Annual Progress Report on the Status of the Dublin General
Plan and Housing Element Compliance
Report prepared by Martha Aja, Assistant Planner
ATTACHMENT:
Annual Progress Report on the Status of the Dublin General Plan
and Housing Element Compliance for the Calendar Year 2007.
RECOMMENDATION:
~
1)
Accept the Annual Progress Report on the Status of the
Dublin General Plan and Housing Element Compliance; and
Direct Staff to forward the Annual Progress Report
(Attachment 1) to the California State Office of Planning &
Research (OPR) and the California Department of Housing
and Community Development (HCD).
2)
FINANCIAL STATEMENT:
None.
DESCRIPTION:
Local governments are required by Government Code Section 65400(b) to provide an annual report to
their legislative body, the California Office of Planning and Research (OPR) and the California
Department of Housing and Community Development (HCD) that includes the status of the General Plan
and the progress made in implementing the Plan as well as meeting its share of regional housing needs.
In years past, Staff prepared an Annual Progress Report based on the fiscal year. In 2006, HCD changed
the reporting period from fiscal year to the calendar year. Last year's Annual Progress Report was the first
report to be prepared for the Calendar Year (Jan 1,2006 to December 31,2006).
During the year 2007, the City of Dublin made significant progress in implementing the goals and policies
of the General Plan as well as meeting its share of the regional housing needs.
-------------------------------------------------------------------------------------------------------------
COPY TO:
Page 1 of2
ITEM NO. If. 7
G:\General Plan\GP Compliance\2008\CC Staff Report. doc
The Land Use Element was amended three times during the last calendar year. These Land Use Element
amendments were for the following projects: Wallis Ranch (aka Dublin Ranch West);
Mo ell erN argas/Tipper; and, the Scarlett Court Design Guidelines. The Circulation and Scenic Highway
Element was amended one time for the creation of a Citywide Bikeways Master Plan.
During the Calendar Year 2007, the City of Dublin issued a total of 48 permits for residential
development. Thirty-eight permits were issued for single-family homes and 10 permits were issued for 80
multi-family units for a total of 118 new housing units. In addition to building permits issued, the City was
successful in lending over $557,196 to 18 households during calendar year 2007 through the First Time
Homebuyer Loan Program (FTHLP). The FTHLP assists households with financing in the form of down
payment assistance towards the purchase of a home. The Housing Element was not amended in 2007;
however, efforts are currently underway to update the Housing Element for state certification by June
2009.
The Annual Progress Report (Attachment 1) is divided into sections according to the various elements of
the General Plan. For each element, a description of actions taken to further the policies ofthat element is
included.
Additionally, the section of the Annual Progress Report on the status of the Housing Element discusses in
detail the progress the City has made over the past calendar year in meeting the goals, policies, programs
and implementation measures contained within the Housing Element. In order to be considered for
housing grants and funding based on performance during the last year, this information must be submitted
to the Department of Housing and Community Development (HCD) following the City Council's review
and acceptance.
ENVIRONMENTAL REVIEW:
In accordance with the California Environmental Quality Act (CEQA), compliance reports are exempt
from environmental review.
RECOMMENDATION:
Staff recommends that the City Council: 1) Accept the Annual Progress Report on the Status of the
Dublin General Plan and Housing Element Compliance; and 2) Direct Staff to forward the Annual
Progress Report (Attachment 1) to the California State Office of Planning & Research (OPR) and the
California Department of Housing and Community Development (HCD).
20f2
/ ~ 0<5
Annual Progress Report on
the Dublin General Plan
and Housing Element
Compliance
Reporting Period: Calendar Year 2007
. (January 1, 2007-December 31,2007)
'JtR/rl\ff4., 3/ ,alot; ~J
ATTACHMENT
d o;\d5
Table of Contents
Page I:
Page 2:
Page 7:
Page 9:
Page 10:
Page 12:
Page 21:
Page 22:
Page 23;
Introduction
Land Use Element
Parks and Open Space Element
Schools, Public Lands and Utilities Element
Circulation and Scenic Highway Element
Housing Element
Conservation Element
Seismic Safety and Safety Element
Noise Element
3 O~, dS
INTRODUCTION
Government Code Section 65400(b) requires planning agencies to provide an annual report to their
legislative body, the Office of Planning and Research (OPR) and the Department of Housing and
Community Development (HCD) on the status of their General Plan and their progress in its
implementation. The report must detail the progress in meeting the jurisdiction's share of regional
housing needs and address efforts by the local agency towards removing governmental constraints to the
maintenance, improvement, and development of housing. The City of Dublin's Annual Report was
presented to the City Council on March 18, 2008.
The purpose for the Annual Progress Report is to assess how the General Plan is being implemented in
accordance with adopted goals, policies and implementation measures; identify any necessary adjustments
or modifications to the General Plan as a means to improve local implementation; provide a clear
correlation between land use decisions that have been made during the 12-month reporting period and the
goals, policies and implementation measures contained in the General Plan; and, to provide information
regarding local agency progress in meeting its share of regional housing needs.
The Dublin General Plan was adopted on February 11, 1985, three years following the City's
incorporation in 1982. The General Plan contains the seven State-required elements which are Land Use,
Circulation, Housing, Conservation, Open Space, Noise and Safety. The State allows the combining of
elements or the addition of new elements as long as the required seven elements are present in some
fashion. Dublin's General Plan contains the following elements:
. Land Use Element
. Parks and Open Space Element
. Schools, Public Lands, and Utilities Element
. Circulation and Scenic Highways Element
. Housing Element
. Conservation Element
. Seismic Safety and Safety Element
. Noise Element
The City of Dublin is in the process of preparing a Community Design Element. The Community Design
Element will establish design principles, policies and implementation measures that are designed to
enhance the livability of Dublin and encourage a high level of quality design. The purpose of the element
will be to improve the physical form of the community by establishing policies that will guide future
development. The Community Design Element will apply to developments throughout the City.
Local governments are required to keep their General Plans current and internally consistent. There is no
specific requirement that a local government update its General Plan on a particular time line, with the
exception of the Housing Element, which is required to be updated every five years. Dublin's Housing
Element was updated and certified by the State Housing and Community Development Department on
July 11, 2003. Since that time, the City of Dublin has been actively implementing the various programs
in the adopted Housing Element and the General Plan.
