - 9"24' - 0"17' - 0" 9' - 0"5' - 0"9' - 0" 9' - 0 " 9' - 0" 9' - 0 " CL TYP 2' - 0"CL TYP 3' - 0"CL TYP 3' - 0"CL TYP 3' - 0"CL TYP. 3' - 0"CL TYP 3' - 10" TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 2' - 0" TYP 1' - 0" TYP 2' - 10" 12 ' - 0 " 11 ' - 5 " 12 ' - 0 " 12 ' - 0 " 34 6 ' - 0 " 12' - 0"12' - 0" 12 ' - 0 " 19 0 ' - 4 1 / 2 " 14 4 ' - 1 " 4 ' - 1 1 " 3 2 ' - 6 1 / 2 " 27' - 0"203' - 11 1/2"27' - 3 1/2" 45 ' - 8 " 27 3 ' - 4 1 / 2 " 23' - 6"4' - 9"32' - 6 1/2"20' - 3" EL E V 2 AM E N I T Y LO B B Y 2 CONF CONFELEV 1 STAIR 06 CO R R I D O R LOBBY 2BARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:00:30 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 216036 A 10DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 42Attachment: 1. Project Plans (Transit Center Site A-3) DN 1 A 2 0 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D + 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 2 B E D 1 B E D J R 1+ B E D 2 B E D 2 B E D 2 B E D 1 B E D J R 1 B E D J R 1+ B E D 1 B E D 2 B E D 2 B E D 2 B E D + 1 B E D J R 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 BED1 BED 2 BED +1 BED 1 BED 1 BED2 BED2 BED COMMUNITY ROOM ? ? ? 2 A 1 9 1 A 1 9 2 A 2 0 ? 5' - 3 1 / 2 " 1 9 0 ' - 3 1 / 2 " 14 4 ' - 2 " 4 ' - 1 1 " 3 2 ' - 6 1 / 2 " 37 1 ' - 1 1 " 137' - 2 1/2"15' - 10 1/2" 3 7 ' - 8 1 /2 " 1 1 6 ' - 1 " 9 ' - 9 " 6 6 ' - 8 " 3 ' - 5 " 1 8 ' - 1 1 /2 " 28 3 ' - 3 1 / 2 " 37' - 6 1/2"32' - 6 1/2" 13' - 9"39' - 11 1/2"158' - 8 1/2" 7 0 ' - 1 1 / 2 " 13' - 0 1/2"75' - 8"13' - 3 1/2" 14 ' - 3 " PO D I U M C O U R T Y A R D (S E E L A N D S C A P E D R A W I N G S ) PO D I U M C O U R T Y A R D (S E E L A N D S C A P E D R A W I N G S ) 7 0 ' - 1 " 9 ' - 0 " BRIDGE ABOVE 9' - 4 " C L 3 9 ' - 9 " 35 8 ' - 6 1 / 2 " 24 ' - 6 1 / 2 " 35 9 ' - 0 " 359' - 0" 35 9 ' - 0 " 35 9 ' - 0 " 24 ' - 7 " 8 ' - 1 1 " 3 ' - 3 " 2' - 4 1 / 2 " 37 7 ' - 5 " 20' - 3"2 BED +1 BED ST O R A G E ? 1 B E D ? ? BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:03:10 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 316036 A 11DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 43Attachment: 1. Project Plans (Transit Center Site A-3) 1 A 2 0 2 B E D + 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED2 BED 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1+ B E D 2 B E D 1 B E D J R 1 B E D J R 2 B E D + 2 BED +2 BED +1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 2 B E D + 1 BED 1 B E D J R OPEN TO BELOW TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 27' - 0"204' - 0 1/2"27' - 2 1/2"137' - 2 1/2"15' - 10 1/2" 3 7 ' - 8 1 /2 " 1 1 6 ' - 1 " 9 ' - 9 " 6 6 ' - 8 " 3 ' - 5 " 1 8 ' - 1 1 /2 " 7 0 ' - 1 1 / 2 " 13' - 0 1/2"75' - 8"13' - 3 1/2" 14 ' - 3 " 14 ' - 3 " UN I T A B O V E B R E E Z E W A Y 9 ' - 0 " C L 3 9 ' - 9 " 35 ' - 4 " 50' - 11 1/2" 10 0 ' - 1 0 1 / 2 " 1 0 ' - 8 " 3 2 ' - 7 1 / 2 " 4 ' - 1 1 " 3 2 ' - 7 1 / 2 " 37 9 ' - 1 0 1 / 2 " 20' - 2" 34' - 2" 2' - 4"34' - 2"221' - 9" 2' - 4 1 / 2 " 4 3 ' - 2 1 / 2 " 33 4 ' - 3 " 20' - 3" 21 ' - 3 1 / 2 " 2 1 ' - 1 1 " 26 4 ' - 2 " 70' - 1" ST O R A G E ST O R A G E ? ST O R A G E 2 BED 1 BEDELEV 1 EL E V 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:07:39 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 416036 A 12DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 44Attachment: 1. Project Plans (Transit Center Site A-3) 1 A 2 0 2 B E D + 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED2 BED 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1+ B E D 1 B E D J R 1 B E D J R 2 B E D + 2 BED +2 BED +1 BED 1 BED1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 2 B E D + 1 BED 1 B E D J R TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 23' - 0"4' - 0 1/2"204' - 0 1/2"27' - 2 1/2"137' - 2 1/2" 76 ' - 7 1 / 2 " 15' - 10 1/2" 3 7 ' - 8 1 /2 " 1 1 6 ' - 1 " 9 ' - 9 1 /2 " 6 6 ' - 8 " 3 ' - 5 " 1 8 ' - 1 1 /2 " 7 0 ' - 1 1 / 2 " 13' - 0 1/2"75' - 8"13' - 3 1/2" 14 ' - 3 " 14 ' - 3 " 1 B E D J R 2 1 ' - 5 1 / 2 " 9 ' - 0 " C L 3 9 ' - 9 " 45' - 8"10' - 8"32' - 7 1/2"4' - 11"32' - 7 1/2" 37 9 ' - 1 0 1 / 2 " 20' - 2" 221' - 9"34' - 2"2' - 4" 34' - 2" 21 ' - 3 1 / 2 " 28 6 ' - 1 " 70' - 1" 2' - 4 1 / 2 " 37 7 ' - 6 " 20' - 1 1/2"50' - 11 1/2"2 BED ST O . ST O R A G E ST O R A G E 2 B E D ELEV 1 EL E V 2 ST O R A G E BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:21:03 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 516036 A 13DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 45Attachment: 1. Project Plans (Transit Center Site A-3) 1 A 2 0 RESIDENT LOUNGE 3 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED2 BED2 BED 1 B E D J R 2 B E D 1 B E D J R 1 B E D J R 2 BED 1 BED1 BED2 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 BED 1 B E D 2 B E D 2 B E D 2 B E D + 1 BED 1 B E D TR A S H TRASH 2 A 1 9 1 A 1 9 2 A 2 0 ID F 27' - 0"196' - 9"34' - 6"112' - 4"15' - 10 1/2" 3 7 ' - 8 1 /2 " 1 1 6 ' - 1 " 9 ' - 9 1 /2 " 6 6 ' - 8 " 3 ' - 5 " 7 0 ' - 1 1 / 2 " 1 B E D J R 2 1 ' - 5 1 / 2 " 9 ' - 0 " 56' - 0" 56 ' - 0 " 56' - 0"20' - 3" 10 0 ' - 1 0 1 / 2 " 1 0 ' - 8 " 3 2 ' - 7 1 / 2 " 4 ' - 1 1 " 3 2 ' - 6 1 / 2 " 7' - 2 1/2"43' - 7 1/2"8' - 2"144' - 11"25' - 3"31' - 7 1/2"33' - 5"5' - 0 1/2" ST O R A G E STAIR 01STAIR 02 ST A I R 0 3 1 BED ME C H A N I C A L EN C L O S U R E ME C H A N I C A L EN C L O S U R E BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:26:16 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 616036 A 14DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 46Attachment: 1. Project Plans (Transit Center Site A-3) 1 A 2 0 OPEN TO RESIDENT LOUNGE BELOW1 BED 1 BED 1 BED 1 BED2 BED3 BED3 BED 3 B E D 2 B E D 2 B E D 2 B E D 1 B E D J R 2 B E D 2 B E D 1 B E D 1 B E D J R 2 B E D 2 B E D + 1 B E D J R 1 B E D ? TRASH 2 A 1 9 1 A 1 9 2 A 2 0 DS DS ? ME C H A N I C A L EN C L O S U R E ME C H A N I C A L EN C L O S U R E OPEN TO DECK BELOW B R I D G E B E L OW 3 ' - 1 0 1 / 2 " 6 6 ' - 8 " 3 ' - 5 " 3 ' - 4 " 7 0 ' - 1 1 / 2 " 3 ' - 4 " 7 0 ' - 1 " 3 ' - 1 1 " 3' - 6 1/2"65' - 0 1/2"3' - 11 1/2"31' - 6 1/2"192' - 2 1/2"34' - 6"31' - 7 1/2"33' - 5"65' - 0 1/2"25' - 1" RO O F O V E R H A N G ROOF OVERHANG ROOF OVERHANG RO O F O V E R H A N G C L 3 9 ' - 8 3 / 4 " 66 ' - 4 " 66' - 4" 66 ' - 3 " 1' - 10 1/2"2' - 0"8' - 6 1/2" 1 ' - 1 1 1 /2 " 2 2 5 ' - 1 1 1 /2 " 1 ' - 1 1 " 25' - 3"2 BED ? ? STAIR 01STAIR 02 ME C H A N I C A L EN C L O S U R E BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 2:27:07 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - LEVEL 716036 A 15DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL 02.09.18ENT RESUMITTAL 23.2.a Packet Pg. 47Attachment: 1. Project Plans (Transit Center Site A-3) DNSLOPESLOPESLOPE S L O P E S L O P E S L O P E S L O P E SLOPE SL O P E SL O P E SLOPE SL O P E S L O P E SL O P E SLOPE SL O P E SL O P E SL O P E SL O P E S L O P E SL O P E S L O P E SL O P E SLOPE SL O P E SL O P E SLOPE SL O P E SLOPE SL O P E S L O P E S L O P E SL O P E SLOPE SL O P E S L O P E SLOPE S L O P E SLOPE S L O P E SL O P E SLOPE SLOPESLOPESLOPESLOPE SLOPE SLOPE SLOPE SLOPE S L O P E SL O P E S L O P E S L O P E S L O P E 1 A 2 0 OPEN TO BELOW 2 A 1 9 1 A 1 9 2 A 2 0 DA S H E D L I N E I N D I C A T E S A R E A DE S I G N A T E D F O R F U T U R E S O L A R PA N E L S ( 1 0 % O F R O O F A R E A M I N . ) ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N ME C H A N I C A L EN C L O S U R E ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N DS DS DS DS DS DS DS DS B E L O W DS DSDSDSDS DS DS B E L O W DSDS DS BR I D G E B E L O W ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N ME C H A N I C A L EN C L O S U R E M E T A L SC R E E N 83' - 2"76' - 9" DS DS DS DS DSDSDSDSDS 76 ' - 9 " 83 ' - 7 " 66 ' - 3 " 33 ' - 7 " 6' - 4" 2 9 ' - 7 1 / 2 " 7 ' - 7 " 73 ' - 5 " 12 3 ' - 1 1 " 73' - 1" 37 8 ' - 9 " 21' - 3 1/2" 2' - 4 1 / 2 " 37 6 ' - 3 1 / 2 " 21' - 4 1/2" 43 ' - 2 1 / 2 " 1 4 1 ' - 5 1 / 2 " 73 ' - 5 " 4 5 ' - 2 1 / 2 " 7 3 ' - 1 " 20' - 11"204' - 8 1/2"32' - 7 1/2" 255' - 11"2' - 4" 10' - 11 1/2"23' - 2 1/2" 7 8 ' - 1 1 / 2 " 1 9 ' - 5 " BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:33:34 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"FLOOR PLAN - ROOF16036 A 16DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 48Attachment: 1. Project Plans (Transit Center Site A-3) LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0" 1 6 2 15 13 7 1 7 3 2 PENTHOUSE ROOF 418' - 8" EN C R O A C H M E N T S A R E A L L O W E D U N D E R C H A P T E R 3 2 O F TH E 2 0 1 6 C B C 20 1 6 C B C 3 2 0 2 . 