Loading...
HomeMy WebLinkAbout7.1 Five-Year Capital Improvement Program 2020-2025, Finding of General Plan Conformance for Proposed Fiscal Year 2020-21 and Fiscal Year 2021-22STAFF REPORT PLANNING COMMISSION DATE: April 28, 2020 TO: Planning Commission SUBJECT: Five -Year Capital Improvement Program 2020-2025, Finding of General Plan Conformance for Proposed Fiscal Year 2020-21 and Fiscal Year 2021-22 Prepared by:Laurie Sucgang, City Engineer EXECUTIVE SUMMARY: The Planning Commission will consider finding that the Fiscal Year 2020-21 and Fiscal Year 2021-22 projects within the City of Dublin Capital Improvement Program are in conformance with the City of Dublin General Plan. RECOMMENDATION: Adopt a Resolution Finding Conformity with the General Plan for the Fiscal Year 2020- 21 and Fiscal Year 2021-22 Projects in the City of Dublin Five -Year Capital Improvement Program 2020-2025 (refer to Attachments 1 and 2). DESCRIPTION: Government Code Sections 65103, 65401 and 65402 require the Planning Commission to review public works projects proposed for the ensuing fiscal year for their conformance with the City's adopted General Plan (refer to Attachment 3). City staff prepared a Five -Year Capital Improvement Program (CIP) covering Fiscal Year 2020-21 through Fiscal Year 2024-25 (Attachment 2). The CIP was prepared to identify public infrastructure improvements, park development, facilities development and other capital items for this five-year period. The Planning Commission's role is to review the CIP and determine whether the CIP is in conformance with the City's General Plan. The Commission's review is limited to only those projects that will be undertaken in Fiscal Year 2020-21 and Fiscal Year 2021- 22. As noted in the CIP, the precise timing of projects is subject to revision with future updates. 7.1 Page 1 of 4 Packet Pg. 544 ANALYSIS: 7.1 Five -Year Capital Improvement Program Projects Below is the list of projects that are proposed for Fiscal Year 2020-21 and Fiscal Year 2021-22 in the Five -Year CIP as it relates to the review by the Planning Commission. The projects are detailed in the CIP draft booklet (Attachment 2). The list below provides the project number, project name, and an indication of whether the project is new to the City of Dublin Capital Improvement Program. Some projects were contained in the previous CIP (2018-2023) and span several fiscal years. Those projects are included again for Planning Commission review, even though the projects were previously found in conformance with the General Plan by Planning Commission Resolution No. 18-08, dated March 27, 2018. GENERALIMPROVEMENTS G10002 Library Tenant Improvements G10119 Civic Center HVAC and Roof Replacement G10120 Cultural Arts Center G10219 Electric Vehicle (EV) Charging Stations G10319 Financial System Replacement GINEW01 Civic Center Rehabilitation NEW GINEW02 Citywide Energy Improvements NEW GINEW03 Resiliency and Disaster Preparedness Improvements NEW GINEW04 Solar Photovoltaic (PV) Canopies at The Wave NEW GINEW05 Audio Visual System Upgrade NEW PUBLIC ART PK0217 Public Art - Don Biddle Community Park PK0218 Public Art - Butterfly Knoll Park PK0219 Public Art - Dog Park Art Replacement PK0317 Public Art - Clover Park & Sunrise Park PK0318 Public Art - Jordan Ranch Neighborhood Park PK0418 Public Art - Sean Diamond Park PK0419 Public Art - Dublin Sports Grounds PKNEW05 Public Art - Camp Parks Sign NEW PARKS PK0001 Wallis Ranch Community Park PK0002 Jordan Ranch Neighborhood Park PK0115 Don Biddle Community Park PK0117 Clover Park & Sunrise Park PK0118 Butterfly Knoll Park PK0119 Fallon Sports Park - Phase 3 PK0215 Dublin Heritage Park Cemetery Improvements PK0518 Imagine Playground at Dublin Sports Grounds PKNEW01 Parks Playground Replacement NEW PKNEW02 Downtown Dublin Town Square Park NEW PKNEW03 Iron Horse Nature Park and Open Space NEW Page 2 of 4 Packet Pg. 545 PKNEW04 Restrooms Replacement NEW "' STREETS ST0116 Tassajara Road Realignment and Widening - Fallon Road to North City Limit ST0117 Annual Street Resurfacing ST0118 Iron Horse Trail Bridge at Dublin Boulevard ST0119 Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School ST0120 Dublin Boulevard Pavement Rehabilitation ST0216 Dublin Boulevard Extension - Fallon Road to North Canyons Parkway ST0218 San Ramon Road Landscape Renovation ST0319 City Entrance Monument Signs ST0417 Dublin Ranch Street Light Improvements ST0514 San Ramon Road Trail Lighting ST0517 Citywide Bicycle and Pedestrian Improvements ST0519 Intelligent Transportation System Upgrade - Connected/Autonomous Vehicle and Safety Improvements ST0713 Citywide Signal Communications Upgrade ST0815 Amador Plaza Road Bicycle and Pedestrian Improvements STNEW01 Traffic Signal Re-lamping NEW STNEW02 Green Stormwater Infrastructure NEW STNEW03 St. Patrick Way Extension NEW STNEW04 Downtown Dublin Street Grid Network NEW STNEW05 Golden Gate Drive Intersection Improvements at Dublin Boulevard and St. Patrick Way NEW Future Projects - Beyond the Five -Year CIP The following list contains identified public works projects with funding that is anticipated beyond the five-year CIP time frame. The list includes projects derived from several sources, including but not limited to, the Parks and Recreation Master Plan, the Streetscape Master Plan, the Eastern Dublin Specific Plan, the Eastern Dublin Traffic Impact Fee program, and the Western Dublin Traffic Impact Fee program. Descriptions of these projects are also included in Attachment 2. FUTURE PROJECTS S-01 City Entrance Signs S-02 Eastern Dublin Traffic Impact Fee S-03 Western Dublin Traffic Impact Fee S-04 Village Parkway Pavement Reconstruction P-01 Dublin Sports Grounds - Phase 5 Renovation P-02 Croak Neighborhood Park West P-03 Croak Neighborhood Park East P-04 Emerald Glen Recreation & Aquatic Center Phase 2 P-05 Public Art - Heritage Park and Museums Page 3 of 4 Packet Pg. 546 ENVIRONMENTAL REVIEW: 7.1 The proposed Finding of General Plan Conformance is not a project as defined by the California Environmental Quality Act (CEQA) per CEQA Guidelines Section 15378 because it does not commit the City to any of the identified projects in the Capital Improvement Program (CIP). Individual projects identified within the CIP will be reviewed in accordance with CEQA requirements prior to their implementation when specific project details are available for analysis. PUBLIC NOTICING: A public hearing is not required for a General Plan Conformity Finding and, therefore, no public notice was provided. ATTACHMENTS: 1. Resolution Finding Conformity with the General Plan for Projects in the Capital Improvement Program 2. DRAFT Fiscal Years 2020-2025 Capital Improvement Program 3. Excerpts from the Government Code Page 4 of 4 Packet Pg. 547 7.1.a RESOLUTION NO. 20 - xx A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN U L FINDING CONFORMITY WITH THE ADOPTED GENERAL PLAN FOR THE FISCAL YEAR 2020-21 AND FISCAL YEAR 2021-22 PROJECTS IN THE CITY OF DUBLIN FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM 2020-2025 E WHEREAS, the City of Dublin has prepared a Five -Year Capital Improvement Program (CIP) outlining major infrastructure improvements for the years 2020-2025, and 0- WHEREAS, Sections 65103 of the Government Code requires that the Planning Commission review the Capital Improvement Program for consistency with the City of Dublin General Plan; and WHEREAS, Sections 65401 and 65402(a) of the Government Code require that plans for major public works projects for the ensuing fiscal year be submitted to the Planning Commission for review as to conformance with the adopted City of Dublin General Plan; and WHEREAS, the proposed finding of General Plan Conformance is not a project as defined by the California Environmental Quality Act (CEQA) per CEQA Guidelines Section 15378 because it does not commit the City to any of the identified projects in the CIP; and WHEREAS, the Planning Commission did review and consider the draft document and heard recommendations at a public meeting on April 28, 2020. NOW, THEREFORE, BE IT RESOLVED that the City of Dublin Planning Commission does hereby find that those major Public Works projects proposed to occur during Fiscal Year 2020-21 and 2021-22 as presented in the 2020-2025 Capital Improvement Program are covered by the adopted General Plan and comply with the General Plan as adopted. BE IT FURTHER RESOLVED that said Resolution shall be submitted to the City Council in accordance with the Government Code. PASSED, APPROVED AND ADOPTED this 28t" day of April 2020 by the following vote AYES: NOES: ABSENT: ABSTAIN: Planning Commission Chair ATTEST: r a Assistant Community Development Director Packet Pg. 548 7.1.b DRAFT 2020-2025 CAPITAL IMPROVEMENT PROGRAM Packet Pg. 549 7.1.b GENERAL IMPROVEMENTS r .Q �a U L R E L 0 L a c aD E m 0 L Q E U N O N O N O N N L R ci U- NQ L7� N r C d E L V R r r Q Packet Pg. 550 7.1.b PROJECT DESCRIPTION This project provides for the design and construction of tenant improvements to the Dublin Library, including completion of 5,150 square feet of currently unoccupied space :t within the library building. The 37,000 square -foot library building was completed in Fiscal Year 2002-2003, however only 30,000 square feet was occupied. In Fiscal Year 2016- Ca 2017, a tenant improvement project was completed which opened an additional 1,850 square feet of space adjacent to the childr en's area. This project will open the remaining V 5,150 square feet of building area for library and community use. Improvements may include removal of interior walls and the installation and modification of shelving and fixtures; carpet replacement; and repainting. The project is consistent with the 2016 Alameda County Library Space Plan. m ANNUAL OPERATING IMPACT: TBD ii MANAGING DEPARTMENT: Public Works M 9100 ISalaries & Benefits 9200 1 Contract Services 9400 lImprovement 9500 Miscellaneous TOTAL 4100 1 Public Facility Fees Internal Service Fund - 6205 Facilities Replacement 1.920 $1 $78,205 $1,722,190 55.430 $35,3051 $78,205 $1,632,190 $1,745,700 $90,000 $90,000 $35,305 $1,722,190 $1,835,700 Packet Pg. 551 PROJECT DESCRIPTION This project provides for the design and replacement of the heating, ventilation, and air conditioning g-iVAC) system and controls, roof replacement, associated building modifications, and code compliance upgrades for City Hall and the former Police Services Building within the Civic Center complex. The existing HVAC and roof systems are at the Ca end• of their useful life and are no longer economical to repair. A new HVAC system and controls will be more energy efficient and have a greater ability to be adjusted. With the U roof replace, .the project will also upgrade communications infrastructure for new data connections to offices, workstations, and conference rooms. The project will be completed in m several phases to minimise disruption to the public and to Staff working within the buildings. a) m This project is funded by $2 million in a General Fund Reserve set aside for this purpose in addition to the Internal Service Fund for Facilities Replacement. E ANNUAL OPERATING IMPACT: None E MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $151 $88,949 9200 Contract Services $440,900 1 $347,000 1 1 1 i $787,900 9400 Improvements $22465,0001 $200,0001 $1,137,3581 $3 802 358 9500 Miscellaneous $5,000 $5,000 $10,000 9600 Equipment $700,000 $700,000 $5,443,638 1001 General Fund $2,000,000 6605 IT Fund $200,000 Internal Service Fund - 6205 Facilities Re lacement $151 $1,699,849 $1,543,638 $.151;,_ __$3,699;849; .