Loading...
HomeMy WebLinkAboutItem 6.2 Storm Drain Ben Dist CITY CLERK File # D[2]~[QJ-~rm AGENDA STATEMENT CITY COUNCIL MEETING DATE: July 15, 2008 SUBJECT: ATTACHMENTS: RECOMMENDATION: ~ FINANCIAL STATEMENT: Public Hearing: Consideration of an Ordinance Amending Ordinance No. 14-08 to Correct the Amount ofth~ Benefit Charges Applicable to Certain Parcels within the Dublin Ranch West Side Storm Drain Benefit District Report Prepared by: John D. Bakker, City Attorney 1) Proposed Ordinance amending Ordinance 14-08 to correct amount of benefit charges. Ordinance No. 14-08 2) 1) 2) 3) 4) 5) 6) Open Public Hearing Receive Staff Presentation Receive Public Testimony Close Public Hearing Deliberate Waive reading and INTRODUCE Ordinance There will be no cost to the City for operation of the District. The developers, have financed and constructed the improvements. They will be partially reimbursed for the costs of construction by other property owners in the District. The City will retain administrative fees to cover its costs of administering the Benefit District. DESCRIPTION: The proposed Ordinance (Attachment 1) will adjust the Dublin Ranch Storm Drain benefit charges adopted earlier this year in order to correct an error. The Dublin Ranch West Side Storm Drain Benefit District, was created by Ordinance No. 12-02 in July of 2002. It consists of 30 parcels east of Tassajara Road and three of the parcels are owned by Dublin Land Company. All of the remaining parcels are or were owned by the Lin family at the time the District was created. The improvements made in the Storm Drain Benefit District were constructed by the Lin Family, Lowes, and Toll Brothers. The Dublin Land Company parcels benefit from these improvements and prior to development the Dublin Land parcels will pay fees to the City, to reimburse the Developers who constructed the improvements. COpy TO: ------------------------------------------------------------------------------------------------------------- Page 1 of2 ITEM NO. ".2- G:\BenefitAssrnt_StonnDrain Lin\West Side\Correcting Ordinance\StaffReport for Correcting Error in Dublin Ranch West Side Stonn Drain Benefit District.DOC On March 18,2008, the City Council adopted Ordinance No. 14-08 (Attachment 2), amending and restating Ordinance No. 12-02 creating the Dublin Ranch West Side Storm Drain Benefit District and establishing "benefit charges." The charges established under the ordinance will be used to reimburse the developers for costs of constructing drainage improvements that benefited properties other than their own. Among other things, Ordinance No. 14-08 adjusted the amounts of the benefit charges to reflect the actual costs ofthe Improvements as determined by the City. These costs were listed in the Engineer's report entitled "Calculation of Revised Benefit Charges & Distribution to Financing Parties" which was attached to the Ordinance (Attachment 3). The Ordinance also contained provisions for automatic annual adjustments for each year that the fees remain unpaid. After the adoption of Ordinance No. 14-08, it was determined that the benefit charge amounts imposed on Area of Benefit Parcels 2,3 and 4 as stated in section 5 of Ordinance No. 14-08, referenced conflicting amounts from the figures contained in Attachment 3. Staff determined that the amounts listed in Attachment 3 of Ordinance No. 14-08 are accurate. The proposed ordinance will correct the inconsistency and accurately reflect the amount of the benefit charges for Area of Benefit Parcels 2, 3 and 4 in the text of Section 5 of Ordinance No. 14-08. The following table summarizes the difference between amounts stated in Ordinance No. 14-08 and the proposed correction. Parcels 2, 3, and 4 are presently owned by Dublin Land Company. The correction results in a decrease in the total amount to be collected from these parcels. WEST DUBLIN RANCH STORM DRAIN BENEFIT CHARGES FOR PARCELS 2, 3, and 4 Per Ordinance Adopted March 2008 (Ordinance 14-08) Compared To Proposed Revision Parcel 2 Parcel 3 Parcel 4 Total Ord. No. 14-08 - Section 5 $ 128,522.24 $ 166,141.91 $ 90,483.01 $ 385,147.16 Corrected Amount $ 129,575.67 $ 167,536.97 $ 82,740.21 $ 379,852.85 Increase/(Decrease) $ 1,053.43 $ 1,395.06 $ (7,742.80) $ (5,294.31) Staff recommends that the City Council open the public hearing, receive public testimony, close the public hearing, deliberate, waive the reading, and INTRODUCE the Ordinance Amending Ordinance No. 14-08. 1056024.1 D(~\d )~~q ORDINANCE NO. - 08 AN ORDINANCE OF THE CITY OF DUBLIN AMENDING ORDINANCE NO. 14-08, WHICH MADE FINDINGS, ADOPTED A LOCAL DRAINAGE PLAN, AND CREATED THE DUBLIN RANCH WEST SIDE STORM DRAIN BENEFIT DISTRICT, A LOCAL BENEFIT DISTRICT TO LEVY AND COLLECT CHARGES, AS A CONDITION OF DEVELOPMENT, TO REIMBURSE DEVELOPERS WHO CONSTRUCT AND INST ALL DRAINAGE FACILITIES THAT BENEFIT PROPERTIES OTHER THAN THEIR OWN RECITALS A. On March 18,2008, the City Council adopted Ordinance No. 14-08, amending and restating Ordinance No. 12-02 creating the Dublin Ranch West Side Storm Drain Benefit District and establishing "benefit charges" to reimburse the developers for costs of constructing drainage improvements that benefited properties other than their own. B. Among other things, Ordinance No. 14-08 adjusted the amounts of the benefit charges to reflect the actual costs of the Improvements as determined by the City. These costs were listed in the Engineer's report entitled "Calculation of Revised Benefit Charges & Distribution to Financing Parties" which was attached to the Ordinance (Attachment 3). C. After the adoption of Ordinance No. 14-08, it was determined that the benefit charge amounts imposed on Area of Benefit Parcels 2,3 and 4 by section 5 of the Ordinance are erroneous but that the amounts listed in Attachment 3 to the ordinance are accurate. D. The purpose of this amendment, therefore, is to accurately reflect the amount of the benefit charges for Area of Benefit Parcels 2, 3 and 4 in the text of Section 5 of Ordinance No. 14-08. NOW, THEREFORE, the City Council of the City of Dublin does hereby ordain as follows: Section 1. Section 5 of Ordinance 14-08 is amended as follows, with deletions indicated in strikethrough and additions indicated in underline: "SECTION 5: OBLIGATIONS IMPOSED. Upon the approval ofa Land Use Entitlement for any Benefited Property in the District, the owner, developer, or other person with an interest in such property shall be required, as a condition of approving the Land Use Entitlement to construct the improvements necessary for that property, as shown in Attachment 1, and/or pay the applicable benefit charges for the property, whichever is appropriate. The benefit charges for Area of Benefit Parcels 2,3, and 4 shall be, respectively, $12g,522.24$129,575.67, $188,141.~1$167,536.97, and $~g, 4S3.91$82,740.21. Payment of benefit charges shall be required at the time the City approves any final or parcel map on that property or at the time the City issues a building Attachment 1 I1-~ #- ~.