The following represents the progress the City has made towards implementing the goals and guiding
policies of the General Plan during the reporting period. The list is organized to correspond with the
elements ofthe Dublin General Plan.
1 of23
~ ~c?5
LAND USE ELEMENT
Amendments
The Land Use Element can be amended a maximum of four times per calendar year. The Land Use
Element of the Dublin General Plan was amended three times during the reporting period of Calendar
Year 2007 for the following projects:
1. Wallis Ranch (aka Dublin Ranch West): A General Plan Amendment to re-designate the land
uses of the parcels designated as Public/Semi-Public to Semi Public land use designations was
approved by the City Council in February 2007.
2. MoellerN argas/Tipper: A General Plan Amendment to the General Plan for the Casamira
Valley/Moller Ranch Property, the Tipper Property and the Vargas Property were approved by the
City Council in May 2007.
3. Scarlett Court: A General Plan Amendment to add policies for implementing the Scarlett Court
Design Guidelines was adopted by the City Council in May 2007. The Design Guidelines are
intended to guide future development and improvements in the Scarlett Court Planning Area and
to enhance the character and image of the area. The Scarlett Court Planning Area is visible from
Interstate 580, Dougherty Road, the Iron Horse Trail and Dublin Boulevard and the view of this
area from these key roadways is of importance to the City.
Progress towards meeting goals and guiding policies of the Land Use Element
Residential Land Use
During the last reporting period, the following residential projects were under review, approved and/or
under construction in furtherance of the guiding policies ofthe Land Use Element for residential land use:
. The Fallon Village project includes the future development of up to 3,108 residential units at
various densities; up to 2.5 million square feet of commercial, office, light industrial and mixed
use development; two elementary school sites; and parks, utility extensions and open space on
1,134 acres of land within eastern Dublin consisting of various parcels with 11 different ownership
interests. A Site Development Review for Positano (Braddock & Logan) was approved in 2007
for the development of 1,043 of the low density single family housing units on 488 acres within
Fallon Village project area. Grading on the site has begun in preparation for development.
. The Dublin Ranch Area F West and East (Toll Brothers 'Sorrento') project includes 1,111
medium density residential units and will provide a variety of housing types within ten distinct
neighborhoods. The project will also provide a transition between the medium-high and high
density residential projects to the south and the medium and low density residential projects to the
north. Construction of the five neighborhoods on the west side of the project site is under
construction and partially occupied. Revised plans will be processed for development of the
easterly five neighborhoods by Regent Development Group.
. In June 2006, the Planning Commission adopted a Resolution approving a Site Development
Review for the Schaefer Ranch (Discovery Homes) project; this project includes 302 single
20f23
5 c-oj c25
family detached residential units in four distinct neighborhoods. The extension of Dublin
Boulevard to the project is complete. The Applicant has begun construction of model homes.
. In June 2006, the City Council adopted an Ordinance to pre-zone the Mission Peak/Fallon
Crossing (Standard Pacific Homes) project; this project, encompassing 74 acres of land, was
annexed to the City in September 2006 and includes up to 117 single family residential units
ranging from small lots/zero lot line parcels to large estate lots. The project was approved by the
City Council in December 2007.
. In March 2006, the City Council adopted a Resolution initiating a General Plan Amendment Study
for the Moller Ranch/Casamira Valley (DeSilva Group) project; this project is an annexation
request for 226 acres of land and includes a proposal for 298 attached and detached units. In May
2007, the City Council authorized Staff to file an annexation with the Local Agency Formation
Commission (LAFCO). The project went to LAFCO for consideration in July 2007 and was
approved with conditions. In 2007 the City Council also adopted a Stage I Development Plan.
. The Dublin Transit Center project includes 1,800 high-density residential units adjacent to the
existing DublinIPleasanton BART Station. Camellia Place (EAH, Inc.), consisting of 112
apartment units, was completed in January 2006 and is fully occupied. Avalon @ Dublin Station
(Avalon Bay Communities) and Elan @ Dublin Station (D.R. Horton) are both under
construction with 305 apartment units and 257 condominium units, respectively, and are partially
occupied. In February 2006, the City Council approved a Planned Development Rezone and Site
Development Review for Metropolitan @ Dublin Station (D.R. Horton); the project includes the
development of 300 condominium units and is currently in Building Permit Plan Check review.
Crescent (Hanover Group), consisting of approximately 195 units, and Ashton (Hanover Group),
consisting of approximately 150 units, are both currently in planning review by City Staff. City
Staff is currently processing a development application for Avalon II @ Dublin Station (Avalon
Bay Communities) for 405 residential units on a 5.8-acre site. The project is currently in planning
review by City Staff.
. The Dublin Ranch West/Wallis project includes the development of a variety of housing types
and residential densities including low, medium and medium-high on 189 acres of land. The
project has been approved and will provide 935 housing units.
. The Tralee Village (Pinn Brothers Fine Homes) project is a mixed-use project containing
medium-high density residential and retail/commercial uses. The project is currently under
construction and will contribute 130 condominiums and 103 townhouse units to the City's multi-
family residential housing stock. The Townhome units are currently for sale and several units have
been sold.
. The Willows at San Ramon Village Plaza (Braddock & Logan) project is another mixed-use
project containing medium-density residential and retail/commercial uses. The project has been
constructed and is almost fully occupied. The project has contributed 56 townhouse units to the
City's multi-family residential housing stock.
. The Dublin Ranch Area F North project, which includes Neighborhood F-l 'Sonata' (Lennar
Homes, previously owned by Standard Pacific Homes) and Neighborhood F-2 'Verona' (Pulte
Homes) will contribute 119 medium density single family homes and 121 low density single
family homes, respectively. Most ofthe units in the Verona project are occupied and the project is
30f23
& mJ 015
nearing completion. The Sonata project is currently under construction and the units in the first
phase have been sold.
. The Silvera Ranch (Pinn Brothers Fine Homes) project is under construction with 254 residential
units on 105 acres of land. The development contains a mix of housing types, including sing1e-
family estate-size units, smaller lot single-family cluster homes and multi-family condominiums.
The project is currently under construction. Several estate units and cluster homes completed as
part of Phase I and Phase II of the project are occupied.
