HomeMy WebLinkAboutItem 7.2 - 2957 Fallon Sports Park Phase III Page 1 of 5 STAFF REPORT CITY COUNCIL DATE: December 17, 2019 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager SUBJECT: Fallon Sports Park Phase 3 - Conceptual Design Prepared by: Rosemary Alex, Parks and Facilities Development Coordinator EXECUTIVE SUMMARY: The City Council will consider approval of the conceptual design for Fallon Sports Park Phase 3. STAFF RECOMMENDATION: Receive the report and approve the conceptual design for Fallon Sports Park Phase 3. FINANCIAL IMPACT: As approved in the updated 2018-2023 Capital Improvement Program (CIP), the total budget for Fallon Sports Park - Phase 3 is $10,360,000, funded by the Public Facility Fee Fund. The CIP budget includes approximately $8.1 million for con struction and approximately $2.2 million in soft costs. The construction cost estimate for the conceptual design is approximately $8.35 million. If the City Council were to direct Staff to proceed with the conceptual design, including any additional elements, Staff would monitor the estimated cost as design progresses and return to the City Council with a future budget adjustment if necessary. DESCRIPTION: The 2018-2023 Capital Improvement Program (CIP) includes the Fallon Sports Park - Phase 3 project (CIP No. PK0119). The project provides for the design and construction of the remaining 14 acres of the 60-acre Fallon Sports Park. Background On January 8, 2019 the City Council directed Staff to include a cricket field and a five - bay batting cage facility in the concept design of the Project. The cricket field and batting cages will be developed instead of the two softball fields that were part of the original Fallon Sports Park Master Plan. The City Council also directed Staff to develop Page 2 of 5 concept plans that could include volleyball courts and/or a BMX facility. Based on City Council direction provided in January, three concept plans were developed for Phase 3 of the park. The three concept plans were presented to City Council on May 7, 2019. At the May City Council meeting, sports user groups provided input and requested that additional items be considered for the Phase 3 project. The City Council provided direction to Staff to do the following: · Delete the stairway and accessible path that connects the Little League field to the corner of Fallon Road and Bent Tree Drive. · Provide for a 4th sand volleyball court. · Provide costs for a two-story scorekeeper booth for Little League. · Provide costs for little league field lighting (two fields). · Provide costs for batting cage lighting. · Provide costs for cricket field lighting and a four-foot fence surrounding the cricket field. · Meet with sports groups again to discuss these items. Subsequent to the May meeting, Staff met with representatives from the sports user groups (Little League, volleyball, and cricket). Those meetings resulted in the following requested project elements: · Little league - Add a two-bay batting cage adjacent to one of the fields. · Volleyball - Add bleachers. · Cricket - Add a storage container, two additional pitches, a two-story scorekeeper booth, scoreboard, perimeter netting, bleachers, and sight screens. Staff and the design consultant prepared estimates for the items identified by the City Council during the May meeting and for the elements requested by the sports user groups. The estimated costs for the base park design and the additional elements are in the table below: Page 3 of 5 Table 1 - Costs of base design and additional elements BASE DESIGN COST Little League Fields: 2 fields with fencing, scoreboards, bleachers, single story scorekeeper booths, bull pens, dugouts, walkways, planting, and irrigation.$2,500,000 Plaza Area: Walkways, playground, planting, and irrigation.$1,150,000 Courts/Cages/Lawn: 3 volleyball courts, 5 bay batting cage, lawn area, walkways, planting, and irrigation.$1,700,000 Cricket Area: Lawn area, single pitch, walkways, concrete terrace seating/steps, drainage, planting, and irrigation.$2,850,000 Subtotal Base Design $8,200,000 ADDED PER CITY COUNCIL MEETING 5/7/2019 COST Little League - Conduits/boxes for future field lighting $291,000 Little League - field lighting $852,000 Little League - 2 story scorebooth (with 1 story deduct)$200,000 Volleyball - add 4th court $20,000 Batting Cage - Conduits/boxes for future lighting $20,000 Batting Cage - lighting $70,000 Cricket - Conduits/boxes for future field lighting $378,000 Cricket - Field lighting $940,000 Cricket - 4' fence $93,000 Subtotal Added Items $2,864,000 ELEMENTS REQUESTED BY USER GROUPS (MAY-JUNE 2019)COST Little League - 2 bay Batting Cage $60,000 Volleyball - bleachers $130,000 Cricket - Storage Container $16,000 Cricket - 2 extra pitches $18,000 Cricket - 2 story scorebooth $300,000 Cricket - Scoreboard $40,000 Cricket - Perimeter Netting $190,500 Cricket - Bleachers/pad $38,000 Cricket - Sight Screens $20,000 Subtotal Requested Elements $812,500 At a work session on October 15, 2019, the City Council received a presentation on the concept design and amenities to be incorporated into Fallon Sports Park Phase 3. The presentation included the cost estimates listed above in Table 1. Based on feedback received during the study session, a revised conceptual design was prepared, as shown in Attachment 1. The conceptual design includes the elements and estimated costs as shown in Table 2 below, with bold text representing the additions City Council requested during the work session. Page 4 of 5 Table 2 - Conceptual Design CONCEPTUAL DESIGN COST Little League Fields: 2 fields with fencing, scoreboards, bleachers, single story scorekeeper booths, bull pens, dugouts, walkways, planting, and irrigation $2,500,000 Plaza Area: Walkways, playground, planting, and