~, 7) Lf)oR.f) N'-t,~ (' 1 o? i o?1 permit on that property, whichever is earlier. The benefit charges listed set forth above shall be increased automatically beginning July 1, 2008 and subsequently at the beginning of each fiscal year by the rate of return the City earns from the Local Agency Investment Fund ("LAIF"). The annual increases will be calculated as follows: a) On or about each July 1 st, the City Finance Department will prepare a schedule setting forth the revised Benefit Charges for the particular Fiscal Year. Notwithstanding the foregoing, ifthe schedule has not been prepared for a particular fiscal year, the applicable fee shall nonetheless be based on the adjusted amount. b) The revised Benefit Charges shall be determined by multiplying the Benefit Charge from the previous fiscal year by the average return earned by the State of California Local Agency Investment Fund (LAIF), calculated using the average of four quarters ending the previous March 31 st. (LAIF Quarterly rates are typically not available until one month following the end of the quarter.) c) Example: The following example of the interest adjustment calculation is for illustrative purposes only: 1. Determination of Interest Adjustment Rate July 1, 2007 LAIF QUARTER ENDING LAIF QUARTERLY RATES June 30, 2006 4.53 % September 30, 2006 4.93 % December 31, 2006 5.11 % March 30, 2007 5.17 % AVERAGE 4 QUARTERS 4.94% 2. Amounts owed as described in section 5 would be increased July 1, 2007 by 4.94% provided they were paid prior to June 30, 2008. Unpaid amounts would be adjusted again each July 1 st in the same manner." Section 2. Effect of adoption; effective date and postin2. In accordance with Section 36937 of the Government Code of the State of California, this Ordinance shall take effect and be in force thirty (30) days from and after the date of its passage. The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public places in the City of Dublin in accordance with Section 36933 of the Government Code of the State of California Attachment 1 2 3 5f ;(") PASSED, APPROVED, AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF DUBLIN on this _ day of _, 2008, by the following votes: Ayes: Noes: Absent: Abstain: Mayor Attest: City Clerk 1081054.1 Attachment 1 3 if 1;;~ ORDINANCE NO. 14 - 08 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DUBLIN *********** AMENDING AND RESTATING ORDINANCE NO. 12-02 MAKING FINDINGS, ADOPTING A LOCAL DRAINAGE PLAN, AND CREATING THE DUBLIN RANCH WEST SIDE STORM DRAIN BENEFIT DISTRICT, A LOCAL BENEFIT DISTRICT TO LEVY AND COLLECT CHARGES, AS A CONDITION OF DEVELOPMENT, TO REIMBURSE DEVELOPERS WHO CONSTRUCT AND INSTALL DRAINAGE FACILITIES THAT BENEFIT PROPERTIES OTHER THAN THEIR OWN FINDINGS A. Large portions of eastern Dublin are presently being developed, have approved development plans, or are likely to be developed in the near future. Pursuant to Municipal Code Section 9.16.110 and Government Code Section 66485, the City required some of the fIrst developers in those areas to construct, install, and dedicate to the City stormwater drainage facilities that will benefIt property outside their respective subdivisions, primarily by containing sufficient capacity to convey stormwater that collects upon their properties and stormwater drained from adjacent properties to the ultimate drainage point for those waters. This Ordinance is adopted as partial implementation of the Eastern Dublin SpecifIc Plan, including particularly Sections 11.3.2 and Policies 10.2, 10.3, 10.5, 10.6, and 10.8. B. On July 2, 2002, the City Council held a properly noticed public hearing at which it considered the adoption of a local drainage plan that would defIne the necessary storm drain facilities for a portion of eastern Dublin (the "Dublin Ranch West Side Storm Drain BenefIt District" or "BenefIt District") and the obligation of each property and subdivision within that area for drainage. That obligation would include the construction of a portion of the required facilities for the area, or if the facilities benefIting a property are provided by others, payment of a charge equal to the dollar-value of the benefIt to each property of all facilities that serve the property. Such charges would be calculated based on a formula described in the plan and used to reimburse the developer who built the facilities. C. At that public hearing, the Council received an engineer's report, prepared by MacKay & Somps Infrastructure Group, dated January 2, 2002 ("the Engineer's Report"), attached hereto as Attachment 1. that described the public drainage facilities that were necessary or are already installed or under construction in a portion of eastern Dublin (hereafter the "Improvements"). D. On July 16,2002, the City Council adopted Ordinance No. 12-02, which made fmdings, adopted a local drainage plan, and created the Dublin Ranch West Side Storm Drain District, a local benefIt district to levy and collect charges, as a condition of development, to reimburse developers that construct and install drainage facilities that benefIt properties other than their own properties. E. The Dublin Ranch West Side Storm Drain BenefIt District consists of Parcels 1 through 31 listed in Exhibit E of the Engineer's Report and depicted on the Map at Exhibit F of the Engineer's Report. F. The Engineer's Report describes drainage facilities that will be necessary for the benefIt area and a map of the BenefIt District showing its boundaries and the location of the necessary facilities. 1/26 A*~~~~~ ~ lO~ IL\-o~ !5 ./')6 02jP; 1 The parties that were responsible for construction of the Improvements did not own all of the properties that will benefit from and use the Improvements. G. The Engineer's Report further set forth the estimated costs of constructing the Improvements and the portion of the costs attributable to each property in the Benefit District (in the form of "benefit charges"), based on the methodology set forth therein. In general, the costs attributable to each property are based on the dollar-value of the benefits to a property of each of the Improvements. H. On July 16,2002, the City Council adopted Ordinance No. 12-02 creating the Dublin Ranch West Side Storm Drain Benefit District, which among other things obligated those developing property within the Benefit District to either construct the improvements or pay a benefit charge. I. Since the adoption of Ordinance No. 12-02, all of the Improvements have been constructed by three entities (the Lins, Toll Brothers and Lowe's), and only three of the parcels within the Benefit District (designated Area of Benefit Parcels 2,3, and 4 in Exhibits E and F of the Engineer's Report and as more specifically depicted on Attachment 4) have not satisfied their obligations under Ordinance No. 12-02. J. The Engineer that prepared the Engineer's Report has updated the cost of constructing the Improvements set forth in Exhibit C of the Engineer's Report to reflect the actual costs, as approved by the City, of constructing the Improvements incurred by the developer or property owner (with an amount attributable to interest in accordance with Government Code section 66486). Those updated costs are reflected in Attachment 2. K. Based on the updated costs of constructing the Improvements set forth in Attachment 2 and the methodology in the Engineer's Report, the Engineer has revised the benefit charges that were set forth in Table 2 of the Engineer's Report for the three parcels (Area of Benefit Parcels 2, 3, and 4) for which the obligations under Ordinance No. 12-02 have not been satisfied. The