Loading...
HomeMy WebLinkAboutReso 138-04 AmdAgmtBerlogar RESOLUTION NO. 138 . 04 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ********* APPROVING AMENDMENT TO AGREEMENT FOR GEOTECHNICAL SERVICES WITH BERLOGAR GEOTECHNICAL CONSULTANTS WHEREAS, the City Council of the City of Dublin approved an agreement for geotechnical services with Berlogar Geotechnical Consultants, on June II, 1996; and WHEREAS, said agreement was amended to extend the tenn of the agreement until June 30, 2005; and WHEREAS, said amendment allows for an adjustment of rates for the 2004-2005 fiscal year, which Berlogar Geotechnical Consultants has requested; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the amendment to the agreement (adjustment of rates) with Berlogar Geotechnical Consultants, which is attached hereto as "Exhibit A." BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment. PASSED, APPROVED AND ADOPTED this 20th day of July, 2004. A YES: Councilmembers McConnick, Oravetz, Sbranti and Zika and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None K2/G/7-20..o4/reso-berlogar.doc (Item 4.5) g:\engr\berlogar\resoamnd 04-05 EXHIBIT "A" OF RESOLUTION f3.b.:04 AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND BERLOGAR GEOTECHNICAL CONSULTANTS FOR GEOTECHNICAL SERVICES WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Berlogar Geotechnical Consultants (hereinafter referred to as "CONSULTANT"), entered into a one-year agreement on June 11, 1996, to provide engineering services to CITY; and WHEREAS, the term of the agreement was extended to June 30, 2005; and WHEREAS, Consultant and the City of Dublin wish to amend said agreement to reflect the rates in effect for Fiscal Year 2004-2005; NOW, THEREFORE, the parties hereto agree as follows: Adiustment of Rates The rate schedule attached hereto as Exhibit I shall be effective for Fiscal Year 2004-2005 until termination of agreement on June 30, 2005. Should a new agreement or amendment to agreement to extend the contract not be entered into by June 30, 2005, then this agreement will automatically extend until a new agreement or amendment to agreement is entered into or City gives written notice of termination. ~(les.ì clefd- g:engr contrdct\berlogar\amndment 04-05.doc BERlOGAR GEOTECHNICAL CONSULTANTS FEE SCHEDULE - 2003 General Blllino Rate/Hour Principal Engineers and GeOlogists . , , , . . , . . , . , . , . , . , . , . , . . , . . , . , . . . . , , , . , , . , . , , . , , , , , , , . . , , , , , , . . . ,. . , .. $180.00 Associate Engineers and Geologists. . , , . , , , , . . , . , . . . , , , . . . . . , . . . . . , , . . . , . ' . . . , , . , , , . . , . . , , , , . , , . . . . , , . . ,. 152.00 Senior Engineers and GeologIsts. . . . , . . . , , . . . , . , , , . , . , . . . . , ' . . . , . . . . . , , , . . . . , , . . . , , . . , , , . . . , , , ' . , . . ' . , , " 135.00 Project Engineers and Geologists , . . . , , . . , . . . . . , , , , , . , . . . , , . . . . . , . . , . , . , . . . . . , . . , . . . . , , . . . , . , . , , . , . , , , . " 123.00 Staff, Engineers and Geologists . , , . , . , . . . . , , , , , . . . . , , . , , . . . . , . . . . , . , . , . . . , . , , , . . . , . . . . . . . . , . ' , ' , . , , , . . . ,. 