3 . 3 E N C R O A C H M E N T S 1 5 O R M O R E F E E T AB O V E G R A D E . EN C R O A C H M E N T S 1 5 F E E T ( 4 5 7 2 M M ) O R MO R E A B O V E G R A D E S H A L L N O T B E L I M I T E D . 23' - 9" 4' - 4"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0" 3 8 7156 1 LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"2 6 1 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PENTHOUSE ROOF 418' - 8"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0" 7 8 3 3 1 8 A 2 5 1 1 / 1 6 " = 1 ' - 0 " A 1 7 2 SO U T H E L E V A T I O N 1 / 1 6 " = 1 ' - 0 " A 1 7 1 WE S T E L E V A T I O N BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:15 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"EXTERIOR ELEVATIONS - SOUTH & WEST16036 A 17DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'0 MA T E R I A L S L E G E N D NO . M A T E R I A L 1 C E M E N T P L A S T E R 2F I B E R C E M E N T P A N E L 3 T I L E O R T H I N S E T M A S O N R Y P R O D U C T 4 F I B E R C E M E N T A C C E N T P A N E L 5 M E C H A N C I A L S C R E E N 6 P E R F O R A T E D M E T A L S C R E E N 7G L A Z I N G 8 P E R F O R A T E D M E TA L B A L U S T R A D E 9 M E T A L P A N E L 10 G L A Z E D B A L C O N Y D O O R 11 S T O R E F R O N T W I N D O W S Y S T E M 12 M T L P A N E L 13 D E C O R T I V E M E T A L F I N 14 C A N O P Y 15 F I B E R C E M E N T L A P S I D I N G 16 M E T A L S U N S H A D E 17 V I N Y L W I N D O W 18 B A L C O N Y 19 J U L I E T B A L C O N Y 20 S T E E L B R I D G E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 49Attachment: 1. Project Plans (Transit Center Site A-3) LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 15 2 2 8 15 7 2 7 8 6 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"6 LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4"ROOF 410' - 8"18 5 3 7 15 2 7 8 7 8 8 7 2 8 15 3 PENTHOUSE ROOF 418' - 8"MEASURED TO THE MIDPOINT OF SLOPED ROOF 13' - 0"12' - 0"10' - 4"10' - 4"10' - 4"10' - 4"14' - 8"25' - 0"56' - 0"81' - 0" 2 5 5 A 2 5 2 1 / 1 6 " = 1 ' - 0 " A 1 8 2 EA S T E L E V A T I O N 1 / 1 6 " = 1 ' - 0 " A 1 8 1 NO R T H E L E V A T I O N BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:24 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"EXTERIOR ELEVATIONS - NORTH & EAST16036 A 18DUBLIN STATION DEMARCUS BOULEVARD 8'16'32'64'48'0 MA T E R I A L S L E G E N D NO . M A T E R I A L 1 C E M E N T P L A S T E R 2 F I B E R C E M E N T P A N E L 3 T I L E O R T H I N S E T M A S O N R Y P R O D U C T 4 F I B E R C E M E N T A C C E N T P A N E L 5 M E C H A N C I A L S C R E E N 6 P E R F O R A T E D M E T A L S C R E E N 7G L A Z I N G 8 P E R F O R A T E D M E T A L B A L U S T R A D E 9 M E T A L P A N E L 10 G L A Z E D B A L C O N Y D O O R 11 S T O R E F R O N T W I N D O W S Y S T E M 12 M T L P A N E L 13 D E C O R T I V E M E T A L F I N 14 C A N O P Y 15 F I B E R C E M E N T L A P S I D I N G 16 M E T A L S U N S H A D E 17 V I N Y L W I N D O W 18 B A L C O N Y 19 J U L I E T B A L C O N Y 20 S T E E L B R I D G E 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 50Attachment: 1. Project Plans (Transit Center Site A-3) LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 BED 2 BED GA R A G E GA R A G E 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PROPERTY LINE CAMPBELL LN PROPERTY LINE SHARED PRIVATE DRIVE MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D GA R A G E GA R A G E ME C H A N I C A L EN C L O S U R E PROPERTY LINE CAMPBELL LN PROPERTY LINE SHARED PRIVATE DRIVE 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:31 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"BUILDING SECTIONS -NORTH/SOUTH16036 A 19DUBLIN STATION DEMARCUS BOULEVARD 1 / 1 6 " = 1 ' - 0 " A 1 9 2 BU I L D I N G S E C T I O N - N O R T H / S O U T H 1 / 1 6 " = 1 ' - 0 " A 1 9 1 BU I L D I N G S E C T I O N - N O R T H / S O U T H 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 51Attachment: 1. Project Plans (Transit Center Site A-3) LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" GA R A G E GA R A G E 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 3 B E D 3 B E D 3 B E D 1+ B E D 1+ B E D 1+ B E D 1 B E D J R 1 B E D J R 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"RESIDENT LOUNGE 3 BED 3 BEDCOMMUNITY / CLUB /REC ROOM LOBBY1 BEDPROPERTY LINE PROPERTY LINE DE MARCUS BVLD CAMPBELL LN MEASURED TO THE MIDPOINT OF SLOPED ROOF 56' - 0"25' - 0"81' - 0"3 BED LEVEL 1 334' - 0"LEVEL 2 347' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"LEVEL 7 400' - 4" BO I L E R RO O M BI K E ST O R A G E GARAGE GARAGE GA R A G E GA R A G E S T O R A G E FITNESS2 BED2 BED2 BED2 BED2 BED3 BED1 BED 1 BED 1 BED 1 BED 1 BED 1 B E D 1 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 2 B E D 1 B E D 1 B E D 1 B E D 2 B E D 2 B E D 2 B E D 14' - 8"10' - 4"10' - 4"10' - 4"10' - 4"12' - 0"13' - 0"PROPERTY LINE PROPERTY LINE DE MARCUS BVLD CAMPBELL LN 1 B E D J R 1 B E D J R 1 B E D J R 1 B E D J R 1 B E D J R 10' - 4"7' - 10"10" 59' - 0" 56' - 0"25' - 0"81' - 0"MEASURED TO THE MIDPOINT OF SLOPED ROOFBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 8/28/2017 4:29:36 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/16" = 1'-0"BUILDING SECTIONS -EAST/WEST16036 A 20DUBLIN STATION DEMARCUS BOULEVARD 1 / 1 6 " = 1 ' - 0 " A 2 0 2 BU I L D I N G S E C T I O N - E A S T / W E S T 1 / 1 6 " = 1 ' - 0 " A 2 0 1 BU I L D I N G S E C T I O N - E A S T / W E S T 8'16'32'64'48'005.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 52Attachment: 1. Project Plans (Transit Center Site A-3) A1 3 70 7 S F BEDROOM LI V I N G DI N I N G KITCHEN EN T R Y BATHROOMCLOSET B1 2 99 0 S F LI V I N G DI N I N G KITCHEN EN T R Y CL O S E T BE D R O O M 1 MA S T E R BE D R O O M CL O S E T BA T H R O O M BA T H R O O M C0 1 11 8 0 S F LI V I N G KITCHEN DI N I N G DE N / O F F I C E BE D R O O M 2 MA S T E R BE D R O O M BA T H R O O M BA T H R O O M CLOSET CL O S E T EN T R Y CL O S E T S0 1 56 0 S F KITCHEN ENTRY DI N I N G BATHROOMBEDROOMLIVINGBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:30 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt 1/4" = 1'-0"ENLARGED TYPICAL UNIT PLANS16036 A 21DUBLIN STATION DEMARCUS BOULEVARD 1 / 4 " = 1 ' - 0 " A 2 1 2 TY P . 1 B E D R O O M U N I T 1 / 4 " = 1 ' - 0 " A 2 1 3 TY P . 2 B E D R O O M U N I T 1 / 4 " = 1 ' - 0 " A 2 1 4 TY P . 3 B E D R O O M U N I T 2'4'8'16'12'0 1 / 4 " = 1 ' - 0 " A 2 1 1 TY P . J R . 1 B E D R O O M U N I T 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 53Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:35 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 22DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 54Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:41 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 23DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 55Attachment: 1. Project Plans (Transit Center Site A-3) BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:45 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt GREENPOINT CHECKLIST16036 A 24DUBLIN STATION DEMARCUS BOULEVARD 05.24.17ENTITLEMENTS 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 56Attachment: 1. Project Plans (Transit Center Site A-3) F.O.S. F.O.S. FD B - c c - 0 0 6 ST U C C O R E T U R N NA I L F I N W I N D O W WD . F R A M I N G , S S D . DR A I N A G E M A T SE A L A N T & B A C K E R R O D SI L L B E L O W ST U C C O LEVEL 1 334' - 0"LEVEL 2 346' - 0"LEVEL 3 359' - 0"LEVEL 4 369' - 4"LEVEL 5 379' - 8"LEVEL 6 390' - 0"4 A 25SIM.THINSET TILE CEMENT PLASTER COLOR O2WIN FRAME COLOR O1 PERFORATED METAL BALUSTRADE PERFORATED METAL SCREEN CEMENT PLASTER COLOR O2 LE V E L 1 33 4 ' - 0 " LE V E L 2 34 6 ' - 0 " LE V E L 3 35 9 ' - 0 " LE V E L 4 36 9 ' - 4 " LE V E L 5 37 9 ' - 8 " LE V E L 6 39 0 ' - 0 " LE V E L 7 40 0 ' - 4 " FI B E R C E M E N T LA P S I D I N G WI N F R A M E CO L O R O 2 BARarchitects 901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:34:55 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedAPPENDIX16036 A 25AuthorCheckerDUBLIN STATION DEMARCUS BOULEVARD 3 " = 1 ' - 0 " A 2 5 4 TY P I C A L R E C E S S E D W I N D O W J A M B 1 / 4 " = 1 ' - 0 " A 2 5 1 EN L A R G E D W E S T E L E V A T I O N 0 2 1 / 4 " = 1 ' - 0 " A 2 5 2 EN L A R G E D N O R T H E L E V A T I O N 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 