Loading...
HomeMy WebLinkAboutItem 4.6 Dougherty Hills Drain Repairor 19 82 /ii � 111 DATE: TO: FROM: STAFF REPORT CITY COUNCIL December 20, 2011 Honorable Mayor and City Councilmembers Joni Pattillo, City Manager""' CITY CLERK File #600 -35 SUBJECT: Acceptance of Work — Contract No. 11 -09, Dougherty Hills Park Slope and Drainage Repair Project (Evans Brothers Inc. — CIP #950017) Prepared by Ferd Del Rosario, Senior Civil Engineer EXECUTIVE SUMMARY: A contract was awarded by the City Council on August 16, 2011 to Evans Brothers, Inc. for the Dougherty Hills Park Slope and Drainage Repair project (CIP #950017) which included slope stabilization and drainage repair and improvements on a hillside within Dougherty Hills Park immediately above Topaz Circle. The Public Works Department has determined that the work under this contract is now complete and ready for acceptance. FINANCIAL IMPACT: As shown in the table below, the total amount authorized by the City Council for the contract with Evans Brothers, Inc. was less than the maximum contract amount. Although the contract amount is less than budgeted, there is a need to increase the total Project Appropriation by $2,360 to account for additional geotechnical engineering /contract inspection work (due to unforeseen subsurface conditions) and miscellaneous printing expenses, both greater than the amount estimated in the project budget. Staff has prepared a Budget Change which will appropriate the additional funds from a Transfer from the Budgeted Contingent Reserve. The total project cost of $131,506 includes all design, inspection and the work performed under the agreement with Evans Brothers, Inc. Capital Project Dougherty Hills Slope Repair Budget Compared To Actual Task Budget Actual Cost Funds Available (Additional Required) Improvements (Evans Bros. Contract) Including $ 106,146 $ 103,178 $ 2,968 Contingency Staff Salaries / Inspection 4,000 2,597 1,403 Contract Design / Special 18,938 25,221 (6,283) Inspection Miscellaneous: Printing/ 62 510 (448) Binding / Legal Notice TOTAL $ 129,146 $ 131,506 ($2,360) Page 1 of 2 ITEM NO. 4.6 RECOMMENDATION: Staff recommends that the City Council; 1) Accept the improvements under Contract No. 11 -09, Dougherty Hills Park Slope and Drainage Repair Project, with Evans Brothers, Inc., and authorize the release of retention after 35 days if there are no subcontractor claims; and 2) Approve the Project Budget Change in the amount of $2,360. u Submit ed By Public Works Director DESCRIPTION: Submitted By Administrative Services Director (9/t,"'. ""I., /" - Reviewed by Assistant City Manager On August 16, 2011, the City Council awarded a contract to Evans Brothers, Inc. to construct the Dougherty Hills Park Slope and Drainage Repair project. The hillside damage was caused by intense rain storms in March of this year which led to flooding and damage to a property located at 7779 Topaz Circle. The work included stabilization of the hillside slopes adjacent to the Park maintenance road, repair and improvement of existing subsurface drainage, construction of a concrete v -ditch behind the damaged property and installation of additional drain inlets. The final contract cost is $103,178.29 which is less than the amount of $106,146 budgeted for construction. Although the contract amount is less than budgeted, there is a need to increase the total Project Appropriation by $2,360 to account for additional geotechnical engineering /contract inspection work and miscellaneous printing expenses not previously anticipated. Actual field conditions required more consultation /inspection work from the Geotechnical Engineering /Inspection firm hired by the City. Staff has prepared a Budget Change which will appropriate the additional funds from a Transfer from the Budgeted Contingent Reserve. Based on the final costs Staff has prepared a Budget Change (Attachment 2) for City Council approval. Staff has determined that the work under this contract is now complete and ready for acceptance. The owners of the property located at 7779 Topaz Circle, Joe and Jan Trippi, have expressed their appreciation of the repair work and would like to thank the City Council for getting the project approved and completed. NOTICING REQUIREMENTS /PUBLIC OUTREACH: None ATTACHMENTS: 1. Location Map 2. Budget Change Page 2 of 2 CITY OF DUBLIN BUDGET CHANGE FORM FISCAL YEAR 2011/2012 New Appropriations (City Council Approval Required) From Un- Appropriated Reserves From New Revenues CHANGE FORM # Budget Transfers: X From Budgeted Contingent Reserve Within Same Department Activity Between Departments (City Council Approval Req'd) Other: DECREASE BUDGET ACCOUNT AMOUNT INCREASE BUDGET ACCOUNT AMOUNT Name: EXPENDITURE: General Name: EXPENDITURE: Parks Fund — Budgeted Contingent Capital Improvement Project Fund - Reserve Dougherty Hills Slope and Drainage CIP Project #950017.9200.9201.1001 GL Account #: 1001.1901.81101 $2,360 GL Account #: 3500.9501.64001 $2,360 Transfer Out: General Fund GL Account #1001.9501.89101 $2,360 Transfer In: Parks Capital Project Fund Project #950017.9501 GL Account #: 3500.9501.49999 $2,360 REASON FOR BUDGET CHANGE ENTRY: Per the City Council's Acceptance of Work by Evan Brothers, Inc. Contract #11 -09 for the Dougherty Hills Park Slope and Drainage Repair Project (CIP #950017) on December 20th, 2011, the City Council also approved a budget change to appropriate $2,360 from the General Fund Budgeted Contingency Reserve to provide funding for the additional expenditures for the close -out of the project. The budget was estimated at $129,146 and the total actual costs were $131,506. Funding is available in the General Fund Budgeted Contingency. As Presented at the City Council Meeting on: Date: 12/20/2011 # # # # # # # # # # # # # # ## #(Finance Use Only) # # # # # # # # # # # # # # # # # ## Posted By: Date: City Council Minutes Excerpt Attached Reviewed By: G:IBudget Changes4 _2011_ 12115_ 12_20_ 11 Doughtery Hills Park Acceptance. doc ATTACHMENT 2