Loading...
HomeMy WebLinkAboutOrd 02-19 Approving an Amendment to the Existing Planned Development Zoning for the Valley Christian Center ORDINANCE NO. 02— 19 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AN AMENDMENT TO THE EXISTING PLANNED DEVELOPMENT ZONING FOR THE VALLEY CHRISTIAN CENTER PLPA 2014-00052 (APN 941-0022-003, 004, 005 & 006) The Dublin City Council does ordain as follows:. SECTION 1. RECITALS A. The Applicant, the Valley Christian Center, has requested approval of an amendment to the existing Planned Development Zoning District, and a Site Development Review Permit to construct a lighted athletic field with sound amplification, a concession stand/ticket booth and associated site improvements including a plaza and landscaping. These planning and implementing actions are collectively known as the "Valley Christian Center project" or the "Project"; and B. The project site is approximately 51 acres and is located at 7500 Inspiration Drive in the westerly portion of Dublin; and C. In 2003, the City Council approved Planned Development Zoning for the Valley Christian Center Campus (Ordinance No. 7-03), which serves as a master plan and established future uses and the location and size of future buildings and expansion of existing buildings. The intent of the Planned Development Zoning was to provide a plan forfuture improvements on the site and to allow phased construction of improvements; and D. The proposed amendments to the existing Planned Development Zoning include the addition of a lighted athletic field with sound amplification, establishing a parking standard for the field, minor adjustment to the western boundary, re-allocating the square feet associated with other various buildings/uses on the campus and permit the continued use of modular buildings on the site; and E. In 2003, the City Council adopted Resolution 92-03 certifying an Environmental Impact Report (EIR), and adopted findings and a Mitigation Monitoring and Reporting Program for the Valley Christian Center Expansion/Master Plan project; and F. The City prepared a modified Initial Study to determine whether supplemental environmental review was required for the currently proposed Valley Christian Center project under CEQA standards. The Initial Study examined whether there were substantial changes to the proposed development, substantial changes in circumstances, or new information, any of which would result in new or more severe significant impacts than analyzed in the prior Valley Christian Center EIR or whether any other standards for supplemental environmental review were met; and G. Upon completion of the Initial Study it was determined that there were new potentially significant impacts associated with the project related to aesthetics, biological resources, noise, and transportation/traffic; therefore, a Supplemental Mitigated Negative Declaration was prepared to analyze those impacts and included mitigation measures to reduce the impacts to less than significant; and Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 1 of 11 H. The Supplemental Mitigated Negative Declaration/Initial Study was circulated for public review from June 12, 2018 to July 12, 2018. The City of Dublin received two comment letters during the public review period and five additional comment letters after the public review period closed; and I. Following a public hearing on August 14, 2018, the Planning Commission adopted Resolution 18-18 recommending that the City Council adopt the Supplemental Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the project, which resolution is incorporated herein by reference and available for review at City Hall during normal business hours; and J. Following a public hearing on August 14, 2018, the Planning Commission adopted Resolution 18-19, recommending that the City Council approve the amendment to the existing Planned Development Zoning District, which resolution is incorporated herein by reference and available for review at City Hall during normal business hours; and K. A Staff Report, dated September 4, 2018, October 2, 2018 and February 5, 2019, and incorporated herein by reference, described and analyzed the project, including the Supplemental Mitigated Negative Declaration and the amendment to the Planned Development Zoning District for the City Council; and L. On September 4, 2018, the City Council was