Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Item 4.10 Street Overlay 07-08
SUBJECT: ATTACHMENTS: CITY CLERK File # D~[aJ[Q]-~~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: May 20, 2008 Award of Bid - Contract No. 08-06, 2007-2008 Annual Street Overlay Program Report Prepared by: Melissa Morton, Public Works Director 1) 2) 3) Resolution of Award Bid Results Location map of overlay streets Adopt resolution awarding Contract No. 08-06, 2007-2008 Annual Street Overlay Program, to Bay Cities Paving & Grading, Inc. RECOMMENDATION: ~ FINANCIAL STATEMENT: 2007-2008 Annual Street Overlay: FY 2007-2008 Budget Low Bid Salaries/Inspections/Miscellaneous: Improvements - Overlay (TCRP funds): Improvements - Overlay (CMA funds): Improvements - Overlay (Measure B funds): TOTAL: $ 53,220 $ 274,239* $ 289,000 $ 98.000 $ 714,459 $ 256,378.24 * The improvements budget of $274,239 is funded through the Traffic Congestion Relief Program (TCRP). Due to the TCRP requirement to expend funds by June 30, 2008, the 2007-2008 Annual Street Overlay Program will only consist of improvements funded by TCRP. The improvements funded through the Alameda County Congestion Management Agency (CMA) and Measure B Local Streets & Roads funds will be completed as part of the FY 2008-2009 Annual Street Overlay Program in order to ensure timely TCRP expenditure. CMA funds are also not available for reimbursement until FY 2008-2009. ------------------------------------------------------------------------------------------------------------- COpy TO: Bay Cities Paving & Grading, Inc. Page 1 of2 4-./0 G:\CIP\Overlay\2007-2008\AS award.doc ITEM NO. DESCRIPTION: The Annual Street Overlay project consists of removing and replacing failed asphalt concrete (AC) pavement to a minimum depth of 4 inches on residential streets and 6 inches on collector/arterial streets, resurfacing the street with a minimum 1-1/2-inch overlay of AC, and re-striping pavement markings. Major cracks will also be sealed prior to resurfacing in order to prevent the cracks from reflecting through the new AC overlay. The 2007-2008 Annual Street Overlay Program will repair and overlay the following streets: STREET LIMITS Davona Drive Sharon Street Alcosta Boulevard to Village Parkway Bonniewood Lane to Kilrush Avenue In addition, pavement failure repairs on Village Parkway between Kimball Avenue and Amador Valley Boulevard are included in this Contract as a cost savings measure. A total of ten bids were received (Attachment 2), with the low bid of $256,378.24 submitted by Bay Cities Paving & Grading, Inc. Staff has reviewed the bids and determined that the low bid contractor has satisfactorily performed similar projects. Staff recommends that the City Council adopt the resolution awarding Contract No. 08-06, 2007-2008 Annual Street Overlay Program, to Bay Cities Paving & Grading, Inc. Page 2 of2 RESOLUTION NO. - 