57Attachment: 1. Project Plans (Transit Center Site A-3) COLOR 04 CO L O R 0 2 C O L O R 0 3 COLOR 05 CO L O R 0 1 W I N C O L O R 0 2 W I N C O L O R 0 2 W I N C O L O R 0 2 WIN COLOR 02 STOREFRONT COLORBARarchitects901 Battery Street, Suite 300 San Francisco, CA 94111 415 293 5700 www.bararch.com cBAR C O P Y R I G H T architects DRAWNBY C PHECKEDBYROJECTNO DATEISSUEDRACPHERODA SCALE:DUBLIN, CA SITE A-3 2/9/2018 12:39:08 PM BIM 360://004-17009 Dublin CA/UDR DUBLIN-A.rvt As indicatedBUILDING MATERIALS16036 P 01RV/MS PCDUBLIN STATION DEMARCUS BOULEVARD MA T E R I A L S CO L O R S FIBER CEMENT PANEL CE M E N T P L A S T E R FI B E R C E M E N T S I D I N G 08.29.17ENT RESUBMITTAL3.2.a Packet Pg. 58Attachment: 1. Project Plans (Transit Center Site A-3) Page 1 of 11 STAFF REPORT PLANNING COMMISSION DATE: November 14, 2017 TO: Planning Commission SUBJECT: PUBLIC HEARING: Ashton at Dublin Station (Transit Center Site A -3) Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 (PLPA 2017- 00036) Prepared by: Martha Battaglia, Associate Planner EXECUTIVE SUMMARY: The Applicant, Ashton at Dublin Station, is proposing to construct a residential project comprised of 220 apartment units, and related amenities including a fitness center, pool, roof top lounge, and 331 spaces of structured parking on an approximately 2.36 -acre site located within the Dublin Transit Center. The proposed mix of residential units includes 122 one-bedroom units, 79 two-bedroom units and 19 three-bedroom units. The site has a land use designation of High Density Residential (25.1 or greater units per acre). The application includes a Planned Development Rezone with a related Stage 2 Development Plan, Site Development Review Permit, and Tentative Map 8437 for condominium purposes. The Planning Commission will review the proposed project and make a recommendation to the City Council. RECOMMENDATION: Disclose ex-parte contacts, conduct the public hearing, deliberate and adopt the following Resolutions: a) Recommending that the City Council adopt an Ordinance rezoning the Dublin Transit Center Site A-3 project site to PD-Planned Development and approving a Stage 2 Development Plan; and b) Recommending that the City Council approve the Site Development Review Permit and Tentative Map 8437 for the Dublin Transit Center Site A-3 project. PROJECT DESCRIPTION: Background The Dublin Transit Center area generally is bounded on the north by Dublin Boulevard, on the south by Interstate 580 and the existing Dublin/Pleasanton BART station, on the east by Arnold Road, and on the west by the Iron Horse Trail (Figure 1). 3.2.b Packet Pg. 59 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 2 of 11 In December 2002, the City Council adopted entitlements establishing the Transit Center. This included General Plan and Eastern Dublin Specific Plan Amendments (Resolution 216-02) to incorporate this area into the Eastern Dublin Specific Plan area and establishing land uses. The project included Planned Development Zoning with a Stage 1 Development Plan (Ordinance 21-02) which established the permitted uses; site areas and proposed densities; maximum number of residential units and non - residential square footage; and a Master Landscaping Plan. The approval also included a Master Development Agreement (Ordinance 5 -03) approved in May 2003. The Dublin Transit Center project area allows for the development of 1,500 residential units on Sites A, B and C; two million square feet of campus office and up to 300 residential units on Sites D and E; and 70,000 square feet of retail uses at street level on Sites B through E, and a 1-acre Village Green located between Sites B and C. Sites A, B and C have been developed with the exception of Site A -3, which is the subject of this Staff Report. Project Site Site A-3 is the last remaining site with a residential land use designation in the Transit Center. The 2.36 acre site is located south of a private street, east and north of Campbell Lane, and west of DeMarcus Boulevard as shown in Figure 1. The site has a General Plan and EDSP land use designation of High Density Residential and Planned Development Zoning with a Stage 1 Development Plan. Figure 1. Vicinity Map The project site is rectangular in shape and has a relatively flat topography. The project site is paved and has previously been used as a parking lot and a construction staging area. There are no permanent structures, existing drainage courses, or native vegetation located on the site. Surrounding street improvements are limited to curb s and gutters along DeMarcus Boulevard and Campbell Lane. This vacant site is surrounded by existing developments (Table 1). 3.2.b Packet Pg. 60 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 3 of 11 Table 1. Surrounding Land Uses LOCATION ZONING GENERAL PLAN LAND USE CURRENT USE OF PROPERTY Building Height North PD High Density Residential Camellia Place – 112 units 53 feet 3 stories over 1 level of parking South PD Public/Semi-Public PG&E Substation N/A East PD High Density Residential Elan – 257 multi- family townhomes & condominiums 65 feet 5 stories over parking West PD Medium-High Density Residential Tribeca – 52 townhomes 40 feet 3 stories Current Request Ashton at Dublin Station is requesting approval of a 220 -unit apartment building, which includes residential amenities consisting of a fitness center, pool, roof top lounge, and 331 spaces of structured parking. The proposed mix of residential units includes 122 one-bedroom units, 79 two-bedroom units and 19 three-bedroom units. The current request for the proposed project includes: • Planned Development Zoning - Planned Development Rezone with a related Stage 2 Development Plan. • Site Development Review Permit - Site Development Review Permit for 220 apartment units, with related amenities and structured parking with 331 spaces. • Subdivision - Tentative Map 8437 for condominium purposes. ANALYSIS: Planned Development Zoning The application includes a Planned Development Rezone with a related Stage 2 Development Plan. The existing Planned Development Zoning Stage 1 Development Plan established a maximum building height for high density residential of 5 stories over parking and a parking standard of 1.5 spaces per unit for residential land uses. The project site is part of Site A, an 8.29 net acre area delineated as Sites A -1, A-2 and A-3. The Planned Development Zoning originally anticipated up to 530 units across all of Site A. The number was later reduced to 430 units when 100 units were transferred to Site C. The total number of units constructed in the Dublin Transit Center project area, including the proposed project, would be 1,451 units. This is 46 units less than 3.2.b Packet Pg. 61 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 4 of 11 anticipated for Site A, and 49 units less than the total allocation of 1,500 units for the overall Transit Center, as shown in Table 2. Table 2. Transit Center Residential Development Site Project Name Units Constructed/Proposed Units Permitted Difference A-1 Tribeca (52 Units) 384 430 46 A-2 Camellia Place (112 Units) A-3 Ashton @ Dublin Station (220 units) B-1 Elan (257 Units) 562 565 3 B-2 Eclipse (305 units) C-1 Avalon (505 units) 505 505 --- Total 1,451 1,500 49 The proposed Stage 2 Planned Development Zoning is in compliance with the requirements of the Dublin Zoning Ordinance and will establish the detailed development plan for the site. This includes a preliminary site plan, development standards, architectural standards, and a preliminary landscape. The project is compatible with the land use concept to maximize transit opp ortunities presented by the adjacent Dublin/Pleasanton BART Station; conforms to the development standards adopted for the Dublin Transit Center; and contributes to a vibrant, pedestrian friendly environment. A Resolution recommending that the City Coun cil adopt an Ordinance approving the Planned Development Rezone with related Stage 2 Development Plan for the Dublin Transit Center Site A-3 is included as Attachment 1, with the draft City Council Ordinance included as Exhibit A. Site Development Review Site Plan The primary entry lobby is located near the northwest corner of DeMarcus Boulevard and Campbell Lane. The primary entry lobby that fronts on this corner has a two story volume and is set back to accommodate a pedestrian plaza. A secondary entr y lobby is located mid-block on the north side of the building along the private street that is shared with Camellia Place. Similar to the primary entry, the building is set back creating a smaller pedestrian plaza with landscaping. Vehicle access to the structured parking will be through a garage entry located on Campbell Lane. The project includes frontage improvements and landscaping consistent with the improvements throughout the Transit Center. 