Loading...
HomeMy WebLinkAboutItem 4.07 Annual Slurry Seal~~ 1 / ~- /w CITY CLERK File # 0~0~-~~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 16, 2008 SUBJECT: Award of Bid -Contract No. 08-13, 2008 Annual Slurry Seal Program Report Prepared by: Melissa Morton, Public Works Director ATTACHMENTS: 1) Budget Change Form 2) Resolution of Award 3) Bid Results 4) Maps of Streets to be Slurry Sealed RECOMMENDATION: 1) Approve a budget change in the amount of $92,742; and 2) Adopt the resolution awarding Contract No. 08-13, 2008 Annual Slurry Seal Program, to Graham Contractors, Inc. FINANCIAL STATEMENT: The following is the available budget in Fiscal Year 2008-2009 for this capital project: Project Components: Adopted Estimated Actual, Additional Budget for Low Bid And Funds Funded by Gas Tax: FY 2008-2009 Continency Required Contract Mgt. /Inspections/ Misc. $ 64,510.00 $ 64,510.00 Improvements (Slurry Seal; Striping) $560,000.00 $543,040.49 Construction Contingency Included $ 54,304.05 Total Gas Tax: $624,510.00 $661,854.54 $37,345.00 Funded by Measure B Bike Program: Contract Design Services/Staff Time $0.00 $ 16,950.00 Bike Lane Striping and Signing per $0.00 $ 38,447.00 Citywide Bikeways Master Plan Total Measure B Bike Funds: $0.00 $ 55,397.00 $55,397.00 Total Additional Funds Required: $92,742.00 Additional Funds will come from Gas Tax monies (Fund 206) for street resurfacing improvements and Measure B Bike Funds (Fund 227) for bike lane striping and signing. COPY TO: Graham Contractors G:\CIP\SLURRY SEAL\2008\AS award.doc Page 1 of 2 ITEM NO. / DESCRIPTION: On June 26, 2008, the City Council approved the Five-Year Capital Improvement Program (CIP) for Fiscal Years 2008-2013. The CIP included funding by Gas Tax monies for CIP No. 96585, Annual Slurry Seal Program, in the amount of $624,510. Slurry seal is a preventative maintenance technique used to prolong the life of asphalt concrete surfacing. As streets begin showing wear and stress cracking, it is important to seal the cracks to keep water from getting into the roadway subgrade. Slurry consists of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. The following streets are scheduled to be slurry sealed as part of the 2008 Program: Street Dublin Boulevard San Ramon Road Tassajara Road Bloomington Way Fenwick Way Marwick Drive Marwick Court Bloomington Court Fenwick Court Fenwick Place Waterford Court Royston Court Putnum Court Project Limits Dougherty Road to Hacienda Drive Silvergate Drive to Dublin Boulevard I-580 to North Dublin Ranch Drive Marwick Drive to Augusta Court Bloomington Way (south) to Bloomington Way (north) Fenwick Way to end Marwick Drive to end Bloomington Way to end Fenwick Way to end Fenwick Way to end Bloomington Way to end Bloomington Way to end Bloomington Way to end The total slurry seal area in the 2008 Program is approximately 1.6 million square feet. Pavement failure repairs and crack sealing improvements