Loading...
HomeMy WebLinkAboutReso 75-20 Approving a Design Builder Agreement to ADC Construction Management IncReso No. 75-20, Item 4.7, Adopted 07/21/20 Page 1 of 2 RESOLUTION NO. 75 - 20 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * AWARDING A DESIGN/BUILDER AGREEMENT TO ADC CONSTRUCTION MANAGEMENT, INC. FOR THE CIVIC CENTER HVAC AND ROOF REPLACEMENT, CIP NO. GI0119 WHEREAS, the City of Dublin did, on March 6, 2020 issued a request for qualifications of Design-Build Entities for the Civic Center HVAC and Roof Replacement, CIP No. GI0119 (“Project”). The project includes the replacement of the flat roof assembly, roof mounted HVAC equipment, modifications to the existing HVAC duct system, HVAC controls, minor structural upgrades, fire alarm panel and ancillary devices, and the installation of 168 Cat6e ethernet data cable drops within the City Hall building of the Civic Center; and WHEREAS, the City of Dublin did, on July 1, 2020, receive Proposals from the Pre- qualified Design-Build Entities for the Project; and WHEREAS, the City of Dublin evaluated the three Proposals received for the Project and determined the Best Value Proposal was submitted by ADC Construction Management, Inc.; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby award a Designer/Builder Agreement to ADC Construction Management, Inc. for the Civic Center HVAC and Roof Replacement Project, Project No. GI0119, for the base proposal plus add alternate 1, and a five-hundred thousand dollar ($500,000) contingency, for a total proposal of four-million three-hundred thirty-six thousand eight hundred thirty-one dollars ($4,336,831), the particulars of which proposal are on file in the Office of the Public Works Director. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or her designee to execute the Design/Builder Agreement with ADC Construction Management, Inc. and to approve Contract Change Orders based on the appropriated funds designated for the Project up to the contingency amount of five-hundred thousand dollars ($500,000). BE IT FURTHER RESOLVED that the City Manager or designee is authorized to execute the Designer/Builder Agreement with ADC Construction Management, Inc. PASSED, APPROVED AND ADOPTED this 21st day of July 2020, by the following vote: AYES: Councilmembers Goel, Hernandez, Josey, Kumagai and Mayor Haubert NOES: ABSENT: ABSTAIN: Reso No. 75-20, Item 4.7, Adopted 07/21/20 Page 2 of 2 ________________________________ Mayor ATTEST: _____________________________ City Clerk