$2001000 m-, $1,543,638 ANNUAL OPERATING IMPACT j $2,000,000 $200,000 $3,243,638 $5,443,638 Packet Pg. 552 } PROJECT DESCRIPTION This project provides for the design and improvement of an approximately 13,000-square-foot Cultural Arts Center on the first floor of the Civic Center, which was formerly occupied by Dublin Police Services. The Parks & Recreation Master Plan identifies a Cultural Arts Center that would serve as a multi -use facility that affords cultural, educational and cc social opportunities for the community. The Cultural Arts Center could include: an Art gallery, Black Box theater space; multi -purpose art and music classrooms; a dance studio; and V restrooms. ` tv m ANNUAL OPERATING IMPACT: TBD m E MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits i $54,640 $54,640 $109,280 9200 Contract Services $866,566 j $866,566 9400 Improvements $4,895,264 $4,895,264 9500 Miscellaneous $18,0901 $18,090 ANNUAL OPERATING IMPACT $5,889,200 $5,889200 Packet Pg. 553 PROJECT DESCRIPTION This project provides for the design and construction of at least two electric vehicle 0E charging spaces at The Wave at Emerald Glen Park and the underground y infrastructure for future expansion. In future years, the project could provide for design and construction of EV charging spaces at other City facilities. Staff will apply a for grant funding that will pay for charging units themselves; agencies typically fund conduits, wiring, and electrical panel upgrades as local/match contribution to grant �j funding. a� This project is funded with General Fund reserve designation for Innovation/New Opportunities. Installation of EV charging units at The Wave is planned for Summer m 2020. ii ANNUAL OPERATING IMPACT: $1,500 E MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 , Contract Services 9400 Im rovements TOTAL $1,643 $7,737 $24,380 $75,000 $115,620 $202,410 $302,410 �r $292,410 $442,410 1001 General Fund $1,643 $148,357 $292,410 $442,410 $292,410 $442,410 TOTAL $1,643!4 $148,357� ANNUAL OPERATING IMPACT Packet Pg. 554 PROJECT DESCRIPTION The City's Enterprise Resource Planning (ERP) system serves as the primary software platform for Finance, Human Resources, Public Works, Community Development, and all other core transactions. The current system was implemented in Fiscal Year 2008-2009 and is nearing the end of its 10-year lifespan. This multi -year ERP replacement project began with the engagement of consultant services to assist with the issuance of Request For Proposals and evaluation of software selections. It is anticipated the selection of software vendor will be finalized in Fiscal Year 2019-2020 and the implementation starts in Fiscal Year 2020-2021. Staff anticipates utilizing consultant services for project management throughout implementation. ANNUAL OPERATING IMPACT: Unknown at this time. As with the current software, annual licensing fees as well as replacement charges will be incurred. MANAGING DEPARTMENT: Administrative Services 9200 Contract Services 9600 Equipment 1001 General Fund Internal Service Fund - 6305 Equipment TOTAL ANNUAL OPERATING IMPACT 98 $9,398 $1 $1,845,OOOI $9,398 $645,603 $9,398 $2,490,603 $1,000,000 $1,500,000 $2,500,000 1,845,000 $655,000 $2,500,000 a U m m U- E L 0 L- a. c m E m 0 L E a ca U uO N O N O N O N N L N U- H U- N C d E t V R a+ a+ Q Packet Pg. 555 PROJECT DESCRIPTION This project provides for the planning, design, and construction of various rehabilitation and renovation projects at the Civic Center. Projects may include: renovation of all restrooms, kitchenettes, and the employee break room; modifications to conference rooms; tenant improvements to the administration office area on the second floor of the former Police Services wing; site improvements to the parking lot area and surrounding walkways of the former Police Services wing building security evaluation and upgrades; repainting; and Americans with Disabilities Act (ADA) upgrades. The relocation of the Parks and Community Services Department offices to the second floor of the former Police wing will be funded by General Fund Designated Reserve. Other potential funding sources for the building security upgrades may include Federal and State public safety grants. ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $5,050 $17,960 $21,360 9200 Contract Services $10,0001 $200,000 $115,000 $100,000 9400 Improvements $5,000 $20,050 $5,000 $222,960 $750,000 $5,000 $891,360 $100,000 $5,000 $205,000 9500 Miscellaneous 70 $20,000 $1,339,370 1001 General fund $20,050 $222,960 $891 360 205,000 _ _ $ _$1,339,370 TOTAL $20,050 $222,960 $891,360 $205,000 $1,339,370 ANNUAL OPERATING IMPACT r Q Packet Pg. 556 PROJECT DESCRIPTION This project provides for the planning (Investment Grade Audit), design, and construction of various energy upgrades, efficiency improvements, lighting upgrades, energy generation, solar photovoltaic systems, and energy storage projects at facilities, parks, and other City -owned property. The project includes construction of lighting upgrades in C Fiscal Year 2022-2023 at Mape Memorial Park, Alamo Creek Park, and Ted Fairfield Park. Future construction phases and funding sources will be determined during project V planning and may include a variety of site and building energy efficiency improvements and lighting upgrades at Emerald Glen Park and at the Phase 1 area of Fallon Sports Park. cc m Possible funding sources are power purchase agreements and on -bill financing through PG&E. E ANNUAL OPERATING IMPACT: Savings in energy costs MANAGING DEPARTMENT: Public Works 9100 ISalaries & Benefits 1 $15 860 $15,7801 $15 780 $47,420 9200 I Contract Services $20,000 $100,000 $501000 $170,000 9400 Improvements $300,000 $300,000 _517,420 ANNUAL OPERATING IMPACT Packet Pg. 557 PROJECT DESCRIPTION This project provides for the planning, design, and construction of various disaster and emergency preparedness improvements to facilities and major signalized intersections to y prepare for future PG&E Public Safety Power Shutoff events and other emergency events. Improvements may include energy storage, back-up power generators, transfer switches C for temporary generators, battery backup units from traffic signals, temporary traffic control devices, portable changeable message electronic boards, power outage alarms and V notification systems. a� Possible funding sources are statewide grants for resiliency from the California Office of Emergency Services. ii ANNUAL OPERATING IMPACT: TBD MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 Contract Services 9400 Improvements 9500 Miscellaneous T TAL . 1001 General Fund "Do -SAL $7,085 $16,010 $15,000 $20,000 $640,000 $5,000 17 $22,085 $681,010] $22,085 $681,010 $703,095 $22,085 $681,0101 - $703,095 Packet Pg. 558 PROJECT DESCRIPTION This project provides for the planning, design, and construction of a solar photovoltaic system, such as solar arrays on canopy structures in the parking lot of The Wave, for energy is generation, potential energy storage, and energy efficiency improvements at The Wave facility at Emerald Glen Park. a U Potential funding source is a power purchase agreement with an energy services company. m ANNUAL OPERATING IMPACT: Savings in energy costs m E MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 Contract Services 9400 Improvement 9500 Miscellaneous ANNUAL OPERATING IMPACT $15,150 $15,150 $20,000 $130,000 $3,000 Packet Pg. 559 PROJECT DESCRIPTION This project provides for audio visual system upgrades at the Shannon Community Center and Library Community Room. The upgrades will include replacement of equipment to �v improve the service quality for rentals, meetings, and corporate events. The upgrade will also bring the audio visual systems to current industry standards. a U The first phase of project will be at the Shannon Community Center, which may include an evaluation of the current system, removal of outdated equipment, and installation of new equipment. The new system may integrate touch panel programming to control individual microphone levels, master level, and presentation content playback. The new system may include: a media player, to allow users to connect wirelessly; a professional DVD player; a new video projector; and ancillary system input/output upgrades. m E The next phase will include the Library Community Room, which will first require an examination of the current system to determine what improvements are necessary, and eventual installation of new equipment E ANNUAL OPERATING IMPACT: TBD MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $4,020 $4,020 1 $8,040 9200 Contract Services $5,000 1 $5,000 9,600 TOTALS E ui anent $56,000 $40,000 $96,000 $65,020 j $44,020RPM $109,040 1001 General Fund $65,020 $44,020 1 $109,040 TO $65,020 . $44,020 _ '09;040 (ANNUAL OPERATING IMPACT Packet Pg. 560 PUBLIC ART .Q U L d L 0 L- a. c m E m 0 L Q E m U M N O N O N O N N L m V N LL H LL Q N r C d E t V R a+ a+ Q Packet Pg. 561 PROJECT DESCRIPTION This public art project is sited within the Community Park that will be developed as part of the Boulevard development. Artist selection for this project took place in Fiscal Year 2017-2018. Artwork design and construction began in Fiscal Year 2018-2019 and installation will coincide with the park construction schedule, which is anticipated to begin in the a Summer of 2020. The selected artwork by sculptor Steven Whyte, titled "Crossroads," is a grouping of four bronze service member figures at 150% of life size. U ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Parks & Community Services ii 9100 I Salaries & Benefits I $1,459 $19,261 $20,7201 9200 Contract Services $12,000 $69,875 $81,875 9400 Improvements $200,000 $377,000 $577,0001 9500 Miscellaneous $291 $863 $1,154 680,749 Public Art Fund ANNUAL OPERATING IMPACT Packet Pg. 562 PROJECT DESCRIPTION This public art project is sited at Butterfly Knoll Park. Artist selection took place in Fall 2019. Artwork design and installation will coincide with the park construction schedule which Fa is anticipated to begin in Fiscal Year 2020-2021. a U ANNUAL OPERATING IMPACT: None m MANAGING DEPARTMENT: Parks & Community Services m ii E L 2020-2025 CAPITAL IMPROVEMENT PROGRAM ; PRIOR 2019-2020 FUTURE ESTIMATED COSTS YEARS BUDGET 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 YEARS TOTALS 11 jSaLxties &Benefits1 11 1 Contract1 1 11 Im. .. u . 