updated benefit charges are set forth in Section 5 and the manner in which those charges were calculated is set forth in Attachment 3. Attachment 3 also specifies how these benefit charges will be distributed to those entitled to reimbursement. L. The revised benefit charges were presented to and received by the City Council at a public hearing noticed pursuant to Dublin Municipal Code Section 9.16.110.C-D. M. The City Council hereby fmds that the subdivision and development of property in the Benefit District identified in the Engineer's Report requires or required the construction of the Improvements, since the facilities were designed based on anticipated land uses under the City's General Plan, and that the charges imposed on properties in the area by this ordinance are fairly apportioned within the area on the basis of the benefits conferred and costs incurred on each property and on the need for the Improvements created by the subdivision and development of each property, since the costs are spread based on the quantity of stormwater anticipated to be generated by each property to the Improvements. THE DUBLIN CITY COUNCIL DOES ORDAIN AS FOLLOWS: SECTION 1: PURPOSE. The purpose of this ordinance is to create a local benefit district, pursuant to California Government Code Section 66487, to provide for the levy and collection of charges as a condition of approving the development of properties within the Benefit District that will necessitate, and 2/26 C, cOt;! 1 benefit from the construction of storm drain improvements. The owner, developer, or other person holding an interest in property in the Benefit District shall be required to construct specified drainage improvements and dedicate them to the City or pay the City charges equal to their share (according to the benefit analysis) of either the estimated costs of constructing those improvements or the actual cost of already constructed improvements. Charges for already constructed improvements shall be an amount equal to the proportional benefit to the benefited property of improvements constructed with supplemental capacity that will benefit or be used by the benefited property. SECTION 2: DEFINITIONS. For the purpose of this ordinance, the. following words and phrases, singular as well as plural, shall have the following meanings: "Benefit District" means the Dublin Ranch West Side Storm Drain Benefit District which includes the property described in Recital E. "Benefited Property" means a property within the Benefit District which receives benefit from the construction of an Improvement. "Financing Party" means a property owner, developer, or governmental entity that is required to install Improvements which benefit properties within the Benefit District. "Improvements" is defined in Recital C. "Land Use Entitlement" may include any of the following: a permit or approval granted by the City for the development of property, a conditional use permit, fmal subdivision map, a tentative subdivision map, a development agreement, a grading permit, a building permit, and a site design review approval. SECTION 3: ADOPTION OF LOCAL DRAINAGE PLAN. Pursuant to Government Code Section 66483, the City Council hereby adopts the Engineer's Report as the local drainage plan for the Benefit District. SECTION 4: CREATION OF LOCAL BENEFIT DISTRICT. Pursuant to its authority under Government Code Section 66487, the City Council hereby creates the Dublin Ranch West Side Storm Drain Benefit District, a local benefit district consisting of the benefited properties labeled Parcels I through 31 as shown in Exhibit F to Attachment 1, which properties are further identified by the Assessor Parcel Numbers listed in Exhibit E to Attachment 1. SECTION 5: OBLIGATIONS IMPOSED. Upon the approval of a Land Use Entitlement for any Benefited Property in the District, the owner, developer, or other person with an interest in such property shall be required, as a condition of approving the Land Use Entitlement to construct the improvements necessary for that property, as shown in Attachment 1 , and/or pay the applicable benefit charges for the property, whichever is appropriate. The benefit charges for Area of Benefit Parcels 2,3, and 4 shall be, respectively, $128,522.24, $166,141.91, and $90,483.01. Payment of benefit charges shall be required at the time the City approves any [mal or parcel map on that property or at the time the City issues a building permit on that property, whichever is earlier. The benefit charges listed set forth above shall be increased automatically beginning July 1, 2008, and subsequently at the beginning of each fiscal year by the rate of 3/26 '1 ~ Jc1 return the City earns from the Local Agency Investment Fund ("LAIF"). The annual increases will be calculated as follows: a) On or about each July 1st, the City Finance Department will prepare a schedule setting forth the revised Benefit Charges for the particular Fiscal Year. Notwithstanding the foregoing, if the schedule has not been prepared for a particular fiscal year, the applicable fee shall nonetheless be based on the adjusted amount. b) The revised Benefit Charges shall be determined by multiplying the Benefit Charge from the previous fiscal year by the average return earned by the State of California Local Agency Investment Fund (LAIF), calculated using the average of four quarters ending the previous March 31 st. (LAIF Quarterly rates are typically not available until one month following the end of the quarter.) c) Example: The follOWing example of the interest adjustment calculation is for illustrative purposes only. 1. Determination of Interest Adjustment Rate July 1,2007. LAIF QUARTER ENDING LAIFQUARTERLY RATES June 30, 2006 4.53% September 30, 2006 4.93% December 31, 2006 5.11 % March 30, 2007 5.17 % AVERAGE 4 QUARTERS 4.94 % 2. Amounts owed as described in section 5 would be increased July 1, 2007, by 4.94% provided they were paid prior to June 30, 2008. Unpaid amounts would be adjusted again each July 1st in the same manner. SECTION 6: USE OF CREDITS. With respect to facilities necessary to provide drainage to a Benefited Property that have already been constructed, are under construction or are a condition of developing another property, no charge shall be levied on a Benefited Property if the Financing Party for those facilities has indicated in writing to the City that a credit should be granted to the owner of the Benefited Property. In that event, the total reimbursable amount owed to the Financing Party for facilities construction shall be reduced by an amount equal to such credit, as adjusted by the annual inflator included in Section 5. SECTION 7: USE OF CHARGE REVENUE. Charges collected from owners of Benefited Properties shall be placed into an account for this Benefit District and used to reimburse Financing Parties (in the proportions shown in Attachment 3) pursuant to reimbursement agreements approved by the City Manager in accordance with Section 9. Any surplus revenue from the charges imposed by this ordinance shall be used as provided for in Government Code Sections 66483.1 and 66483.2 with preference for reimbursement of the original payer, when feasible. SECTION 8: INTENTIONALLY DELETED. 