3.2.b Packet Pg. 62 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 5 of 11 Residential amenities including a lobby, fitness center and a leasing office (approximately 6,200 square feet) are proposed along DeMarcus Boulevard. Ground - floor residential units with front stoops are proposed on the north elevation, which enhance the residential scale and character established by the Camelli a Place residential project across the street. Architecture The project architecture has a contemporary aesthetic with angular lines and includes a variety of high quality exterior materials and colors. Façade treatments include stucco, fiber cement and metal accent, metal window surrounds, limited areas of storefront glazing and metal and translucent entry canopies. Balconies and screening inserts used within the garage include translucent perforated metal screening. The proposed project includes unique architectural features and massing elements to provide visual interest as well as open space for the occupants. The design includes two opposing yet complementary tilted overhanging roof forms which accentuate the taller massing elements of the building. The roof design allows the top-level units to have generous windows and optimized views of the surrounding area. The project’s design provides visual interest as viewed from Interstate 580 to the south and the pedestrian pathways along DeMarcus Boulevard and Campbell Lane. The design of the east podium courtyard allows glimpse in from the surrounding area and also provides a strong pedestrian visual scale for the project. The two-story parking podium façades face Campbell Lane to the west and south. The parking garage has been designed to include architectural elements that provide functional screening as well as visual interest. The façade of the parking structure is comprised of framed openings which provide articulation and depth along the ground floor. Infill surfaces fill the frames and angle inward in varying directions. The architecture elements described can be seen in the renderings below. Aerial at SE corner – Campbell Lane & DeMarcus Blvd. 3.2.b Packet Pg. 63 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 6 of 11 The massing of the proposed building is consistent with the scale of the adjacen t buildings with the tallest massing located at the east side of the project opposite the adjacent buildings along DeMarcus Boulevard (Elan and Avalon). The lowest massing is located on the west side opposite the lower height townhouses across Campbell Lan e (Tribeca). The proposed range of building heights, including 3, 4 and 5 residential stories, over parking podium gives the project a sense of visual interest and variation in roof profile, and it enables the building to respond contextually to the preexi sting massing variation within the Transit Center. A feature of the building projects over a portion of the sidewalk adjacent to Campbell Lane. The total projection area is approximately 300 square feet as shown in Figure 2 below. The projection into the right-of-way includes living space, balconies and roof overhang. The projection starts on the third floor at 23 feet above grade so as not to conflict with use of the sidewalk. SE corner – Campbell Lane & DeMarcus Blvd. NE corner – DeMarcus Blvd. SW corner – Campbell Lane NW corner – Campbell Lane 3.2.b Packet Pg. 64 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 7 of 11 Figure 2. Right Of Way Projection The City will quitclaim fee title ownership of the area with the proposed building projection, while reserving a public access easement and a utility easement over the area. These easements will allow for continued use of this area by the public and utility companies. Landscaping The landscaping has been designed to be consistent with and completes the streetscape as identified in the Design Guidelines for the overall Dublin Transit Center. Similar to other higher density residential developments, landscaping and recreational amenities are used to provide quality open areas and visual relief. Plantings and hardscape elements are used to create neighborhood identification and an attractive community entry. Colored concrete unit pavers connect the project site with the rest of the Dublin Transit Center, while helping to define the main entries and gathering spaces. The landscape plan includes trees, along with flowering shrubs and groundcover, which line and define the project entry. Perimeter areas are proposed to be landscaped wit h a variety of drought tolerant plant materials that are low maintenance and encourage water conservation. Please refer to Sheets L2.00-L5.00 of the attached plans (Exhibit A to the City Council Resolution) for the proposed plant palette. 3.2.b Packet Pg. 65 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 8 of 11 The project includes two podium level roof courtyards and a swimming pool on the third floor. Amphitheater stair seating is proposed near the project’s southeast corner within the pedestrian plaza. Benches and raised planters are located throughout the landscape public spaces. There is a 20’ storm drain easement located along the eastern property boundary along DeMarcus Boulevard. This easement area is planted with a variety of taller flowering shrubs and succulents that delineate the space without using fences or walls . In compliance with water quality requirements, flow through planters are located on the northern portion of the project site and within the open courtyard areas. The plantings within these areas include grasses and flowering plants. Private sidewalks with public access are proposed on all four frontages. The project includes a variety of site lighting, including tree uplight, pool & spa lighting, stake mounted LED lights along pathways, recessed planter wall lights and decorative string lights. The conceptual lighting plan is shown on Sheet L6.00 of the attached plans. Floor Plans The project includes a mix of studio, one, two and three -bedroom flats that vary in size and layout. The floor plans are shown on Sheet A21 of the attached plans. Access to the units would be primarily from interior corridors with exception to the stoop units along the private street facing Camellia Place to the north. An open -air bridge comprised primarily of perforated metal screen is visible from the south elevation and provides a connection across the eastern podium. Table 3 below details the square footage of the individual units as well as the percentage of each unit type within the project. TABLE 3. Floor Plans Unit Type Square Footage # of Units % of Project Jr. 1 Bedroom 640 SF 22 10.0% 1 Bedroom 800 SF 92 41.8% 1+ Bedroom 975 SF 8 3.6% 2 Bedroom 1,120 SF 79 35.9% 3 Bedroom 1,280 SF 19 8.6% Total 100% Parking The Development Regulations for the Dublin Transit Center require 1.5 parking spaces per unit, which includes guest parking. Based on this standard, a total of 330 spaces would be required. The proposed project provides 331 spaces located within a two – 3.2.b Packet Pg. 66 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 9 of 11 story podium parking garage. Fifteen percent (15%) of the required parking spaces (50 spaces) are unassigned guest parking spaces. Additionally, surface stalls will be located on the public streets along the project frontage, which are not included in the parking requirement for the project. Bicycle storage parking is provided on the first floor of the parking garage. A total of 130 bicycle parking stalls are provided. Affordable Housing/Inclusionary Zoning The Dublin Transit Center requires 15% of the residential units be affordable units. The Camellia Place apartment project on Site A-2 has been used to satisfy the very low and low portion of the inclusionary housing requirement for the project. Ten percent (10%) of the units in the proposed project are required to be affordable to moderate income household earning between 80% and 120% of the area median income adjusted for actual household