AGENDA STATEMENT
CITY COUNCIL MEETING DATE: July 3, 2001
SUBJECT: Acceptance of Work - Contract No. 01-02, 2000-2001 Annual
Sidewalk Safety Repair Program and Curb Modifications at
Amador Valley Boulevard/Starward Drive
Report Prepared by: Lee S. Thompson, Public Works Director
ATTACHMENTS: None
RECOMMENDATION:
Accept improvements under Contract No. 01-02 and authorize the
release of retention after 35 days if there are no subcontractor claims
FINANCIAL STATEMENT:
Budget Actual
Sidewalk Safety Repair:
Improvements (Remove & Replace) $46,850 $44,458
Curb Ramps (CDBG) $11,614 $11,614
Subtotal: $58,464 $56,072
AVB/Starward Drive Improvements: $20,984 $19,020
TOTAL: $79,448 $75,092
The Sidewalk Safety Repair is funded through the General Fund (001). Curb ramps
are funded through a Community Development Block Grant (209). The Amador
Valley Boulevard/Starward Drive improvements are funded through Gas Tax (206).
DESCRIPTION: On March 20, 2001, the City Council awarded Contract No. 01-02,
2000-2001 Annual Sidewalk Safety Repair Program and Curb Modifications at Amador Valley
Boulevard/Starward Drive, to Vanguard Construction.
The Annual Sidewalk Safety Repair Program repaired sidewalk locations that are offset 3/4" or more and
posed potential tripping hazards. This contract specified removal and replacement of existing sidewalk,
curb and gutter. This year's project included the construction of 14 curb ramps at various street corners.
An additional portion of this contract modified the curb and striping at the intersection of Amador Valley
Boulevard and Starward Drive.
-------------------------------------------------------------------------
COPIES TO: Vanguard Construction C4-
ITEM NO. sue,
g:\mntcproj\sidewalk\AS acceptance �y, (�
Staff has reviewed the work on the project and has determined that the work is complete.
Staff recommends that the City Council accept the improvements under Contract No. 01-02 and authorize
the release of retention after 35 days if there are no subcontractor claims.