4/26 ? b1::C 21 SECTION 9: REIMBURSEMENT AGREEMENTS. The City Manager is herby authorized to enter into reimbursement agreements with Financing Parties consistent with the terms of this Ordinance, Government Code Section 66485 et seq., and the adopted Engineer's Report. SECTION 10: EFFECT OF ADOPTION; EFFECTIVE DATE AND POSTING. This Ordinance shall supersede Ordinance No. 12-02 in all respects, except that (a) the adoption of the local drainage plan and the creation of the local benefit district, by sections 3 and 4 of this Ordinance, respectively, shall be deemed to have occurred on the effective date of Ordinance No. 12-02 and (b) if this ordinance is invalidated or otherwise become ineffective for any reason, Ordinance No. 12-02 shall be deemed to have remained at all times in full force and effect. In accordance with Section 36937 of the Government Code of the State of California, this Ordinance shall take effect and be in force thirty (30) days from and after the date of its passage. The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public places in the City of Dublin in accordance with Section 36933 of the Government Code of the State of California SECTION 11: ATTACHMENTS. Attachment 1 Engineer's Report, dated January 2, 2002 Attachment 2 Summary of Costs Attachment 3 Calculation of Revised Benefit Charges and Distribution to Financing Parties Attachment 4 Map of Area of Benefit Parcels 2,3, and 4 PASSED, APPROVED AND ADOPTED this 18th day of March, 2008, by the following vote: AYES: Councilmembers Hildenbrand, Oravetz, Sbranti and Scholz, and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None A~t!W Deputy City Clerk 5/26 '1 OJ d'1 . , I I I ENGINEER'S REPORT ! I I I ( City of Dublin Alameda County, California Dublin Ranch West Side Storm Drain Benefit District January 2, 2002 IDAClCAl l S..PS INFRASTRUCTURE GROUP Civil Engineering Planning Land Surveying 6/26 ATTACHMENT 1 I -1;_ r', J'.. I tJ ~ .2'1 City of Dublin Alameda County, California Dublin Ranch West Side Storm Drain Benefit District January 2, 2002 Table of Contents Executive Summary.... ............. ............... .......,..... ............. ........... ..... ....... I Exhibit A - Description of Work.............................................................. 2 Exhibit B -Plans for Improvements.......................................................... 2 Exhibit C -S.ummary of Cost.................................................................... 3 Exhibit D -Methodology ......................................................................... 5 Exhibit E -Assessors Roll ........................................................................12 Exhibit F -Area of Benefit ...................................................................... 13 .ICKAY l SOIDPS INFRASTRUCTURE GROUP Civil Engineering Planning Land Surveying 7/26 II ~);24 City of Dublin Alameda County, California Dublin Ranch West Side Stann Drain Benefit District January 2, 2002 Enaineer's Report Executive Summary A portion of the master stann drain system for Dublin Ranch provides supplemental capacity for other properties. Part of this stann drain system will be installed with the early phases of Dublin Ranch. The remainder of the proposed system will be built in the future. The "Area of Benefit" (AOB) is therefore established as a means to reimburse the party constructing the improvements for supplemental capacity that benefits other properties. The boundary showing the Area of Benefit is shown on the attached Exhibit F. The boundaries are based on the approved drainage master plan. Minor changes in the grading plan shall not affect the pro-rata share of the proposed improvements. The cost of the proposed improvements, plus 4% miscellaneous expenses {mobilization, erosion control, clearing and grubbing, etc.) and 21.5% for the following items shall be considered the reimbursable amount: Design Plan checking Bonding Surveying Construction Administration Inspection City District Administration Total 7.0 % 1.0 % 1.5 % 2.0 % 5.5 % 3.0 % 1.0 % 21.5 % The drainage improvements included in this Area of Benefit were divided into three segments, A, C and D. Each parcel benefiting from a given segment will pay for their share based on the amount of stann water flow their parcel generates. There are 141 acres outside the district boundaries and within the drainage shed that will benefit from segment C. The benefit associated with this area has been apportioned to area of benefit number 32. This report includes; Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Description of Work Plans for Improvements Summary of Cost Methodology Assessors Roll Area of Benefit K:\1.DD2i\projccts\11267\documcnts\05\specifications\Dublin JU2i -2:6 sick BD EngillCCfS Rcport.doc ! . 1;< ~ ~ 1 Exhibits A) Description of Work The improvements included in the Area of Benefit district include the stonn drain pipe and minor facilities included in area G and area H of Dublin Ranch. B) Plans for Improvement Conceptual plans for the improvements to be constructed are shown on Exhibit F. 9/26 ) 2 2_p~tY" . .:..) ~//1 Dublin Ranch - West Side Stann Drain Benefit District Exhibit C, Summary of Cost Unit Construction Total cost per pipe with Item Quantity Unit Description Price Amount so ft and other costs A. Line 1. 920 L.F. 60" RCP $118 $108,560 4 Ea. Large Inlets S4,{)43 $16,172 Sub- Total for 60" Reach $124,732 $157,611 2. 900 L.F. 48" RCP $91 $81,900 3 Ea. Large Inlets $4,043 $12,129 I Ea. Standard Inlets $2,310 $2,310 Sub- Total for 48" Reach $96,339 $121,734 3. 770 L.F. 42" RCP $79 $60,830 2 Ea. Standard Inlets $2,310 $4,620 Sub- Total for 42" Reach $65,450 $82,703 4. 470 L.F. 30" RCP $53 $24,910 2 Ea. Standard Inlets $2,310 $4,620 Sub- Total for 30" Reach $29,530 $37,314 Total Construction Cost $316,051 4% miscellaneous (mobilization, erosion control, clearing & grubbing, etc.) $12,642 Sub-total $328,693 21.5% Engineering, Inspection. etc. $70,669 Total S399,362 S399,362 3 of 12 216102 10/26 11267-05\l1ow distr cales MB revise 011702 eMB Unit ConstnlCtion hem Quantity Unit Description Price Amount C. Line I. 1140 L.F. 96" RCP $332 $378,480 2. 2 Ea. Large Manhole $4,043 8,086 3. I Ea. Outfall Structure $34,650 .34,650 Total Construction Cost 4% miscellaneous (mobilization, erosion control, clearing & grubbing, etc.) Sub-lolal 21.5% Engineering, Inspection, etc. Total D. Line htp 1. 500 L.F. 42" RCP @ -7' $40,000 2. 1 Each Standard Inlet $2,310 2,310 SuO- Total for 42" Reach /4 ~02~ Total cost per pipe with soft IIll<l other costs $421,216 $16,849 $438,065 $94,184 $532,249 $532,249 S532,249 3. 4. 