scheduled to hold a properly noticed public hearing on the project and the Amendment to the Planned Development Zoning for the Valley Christian Center and upon a request by the Applicant, continued the item to October 2, 2018; and M. On October 2, 2018, the City Council was scheduled to hold a properly noticed public hearing on the project and the Amendment to the Planned Development Zoning for the Valley Christian Center and upon a request by the Applicant, continued the item to a date uncertain; and N. On February 5, 2019, the City Council held a properly noticed public hearing on the project, including the proposed amendment to the Planned Development Zoning District, at which time all interested parties had the opportunity to be heard; and O. The City Council adopted Resolution xx-19 adopting the Supplemental Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the project; and P. The City Council considered the Supplemental Mitigated Negative Declaration and related prior CEQA documents and all above referenced reports, recommendations, and testimony prior to taking action on the project. SECTION 2: FINDINGS A. Pursuant to Section 8.32.070 of the Dublin Municipal Code, the City Council finds as follows. 1. The Valley Christian Center project meets the purpose and intent of Chapter 8.32 in that it continues to provide a comprehensive master plan that creates a desirable use of land that is sensitive to surrounding land uses by virtue of the layout and design of the site plan. 2. Development of the Valley Christian project under the amended PD-Planned Development zoning will be harmonious and compatible with existing and future development in the surrounding area in that the site provides facilities that will be used to support the school's academic and sports programs. As conditioned, the school facilities will be operated, in a manner as to reduce impacts on the surrounding neighborhood. Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 2 of 11 B. Pursuant to Sections 8.120.050.A and B of the Dublin Municipal Code, the City Council finds as follows. 1. The amended PD-Planned Development zoning for the Valley Christian Center project will be harmonious and compatible with existing and potential development in the surrounding area in that the proposed site plan has taken into account sensitive adjacencies and will provide facilities to support the existing school. The proposed site plan has taken into account a land use type and density that is compatible with the adjacent areas and densities. 2. The project site is physically suitable for the type and intensity of the amended zoning district being proposed in that the project site is relatively flat with improved public streets and utilities. The project site conditions are documented in the Supplemental Mitigated Negative Declaration/Initial Study and prior certified Environmental Impact Report (EIR), and the project will implement all adopted mitigation measures, as applicable. There are no site conditions that were identified in the Supplemental Mitigated Negative Declaration/Initial Study that will present an impediment to development of the site for the proposed campus development. 3. The amended PD-Planned Development zoning will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare in that the project will comply with all applicable development regulations and standards and will implement all adopted mitigation measures, as applicable. The project uses are compatible with surrounding uses. 4. The amended PD-Planned Development zoning is consistent with and in conformance with the Dublin General Plan, in that the existing church and school is consistent with the existing Public/Semi-Public land use designations for the site. SECTION 3. AMENDMENTS TO THE EXISTING STAGE 1 & STAGE 2 DEVELOPMENT PLAN 1. Statement of proposed uses: Parcel 1. PD — Community Facility The following uses are added as a permitted use for Parcel 1. PD — Community Facility • Athletic field with lights and sound amplification. • Amphitheater with sound amplification. The amphitheater is limited to a maximum capacity of 450. • Facilities to support the athletic field, including but not limited to bleachers with a maximum of 600 seats, an 8 lane running track, a ticket booth and concession stand. These facilities shall not be used for music/entertainment events by non-Valley Christian organizations. • One on-site residential caretaker unit to be occupied by a Valley Christian Center staff member. • Two modular buildings to be used as temporary classrooms (totaling up to 3,500 square feet). The modular buildings shall be removed from the site upon occupancy of the permanent structures • 5,000 square-foot modular building to be used as an administrative office until such time as the present administrative office building is expanded. Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 3 of 11 2. Statement of proposed uses: Parcel 1-A The following uses are added as a permitted use for Parcel 1-A. PD — Community Facility • Sports facilities, including but not limited to baseball diamond and basketball court (without night game illumination and without public announcement system). • Facilities to support the sports facilities, including but not limited to dugouts, bleachers, ticket booth and concession stand. • Storage buildings/containers. 3. Site area, proposed densities, size and new area, Phasing Plan (Parcel 1 & 1-A) The square feet associated with the buildings/uses on campus are amended to read as follows (refer to the Site Plan for the general location of these facilities): Building ,,,Land Use s7 Building Size • A Sanctuary 47,400 SF Al Pre-School/Day Care/Fellowship/Administration 30,600 SF A2* Fellowship/Sanctuary/Administration 7,400 SF D, 2 Pre-School/Daycare 22,300 SF 3 Junior/Senior High School 10,725 SF 4 Junior/Senior High School 32,600 SF 5 Elementary School 52,500 SF B Junior& Senior High School/Administration/Sports 52,075 SF C Sports Support Facilities/School building 15,000 SF E Senior Center/Counseling/Club/Activity Center/Caretaker unit 30,000 SF F Church/School Assembly 6,000 SF Total 306,600 SF Development of the project site may occur in phases over time provided that adequate parking is provided to support the development using shared parking. Modifications to the proposed size of individual buildings may be approved by the Community Development Director. Letters and numbers shown in the table above do not imply sequence of timing or phasing. The remaining improvements are envisioned to be constructed in 4 phases as shown below and on the Site Plan. The location, size and configuration of buildings and improvements is conceptual in nature and may be adjusted. *NOTE: A2 Building shall be limited to 1-story and relocated to the western area of the parking lot near the sanctuary building. Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 4 of 11 Phase 1: Improvements as shown in the Phase 1 Site Plan and generally described below Phase 1 improvements include the following: • New athletic field & support facilities • New Central plaza & site improvmements • New caretaker unit Anticipated New building area (gross square feet): • C1 & C2 support facilities: 2,500 SF • Caretaker unit E-1: 1,000 SF Total: 3,500 SF Phase 1 Site Plan -a- , r ►, F N. I {' +ir°�*s .`�# PARCEL 3 tar vr,C./ , : .,e„;00:-egp ,,,,3„,...-, . , ,,,,,,,,,. .„....„---,,,,,, maiiiir.jr,' )::,,tgv, s.?, /:- ,,,'7A-''' s''',k•-,-,?'',..,.:1::.-4-,-,7"'s:\ „, :, fit $^: v ,8'.". f x f Y) $e r-rit wizsgso .. _ • - sue-'- 1. r. ,..,100.,, ,,,,::,,-,. .¢ +c'°^. ,,c.6.'. �.j`�t b g O hl`} ia- �. 01 • 4� '�, �'�` "`g�.�y cam'"" e y a , ,-.7.7, 4,,.4 { _ i ` N.. '+s, 11 :,.. t.om , . r � PARCEL 1 . - d Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 5 of 11 Phase 2: Improvements as shown in the Phase 2 Site Plan and generally described below Phase 2 improvements include the following: • Demolition of temporary office and classrooms • New Building C • Building Al build-out • Building 2, D build-out Anticipated New building area (gross square feet): • Building C: 12,500 SF • Al: : 16,200 SF • D,2: 12,300 SF Total: 41,000 SF Phase 2 Site Plan \, . --a , PARCEL 3 'Af3CL 1_q a a, t °ill 'iv ., ) , ' e4 • / -,,,,,5‘,.. ' ,,, fif fr � ' . M K`\. -----Ifi : *' ' N. a ,,,,,„,,,.„ ,,,, r -. a 4c, vf•ike. te,.....,,,„•,4: , Mr Ifilittioli' II- iii .„.... ,..,-,,,,,, i „.,,,, .„-- vif,k,. 4,44, te 4 �a•��llitiil@ +yam , , 1 *�'� � .�_a ` ��s._���J+�� myµ � b rM �� E �{ t� i ::N:::':;Q'r,:k.!',,',N':::t:"!:T:?::tip,„/jif.,..,4::o:'";'„.:Ij''/,',,':„;1,.,--';,!'\,.,:\i \'' m ir P' Iva.. i..