irrigation. $1,150,000 Courts/Cages/Lawn: 3 volleyball courts, 5 bay batting cage, lawn area, walkways, planting, and irrigation. Plus batting cage lighting and conduit, one additional volleyball court, and bleacher pads. $1,810,000 Cricket Area: Lawn area, single pitch, walkways, concrete terrace seating/steps, drainage, planting, and irrigation. Plus two extra pitches, two sight screens, and bleacher pads. $2,888,000 Subtotal Base Design $8,348,000 Requests by the City Council In addition to the elements included in the conceptual design, the City Council directed Staff to seek feedback from sports user groups on interest in providing financial support on additional elements not included in the conceptual design . Dublin Little League agreed to remove the request for a two-story score booth and committed to approximately $20,000 to be utilized towards park improvements. Additionally, all known Dublin cricket organizations were contacted on both November 13, 2019 and November 26, 2019, however no groups have committed to the donation of any funds thus far. The City Council also requested that Staff review sponsorship practices of nearby cities, specifically the City of Pleasanton. The City of Pleasanton entered into a Memorandum of Understanding with eight user groups which set fundraising parameters, commitments, and involvement in raising funds for a portion of a park project over a 10- year period. The outstanding $2 million balance was allocated to each sanctioned sports group based on the number of players in each league. During the period of 10 years, no user fees would be assessed for utilization of athletic fields, thus allowing time for the leagues to fulfill their fundraising commitment. The City of Pleasanton program began in 2015, with $1.2 million ($240,000 per year) raised to date. It is anticipated that the leagues’ commitment will be realized within the next two years. If a similar fundraising program were to be implemented in the City of Dublin, a t an average of $240,000 raised per year, it would take four user groups roughly 15 years to pay off the unbudgeted amount (over $3 million), in addition to the $60,000 loss annually in field rental revenue (or $900,000 during that 15 year period). Master Plan and Lighting The conceptual design differs from the Master Plan in that the two softball fields will be replaced by cricket and by the multi-sport batting cages. Additionally, the conceptual design eliminates the picnic area, restrooms, and stairway connection to Fallon Road and Bent Tree Drive. The BMX facility remains as-is, with no proposed further improvements. Page 5 of 5 The Master Plan identified where lighting would be located within the park. On February 18, 2014, the City Council approved an addendum to the Fallon Sports Park Mitigated Negative Declaration for lighting of the Phase 2 soccer fields. Since the Master Plan and the Mitigated Negative Declaration did not include any field lighting in the Phase 3 area, an updated environmental document will be required in order to include lighting for the five bay batting cages or for any other lighting of athletic facilities shown in the conceptual design. Staff recommends that the City Council approve the concept ual design for Fallon Sports Park Phase 3 and direct Staff to proceed with updating the Mitigated Negative Declaration for the Project to include the lighting of the five bay batting cages. With such approval, Staff anticipates the project would begin construction in late 2020. STRATEGIC PLAN INITIATIVE: None. NOTICING REQUIREMENTS/PUBLIC OUTREACH: A copy of this Staff Report was sent to the following sports user groups: · Dublin United Soccer League · Dublin Little League · Cricket for Cubs · Dublin Cricket Academy · Dublin Cricket League · San Ramon Cricket League · USA Cricket ATTACHMENTS: 1. Fallon Sports Park Phase 3 Conceptual Plan 2. CIP Document - PK0119 Fallon Sports Park - Phase 3 Dublin, California 10/31/2019 LITTLE LEAGUE LITTLE LEAGUE PLAY AREA WITH ADJACENT SEATING SCORE KEEPING BOOTHS NEW WALKS BATTING CAGES WITH TURF LAWN SAND VOLLEYBALL COURTS CRICKET FIELD CONCRETE TERRACE SEATING 3–PITCHES SIGHT SCREEN SIGHT SCREEN Fallon Sports Park - Phase 3 Concept Plan Number PK0119 Program PARKS PRIOR YEARS 2018-2019 BUDGET 2019-2020 2020-2021 2021-2022 2022-2023 FUTURE YEARS ESTIMATE TOTALS 9100 $31,564 $32,864 $64,428 9200 $1,994,212 $1,994,212 9400 $980,924 $7,120,436 $8,101,360 9500 $100,000 $100,000 $200,000 $2,125,776 $1,113,788 $7,120,436 $10,360,000 PRIOR YEARS 2018-2019 BUDGET 2019-2020 2020-2021 2021-2022 2022-2023 FUTURE YEARS ESTIMATE TOTALS 4100 $2,125,776 $1,113,788 $7,120,436 $10,360,000 $2,125,776 $1,113,788 $7,120,436 $10,360,000 ANNUAL OPERATING IMPACT $215,000 FUNDING SOURCE FALLON SPORTS PARK - PHASE 3 2018-2023 CAPITAL IMPROVEMENT PROGRAM ESTIMATED COSTS Salaries & Benefits Contract Services Improvements Miscellaneous TOTAL TOTAL Public Facility Fees PROJECT DESCRIPTION This project provides for the design and construction of the remaining 14 acres of Fallon Sports Park, referred to as the Upper Terrace. The design will precede an update of the Fallon Sports Park Master Plan. The concept design will include an option for a cricket field,in lieu of two softball fields. The Phase 3 concept design will also include options for sand volleyball and multi-sport batting cages. Fallon Sports Park is a 60-acre community park bordered by Fallon Road, Central Parkway, Lockhart Street and Gleason Drive. Phases 1 and 2 of the park have been completed and Phase 3 represents the final phase of park development. Concept design options for Phase 3 will be completed in 2019 and construction is anticipated to start in 2020. ANNUAL OPERATING IMPACT: $215,000 MANAGING DEPARTMENT: Public Works