1 1 • j I I - r�0 PRIOR 2019-2020 FUTURE FUNDING SOURCE YEARS BUDGET 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 YEARS TOTALS Packet Pg. 563 PROJECT DESCRIPTION This project is for replacement artwork for the piece deaccessioned by the City Council on October 3, 2017. Artist selection and approval occurred in the Fall of 2019 and is installation is anticipated to be complete in Spring 2020. Q U ANNUAL OPERATING IMPACT: None L cc m MANAGING DEPARTMENT: Parks & Community Services m ii E L O 2020-2025 CAPITAL IMPROVEMENT•• L a • •• i �imm c m ESTIMATED •• 9100 Salaries & Benefits $333 $3,347 ' $33680 Q. 9200 Contract Services $1,500 $500 I I I $2,000 E 9400 Im rovements $20,000 I I $20,000 9500 Miscellaneous $129 $871 $1,000 TOTAL . _.. - $1,962 $24,7 — .._ _ $26,680 U u, 2801 (Public ArtFund $1,962 $24,718 $26,680 TOT' $1,962 $24,718 $26,680 •IMMUNE Packet Pg. 564 PROJECT DESCRIPTION: This public art project is sited at Clover Park and Sunrise Park. Artist selection took place in Fall 2019. Artwork design and installation will be complete in Spring/Summer 2020 is in conjunction with the parks) completion. a U ANNUAL OPERATING IMPACT: None m MANAGING DEPARTMENT: Parks & Community Services ii $35,600 $35,600 Packet Pg. 565 PROJECT DESCRIPTION: This public art project is sited at Jordan Ranch Neighborhood Park_ . Artist selection and approval took place in Fall 2019. Artwork design and installation will be completed in Spring/Summer 2020. a ANNUAL OPERATING IMPACT: None V L MANAGING DEPARTMENT: Parks & Community Services m 9100 Salaries & Benefits 9200 Contract Services 9400 Improvements -�+� TOTAL 9 451 S2.015 760 $41,000 $46,980 2801 Public ArtFund $1,581 $45,399 $46,980 TOTAL $1,581� $45,399 146,980� Packet Pg. 566 PROJECT DESCRIPTION This public art project is sited at Sean Diamond Park. Artist selection and approval was completed in Fall 2019. Design and Installation is expected be complete in Winter 2021. Q ANNUAL OPERATING IMPACT: None cc cc L MANAGING DEPARTMENT: Parks & Community Services m ii Public Art Fund $47,411 ANNUAL OPERATING IMPACT Packet Pg. 567 PROJECT DESCRIPTION M 41 This project will install public art adjacent to the All -Abilities Playground at Dublin Sports Grounds. C U Artist selection for this project took place and design and fabrication began in Fiscal Year 2018-2019. Artwork installation will be completed in conjunction with construction of the All -Abilities Playground (CIP No. PK0518), which is anticipated to be complete in Fall 2020. The selected artwork by Barbara Grygutis is titled "Conversation." m ANNUAL OPERATING IMPACT: None ii MANAGING DEPARTMENT: Parks & Community Services E 9100 Salaries & Benefits $3,840 j I I $3,840 9200 Contract Services $1,858 , $5,142 $7,000 9400 Improvements I 9500 Miscellaneous $82,500 $242,500 1 $1,000 1 I $325,000 $1,000 TOTAL ANNUAL OPERATING IMPACT E Packet Pg. 568 PROJECT DESCRIPTION The project includes the restoration and relocation of the historic Camp Parks entrance sign from its current location at approximately 201 Dougherty Road to the new entrance at Camp Parks Boulevard and Dougherty Road. U The original sign was constructed by artist/architect Bruce Goff in the 1940s and is eligible for the National Register. Rehabilitation will be in accordance with standards and guidelines per the U.S. Department of the Interior National Park Service. The addition of functional public art will be incorporated into the site of relocation. m ANNUAL OPERATING IMPACT: None E MANAGING DEPARTMENT: Parks & Community Services Department L 0 L- a. c m E 2020-2025 CAPITAL IMPROVEMENT PROGRAM m > •� i i � =M'E Q. E ESTIMATEDCOSTS BUDGET 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 9100 Salaries & Benefits I $25,450 j $25,450 9200 'Contract Services $65,000 $65,000Ln U 9400 Improvements $400,000 j $400,000 c 9500 Miscellaneous $10,000 $10,000 N c _. TOTAL $100,450 $400,000 $500,450 N N 2801 Public Art Fund $100,450 $400,000 $500 450 -- — — - $100,-= -- $400,00 Aw $500,450 Packet Pg. 569 7.1.b PARKS r .Q �a U L R L 0 L a c aD E m 0 L Q E U N O N O N O N N L R ci U- U- NQ L7� N r C d E L V R r r Q Packet Pg. 570 7.1.b PROJECT DESCRIPTION The Wallis Ranch Community Park consists of three separate parcels totaling 8.85 acres in the Wallis Ranch Development. The project will provide for the design and construction of a community park on the parcels will be designed to the Community Park Standards contained in the Parks and Recreation Master Plan. Park amenities could include: play area, picnic facilities, turf area, natural area, restrooms, pathways, lighting, and irrigation and landscaping. ANNUAL OPERATING IMPACT: $112,100 MANAGING DEPARTMENT: Public Works 9100 ISalaries & Benefits 9200 Contract Services 9400 Improvements 9500 Miscellaneous 41iwi"Pw- $73,070 $135,600 $470,000 $546,000 $21,685 $5,052,870 R399,775 $964,530 $5,734,470 $1,016,00( $5,074,55 $399,77' $964,530 $5,734,470 $6,699,00( $964,530 $5,734,470 ' Packet Pg. 571 PROJECT DESCRIPTION This project provides for the design and construction of a 2.0-acre neighborhood square in the Jordan Ranch Development. The neighborhood square will be designed in is accordance with the Neighborhood Square Standards contained in the Parks and Recreation Master Plan. The design and construction is subject to available funds in the Public C Facility Fee Program and may not occur until future years beyond the 5-year Capital Improvement Program. V L ANNUAL OPERATING IMPACT: $57,000 m MANAGING DEPARTMENT: Public Works LL 9100 Salaries & Benefits $51,018 $49,068 $100,086 9200 Contract Services $200,000 $150,000 $350,000 9400 Improvements I $9,063 $911,811 $920,874 9500 Miscellaneous $143,040 $143,040 TOTAL $403,121 $1,110,8791 $1,514,000 4100 1Public Facility Fees TOTAL - $403,121 $403,121 $1,110,879 $1-�,110,879+_ ANNUAL OPERATING IMPACT I I I I 1 1 $57,000 $1,514,000 $1,514,000 Packet Pg. 572 PROJECT DESCRIPTION: This project provides for the design and construction of a 30-acre community park in the Boulevard Development within the Dublin Crossing Specific Plan. The park will be located _ between Dublin Boulevard, Scarlett Drive, Horizon Parkway, and Columbus Street and will be built by the Boulevard Developer. The conceptual plan was approved by the City a ca Council on January 9, 2018. The plan includes tennis courts, basketball courts, a picnic and barbeque area, a great lawn (multi -use lawn area), playgrounds, parent paddock, U community garden, and other amenities. On October 2, 2018, City Council provided direction to use $600,000 of Community Benefit Funds for the inclusion.of a specimen tree and m upgraded playground equipment in the park design. Construction is anticipated to begin in Spring of 2020. m In accordance with the Dublin Crossing Development Agreement, the Developer is responsible for project costs up to $12 857142. The City is responsible for reimbursing the LL Developer for project costs that exceed that amount City funding will come from Public Facility Fee Funds. E W ANNUAL OPERATING IMPACT: $660,000 (at completion) a� MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 Contract Services 9400 Improvements 9500 IMscellaneous 7691 $433,133 J $18,804,720 $429 $2,042,792 $228,464 $22,571,536 1001 General Fund 1 $600,000 4100 Public Facility Fees $228,464 $9,114,394 $524,000 9999 Developer Built $12,857,142 TOTAL $228,464 $22,571,536 $524,000 $1,432,157 $19,328,720 $2,043,221 Wr $23,324,000 $600,000 $9,866,858 $12,857,142' MW $23,324,000 Packet Pg. 573 CLOVER PARK & SUNRISE PARK - --- -- . - --- Programv PROJECT DESCRIPTION This project provides for the design and construction of a 10.75-acre nature community park and the adjacent 2.0-acre neighborhood square in the Irongate Development, bordered_ by Central Parkway, Dublin Boulevard, Lockhart Street, and Fallon Road. Q- U The land for the parks was dedicated by the Developer. In accordance with agreements approved by the City Council on July 21, 2015 and December 15, 2015, the parks will be constructed by the Developer in exchange for credit toward Public Facility Fees for Nature Community Park Land Improvements and Neighborhood Park Improvements. The City Council approved a concept plan and authorized proceeding with design for Clover Park in September 2016. Construction is estimated to be completed in Spring 2020. ii ANNUAL OPERATING IMPACT: $113,750 _ MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $47,940 I $47,940 9200 Contract Services $155,676 j $155,676 9400 Improvements $1,338,570 $1,338,570 9500 Miscellaneous $239,172 $1,781,35 1 $239,172 t $1,781,358 9999 Developer Built TOTAL $1,781,358 $1,781,358 --J L...J $1,781,358 $1,781,358 Packet Pg. 574 PROJECT DESCRIPTION This project provides for the design and construction of a 1.08-acre neighborhood square in the Tassajara Hills Development (formerly Moller Ranch).cc cc a cc The land for the park was dedicated by the Developer. In accordance with an agreement approved by City Council on September 19, 2017, the park was designed and constructed V by the Developer in exchange for credit toward Public Facility Fees for Neighborhood Park Improvements. The Developer will receive credits equivalent to $777,600, based upon m park area of 1.08 acres and the per acre improvement cost in the Public Facilities Fee program. The neighborhood square was designed in accordance with the Neighborhood >- Square Standards contained in the Parks and Recreation Master Plan. The City Council approved the park design on November 8, 2018. Park construction is anticipated to be j complete in fall of 2020. ANNUAL OPERATING IMPACT: $32,100 M MANAGING DEPARTMENT: Public Works 9400 Improvements $1,053,000 $1,053,000 -- - -�_ $1,053,000 9999 Developer Built $1 _$1,053,000 -' _$1,053,000 Packet Pg. 575 PROJECT DESCRIPTION Fallon Sports Park is a 60-acre community park bordered by Fallon Road, Central Parkway, Lockhart Street and Gleason Drive. Phases 1 and 2 of the park have been completed and Phase 3 represents the final phase of park development. U The Phase 3 project provides for the design and construction of the remaining 14 acres of Fallon Sports