500 L.F. 30' RCP I Each Standard Inlet $53 $2,3 10 SuO-Total for 30" Reach 26,500 2,310 $36,404 Total Construction Cost 4% miscellaneous (mobilization, erosion control, clearing & grubbing, etc.) Sub-total 2) .5% Engineering, Inspection, etc. Total Summary Total Construction Cost 4% misce([aneous (mobilization, erosion control, clearing & grubbing, etc.) Sub-total 21.5% Engineering, Inspection, etc. Total Estimated Benefit $42,310 $28,810 $71,120 $2,845 $73,965 $15,902 589,867 S808,387 532,335 S840,722 5180,755 51,021,478 $53,463 589,867 .04 of 12 216102 11/26 11267-GSIJIow dislr cales A&B revise 011702 eMS D) Methodology The "Area of Benefit" (AOB) numbers shown on Exhibit F were developed using land use areas as shown on tentative maps or other available planning docwnents. The drainage shed and sub- shed boundaries depicted on the Drainage Shed Map were taken from the "DUBLIN RANCH MASTER DRAINAGE PLAN", dated April 2000, and last revised August 2001, prepared by MacKay & Somps Infrastructure Group. The drainage sub-areas represent the different land uses within each sub-shed. The costs of the proposed improvements were distributed to each AOS parcel number within the AOS based on the quantity of stonn runoff generated by each sub-area. The amount of runoff generated by each sub-area was calculated using the Rational Method. The areas, runoff coefficient "c" for the different land uses, intensity and time of concentration used to calculate the flow, "Q" were taken from the "DUBLIN RANCH MASTER DRAINAGE PLAN", prepared by MacKay & Somps Infrastructure Group. The areas contributing to each facility is shown on the Drainage Shed Map. The contributing stonn water runoff flows from each sub-area for each reach are shown in Table 1. The benefit amount for the areas outside the district but inside the drainage sheds (subareas B I & B2a) is identified in area of benefit nwnber 32. The benefit distributed to each AOS number for each reach is shown in Table 2. The benefit associated with the existing assessors parcel numbers (APN) and with property owners is summarized inTable 3 & 4 respectively. 12/26 /5 ';f;!~ Dublin Ranch- West Side Storm Drain Benefit District Table 1 Reach SubArea Area of Benefit I t., Unit Intensity C A30" 10.9 0.1509 1.64 A30" A1a 5 0.55 A30" A1b 5 0.52 A30" A1c 8 0.90 A30" A1d 5 0.90 A30" A1e 6 0.35 A30" A2a 5 0.55 A30" A2b 5 0.70 A30" A2c 7 0.90 A30" A2d 8 0.90 Reach Total A acres 11.12 2.97 0.53 0.93 4.22 15.14 11.62 0.59 0.09 47.21 Subarea, Q. cfs 10.06 2.54 0.78 1.38 2.43 13.69 13.37 0.87 0.13 45.26 OslOr, % 1& ~/C1 Benefit Cost $37,314.11 $8,.291.30 $2,093.70 $646.66 $1,134.70 $2,002.33 $11,288.70 $11,027.05 $719.86 $109.81 $37,314.11 $82,702.62 $9,229.14 $2,330.5? $719.80 $1,263.05 $2,228.82 $1. ?,.~?:5.? ~1.?!.~7~:.~ _ , $80.!.:..~ $122.23 ...-------- " , __~,307 J3~ . ..!.11 ,653.01 .J4,82~1 ..$5,147.~ _ $909.94 _~E!..~75.06 $4 753.40 $82,702.62 $121,733.96 - H____ .." ._____________..__ 9.5% .$1~,.~!?.Q:...~~ 2.4% . _~?,.9_1~:.1~ 0.7% $901.61 _____.__~.__. d. _"__..._._ . J.JJ~ .._. __ .__,H2~~.:.C!!! 2.3% , .~?~?J1 :!~ 4.4% ,~_5.!...~~.:?3. 12.6% ~~5-,-~.74.7_1 0.8% $1,993.68 0.1% $1?3.10 8.5% $10,406.37 12.0% $14,596.45 5.0% $6,039.12 5.3% $6,447.40 0.9% $1,139.78 5.7% $6,983.26 4.9% $5,954.06 8.4% $10,266.84 2.3% $2,772.89 2.1% $2,547.01 10.6% $12950.74 100% $121,733.96 22.2% 5.6% 1.7% 3.0% 5.4% 30.3% 29.6% 1.9% 0.3% 100% A42" 12.2 0.1214 1.48 A42" A1a 5 0.55 11.12 9.06 11.2% A42" A1b 5 0.52 2.97 2.29 2.8% A42" A1c 8 0.90 0.53 0.71 0.9% A42" Aid 5 0.90 0.93 1.24 1.5% A42" A1e 6 0.35 4.22 2.19 '2.7% A42" A2a 5 0.55 15.14 12.34 15.2% A42" A2b 5 0.70 11.62 12.05 14.8% A42" A2c 7 0.90 0.59 0.79 1.0% .. .. .. 0.1% A42" A2d 8 0.90 0.09 0.12 .. .. 10.0% A42" A3b 2 0.65 8.47 8.16 - A42" A3c 2 0.65 11.88 11.44 14.1% A42" A4a 7 0.45 7.10 4.73 5.8% _._-~--_. A42" Mb 8 0.45 7.58 5.05 6.2% I '. .-.. 1.1% A42" A4c 9 0.30 2.01 0.89 -.--.- ~.'" .. ... .. 6.7% A42" Md 10 0.45 8.21 5.47 '--.--. --. -- .. .-- -_.- -'--.-"-'- - A42" A4e 7 0.45 7.00 4.67 5.7% Reach Total 99.46 81.19 100% A48" 13.2 0.1554 2.05 -- .--.. ---. .-- ..-----.--.....--.----.... A48" A1a 5 0.55 11.12 ....... ..---. . A48" A1b 5 0.52 2.97 .----___........__.____._ . _..___._ ,._. ._.____.n.______" A48" A1c B 0.90 0.53 . .----.. .,----.-.-.....-. ---- ----.----...----- A4B" A1d 5 0.90 0.93 -- .----- ---.-----..-.-..---.---- ----.-.-.----.----.-.-- A48" A 1 e 6 0.35 4.22 ..--. '--'-"'.'-'" ..... ..... A48" A2a 5 0.55 5.14 - A48" A2b 5 0.70 11.62 .. ., A48" A2c 7 0.90 0.59 A48" A2d 8 0.90 0.09 A48" A3b 2 0.65 8.47 A48" A3c 2 0.65 11.88 A48" A4a 7 0,45 7.10 A48" Mb 8 0.45 7.58 A48" Me 9 0.30 2.01 A48" A4d 10 0.45 8.21 A48" Me 7 0.45 7.00 A48" A5a 3 0.80 6.79 A48" A5b 17 0.90 1.63 A48" A5c 17 0:55 2.45 A48" A5d 3 0.80 8.56 Reach Total 108.89 12.54 3.17 0.98 1.72 3.03 5.80 16.68 1.09 0.17 11.29 15.64 6.55 7.00 1.24 7.58 6.46 11.14 3.01 2.76 14.05 132.10 13/26 I I I I I Dublin Ranch~ West Side Storm Drain Benefit District Table 1 Reach SubArea Alea of Benefit I Subarea, Q. Q/Qr, % Benefit Cost t" Unit Intensity C A acres cfs A60"-1 14.7 0.1327 1.95 $78,805.68 A60"-1 A1a 5 0.55 11.12 11.93 6.7% $5,259.74 A60" -1 A1b 5 0.52 2.97 3.01 1.7% $1.328.18 A60"-1 A1c 8 0.90 0.53 0.93 0.5% $410.22 A60" -1 A1d 5 0.90 0.93 1.63 0.9% $719.82 A60" -1 A1e 6 0.35 4.22 2.88 1.6% $1,270.22 A60" -1 A2.a 5 0.55 15.14 16.24 9.1% $7.161.19 A60"-1 A2b 5 0.70 11.62 15.87 8.9% $6.995.21 A60" -1 A2c 7 0.90 0.59 1.04 0.6% $456.66 A60"-1 A2d 8 0.90 0.09 0.16 0.1% $69.66 A60"-1 A3b 2 0.65 8.47 10.74 6.0% $4,734.71 A60" -1 A3e 2 0.65 11.88 15.06 8.4% $6,641.12 A60"-1 A4a 7 0.45 7.10 6.23 3.5% $2,747.69 A60"-1 Mb 8 0,45 7.58 6,65 3.7% $2,933.45 A60"-1 A4e 9 0.30 2.01 1.18 0.7% $518.58 A60"-1 Md 10 0.45 8.21 7.21 4.0% $3,177.26 A60"-1 A4e 7 0.45 7.00 6.15 3.4% $2,70.8:99 A60"-1 A5a 3 0.80 6.79 10.60 5.9% $4,671.23 A60"-1 A5b 17 0.90 1.63 2.86 1.6% $1,2.~1.:~? ~6g"-:.1 A5c 17 0..55 2.45 2.63 1.5% .~ 1!_!.?8.:.l!?. A60"-1 A5d 3 0.80 8.56 13.37 7.5% $~fl~?~~? A6D"-1 A6a 3 0.80 5.19 8.10. 4.5% $;1.~?1.05 A60"-1 A6b 26 0.65 0.84 1.07 0.6% $469.56 ----.--.-- A60.-1 A6e 26 0.90 0.58 1.02 0.6% .. ._ $:4.i~ .ll..? A6D. -1 A6d 3 0.90 3.20 5.62 3.1% g_,476. 7~ -- .. A60" -1 A6e 3 0.80 8.00 12.49 7.0% .$.5!~Q~.98 .. A60" -1 A6f 26 0.90 1.50 2.63 1.5% _~1.16~.:.~ .. A60. -1 A7a 26 0..65 7.58 9.61 5,4% $j..__2}? .20 A60"-1 A7b 26 0..90. 0.80 1.40 0.8% _. $6~.~.20 - - -- ...~-_._-- A60"-1 A7e 26 0.90 0.26 0.46 0.3% $20.1.24 Reach Total 146.59 178.76 100% $78,805.68 A60".2 14.7 0.1327 1.95 $78,805.68 '. -- . .. .. . ~. .~ ~?..!Q?9.99 A60" -2 A1a 5 0.55 11.12 11.93 6.4% .-._.--.~. -. .. A60. -2 A1b 5 0.52 2.97 3.01 1.6% .~1,282.~~ - - A60.-2 A1c 8 0.90 0.53 0.93 0.5% $396.20 -- .. -- -...- A60"-2 A1d 5 0.90 0.93 1.63 0.9% $695.22 A60"-2 A1e 6 0.35 4.22 2.88 1.6% $jI~6.~9 A60.-2 A2a 5 0.55 15.14 16.24 8.8% $.6..91.6:~? A60. -2 A2b 5 0.70 11.62 15.87 8.6% $6,756. J_5 A60. -2 A2.e 7 0.90 0.59 1.04 0.6% $441:0..5 A60. -2 A2d 8 0.90 0.09 0.16 0.1% $67.28 A60. -2 A3b 2 0.65 8,47 10.74 5.8% $4,572.90 A60. -2 A3c 2 0.65 11.88 15.06 8.1% $6,414.15 A60.-2 A4a 7 0.45 7-10 6.23 3.4% $2,653.79 A60"-2 A4b 8 0.45 7.58 6.65 3.6% $2,833.20 A60" -2 Me 9 0.30 2.01 1.18 0.6% $500.86 A60"-2 A4d 10 0.45 8.21 7.21 3.9% $3,068.67 A60"-2 A4e 7 0.45 7.00 6.15 3.3% $2,616.41 A60" -2 A5a 3 0.80 6.79 10.60 5.7% $4,511.59 A60"-2 ASb 17 0.90 1.63 2.86 1.5% $1,218,50 A60. -2 A5c 17 0.55 2.45 2.63 1.4% $1.119.24 A60"-2 ASd 3 0.80 8.56 13.37 7.2% $5~~90.~8 A60. -2 ABa 3 0.80 5.19 8.10. 4.4% ~3,~~.O~ A60"-2 -- - "---~ ASb 26 0.65 0.84 1.07 0.6% $453.51 _ 1 4/,~p 17 o~074 Dublin Ranch- West Side Storm Drain Benefit District Table 1 I \ Reach SubArea Area of Benefit I Subarea, Q. O/Qr, % Benefit Cost t., Unit Intensity C A acres efs A60"-2 A6c 26 0.90 0.58 1.02 0.6% $433.58 A60"-2 A6d 3 0.90 3.20 5.62 3.0% $2,392.14 A60"-2 A6e 3 0.80 8.00 12.49 6.7% $5,315.88 A60"-2 A6f 26 0.90 1.50 2.63 1,4% $1,121.32 A60. -2 A7a 26 0.65 7.58 9.61 5.2% $4,092.40 A60"-2 A7b 26 0.90 0.80 1.40 0.8% $598.04 A60"-2 A7c 26 0.90 0.26 0,46 0.2% $194.36 A60" -2 A8a 27 0.65 3.41 4.32 2.3% $1,841.04 A60"-2 A8b 27 0.90 1.14 2.00 1.1% $852.20 Reach Total 151.40 185.09 100% $78,805.68 C96" 28.1 0.0529 1.49 $532,248.54 C96" A1a 5 0.55 11.12 9.09 2.5% $13,368.72 C96" A1b 5 0.52 2.97 2.30 0.6% $3,375.84 C96" A1e 8 0.90 0.53 0.71 0.2% $1,042.66 C96" A1d 5 0.90 0.93 1.24 0.3% $1,829.56 C96" A1e 6 0.35 4.22 2.20 0.6% $3,228:52 C96" A2a 5 0.55 15.14 12.38 3,4% $18,201.66 C96" A2b 5 0.70 11.62 12.09 3.3% $1!,~~~.!