size. The affordable units are required to reflect the range of numbers of bedrooms provided in the project. The applicant proposes to provide the required number of moderate income units (22) which will include a range of one, two and three - bedroom units. A Condition of Approval has been placed on the project that requires the applicant to enter into an Affordable Housing Agreement. Public Art Compliance The project is part of a comprehensive plan to provide public art as part of the Dublin Transit Center project. The public art requirement has already bene satisfied. Tentative Map Although the project is proposed for occupancy as apartments, the Applicant is requesting approval of a Tentative Map for condominium purposes as is common with other recent apartment projects. A Resolution recommending that the City Council approve the Site Development Review Permit and Tentative Map is included as Attachment 2, with the dra ft City Council Resolution included as Exhibit A. CONSISTENCY WITH THE GENERAL PLAN AND ZONING ORDINANCE: The project site has a current General Plan and EDSP land use designation of High Density Residential and consistent Planned Development Zoning. The proposed project is consistent with the land use designation and zoning. The project will contribute to housing opportunities and diversity of product type and complement the surrounding neighborhoods. The proposed project has been reviewed for conformance with the Community Design and Sustainability Element of the General Plan. The project has been designed to be compatible with adjacent and surrounding development. Pedestrian circulation and 3.2.b Packet Pg. 67 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 10 of 11 gathering spaces have all been linked together with sidewal ks and public and private streets. In general, the proposed project furthers the goals of the Community Design and Sustainability Element of the General Plan by providing a high quality of life and preserving resources and opportunities for future generations. REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES: The Building Division, Fire Prevention Bureau, Public Works Department, and Dublin San Ramon Services District reviewed the project and provided Conditions of Approval where appropriate to ensure that the Project is established in compliance with all local Ordinances and Regulations. Conditions of Approval from these departments and agencies have been included in the attached Resolution pertaining to the Site Development Review Permit and Tentative Map (Exhibit A to Attachment 2). ENVIRONMENTAL REVIEW: The City has determined that the project qualifies for a statutory exemption from CEQA under Government Code section 65457. The proposed project is consistent with the General Plan Land Use Designation for Site A-3 and does not exceed the units allowed by the Dublin Transit Center Stage 1 Planned Development Zoning. An EIR has been certified for the Dublin Transit Center Stage 1 Planned Development Zoning. The CEQA document in Support of a Specific Plan E xemption finds that no event as specified in Section 21166 of the Public Resources Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a supplemental CEQA document. Public Resources Code Section 21166 and CEQA Guidelines Section 15162 identify the conditions requiring subsequent environmental review. After a review of these conditions, the City has determined that no subsequent EIR or Negative Declaration is required for this project. The CEQA Analysis in Support of a Specific Plan Exemption is included as Attachment 3. The 2002 Dublin Transit Center EIR, upon which the exemption relies, is available for review at the Planning Division in City Hall during normal business hours. PUBLIC NOTICING: In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project to advertise the project and the and posted at several locations throughout the City. A copy of this Staff Report has b een provided to the Applicant. ATTACHMENTS: 1. PC Resolution recommending that the City Council adopt an Ordinance Rezoning the Dublin Transit Center Site A-3 1a. Exhibit A to Attachment 1 3.2.b Packet Pg. 68 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) Page 11 of 11 2. PC Resolution recommending that the City Council approve the SDR & Tentative Map for site A-3 2a. Exhibit A to Attachment 2 2b. Exhibit A to City Council Resolution approving the SDR & Tentative Map 3. Ashton at Dublin Station_CEQA Analysis 3.2.b Packet Pg. 69 At t a c h m e n t : 2 . P l a n n i n g C o m m i s s i o n S t a f f R e p o r t d a t e d N o v e m b e r 1 4 , 2 0 1 7 w i t h o u t a t t a c h m e n t s ( T r a n s i t C e n t e r S i t e A - 3 ) RESOLUTION NO. 18-xx A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN RECOMMENDING THAT THE CITY COUNCIL ADOPT AN ORDINANCE APPROVING A DEVELOPMENT AGREEMENT BETWEEN THE CITY OF DUBLIN AND ASHTON AT DUBLIN STATION, LLC PLPA-2017-00036 WHEREAS, the Applicant, Ashton at Dublin Station, is proposing to construct a residential project comprised of 220 units, residential amenities including a fitness center, pool, roof top lounge, and 331 spaces of structured parking on an approximately 2.36 -acre site located on Site A-3 in the Dublin Transit Center. The proposed development and applications are collectively known as the “Project”; and WHEREAS, the Planning Commission considered the proposed project on November 14, 2017, and recommended that the City Council approve the project; and WHEREAS, the City and the Applicant desire to enter into a Development Agreement in conjunction with the project; and WHEREAS, the proposed Development Agreement is attached to the Ordinance as Exhibit A; and WHEREAS, on July 10, 2018, the Planning Commission held a public hearing on the proposed Development Agreement; and WHEREAS, proper notice of the public hearing was given in all respects as required by law; and WHEREAS, the Staff Report was submitted recommending that the Planning Commission recommend that the City Council adopt an Ordinance approving the Development Agreement; and WHEREAS, the Planning Commission did hear and use their independent judgment and considered all reports, recommendations, and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT the City of Dublin Planning Commission does hereby recommend that the City Council make the following findings and determinations regarding the proposed Development Agreement: 1. The proposed Development Agreement is consistent with the objectives, policies, general land uses and programs specified in the General Plan and Eastern Dublin Specific Plan in that: a) the General Plan and Eastern Dublin Specific Plan land use designation for the subject site is High Density Residential and the Development Agreement is consistent with that designation; and b) the Development Agreement is consistent with the fiscal policies in relation to the provision of infrastructure and public services of the General Plan and Eastern Dublin Specific Plan. 3.2.c Packet Pg. 70 At t a c h m e n t : 3 . R e s o l u t i o n R e c o m m e n d i n g t h a t t h e C i t y C o u n c i l A d o p t a n O r d i n a n c e A p p r o v i n g a D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e 2 of 2 2. The proposed Development Agreement is compatible with the uses authorized in, and the regulations prescribed for, the land use designation in which the real property is located. 3. The proposed Development Agreement is in conformity with the public convenience, general welfare and good land use practice in that the proposed project will impleme nt land use guidelines that are in place at the time the project is approved. 4. The proposed Development Agreement will not be detrimental to the health, safety, and general welfare in that the project will proceed in accordance with the General Plan, Eastern Dublin Specific Plan, Planned Development Zoning, and any Conditions of Approval for the proposed project. 