Park referred to as the Upper Terrace. On December 17, 2019, City Council approved the concept design that includes a cricket field, sand volleyball courts and multi -sport batting cages. Construction is anticipated to start in 2021. ANNUAL OPERATING IMPACT: $260,000 i- MANAGING DEPARTMENT: Public Works E 9100 Salaries & Benefits $19,909 $44,519 9200 Contract Services $55,696 $1,938,416 9400 Improvements $980,924 9500 INfiscellaneous $26 $200,074 $75,631 $3,163,933 $105,590 $7,252,846 $7,358,436 4100 Public Facility Fees $75,631 $3,163,933 $7,358,436 TOTAL -- -- _- $75,631 $3,163,933 $7,358,436 $170,018 $1,994,112 $8,233,770 $200,100 $10,598,000 $10,598,000 $10,598,000 Packet Pg. 576 PROJECT DESCRIPTION This project provides for the renovation of the existing Pioneer Cemetery at the Dublin Heritage Park. Renovation improvements may include: improved pathways; renovated r landscaping at cemetery entry and along Hawthorne Lane; a renovated plaza area near St Raymond's Church including seating and shade; and a low stone wall along Donlon Way. Q The project will incorporate a memorial program, allowing for benches, boulders, pavers and additional trees that could be purchased in memoriam. In October 2019, the City Council approved a Memorial Program, which will be accommodated with the design of the project The Memorial Program will include cremation monuments and memorials, such as benches, boulders, trees, and engraved pavers. Design began in Spring 2020. Construction anticipated to commence in 2021. m Funding for the project comes from a Developer contribution from the Schaefer Ranch project. ii ANNUAL OPERATING IMPACT: $6,000 E MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $8,263 $66,885 j $75,148 9200 Contract Services $563,0.00 $563,000 9400 Im rovements $724,470 $724,470 9500 Miscellaneous $137,3821 $137,382 1001 General Fund TOTAL $8,263 $1,491,737 $8,263 $1,491,737i $1,500,000 $1,500,000 Packet Pg. 577 PROJECT DESCRIPTION This project provides for the design and construction of the replacement of the existing playground at the Dublin Sports Grounds, 6700 Dublin Boulevard, with a new all -abilities playground, including the replacement of the restroom/concession building; picnic tables and barbeque grills; benches and waste receptacles; safety surfacing, toddler play C structures, youth playground equipment, and adult exercise equipment; fencing and signage; landscaping and irrigation; parking lot lighting; and stormwater management. Artwork U will also be installed under a separate Capital Improvement Program project (PK0518). The improvements will expand the existing playground area of approximately 3,000 square m feet to approximately 16,000 square feet. The City Council awarded the construction contract on August 14, 2019 and it is anticipated that construction will be completed in Fall >- 2020. ii This project is funded with a General Fund reserve designation and State Local Assistance Specified Grant. ANNUAL OPERATING IMPACT: TBD MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 1 Contract Services ,711 9400 Improvements $4,090,876 $4,0902876 9500 Miscellaneous $716 $35,284 $36,000 $4,800,000 1001 General Fund 2403 State Park Grant TOTAL ANNUAL OPERATING IMPACT $1 $1,400,000 $4,800,000 Packet Pg. 578 I 7.1.b I PROJECT DESCRIPTION This project provides for the planning, design and construction of the replacement of playground equipment at various parks. Based on the results of annual inspections and M a regular maintenance records, all City parks will be evaluated for the need to replace play equipment at the end of their useful life. The first phase will be at Emerald Glen Park V (Near Splash Pad Ages 5-12), Ted Fairfield Park (Ages 2-5 and 5-12), and Kolb Park (Ages 2-5 and 5-12). L a� ANNUAL OPERATING IMPACT: None m MANAGING DEPARTMENT: Public Works E L 0 L a 2020-2025 CAPITAL IMPROVEMENT•• c E E • •• i i i FUTUREo d L ESTIMATED COSTSIBUDGET 2020-2021(I21-2022 2022-2023 2023-2024 2024-2025 YEARSTOTALSC 9100 Salaries & Benefits $90,780 $90,781 9200 Contract Services $120,000 $120,001 C 9400 Improvements $1,200,000 $1,200,001 Ln 9500 Miscellaneous $21,000 $21,001 N TOTAL $1,431,780=in, G N TOTAL �— $1,431,780 ANNUAL OPERATING IMPACT �- w— $1,431,78, Packet Pg. 579 PROJECT DESCRIPTION This project provides for the planning of anew Town Square, in accordance with the main principles of the Downtown Dublin Preferred Vision, which was approved by the City y Council on November 5, 2019. The Town Square is a one -acre park and plaza that will serve as Downtown Dublin's gathering place, which may include a market promenade, a outdoor dining, and event space, and will be located one block north of Dublin Boulevard in the Dublin Place shopping center along the proposed extension of Golden Gate Drive. M L R Possible funding sources are development impact fees, community facilities district or other assessment district. m ANNUAL OPERATING IMPACT: TBD ii MANAGING DEPARTMENT: Public Works E 9100 Salaries & Benefits ! $18,020 9200 Contract Services $50,000 9300 Land/Right of Way 9400 Improvements TOTAL $68,020 1001 General Fund 4100 TOTAL Public Facility Fees Am $68,020 F $29,505 $4,505 $4,505 $29,505 $4,505 $4,505 1 $2,400,000 $1,440,000 $4,500,000 $4,500,000 $4,505 $4,500,000 $1,440,000 $4,611,040 $111,040 $4,500,000 $4,611,040 Packet Pg. 580 Numbet PKNE ,e PROJECT DESCRIPTION This project provides for the planning, design, and construction of 12.13 acres of a nature park and open space adjacent to the Iron Horse Trail, from the Dublin/San Ramon city r limit to the confluence of Amador and South San Ramon Creeks, that will be developed in partnership with Zone 7 Water Agency. The park size could increase to over 20 acres ofCL M usable parkland when combined with adjacent Zone 7 Water Agency property. The park will be designed in accordance with the Iron Horse Nature Park and Open Space Master V Plan, which was approved by City Council on October 1, 2013. The City has already acquired the 12.13 acres and the balance of the parkland would be accessible through an easement and operational agreement with Zone 7 Water Agency. It is anticipated that planning will begin in Fiscal Year 2022-2023. iv In addition to the Public Facility Fee, possible funding sources are statewide grants for projects that provide non -motorized infrastructure and enhancements that promote new or alternate access to parks, waterways, outdoor recreational pursuits, and forested or other natural environments to encourage health -related active transportation and opportunities for E Californians to reconnect with nature, such as Active Transportation Program grants or Proposition 68. MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $60,4001 $102,900 $85 9200 Contract Services $400,000 1 $780,000 $646 $1,000,000 $7,867 9400 Im xovements 9500 Miscellaneous $1,250 $619,250 $461,650 $2,502,1501W $8,599 4100 Public Facility Fees $461,650$2,502,1501 $4,117,200 9998 Unidentified $4,482,000 TOTAL $461,650 $2,502,150 $8,599,200 ANNUAL OPERATING IMPACT $248,300 i $7,081,000 $4,482,000 W $11,563,000 Packet Pg. 581 PROJECT DESCRIPTION This project provides for the planning, design, and construction to replace the existing restrooms at Alamo Creek Park, Mape Memorial Park, and Kolb Park. In order to bring the° restrooms up to current accessibility standards and codes, the existing restroom buildings will be demolished and replaced with pre-engineered restroom buildings. C U Planning and design is anticipated to begin in Fiscal Year 2020-2021. cc m ANNUAL OPERATING IMPACT: None m E MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits I $33,3801 $33,380 9200 Contract Services $50,0001 $9,000 $59,000 9400 Improvements $900,000 $900,000 9500 Miscellaneous $500 $83,880 $7,120 _ $91G,120, $7,620 $00.O000 PRIOR 2019-2020 - — FUTURE INDING SOURCE YEARS BUDGET 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 YEARS TOTALS 1001 GeneralFund $83,8801$916,120 1/111/ ANNUAL OPERATING IMPACT $1,000,000 Packet Pg. 582 STREETS .Q U L d L 0 L- a. c m E m 0 L Q E m U M N O N O N O N N L m V N LL H LL Q N r C d E t V R a+ a+ Q Packet Pg. 583 7.1.b PROJECT DESCRIPTION The project provides for the planning and preliminary engineering to define a new roadway alignment, design cross-section, right-of-way, and environmental clearance for Tassajara Road between North Dublin Ranch Drive and the City and Contra Costa County limit The project also provides for the design and construction of a realigned Tassajara Road from Fallon Road to the northern City limit, which will be coordinated with Contra Costa County. Planning and preliminary engineering cost will be split in accordance with the Memorandum of Understanding, which was approved on September 16, 2014. Costs for the design and construction will be agreed upon and split proportionally with the work within each jurisdiction. The design and construction of the southerly Tassajara Road segment is included in another Capital Improvement Program project, Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School (ST0119). This project will widen Tassajara Road to a four -lane arterial standard with bike lanes, sidewalks, landscaped median, stormwater treatment areas, and other associated street improvements. Portions of the existing roadway have been improved by adjacent development projects and this project will complete the street improvements and realign a portion of existing roadway to improve safety and achieve better circulation while adhering to the Complete Streets Policy. The roadway segment is a project within both the Tri-Valley Transportation Council Strategic Expenditure Plan (Project B-8) and the Eastern Dublin Traffic Impact Fee Program (Category 1). ANNUAL OPERATING IMPACT: TBD MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits j $23,308 9200 Contract Services $136,694� � $168,790 $1,647,718 $113,380 $145,050 $305,478 $1,929,462 9300 Land/Right of Way $1,980,000 $1,980,000 9400 Improvements $48,589 $6,158,791 $1,865,096 $8,072,476 9500 Miscellaneous $490,000 $490,000 —,r-- -- --- ---------- ---- - - $160,002 $1,865,097 $8,887,221 $1,865,096 $12,777,416 2201 State Gas Tax $200,000 $200,000 Road Maint. & Rehab. I 2220 Account (RMRA) i $47,880 $644,179 $692,059 Traffic Impact Fee - 4301 CategoEZ 1 $112,122 $108,638 $3,922,883 $1;865,096 $6,008,739 ITraffic Impact Fee - 4303 ! Category 3 I $409,263 $409,263 Packet Pg. 584 ITraffic Impact Fee - 4305 Dougherty Valley $3,964,338 $3,964,338 4306 TVTD $503,017 $503,017 9997 Other $1,000,000 $1,000,000 V TOTAL $160,002 $1,865,097 $8,887,221 $1,865,096 $12,777,416 ANNUAL OPERATING IMPACT Packet Pg. 585 PROJECT DESCRIPTION This project provides for the design and construction of a variety of pavement resurfacing treatments, from slurry seal to major rehabilitation and reconstruction of streets, and resurfacing of bridge decks. The project also includes installation of new or upgrade of existing ADA curb ramps on roads that are reconstructed or receive an asphalt concrete overlay. Streets are selected for improvements based on the City's Pavement Management System to optimize the pavement condition in relation to available budget The CitT owns and maintains approximately 150 centerline miles of streets. The Metropolitan Transportation Commission groups Pavement Condition Index (PCI) ratings into the following categories: 80-100 Very Good -Excellent; 70-79 Good, 60-69 Fair, 50-59 At Risk, 25-49 Poor, and 0-24 Failed. The City of Dublin is rated very good with a rolling three-year average PCI of 85. This annual Resurfacing Program is primarily funded by Alameda County Transportation Commission (ACTC919) Measure B/BB funds, SB-1, and Gas Tax. This program protects the substantial investment the City has in the public street system. ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 Contract Services 9400 Improvements 9500 Miscellaneous 2201 State Gas Tax Measure B Sales Tax - Local Streets 2204 Fund (ACTC) Measure B Sales Tax - Bike & 2205 Pedestrian Fund (ACTC) Measure BB Sales Tax - Local 2214 Streets Fund (ACTC) Measure BB Sales Tax - Bike & 2215 Pedestrian Fund (ACTC) $35,145, $53,050 $29,800 $34,160 $34,160, $34,160 $34,160 $254,635 N $708,107 $549,237 $60,000, $340,000 $340,000 $340,000 $340,0001 $2,677,344 c $13,, $3,719,292 $1,744,153 $625,0801 $1,955,821 $1,955,821 $1,955,821 $1,955,821 911809 w $2,848 $24,983 1 $7,120 $7,120 $7,120 $7,120 $7,1201 $63,431 M $4,465,392 $2,371,421 w v N ii I I FUTURE 1 M[BUDGET H 1 1 1 I I I 023 2024-2025 $2,124,0361 $1,109,0631 $250,000 $563,140 $563,140 $563,1401 $563,1401 $5,735,659 N $764,999 $220,0001 $500,000 $500,000 $500,OOO1 $500,OOO1 1 $2,984,999 E $100,000 1 $100,000 1 $200,000 r Q $1,090,000 $312,000 $150,000 $150,000 $150,000 $150,0001 $2,002,000 i $100,000 $100,000, $87,000 $287,000, Packet Pg. 586 I 7.1.b I Road Maint. & Rehab. Account 2220 TNIRA) 2114 Local Re cling Pxo ams TOTAL ANNUAL OPERATING IMPACT $130,717 $526,000 $385,000 $1,123,961 $155,640 $4,360 $4,465,392 $2,371,423 $722,000 $2,337,101 $1,123,961 $1,123,961 $1,123,961 $2,337,101 $2,337,101 $2,337,101 _ .. $5,537,561 $160,000 $16,907,219 Packet Pg. 587 PROJECT DESCRIPTION This project provides for the planning, design, and construction of the Iron Horse Trail bridge for bicycles and pedestrians over Dublin Boulevard. The project will construct a truss arch bridge consistent with the Iron Horse Trail Feasibility Study and preliminary bridge design, approved by the City Council on November 7, 2017. The bridge will provide safer a and easier trail access, including access to and from the Dublin -Pleasanton BART station. The City Council approved the concept bridge design on November 7, 2017. U L The Alameda County Transportation Commission (ACTC) approved an allocation of $1,294,000 of Measure BB discretionary funds in Fiscal Year 2017-2018 for the bridge design and environmental clearance. On June 17, 2019 ACTC approved additional funding in the amount of $4,751,000 of Measure BB and $856,419 of Transportation for Clean Air funds for the construction phase of the project. The project will also receive funding of $1,000,000 for construction from a Developer contribution from the Boulevard Project ii ANNUAL OPERATING IMPACT: $50,000 E MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $7,809 $92,191 $55,460 1 $155,460 9200 Contract Services $379,562 $1,042,438, $1,000,000 $2,422,000 9400 Improvements $7,516;979 $7'516 979 9500 Miscellaneous TOTAL $387,371 $1,134 629 � $10,000 $8,582,439. _ $10,000 $10,104,439 PRIOR 1 1 1 IFUNDING SOURCE . I I I I 1 0 FUTURE I., I I 1 I • 2201 State Gas Tax $28,000 $752,549 _ $780,549 Measure B Sales Tax - Local 2204 Streets Fund ACTC $722,471 _ $722,471 TFCA/Transportation for _ _ 2207 Clean Air $856,419 $856,419 2217 Measure BB Grants $321,907 $972,0931 $4,751,000 $6,045,000 Road Maint. & Rehab. 2220 Account I $65,464 $134,536 $500,000' j $700,000 4401 Dublin Cross' Fund $1,000,000, S1,000,000 W`� - _ $10,104,439 ANNUAL OPERATING IMPACT $50,000,1 $50,000 $50,000� Packet Pg. 588 PROJECT DESCRIPTION. This project provides for design and construction to complete the street improvements on Tassajara Road, from North Dublin Ranch Drive to Quarry Lane School. The scope of r this project was previously included as part of Fiscal Year 2016-2021 Capital Improvement Program project, ST0116 - Tassajara Road Realignment & Widening, which included the CL design and construction of Tassajara Road from North Dublin Ranch Drive to Dublin's northern limit. In Fiscal Year 2018-2019, the scope of ST0116 was revised to only include U the segment of Tassajara Road north of Fallon Road. M The project will improve Tassajara Road to a four -lane arterial standard, with bike lanes, sidewalks, landscaped median, stormwater treatment areas, and other associated street m improvements. Portions of the existing roadway have been improved by adjacent development projects and this project will complete the street improvements implementing the General Plan and the Complete Streets Policy. This roadway segment is a project within the Eastern Dublin. Traffic Impact Fee program (Category 1). Preliminary engineering and environmental document preparation are being completed as part of ST0116. E L Design of the project began in early 2020. Construction is anticipated to start in Fiscal Year 2020-2021, however it is dependent upon utility relocation, right-of-way acquisition, and a permitting by regulatory agencies. c d ANNUAL OPERATING IMPACT: TBD E d 0 L 0. G M 2020-2025 CAPITAL IMPROVEMENT• Q M PRIOR 1 I I FUTURE V COSTSLn BUDGET1 1 1 1 I 1 1 1 124 2024-2025 YEARS• C 9100 ' Salaries & Benefits $1121 $135,928 $136,040 c 9200 Contract Services $1,315,960 $1,315,960 c N 9300 Land/ ht of Way$290,000 $290,000 9400 Improvements $5,340,000 $5,340,000 9500 Miscellaneous $418,000 - i� , $4181000 v u .. - $7,500,000LL H LL Q • • I , 1 1FUTURE UNDING SOURCE-BUDGETI I I21 2024-2025 YEARS TOTALSN 2201 (State Gas Tax j $1,201,980 $1,201,980 Traffic Impact Fee - m I $2,798,020 t 4301 Cate o 1 $112i $2,797,908 4306 TVTD $3,500,000 $3,500,000 Q $7,500,000 Packet Pg. 589 .Q U L d L 0 L- a. c m E m 0 L Q E .Q U uO N O N O N O N N L V N LL H LL Q N r C d E t V R a+ a+ Q Packet Pg. 590 PROJECT DESCRIPTION This project provides for pavement rehabilitation of Dublin Boulevard between Scarlett Drive and Hacienda Drive. Rehabilitation will include removal and replacement of t existing failed pavement, resurfacing with new asphalt concrete, and installation of new pavement striping. The project will also include installation of new curb ramps or upgrade Ca of existing curb ramps to comply with Americans with Disabilities Act standards. U L R On April 4, 2017, the City Council authorized the filing of an application to the Metropolitan Transportation Commission (MTC) for federal funding through the One Bay Area Grant Local Streets and Roads (OBAG-LSR) program. In November 2017, MTC approved OBAG-LSR funding of $661,000 for the project. The OBAG-LSR funding requires 11.47% local funding, which is provided by Measure B Local Streets and Roads funds. ii This project represents the OBAG-LSR funded portions on the improvements along Dublin Boulevard. The balance of the improvements will be constructed in conjunction with that year's Annual Street Resurfacing Capital Improvement Program project (ST0117). This project will protect the substantial investment the City has in the public street system. ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Public Works Federal Transportation 2202 Grant $661,000 $661,000 Measure B Sales Tax - 2204 Local Streets Fund $76,000, $76,000 TOTAL $ - IFL_-!$737,000 • I Packet Pg. 591 PROJECT DESCRIPTION This project provides for the environmental review, preliminary engineering, design and construction of the 1.5-mile extension of Dublin Boulevard from Fallon Road to North Canyons Parkway in Livermore. The extension is planned to have four to six travel lanes, bike lanes, a Class 1 bike/multi-use path, sidewalk, curb and gutter, traffic signals, street lighting, landscaped medians, bus stops, and all city street utilities. The preliminary engineering and environmental impactreport cost allocation between the City of Dublin and City of Livermore is governed by a Memorandum of Understanding approved by the City. Council on April 19, 2016. On November 1, 2016, the City Council approved a contract for Preliminary Engineering and an Environmental Impact Report. On April 27, 2017, Alameda County Transportation Commission (ACTq approved $8.233 million of Measure BB Grant funds for the design and environmental phases of the project starting with the Fiscal Year 2017-2018 funding. The project EIR and precise roadway alignment was completed in Summer 2019, after which ACTC took the lead in final design. The preliminary engineering level cost estimate for this project is approximately $166.1 million, which includes all project mitigation costs and indirect impacts mitigation, and is anticipated to be divided among the City of Dublin and the City of Livermore on the basis of street length in each jurisdiction. It is expected that the City of Dublin share willbe approximately $111.1 million and the City of Livermore share will be $55 million. The unincorporated Alameda County's costs will be shared between the City of Dublin and City of Livermore with the final cost allocation to each jurisdiction to be defined by a Cooperative Agreement ANNUAL OPERATING IMPACT: TBD MANAGING DEPARTMENT:. Public Works 9100 Salaries & Benefits 1 $35,278 _ $283,747 $284,090 9200 Contract Services $953,679 $510,7001 $200,000 9300 Land/Right of Way 9400 Improvements $12,586 9500 Miscellaneous $154 $113,361 TOTAL $989,111 $907,808 $496,676 $123,000 $200,000 $803,115 I I $9,850,912 $11,515,291 $3,500,000 $3,000,000 $21,485,289 $27,985,289 $91,000 $78,0001 $70,474,775, $70,656,361 -_ %11', 515 $3,591,000 $3 078,00 $102,010,976 $111,073,571 $973,919 Packet Pg. 592 9997 Other $496,676 9998 Unidentified $3,591,000 4l�9etla11Ww ,en(,Lk30&d=i $496,676 $3,591,000 ANNUAL OPERATING IMPACT $3,078,000 $102,010,976 $3,078,000 $102,010,976 $496,676 $108,679,976 $111,073,571 Packet Pg. 593 7.1. b PROJECT DESCRIPTION This project provides for design and construction to renovate the landscaping along San Ramon Road between Silvergate Drive and Alcosta Boulevard. Proposed renovation Fa includes the removal of failing plants, soil