~ C96" A2e 7 0.90 0.59 0.79 0.2% $1,160..6.9 C96" A2d 8 0.90 0.09 0.12 0.0% $177.05 C96" - .. .--....--.-- A3b 2 0.65 8.47 8.18 2.3% ~g,034~.? ... C96" A3c 2 0.65 11.88 11.48 3.2% H~.!?...~19. 7~ C96" A4a 7 0.45 7.10 4.75 1.3% ~.6,98~~? .. C9S" A4b 8 0.45 7.58 5.07 1.4% E~~.?J_..~ C96" A4e 9 0.30 2.01 0.90 0.2% . _~.1.l~~8.0Z - . C96" A4d 10 0.45 8.21 5.49 1.5% ~~075.66 ".----.-. ". C96" A4e 7 0.45 7.00 4.68 1.3% .~~li?..? A? C96" A5a 3 0.80 6.79 8.07 2.2% ~1.!!~.72.89 C96" A5b 17 0.90 1.63 2.18 0.6% ~~~_C?6. 66 ."-_."..-, COO" A5e 17 0.55 2.45 2.00 0.6% .~~Jl!?:45 C96" A5d 3 0.80 8.56 10.19 2.8% ~.14.~.I~64 C96" A6a 3 0.80 5.19 6.17 1.7% $_~.!Q76~~ -- C9S" A6b 26 0.65 0.84 0.81 0.2% $1.!1.~~:1~ . . C96" . A6c 26 0.90 0.58 0.78 0.2% .~1_, ~~.~:.q.? C96" A6d 3 0.90 3.20 4.28 1.2% . __J~.!~9_!)~~ --"---- - - -- -. - COO" A6e 3 0.80 8.00 9.51 2.6% _ !1]ll_!i.~?Q ..-------. -- .. .. .. .- COO" ASf 26 0.90 1.50 2.01 0.6% _~?!.~?lh~_1 C96" A7a 26 0.65 7.58 7.32 2.0% ~_1.9! ~~9..x;? COO" A7b 26 0.90 0.80 1.07 0.3% $1,?.7.3.82 COO" A7e 26 0.90 0.26 0.35 0.1% ~511::~9 C96" A8a 27 0.65 3.41 3.29 0.9% $4,844.96 C96" A8b 27 0.90 1.14 1.53 0.4% $2,242.69 C96" 81 32 0.52 42.9 33.16 9.2% $48,762.17 COO" B2a 32 0.52 98.3 75.98 21.0% $111,732.42 C96" B2b 32 0.52 5.1 3.94 1.1% $5,796.90 C96" S3a 5 0.55 4.4 3.57 1.0% $5,253.71 C96" 83b 5 0.52 2.5 1.96 0.5% $2,887.08 C96" S3e 5 0.90 0.9 1.26 0.3% $1,849.24 C9S" B4 6 0.35 15.9 8.27 2.3% $12,156.66 C96" B5a 8 0.45 2.6 1.77 0.5% $2,596.17 C96" 8Sb 8 0.30 0.2 0.08 0.0% $120.88 C96" B5e 8 0.90 0.6 0.76 0.2% $1,116.08. COO" 85d 12 0.45 9.2 6.15 1.7% $9,049.46 COO" SSe 13 0.70 8.6 8.97 2.5% ~1}! 1~~:~.8 ...-.- -. ..-- - -- . C96" 85f 10 0.45 2.5 1.69 0.5% $2 488.60 ...1.5/26 ,IV- ~Ad~ Dublin Ranch- West Side Storm Drain Benefit District Table 1 i I 1 I I Reach SubArea Area of Benefit I Subarea, O. O,lOr. % Benefit Cost t., Unit Intensity C A acres cfs C96" B5g 10 0.30 0.2 0.08 0.0% $117.16 C96" BSh 10 0.90 0.6 0.75 0.2% $1,097.79 COO" B5i 14 0.30 5.6 2.49 0.7% $3,654.78 C96" B5j 15 0.45 12.2 8.14 2.2% $11!971.93 C96" BSa 10 0.90 1.5 2.06 0.6% $3,024.68 C96" B6b 7 0.45 0.4 0.24 0.1% $359.29 C96" B6e 10 0.45 0.6 0.38 0.1% $553.62 C96" B6d 10 0.45 0.8 0.51 0.1% $753.51 C96" B6e 11 0.45 1.3 0.89 0.2% $1,310.68 C96" B6f 11 0.90 1.2 1.55 0.4% $2,272.30 C96" B6g 11 0.30 0.1 0.03 0.0% $46.13 C96" 87a 15 0.70 2,0 2.05 0.6% $3,017.72 C96" B7b 15 0.45 0.7 0.50 0.1% $731.26 C96" B7c 15 0.45 0.5 0.33 0.1% $482.79 C96" B7d 16 0.45 1.8 1.20 0.3% $1,770.55 C96" B7e 16 0.90 1.2 1.56 0.4% $2,290.28 C96" B8a 17 0.55 5.4 4.41 1.2% $6,492.00 C96" B8b 17 0.90 1.8 2.36 0.7% $3,476.70 C96" B8c 18 0.35 2.4 1.22 0.3% $1,80.0:.17 C96" B8d 20 0.30 0.7 0.32 0.1% $471.75 C96" B8e 18 0.30 0.3 0.13 0.0% . ~1~:~~ C96" B8f 19 0.85 3.4 4.33 1.2% . $_6.!~?9.:.1_~ C9S" . ~~g 22 0.85 2.2 2.84 0.8% ~ ,.1.6~:~~ C96" B8h 21 0.85 0.5 0.59 0.2% $874.03 C96" B8i 23 0.30 0.1 0.04 0.0% $58.97 ._.._.._-~. C96" B9a 17 0.55 1.1 0.93 0.3% . .~.1.!~_~_5.6~ .. . C96" 8gb 26 0.90 1.4 1.83 0.5% .~~~~?.92 C9S" Bge 20 0.30 1.3 0.59 0.2% !~?~.;~2 C96" B9d 20 0.85 0.3 0.34 0.1% ~.~Q.3JJ C9S" Bge 21 0.85 3.2 4.09 1.1% h$_6!.0_1.~:.6? h. C96" B9f 23 0.85 2.3 2.93 0.8% $4 ,31.o:~? COO" ~~g 24 0.30 9..2 0.09 0.0% l1.2~:.1.~ C96~- 89h 24 0.55 11.6 9.51 2.6% $1.3~_~.02 C96" B9i 27 0.85 0.6 0.79 0.2% $1 ,'L5_?.:~O C96" . ... .!~9j h 28 0.85 0.4 0.49 0.1% EJ.'!:.~~ . h C96" B9k 24 0.90 2.3 3.08 0.9% .~!.~2.~.~?~ C96" B9/ 25 0.30 2.1 0.92 0.3% $1,359.68 eg6" 89m 29 0.70 1.5 1.56 0.4% '$:?J~]~ " COO" 810a 28 0.85 3.5 4.36 1.2% $6,413.61 COO" B10b 28 0.90 2.1 2.84 0.8% '$4'.'169:62 Reach Total 426.32 361.96 100% $532,248.54 030" 12.2 0.1131 1.38 $36,404.32 030" 01 4 0.80 22.21 24.52 100.0% $36 404.32 Reach Total 22.21 24.52 100% $36,404.32 042" 12.2 0.1214 1.48 $53,462.92 042" 01 4 0.80 20.36 24.13 49.6% $26,523.03 042" 02 30 0.80 11.69 13.85 28.5% $15,228.59 042" 03 31 0.80 8.99 10.65 21.9% $11 711.30 Reach Total 41.04 48.64 100% $53,462.92 16/26 /~ ~07q ..:.1510'2 Dublin Ranch - West Side Stann Drain Benefit District Table 2 0< 0 ~ 2~ ( 'I, -.... ''\) . Benefit CharQes Reach Benefit Property A30" A42" A48" AGO" -1 A60"-2 C96" 030" 042" Benefit (AOS Darcel number} Total 1';2." '.' $0.00 $19,960.90 $25,002.82 $11,375.83 $10,987.06 $28,914.03 $0.00 $0.00 $96,240.64 3 $0.00 $0.00 $23,217.58 $22,115.40 $21,359.60 $56,210.88 $0.00 $0.00 $122,903.46 4 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $36,404.32 $26,523.03 $62,9?7.34 5 $33.835.45 $37,662.63 $36,779.84 $21,464.15 $20,730.59 $64,545.61 $0.00 $0.00 $215,018.26 6 $2,002.33 $2,228.82 $2,791.79 $1,270.22 $1,226.80 $15,385.18 $0.00 $0.00 $24,905.14 7 $719.86 $10,375.99 $12,996.86 $5,913.34 $5,711.25 $15,389.27 $0.00 $0.00 $51,106.57 8 $756.47 $5,989.28 $7,502.12 $3,413.33 $3,296.67 $12,508.82 $0.00 $0.00 $33,466.69 9 $0.00 $909.94 $1,139.78 $518.58 $500.86 $1,318.07 $0.00 $0.00 $4,387.22 10 $0.00 $5,575.06 $6,983.26 $3,177.26' $3.068.67 $16,111.01 $0.00 $0.00 $34,915.26 11 $0.00 $0.00 $0.00 $0.00 $0.00 $3,629.11 $0.00 $0.00 $3,629.11 12 $0.00 $0.00 $0.00 $0.00 $0.00 $9,049.45 $0.00 $0.00 $9,049.46 13 $0.00 $0.00 $0.00 $0.00 $0.00 $13,189.48 $0.00 $0.00 $13,189.48 14 $0.00 $0.00 $0.00 $0.00 $0.00 $3,654.78 $0.00 $0.00 $3,654.78 15 $0.00 $0.00 $0.00 $0.00 $0.00 $16,203.70 $0.00 $0.00 $16,203.70 16 $0.00 $0.00 $0.00 $0.00 $0.00 $4,060.82 $0.00 $0.00 $4,060.82 17 $0.00 $0.00 $5,319.91 $2,420.46 $2,337.74 $17,486.43 $0.00 $0.00 $27,564.54 18 $0.00 $0.00 $0.00 $0.00 $0.00 $1,995.06 $0.00 $0.00 $1,995,06 19 $0.00 $0.00 $0.00 $0.00 $0.00 $6,370.15 $0.00 $0.00 $6,370.15 20 $0.00 $0.00 $0.00 $0.00 $0.00 $1,843.94 $0.00 $0.00 $1,843.94 21 $0.00 $0.00 $0.00 $0.00 $0.00 $6,887.68 $0.00 $0.00 $6,887.68 22 $0.00 $0.00 $0.00 $0.00 $0.00 $4,168.88 $0.00 $0.00 $4,168.88 23 $0.00 $0.00 $0.00 $0.00 $0.00 $4,369.32 $0.00 $0.00 $4,369.32 24 $0.00 $0.00 $0.00 $0.00 $0.00 $16,636.68 $0.00 $0.00 $18,636.88 25 $0.00 $0.00 $0.00 $0.00 $0.00 $1,359.68 $0.00 $0.00 $1,359.68 26 $0.00 $0.00 $0.00 $7,137.11 $6,893.20 $20.836.37 $0.00 $0.00 $34,866.69 27 $0.00 $0.00 $0.00 $0.00 $2,693.24 $8,244.95 $0.00 $0.00 $10,938.19 28 $0.00 $0.00 $0.00 $0.00 $0.00 $11.297.91 $0.00 $0.00 $11,297.91 29 $0.00 $0.00 $0.00 $0.00 $0.00 $2,289.59 $0.00 $0.00 $2,289.59 30 $0.00 $0.00 . $0.00 $0.00 $0.00 $0.00 $0.00 $15,226.59 $15,228.59 31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $11,711.30 $11,711.30 32 $0.00 $0.00 $0.00 $0.00 $0.00 $166,291.49 $0.00 $0.00 $166,291.49 Reach T otaf $37,314.11 $82,702.62 $121,733.96 $76,605.68 $78,805.68 $532,24854 $36,40432 $53,462.92 $1,021,4n.81 ",(...0&.:-'-" 17/26 ;II ~:7'1 Dublin Ranch - West Side Storm Drain Benefiting Properties Table 3 . * Assessor's Parcel No. 985-0009-001. & 985-0009-002 985-0009-002 ~ $62,927.34 $219,144.11 985-0009-004-002 $198,568.23 985-0009-004-003 $132,588.49 $26,939.89 985-0009-005-002 985-0014-005 or 985-0014-009 or 985-0009-004-002 $215,018.26 Areas 81 & 82 $166,291.49 Total Benefit $1,021,477.81 Table 4 Owner Un. et.at. ~ $739,406.37 Dublin Land Company $282,071.45 Total Benefit $1,021,477.81 * APN are per August 2001 assessor's roll. 18/26 Dublin Ranch - West Side Storm Drain Benefit District ;.