. The Dublin Ranch Villages (Toll Brothers) project includes 1,396 condominiums and townhomes
and is nearing completion of construction. The majority of the units have are occupied, with the
exception of the Terraces, which is still under construction.
. The Windstar Condominium (Windstar) project, which includes 309 units on approximately
3.66 acres in the West Dublin BART Specific Plan area, was approved by the City Council in
November 2007.
Commercial and Industrial Land Use
During the Calendar Year 2007 reporting period, the following commercial and industrial projects were
under review, approved and/or under construction in furtherance of the guiding policies of the Land Use
Element for Commercial and Industrial land use:
. The Elephant Bar project is an 8,300 square foot restaurant located within the Downtown
Specific Plan area; the project contributes to the intensification of the downtown by revitalizing an
existing vacant building. The project is under construction.
. In June 2006, the City Council approved a Planned Development rezone and Site Development
Review for a 17,500 square foot commercial building within the Dublin Place Shopping Center.
The project contributes to the intensification of the downtown through the development of a new
commercial building within an existing shopping center in the central downtown area. The project
was constructed in 2007. Tenants are occupying the building and the project is complete.
. In September 2006, the City Council approved the initiation of a Downtown Core Specific Plan
Amendment Study to consider an expansion and re-use of an existing and soon to be vacated auto
dealership building on a 1.94-acre parcel for retail use called Custom Fireplace, Patio & BBQ.
The project (which included a Specific Plan Amendment, Stage 2 Development Plan, Conditional
Use Permit and Site Development Review) was approved by the City Council in October 2007.
The project is currently in Building Permit Plan Check.
. The Ulferts Center project is a 50,530 square foot retail commercial center. The project is
located within the Eastern Dublin Specific Plan Area and contributes a range of commercial and
employment generating uses that will meet the needs of the City and surrounding Tri-Valley area.
The construction of the project was completed in 2007 and is almost completely occupied.
. The GM Auto Mall project includes a 32,543 square foot Hummer, Saturn and Saab automotive
dealership. The project is located on a parcel of land within the GM Auto Mall with freeway
frontage. The project was completed in October 2007.
40f23
1O;f076'
· The Honda project is a 53,680 square foot automotive dealership located on Scarlett Court within
close proximity to other automobile dealerships and has freeway frontage. The construction of the
project was completed in 2007.
· The Dublin Gateway Medical Center is a 178,000 square foot medical office complex.
Construction of approximately 120,000 square feet of medical offices was completed in 2007.
The project is located within the Eastern Dublin Specific Plan Area and is within walking distance
of Water ford Place, a mixed use project and neighborhood shopping center. A hospital facility was
also approved in 2007 by the Planning Commission and City Council. The property was recently
sold to Eden Medical Group and requires review and approval by the Office of Statewide Health
Planning and Development.
. The Shamrock Village shopping center is a neighborhood shopping center for which a fa<;ade
enhancement and the construction of a new 25,846 square foot retail building were completed in
November 2006. In December 2007 the Planning Commission approved a Site Development
Review for Big Lots, which is located within the Shamrock Village shopping center. The Site
Development Review for Big Lots included a 4,185 square foot addition to the existing 21,470
square foot building and associated site improvements including exterior. building renovation,
landscaping and parking lot upgrades. The Shamrock Village shopping center is located within the
downtown area and contributes to the strengthening of an existing neighborhood shopping center
through the renovation of existing buildings and the construction of additional retail square
footage; together these improvements have reduced the vacancy rates within the center.
. In 2007, Staff approved a Site Development Review for Kentucky Fried Chicken, located within
the Village Parkway Specific Plan area. The Site Development Review included a fa<;ade remodel,
site improvements, and new signage. The remodel project will update the existing restaurant and
site, which was approved by Alameda County in 1977. Construction is currently underway.
· In June 2007, the City Council approved a Rezone, Conditional Use Permit and Site Development
Review for an existing Shell Gas Station at 8999 San Ramon Road. The project includes
demolition of an existing service station which includes a car wash, cashier kiosk, fuel dispensers
and canopy cover, and the construction of a new 2,162 square foot convenience store, a 1,264
square foot automated car wash and six new fuel dispensers with a new canopy cover. The project
is currently in Building Permit Plan Check Review and construction is anticipated to begin in
2008.
· In August 2006, the City Council approved a Planned Development Rezone for the 318,000
square foot Grafton Shopping Center located within the Eastern Dublin Specific Plan area.
Grafton Station encompasses approximately 29 acres at the corner of Dublin Boulevard and
Grafton Street. In 2007, the Planning Commission also approved a Site Development Review for
an approximately 100,000 square foot home improvement warehouse, Lowe's, within the Grafton
Station shopping center. Lowe's opened to the public in December 2007. In March 2007, the
Planning Commission approved a Site Development Review for four retail buildings totaling
approximately 48,000 square feet. The retail buildings are currently under construction.
. In October 2006, the Planning Commission approved a Site Development Review for the Venture
Commerce Center project. The project included demolition of an existing one-story, 38,825
square foot building and construction of four two-story buildings on the site. The new buildings
range in size from 14,774 square feet to 18,602 square feet for a total floor area of 67,029 square
50f23
9 tJi;2~
feet. The four buildings have approximately 31 units which will be sold as "office
condominiums." Construction of the project has been completed and the majority of "office
condominiums" have been sold.
· The City is working closely with Blake Hunt Ventures on the Emerald Place project located at
the intersection of Hacienda Drive and Dublin Boulevard in the Eastern Dublin Specific Plan
Area. A Stage 1 Development Plan was approved in November 2007. Blake Hunt Ventures and
the City are currently working together to further refine the site layout for a retail commercial life
style project. The project is expected to contribute to a range of commercial and employment
generating uses that will meet the needs ofthe City and surrounding Tri-Valley area.
60f23
1 r:f:2:7
PARKS AND OPEN SPACE ELEMENT
Amendments
The Parks and Open Space Element was not amended during the reporting period for Calendar Year 2007.
Progress towards meeting goals and guiding policies of the Parks and Open Space Element
. As part of the reconstruction of the Shannon Community Center, three artists were selected to
design and install public art at the Shannon Community Center.
. A public art/mural for the San Ramon Village Plaza project was approved and completed in
2007.
. In cooperation with the Dublin Fine Arts Foundation, a public art piece was installed at Bray
Commons and accepted by the City.