amendment, and installation of new plants, with an emphasis on bay friendly and water conserving plant species. Much of the existing C landscaping in this area was installed between 1993 and 1995, and some plant material has reached the end of its life expectancy. The project has been delayed due to prior years V droughts and due to other adjacent projects, such as installation of a recycled water irrigation main by Dublin San Ramon Services District. The project design will commence in winter 2020 and construction is anticipated to be complete in summer 2021. Potential funding for Bay Friendly landscaping may be available from Measure D. m ANNUAL OPERATING IMPACT: None > ii MANAGING DEPARTMENT: Public Works E L O L- a. i i-2025 CAPITAL IMPROVEMENT PROGRAM m E • •• i i i FUTUREm > 9100 Salaries & Benefits $405 $12,459 I $12,864 9200 Contract Services I $19,000 I I $19,000 9400 Improvements $206,2011 $206,201 I $1,000 V9500 Miscellaneous $1,000 LO 1001 JGeneralFund 1 $405 $238,660 $239,065 $239,065 OPERATINGANNUAL Packet Pg. 594 PROJECT DESCRIPTION This project provides for the design and construction to install City entrance monument signs at the four following locations: Village Parkway median at Kimball Avenue, San r Ramon Road median at Alcosta Boulevard, Schaefer Ranch Road at Dublin Boulevard, and Tassa*a Road north of Fallon Road. The new signs will conform to the City of Ca Dublin Streetscape Master Plan and will match the existing granite monument signs currently installed within the City. Installation is anticipated in 2021. U L R The Streetscape Master Plan also calls for entrance monument signs at Fallon Road at Dublin Boulevard and at Dublin Boulevard at the eastern city limits. Currently there are no medians at these locations on which to install the signs. These two entrance monument signs may be installed on the Dublin Boulevard Extension - Fallon Road to North Canyon Parkway project (ST0216) or when adjacent -property develops'and installs associated street improvements. ANNUAL OPERATING IMPACT: None E L MANAGING DEPARTMENT: Public Works o 9100 I Salaries & Benefits 9200 1 Contract Services 9400 Improvements $200,000 1 $200,000 1 9500 Miscellaneous I $5,725 1 1 $5,725 $285,000 1 $285,000 ANNUAL OPERATING IMPACT Packet Pg. 595 PROJECT DESCRIPTION This project provides for the design and repainting of decorative street light poles and conversion of existing street lights into energy efficient LED street lights in the° Dublin Ranch Street Light Assessment District (1999-1). The conversion to LED lights is expected to save the District on annual energy costs. Design for the LED Q- conversion project is anticipated to commence in 2020 with construction to follow in 2021. Repainting of the street light poles protects the integrity of the poles and also V improves aesthetics in the surrounding neighborhood. This project is funded by revenue collected through District assessments. ANNUAL OPERATING IMPACT: Savings in energy costs ii MANAGING DEPARTMENT: Public Works j 2705 East Dublin 1999-1 $1,690I $761,615 $40,106 $40,106 $40,106 $40,106 $40,106 $963,835 TOI ' $1 $761,615 $40,106 $40,106 $40,106 $40,106 $40,106 's $963,835 ANNUAL OPERATING IMPACT Packet Pg. 596 PROJECT DESCRIPTION This project provides for the design and construction of improvements to the trail light fixtures between Alcosta Boulevard and Silvergate Drive. In prior years, the project ;a included installation of tree root barriers and repair of portions of the asphalt concrete trail. Other CIP Projects (ST0514 - Storm Drain Bypass San Ramon Road, ST0117 - Annual C Street Resurfacing, and ST0517 - Cityuride Bicycle and Pedestrian Improvements) replaced the existing asphalt trail surface. The trail lighting improvement project is anticipated to U be completed in 2021. m ANNUAL OPERATING IMPACT: None m MANAGING DEPARTMENT: Public Works E L O L 2020-2025 CAPITAL IMPROVEMENT•• a c F$17,192 i i i9100 Salaries &Benefits $11,1861 $28,378, L- 9200 Contract Services $5,000 E $54,409 $84,G24 $139,033 9400 Improvements I ,0 9500 Miscellaneous $450 $6001 $1,050 v 1001 General Fund $72,051 ' $101,410 $173,461 TOTAL ANNUAL OPERATING IMPACT Packet Pg. 597 PROJECT DESCRIPTION This project includes planning, design, and construction of improvements to various pedestrian and bicycle facilities throughout the City, including pedestrian/bicycle bridges. This project replaces former projects that provided funding for Americans with Disabilities Act (ADA) Transition Plan improvements and Citywide Sidewalk Repair Improvements. In addition to the scope of those previous projects, this project includes design and construction of improvements recommended in the City of Dublin Bicycle and Pedestrian Master Plan, the ADA Transition Plan, and the Class 1 Facilities Maintenance Plan. The project includes an update to the ADA Transition Plan. The plan update will include a review of City buildings, parks, and rights -of -way. The ADA Transition Plan update will be funded by General Fund. It is anticipated that the ADA Transition Plan update will be completed in 2021. An update of the City of Dublin Bicycle and Pedestrian Master Plan began in Fiscal Year 2019-2020. ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Public Works 2020-2025 CAPITAL IMPROVEMENT PROGRAM PRIOR 2019-2020 FUTURE ESTIMATED COSTS YEARS BUDGET 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 YEARS TOTALS 9100 Salaries & Benefits $12,929 $79,951 $12,630 $12,630 $12,630 $12,630 $12,630 1 $156,030 9200 Contract Services $84,694 $395,306 $30,000 $30,000 $30,000 $30,000 $30,000 1 $630,000 9400 Improvements $732,454 $531,696 $390,988 $390,988 $390,988 $390,988 $390,988i $3,219,090 9500 Miscellaneous S690 $44,760 $9,730 $9,730 $9,730 $9,730 $9,730 $94,100 $830,768 $1,051,712 $443,348 $443,348 $443,348 $443,348 $443,348 $4,099,220 -��- .r......,..,...� �..... 4p--,vvvj .ip.vv,vvv qpivv,vvV g1VU1vvV1 4plvo,vvv .P1V0,UUV1 apJ/G,000 2203 Transportation Development Act $210,000 I $210,000 Measure B Sales Tax - Local Streets 2204 Fund (ACTC) $360,000 $150,000 $510,000 Measure B Sales Tax - Bike & 2205 Pedestrian Fund ACTC $77,660 $23,440, $23,000, $23,000j $23,000 $23,000 $23,0001 $216,100 Measure BB Sales Tax - Local Streets 2214 1 Fund ACTC $247,327 $216,273 $280,000 $280,000 $280,000 $280,000 $280,000 $1,863,600 ,r a M U a� m ii E L 0 L a c d d 0 L 0. E Q M U Ln N O N O N O N M v N U. H u_ Q N r c m E t r Q Packet Pg. 598 Measure BB Sales Tax - Bike & 2215 Pedestrian Fund ACTq TOTAL �- $145,780 $20,000 �$32,348 $32,348 $32,348 $32,348 $32,348 $830,768 $1,051,712 $443,348 $443,348 $443,348 $443,348 $443,348 $327,520 a $4,099,220 U m ii Packet Pg. 599 7.1.b PROJECT DESCRIPTION This project provides for improvements to the City's transportation system using emerging technologies, such as support for connected and autonomous vehicles, and is y a collaborative effort between the City of Dublin, Livermore Amador Valley Transportation Authority (LAVTA), and the Metropolitan Transportation Commission a (MTC). System improvements will be completed both by the City and MTC. MTC's work is funded with a $385,000 federal grant through MTC's Innovative �j Deployments to Enhance Arterials (IDEA) Challenge Grant Program. The funding source for the MTC work is shown as "Other" because MTC project costs will be funded directly by MTC. 0 m Transportation system improvements will include: Connected Vehicle Software that will integrate with the City's central traffic management system to broadcast real- time traffic signal information to transit vehicles and other motorists; Shared Autonomous Vehicle (SAV) Communications that will provide for the integration of SAV with the City's traffic signal controllers. LAVTA's testing of SAVs on public streets in the City in the vicinity of the Dublin/Pleasanton BART Station, and this project E will allow for the SAVs to communicate and interface with the City's traffic signal controllers., The project will also evaluate vulnerable road user protection systems at 3 to 4 signalized intersections on Dublin Boulevard in the vicinity of the BART station to see if it can effectively detect pedestrians and bicyclists in or near the intersections. The Iron Horse Trail crossing at the intersection of Dublin Boulevard and Scarlett Drive will have passive bicycle and pedestrian detection allowing trail users to be detected before reaching the intersection in order to reduce the wait time at the signalized crossing. ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $3,577 $19,763 , _ $23,340 1 9200 _ Contract Services $4,0001 $38,860 � --- $42,860 9400 ;Improvements $4,318 1 $550,682 j $555,000 $621,200 Packet Pg. 600 R L 0 L a c aD E m 0 L Q E Y .Q R U N O N O N O N N L R ci U- U- NQN L7� N r C d E L V R r r Q Packet Pg. 601 7.1.b PROJECT DESCRIPTION This project provides for the continued upgrades of the traffic signal communications system. Work will include the replacement of signal controllers, conflict monitors, and ' t CL battery backup units. The project also includes managing ongoing signal operations of coordinated corridors. In Fiscal Years 2019-2020 and 2020-2021, the project will further M expand the traffic communication network, connecting traffic signals on Fallon Road and Tassajara Road and replacing existing copper communication cables with fiber optic V cables on Dublin Boulevard. The project will also expand the adaptive traffic signal system along key corridors and will connect existing and new public safety infrastructure, such m as situational awareness cameras and automated license plate recognition cameras, to the high speed fiber optic communications system. m The project will update the existing City of Dublin Travel Demand Forecasting Model to provide traffic flow projections on the arterial and collector roadways as well as analyze future land use development proposals and transportation network changes in the City. The last comprehensive update was done in 2013 and was based on the 2011 Alameda E County Transportation Commission (ACTC) countywide model. The updated City of Dublin Travel Demand Forecasting Model will be based upon the 2018 update of the ACTC countywide model. This project is partially funded with General Fund reserve designation for One Time Initiative - Capital. Potential other funding for this project may include Federal and State grants. ANNUAL OPERATING IMPACT: None MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 Contract Services 9400 Imvrovements 9500 (Miscellaneous 9600 Equipment TOTAL 1001 I General Fund 2201 1 State Gas Tax Measure B Sales Tax - Local 2204 1 Streets Fund (ACTC) $5,446 $96,261 $9,880 $11,720 $8,0401 $8,040 $8,040 $175,606 $667,395 $50,000 $83,600 $135,000 $135,0001 $135,000 $599,830 $1,477,848 $150,000 $400,080 $92,960 $92,960 $92,960 $4,900 $5,120 $785,782 $2,241,504 $215,000 ;V- $495,400 __,9- $236,000 $236,000 $236,000 $11 $1,500,000 $130,000 $90,000 0 47,427 81.601 $5,120 $4,445,686 30,000 $860,640 Packet Pg. 602 7.1.b 2212 Vehicle Registration Fee (ACTC) $586,308 $70,438 $80,OOO $10,000 $36,000 $36,000 $36,000 $854,746 Road Maint. & Rehab. Account 2220 $166,000 $115,000 $245,400 �_ _ $526,400 V 4301 Traffic Impact Fee - Category 1 $200,000 $200,000 Western Dublin Traffic Impact 4304 Fee $199,000 _ $199,000 ii 6305 Internal Service Fund - Equipment $89,474 $45,426 $20,000 $20,000 $174,900 E $785,782 $2,241,504 $215,000 $495,400 $236,000 $236,000 $236,000 $4,445,686 O L. ANNUAL OPERATING IMPACT fit Packet Pg. 603 PROJECT DESCRIPTION This project provides for the design and construction of pedestrian, bicycle, and vehicular improvements along Amador Plaza Road between Dublin Boulevard and Amador Valley Boulevard. The pedestrian and bicycle improvements are a Tier 1 priority project in the City of Dublin Bicycle and Pedestrian Master Plan. The project is also C consistent with the Western Dublin Traffic Impact Fee program. U L The project has two phases. On December 6, 2016, the City Council accepted the first phase of improvements, which included the installation of two mid -block crosswalks >_ with pedestrian warning lights and construction of a raised concrete median at the southern Safeway/Dublin Place driveway. The second phase will include construction of an exclusive southbound right turn lane on Amador Plaza Road at Dublin Boulevard. Phase 2 design began in mid-2018 and construction will occur following acquisition of jL the right-of-way for these improvements, which are dependent upon the timing of an adjacent development project at the former Coco's site. E ANNUAL OPERATING IMPACT: None n, MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $11,344 $8,072 9200 Contract Services $190,849 $37,522 9300 Land/Right of Way _ $12_6,000 9400 Improvements $350,242 $685,620 9500 Miscellaneous $716 $3,284 TOTAL $553,151 $860,498 _ _ _ ___ __ Western Dublin Traffic 4304 1Impact Fee TOTAL , ANNUAL OPERATING IMPACT $19,416 $228,371 $126,000 $1,035,862 $4,000 $1,413,649 $1,413,649 $1,413,649. Packet Pg. 604 PROJECT DESCRIPTION This project provides for the replacement of the traffic signal and pedestrian signal LED lamps at approximately 78 traffic signals. The City currently has 98 traffic signals, many of CL which were installed in 2008, and the LED lamps are reaching the end of their useful life, which is typically eight to ten years. The City has replaced 20 traffic signal lamps through on -going maintenance efforts. New LED lamps will insure proper visibility of vehicle and pedestrian signal heads, which is critical for maintaining a safe traffic flow. V L R ANNUAL OPERATING IMPACT: None m MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits $4,020 $4,020 1 $8,040 9200 Contract Services $35,000 $35,000I $70,000 9400_,Improvements I I $260,0001 $260,000 I $520,000 2201 State Gas Tax $119,020 $119,020 Measure B Sales Tax - 2205 Bike & Pedestrian Fund $50,000 $50,000 Vehicle Registration Fee 62212 (ACTC) $130,000130,000 $299,020 'P $299,020 �ANNUAL OPERATING IMPACT $23 $260,000 $598,040� Packet Pg. 605 7.1.b Number STNEW02 PROJECT DESCRIPTION: This project provides for the planning, design, and construction of various citywide projects that will improve water quality and provide other environmental benefits in accordance with the Green Stormwater Infrastructure (GSI) Plan, which was approved by City Council on June 18, 2019. The GSI Plan and implementing are mandated b the Municipal Regional Stormwater Permit Projects may include: stormwater trash capture; bioretention areas and rain gardens; tree well filters; t CL projects Y P') j Y P Bay Friendly landscape retrofits; storm drain hydrology assessments (e.g. determining inverts, pipe diameter, asset photos, etc.); and stormwater injection wells. Injection wells will also include coordination with Zone 7 Water and Dublin San Ramon Services District. V L R ANNUAL OPERATING IMPACT: TBD. On -going operations and maintenance (O&M) expenditures for installed facilities are required, but may be equal to current >_ maintenance expenditures, particularly for retrofit and replacement projects. For completely new projects, O&M costs are estimated at 1.3% of construction cost for parcel -based GSI or regional stormwater controls, such as injection wells, and 3.6% of construction costs for green street projects. EL MANAGING DEPARTMENT: Public Works W 9100 j Salaries & Benefits 1 $18,715 1 $29,785 $49,0301 $97,530 9200 Contract Services $50,0001 $275,070 $286,295 $611 365 9400 Improvements _ $3,000 $6,000 $310,855 $1,436,000 $3,000 _ j $1,774,325j $1,436,000 _ 9500 Miscellaneous TOTAL _&, $12,000 1001 General Fund TOTAL ANNUAL OPERATING IMPACT ,fir. $71,715 $71,715 $310,855 $310,855 $1,774,325 $1,774,325 $2,156,895 $2,156,895 Packet Pg. 606 7.1.b PROJECT DESCRIPTION This project provides for the design and construction of the final segment of Saint Patrick Way from west of Golden Gate Drive to Regional Street This is a Western Dublin Traffic . CL Impact Fee Program project to relieve congestion, reduce GHG, and is an Active Transportation Solution. The project is identified in the General Plan, Downtown Dublin Specific M Plan, and the Bicycle and Pedestrian Master Plan. V a� Prior segments of Saint Patrick Way were constructed by Caltrans in 1998 and Connelly Station in 2014. The developer of the St Patrick Way Bayview Development Group project entered into an agreement with the City on June 18, 2018, which required dedication of right-of-way and construction of improvements to complete the Saint Patrick Way Extension. > The developer is responsible for all project costs to acquire right-of-way, design, and construction in exchange for credit toward Western Dublin Traffic Impact Fees. Construction is anticipated to begin in 2021. ANNUAL OPERATING IMPACT: TBD MANAGING DEPARTMENT: Public Works 9400 Improvements $3,742,556 $3,742,556 TOTAL $3,742,556 $3,742,556 9999 Developer Built TOTAL $3,742,556 j $3,742,556 w $3,742,556 $3,742,556 Packet Pg. 607 PROJECT DESCRIPTION This project provides for the planning of a new Street Grid Network, in accordance with the main principles of the Downtown Dublin Preferred Vision, which was approved by the City Council on November 5, 2019. The Street Grid Network will introduce new streets that will break down the large block format into smaller, walkable -sized blocks between 350 C to 450 feet per side. The proposed extension of Golden Gate Drive north from Dublin Boulevard up to Amador Valley Boulevard will become a new main street with the classic U Downtown street grid network within street rights -of -way varying between 60 and 90 feet wide. Street infrastructure may include storm drainage, sewer, water, recycled water, M communications, gas, and electric utilities, as well as landscaping and irrigation. m Street rights -of -way are anticipated to be dedicated by developers. jL Possible funding sources are development impact fees, community facilities district or other assessment district. E ANNUAL OPERATING IMPACT: TBD MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 I Contract Services 9400 Imvrovements 1001 I General Fund 9998 Unidentified TOTAL' ANNUAL OPERATING IMPACT $10,210 $10,210 $50,000 $140,840 $60,210I $10,210 $10,210 $10,210 _..._,. , m,....._ _._.._, .. .._ ,...._.....,.,._..�,.,....... _._..... ,_.........,_... $140,840 $60,210 $10,210 $10,210 $10,210 $200,000 $281,680 $1,000,000 $1,150,000 $20,000,000, $20,000,000 $231,680 $21,200,000 $21,200,000 $21,200,000 $21,431,680 Packet Pg. 608 7.1.bWalk- PROJECT DESCRIPTION r This project provides. for the design and construction of intersection improvements at the intersections of Dublin Boulevard at Golden Gate Drive and St Patrick Way at Golden a Gate Drive. This is a Western Dublin Traffic Impact Fee Program project to relieve congestion, reduce GHG, and is an Active Transportation Solution. The project is identified in U the Downtown Dublin Specific Plan and the Bicycle and Pedestrian Master Plan. The improvements may include a new traffic signal at the intersection of St. Patrick Way and Golden Gate Drive; traffic signal modifications at the intersection of Dublin Boulevard at Golden Gate Drive; conversion of copper connection to fiber optic; signing, striping and markings; necessary utility, pavement, curb, gutter, and sidewalk modifications or adjustments. Design is anticipated to begin in 2099. ii ANNUAL OPERATING IMPACT: TBD .. MANAGING DEPARTMENT: Public Works 9100 Salaries & Benefits 9200 Contract Services 9400 Improvements TOTAL $10,630 $21,260 $7,3601 j $39,250 $10,000 $91,000 $99,0001 $200,000 $709,000 $709,000 $20,630#I $112,260 $815,360 Western Dublin Traffic 4304 Impact Fee 520,630 $112,260 $815,360 $948,250 TOTAL r $20,630 $112,260 $815,360 $948,250 ANNUAL OPERATING IMPACT Packet Pg. 609 7.1.b FUTURE PROJECTS r .Q �a U L R L 0 L a c aD E m 0 L Q E U N O N O N O N N L R ci u- NQ L7� N r C d E L V R r r Q Packet Pg. 610 [Number S-01 CITY ENTRANCE SIGNS P PROJECT DESCRIPTION This project provides for the design and construction to install City, entrance signs at the following two locations: Fallon Road at Dublin Boulevard and at Dublin Boulevard at the eastern city limit. Currently there are no medians at these locations on which to install the signs. The new signs will conform to the City of Dublin Streetscape Master Plan and will match the existing granite monument signs currently installed within the City. ESTIMATED COSTS: $180,000 MANAGING DEPARTMENT: Public Works N EASTERN DUBLIN TRAFFIC IMPACT FEE Program FUTURE PROJECTS PROJECT DESCRIPTION This project provides for the design and construction of 24 projects being partially funded by the Eastern Dublin Traffic Impact Fee (EDTIF) program. The City Council established the EDTIF program on January 9,1995 and adopted the most recent update on March 16, 2010. This project does not include completed EDTIF projects, current projects that are individual CIP projects, or current projects to be constructed by developers. EDTIF projects within the five-year capital improvement program are: ST0911 Dougherty Road Improvements - Sierra Lane to North City Limit; ST1012 Dublin Boulevard Improvements - Sierra Court to Dublin Court; ST0116 Tassajara Road Realignment & Widening; ST0119 Tassajara Road Improvements - North Dublin_ Ranch Drive to Quarry Lane School; and ST0216 Dublin Boulevard Extension. ESTIMATED COSTS: $57,000,000 MANAGING DEPARTMENT: Public Works