5. The proposed Development Agreement will not adversely affect the orderly development of the property or the preservation of property values in that the development will be consistent with the City of Dublin General Plan, Eastern Dublin Specific Pla n, Planned Development Zoning, and future project approvals. NOW, THEREFORE, BE IT FURTHER RESOLVED THAT the City of Dublin Planning Commission does hereby recommend that the City Council ado pt an Ordinance approving the Development Agreement between the City of Dublin and Ashton at Dublin Station, LLC. PASSED, APPROVED AND ADOPTED this 10th day of July 2018 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Planning Commission Chair ATTEST: Assistant Community Development Director 3.2.c Packet Pg. 71 At t a c h m e n t : 3 . R e s o l u t i o n R e c o m m e n d i n g t h a t t h e C i t y C o u n c i l A d o p t a n O r d i n a n c e A p p r o v i n g a D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e 1 of 3 ORDINANCE NO. xx – 18 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * * * * * * APPROVING THE DEVELOPMENT AGREEMENT BETWEEN THE CITY OF DUBLIN AND ASHTON AT DUBLIN STATION, LLC PLPA-2017-00036 THE CITY COUNCIL OF THE CITY OF DUBLIN DOES HEREBY ORDAIN AS FOLLOWS: Section 1: RECITALS A. The Applicant, Ashton at Dublin Station, is proposing to construct a residential project comprised of 220 units, residential amenities including a fitness center, pool, roof top lounge, and 331 spaces of structured parking spaces on approximately 2.36 -acre site located on Site A-3 in the Dublin Transit Center. The proposed development and applications are collectively known as the “Project”; and B. The City Council denied the project on March 6, 2018, and the Applicant subsequently filed a lawsuit against the City; and C. In accordance with the settlement agreement, the City Council will reconsider the project , and consider the proposed Development Agreement; and D. The Planning Commission held a public hearing on the proposed Development Agreement on July 10, 2018 for which public notice was given by law; and E. The Planning Commission made its recommendation to the City Council for approval of the Development Agreement by Resolution 18-xx; and F. A public hearing on the proposed Development Agreement was h eld before the City Council on July _____, 2018 for which public notice was given as provided by law; and G. The City Council has considered the recommendation of the Planning Commi ssion including the Planning Commission’s reasons for its recommendation, the C ity Council Staff Report dated July ______, 2018 and all comments received in writing and all testimony received at the public hearing. Section 2: FINDINGS AND DETERMINATIONS Therefore, on the basis of: a) the foregoing Recitals which are incorporated herein, b) the City of Dublin General Plan, Eastern Dublin Specific Plan and Transit Center Stage 1 Development Plan, c) the Staff Report, and, on the basis of the specific conclusions set forth below, the City Council finds and determines that: 1. The proposed Development Agreement is consistent with the objectives, policies, general land uses and programs specified in the General Plan and Eastern Dublin Specific Plan in that: a) the General Plan and Eastern Dublin Specific Plan land use designation for the subject site is High Density Residential and the Development Agreement is consistent with 3.2.d Packet Pg. 72 At t a c h m e n t : 4 . D r a f t O r d i n a n c e A p p r o v i n g a D e v e l o p m e n t A g r e e m e n t f o r t h e A s h t o n a t D u b l i n S t a t i o n P r o j e c t ( T r a n s i t C e n t e r S i t e A - 3 ) 2 of 3 that designation; and b) the Development Agreement is consistent with the fiscal policie s in relation to the provision of infrastructure and public services of the General Plan and Eastern Dublin Specific Plan. 2. The proposed Development Agreement is compatible with the uses authorized in, and the regulations prescribed for, the land use designation in which the real property is located. 3. The proposed Development Agreement is in conformity with the public convenience, general welfare and good land use practice in that the proposed project will implement land use guidelines that are in place at the time the project is approved. 4. The proposed Development Agreement will not be detrimental to the health, safety, and general welfare in that the project will proceed in accordance with the General Plan, Eastern Dublin Specific Plan, Planned Development Zoning, and any Conditions of Approval for the proposed project. 5. The proposed Development Agreement will not adversely affect the orderly development of the property or the preservation of property values in that the development will be consistent with the City of Dublin General Plan, Eastern Dublin Specific Plan, Planned Development Zoning, and future project approvals. Section 3: APPROVAL The City Council hereby approves the Development Agreement (Exhibit A to the Ordinance) and authorizes the City Manager to execute it. Section 4: RECORDATION Within ten (10) days after the Development Agreement is fully executed by all parties, the City Clerk shall submit the Agreement to the County Recorder for recordation. Section 5: EFFECTIVE DATE AND POSTING OF ORDINANCE This Ordinance shall take effect and be in force thirty (30) days from and after the date of its final adoption. The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public places in the City of Dublin in accordance with Section 39633 of the Government Code of California. PASSED, APPROVED, AND ADOPTED BY the City Council of the City of Dublin on this ___day of , 2018, by the following votes: AYES: NOES: ABSENT: ABSTAIN: 3.2.d Packet Pg. 73 At t a c h m e n t : 4 . D r a f t O r d i n a n c e A p p r o v i n g a D e v e l o p m e n t A g r e e m e n t f o r t h e A s h t o n a t D u b l i n S t a t i o n P r o j e c t ( T r a n s i t C e n t e r S i t e A - 3 ) 3 of 3 _____________________________ Mayor ATTEST: ___________________________________ City Clerk 3.2.d Packet Pg. 74 At t a c h m e n t : 4 . D r a f t O r d i n a n c e A p p r o v i n g a D e v e l o p m e n t A g r e e m e n t f o r t h e A s h t o n a t D u b l i n S t a t i o n P r o j e c t ( T r a n s i t C e n t e r S i t e A - 3 ) RECORDING REQUESTED BY: CITY OF DUBLIN WHEN RECORDED MAIL TO: City Clerk City of Dublin 100 Civic Plaza Dublin, CA 94568 Fee Waived per GC 27383 Space above this line for Recorder’s use DEVELOPMENT AGREEMENT BETWEEN THE CITY OF DUBLIN AND ASHTON AT DUBLIN STATION, LLC FOR THE ASHTON AT DUBLIN STATION PROJECT 3.2.e Packet Pg. 75 At t a c h m e n t : 5 . E x h i b i t A t o A t t a c h m e n t 4 - D r a f t D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e A - 3 ) Page 2 THIS DEVELOPMENT AGREEMENT (this “Agreement” or this “Development Agreement”) is made and entered in the City of Dublin on this __ day of ___________, 2018 (the “Effective Date”), by and between the City of Dublin, a Municipal Corporation (hereafter “City”) and Ashton at Dublin Station, LLC, a Delaware limited liability company (hereafter “Developer”) pursuant to the authority of §§ 65864 et seq. of the California Government Code and Dublin Municipal Code, Chapter 8.56. City and Developer are, from time-to-time, individually referred to in this Agreement as a “Party,” and are collectively referred to as “Parties.” RECITALS A. California Government Code §§ 65864 et seq. (“Development Agreement Statute”) and Chapter 8.56 of the Dublin Municipal Code (hereafter “Chapter 8.56”) authorize the City to enter into a Development Agreement for the development of real property with any person having a legal or equitable interest in such property in order to establish certain development rights in such property. B. Developer owns certain real property (the “Property”) consisting of approximately 2.36 acres of land, as more particularly described in Exhibit A attached hereto and incorporated herein by reference. C. City has previously approved various land use approvals in connection with the development of the Dublin Transit Center Project, including the Project, which approvals include, without limitation, a General Plan and Eastern Dublin Specific Plan Amendment for the Dublin Transit Center Project (Resolution No. 216-02 adopted on November 19, 2002), a Stage 1 Planned Development Zoning and Development Plan (Ord. No. 21-02 adopted on December 3, 2002; amended by Ord. No. 06-11 adopted on June 7, 2011), and a Master Development Agreement (Ord. No. 05-03 adopted on May 6, 2003; amended by Ord. No. 24-05 adopted on October 4, 2005) (collectively referred to herein as the “Transit Center Approvals”). D. Developer has applied for, and City has approved, various land use approvals in connection with a high-density residential development of two hundred twenty (220) units and related amenities (the “Project”), including, without limitation, a