. The Fallon Sports Park Master Plan has been completed for a new 60 acre community park in
Eastern Dublin Specific Plan Area. The new park will include, ball fields; several children's play
areas; picnic facilities; basketball, volleyball and tennis courts; a BMX track; and bocce ball
courts. The City entered into a consultant services agreement for Fallon Sports Park, Phase I
which encompasses 27 acres of the 60 acre site. Improvements include 2 lighted softball fields; 2
lighted soccer fields; 2 little league fields; lighted basketball court and tennis courts;
restroom/concession buildings and off-street parking.
. The construction of a 2-acre Dougherty Hills Dog Park was completed in January 2007. The
park opened to the public in May 2007. The improvements include a separated area for both large
and small dogs with a turf surfacing and off-street parking. The City accepted the public art
installed at the dog park, which was done in cooperation with the Dublin Fine Arts Foundation.
. The building design for the new Shannon Community Center at Shannon Park was completed.
The Center includes 19,700 square feet of new construction including a large social hall, two
preschool classrooms, two multi-use classrooms, a conference room and an office area.
Construction of the community center is currently underway with an anticipated completion date
of fall 2008.
. In 2007, the City entered into a consultant services agreement for the expansion of the Dublin
Civic Center.
. The design of a 2-acre neighborhood square within the Sorrento project (Dublin Ranch Area F
South) was completed in November 2006. The park will include a large open turf meadow, picnic
area, children's play areas, and a walking path. In 2007, the City awarded the construction contract
for Piazza Sorento.
. In 2007, the City entered into a consultant services agreement for Passatempo Park, which is a
five area neighborhood park within the Sorrento project (Dublin Ranch Area F South).
. In 2007, the City awarded the construction contract for Devany Square, a two acre neighborhood
square in Dublin Ranch Villages.
70f23
10 ~-r cJ 5'
. In 2007, the playground equipment at Alamo Creek Park was replaced as part of an ongoing
project to replace aging play equipment in City Parks.
. The City entered into an improvement developer agreement for the Schaefer Ranch Park, which
provides that the developer of the Schaefer Ranch project will design and construct the 10.6 acre
neighborhood park.
. In 2007, the City entered into a consultant services agreement for the Dublin Historic Park for
the Phase 1 improvements. Additionally, the agreement provided for a study of the historical
implications of moving historic structures from the Kolb Ranch to the Historic Park, the potential
uses of the moved structures and the cost of rehabilitating the structures.
. In 2007, the Visitor Center at the Dublin Heritage Center, which is located inside Old St
Raymond's Church, was completed.
. A Playground Safety Program for park playgrounds and Playground Safety Policies were adopted
in February 2007.
. This past year a Parks & Community Services Needs Assessment was initiated. The primary
purpose of the needs assessment is to provide a community-based assessment of the recreation and
cultural arts programs the City currently offers and recommendations for future programs that the
City should design and implement.
. In 2007, the City continued to work with East Bay Regional Park District (EBRPD) to negotiate
for land acquisition in the Western Extended Planning Area for Open Space Area.
. In 2007, the City continued to negotiate with developers to include natural open space areas within
development projects which are adjacent to undeveloped land.
80f23
SCHOOLS, PUBLIC LANDS AND UTILITIES ELEMENT
II ~X~;(t
Amendments
The Schools, Public Lands, and Utilities Element was not amended during the reporting period for
Calendar Year 2007.
Progress towards meeting goals and guiding policies of the Schools, Public Lands, and Utilities
Element
Schools
. In 2007, City Staff continued to work with developers and property owners to ensure that adequate
sites are reserved to meet the Dublin Unified School District's projected demand for future
school uses. School fees are collected at the building permit issuance stage of project development
in accordance with State law.
. The Quarry Lane School, a privately owned school located within the Eastern Extended Planning
Area, was expanded from an elementary school to include a new middle school and high school
with playing fields and associated improvements. Construction of the project was nearly
completed in 2007 and the new middle school and high school is now open.
Public Lands
. As part of a General Plan Amendment study, the City has been working closely with the Army
regarding future development at the Camp Parks military facility. The Camp Parks Master Plan
identifies the redevelopment of 187 acres of government property for private commercial,
residential and open space uses. The Community Visioning Process was completed in 2004. The
City worked extensively with the Army in 2007 in preparation for Industry Day. Industry Day was
the first step in the Army's selection of a Master Developer. Once the developer prepares an
overall land use plan for the site and an official project application is submitted to the City, the
environmental analysis for the project will commence shortly thereafter.
Utilities
· In 2007, the City continued to work closely with project applicants and the service utilities to
ensure that there is adequate capacity to serve all new and existing areas of Dublin.
90f23
CIRCULATION AND SCENIC HIGHWAYS ELEMENT
101 :f0i5
Amendments
The Circulation and Scenic Highways Element was amended once during the reporting period of Calendar
Year 2007 for the following project:
1. Bikeways Master Plan: The development of a Citywide Bikeways Master Plan was approved
by the City Council in July 2007. The plan evaluated existing bicycle conditions and created an
integrated plan including access to parks and open space areas.
Progress towards meeting goals and guiding policies of the Circulation and Scenic Highways
Element
. The City, in cooperation with Caltrans and the Cities of P1easanton and Livermore, is proposing
improvements for the I-580/Fallon Road and EI Charro Road interchange to increase the
interchange capacity while maintaining safe and efficient traffic operations. Environmental
evaluation for the project has been completed and the required permits obtained. It is anticipated
that construction will begin in spring of 2008.
. The design of the Dougherty Road improvements was completed in 2007 and construction is
underway to widen the existing roadway between Houston Place and 1-580 and on Dublin
Boulevard between Dublin Court and approximately 700 feet east of Dougherty Road. The
improvements will accommodate additional traffic generated from planned growth in the area. It is
anticipated that the project will be completed fall of2008.
. The City worked jointly with East Bay Regional Park District, the City of Pleasant on, Caltrans and
Zone 7 to complete a preliminary engineering study to determine the feasibility of constructing an
extension to the Alamo Canal Trail underneath 1-580. The study was completed in November
2006. The design of improvements is underway.
. The development of a Citywide Bikeways Master Plan was approved by the City Council in July
2007. The plan evaluated existing bicycle conditions and created an integrated plan including
access to parks and open space areas.