08 I ;r Lf A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ********************** AWARDING CONTRACT NO. 08-06, 2007-2008 ANNUAL STREET OVERLAY PROGRAM TO BAY CITIES PAVING & GRADING, INC. WHEREAS, the City of Dublin did, on May I, 2008, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 08-06, 2007-2008 Annual Street Overlay Program, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the Public Works Director, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract No. 08-06 to the lowest responsible bidder therefor, to wit, Bay Cities Paving & Grading, Inc., at a bid of Two Hundred Fifty-Six Thousand, Three Hundred Seventy- Eight Dollars and Twenty-Four Cents ($256,378.24), the particulars of which bid are on file in the Office ofthe Public Works Director. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the Agreement. PASSED, APPROVED AND ADOPTED this 20th day of May, 2008, by the following vote: AYES: NOES: ABSENT: ABSTAINING: Mayor ATTEST: City Clerk G: ICIPIOverlayI2007-2008\reso award. doc InlCHIEIT L. SUMMARY OF BID RESULTS - May 1, 2008 i I I __I I -+' I \ ~NT~CT 08- 06, ANNUAL STREET OVERLAY PROJECT ,', ,,' --+ ,-t-u___+----" --+----~ I ",' '~, ,-~ ---,r ~ - - - -~ ~ =1- - 'F r ~ r:-ENGINEER'SESTIMJ\TE! BAY CITIES PAVI~NG r- TOP GRADE CONSTR:- i . G~ BORTOlOTTO ~ - I~~~ I ITEM DESCRIPTION' ,I MU:~~~:EI QTY I UNIT PRICJ;OT:L PRIC~IT PRI~~[ TOTAL PRICE I UNIT PRICE!TOTAL PRICEI ~NIT ~RICE I ~~~~ 1 Striping & Marking Removal LS '-t ~I L 6,500.0jL $ 6,500.00: $ 4,819.00 $ 4,819.00 : $ 1,690.75 $ 1,690.75 $..2,212:00 $ 2,212.00 2 PlaneACPavement12'Wide LF 180. $ 2.63 $ 473.40 $ 9.90 $ 1,782.00 $ 10.00 $ 1,800.00 $ 2.18 $ 392.40 3 PlaneACPavement6'Wide' 'LF 1 8,2~ $ 1.59 $ 13,038.00 $ 1.15 $ 9,430.00 $ 1.25 $ 10,250.00 i $ 1.11 $ 9,102.00 4 Pavement Failure Repairs 4" . I: SF 18,500 $ ... 2.87 $ 53,095.00 $ 3.20 $ 59,200.00' $ 2.86 $ 52,910.00 $ 3.01 $ 55,685.00 5 iCrack Sealing LS .1....~ 8,000.00 $ 8,000.00 $ 7,652.00 $ 7,652.00 $ 4,000.00 . $ 4,000.00 $ 4,280.00 $ 4,280.00 6 Install 1 1/2" AC overlay , SF ~9,215 $ 0.77 $ 145,695.55 $ 0.71 $ 134,342.65 I $ 0.78 $ 147,587.70 ' $ 0.79 $149,479.85 7 ,Reinforcing Pavement Fabric -----t-SF U79,115 $--6.15-"$ 26,867.25~ 0.14 $ 25,076.10' $, 0.15 $ 26,867.25 $ 0.14 $ 25,076.10 8 Install Detector Loops -~----EAI 8 $ 431.000 $ 3,448.00 $ 367.50 $ 2,940.00 $ 380.00 $ 3,040.00 $ -----'374.00 $ 2,992.00 9 Adjust Storm Drain Manhole EA 1 $ 500.00 $ 500.00 $ 918.75 $ 918.75 $ 528.000 $ 528.00 '$ 301.000 $ 301.00 10 Adjust Monuments to Grade EA! 7 $ 378.00 $ 2,646.00 $ 577.50 $ 4,042.50 $ 400.00 $ 2,800.00 $ 212.00 $ 1,484.00 11 12" Line, WhitelYellowThermo LF I 699 $ 3.08 $ 2,152.92 $ 2.36 $ 1,649.