--., * - lir it A ., �/�If/ Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 6 of 11 Phase 3: Improvements as shown in the Phase 3 Site Plan and generally described below Phase 3 improvements include the following: • West site access & parking adjacent to new Building B • Site improvements and new play areas, including a baseball diamond • New Building B • Removal of temporary storage containers • New storage B1 Anticipated New building area (gross square feet): • Building B — south: 28,200 SF • Storage B1: 1,000 SF Total: 29,200 SF Phase 3 Site Plan N - 4za444,-- ti., / .. ' + `s41: PARCEL AI EL3 - : - „,/ , ' ,,, ,./ 1,,1 1/4?:.:,1-4,,,;;::::::i.'-';'-''''''i----.%--,"„. N'''• '''c ?„ , ,,, t x' yr lic.c,,, 1 '� • 'e- t ,:::::Zt4.;;:,.. —\ 0,_ 5 ,, .. ;1..:' f 1.//* 1 I R d 04 + ^ 1000 ( Mkt ' $ 'i , lit __az )i ,�q 4 l- . Jiiiiiti,w.. 6 4 pt` h + litti . 1 , :-..,-4,110N.,1„,:,,,i,,,, wilt ./ „ % .•,,,, \ \6:.--,4-6,111;DC''''17 '''' ' x• f = "any" I ° - i ::::, F ±-7:: V"VA ,1.tr_gro wIt ,01,2,-. --.\ F ''''''' 4 iiTi,'1, '' ),,p1 i 1 West site access &parking.;.,„._.%eid , . _ I 4.2 ar,0,7_,7%,,,,...„. „.:%,..i.,_____.. - - ....irriohliospoog ....., : Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 7 of 11 Phase 4: Improvements as shown in the Phase 4 Site Plan and generally described below Phase 4 improvements include the following: • Building A build-out • New Building A2 • New Building E and parking • New Building B & site improvements Anticipated New building area (gross square feet): • Building A: 31,700 SF • Building A2*: 7,400 SF • Building E: 29,000 SF • Building B: 22,875 SF • Building F: 6,000 SF Total: 96,975 SF *NOTE: A2 Building shall be limited to 1-story and relocated to the western area of the parking lot near the sanctuary building. Phase 4 Site Plan VS .: r�..,` PARCEL 3 - "- c',-4Rye -----'j 4. 5 y 1..,-;:4-_-,, ,,----4.4ri, k X ,--- 7 -‘") ..4,.. , A ,,,:_,C!, ,.It I-, .'. .f„:... A (-:--,-,,-, i 46,.‘cs c -.),... \ ° ' ‘ 0* N-:',...)4%;i',,, / .11!?k \ \ 1 4 . ....,:-.. ,0,, r el .,3 # " 1,\,...,N { . }fjl Xz�f �Y 4( Ar . _alit „ - ,- 4 ,-,/,',..11N,\,,ntito volikt.,...„, ' 1 ' ,I':,,X 1 '---`,\ '' T, - , -. ,„,,,, ,.0.-.---4,41,,u,..... :.,.. , I II .,,( \ , , — -- = -L, \:,, i ' siC9 ,..„ , _ As. m,,,,,,, r ,, - ---. , .. ,- % I iw' oaf, 1 , w' / i PARC 1 ��'' 4. Parking/Traffic Standards: The following parking standards are added to apply to Parcel 1: • The parking requirement for the athletic field is 0.46 spaces per seat. • No other events, including but not limited to class sessions, school events or religions activities are permitted on the campus at the same time that a football game is held on campus. Other Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 8 of 11 events may occur at the same time that the athletic field is in use for practices, soccer games, track meets as long as the required parking does not exceed the provided parking. • As required by Mitigation Measure TRA-2, prior to the issuance of a building permit for the athletic field, the Applicant shall retain a California-registered Traffic Engineer fio prepare a Parking Management Plan for the operation of football games and other large activities (such as graduations) held at the proposed athletic field. The Parking Management Plan shall include measures to manage traffic that would cut through the neighborhood. The Parking Management Plan is subject to review and approval by the Community Development Director and the Public Works Director and shall be reviewed by the City periodically at the City's discretion. • The Valley Christian Center shall post signs at athletic events to inform visitors that a left turn onto Inspiration Drive is restricted in order to eliminate cut through traffic through adjacent neighborhoods. • Valley Christian Center Staff shall direct traffic after games and at other large events that have a projected attendance of 250 people or more. • Varsity football games and other large activities are prohibited from occurring on the athletic field during peak traffic hours (4:00 pm to 6:00 pm). 5. Amended Site Plan The site plan is amended as shown below: VALLEY GWRISTIAPA CENTERFUU E€1 BEVEL'PPoGENT-SITE RI N ATTON a� £ n '' ,•_ � ;-13i !' J''-11� tSExsk'EI�IT- .,,. rt e x� � t R. .' "`tp4+ 0-P]IiYA`5NGs+'PH _'.,Sl :4 ▪ s `,gymit . `,k:4 d�G`�'i YSYl B962i&tlLLNiLSfd a Si `� "ui" ���� �rv � �4F.t#�A7K1 tit- d t, x9 k !nZGw, =,-'s .,, ;, f l ,� f'. x �3 Yy �• t� �"f�f 't �' _ �+ S 'ti 'I 5'' S U t �J�u tar`I �A � 'xs i4,.: .I1,-,....:-.:,,,,:.1 '4,'. .i.2:ff, € ,, [� p : ▪ `:� n� ' I E r- rn a� .'Y p '7 t r' �-. :'i "" _.. ,,. ,‘,/t,,,°,4'_ • -,,s,,,;•; :` s:i; . : ' • 8 ..... ..... 