Stage 2 Planned Development Rezoning and Development Plan for the Transit Center Site A-3 (Ord. No. ___ adopted by the City Council on ______, 2018), and a Site Development Review (SDR) approval permit and Tentative Map 8437 for the Transit Center Site A-3 Project (Resolution No. ___ adopted on ______, 2018), and the DA Approving Ordinance (defined below) (collectively with the Transit Center Approvals, referred to herein as the “Project Approvals”). E. City desires the timely, efficient, orderly and proper development of the Project. F. The City Council has found that, among other things, this Development Agreement is consistent with its General Plan and the Eastern Dublin Specific Plan (“Specific Plan”), as both have been amended by the Project Approvals, and has been 3.2.e Packet Pg. 76 At t a c h m e n t : 5 . E x h i b i t A t o A t t a c h m e n t 4 - D r a f t D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e A - 3 ) Page 3 reviewed and evaluated in accordance with the Development Agreement Statute and Chapter 8.56. The proposed project is consistent with the General Plan Land Use Designation for Site A-3 and does not exceed the units allowed by the Dublin Transit Center Stage 1 Planned Development Zoning. G. City and Developer have reached agreement and desire to express herein a Development Agreement that will facilitate development of the Project subject to conditions set forth herein. H. City has undertaken, pursuant to the California Environmental Quality Act (Public Resources Code Section 21000 et seq., hereinafter “CEQA”), the required analysis of the environmental effects that would be caused by the Project and has determined that the project qualifies for a statutory exemption from CEQA under Government Code section 65457. An EIR has been certified for the Transit Center Approvals. Public Resources Code Section 21166 and CEQA Guidelines Section 15162 identify the conditions requiring subsequent environmental review. The CEQA document in Support of a Specific Plan Exemption finds that no event as specified in Section 21166 of the Public Resources Code has occurred since the certification of the Dublin Transit Specific Plan EIR that requires preparation of a subsequent or supplemental EIR or Negative Declaration. I. On ___________, 2018, the City Council of the City of Dublin adopted Ordinance No. ___ approving this Development Agreement (the “DA Approving Ordinance”). The DA Approving Ordinance took effect on ____________, 2018. NOW, THEREFORE, with reference to the foregoing recitals and in consideration of the mutual promises, obligations and covenants herein contained, City and Developer agree as follows: AGREEMENT 1. Description of Property. The Property that is the subject of this Agreement is described in Exhibit A attached hereto (“Property”). 2. Interest of Developer. Developer has a legal interest in the Property in that it is the owner of the Property. 3. Relationship of City and Developer. It is understood that this Agreement is a contract that has been negotiated and voluntarily entered into by the City and Developer and that Developer is not an agent of the City. The City and Developer hereby renounce the existence of any form of joint venture or partnership between them, and agree that nothing contained herein or in any document executed in connection herewith shall be construed as making the City and Developer joint venturers or partners. 3.2.e Packet Pg. 77 At t a c h m e n t : 5 . E x h i b i t A t o A t t a c h m e n t 4 - D r a f t D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e A - 3 ) Page 4 4. Effective Date and Term 4.1 Effective Date. The effective date of this Agreement (“Effective Date”) is _______________ (as first set forth above). 4.2 Term. The term of this Agreement shall commence on the Effective Date and shall continue for five (5) years thereafter, unless said term is otherwise extended or terminated as provided in this Agreement. In the event that any third-party lawsuit is filed challenging the City’s issuance of the Project Approvals or its compliance with CEQA, the term of this Agreement shall be automatically extended for a duration equal to the time from the filing of such lawsuit to the entry of an order dismissing or otherwise terminating such lawsuit, which duration shall include any appeals. 4.3 Term of Project Approvals. The term of any Project Approvals for the Property or any Portion thereof, specifically including the Site Development Review approval permit and Tentative Map No. 8347 approved by Resolution No. _____, shall be extended automatically for the Term of this Agreement. 5. Vested Rights/Use of the Property/Applicable Law/Processing 5.1 Right to Develop. Developer shall have the vested right to develop the Project on the Property in accordance with the terms and conditions of this Agreement, the Project Approvals (as and when issued), and any amendments to any of them as shall, from time to time, be approved pursuant to this Agreement, and the City’s ordinances, codes, resolutions, rules, regulations and official policies governing the development, construction, subdivision, occupancy and use of the Project and the Property including, without limitation, the General Plan, the Dublin Municipal Code, and the Specific Plan, the permitted uses of the Property, density and intensity of use of the Property and the maximum height, bulk and size of proposed buildings, and the provisions for reservation or dedication of land for public purposes that are in force and effect on the Effective Date of this Agreement (collectively, “Applicable Law”). In exercising its discretion when acting upon subsequent project approvals, City shall apply the Applicable Law as the controlling body of law (within which Applicable Law such discretion shall be exercised). Notwithstanding the foregoing or anything to the contrary herein, any amendment to the Project Approvals shall not become part of the law Developer is vested into under this Agreement unless an additional amendment of this Agreement is entered into between Developer and City in accordance with this Agreement. In the event that such amendments to the Project Approvals are sought for any distinct portion of the Property or Project, such amendments shall not require amendment of this Agreement with respect to any other portion of the Property or Project, except to the extent set forth in such amendment. 5.2 Fees, Exactions, Dedications. The City shall not apply to the Project any development impact fee or any application, processing or inspection fee (collectively, “Fees”) that the City first enacts after the Effective Date. Furthermore, the rate imposed for each such applicable Fee shall be the lower of (a) the rate in effect on June 30, 2018, as set forth in the schedule attached hereto as Exhibit B, or (b) the rate 3.2.e Packet Pg. 78 At t a c h m e n t : 5 . E x h i b i t A t o A t t a c h m e n t 4 - D r a f t D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e A - 3 ) Page 5 in effect at the time such Fee is payable under the terms of the legislation imposing the particular Fee. Notwithstanding the foregoing, the City shall be permitted to impose any Exaction on a subsequent project approval that requires an amendment to the Project Approvals. 5.3 Construction Codes. Notwithstanding the provisions of Section 5.1 above, to the extent Applicable Law includes requirements under the state or locally adopted building, plumbing, mechanical, electrical and fire codes (collectively the “Codes”), the Codes included shall be those in force and effect at the time Developer submits its application for the relevant building, grading, or other construction permits to City. In the event of a conflict between such Codes and the Project Approvals, the Project Approvals shall, to the maximum extent allowed by law, prevail. For construction of public infrastructure, the Codes applicable to such construction shall be those in force and effect at the time of execution of an improvement agreement between City and Developer pursuant to Chapter 9.16 of the Dublin Municipal Code. 5.4 Omitted. 