~4 $ 3.00 $ 2,097.00 $ 3.70 $ 2,586.30 12 24" Crosswalk, Yellow, Paint LFI 99 $ 6.00 $ 594.00 $ 2.10 $ 207.90 $ 2.70 $ 267.30 $ 3.21 $ 317.79 13 Detail 1 ~_ 2,120 $ 2.00 $ 4,240.00 $ 0.32 $ 678.40 $ 0.90 $ 1,908.00 $ 1.07 $ 2,268.40 14 KEEP CLEAR Legend, Thermo. ~4--+-- 2 $ 400.00 $ 800.00 $ 207.90 $ 415.80 . $ 130.00 $ 260.00 $ 152.00 $ 304.00 15 SLOW SCHOOL XING Legend, Thermo. EA: 2 $ 500.00 $ 1,000.00 $ 323.40' $ 646.80 $ 250.00 $ 500.00 $ 289.00 $ 578.00 16 YIELD Legend, Thermoplastic_EA ,,+.1 $ 226.00 $ . 226.00 $~,~J, 115.50 $ 85.00 $ 85.00 $ 101.00 $ 101.00 17 STOP AHEAD Legend, Thermo. EA *='$ 400.00 $ 3,200.001$ 92.40 $ 739.20 $ 112.00 $ 896.00 $ 131.00 $ 1,048.00 18 STOP Legend, Thermoplastic. .~-+-n_. 8 $'.. 22_~L-1,808.00 $ 207.~..!~1,663:.2Q..,.j_85.0o'...l........ 680:QQ..J... 101.00, $ 808.00 19 Reflective Markers (Blue) , ~ 7. $ 21.70 I $ 151.90 , $ 8.40 $ 58.80 $ 13.00 $ 91.00 $ 17.00 $ 119.00 TOTAL'I_ -- u-l-___ l: _~27..43"'2_ _ i $ 2".37B.24 ~ - ~.I $25B.2~~ ~ i $259,134.84 -I I I MCK SERVICES~E SILVA GATES E-c. F. A.RCHIBALD~VENS CK QUARRY UNIT OF ~~ I '~I 'I TOTAL MEASURE Q.TY . UNIT p. RICE P~,OTAL PRICEI UNIT PRICE TOTAL PRICE UNIT PRICE 'I TOTAL PRICE UNIT PRICE PRICE LS 1 $ 1,850.00, $ 1,850.00 $ 6,000.00 $ 6,000.00 $ 4,000.00 . $ 4,000.00 $ 2,985.00 $ 2,985.00 LF18O~ 0.19 $ 34.20 $ 4.00 $ 720.00 $ 5.00 I $ 900.00 $ 1.00 $ 180.00 -~ ' LF I 8'~n 0.19 $ 1,558.00 $ 1.20 $ 9,840.00 $ 1.30 $ 10,660.00 $ 2.00 $ 16,400.00 SF 18,~~ 3.48 $ 64,380.00 $ 4.00 ,$ 74,000.00 $ 3.50 $ 64,750.00 $ 3.00 $ 55,500.00 LS 1 $ 4,000.00 $ 4,000.00 $ 3,500.00 $ 3,500.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 SF 189,215 $ 0.84 $ 158,940.60 $ 0.76 $ 143,803.40 $ 0.90 $ 170,293.50 $ 0.90 $170,293.50 SF 179,115 $ 0.13 $ 23,284.95 $ 0.14 $ 25,076.10 $ 0.15 $ 26,867.25 $ 0.20 $ 35,823.00 EA 8 $ 350.000 $ 2,800.00 $ 500.00 $ 4,000.00 $ 500.00 $ 4,000.00 $ 350.00 $ 2,800.00 EA 1 $ 875.00 $ 875.00 $ 500.00 $ 500.00 $ 500.000 $ 500.00 $ 750.000 $ 750.00 EA 7 $ 550.00 $ 3,850.00 $ 500.00 $ 3,500.00 $ 250.00 $ 1,750.00 $ 300.00 $ 2,100.00 LF 699 $ 2.25 $ 1,572.75 $ 3.00 $ 2,097.00 $ 4.00 $ 2,796.00 $ 3.50 $ 2,446.50 LF 99 $ 2.00 $ 198.00 $ 3.00 $ 297.00 $ 4.00 $ 396.00 $ 3.00 $ 297.00 LF 2,120 $ 0.30 $ 636.00 $ 1.00 $ 2,120.00 $ 0.50 $ 1,060.00 $ 1.00 $ 2,120.00 \) EA 2 $ 198.00 $ 396.00 $ 250.00 $ 500.00 $ 250.00 $ 500.00 $ 145.00 $ 290.00 X,J EA 2 $ 308.00 $ 616.00 $ 250.00 $ 500.00 $ 350.00 $ 700.00 $ 275.00 $ 550.00 A EA 1 $ 110.00 $ 110.00 $ 150.00 $ 150.00 $ 100.00 $ 100.00 $ 95.00 $ 95.00. ~ EA 8 $ 88.00 $ 704.00 $ 150.00 $ 1,200.00 $ 100.00 $ 800.00 $ 125.00 $ 1,000.00 \' i EA 8 $ 198.00 $ 1,584.00 $ 100.00 $ 800.00 $ 250.00 $ 2,000.00 $ 95.00 i $ 760.00---t="" EA 7 $ 8.00 $ 56.00 $ 20.00 $ 140.00 $ 20.00 $ 140.00 $ 15.00 $ 105.00 = I; I -I f--B ID I ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 ~ . ITEM DESCRIPTION Striping & Marking Removal Plane AC Pavement 12' Wide Plane AC Pavement 6' Wide Pavement Failure Repairs 4" Crack Sealing Install 1 1/2" AC overlay Reinforcing Pavement Fabric Install Detector Loops Adjust Storm Drain