1 fi AfRa1 Z a r',, 4' � tr , r• *2 v ra�'a �� aswr sa x }- - .. ,,,,,,e,-/-8,- . _-,',,,,,,,,- , , PlRcE.1 -r x m: x> ^tea + + + Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 9 of 11 6. Amended Landscape Plan The landscape plan is amended for a portion of Parcel 1 as shown below:v CAPE DESIGN STATEMENT,,°"am- �,� w "4'tiVa �"w,�,... a-. +`" l -.ate.,,, ._,, x,,, ,„:,`,, s,.,�:'' w+�,_.-,a..�. 'g* 4 ,.', L ,mow'°"-.% „4'a• `a .. ` 3 \ .tr "'""sce mean. + '0 t't.V,a,\ --A ----TY' "A% a,-: if,""*.`40•/- ' k'''`kk-.-- ' '7.... % g t a k � r £ -/—a(� a +''�S ‹ / \ t:� rrsaa 1 eR �. ��' .% .sue.?` a.a .aw % -, z ( #. ,, igi • X, , " �t tires • , '1 <"v ',/ .i'''::\ \ i ::,;X' '44,,,,,,,,FP 41,e,77',.45-''' ' '''. /;"?'1/ ..r„k k e �"i'°rf¢� ,` .,. 3 s. �,�r`, -�,, ,,`4 y �`„%�a" \*.. z<i , as', b =. sy.-,�,� ,IS. t �* (7 � *v p, ` c° �v - '��it gi—cA"a "�.`3 1 v,. / _' 7 ° ` t�.° . '"irk, i7, \� ', ' [ `tftit£ ki t. "a mow: ' p� 7 a `� r ` £ w i s t e' ', re ,, "�V_., 1�s > e \ ', 5 1, s ''', %,1 ,e1:04, ti ,,::::z''',:77''''',N,,,.,„st?4,-1,-....:T.,..,'''''' , .'s)=.\-4e....4:::'-',NX/ '.''I.% \7` \ Arc ";:f:--„, ;,5,,-;:;,-A,,a-''''';'-'illff 16, / t,..)". -we), -,,,,,,7t,-,,,.teeilfiroar---, —/ - ,,,,,,, . 4 _y A . i j -.g,,,, 1J- ' -"" ,:',"7''.7,"f"'g;,.','7'<.11,.'-4.0S'''*;-.`;**4''': t '..7v7:',-7•7:-;-;70 .:--4,7„,„.„`4r:,:;Lf„.2 :. r .0._ _ „4,1 1 1 1.:::::::01 7 ,,,,, 1 ,1/2i I ,-,s, ,,,,,:0,.„,,,..,- R tk If if r /` t X,.;. �. s I t {fit, 114 i r J'''klf'1")". w+.r.. a.......,. u,wI,u.r..r r..-w... # f'.:°YK*�, k °' .. '� ', ,..a.,*.,4L—� _.✓+.q"^' Y � ('8 'f'},,, ,,,- 7"/1-72:1;FTZPSUIIE ,F SS�4e SApu.g--:tli'lill'"---- :I.:::44#4.1,1'111; :w , - i 'l .. ..,,w ,. r ^, k1 fit.4 ,74,14- 4--;2.f +.,;<'.<'7 m.t" i€t .,jJ, '4 x� . � ,.. ?FdRTt1 7. Development Standards for Lights/Public Address System • The amplification system at the athletic field shall not exceed 75dBA Lmax at a distance of 50 feet from each speaker (Mitigation Measure NOISE-1 from the Supplemental Mitigated Negative Declaration/Initial Study, June 2018). • The speakers for the athletic field shall be mounted on stair railings or press box/scorer tables and directed towards the bleachers. • The lights and sound amplification at the athletic field shall not be used after 8:00 pm on Monday through Thursday and after 10:00 pm on Friday and Saturday evenings. The lights and sound amplification shall not be used on Sundays. Amplified sound is permitted during the day for other sporting events including football games, soccer games and track meets. • The Public Address system at the athletic field shall be used a maximum of 50 times per year. Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 10 of 11 • The amplification system at the outdoor amphitheater shall not exceed 75 dBA at a distance of 50 feet from each speaker (Mitigation Measure NOISE-1 from the Supplemental Mitigated Negative Declaration/Initial Study, June 2018). • Amplified sound is allowed at the amphitheater for theatrical plays and lectures. Use of sound amplification at the amphitheater shall not commence before 10:00 am daily, and shall conclude by 8:00 pm on Sunday through Thursday and 10:00 pm on Friday and Saturday evenings. • The Public Address system at the amphitheater shall be used a maximum of 15 times per year. • Athletic field lights shall use LED or similar energy efficient technology with similar directional light capabilities. All lights fixtures shall be encased within a box element that directs the lighting downward to prevent light spill-over. Athletic field light levels shall be 0 foot candle at shared property lines with residential uses. SECTION 4. POSTING OF ORDINANCE The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public spaces in the City of Dublin in accordance with Section 36933 of the Government Code of the State of California. SECTION 5. EFFECTIVE DATE This Ordinance shall take effect thirty (30) days following its adoption. PASSED, APPROVED AND ADOPTED this 19th day of February 2019, by the following vote: AYES: Councilmembers Hernandez, Josey, and Mayor Haubert NOES: Councilmembers Goel and Kumagai ABSENT: ABSTAIN: M r ATTEST: 61//A47 City Clerk Ord. 02-19, Adopted 2/19/2019, Item 4.8 Page 11 of 11