5.5 New Rules and Regulations. During the term of this Agreement, the City may apply new or modified ordinances, resolutions, rules, regulations and official policies of the City to the Property which were not in force and effect on the Effective Date only to the extent they are not in conflict with the vested rights granted by this Agreement, the Applicable Law, the Project Approvals or this Agreement. In addition to any other conflicts that may occur, each of the following new or modified ordinances, resolutions, rules, regulations or official policies shall be considered a per se conflict with the Applicable Law: 5.5.1 Any application or requirement of such new or modified ordinances, resolutions, rules, regulations or official policies that would (i) cause or impose a substantial financial burden on, or materially delay development of the Property as otherwise contemplated by this Agreement or the Project Approvals, (ii) frustrate in a more than insignificant way the intent or purpose of the Project Approvals or preclude compliance therewith including, without limitation, by preventing or imposing limits or controls in the rate, timing, phasing or sequencing of development of the Project; (iii) prevent or limit the processing or procuring of subsequent project approvals; or (iv) reduce the density or intensity of use of the Property as a whole, or otherwise requiring any reduction in the square footage of, or total number of, proposed buildings, structures and other improvements, in a manner that is inconsistent with or more restrictive than the limitations included in this Agreement and the Project Approvals; and/or 5.5.2 If any of such ordinances, resolutions, rules, regulations or official policies do not have general (City-wide) applicability. Developer specifically acknowledges that it will be subject to new or modified ordinances, resolutions, rules, regulations or official policies that implement the Municipal Regional Stormwater NPDES Permit issued by the Regional Water Quality 3.2.e Packet Pg. 79 At t a c h m e n t : 5 . E x h i b i t A t o A t t a c h m e n t 4 - D r a f t D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e A - 3 ) Page 6 Control Board for the San Francisco Bay Region from time to time (the “MRP”) to the extent that the permit does not include exemptions that apply to the Project. 5.6 Moratorium Not Applicable. Notwithstanding anything to the contrary contained herein, if a City ordinance, resolution, policy, directive, or other measure is enacted or becomes effective, whether by action of the City or by initiative, and if it imposes a building moratorium which affects all or any part of the Project, City agrees that such ordinance, resolution or other measure shall not apply to the Project, the Property, this Agreement or the Project Approvals unless the building moratorium is imposed as part of a declaration of a local emergency or state of emergency as defined in Government Code section 8558, provided that to the extent a moratorium applies to all or any part of the Project then the Term shall automatically be extended for a period of time equal to the period of the moratorium. 5.7 Revised Application Fees. Notwithstanding section 5.2 above, any existing application, processing and inspection fees that are revised during the term of this Agreement shall apply to the Project provided that (1) such fees have general applicability and are consistent with State law limitations that processing fees not exceed the estimated reasonable cost of providing the service for which they are charged; (2) the application of such fees to the Property is prospective; and (3) the application of such fees would not prevent, impose a substantial financial burden on, or materially delay development in accordance with this Agreement. By so agreeing, Developer does not waive its rights to challenge the legality of any such application, processing and/or inspection fees. 5.8 New Taxes. This Agreement shall not prohibit the application of any subsequently enacted city-wide taxes to the Project provided that (1) the application of such taxes to the Property is prospective, and (2) the application of such taxes would not prevent development in accordance with this Agreement. By so agreeing, Developer does not waive its rights to challenge the legality of any such taxes, facially or as applied to its Project or Property, or to claim exemption from any taxes to the extent allowed by law. 5.9 Development of the Project; Phasing, Timing. Since the California Supreme Court held in Pardee Construction Co. v. City of Camarillo (1984) 37 Cal. 3d 465, that the failure of the parties therein to provide for the timing of development resulted in a later adopted initiative restricting the timing of development to prevail over such parties’ agreement, it is the Parties’ intent to cure that deficiency by acknowledging and providing that this Agreement contains no requirements that Developer must initiate or complete any action, including without limitation, development of the Project within any period of time set by City. Nothing in this Agreement is intended to create nor shall it be construed to create any affirmative development obligations to develop the Project at all or in any particular order or manner, or liability in Developer under this Agreement if the development fails to occur. It is the intention of this provision that Developer be able to develop the Property in accordance with its own time schedules and the Project Approvals. 3.2.e Packet Pg. 80 At t a c h m e n t : 5 . E x h i b i t A t o A t t a c h m e n t 4 - D r a f t D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e A - 3 ) Page 7 5.10 Processing. Nothing in this Agreement shall be construed to limit the authority or obligation of City to hold necessary public hearings, nor to limit the discretion of City or any of its officers or officials with regard to subsequent project approvals that require the exercise of discretion by City, provided that such discretion shall be exercised consistent with the vested rights granted by this Agreement, the Applicable Law and this Agreement. 6. Community Benefits. 6.1 Community Benefit Payment. Concurrently with the Effective Date of this Agreement, Developer has contributed the sum of Six Hundred Thousand Dollars ($600,000) to the City as a Community Benefit, to be allocated by the City toward improvements in Don Biddle Community Park, in accordance with the Master Plan adopted for the park. 6.2 Affordable Housing. Developer shall ensure that a minimum of 10% of the units in the Project shall be made affordable for fifty-five (55) years to households earning between 80% and 120% of area median income, pursuant to an Affordable Housing Agreement with the City, which agreement shall comply with the City’s Inclusionary Zoning Ordinance (Municipal Code Chapter 8.68) and shall satisfy Developer’s obligations thereunder. 6.3 Right-of-Way Purchase. As consideration for Developer’s purchase of approximately three hundred (300) square feet of the City’s right-of-way in accordance with the terms and conditions of the Project Approvals, Developer shall contribute the purchase price of Twenty-Five Thousand Dollars ($25,000), prior to issuance of building permits for the Project. 7. Amendment or Cancellation. 7.1 Modification Because of Conflict with State or Federal Laws. The Project and Property shall be subject to state and federal laws and regulations and this Agreement does not create any vested right in state and federal laws and regulations in effect on the Effective Date. In the event that state or federal laws or regulations enacted after the Effective Date of this Agreement prevent or preclude compliance with one or more provisions of this Agreement or require changes in plans, maps or permits approved by the City, the parties shall meet and confer in good faith in a reasonable attempt to modify this Agreement to comply with such federal or state law or regulation. Any such amendment or suspension of the Agreement shall be subject to approval by the City Council (in accordance with Chapter 8.56). Each Party agrees to extend to the other its prompt and reasonable cooperation in so modifying this Agreement or approved plans. 7.2 Amendment by Mutual Consent. This Agreement may be amended in writing from time to time by mutual consent of the parties hereto and in accordance with the procedures of State law and Chapter 8.56. When a Party seeking such an amendment owns or has an equitable right to only a portion of the whole of the Property 3.2.e Packet Pg. 81 At t a c h m e n t : 5 . E x h i b i t A t o A t t a c h m e n t 4 - D r a f t D e v e l o p m e n t A g r e e m e n t ( T r a n s i t C e n t e r S i t e A - 3 )