HomeMy WebLinkAboutReso 075-88 StLtMAD83-1EngrRptRESOLUTION NO.75 -88
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
A RESOLUTION APPROVING PRELIMINARY ENGINEER'S REPORT,
CONFIRMING DIAGRAM AND ASSESSMENT
CITY OF DUBLIN STREET LIGHTING
MAINTENANCE ASSESSMENT DISTRICT
WHEREAS, by its Resolution No. 58-88, a Resolution Directing
Preparation of Annual Report for Maintenance Assessment District, City of
Dublin Street Lighting Maintenance Assessment District (the "district"), this
Council designated the City Engineer, as Engineer and ordered said engineer to
make and file a report in writing in accordance with and pursuant to the
Landscaping and Lighting Act of 1972; and
WHEREAS, said Engineer of Work has made and filed with the City
Clerk a preliminary report in writing as called for in said Resolution No.
58-88 and under and pursuant to said Act, which report has been presented to
this Council for consideration; and
WHEREAS, said Council has duly considered said report and each
and every part thereof, and finds that each and every part of said report is
sufficient; and that said report, nor any part thereof requires or should be
modified in any respect;
NOW, THEREFORE, BE IT RESOLVED
a) that the Engineer's estimate of the itemized and total costs
and expenses of maintaining said improvements and of the incidental expenses
of maintaining said improvements and of the incidental expenses in connection
therewith, as contained in said report be, and each of them are hereby
preliminarily approved and confirmed.
b) that the diagram showing the assessment district, description
of the improvements to be maintained, and the boundaries and dimensions of the
respective lots and parcels of land within said district, as contained in said
report be, and it is hereby preliminarily approved and confirmed.
c) the assessment of the total amount of the cost and expenses of
the proposed maintenance of said improvements upon the several lots and
parcels of land in said District in proportion to the estimated benefits to be
received by such lots and parcels, respectively, from said maintenance, and of
the expenses incidental thereto, as contained in said report be and they are
hereby preliminarily approved and confirmed.
PASSED, APPROVED, AND ADOPTED this 23rd day of May, 1988.
AYES:
Councilmembers Hegarty, Moffatt, Snyder and
Mayor Jeffery
NOES: None
ABSENT:
Councilmember Vonheeder
ATTEST:
CITY OF DUBLIN
STREET LIGHTING MAINTENANCE ASSESSMENT DISTRICT
(FISCAL YEAR 1988-1989)
PRELIMINARY
ENGINEER'S REPORT
CONTENTS
Assessment: Including Estimate of Costs and Method of
Apportioning (Assessment Roll under separate cover)
2. Assessment Diagram
-1-
ASSESSMENT
WHEREAS, on April 25, 1988, the City Council of the City of Dublin, California,
pursuant to the provisions of the Landscaping and Lighting Act of 1972, adopted its
Resolution Directing Preparation of Annual Report for Maintenance Assessment District
for the maintenance of improvements more particularly therein described] and
WHEREAS, said Resolution directed the undersigned to prepare and file a report
pursuant to Section 22565, et. seq. of said Act~
NOW, THEREFORE, the undersigned, by virtue of the power vested in me under said
Act and the order of the Council of said City, hereby make the following assessment
to cover the portion of the estimated cost of the maintenance of said improvements
and the cost and expenses incidental thereto, to be paid by said District.
ESTIMATE OF COSTS
Cost of Maintenance
Incidental Expenses
TOTAL COST:
(1) (2) (3)
As Filed As Preliminarily As Finally
Approved Approved
1988-89 Interest Income Applied
to 1988-89 Operating Costs: $
Reimbursement from Pole
Knockdowns
144,500
65,669
210,169
Surplus from Previous
Fiscal Year
2,000
NET TO BE ASSESSED FOR
FISCAL YEAR 1988-89
$ 5,000
$ 46,919
$ 156,250
As required by said Act, a diagram is hereto attached showing the exterior
boundaries of said lighting maintenance assessment district and, by reference, the
lines and dimensions of each lot or parcel of land within said lighting maintenance
assessment district as they existed as of March 1, 1988, each of which lots or
parcels having been given a separate number upon said diagram by reference.
I do hereby assess the net amount to be assessed upon all assessable lots or
parcels of land within said lighting maintenance assessment district by apportioning
that amount among the several lots or parcels in proportion to the estimated benefits
to be received by each such lot or parcel from the maintenance of said improvements,
and more particularly set forth in the list hereto attached and by reference made a
part hereof.
-2-
Said assessment is made upon the several lots or parcels of land within said
lighting maintenance assessment district in proportion to the estimated benefits to
be received by said lots or parcels respectively from the maintenance of said
improvements. The diagram and assessment numbers appearing herein are the diagram
numbers appearing on said diagram, to which reference is hereby made for a more
particular description of said property.
Each lot or parcel of land assessed is described in the assessment list by
reference to its parcel number as shown on the Assessor's Maps of the County of
Alameda for the fiscal year 1988-1989 and includes all of such parcels within the
City Limits of the City of Dublin as of March 1, 1988. For a more particular
description of said property, reference is hereby made to the deeds and maps on file
and of record in the office of the County Recorder of said County. Because the names
of the several owners are unknown to me~ I hereby place the word "Unknown" opposite
the number of each lot or parcel of land assessed, the amount assessed thereon~ and
the number of the assessment.
Dated: May 18, 1988
-3-
CITY OFDUBLIN
STREET LIGHTING MAINTENANCE ASSESSMENT DISTRICT
ENGINEER'S COST ESTIMATE
FISCAL YEAR 1988-1989
MAINTENANCE
a) Electric Energy (PC & E)
b) Replace PoleKnockdowns
$134~000
10,500
INCIDENTALS
a)
b)
C)
c)
Engineer's Report and Proceedings $ 8,500
Cost of Collection (County) $ 2,600
Delinquencies $ 7,650
Contingencies/Pole Replacement Fund $ 46,919
TOTAL
$144,500
$ 65,669
$210,169
-4-
METHOD OF APPORTIONMENT OF ASSESSMENT
The assessments shall be spread using a method of "factor rates" assigned to
different land uses.
The establishment of the apportionment of a factor rate of "i" will be
calculated by dividing the total assessment of the year by the sum of factor rate
numbers assigned wherein the factor rates are assigned as follows:
Use
Factor Rate (x 1/2 if va.cant)
Exempt (Gov't./Utility/etc.) 0
Single Family Residential & Condo 1
Small Multiples (2-4 units) 3
Commercial 5.5/ac.
Industrial 5.5/ac.
Rural 0.5
Institutional 5.5/ac.
Apartments 6
Commercial 5.5/ac.
Commercial 5.5/ac.
The assessment of each parcel shall be established by multiplying the factor
rate for that parcel by the apportionment for a factor rate of 1.