\EXhibit A Assessor's Roll * Assessors Parcel No. 985-0009-002 985-0009-002 985-0009-001 & . 985-0009-002 985-0014-005 or 985-0014-009 or 985-0009-004-002 985-0009-004-002 985-0009-004-002 985-0009-004-002 985:0009-004-002 985-0009-004-002 985-0009-004-002 985-0009-004-002 985-0009-004-002 985-0009-004-002 985-0009-004-002 985-0009-004-002 985-0009-004-003 985-0009-004-003 985-0009-004-003 985-0009-004-003 985-0009-004-003 985-0009-004-003 .985-0009-004-003 985-0009-004-003 985-0009-004-003 985-0009-004-003 985-0009-004-003 985-0009-004-003 985-0009-004-003 985-0009-005-002 985-0009-005-002 Area of Benefit No. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Grand Total Benefit Numbers are keyed to the Exhibit F, Area of Benefit. * APN are per August 2001 assessor's roll. 19/26 Benefit Amount $96,240.64 $122,903.46 $62,927.34 $215,018.26 $24,905.14 $51,106.57 $33,466.69 $4,387.22 $34,915.26 $3,629.11 $9,049.46 $13,189.48 $3,654.78 $16,203.70 $4,060.82 $27,564.54 $1,995.06 $6,370.15 $1,843.94 $6,887.68 $4,168.88 $4,369.32 $18,636.88 $1,359.68 $34,866.69 $10,938.19 $11,297.91 $2,289.59 $15,228.59 $11,711.30' $166,291.49 $1,021,4n.81 cPd 5f o? C) I u. ,.~~ , 1 1 l \Hl;')-OOOfJ-002 DUBLIN LAND CO. ~ ~ .0 .- ,.!: >< W .I' /" ,/ I .i..':''' 0) 8 w Z :) . o . J l ;7 j~o?'1 i!,._.~'\1 .~ ~ 1 1 I I' ;\ -' ; .;r ., ~ 1 \ I o r':. "... r '* i, "='--~' Ii Ii r<:: 30' .; .. i CD -TT- o ~0 9B5-0~04-002 / -';':'.. ,1ENNIFE1~ ~J~ I @ '/ ,@_.- \ o a:> l/'l I "' 91\;)-000\)- (.10;:) -llO:~ JENNTFEH U\" => i o II> 2: i; o i; 1.___.. I \-, I\~L\ SHW10f'2 PROJECT NO. Dublin Ranch, Wesl Side Storm Drain Benefit District "'~'F'---- ..---.......-"'....."'THc.("',,==-~ II.' (XItI. "57. ~, c. ')!> 20/26 DEVANEY DRIVE @ \ \ @ L @ .----...... .. j~ -;~ v/\\ IDAcKAY & somps =. JMl\~ ~o INFRASll\UC'T\JRe OROUI" DII.IlIIl rr. SSG ~~~;~P\NNC ~~ -~----~"~c_-....Bfl.. ..~ Io'':..c'': ~ :3CtD '\CG I u.. \J~ ~;e ~~ c 1- ~.:. <'~,~ , I I , J l ;t: J l ~--"lr"'il 1$ t I 1 ,. , I .. il /- ./ I w Z ::; @ I I I -L . Cl . o lO Il"l I . . o CD , t :1 \ I \)t\~)-OOOH-002 DUBLIN LAND CO. @ .'r ~n5-0009-005-uO~ JENN!FEH UN :> o i ; i; SHEET 1 Of 2 PROJECT NO. "67. ~~ lD ,. :z , i I ~ i ~ , I i ; i i I , I L.. @ .. ._" _ __m_ 'N - I \-, I\~-L\ L- ll!lID:Ul t I t~1 I GIllJ"HIC BCALL 1M 300 1100 I ( 'PI rar) IC.u.li 1....00. o _ BENEFIT llDUNllAR't DRAINAGE SHEDS o BENEFIT AREA NVUBER 1\ j:' 985-0014- 00:', JENN1FEI~ U?\ 96" --- -------- ........ w "C" LINE - - - - o Vi ~ ,lS -z -TT- CD 9B5-~04-0~ .JENNIFEl~ ~J~ '@"'d ~ .ojj; fi I: ~ tl ~ 1""';r;t'~ ,!.'~ ~~.ii11la. 30. o CD --- -.:.:..:.-- DEVANEY @ CD Dublin Ranch, Wesl Side Storm Drain Benefit District "'~'F' _h_ r~ --J V/'\ \ \ DlAcKAY 1:50mpS :, ~Ef1".~R~ QR~ Ilft.\Mc II'; SSG ...=,l!~i-S!~_.. --.!~=~~_ _.'.'- .t'f:3riNf1\.~~-_._--BE.L-- ----""=-......"'1\4 c. r~===-- .. tv.. \ ~ ~ . .. ~ 6 ~ .. 7~ ~~. !.i ,.. "..... of'; c.o . ~ I N "'~ -r---- B 1 AND B2a . 141 Ac. (Hl:',-OOl.j-(l()\j ,JE~;'-;\FEH Ll\- '{, i I 1 ~ \ I~ j/ Tf: I~ if ~. al (;\) a:l o?~~ \ i!J~. :~rJ Ii ,/ ~<fZJPE1E "'a: Q Q Q ~ 7- S&JWCWQ:1tQ :t: :z: ;:z: ,::)::> t.t:I tI1 ~ [J) In kl~CoJw~ 00001;3 fl j ~ ~ j j I. w I~~~~~~ ,~ : rn \. ~ t ~i: i~ I I -r-- ~ ,/' / / / c ~ ( I / i - ~ ~ / ~&i"f "I ~8fi1,1 ~~2'1 Q ~;; 11 ClaW."', .~l :f ~M " i01i!~ E~n !~ _31 I! '( II I a :J! I .1 i:f .. "'~ ~ ~! j i' I-- I if E ,/"" I I I I I I I ~ON I _~_ I I - ,-~---- I - - ~~--- -----==----=====-=~~ ~~==-~~- ~ ------=---.::::==-~- -------..:::::. --=-- m26 ---=::::= , .i ~ sJ .~ I .b i Ql <II o...i "0._ <::J i;i 0 ;:a' ........ J ",._~ OJ 'Qj ~I ;: s::: ' - 4J ::Cj "5 IrJ en! ; a ~ I ~.- 0 s::: ~ <1 :::02::1 .!) -', ;::! C -....., o cO::: 1 00 ..... en "'E. "'. .~ ; -=::===5 '01"4'. zn '" c.?b <;f ;?q Attachment 2 (Page 1 of 1) Dublin Ranch West Side Storm Drain Benefit District Summary of Costs - (Actual Costs) Update of costs shown in Exhibit C of the Engineer's Report based on actual costs February 7, 2008 CONSTRUCTED BY LINE ITEM QUANTITY UNIT UNIT PRICE CONST. COST MlSC COST SOFT COST TOTAl COST lINS TOLL LOWE'S 4% 21.50% A 60" RCP 921 LF $ 124.00 $ 114,204 $ 4,568 $ 25,536 $ 144,308 $ 144,308 Large Inlets 2 EA $ 2,900.00 $ 5,800 $ 232 $ 1,297 $ 7,329 $ 7,329 Large Manhole 2 EA $ 8,925.00 $ 17,850 $ 714 . $ 3,991 $ .22,555 $ 22,555 Subtotal AGO $ 174,192 $ 174,192 $ $ 48" RCP 672 LF $ 105.00 $ 70,560 $ 2,822 $ 15,777 $ 89,159 $ 89,159 inlet 1 EA $ 1,900.00 $ 1,900 $ 76 $ 425 $ 2,401 $ 2,401 manhole 1 EA $ 1,800.00 $ 1,800 $ 72 $ 402 $ 2,274 $ 2,274 48" RCP 166 LF $ 93.50 $ 15,521 $ 621 $ 3,471 $ 19,613 $ 19,613 Large Inlets 1 EA $ 2,900.00 $ 2,900 $ 116 $ 648 $ 3,664 $ 3,664 Large Manhole 1 EA $ 8,925.00 $ 8,925 $ 357 $ 1,996 $ 11,278 $ 11,278 Subtotal A48 $ 128,389 $ 34,555 $ 93,834 $ 42" RCP 658 LF $ 87.35 $ 57,476 $ 2,299 $ 12,852 $ 72,627 $ 72,627 Stand. Inlets 2 EA $ 1,900.00 $ 3,800 $ 152 $ 850 $ 4,802. $ 4,802 42" RCP 110 LF $ 82.00 $ 9,020 $ 361 $ 2,017 $ 11 ,398 $ 11,398 Stand. Inlets 1 EA $ 8,925.00 $ 8,925 $ 357 $ 1,996 $ 11,278 $ 11,278 Subtotal A42 $ 100,105 $ 22,676 $ 77,429 $ Total Line A $ 402,686 $ 231,423 $171,263 $ C 96" RCP 48 LF $ 346.50 $ 16,632 $ 665 $ 3,719 $ 21,016 $ 21,016 96" RCP 1,089 LF $ 433.50 $ 472,082 $ 18,883 $ 105,557 $ 596,522 $ 596,522 large Manhole 2 EA $ 8,680.00 $ 17,360 $ 694 $ 3,882 $ 21,936 $ 21,936 Outfall Structure 80% EA $ 92,000.00 $ 73,600 $ 2,944 $ 16,457 $ 93,001 $ 93,001 Total line e96 $ 732,475 $ 732,475 $ $ 0 42" RCP 168 LF $ 114.00 $ 19,152 $ 766 $ 4,282 $ 24,200 $ 24,200 42" RCP 332 LF $ 120.00 . $ 39,840 $ 1,594 $ 8,908 $ 50,342 $ 50,342 . Stand. I nlets 1 EA $ 2,300.00 . $ 2,300 $ 92 $ 514 $ 2,906 $ 2,906 . Subtotal 042 $ 77,448 $ 24,200 $ $ 53,248 30" RCP 439 LF $ 72.00 . $ 31,608 $ 1,264 $ 7,067 $ 39,939 $ 39,939 . Stand. Inlets 1 EA $ 2,300.00 . $ 2,300 $ 92 $ 514 $ 2,906 $ 2.906 . Subtotal D30 $ 42,845 $ $ $ 42,845 . Total line D $ 120,293 $ 24,200 $ $ 96,093 . TOTAL $ 1,255,454 $ 988,098 $171,263 $ 96,093 . 23/26 ATTACHMENT 2 +n Onl i v'\lLl-1 rp..,. Attachment 3 (Page 1 of 2) Dublin Ranch West Side Storm Drain Benefit District CALCULATION OF REVISED BENEFIT CHARG~S & DISTRIBUTION TO FINANCING PARTIES Based on the Summary of Costs (Attachment 2) and the Methodology described In the Engineer's Report, dated January 2, 2002 February 7, 2008 ~ttuared!;IijnrnjRoveffi~~ur tiy:~a:t~~t '~J cl!ftlJtpVE!~eHjs ~ijtisltt!~f~l~J~yJ.:~~_~~; '~:~~ - ~ - - , -- ~~ . " T 1_,-, ..~~; ,]->< , " : 04 ~~ :'.:.1 . . _:.J .> .~. '" - - -~-, - -,..... ~. ~~-~ ~~~ _ _.1-__ ~... ~~ ._~ ~ Parcel 2 (1) Parcel 3 Parcel 4 Slorm Drain Line Cosl(2) Drainage Subareas and Benefits (3) Drainage Subareas and Benefils (3) Drainage Subareas and Benefils (3) A3b A3c Sublolal % Subia tal $ A5a A5d A6a A62 A6e Sublotal % Subtotal $ 01 Subia tal % Sublotal $ A42" $ 22,676.00 10.0% 14.10/. 24.1% $ 5,464.92 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% $ 0.0% 0.0% $ A48" S 34,555.00 8.5% 12.0% 20.5% $ 7,083.78 8.4% 10.6% 0.0% 0.0% 0.0% 19.0% $ 6,565.45 0.0% 0.0% $ A60".1 S 80,031.00 6.0% 8.4% t4.4% $ 11,524.46 5.9% 7.5% 4.5% 3.1% 7.0% 28.0% $ 22,408.68 0.0% 0.0% $ . ASO".2 $ 94,161.00 5.8% 8.1% 13.9% $ 13,088.38 5.7% 7.2% 4.4% 3.0% 6.7% 27.0% $ 25,423.47 0.0% 0.0% $ C96" $ 732,475.00 2.3% 3.2% 5.5% $ 40,286.13 2.2% 2.8% 1.7% 1.2% 2..6% 10.5% $ 76,909.88 0.0% 0.0% $ D42' $ 24,200.00 0.0% 0.0% 0.0% $ . 