PROJECT DESCRIPTION This project provides for the design and construction of eight projects being partially funded by the Western Dublin Traffic Impact Fee (WDTIF) program. The City Council adopted an update to the WDTIF on September 6, 2016. The WDTIF program includes a total of nine projects, however one project, ST0815 — Amador Plaza Road Bicycle and Pedestrian Improvements, is within the five-year capital improvement program. ESTIMATED COSTS: $8,500,000 MANAGING DEPARTMENT: Public Works Packet Pg. 611 7.1.b PROJECT DESCRIPTION This project provides for the planning, design, and reconstruction of Village Parkway north of Amador Valley Boulevard to the City limit. The project will include evaluation of the existing curb, gutter, sidewalk, median, and street landscaping. ESTIMATED COSTS: $10,000,000 MANAGING DEPARTMENT: Public Works PROJECT DESCRIPTION This project provides for the design and construction to renovate a portion of the Dublin Sports Grounds. The Phase 5 project encompasses approximately 180,000 square feet, west of Soccer Field #3, and includes installation of a sand channel drainage system, irrigation upgrades and new turf. ESTIMATED COSTS: $2,180,000 MANAGING DEPARTMENT: Public Works PROJECT DESCRIPTION This project provides for the design and construction of a 5.0-acre neighborhood park to serve new development. The park will be designed in accordance with the Neighborhood Park Standards contained in the Parks and Recreation Master Plan. Based on development projections, it is anticipated that design and construction will occur beyond the current CIP time frame and will occur at or after development of the project area, ESTIMATED COSTS: $3,785,000 MANAGING DEPARTMENT: Public Works Packet Pg. 612 7.1.b PROJECT DESCRIPTION This project provides for the design and construction of a 5.5-acre neighborhood park to serve new development The park will be designed in accordance with the a Neighborhood Park Standards contained in the Parks and Recreation Master Plan. Based on development projections, it is anticipated that design and construction will f° occur beyond the CIP time frame and will occur at or after development of the project area. V a� ESTIMATED COSTS: $4,163,000 m MANAGING DEPARTMENT: Public Works PROJECT DESCRIPTION This project provides for the design and construction of the final phase of the Emerald Glen Recreation and Aquatic Complex (known as The Wave). Amenities may include a community room and gymnasium space. This project may be modified as the City has entered into an agreement for a joint use gymnasium at the Dublin Crossing school site. Until such time, the project will remain in future. ESTIMATED COSTS: $16,120,000 PUBLIC ART — HERITAGE PARS AND MUSEUMS Program FUTURE PROJECTS PROJECT DESCRIPTION This public art project will be featured at Dublin Heritage Park and Museums, located at the comer of Dublin Boulevard and Donlon Way. On August 15, 2017, the City Council directed Staff to review and update the Dublin Historic Park Master Plan, which it plans on incorporating in the larger update to the Parks and Recreation Master Plan. The project budget is based on Public Art In -Lieu contribution required by Schaefer Ranch Development Agreement, which is subject to change. It is anticipated the design and construction will occur beyond the CIP time frame. ESTIMATED COSTS: $530,000 MANAGING DEPARTMENT: Parks & Community Services Packet Pg. 613 7.1.c CALIFORNIA GOVERNMENT CODE - EXCERPT TITLE 7. PLANNING AND LAND USE [65000 - 66499.581 ( Heading of Title 7 amended by Stats. 1974, Ch. 1536.) DIVISION 1. PLANNING AND ZONING [65000 - 662101 ( Heading of Division 1 added by Stats. 1974, Ch. 1536. ) CHAPTER 3. Local Planning [65100 - 65763] ( Chapter 3 repealed and added by Stats. 1965, Ch. 1880. ) ARTICLE 1. Local Planning (Article 1 repealed and added by Stats. 1984, Ch. 690, Sec. 2. ) 65103. Each planning agency shall perform all of the following functions: (a) Prepare, periodically review, and revise, as necessary, the general plan. (b) Implement the general plan through actions including, but not limited to, the administration of specific plans and zoning and subdivision ordinances. (c) Annually review the capital improvement program of the city or county and the local public works projects of other local agencies for their consistency with the general plan, pursuant to Article 7 (commencing with Section 65400). (d) Endeavor to promote public interest in, comment on, and understanding of the general plan, and regulations relating to it. (e) Consult and advise with public officials and agencies, public utility companies, civic, educational, professional, and other organizations, and citizens generally concerning implementation of the general plan. (f) Promote the coordination of local plans and programs with the plans and programs of other public agencies. (g) Perform other functions as the legislative body provides, including conducting studies and preparing plans other than those required or authorized by this title. (Repealed and added by Stats. 1984, Ch. 690, Sec. 2.) ARTICLE 7. Administration of General Plan (Article 7 added by Stats. 1965, Ch. 1880. ) 65401. If a general plan or part thereof has been adopted, within such time as may be fixed by the legislative body, each county or city officer, department, board, or commission, and each governmental body, commission, or board, including the governing body of any special district or school district, whose jurisdiction lies wholly or partially within the county or city, whose functions include recommending, preparing plans for, or constructing, major public works, shall submit to the official agency, as designated by the respective county board of supervisors or city council, a list of the proposed public works recommended for planning, Packet Pg. 614 7.1.c initiation or construction during the ensuing fiscal year. The official agency receiving the list of proposed public works shall list and classify all such recommendations and shall prepare a coordinated program of proposed public works for the ensuing fiscal year. Such coordinated program shall be submitted to the county or city planning agency for review and report to said official agency as to conformity with the adopted general plan or part thereof. (Amended by Stats. 1970, Ch. 1590.) 65402. (a) If a general plan or part thereof has been adopted, no real property shall be acquired by dedication or otherwise for street, square, park or other public purposes, and no real property shall be disposed of, no street shall be vacated or abandoned, and no public building or structure shall be constructed or authorized, if the adopted general plan or part thereof applies thereto, until the location, purpose and extent of such acquisition or disposition, such street vacation or abandonment, or such public building or structure have been submitted to and reported upon by the planning agency as to conformity with said adopted general plan or part thereof. The planning agency shall render its report as to conformity with said adopted general plan or part thereof within forty (40) days after the matter was submitted to it, or such longer period of time as may be designated by the legislative body. If the legislative body so provides, by ordinance or resolution, the provisions of this subdivision shall not apply to: (1) the disposition of the remainder of a larger parcel which was acquired and used in part for street purposes; (2) acquisitions, dispositions, or abandonments for street widening; or (3) alignment projects, provided such dispositions for street purposes, acquisitions, dispositions, or abandonments for street widening, or alignment projects are of a minor nature. (b) A county shall not acquire real property for any of the purposes specified in paragraph (a), nor dispose of any real property, nor construct or authorize a public building or structure, in another county or within the corporate limits of a city, if such city or other county has adopted a general plan or part thereof and such general plan or part thereof is applicable thereto, and a city shall not acquire real property for any of the purposes specified in paragraph (a), nor dispose of any real property, nor construct or authorize a public building or structure, in another city or in unincorporated territory, if such other city or the county in which such unincorporated territory is situated has adopted a general plan or part thereof and such general plan or part thereof is applicable thereto, until the location, purpose and extent of such acquisition, disposition, or such public building or structure have been submitted to and reported upon by the planning agency having jurisdiction, as to conformity with said adopted general plan or part thereof. Failure of the planning agency to report within forty (40) days after the matter has been submitted to it shall be conclusively deemed a finding that the proposed acquisition, disposition, or public building or structure is in conformity with said adopted general plan or part thereof. The provisions of this paragraph (b) shall not apply to acquisition or abandonment for street widening or alignment projects of a minor nature if the legislative body having the real property within its boundaries so provides by ordinance or resolution. (c) A local agency shall not acquire real property for any of the purposes specified in paragraph (a) nor dispose of any real property, nor construct or authorize a public building or structure, in any county or city, if such county or city has adopted a general plan or part 2 Packet Pg. 615 7.1.c thereof and such general plan or part thereof is applicable thereto, until the location, purpose and extent of such acquisition, disposition, or such public building or structure have been submitted to and reported upon by the planning agency having jurisdiction, as to conformity with said adopted general plan or part thereof. Failure of the planning agency to report within forty (40) days after the matter has been submitted to it shall be conclusively deemed a finding that the proposed acquisition, disposition, or public building or structure is in conformity with said adopted general plan or part thereof. If the planning agency disapproves the location, purpose or extent of such acquisition, disposition, or the public building or structure, the disapproval may be overruled by the local agency. Local agency as used in this paragraph (c) means an agency of the state for the local performance of governmental or proprietary functions within limited boundaries. Local agency does not include the state, or county, or a city. (Amended by Stats. 1974, Ch. 700.) 3 Packet Pg. 616