. The City began preliminary engineering and environmental work for an extension of Scarlett
Drive tying Dublin Boulevard to Dougherty Road along the Iron Horse Trail. The roadway
extension will alleviate traffic congestion at the Dublin Boulevard and Dougherty Road
intersection by providing a bypass to the intersection. The Mitigated Negative Declaration for the
project was approved by the City Council in 2007. The design and improvements for the project
are on hold due to lack of funding.
. In 2007, the City continued to provide for the replacement of damaged curbs, gutters and
sidewalks at various locations throughout the City as well as completing annual street overlay and
slurry seals projects.
. The northern extension of Fallon Road and the connection of Fallon Road and Tassajara Road
have been constructed and connect with the Silvera Ranch development project.
100f23
)) ~;;f~5
. The extension of Silvera Ranch to Dublin Ranch is under construction and project is scheduled for'
completion in the summer of 2009.
. The engineering design phase for the widening of Tassajara Road between 1-580 and the
Alameda-Contra Costa County limit line in the Eastern Dublin Specific Plan Area began in 2003
and continues with the review of future projects.
. In 2007, the City continued to collect traffic impact fees for new development projects to ensure
that new facilities are built to accommodate the additional vehicle, bicycle, and pedestrian trips
that result from the project.
. In 2006, the City received a Housing Incentives Grant of approximately $3,000,000 by the
Metropolitan Transportation Commission (MTC). The City will be using the grant to fund multi-
modal improvements and streets cape enhancements in accordance with the Streetscape Master
Plan along Dublin Boulevard, from Hansen Drive to Tassajara Road. Currently, the design of
improvements and streetscape enhancements are underway and is scheduled for construction in
2009.
11 of 23
JI-f ~;;5
HOUSING ELEMENT
Amendments
The Dublin General Plan Housing Element was certified by the Department of Housing and Community
Development on July 11, 2003. The Element was not amended during the Calendar Year 2007.
Progress towards meeting goals and policies of the Housing Element
Number of New Housing Permits Issued
During Calendar Year 2007, the City of Dublin issued a total of 48 permits for residential development.
Thirty-eight permits were issued for single-family homes and 10 permits were issued for 80 multi-family
units for a total of 118 new housing units in 2007.
Progress toward Mitigating Governmental Constraints III the Maintenance, Improvement and
Development of Housing
The City of Dublin Housing Element identifies governmental and non-governmental constraints relative
to providing housing sufficient to meet the number of units identified in the Regional Housing Needs
Allocation (RHNA) developed by the Association of Bay Area Governments (ABAG). The non-
governmental constraints include: market conditions such as, land costs; construction and labor costs; and,
the cost and availability of financing. Efforts to mitigate non-governmental constraints included the
creation of a First Time Homebuyer Loan Program.
The City was successful in lending over $557,196 to 18 households in Calendar Year 2007 through the
City's First Time Homebuyer Loan Program (FTHLP). The FTHLP assists households with financing
in the form of down payment assistance towards the purchase of a home.
The primary governmental constraint identified in the Housing Element is the permit and processing fees.
Dublin charges a number of planning, building and engineering fees to cover the cost of processing
development requests, providing public facilities and services to new development, and mitigating the
environmental impacts of new development. These fees are necessary to meet City service and
environmental standards. Impact fees for water, sewer and school services are charged by other agencies.
Comparison of Units Added To Regional Housing Need Allocation by Income for the current Housing
Element period.
The City of Dublin's fair share of regional housing need for the previous Housing Element cycle was
5,436 units. From Fiscal Years 199912000 to 200512006, Dublin has issued permits for 3,585 residential
units. For Calendar Year 2007, Dublin issued building permits for a total of 118 new residential units.
Because the reporting period for the annual General Plan Progress Report changed from a Fiscal Year
reporting period to Calendar Year reporting period, there is some overlap in housing numbers. For the
period of July 1, 1999 to December 31, 2007, the total number of permits issued for residential units is
3,950. To meet the total housing need, Dublin removed constraints and adequately zoned land that would
allow for the construction of all 5,436 units.
120f23
15 :;f::25'
T bl 1 B oldo P
o I
dT
dMf thRO
lH
N d
a e : Ul lD2 ermIts ssue owar s ee lD2 e e2lOna oUSlD2 ee
Income Level New Units Added Total Units Remaining
Construction in Permitted** Construction
Need For 1999- CY 2007 through Need
2007 CY 2007
(includes overlap
from FY 2005-
2006)
Very Low Income 796 0 263 533
(:::50% AMI*)
Low Income 531 0 243 288
(>50% ~80% AMI*)
Moderate Income 1 ,441 0 378 1,063
(>80% ::: 120% AMI*)
Above Moderate Income 2,668 118 3,066 (398)
(>120% AMI*)
Total 5,436 118 3,950 1,486***
* AMI = Area Median Income a family of 4 for 2007 - $83,800
* *Permitted is defined as the issuance of Building Permits for the construction of a residential unit.
*** This number represents the net number of homes remaining to be built in order to fulfill the overall RHNA numbers.
Actual remaining units to be built in certain income categories are also listed in the chart above.
Affordabilitv of New Units Including the Number of Deed Restricted Affordable Housing Units
. The median sales price for a single family home in Dublin at the end of Calendar Year 2007 was
$730,500.1 These units are financially available to above-moderate income households. Above-
moderate income households are those households that have an annual income that exceeds 120%
of the Area Median Income (AMI). The AMI for 2007 was $83,800. Very low income households
are defined as households with annual income less than or equal to 50% of the AMI; low income
households are households with an annual income that falls within 50% to 80% of the AMI; and,
moderate income households are households with an annual income that falls between 80% to
120% of the AMI.
. The affordable units constructed and/or sold during this reporting period include:
o 11 new units were sold at The Terraces @ Dublin Ranch to moderate-income households
with 30-year deed restrictions.
o 3 units were re-sold at The Terraces @ Dublin Ranch to moderate-income households with
30-year deed restrictions.
o 17 units were sold at Elan @ Dublin Station to moderate-income households with 55-year
deed restrictions.
o 9 units were sold at Silvera Ranch; 7 units to moderate-income households, 1 unit to a low-
income household and I unit to a very-low income household, all with 55-year deed
restrictions.
o 4 units were sold at the Willows; 2 units to moderate-income households, 1 unit to a low-
income household and 1 unit to a very-low income household, all with 55-year deed
restrictions.
