HomeMy WebLinkAboutItem 4.09 Park Lighting Replacemtc~~~~ Off' nU~~~ /ii ~ 111 L~~ - ~ ~~~ DATE: TO: FROM: SUBJECT STAFF REPORT CITY COUNCIL CITY CLERK File #600-35 November 15, 2011 Honorable Mayor and City Councilmembers ~~ Joni Pattillo, City Manager ° ~' Park Lighting Replacement Project, Contract #11-11 Prepared by Rosemary Alex, Parks and Facilities Development Coordinator EXECUTIVE SUMMARY: The Park Lighting Replacement project will replace the park lighting at Kolb, Dolan and Shannon Parks. The initial funding for this Project was a Federal Energy Block Grant. Staff is seeking City Council authorization for Staff to award bid to Bahia Electric and, based on the low bid, appropriate additional funding to the project. The additional funding will accommodate the low bid plus an additional $3,000 in design costs. FINANCIAL IMPACT: The project design was started in Fiscal Year 2010/2011. The total funding appropriated for the Park Lighting Energy Grant Project (CIP #950012) is $185,700. This includes $23,456 for design and project administration and $162,244 for the improvements to be installed under this contract. The following table shows the available grant funds for installation of the lighting compared to the low bid. IMPROVEMENT BUDGET COMPARED TO BID Contract Costs /Funding Budget For Improvements Low Bid With 10% Contingency Budget Change Required Improvements $ 162,244 $ 198,000 10% Contingency: Included $ 19,800 Total: $ 162,244 $ 217,800 $ 55,556 Funding Source Federal Energy Block Grant 2311 $ 162,244 $ 162,244 None Dublin -General Fund 1001 None $ 55,556 $ 55,556 Total: $ 162,244 $ 217,800 $ 55,556 In addition to the $55,556 for the construction costs (including a contingency) Staff is recommending that the Total Budget Change be increased by $3,000 to accommodate additional design costs. A total of $58,556 in additional project funding is recommended to be provided from the General Fund Reserve designated for Innovations and New Opportunities. In accordance with City policies the City Council must authorize appropriations from this source. Page 1 of 3 ITEM NO. 4.9 RECOMMENDATION: Staff recommends that the City Council: 1) Adopt Resolution awarding Contract #11-11 to Bahia Electric; and 2) Approve Budget Change. ~~ ~' Submitted By Parks and Community Services Director ..~ ~~ ~ ~ ~~0.~1 ~, a ~.~ ~. ~,~ Reviewed By Administrative Services Director ,, Reviewed y Assistant City Manager DESCRIPTION: On September 20, 2011 the City Council authorized Staff to advertise the Park Lighting Replacement Project which provides for the replacement of park lighting at Kolb, Dolan and Shannon Parks. The project entails the removal and replacement of park pathway lights including existing poles and light fixtures along with the addition of some new lights where gaps in illumination levels occurred. In addition to the work described above, the lights in the Shannon Park parking area will be replaced as well. The replacement of the metal halide lamps with the more energy efficient light emitting diodes (LED) will result in a total estimated energy reduction of 42% or $1,200 per year for all three sites. In addition, the LEDs last significantly longer than the metal halide lamp which reduces the amount of labor and materials cost in replacing the lamps. It is estimated that metal halide lights will need to be replaced twice (at year 5 and year 10) to meet the lamp life of LED lights. BID RESULTS: After a nearly four week bid period, the City received bids on October 24, 2011 from the following companies: Com pany Name Bid Amount 1 Bahia Electric $198,000.00 2 Dan Electric $199,700.00 3 Republic ITS $222,600.00 4 Columbia Electric $224,400.00 5 Steiny and Company $255,675.00 6 WBE $266,966.00 7 Tennyson Electric $268,261.50 8 Ranis Construction $268,500.00 9 Harris Electric $337,700.00 10 B-Side Incorporated $357,700.00 11 CF Contracting $753,000.00 As discussed in the financial statement above, the low bid exceeds the available budget for the park improvements by $55,556 reflecting the bid amount including the 10% contingency. In addition, Staff is recommending that the additional appropriation include $3,000 for additional design expenses associated with the project. Staff has prepared a Budget Change Form (Attachment 2). Page 2 of 3 NOTICING REQUIREMENTS/PUBLIC OUTREACH: A copy of the Staff Report was provided to the bidders. ATTACHMENTS: 1. Resolution awarding Contract #11-11 to Bahia Electric 2. Budget Change Form Page 3 of 3 RESOLUTION NO. XX - 11 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN *********** AWARDING CONTRACT NO. 11-11 PARK LIGHTING REPLACEMENT TO BAHIA ELECTRIC WHEREAS, the City of Dublin did, on October 24, 2011, publicly open, examine and declare all sealed bids for doing the work described in the approved Plans and Specifications for Contract No. 11-11, which Plans and Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; and WHEREAS, the source of funding in addition to a Federal Energy Block Grant is proposed to be the General Fund Reserve designated for Innovations and New Opportunities; and WHEREAS, Resolution 106-11 which established the General Fund Reserve designated for Innovations and New Opportunities requires approval by the City Council to appropriate funds from this source. NOW, THEREFORE, the City Council of the City of Dublin does RESOLVE as follows: 1. The City Council of the City of Dublin, does hereby award Contract No. 11-11 to the lowest responsible bidder therefor, to wit, Bahia Electric, at a bid of one-hundred and ninety-eight thousand dollars even ($198,000) the particulars of which bid are on file in the office of the City Engineer. 2. The City Council of the City of Dublin, does hereby approve the appropriation of funds from the Innovations and New Opportunities General Fund Reserve for Contract No. 11- 11. PASSED, APPROVED AND ADOPTED this 15th day of November, 2011, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: City Clerk Mayor ATTACHMENT 1 CITY OF DUBLIN BUDGET CHANGE FORM FY 2011 / 2012 CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: X From Unappropriated Reserves From Budgeted Contingent Reserve ($58,566 from Committed Fund Balance (1001.1901-81101) Innovations & New Opportunities) Within Same Department Activity From New Revenues _ _ Between Departments (City Council Approval Required) Other DECREASE BUDGET ACCOUNT AMOUNT INCREASE BUDGET ACCOUNT AMOUNT CIP EXPENDITURE: GENERAL FUND -Design Energy Grant Park Lighting Project $ 3,000 Project # 950012.9200.9202.1001 GL Account #: 3500.9501.64091 CIP EXPENDITURE: GENERAL FUND -Improvements Energy $ 55,556 Grant Park Lighting Project Project # 950012.9400.9401.1001 GL Account #: 3500.9501.73103 CIP Transfer Out: General Fund 1001.1901.89101 $ 58,556 CIP Transfer In: Parks CIP: #3500.9501.49999 $58,556 REASON FOR BUDGET CHANGE ENTRY: As presented to the City Council on November 15, 2011, Staff have obtained bids to replace walkway lighting at Kolb, Dolan and Shannon Parks. Based on the low bid received including a contingency the project will require additional $55,556 in funding. In addition $3,000 is needed for additional design services. The remainder of the project is funded by a Federal Grant which was allocated at a specific amount. Therefore, the additional $58,556 is proposed to come from the Committed Fund Balance for Innovations and New Opportunities as approved by the City Council. As Presented at the City Council Meeting on: Posted By: #################(Finance Use Only)################### Date: 11 /15/2011 Date: ~, ~r~ada~er~~~,~an~~~~,-r_zoll_IZ~~IZ 11_l~_ll E„~~~~,~ ~z~~~_~~~~,n~P~-L,~~,n~n~a~~ ATTACHMENT 2