Manhole Adjust Monuments to Grade 12" Line, WhitelYellow Thermo 24" Crosswalk, Yellow, Paint Detail 1 KEEP CLEAR Legend, Thermo. SLOW SCHOOL XING Legend, Thermo. YIELD Legend, Thermoplastic STOP AHEAD Legend, Thermo. STOP Legend, Thermoplastic Reflective Markers (Blue) I TOTAL:! ~. $ 267,445.50 I $ 278,743.50 $ 297,212.75 : $ 299,495.00 :~:~:"~TO~~:. ~~~~~;T~~E~ ~~:R'r PROJEcT __~- ~L - _ :L - _~- __ _+ _ -1 . _ -1- -_ ~ _ . .,0 I . --- .-J UN'TOFl __\1 ELCAMI~OPAVI~I ,O'G~PAVING !. - J.A.G01,NSALVES I t--- ITEM ITEM DESCRIPTION __~ MEASURE I QTY UNIT PRICE TOTAL PRICE, UNIT PRICE] TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Striping & Marking Removal I LS. 1 ,$ 1,850.00 $ 1,850.00 $ 5,000.00 i $ 5,000.00 $ 2,985.00 $ 2,985.00 2 Plane AC Pavement 12' Wide ClF 180 $ _7.25 , $ 1,305.00 $ 5.00 $ 900.00 $ 12.25 $ 2,205.00 3 Plane AC Pavement 6' Wide I IF 8,200 I $ 1.80 $ 14,760.00 $ 1.50 $ 12,300.00 $ 1.40 $ 11,480.00 4 Pavement Failure Repairs 4" -_of SF, 18,500 $ 4.03 $ 74,555.00 $ 5.00 $ 92,500.00 $ 3.65 $ 67,525.00 5 Crack Sealing ~ LS 1 I $ 4,200.00 $ 4,200.00 $ 5,500.00 $ 5,500.00 $ 10,000.00 $ 10,000.00 6 Install 1 1/2" AC overlay SF 189,215 $ 0.883 $ 167,076.85 $ 0.80 $ 151,372.00 $ 1.34 $ 253,548.10 7 Reinforcing Pavement Fabric SF __ 179,1151 $ . 0.14 $ 25,076.10 $ 0.15 $ 26,867.25 $ 0.18 $ 32,240.70 8 Install Detector Loops EA ~367.500 $ 2,940.00 $ 385.00 $ 3,080.00 $ 950.00 $ 7,600.00 9 Adjust Storm Drain Manhole EA 1 $ 475.00 $ 475.00 $ 600.00 $ 600.00 $ 750.000 $ 750.00 10 Adjust Monuments to Grade EA 7 $ 375.00 $ 2,625.00 $ 250.00 $ 1,750.00 $ 600.00 $ 4,200.00 11 12" Line, WhiteNellowThermo LF 699 $ 2.25 $ 1,572.75 $ 2.50 $ 1,747.50 $ 3.50 $ 2,446.50 12 24" Crosswalk, Yellow, Paint LF 99 $ 2.00 $ 198.00 $ 3.00 $ 297.00 $ 3.00 $ 297.00 13 Detail 1 LF 2,120 $ 0.30 $ 636.00 $ 0.35 $ 742.00 $ 1.00 $ 2,120.00 14 KEEP CLEAR Legend, Thermo. EA 2 $ 198.00 $ 396.00 I $ 220.00 $ 440.00 $ 145.00 $ 290.00 15 SLOW SCHOOL XING legend, Thermo. EA 2 $ 308.00 $ . 616.00 1$ 340.00 I $ 680.00 $ 275.00 '$ 550.00 16 YIELD legend, Thermoplastic EA 1 $ 110.00,$ 110.00 $ 120.00 $ 120.00 $ 95.00 $ 95.00 17 STOP AHEAD Legend, Thermo. EA 8 $ 88.00 I $ 704.00 ~- 95.00 $ 760.00 $ 125.00 $ 1,000.00 18 STOP Legend, Thermoplastic EA '\_ 8 ~~98,OU 1,584.00 ~220.00 $ 1,760.00 $ 95.00 $ 760.00 19 Reflective Markers (Blue) EA. 7 $ 8.00 $ 56.00 $ 9.00 I $ 63.00 $ 15.00 $ 105,00 1-----+ TOTAL: I $ 300,735.70 ($ 306,478.75 $ 400,197.30 ( \ J ~ '''''''; ~ E co 1- 01 ., 1J) .j...I 0 i Q) Q) 1 I... 1- .j...I a... 1 (/) i >- IU >- 1 1: Q) co 1 > 1 0 1- i . OJ \ > \ 0 i / .' +-I ( OJ -.. ~., OJ ........ 1- \ 0 \ctl +-I \: lJ) \, \ \ co \ ::J \ c i C /" .' <( 00 0 0 N I I'-. 0 0 N '" c:i I '-1 I I \---_J !,~t'~~'\~"~\ i:'i:3~/~I~\',,~\, 'C"..'.~~...i-." "':~~~, W ,;/S:~~/ q}~;-~~~-;;;f! '~/ !frO . ! i 1 ! ! j ci 'i CD 1J) .j...I Q) Q) I... .j...I If) '" '" c:i o InACllEIT 3.