1 Bay East Association of Realtors, December 2007 Housing Statistics - Single Family Residence
13 of 23
Ie ~ ;;5
o 29 units are reserved for income restricted households at Tralee; 14 units to moderate-
income households, 6 units to low-income households and 9 units to very-low income
households.
o 19 units for income restricted households at Silvera Ranch; 9 units to moderate-income
households, 4 units to low-income households and 6 units to very-low income households.
. The affordable units constructed and/or rented during this reporting period include:
o 30 units are restricted to moderate-income households at Avalon @ Dublin Station.
o 535 rental units are restricted for income restricted to various income levels at the Groves at
Dublin Ranch; 221 units to moderate-income households, 187 units to low-income
households and 127 units to very-low income households.
Status of Pr02rams in Adopted HousiD!! Element (Calendar Year 2007)
GOAL A:
POLICY 1:
Progress:
POLICY 2:
Progress:
GOAL B:
POLICY 1:
Progress:
TO PROVIDE ADEQUATE SITES TO MEET THE CITY HOUSING NEEDS
Ensure that adequate sites exist to accommodate future housing needs.
Ongoing.
Increase units produced in Dublin; increase sites appropriate for affordable housing
and accessible to downtown.
Three residential developments have been approved in the Downtown Intensification Area.
A mixed-use project including 150,000 square feet of office space and 308 multi-family
apartment units within the West Dublin BART Specific Plan Area has received full
entitlements. The project will provide 39 affordable units of which 23 units must be
constructed on-site. The Development Agreement for this project allows the developer to
construct the project by June 2014. The project is anticipated to be constructed within the
next five years. The project will be built at 6541 Golden Gate Drive, the former Corovan
warehouse building.
A 309-unit high density condominium project known as Windstar received full
entitlements in 2007 and will be constructed adjacent to the City's future West
DublinIPleasanton BART Station. The project will be located on a 3.55 acre vacant piece
of property. Construction on this project is anticipated to begin in the summer of 2008.
TO INCREASE THE AVAILABILITY OF HOUSING AFFORDABLE TO LOW-
AND MODERATE-INCOME HOUSEHOLDS
Promote development of affordable housing in Dublin.
The Groves @ Dublin Ranch, formerly known as Fairway Ranch, includes a 304 unit
multi-family apartment project known as Oak Groves. This project is 80% affordable.
Tenants started moving into the complex in September 2006. The City of Dublin provided
a loan for $2,250,000 to assist with the financing of the project. The project was fully
occupied in 2007.
140f23
POLICY 2:
Progress:
POLICY 3:
Progress:
11 ~:f c?.5
The Groves @ Dublin Ranch, formerly known as Fairway Ranch, also includes a 322-
unit senior apartment project known as Pine Groves and Cedar Groves. This project is
90% affordable. Tenants started moving into the complex in September 2006. All units are
restricted to seniors 55 years of age and over. The City of Dublin provided a loan for
$2,250,000 to assist with the financing of the project. The project was being leased in
2007.
Provide incentives for affordable units.
In March 2007, the City repealed the previous Density Bonus Ordinance and adopted a
new Ordinance (Chapter 8.52) in order to comply with current State Law.
The City provided low interest loans to assist with the development of two projects which
include affordable units: The Groves @ Dublin Ranch (formerly known as Fairway
Ranch). The Groves is a high density residential project located in eastern Dublin that
includes 304 for-sale condominiums and 626 rental units. Of the 930 units, 587 are Below
Market Rate (BMR) units.
Require the development of lower-income housing.
Avalon @ Dublin Station (Avalon Bay Communities), a 305 unit multi-family residential
apartment community near the existing Dublin/Pleasanton BART Station will provide 30
units for rent to moderate-income households. All affordable units will have restrictions
on rental rates for 55 years. The project was almost complete in 2007.
Elan @ Dublin Station (D.R. Horton), a 257 unit multi-family residential condominium
project also near the existing Dublin/Pleasanton BART Station will provide 26 affordable
units for sale to moderate-income households. All affordable units will have 55-year resale
restrictions. The project was almost complete in 2007.
The Groves at Dublin Ranch, formally known as Fairway Ranch, has a multi-family
residential apartment community and a senior apartment community totaling 626 units.
The multi-family project, The Oaks has 304 units of which 243 will be affordable as
follows: 90 moderate-income units, 90 low-income units and 63 very-low income units.
The senior project, The Pine Groves and The Cedar Groves has 322 units of which 292
will be affordable as follows: 131 moderate-income units, 97 low-income units and 64
very-low income units. All affordable units will have restrictions on rental rates for 55
years. The project was being leased in 2007.
Silvera Ranch (Pinn Brothers Fine Homes), a 254 unit residential ownership subdivision,
will have a total of 19 affordable single-family dwellings and town homes. Of these, 9
units will be for moderate-income households, 4 units will be for low-income households
and 6 units will be for very-low income households. All affordable units will have 55-year
resale restrictions.
Tralee (Pinn Brothers Fine Homes), a 233 unit multi-family residential mixed-use project,
will have 29 affordable units for sale. Of these, 9 units will be for very-low income
households, 6 units will be for low-income households and 14 units will be for moderate-
income households. All affordable units will have 55-year resale restrictions.
150f23
POLICY 4:
Progress:
POLICY 5:
Progress:
POLICY 6:
13 ~d5
The Villages @ Dublin Ranch (Toll Brothers), a 1,395 unit multi-family residential
condominium community consisting of 4 distinct neighborhoods, will have a total of 105
affordable units. All of the affordable units will be located within the neighborhood
known as The Terraces and will be affordable to moderate-income households; all
affordable units have 30-year resale restrictions.
The Willows (Braddock & Logan), a 56 unit multi-family residential town home
community, will have a total of 7 affordable units. Of these, 2 units will be for very-low
income households, 1 unit for low-income households and 4 units for moderate-income
households. All affordable units will have 55-year resale restrictions.
Conduct Housing and Commercial Nexus Study to determine the feasibility of
establishing a commercial linkage fee to be deposited in the City's Inclusionary
Housing Fund.
A task force was formed to work with a consultant on the development of a commercial
linkage fee was subsequently approved by the City Council in May 2005. The Non-
Residential Development Affordable Housing Impact Fee was also adopted at that time.
