HomeMy WebLinkAboutItem 4.05 Dublin Blvd Resurface Accept Work CITY CLERK File # D~~~-~l5J AGENDA STATEMENT CITY COUNCil MEETING DATE: August 21, 2007 SUBJECT: Acceptance of Work - Contract 07-07, Dublin Boulevard Bridge Resurfacing at Alamo Canal Report Prepared by: Melissa Morton, Public Works Dir~ ATTACHMENTS: 1) 2) Budget Change Form Location Map RECOMMENDATION: ,--7 A ~.....l) f' It~ 2) ~ Approve a Budget Change in the amount of $ 23,400; and Accept improvements under Contract No. 07-07, Dublin Boulevard Bridge Resurfacing at Alamo Canal, and authorize the release of retention after 35 days if there are no subcontractor claims. FINANCIAL STATEMENT: This project was completed within the funds budgeted for Fiscal Year 2006-2007; however, the work extended into Fiscal Year 2007- 2008. Therefore, a budget change is required to add funds for this Capital hnprovement Program project in Fiscal Year 2007-2008 in the amount of $23,400. Estimated costs for FY 2007-2008: Salaries hnprovements $ 1,400 22,000 $23,400 The original total budget for the project was $29,009 from Gas Tax funds, of which $3,362 was expended in Fiscal Year 2006-2007. DESCRIPTION: The bridge over the Alamo Canal is located on Dublin Boulevard just west of the Civic Center, and carries six lanes of traffic, as well as pedestrians on sidewalks on both sides of the bridge. This structure is the oldest bridge in the City of Dublin, having been constructed in 1986 by the State of California Highway Department. It was widened in 2003 by adding two lanes to the existing four-lane facility. ------------------------------------------------------------------------------------------------------------- COPY TO: Bay Line Cutting and Coring, Inc. Page 1 of2 ITEM NO. 4-. 5 G:\CIP\Dublin Blvd Bridge Resurfacing\AS acceptance.doc California's Department of Transportation (Caltrans) is responsible for the inspection of all bridges in the State. The last report generated by Caltrans recommended that the Dublin Boulevard bridge deck at Alamo Canal be resurfaced with a protective chemical treatment (High Molecular Weight Methacylate Resin). The treatment will block moisture from reaching the steel reinforcing in the deck through small age cracks in the concrete surface. The bridge deck surface was last sealed in 1992. Bay Line Cutting and Coring, Inc., has now completed the sealing of the bridge deck per the project specifications and to the satisfaction ofthe Public Works Director. Staff recommends that the City Council 1) approve a budget change in the amount of $23,400; and 2) accept improvements under Contract No. 07-07, Dublin Boulevard Bridge Resurfacing at Alamo Canal, and authorize the release of retention after 35 days ifthere are no subcontractor claims. Page 2 of2 CITY OF DUBLIN BUDGET CHANGE FORM /12-- CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: x From Unappropriated Reserves (If Other than General Fund, Fund No - From New Revenues From Budgeted Contingent Reserve (10800-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: General FundEngineering - Salaries Name: Gas Tax Fund: Engineering -Salaries $1,400 $1,400 Account#: 001-90300-701-001 Name: Account #: 2006-96022-701-001 Name: Account #: Name: Account #: Name: Gas Tax: Dublin Blvd. Bridge Resurfacing @ Alamo Canal Project - Improvements $22,000 Account #: Name: Account #: 206-96022-750-050 Name: Account #: Name: Account #: Name: Account #: Account #: ASD/Fin Mgr a~~Q fJ Signature Date: ~ REASON FOR BUDGET CHANGE ENTRY: The Dublin Blvd Bridge Resurfacing at Alamo Creek (Project 96022) was anticipated to be completed in Fiscal Year 2006/07. The project carried over into Fiscal Year 2007- 2008. An appropriation is required for the portion of the work completed in 2007-2008. The first entry accounts for Staff time that was not allocated to the project in Fiscal Year 2007-2008. Therefore, General Fund Staffing in Engineering is reduced and fully offset by Gas Tax Funds for Staffing costs in the project. The second entry accounts for Contract hnprovement costs that will be incurred in Fiscal Year 2007/08. City Manager: ~~'~~(-J .. " SIgnature Date: g (\ '3 I iJ 7 As approved at the City Council Meeting on: Date: Mayor: Date: Signature Posted By: Date: Signature IrrtcWiT1JU7! H:\CC-FORMS\FORM-budget change. doc '0 L- eo > (]J ::J o CO c .- ..a ::J o a; .21 o o LO l/) (ij ::J CT OJ .c <J .5 00; o~ o .,.; o o Ln o Ln N o ~ ~ Z o ~ E--t ~ U o ~. ~ c.:J o PZ aq