111 .00 Supervising Technicians ...,.,..."".".,..,.,.",....,...,.,....,."".,",....,.,.,.....,...,',.,'" ·125.00 Laboratory Technicians. . . . , . . , , , . , . . . . . , , . . . . ,. . . , , . . . . , . , . . , . , . , . . , . . . . . , . , . , . . . ' , , , , , . . . , , . , , , , . , . , . . 93.00 Senior Engineering Technicians, . . , . . , . , . . . . . . , . . , . . . . . , , , , . . , , . . , ' , . . , . . , . . , . , , , . , . . , , . . . . . , . . , , . , , . . , . , . 93.00 Engineertng Technicians. . , , . ' , , . . '.' . . . . . , . . . . . . , . . , . , . , , . . . . . . , . . . , . , . . . , . . , . . .. , . . , . , , , . . , , , , . , , . . . , .. 85.00 Computer Time. . , . . . , , . . '.... . . , . . . , . . , , . , . , . , . , , . . . , . , . , , . , . , . . , , . . . . .. . . . , . , . . . , , . . . . . , . . . , , . , . . . . . . . , 27.00 Droftsman . " , . . , , , , . , ' . , :' , . . . , . . . , . , . . , . . , , , . . . . , . , . , , , . , . . , , , . . . , , , , , . . . . , , . . . . . . . . , . . . , , . , . , , . . . . .. 84.00 Word Processor. . . , . , , . . , , , . , . , . . . . . . , . ' , , . . , . . , . , . . . . . . , . . , , . . , . , , , , . , . , . ' , . , , . . . . , . , . . . , . ' , . , , , . , , . . 57,00 Clerical, . . . , , . . . . . , . , , , . . . , . . . . , . . . , , . . , , , , . , . . . , . . , . . . . , . . . . . . , , . , ' . . , , . , . . , , . . , . . , . , , , ' . . . . . . . . . . , 40,00 Outside Services ........",. , , , . . , , , . , , , , . . . . . . , , , . . . . , , , . . , . , , . , , , , , , , . . . , , . , . , . , . , , , . , . , . . , . . . . Cost + 20% Vehicle ".""",.,.",....,...,..".,...",.,..."..,.."..............,",.".".,..,',., . , . . , , . 49Q/miie Nuclear Density Gauge (Two-HOur Minimum) , ' . , . . . . . . . . . ' . , . . , , . . . , , , . , . . , , . . . . , ' . . , . , . , . , , . . . . . , , . , . . . . . .' 9,00 Proton Magnetometer .."",."",...""""".,..",..,.,..,.,..,',..,',.,.".,',.".."., 130.DO/day Seism0groph (12 Channel). "..",.,.,....,',.."',....,' ' . . . , , . . . , , ' , . . . . . , . . , , , , . , . . .. 353.00/day Slope !ndlcator .., . . . , , . . , , , . . . , . . . . , , . . , , , . . . . , , . . . , . . . . , . , , . . . . , . ' , . , . . . . . , . . . ,. . . . . , . . . '.' . , , ., 163.00/day Sondex Instrument, ' . , , . . . . , . . . , , . , . , . . . , , . . . . . , , , , . . , . , , . , , . , . . . , . , . , . . , , . . . . . , ' . . ' . . , . , . . . . . . . .. 120.00/day Overtime work performed at the request of the Client or necessitated by Contractor working overtime will be billed at 1 .5 times the hourly rates listed above, Expert witness testimony/deposition minimum charges: $2,200/day, $1 ,300/half-day; preparation at applicable hourly rates, Project-related out-side costs Including: Equipment rental, consultants, special fees, permits or insurance, meals and lodging and other similar Items are billed at cost + 20%, In lieu of individually charging for: photo copies, federal express. facsimile, teiephone and clerical time a flat fee of 2% of total labor will be charged, Copies of previously issued reports of up to 50 pages will be billed at $42.00 for the first copy, and $32.00 for each additional copy. Specific quotes for larger reports and/or reports containing drawings larger than 8V2 X 11 inches. Laboratory Tests (Unit charge for laboratory testing Including the normal laboratory work and report at results only. Unusual or time-consuming sample preparation or special tests are billed at hourly charge for the laboratolY technician, Charges for testing which are not listed will be given upon request, Simiiarly, a reduction of the Fee Schedule rate can be given for a large number of tests), Billing Rate/Test Classification Tests Atterberg Limits (PI & LL) , , , . . . . . . . . , , . , . . , . . . . , .. $125 Sieve Analysis ........,...,......,.."