Fees collected will be deposited into a Housing In-lieu fund for the funding of affordable
housing programs. A total of $344,40 1 has been collected through December 2007.
Improve housing affordability with higher densities near BART.
The City currently has a functioning BART station, the Dublin/Pleasanton BART Station,
and a new BART Station and parking structure under construction, the West
Dublin/Pleasanton BART Station within the Downtown Intensification Area. Adjacent to
the new BART station will be a 308-unit high density residential project (AMB) and a 309-
unit high density residential project (Windstar), along with other commercial, retail and
office uses.
The existing Dublin/Pleasanton BART Station is located in an area known as the Dublin
Transit Center which allows for up to 1,800 units of high density residential housing.
Currently, four high density residential projects have been approved and are either under
construction or have completed construction. Camellia Place (EAH, Inc) has completed
construction and provides 112 very-low and low-income apartment units; Elan @ Dublin
Station (D.R. Horton) has also completed construction and provides 257 for sale
condominium units with 26 units set aside for moderate-income households; and, Avalon
@ Dublin Station (Avalon Bay Communities) is currently under construction and will
provide 305 apartment units with 30 units set aside for moderate-income households. The
fourth high density residential project, Metropolitan @ Dublin Station (D.R. Horton),
will provide 300 market-rate, for-sale condominium units. Three additional high density
residential projects are currently in planning review. They include a 405 unit apartment
project, known as Avalon II @ Dublin Station (Avalon Bay), with 41 units set aside for
moderate-income households. The Hanover Group currently has two projects in planning
review including a 195 unit apartment community known as Crescent (Site A-I) and a 150
unit apartment community known as Ashton (Site A-3).
Simplify and coordinate the means of obtaining project approvals for senior projects
and those with below-market-rate units.
160f23
/1 (!)XJ5
Progress: The City has a procedure in place to expedite all residential projects. The Groves Senior
project was completed in 2007.
POLICY 7: Encourage reduction of housing expenses through shared-living arrangements.
Progress: A Housing Needs Survey was completed in June 2005 and evaluated the feasibility of a
shared-housing program. Information collected in a random sample by Godbe Research
indicated that residents did not have any interest in a shared housing program nor would
use a shared-housing program at this time.
POLICY 8: Encourage development of affordable housing by private organizations primarily
engaged in housing construction or management.
Progress: Ongoing.
POLICY 9: Promote the use of available funds and funding mechanisms in private-sector housing
development.
Progress: The City of Dublin website continues to provide information on those developers
accepting applications for restricted Inclusionary Below Market Rate (BMR) units for both
ownership and rental units. The web page is updated routinely to provide up-to-date
information on various housing opportunities in the region. Included on the website are the
Inclusionary Ordinance and the Inclusionary Ordinance Laypersons Guidelines to assist
developers with the requirements related to the development of affordable housing units.
In addition, the City offers loans to new homeowners through the First Time Homebuyer
Loan Program. The City committed $500,000 in fiscal year 2007-2008 for this purpose.
POLICY 10: Promote energy efficiency in new projects.
Progress: The City requires all developments to submit a Waste Management Plan to meet the City's
Construction and Debris Ordinance to divert at least 50% of waste from landfills. In
addition, the City Council adopted Green Building Guidelines for use in Civic Buildings in
the future to promote energy efficiency. The City continues to implement the Guidelines
on a project specific basis.
POLICY 11: Provide opportunities for first-time homebuyers to purchase homes in Dublin.
Progress: The City continues to support the Tri-Valley Housing Opportunity Center (TVHOC)
designed to serve as a one-stop center for affordable homeownership in the Tri-Valley.
In Fiscal Year 2007-2008, the City's First Time Homebuyer Loan Program funded 18
loans totaling $557,196.
POLICY 12: Continue to make available fee deferrals to encourage the development of affordable
housing.
Progress: Ongoing.
170f23
070 (f/cJ 5
('{
I
POLICY 13: Encourage a mix of housing types as a means of achieving a wider range of housing
types, sizes, and potential affordability to low and moderate income households,
including affordable by design units and large family units.
Progress: Fallon Village: This project will include a variety of residential densities including low,
medium, medium-high and mixed-use for a total of 3,108 units. All projects within Fallon
Village are subject to the City's Inclusionary Zoning Ordinance. The first project within
Fallon Village is known as Positano, which is 1,043 dwelling units (Braddock & Logan).
The first neighborhoods include 143 units in Cantara and Solerno. Building permits have
been issued for the models for the project.
Dublin Ranch Area F West and East (Sorrento): This project includes a variety of
housing types within ten distinct neighborhoods for a total of 1,111 medium density
residential units. The Inclusionary Zoning requirements for this project have been satisfied
within the Groves @ Dublin Ranch (formerly known as Fairway Ranch) project. Each
neighborhood has between 4 and 9 varying floor plans and units range in size from 1,320
square feet up to 2,981 square feet. These units are under construction.
Schaefer Ranch: This project includes 302 units in four distinct neighborhoods. Housing
types and sizes include one-story and two-story single detached units with 20 differing
floor plans. Units range from 2,692 square feet up to 6,853 square feet. These units are
under construction.
Wallis: This project would also include a variety of housing types and residential densities
including low, medium and medium high. The project has been approved for 937 housing
units and is currently under review. Staff anticipates a variety of floor plans and unit sizes.
Fallon Crossings: The project proposal includes up to 117 single family residential units
on lots ranging from small lots, zero lot line lots to large estate lots.
GOAL C:
TO CONSERVE THE EXISTING STOCK OF AFFORDABLE RENTAL
HOUSING
POLICY 1:
Preserve low income housing.
Progress:
In 2005, a Condominium Conversion Ordinance was passed by the City Council to
preserve the existing rental housing stock. In addition, for each for-sale affordable unit,
the buyers must sign a Resale Restriction Agreement that guarantees that the units will
remain affordable for up to 55 years.
The list of rental properties is updated when new projects are complete. The Tri-Valley
Area Affordable Rental Housing Directory was updated in 2007 listing existing and new
projects in the Tri- Valley. There were no subsidized rental properties in the City of
Dublin at risk of converting to market-rate housing during this reporting period.