required prior to slurry seal resurfacing are included in this project. Three major streets (Dublin Boulevard, San Ramon Road and Tassajara Road) are scheduled to be slurry sealed. As a cost savings opportunity, it is proposed to complete new bike lane pavement striping and marking as part of the slurry seal improvements. The Citywide Bikeways Master Plan includes a recommendation to incorporate proposed bikeways on these roadways in projects involving pavement overlay and slurry seal. To implement this recommendation, additional funds are required to design the plans and include the bike lane striping as a change order to this contract. The cost is estimated at $55,397.00 and Measure B Bike Program funds will be used to supplement the project budget. Adequate Measure B funds are available to fund this extra work. Four bids were received (Attachment 3), with the low bid of $543,040.49 being submitted by Graham Contractors, Inc. Staff has reviewed the bids and determined that the low bid contractor has satisfactorily performed similar projects. The low bid plus 10% contingency is more than the amount budgeted for slurry seal improvements due to higher materials costs from high oil prices. Therefore, a budget change in the amount of $37,345 is necessary to fund the improvements, including the contingency, and to expend $55,397 from Measure B funds for the Slurry Seal Program. Staff recommends that the City Council 1) approve a budget change in the amount of $92,742.00; and 2) adopt the resolution awarding Contract No. 08-13, 2008 Annual Slurry Seal Program, to Graham Contractors, Inc. Page 2 of 2 BUDGET CHANGE FORM New Appropriations (City Council Approval Required}: xxx From Un-appropriated Reserves From New Revenues DF,CREASF BImGFT A~(~~I1NT aNInI1NT Budget Transfers: CHANGE FORM # Ia~jS From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other TNC'RFAGF RTiTI(,FT d('f'(1TiNT AMl1f1NT Name: Name: GAS TAX FUND/ 37,345 ANNUAL SLURRY SEAL CIP/ IMPROVEMENTS Account #: Account #: 206.96585.750.050 Name: Name: MEASURE BBIKE /PED FUND / 38,447 ANNUAL SLURRY SEAL CIP/ IMPROVEMENTS Account #: Account #: 227.96585.750.050 Name: Name: MEASURE BBIKE /PED FUND / 15,750 ANNUAL SLURRY SEAL CIP/ ENGINEERING DESIGN Account #: Account#:227.96585.740.078 Name: Name: MEASURE BBIKE /PED FUND / 1,200 ANNUAL SLURRY SEAL CIP/ ENGINEERING DESIGN Account #: Account #:227.96585.740.701.001 REASON FOR BUDGET CHANGE ENTRY: Based on the bids received for Slurry Seal maintenance, an additional appropriation is required to complete the scheduled work. It is proposed that the additional funding of $37,345 be appropriated from Gas Tax fund (fund #206). When bids were solicited for the Annual Slurry Seal work, some of the streets contain Bike Lanes identified in the Bicycle Master Plan. The work involving striping and signing of bikes lanes consistent with the Citywide Bikeways Master Plan totals $55,397 and would be an eligible