HomeMy WebLinkAbout4.09 ShannonParkLot AICITY CLERK File # E]Mldld-&� AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 7, 2001 SUBJECT: Acceptance of Work — Contract No. 01-04, Shannon Center Parking Lot, Hansen Drive & Bedford Court Improvements Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: RECOMMENDATION: FINANCIAL STATEMENT: Salaries/Inspections/Misc.: Shannon Center Parking Lot Hansen Drive Bedford Court Subtotal Improvements: Shannon Center Parking Lot Hansen Drive Bedford Court Subtotal: TOTAL: Budget Change Forms 1) Accept improvements under Contract No. 01-04 and authorize the release of retention after 35 days if there are no subcontractor claims 2) Authorize an additional appropriation in the amount of $1,711 in Fiscal Year 2001-2002 as described on attached budget change 3) Approve transfer in the amount of $670 from the Shannon Parking Lot project to the Bedford Lane Subdrain project Budget Estimated Actual FY 2000-2001 FY 2000-2001 FY 2001-2002 Total $ 4,200 $ 3,118.00 $ 890.00 $ 4,008.00 $ 5,350 $ 3,264.00 $ 461.00 $ 3,725.00 $ 2,200 $ 2,552.00 $ 360.00 $ 2,912.00 $ 11,750 $ 8,934.00 $1,711.00 $ 10,645.00 $ 77,065 $ 70,058.60 $ 0.00 $ 70,058.60 $ 80,726 $ 80,858.80 $ 0.00 $ 80,858.80 $ 16,305 $ 16,623.00 $ 0.00 $ 16,623.00 $174,096 $167,540.40 $ 0.00 $167,540.40 185 846 $176,474.40 1 711.00 $178,1 55.40 All three capital projects are funded by the City's General Fund (001). Although the overall contract is under budget, budget changes will be necessary to sufficiently fund the three CIP projects individually in Fiscal Years 2000-2001 and 2001-2002. A transfer of $670 from the -------------------------------------------------------------- COPY TO: Bruce Carone Grading & Paving ITEM NO. rl,� g:\miscproj\shannon-hansen-bedford\AS accept ��r Shannon Center Parking Lot project to the Bedford Court Subdrain project is recommended for Fiscal Year 2000-2001. An additional appropriation totaling $1,711 for all three projects is recommended for Fiscal Year 2001-2002. DESCRIPTION: On May 1, 2001, the City Council awarded Contract No. 01-04, Shannon Center Parking Lot, Hansen Drive & Bedford Court Improvements, to Bruce Carone Paving & Grading, Inc. The projects, with descriptions, are as follows: Shannon Park & Community Center Parking Lot Paving: The asphalt parking lot at the Shannon Park and Community Center has failed in several areas and the surface was badly weathered. This project repaired the failed areas and repaved with 2-inch asphalt concrete. In addition, the parking stalls were striped with thermoplastic. Bedford Court Subdrain: The roadway of Bedford Court has been damaged by underground springs. This project installed a 600-lineal foot subdrain system to eliminate some of the water causing the deterioration of the roadway bed. Hansen Drive Drainage Improvements: Underground springs have also caused damage to the Hansen Drive roadway. A new subdrain system was installed to eliminate some of the water, and the street also received a 1-1/2 inch overlay from the west end of Hansen Drive to Silvergate. Drive. The three projects were combined into one contract as a cost savings measure. Staff'has reviewed the work included in the project, and recommends that the City Council accept the improvements under Contract No. 01-04, Shannon Center Parking Lot, Hansen Drive & Bedford Court Improvements, approve budget changes and authorize the release of retention after 35 days if there are no subcontractor claims. -2- CITY OF DUBLIN BUDGET CHANGE FORM New Appropriations (City Council Approval Required): Budget Transfers: CHANGE FORM # From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) (If Other than General Fund, Fund No - ) Within Same Department Activity. From New Revenues "~ Between Deparmqents (City Council Approval Required) Other Name: Shannon Center Parking Lot - Name: Bedford Court Subdrain - Improvements ($2,381) Inspection $352 Accou~at #: 001-95405-750-050 Account #: 001-96021-740-079 Name: Name: Bedford Court Subdrain - Improvements $ 318 Account #: Account #: 001-96021-750-050 Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Date: Signature ASD/Fin Mgr ~~ ~o,.~-¢-.~ Date: Signature REASON FOR BUDGET CHANGE ENTRY: Budget change to sufficiently fund improvements between the three capital projects included in Contract No. 01-04 in FY 2000-2001. Mayor: Posted By: Signature Signature Date: Date: CITY OF DUBLIN BUDGET CHANGE FoRM New Appropriations (City CoUncil Approval Required): '~ From Reserves Unappropriated (If Other than General Fund, Fund No - ) From New Revenues Budget Transfers: CHANGE FORM # From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: Name: Shannon Center Parking Lot - Salaries/Inspection/Misc. (FY 01-02) $890 Account#: Account#: 001-95405-740-079 Name: Name: Hansen Drive Drainage Imp.- Salaries/Inspection/Misc. (FY 01-02) $461 Account#: Account#: 001-96023-740-079 Name: Name: Bedford Court Subdrain- Salaries/Inspection/Misc. (FY 01-02) $360 Account#: Account#: 001-96021-740-079 Name: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Date: Signature ASD/Fin Mgr ~,.._~j(_ ~ .- Date: Signature REASON FOR BUDGET CHANGE ENTRY: Budget change to sUfficiently fund improvements between the three capital projects included in Contract No. 01-04 in FY 2001-2002. Mayor: Date: Signature Posted By: Date: Signature