180f23
GOAL D:
:2{ ~ r3~
TO PRESERVE AND INCREASE THE EFFICIENT USE OF THE CITY'S
EXISTING HOUSING STOCK
POLICY 1:
Encourage efficient use of existing housing stock; promote development of small units
at low cost.
Progress:
Providing financial assistance to construct second units on sites with existing single family
homes was evaluated through the Housing Needs Study. The Study indicated that residents
did not find that providing financial assistance for second units was a highly needed
program for the City. However, in October 2005, the City Council approved a new Second
Unit Ordinance that makes it easier for families to provide alternative housing by means of
second units.
The Housing Authority selected the development team of Eden Housing and Citation
Homes to redevelop the existing Arroyo Vista project with approximately 400 housing
units, in a combination of affordable and market rate, rental and ownership units. Staff is
currently working with the developers to navigate the Deposition and Development
Agreement through the US Housing and Urban Development (HUD) process to get
authorization to proceed with the project. Project environmental work is currently
underway. The existing affordable housing will be replaced with new affordable housing,
along with additional affordable and market rate units.
POLICY: 2: Provide subsidies for housing rehabilitation.
Progress: The Alameda County Community Development Agency administers a Minor and Major
Home Improvement Program for the City of Dublin. For Fiscal Year 2007-2008, on behalf
of Dublin, Alameda County administered $14,786 of Community Development Block
Grant funds for one minor home repair, one paint grant and two major home improvements
in the City of Dublin.
GOAL E: TO PROMOTE EQUAL HOUSING OPPORTUNITIES FOR ALL DUBLIN
RESIDENTS
POLICY 1: Support services and programs that fight housing discrimination; direct persons
towards agencies that provide assistance to victims of discrimination.
Progress: The City of Dublin web page has an entry for fair housing issues directing interested
readers both to ECHO Housing and to the State of California Consumer Affairs Office
booklet "California Tenants: Guide to Residential Tenants and Landlord's Rights and
Responsibilities. "
POLICY 2: Encourage greater access to housing for persons with disabilities.
Progress: In October 2007, the City adopted a Universal Design Ordinance which requires new
single-family home developers to install base Universal design features in all single-family
developments of 20 or more homes.
190f23
GOAL F:
POLICY 1:
Progress:
dd 0;(01.(
TO PROVIDE SHORT-TERM SHELTER FOR INDIVIDUALS AND FAMILIES
WITHOUT AFFORDABLE PERMANENT HOUSING
Allow emergency shelters and transitional housing for homeless.
An Emergency Shelter Ordinance was adopted by the City Council in October 2004 as
required by State law. In addition, the City provides a Community Development Block
Grant to the Tri-Valley Haven which supports a Domestic Violence Shelter and a
Homeless Shelter.
200f23
';{3 ~ f)~
CONSERVATION ELEMENT
Amendments
The Conservation Element was not amended during the reporting period of Calendar Year 2007.
Progress toward meeting goals and guiding policies of the Conservation Element
. The City continues to review each new development project that is proposed near a natural
resource such as a stream corridor with the intent of protecting the resource. Conditions of
approval include measures to ensure adequate setbacks, minimal impacts to water quality, passive
recreational opportunities, and the maintenance of natural systems to the extent possible.
. The City continues to work with developers to ensure that open space corridors established in new
neighborhoods are maintained and managed appropriately, and open space areas are contiguous
with other such lands.
. Schafer Ranch is currently collaborating with the East Bay Regional Park District to dedicate
land and to construct trails and trailheads within the project area. The project is approximately 500
acres and is located at the western edge ofthe City.
. The City continues to work on preserving Dublin's historic resources. After completing an
archeological resource analysis and historic resource inventory study in 2005, the City adopted a
Historic Overlay Zoning District and Historic Area Design Guidelines for projects within the
historic area. The Historic Area is approximately 40 acres. In August 2006, the City Council
adopted the Dublin Village Historic Area Specific Plan. The City initiated a Specific Plan Study
for the City's historic core and the Specific Plan calls out land use designations and development
guidelines and future public/private development in the planning area. In 2007, two additional
properties were added to the Dublin Village Historic Area Specific Plan.
· In August 2006, following the adoption of the Dublin Village Historic Area Specific Plan, the City
Council also adopted the Dublin Historic Park Master Plan. The Master Plan approaches the
creation of the Dublin Historic Park that will compliment the existing Heritage Center, meet the
needs of the community for parkland and will re-establish the City's historic heart. The Historic
Park will add to the Dublin Heritage Center where several notable historic buildings have been
assembled and preserved. In 2007, the City entered into a consultant services agreement for the
Dublin Historic Park for the Phase 1 improvements. Additionally, the agreement provided for a
study of the historical implications of moving historic structures from the Kolb Ranch to the
Historic Park; the potential uses of the moved structures and the cost of rehabilitating the
structures.
21 of23
SEISMIC SAFETY AND SAFETY ELEMENT
c2l{ ~ J-S
Amendments
The Seismic Safety and Safety Element was not amended during the reporting period for Calendar Year
2007.
Progress toward meeting goals and guiding policies of the Seismic Safety and Safety Element
. In conjunction with the Dublin Unified School District, a school disaster training course and
curriculum has been developed.
. The City took part in a citywide functional disaster exercise by participating in the statewide
Golden Guardian Terrorism exercise.
. In August 2006, the City Council adopted the National Incident Management System (NIMS),
which would provide a consistent nationwide approach for federaf, state, local and tribal
governments to work together inore effectively and efficiently to prevent, prepare for, respond to,
and recover from disasters, regardless of cause, size, or complexity. The City of Dublin will
integrate the National Incident Management System, to the extent appropriate, into the existing
emergency management system, in its efforts toward disaster prevention and preparedness.
22 of 23
NOISE ELEMENT
'/5 ~ ;)5
Amendments
The Noise Element was not amended during the reporting period for Calendar Year 2007.
Progress toward meeting goals and guiding policies of the Noise Element
Due to the nature ofthe guiding and implementing policies of the Noise Element, the efforts to implement
this element of the General Plan are on-going in nature. Projects are reviewed on a case-by-case basis for
adverse noise impacts to the environment and sensitive receptors. Additionally, a Noise Mitigation fee is
charged to developers in the Eastern Dublin Specific Plan area to assist in funding the construction of
improvements to mitigate noise impacts.
23 of 23