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% $ 49.6% 49.6% $ 12,003.20 Subtolal $ 988,098.00 $ 77.447.67 $ 131.307.48 $ 12,003.20 Total Parcels 2, 3 & 4 $ 220,758.35 ~Ar:tU~1 ttJst ~t IIflJjr~Veifletits.by J:Sateel f~(lrrlpfd\iEimet1Is'tol1,!;lt4tjl(d b\.ff6U ~f6lhet!; ,- . " " - -,' .. , . . - .' . Parcel 2 Parcel 3 Parcel 4 Cost(2) Storm Drain LIne Drainage Subareas and Beneflls (3) Drainage Subareas and Benefils (3) Drainage Subareas and Benelils {3} A3b A3c Sublotal % Subtotal $ A5a A5d A6a A62 A6e Sublotal % Subtotal $ 01 Subtotal % Sublotel $ A42" $ 77,429.00 10.0% 14.1% 24.1% $ 18,660.39 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% $ . 0.0% 0.0% $ M8" $ 93,834.00 8.5% 12.0% 20.5% $ 19,235.97 8.4% 10,6% 0.0% 0.0% 0.0% 19.0% $ t7.828.46 0.0% 0.0% $ . Sublolal $ 171,263.00 $ 37,896.36 $ 17,828.46 $ . I';) .&:::0 "- I';) en Total Parcels 2, 3 & 4 $ 55,724.82 AtlOid Cds. 6f ImprdVettU!hbf by J:fatc~I fof ItttptliVeh1eHls :ttH1sttUtted bY laWes' , . . - .. -. -, - - ^' Parcel 2 Parcel 3 Parcel 4 Cost(2) Storm Drain Line Drainage Subareas and Benefits (3) Drainage Subareas and Benelits (3) Drainage Subareas and Benefits (3) A3b A3c Subtotal % Subtotal $ A5a A5d A6a A62 A6a Subia tal % Subtolal $ 01 Subtotal % Sublotal $ 042' $ 53,248.00 0.0% 0.0% 0.0% $ 0.0% 0.0% 0.0% 0.0% 0.001. 0.0% $ . 49.6% 49.6% $ 26,411.01 030" $ 42,845.00 0.0% 0.0% 0.0% $ . 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% $ 100.0% 100.0% $ 42,845.00 Sublolal $ 96.093.00 $ $ . $ 69,256.01 Total Parcels 2, 3 & 4 $ 69,256.01 . . ~ :1= ~ ;S-(l) :\~ (2) o :>. (3) ~ ~(4) Tolal Total Parcels 2, 3 & 4 - Area of Benefit Parcels are Described and De icted on Exhibit E and Exhibit F in the En ineer's Re art. - Costs are from Sununar of Costs Attachment 2 - Pa e 2) _ Drainage sub-areas and percentage benefit for the storm drain line reach is based on the methodology set forth in the Engineer's Report and as shown in Table I in the En ineers Re art _ In accordance with Government Code section 66486, subdividers that construct,storm drain ,improvements are entitled to be reimbursed for the costs of those improvements plus "an amount attributable to interest." The "total costs" in the table do not include interest. See page 2 for the adjusted cost including interest based on when the improvements were completed. Interest has been calculated in the same manner that Section 6 of the Ordinance calculates interest on the Benefit Charges. ~ ~ ~ Attachment 3 (Page 2 of 2) Dublin Ranch V' t, Side Storm Drain Benefit District CALCULATION OF REVISED BENEFIT CHARGES (X DISTRIBUTION TO FINANCING PARTIES Based on the Summary of Costs (Attachment 2) and the Methodology described in the Engineer's Report, daled January 2, 2002 February 7, 2008 ~;~i,~~et~'Sh~t;'~t-~enl:!t1i-~~~t~es bV~~;c~it~t-rfup.t~Y~t!ht'S Cc;hsltUhted by ljH~ .--. .... ... - .', . ,. . . -to+AI:.~clils llN tONst!:lUctION'; ;.M ,-<, . ~ ~.. ~ - . ~ . __~.. ,~'" . ""~ ~ ,,~., _ " _ _ l~_., . , .:> _ .)~.~ _ n _ _ _ . pe"et,~lJers Sh~t~ ~t ~el1efit CI1~'t!1es' by Patt:~l tt);'I~;bV~tt1e~t; COt1sttuctetfby-t~li ~it1~h~ts ~.. .. ~ . ftjtAi.f.:~t1:ls ~~l~s~~~b~r:~' ~, "" - - -~ ~ ~ - -.. , -" - ~- . - >- - " - f"f'~~-~;~"--~ -.- ----r'~'" ^r",r:,~',,,,;r\ --.,..-., ,,--~ -~~_O~"""""'::1(-:::~'''!7--- ---<-__~ ~ ~ ~_.......,~~~ -r-~_~.__ ____.. ___"""::"--.~._._"~_ ____. ;' __ ._. ___ __, _, pe~.~!~p~~~ ~h~.t~.~!.~e,.~e!,I~ ~f1a!~es by ~atc:1 i~~t~~[tHl~h1eht~. Cbl1sltUcl~d by l6W~~: :~. . ". . _ " . > ".: tbt~i.:':~b~LS ttjN;~:J;TloN 1 Parcel 2 Parcel 3 TOTAL COSTS AOJustment Adjustment Percentage Subtotal $ Percentage Subtotal $ COSTS $ 220,758.35 $ 77,447.67 $ 131,307.48 Interest Adjustment July 1, 2004 1.61% $ 78,694.58 1.61% $ 133,421.53 Interest Adjustment July 1, 2005 1.87% $ 80,166.17 1.87% $ 135,916.51 Interest Adjustment July 1, 2006 3.42% l:li 82,907,85 3.42% $ 140,564.85 Interest Adjustment Julv 1, 2007 4,94% $ 87,003.50 4.94% $ 147,508.75 DEVELOPERS SHARE OF $ 87,003.50 $ 147,508.75 BENEFIT CHARGE Parcel 4 AOjUSlment Percentage Subtotal $ $ 12,003.20 1.61% $ 12,196.45 1.87% $ 12,424.52 3.42% $ 12,849.44 4.94% $ 13,484.20 $ 13,484.20 Parcel 2 Parcel 3 Parcel 4 TOTAL COSTS AdjUstment AdjUstment AdjUstmem Percentage Subtotal $ Percentage Sublotal $ Percentage Subtotal $ Al;IUAL $ 55,724.82 $ 37,896.36 $ 17,828.46 $ <rQsTS . ItR.I.erest Adlustment July 1, 2004 1.61% :jj 38,506.49 1.61% $ 18,115,50 1.61% $ . l!\Orest Adjustment July 1, 2005 1.87% $ 39,226.56 1.87% $ 18,454.26 1.87% $ . Iftn!rest Adjustment July 1, 2006 3.42% $ 40,568.11 3.42% $ 19,085.40 3.42% $ . Interest Adjustment July 1, 2007 4.94% $ 42,572.17 4.94% $ 20,028.22 4.94% $ . DEVELOPERS SHARE OF $ $ BENEFIT CHARGE 42,572.17 20,028.22 $ . arce 2 Parcel 3 Parcel 4 TOTAL COSTS AdJuslment Adjustment AOjUStmem Percentage Subtotal $ Percentage Subtotal $ Percentage Subtotal $ COSTS $ 69,256.01 $ - $ - Complete Jan. $ 69,256.01 2008 Interest Adjustment Julv 1, 2004 1.61% $ . 1.61% $ - 1.61% Interest Adjustment July 1, 2005 f.87% $ " 1.87% $ - 1.87% ) Interest Adjustment July 1, 2006 3.42% $ . 3.42% $ . 3.42% . Interest Adiustment July 1, 2007 4.94% $ . 4.94% $ - 4.94% . DEVELOPERS SHARE OF Complete Jan. BENEFIT CHARGE $ - $ . 2008 $ 69,256.01 P $ 220,758.35 ACTUAL COSTS $ 224,312.56 $ 228,507.20 $ 236,322.14 $ 247,996.45 Share Of $ 247,996.45 Benefit Charge $ 55,724.82 ACTUAL COSTS 56,621.99 $ 57,680.82 $ 59,653.51 $ 62,600.39 Share Of $ 62,600.39 Benefit Charge $ 69,256.01 ACTUAL COSTS $ - $ . $ - $ . Share Of $ 69,256.01 18.2% Benefit Charge I -~ -~_. . or- ---~c.-..,.-,.. '-- . ,'. . "'..- -'-", . .--., ., . ._-.. .-.--., ", .. ....f- ii'" r ' - ,- ~UMMA"V ii TdtA~ tn~"II:F1t tHAr:tGES ALL t=INANCINti ~ARtIES (Patce's 2j~I&4). . ' tjt~ 3 :~CE s 1 1:.' . ,~~~ A> <" A. _'A .C_"-' ->- ~._ Aj ;__"~. 0_'_" '- ',-<= ___." f '< ~~ "~_ _ ~ , ._. ." . I _ _ .<A TOTAL $ TOTAL $ TOTAL $ I Benefit Charges (Actual Cost Adjusted Interest To 6130/08) $ 129,575.67 $ 167,536.97 $ 82,740.21 - $ $ 379,852.85 J; ~ ~, "",) .S\ J q ~2q Attachment 4 Map of Area of Benefit Parcels 2, 3, and 4 DUBLIN RANCH WEST SIDE STORM DRAIN BENEFIT DISTRICT Dublin Ranch West Side Storm Drain Benefit District Parcels - Subject to Fee (# As Indentified in Engineer Report Dated 2/2/2002 Adopted City Ordinance #12-02) / ..../ --- A .' '- .. "....... ....... .' \.......... ___'_00 L_ Included in _.=~~:.:_----~~ Engineer Report #4 ~.,=.~' ~ ,- .. ,,<. . ",., .. I-~~:-~~~fi /,:<':'j Ii /y r. . If lIT ~------r</ . Ii ,;,'.~\\.':~.:,.,."........., I I c~~ .. "'':::'' ""'_ ! I! ""~==::~'~._..._.._~~~~~::=~;:~::;;;~;~._ __=-__===-.'.mJ .. ----. ~---- ;----..-- ---_._.__.~--~-==.=::::::-----...__.._._..... Parcel # 985-0051-003-00 (as of 4/17/2007) \~ 1:..., '1- I \;'A .") __J"--. ..... . ..' h.\~1 I.;..' t-' \.I,! ." ---.t------,.J ....' I .. I 'I .. ... .,..--....-J.. ., ':.. 'r-.---.--.---4 Jj ; I -~l~ 9B5-::;;~O~'-00 n ), (as of 4/17/2007) ( . -...) 1 inch equals 500 feDt &3 ~ o 250 500 I 1,000 I 1,500 I Feet 2,000 P.ReIbo.1nu..... _ '.......lllli~."'dtg: FI..,,:w.OJ:\trflot._,",,_ 26/26 ATTACHMENT 4 -11) On:\ \ V\(.t.-Vu::.e,