..,',..," 98 Percent Passing #200 Sieve. . . , . , . . . . . . . . , , . . . . , ., 51 Hydrometer Analysis ..,..,..,...,...,..".,...,. 1 20 Sand Equivalent ,........."........"...,...,. 1 03 SpeCinc Gicwiiy . , , , . . . , . . . . , , . . . , . . . . , , . . . . , , ... 1 24 Bulk Specific Gravity .".."........,.,..,..,.... 1 06 Moisture Content/Unit Weight ........,........,',., 15 Compaction Curves A, 4-lnch Mold ",.",....."..,."""..,.,'" 1 95 B. 6-lnch Mold. . . . . , . . . , , . . . , , . . . . . . . , . . . . , . , ,. 228 C. Callmpact (Wet) .,.,......,."..,."...".,' 1 95 D, Callmpact (Dry) . , . , . . . , , , ' , . . . . . . . . . . . . . . , ,. 228 E. 1 Point Verification , . . . . , . , , , . , ' . , , . . . , , . ' . . . , " 84 Durability Factor A. Fine . , . , . . . , . , . . . . . . . . . '.. . , , . . . . , , . . . , . . . ., 1 85 B, Coarse ..,..........."......,',.........., 152 L.A, Ra1tier . , . . . . , . . . , . . . . . . . . , , . . , . , , . , , . , . . .. 195 R-Volue Tests Not Requiring Reproportloning .....",."...,..,., 260 Requiring Reproportlonlng .,.,.,...."...,...,',. 294 Cement, Lime, Other ."".,....,...,.,.,.,.' 294 Concrete Tests (including moisture content and dry unit weight determinations) A. Compression Tests (set of 3 specimens) . , , . . . . . . . ,. 62 B. Trial Batch .....",.",.........".......,.,. 788 Billing Rate/1est Shrink/Swell Tests (inCluding moisture content and dry unit weight determinations) A Undisturbed. , . . , . , , , . . , , , . . . . . , , , . . . . . . , . , , . $ 82 B. Remolded . , . , , . , , . , . . . . . . , , , . . . . . , . . . , . . . ,. 158 Strenqth Tests (including moisture content and dty unit weight determinations) Dire~2Ll'.:...~rl',g1'lt A. Undisturbed ...,......",',... ,. . . . . , . , , .. 49 B, Remolded. . . . . , . . . . . . . . . . . , . , . . . . . . . , . . ., 98 Triaxial Compression, Per Point A. Unconsolidated, Undrained .".....,...,..., 128 B, Unconsolidated, Undrained and Backsaturatlon . 217 C. Consolidated, Undrained. . . . , , . , . . . . . . . . , ., 233 D, Consolidated, Undrained and Backsaturated ." 294 E, Consolidated, Drained. , , . , , . . . . . . . , . , . , . .. 230 F. Pore Pressure Measurements ."..........,... 76 G, Remolded Specimens, Add, Per Point. , . . . . , . .. 55 Unconfined Compression A,Undisturbed .",..,..........,."..,.".,. 82 B. Remolded. , , , , . , . . , .. , . , .'. . . , . , . . , . , . , " 130 Consolidation Tests (Including moisture content and dty unit weight determinations) A. Undisturbed ",.,......,.".",..,.,.,..' 195 B" Remolded , , . . . . . . . , . ' , . . , . . . , . , . . , . , , 250 C. Time Compression Curve, Per Increment. . . . . , ., 49 Asphaltic Concrete A. Maximum Density . , , , . , , . . , . . . . , , , , , . . , , " 1 03 B. Extraction ,..,.,..".,.".,....,.......,' 1 30 C. Gradation .,.,...""........."...,.,.. 120