expense from the Measure B Bike/Pedestrian fund (fund #227). An additional appropriation is required. Fin Mgr/ASD: City Manager: Signature Signature As Approved at the City Council Meeting on 09/16/2008 Mayor: Posted By: Signature Signature Date: ~ ~ ~ ~'~ Date: Date: Date: ~ir~L. Z~j S RESOLUTION NO. - 08 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT N0.08-13 2008 ANNUAL SLURRY SEAL PROGRAM TO GRAHAM CONTRACTORS, INC. WHEREAS, the City of Dublin did, on August 28, 2008, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 08-13, 2008 Annual Slurry Seal Program, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the Public Works Director, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract No. 08-13 to the lowest responsible bidder therefor, to wit, Graham Contractors, Inc., at a bid of Five Hundred Forty Three Thousand, Forty Dollars and Forty-Nine Cents ($543,040.49), the particulars of which bid are on file in the Office of the Public Works Department. PASSED, APPROVED AND ADOPTED this 16th day of September, 2008, by the following vote: AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor City Clerk G: ICIPISLURRYSEALI20081RESOAWRD.doc ATTACHMENT BID RESULTS -ANNUAL SLURRY SEAL, CONTRACT NO. 08-13 BID OPENING DATE -AUGUST 28, 2008 ~ ~- -- - _ _~ ENGINEER - 'S ESTIMATE ~_~ GRAHAM CONTRACTORS AMERICA ASPHALT ~ ~ - INTERMOUNTAIN ~ ~ --- VALLEY SLURRY SEAL BID ITEM 1 _ 2 ; ITEM DESCRIPTION Street Slurry Seal Surfacing, Type II Remove Oil Deposits UNIT OF MEAS. SF SF QTY UNIT PRIC 1,599,874 $ 0.15 1,000 , $ 2.54 _ ~PRICE $ 239,981.10 $ 2,540.00 UNIT PRICE $ 0.187 $ 3.00 ~ TOTAL PRICE UNIT PRICE $ 299,176.44 $ 0.19 $ 3,000.00 $ 2.50 TOTAL PRICE $ 303,976.06 $ 2,500.00 ~UN_IT PRICE TOTAL PRICE ~ $ 0 17 ~$ 271,978.58 $ 5.50 $ 5,500.00 UNIT PRICE I TOTAL PRICE $ 0.188~$ 300,776.31 $ 1.00. $ 1,000.00 2a. Crack Sealing _ _ LS 1 $ 20,000.00 $ 20,000.00 $ 39,000.00 $ 39,000.00- ~' $-55,000.00 $ 55,000.00 $ 49,700.00 , $ 49,700.00 $ 46,988.00 $ 46,988.00 3 Pavement Failure Repair 4" _ SF _ 3,600 $ 3.17 $ 11,412.00 $ 5.45 $ 19,620.00 I $ 5.14 $ 18 504.00 $ 9 48 $ 34 128 00 $ 7 60 $ 27 360 00 4 Pavement Failure Repair 6" SF 8,200 $ 6.38 $ 52,316.00 $ 8.40 $ 68,880.00 t $ 7.87 , $ 64,534.00 . $ 9.75 , . $ 79,950.00 . $ 11.40 , . $ 93,480.00 SP 5 Remove Existing Striping/Markings LS 1 $ 87,500.00 $ 87,500.00 $ 47,000.00 $ 47,000.00 $ 46,775.00 $ 46,775.00 $ 40,500.00 $ 40,500.00 $ 43,500.00 $ 43,500.00 INSTALL: SP 6 White 12" Line, Thermo. LF 6,607 $ 3.23 $ 21,340.61 $ 2.20 $ 14,535.40 $ 2.20 $ 14,535.40 $ 2.45 $ 16,187.15 $ 2.31 ' $ 15,262.17 SP 7 Yellow 12" Line, Thermo. LF 796 $ 3.23 $ 2,571.08 $ 2.20 $ 1,751.20 ' $ 2.20 $ 1,751.20 $ 2.45 $ 1,950.20 $ 2.31 $ 1,838.76 SP 8 Detail 8, Thermoplastic LF 12,284 $ 0.70 $ 8,598.80 $ 0.50 $ 6,142.00 $ 0.50 $ 6,142.00 $ 0.60 $ 7,370.40 $ 0.52 $ 6,387.68 SP 9 Detail 10, Thermoplastic LF 24,868 $ 0.65 $ 16,164.20 $ 0,40 $ 9,947.20 $ 0.40 $ 9,947.20 $ 0.50 $ 12,434.00 $ 0.42 $ 10,444.56 SP 10 Detail 21, Thermoplastic LF 3,600 $ 0.86 $ 3,096.00 $ 0.80 $ 2,880.00 $ 0.80 $ 2,880.00 $ 0.90 $ 3,240.00 $ 0.84 ' $ 3,024.00 SP 11 SP 12 Detail 276, Thermoplastic Detail 37B, Thermoplastic ~ LF LF 10,988 1,886 $ 0.60 $ 1.62 $ 6,592.80 $ 3,055.32 $ 0.35 $ 0.60 $ 3,845.80 $ 1 131.60 $ _ 0.35 $ 0 60 $ 3,845.80 $ 1 131 60 _ $ 0.40_' $ 0 70 $ 4,395.20 $ 1 320 20 $ 0.37 $ 0 63 $ 4,065.56 $ 1 188 18 SP 13 SP 14 Detail 38, Thermoplastic Detail 38A, Thermoplastic ~ LF TLF .11,838 I. 5,366 $ _ 1.62 $ 1.34 $ 19,177.56 ,190.44 ~ $ 0.60 $ 0.50 , $ 7,102.80 $ 2,683.00 _ . $ 0.60 $ 0.50 , . $ 7,102.80 $ 2,683.00 . $ 0.70 ' $ 0.60 , . $ 8,286.60 $ 3,219.60 . $~ $ 0.52 , . $ 7,457.94 $ 2,790.32 SP 15 SP 16 Detail 39A, Thermoplastic Detail 40A LF LF 249 992 $ 0.88 $ 3.23 $ 219.12 $ 3,204.16 $ 0.45 $ 0.75 $ 112.05 $ 744.00 $ 0.45 $ 0.75 $ 112.05 $ 744.00 $ 0.50 $ 0.90 $ 124.50 $ 892.80 $ 0.47 $ 0.79 $ 117.03 $ 783.68 SP 17 Detail 41 LF 92 $ 3.23 $ 297.16 $ 2.00 $ 184.00 $ _ 2.00 $ 184.00 $ 2.20 $ 202.40 $ 2.10 $ 193.20 SP 18 "25" Le end, Thermo. EA 5 $ 80.72 $ 403.60 $ 75.00 $ 375.00 $ 75.00 $ 375.00 $ 82.50 $ 412.50 $ 78.75 $ 393.75 SP 19 "580 West Onl "Legend, Thermo. EA 1 $ 323.00 $ 323.00 $ 400.00 $ 400.00 $ 400.00 $ 400.00 $ 440.00 $ 440.00 $ 420.00 $ 420.00 SP 20 "Ahead" Legend, Thermo. EA 1 $ 108.00 $ 108.00 $ 130.00 $ 130.00 $ 130.00 $ 130.00 $ 143.00 $ 143.00 $ 136.50 , $ 136.50 SP 21 "Bike Lane" Legend, Thermo. EA 4 $ 108.00 $ 432.00 $ 160.00 $ 640.00 $ 160.00 $ 640.00 $ 176.00 $ 704.00 $ 168.00 $ 672.00 SP 23 ArroOwPTLpe I (10) Thermo. EA _ 16 $ 180.072 $ ^-1 484.32 $ 155.00 $ 2 330.00 $ 155.00 $ 2 330.00 $ 160.50 $ 2 363.00 $ 156.05 $ 2,268.00 $ 346.50 SP 24 Arrow, T pe ! (24) Thermo. EA 22 $ 161.00 $ 3,542.00 $ 55.00 $ 1,210.00 $ 55.00 $ 1,210.00 $ 60.50 $ 1,331.00 $ 57:75 $ 1,270.50 SP 25 SP 26 SP 27 SP 28 SP 29 Artow, Type III (L) Paint Arrow, Type III (R) Paint Arrow, Type III (L) Thermo. _ Arrow, Type III (R) Thermo. Arrow, Type IV (R), Thermo. EA EA EA EA EA 10 3 72 49 2 ~ $ 215.00 $ 215.00 $ 215.00 $ 215.00 $ 80.72 $ 2_,150.00 $ _ 645.00 $ 15,480.00 $ 10,535.00 $ __161.44 $ 45.00 $ 45.00 $ 75.00 $ 75.00 $ 50.00 $ 450.00 $ 135.00 $ 5,400.00 $ 3,675.00 $ 100.00 $ 45.00 $ 45.00 $ 75.00 $ 75.00 $ 50.00 $ 450.00 $ 135.00 $ 5,400.00 $ 3,675.00 $ 100.00 $ _ 49.50 $ 49.50 $ 82.50 $ 82.50 $ 55.00 $ 495.00 $ 148.50 $ 5,940.00 $ 4,042.50 $ 110.00 $ 47.25 $ 47.25 $ 78.75 $ 78.75 $ 52.50 $ 472.50 $ 141.75 $ 5,670.00 $ 3,858.75 $ 105.00 SP 30 Arrow, Type VI (10), Thermo. EA 4 $ 80.72 $ 322.88 $ 75.00 $ 300.00 $ 75.00 $ 300.00 $ 82.50 $ 330.00 $ 78.75 $ 315.00 _ TOTAL BID: - _ $541,787.59 $ 543,040,49 $ 557,653.11 $ 558,215.13 $ 582,727.64 r ~J" 2008-2009 Annual Slurry Seai Program } ~ ~~~~ OF DU~~~~ /// ~ ~\~ ~~,; ~.,, ~ 1 ~ _ ~__ - __ \~, t ~; ~ t;` "" o ti4 r: ~ . ' ~~ ~ } . , ,~ ~~ ~~~ ~ ~~ ~~ ~.o -_ _ - _ __ _ _ Y ,.~F~ 0.25 0.5 1 1.5 Miles Slurry Seal Streets Streets ~1